Report to the Board of Supervisors
Prepared by the Maricopa County Planning and Development Department
Board Hearing Date: April 21, 2021
Case #/Title: Z2020075 – Sun Streams Expansion Solar Project
Supervisor Districts: 4 & 5
Applicant/Owner: Sun Streams Expansion, LLC / Arizona State Land Department,
West Valley I, II, III & IV LTD Partnership
Request: Zone Change from Rural-43 to IND-2 IUPD
Site Location: Generally located between the 323rd Ave. alignment to the
east, 351st Ave. to the west, Union Pacific Railroad to the
south, Southern Avenue to the north
Site Size: Approx. 3,221 acres
County Island Status: No
Additional
Comments: The applicant seeks a Zone Change from Rural-43 to IND-2
IUPD for the development of a utility-scale solar development
that will generate approximately 385 megawatts (MWs) of
electricity along with battery storage. Comments were
received by ADOT ROW Project Management, City of
Buckeye and SHPO stating no concerns with the proposal.
Staff received five (5) letters of support stressing the economic
benefits of the proposal. Staff also received eight (8) letters
of opposition from the bird-watching community including
from individuals from the Maricopa Audubon Society (MAS).
According to the Maricopa Audubon Society, this site is the
nesting site of the Le Conte’s Thrasher, among other species,
and is a known bird-watching site. The applicant is leaving
approx. 1,260 (over 1/3rd of the site) acres of land
undeveloped in order to protect existing vegetation and bird
habitats. MAS produced a study that produced additional
recommendations to protect the bird habitat. As a result of
this study, the applicant consulted with MAS and staff as part
of a robust public outreach program to propose additional
protective measures such as a biologist to review bird-nesting
sites. Ultimately, while MAS wanted additional conditions, a
representative from the organization spoke in support of the
proposal.
April 21, 2021
Z2020075
Page 1 of 6

Since the publishing of the staff report for the above case, the
applicant presented additional conditions of approval the
Commission voted to include these conditions in their
recommendation to the Board. The conditions address
concerns related to bird habitats.
Shown below are the additional conditions in leg-edit format
with new language underlined and bolded.
j. Prior to commencement of construction, a qualified biologist will delineate a
suitable nesting habitat for LeConte’s and Bendire’s Thrashers.
k. All costs or expenses associated with the biologist and their work in association
with the development shall be borne by the property developer.
l. The property developer shall submit a letter from AFGD approving the credentials
of the selected biologist.
m. Construction will be phased so that ground-disturbing activities in a suitable
nesting habitat for LeConte’s and Bendire’s Thrashers will be conducted outside of
the breeding season for LeConte’s and Bendire’s Thrashers (defined as January
through June) to the greatest extent practicable.
n. If ground-disturbing activities in a suitable nesting habitat for LeConte’s and
Bendire’s Thrashers must be conducted during the breeding season (defined as
January through June), a preconstruction survey to identify active nests would be
performed by a qualified biologist prior to the commencement of ground-
disturbing activities.
o. If active LeConte’s or Bendire’s Thrashers nests are found during pre-construction
surveys or during construction, a spatial buffer would be established around the
nest and monitored by the qualified biologist. Ground-disturbing activities within
the buffer would be postponed until the qualified biologist confirms that the nest is
no longer active.
p. Written documentation of the biologist’s findings regarding active nests shall be
provided in writing to and for acceptance by the Zoning Inspector or his or her
designee prior to initiating construction activity.
Commission
Recommendation: On 3/25/21, the Commission voted 9-0 to recommend
approval of Z2020075 subject to conditions ‘a’ – ‘p’:
a. Development of the site shall be in substantial conformance with the Site Plan
entitled “Sun Streams Solar Expansion“, consisting of 20 full-size sheets, dated
March 3, 2021, and stamped received March 3, 2021, except as modified by the
following conditions.
b. Development of the site shall be in substantial conformance with the Narrative
Report entitled “Sun Streams Expansion Solar Project”, consisting of 22 pages,
April 21, 2021
Z2020075
Page 2 of 6

dated February 26, 2021, and stamped received March 1, 2021 except as
modified by the following conditions.
c. Subject to the discretion of the Zoning Administrator or their designee, alterations
of a substantial nature to the conservation area provided in Figure 3 on page 22
of the Narrative Report entitled “Sun Streams Expansion Solar Project” shall be
grounds for requiring a Zone Change Major Amendment.
d. The following Planning Engineering conditions shall apply:
1. Final design of drainage infrastructure shall be based on Rational Method
calculations, except in situations where drainage areas significantly exceed
160 acres.
2. Drainage Waiver case DRB2021002 must be approved prior to issuance of
building permits.
3. Detailed Grading and Drainage Plans showing the new site improvements
must be submitted for the acquisition of building permits. On-site (solar field)
areas must be designed in such a manner so that flows area directed to
retention basin(s). Basin bleed-offs and overflows must be directed to well
defined drainage corridors, to the maximum extent possible.
4. Drainage review of planning and/or zoning cases is for conceptual design only
and does not represent final design approval nor shall it entitle applicants to
future designs that are not in conformance with Section 1205 of the Maricopa
County Zoning Ordinance and the Maricopa County Drainage Policies and
Standards. All development and engineering design shall be in conformance
with Section 1205 of the Maricopa County Zoning Ordinance and current
engineering policies, standards and best practices at the time of application
for construction.
5. Owner or owner’s agent shall be responsible for identifying and procuring any
permit(s) for disturbance of, or work within delineated jurisdictional (404)
washes.
6. Any work within a regulated SFHA (floodplain) will require as Floodplain Use
Permit (issued concurrent with the required building permit(s) for the site
improvements).
7. Pads for inverters and other electrical equipment; and any buildings within the
Zone A or AE Floodplain must be elevated to the regulatory flood elevation or
otherwise designed to meet the requirements of the Floodplain Use
Regulations. All development and engineering design shall be in conformance
with the most current version of the Floodplain Use Regulations for Maricopa
County.
8. The following right-of-way preservations shall be required and shown on the
plans submitted for building permits:
Required Preservation:
April 21, 2021
Z2020075
Page 3 of 6

a. 65’ half width, 130’ full width right-of-way for Salome Highway
b. 65’ half width, 130’ full width right-of-way for 331st Avenue
c. 55’ half width, 110’ full width right-of-way for Dobbins Road
d. 65’ half width, 130’ full width right-of-way for Baseline Road (east of Salome
Highway)
e. 65’ half width, 130’ full width right-of-way for 339th Avenue (north of Salome
Highway)
f. 100’ half width right-of-way for Southern Avenue
g. 30’ half width right-of-way for 339th Avenue (between Baseline and Dobbins
Road)
h. 40’ half width right-of-way for 335th Avenue (between Dobbins and South
Mountain, and Vineyard and Southern)
i. 40’ half width right-of-way for South Mountain Avenue
j. 40’ half width right-of-way for Vineyard Road
k. 55’ half width right-of-way for Elliot Road
l. 55’ half width right-of-way for Baseline Road (west of Salome Highway)
m. 55’ half width right-of-way for 347th Avenue (section line alignment)
e. The following IND-2 IUPD Zoning District standards shall apply:
1. Min. Front Yard – 25’except as shown on sheet C1.2 of the Site Plan
2. Min. Side Yard – 0’except as shown on sheet C1.2 of the Site Plan
3. Min. Rear Yard – 0’ except as shown on sheet C1.2 of the Site Plan
4. Max. Lot Coverage – 60%; Solar panels shall not be counted as lot coverage
5. Parking Spaces Required – None required
6. Loading and Unloading Spaces Required – None required
7. Landscaping – No landscaping areas required
8. Sight Visibility Triangles – No sight visibility triangles are required at driveways,
mid-section lines intersecting alignments, section line intersecting alignments
9. Article 902.91 – All utility uses shall be permitted to be conducted outdoors
10. Site Enclosure and Screening – Chain-link fencing including 1’ of barbed wire
permitted; Slatted chain-link fencing required in all areas abutting subdivided
parcels in accordance with sheet C1.2 of the Site Plan
f. The IND-2 IUPD shall limit the use of the site exclusively to public utility treatment
and generating plants including sewage, wastewater, power, electrical, nuclear
and solar, and including ancillary offices. Attendant facilities and appurtenances
to the above uses as well as uses associated with service to the public of water,
gas, telephone and cable television. Where an electrical generating plant is in
operation, evaporation ponds and other appurtenances may be permitted
provided such evaporation ponds or appurtenances are associated with the
facility being served. All other site uses shall require a Zone Change Major
Amendment.
g. Noncompliance with any Maricopa County Regulation shall be grounds for
initiating a revocation of this Zone Change as set forth in the Maricopa County
Zoning Ordinance.
April 21, 2021
Z2020075
Page 4 of 6

h. The property owner/s and their successors waive claim for diminution in value if
the County takes action to rescind approval due to noncompliance with
conditions.
i. The granting of this change in use of the property has been at the request of the
applicant, with the consent of the landowner. The granting of this approval allows
the property to enjoy uses in excess of those permitted by the zoning existing on
the date of application, subject to conditions. In the event of the failure to comply
with any condition, and at the time of expiration of the Zone Change, the property
shall revert to the zoning that existed on the date of application. It is, therefore,
stipulated and agreed that either revocation due to the failure to comply with any
conditions, or the expiration of the Zone Change, does not reduce any rights that
existed on the date of application to use, divide, sell or possess the property and
that there would be no diminution in value of the property from the value it held
on the date of application due to such revocation or expiration of the Special Use
Permit. The Zone Change enhances the value of the property above its value as
of the date the Zone Change is granted and reverting to the prior zoning results in
the same value of the property as if the Zone Change had never been granted.
j. Prior to commencement of construction, a qualified biologist will delineate a
suitable nesting habitat for LeConte’s and Bendire’s Thrashers.
k. All costs or expenses associated with the biologist and their work in association
with the development shall be borne by the property developer.
l. The property developer shall submit a letter from AFGD approving the credentials
of the selected biologist.
m. Construction will be phased so that ground-disturbing activities in a suitable
nesting habitat for LeConte’s and Bendire’s Thrashers will be conducted outside
of the breeding season for LeConte’s and Bendire’s Thrashers (defined as January
through June) to the greatest extent practicable.
n. If ground-disturbing activities in a suitable nesting habitat for LeConte’s and
Bendire’s Thrashers must be conducted during the breeding season (defined as
January through June), a preconstruction survey to identify active nests would be
performed by a qualified biologist prior to the commencement of ground-
disturbing activities.
o. If active LeConte’s or Bendire’s Thrashers nests are found during pre-construction
surveys or during construction, a spatial buffer would be established around the
nest and monitored by the qualified biologist. Ground-disturbing activities within
the buffer would be postponed until the qualified biologist confirms that the nest
is no longer active.
p. Written documentation of the biologist’s findings regarding active nests shall be
provided in writing to and for acceptance by the Zoning Inspector or his or her
designee prior to initiating construction activity.
April 21, 2021
Z2020075
Page 5 of 6

Presented by: Adam Cannon, Planner
Reviewed by: Darren Gerard, AICP, Planning Manager
Attachments: 3/25/21 P&Z Packet (124 pages)
3/25/21 P&Z Handout (8 pages)
Note: 3/25/21 Draft P&Z Minutes are not available as of the writing of this report, but can
be provided upon request later when available.
April 21, 2021
Z2020075
Page 6 of 6

Report to the Planning and Zoning Commission
Prepared by the Maricopa County Planning and Development Department
Case: Z2020075 – Sun Streams Expansion Solar Project
Hearing Date: March 25, 2021
Supervisor Districts: 4 & 5
Applicant: Sun Streams Expansion, LLC
Owners: Arizona State Land Department, West Valley I, II, III & IV LTD
Partnership
Request: Zone Change from Rural-43 to IND-2 IUPD
Site Location: Generally located between the 323rd Ave. alignment to the east,
351st Ave. to the west, Union Pacific Railroad to the south, Southern
Avenue to the north
Site Size: Approx. 3,221 acres
Density: N/A
County Island: No
County Plans: Tonopah Arlington Area Plan & Old U.S. Highway 80 Area Plan –
Utilities
Municipal Plan: N/A
Municipal Comments: City of Buckeye – No Concerns
Support/Opposition: 5 support letters received/8 opposition letters received
Recommendation: Approve with conditions
Z2020075
Page 1 of 12

Project Summary:
1. Sun Streams Expansion LLC is requesting a Zone Change from Rural-43 to IND-2 IUPD with
a Plan of Development for a utility-scale solar development project generating
approximately 385 megawatts (MWs) of electricity along with battery storage. The
subject property is designated as a Utilities land use in the Tonopah-Arlington Area Plan
and Old U.S. Highway 80 Area Plan following a Major Comprehensive Plan Amendment
approved by the Board of Supervisors on December 9, 2020.
2. The site is comprised of approximately 2,597 acres of contiguous ASLD land. The
remainder of the site is comprised of six (6) private contiguous parcels comprising
approximately 624 acres. Most properties in the immediate vicinity of the project are
privately owned.
3. Nearly all land used for solar energy projects like this are developed for the large fields
of solar collectors that capture the energy through photovoltaic technology. The
subject site is relatively flat and allows for the development of solar energy with little or
no additional grading. Washes are present on site and the applicant has committed to
avoiding washes to the extent possible in conjunction with agency comments. In
addition, the general area contains significant local electrical infrastructure including
power generation facilities (nuclear, gas, and solar), transmission lines, substations, and
switchyards.
4. According to the applicant’s narrative, the applicant is leaving approx. 1,260 acres of
land undeveloped in order to protect existing vegetation and bird habitats. According
to the Maricopa Audubon Society, this site is the nesting site of the Le Conte’s Thrasher
and is a known bird-watching site.
5. The subject site is currently zoned Rural-43. The applicant is requesting to change the
zone to IND-2 IUPD. The base IND-2 zone and requested zoning standards for the IND-2
IUPD district are listed below:
BASE ZONING DISTRICT PROPOSED ZONING REGULATIONS
REGULATION
REGULATIONS (IND-2) (IND-2 IUPD)
Max. Height 40’ 40’
25’ except where shown on the
IUPD setback sheet in the site
Min. Front Yard 10’ – 25’ plan (sheet C1.2), where a Min.
100’ setback is used in
identified locations
0’ except where shown on the
Min. Side Yard 3’ - 10’ IUPD setback sheet in the site
plan (sheet C1.2)
0’ except where shown on the
Min. Rear Yard 25’ IUPD setback sheet in the site
plan (sheet C1.2)
Min. Lot Area 6,000 sq. ft. 6,000 sq. ft.
Min. Lot Width 60’ 60’
60%; Solar panels not counted as
Max. Lot Coverage 60%
lot coverage
Z2020075
Page 2 of 12

Parking Spaces
1 per 250 sq. ft. of floor area None required
Required
Article 1103.2 one loading and
unloading space for each
Loading and 10,000 square feet of floor
None Required
Unloading area, or fraction thereof,
devoted to such use in the
building
Article 901.4.1: All properties
Landscaping requirements within
abutting a public street shall
the front yard setback not
have an open setback area
Landscaping required with enhanced setbacks
which shall be landscaped
and open corridors (as shown on
extending for the full width of
sheet C1.2)
the property
No sight triangle limitations at all
Sight Visibility driveways, section line and mid-
Required
Triangles section line intersecting
alignments
All uses except for parking, A waiver from Article 902.9.1 as
loading, unloading or storage applied to solar arrays; they will
Article 902.9.1
shall be conducted within a not be located inside enclosed
completely enclosed building buildings
Chain-link fencing, including one
foot of barbed wire topping, and
gates shall be allowed on the
perimeter of the Project. In areas
6’ CMU wall adjacent to rural where the site abuts developed
Site Enclosure & and residential zoning subdivided parcels (as shown on
Screening boundaries and for outdoor use the IUPD setback sheet in the
of an industrial nature site plan), slats will be added to
the perimeter fence to provide
visual screening as shown on
fencing detail sheet (sheet C5.4)
in the site plan.
6. It should be noted that since the applicant is proposing a site plan (required plan of
development, POD) and although the zone change is a legislative approval, the POD is
administratively approved. Therefore, POD approval is contingent upon prior rezoning
approval.
7. The applicant is requesting to vary setbacks (front, rear and side), lot coverage, parking
spaces required, loading and unloading spaces required, landscaping, sight visibility
triangles, site enclosure, screening and sign standards. The proposed standards are
consistent with other utility-scale solar installations in the County.
Z2020075
Page 3 of 12

8. In order to accommodate nearby residential properties and existing vegetation, the
applicant has agreed to provide a 100’ setback at locations where the site abuts
residential properties while requesting a 25’ setback at locations less proximate to
residential properties. Likewise, the applicant is requesting to vary the rear and side
setbacks to 0’. These setbacks are identified as an exhibit in the applicant’s site plan
(Sheet C1.2). Additionally, the applicant is requesting that lot coverage does not include
the solar panels as the panels are not considered permanent structures or buildings.
9. The applicant is requesting to waive landscaping in order to preserve existing
landscaping (natural desert vegetation). It is important to note that over 1/3 of the site
will be left undisturbed. For screening, the applicant has proposed chain-link with 1’ of
barbed wire fencing in lieu of a 6’ CMU wall abutting rural or residential zoning. In areas
where the site abuts residential properties, the applicant has proposed a more
appropriate screen of slatted chain-link fencing. Additionally, the applicant is requesting
that site uses be permitted outside of an enclosed building as the nature of the use (solar
panels) requires the use to be conducted outdoors to generate energy.
10. The applicant is also requesting to vary required site visibility triangles at all driveways and
intersecting alignments. The MCZO specifies that 25’x25’ sight visibility triangles are to be
provided at the property line where all access points are present and at the corner of
properties with an intersection. Sight visibility triangles are unnecessary at alignments
internal to the site. Additionally, proposed fencing at the intersecting alignments and
driveways will not include slats and thus visibility will not be obstructed. Also, the applicant
requested that there be no parking or loading spaces as no regularly occupied buildings
will be placed on site.
Exhibit 1 – 2020 Aerial Map
Z2020075
Page 4 of 12

Exhibit 2 – Rural-43 Zoning District and Surrounding Zoning Districts
Exhibit 3 – Site Plan Excerpt
Z2020075
Page 5 of 12

Exhibit 4 – Conservation Area Exhibit
Existing On-Site and Adjacent Zoning / Land Use:
11. On-site: Rural-43 / Vacant/Agricultural
North: Rural-43 / Vacant/Agricultural with Scattered Rural Residential
South: Rural-43 / Vacant/Agricultural
East: Rural-43 / Vacant/Agricultural with Scattered Rural Residential
West: Rural-43 / Vacant/Agricultural with Scattered Rural Residential
Utilities and Services:
12. Water: Private Well
Wastewater: Septic
School Districts: Arlington Valley Elementary School District #47
Buckeye Union High School District #1
Saddle Mountain Unified School District #90
Fire: Arizona Fire & Medical Association
Police: MCSO
Z2020075
Page 6 of 12

Right-of-Way:
13. The following table includes existing and proposed half-width right-of-way and the future
classification based upon the Maricopa County Department of Transportation (MCDOT)
Major Streets and Routes Plan.
Street Name Existing R/W Proposed R/W Future Classification*
Salome Hwy 80’ (full) 130’ Minor Arterial
Baseline Rd. 0’ - 65’ (half) 130’ Minor Arterial
Southern Ave. None Existing 100’(half) Minor Collector
Dobbins Rd. 80’ (full) 110’ Minor Arterial
331st Ave. 0’ - 55’ (half) 130’ Minor Arterial
339th Ave. 0’ – 65’ (half) 130’ Minor Arterial
347th Ave. 0’ – 55’ (half) 55’(half) Minor Arterial
South Mountain Ave. 0’ – 40’ (half) 40’ (half) Minor Arterial
Vineyard Rd. 0’ – 40’ (half) 40’ (half) Minor Arterial
Elliot Rd. 0’ – 55’ (half) 55’ (half) Minor Arterial
Adopted Plans:
14. Old U.S. Highway 80 Area Plan & Tonopah/Arlington Area Plan: The ASLD land is
designated and six privately-owned parcels are designated as Utilities. The Utilities
designation is for electric generating plants, water, and wastewater treatment facilities,
associated offices and accessory equipment. Under a Utilities designation, the
appropriate zoning district is IND-2.
Public Participation Summary:
15. The applicant complied with the Maricopa County Citizen Review Process with the
required posting of the site and notification by first class mail to adjacent property owners
within 300’ of the subject parcel and interested parties. The applicant submitted a Public
Participation Results Report.
16. According to the Public Participation Results Report, the applicant received 29 inquiries
from residents and interested parties about the proposed zone change. A majority of
the inquiries were job opportunity requests and concerns related to a Le Conte’s Thrasher
bird-watching site. Other inquiries included general information requests and a request
to do business with the applicant.
17. The applicant conducted a virtual open house meeting on September 10, 2020 that took
place just prior to the submittal of the zone change application and during the
applicant’s major comprehensive plan amendment application. There were 19 citizen
attendees not including staff of the applicant. The applicant received general questions
related to project lifespan/decommissioning, property values, wildlife/pests, project
fencing, heat increase and road use/repair. Additionally, the applicant included a
summary of their citizen contacts from the meeting and the manner in which they
responded to those questions.
18. A significant amount of outreach was conducted with the Arizona Game and Fish
Department, National Audubon, local Audubon and concerned individuals regarding a
bird watching area for the Le Conte’s Thrasher species. Based upon this outreach, the
Z2020075
Page 7 of 12

applicant made significant changes to their Plan of Development and will be leaving
approx. 1,260 acres of land undeveloped to preserve the habitat of the Thrasher and the
bird-watching area.
19. County Staff received five (5) support letters. The first letter was from a law firm
representing the owners of the privately owned parcels that comprise 624 acres of the
subject site. The support letter suggested that the project would result in increased
property tax revenue, construction jobs and would provide emission-free energy to the
state. The second letter was from Deanna K. Kupcik, President/CEO of the Buckeye
Valley Chamber of Commerce. The letter noted that the “economic and social benefits
of this project outweigh any perceived impacts”. The three other support letters from
Blount, McCarthy Building Companies and Nuclear Vision LLC expressed their support for
the solar development and the potential jobs/economic benefits the development
could provide.
20. Staff received eight (8) opposition letters related to a bird habitat and bird watching spot
located interior to the subject property. Some of these letters were submitted during the
finalization of the CPA process; however, we believe that they were intended for the
Zone Change case. A significant amount of outreach was conducted with the Arizona
Game and Fish Department, National Audubon Society, Southwest Audubon Society
and Maricopa Audubon Society and concerned individuals regarding a bird watching
area for the Le Conte’s Thrasher species. The applicant conducted a web meeting with
Arizona Game and Fish. Arizona Game and Fish did not comment on the proposed zone
change. Based upon this outreach, the applicant made significant changes to their Plan
of Development and will be leaving approx. 1,260 acres of land undeveloped to preserve
the habitat of the Thrasher and the bird-watching area. The applicant met on site with
Mr. Mark Horlings (opposed). Mr. Horlings submitted a report to Staff prepared by James
Holderer and Micah Reigner of the Maricopa Audubon Society about the bird habitat.
The report summarizes the various species in the area and lists technical
recommendations. The report has been included as an attachment to this Staff report.
Outstanding Concerns from Reviewing Agencies:
21. N/A
Staff Analysis:
22. The state and Maricopa County recognize the potential environmental and economic
benefits that solar technology can provide. The Sun Streams Expansion Solar Project will
use photovoltaic technology that generates energy from sun absorption. Photovoltaic
technology differs from other models of solar electric generation that require vast
amounts of water to cool the units. In contrast, very little water is utilized for photovoltaic
technology. As a result, this development would not pose a threat to groundwater
depletion.
23. Staff believes the proposed solar facility is well suited to this rural area, which requires
large amounts of relatively flat land. The majority of the land is flat. Staff agrees with the
applicant that the subject site is suitable due to proximity to electrical transmission lines,
nearby stations and substations, and because the surrounding area is vastly
Z2020075
Page 8 of 12

undeveloped. Staff agrees with the applicant that the project will not detrimentally
affect the visual quality of the area.
24. The applicant has demonstrated a commitment to preservation by dedicating over 1/3
(approx. 1,260 acres) of the 3,221 acre property to protect the bird habitat, bird watching
area and natural drainage ways. The applicant received comments from SHPO
indicating that there are “no historic properties affected” on the site following a survey
submitted by the applicant.
25. The development of solar energy over the past several years in Maricopa County
reinforces the County’s interest in promoting the County as an economic leader for solar
development. Staff believes the Sun Streams Expansion Solar Project would add to this
effort in a positive way by providing the potential for 800 temporary construction and
operation/maintenance jobs. There will also be a small number of long-term
employment opportunities for County residents.
Recommendation:
26. For the reasons outlined in this report, staff recommends the Commission motion for
Approval, subject to conditions ‘a’ – ‘i’.
a. Development of the site shall be in substantial conformance with the Site Plan
entitled “Sun Streams Solar Expansion“, consisting of 20 full-size sheets, dated
March 3, 2021, and stamped received March 3, 2021, except as modified by the
following conditions.
b. Development of the site shall be in substantial conformance with the Narrative
Report entitled “Sun Streams Expansion Solar Project”, consisting of 22 pages,
dated February 26, 2021, and stamped received March 1, 2021 except as
modified by the following conditions.
c. Subject to the discretion of the Zoning Administrator or their designee, alterations
of a substantial nature to the conservation area provided in Figure 3 on page 22
of the Narrative Report entitled “Sun Streams Expansion Solar Project” shall be
grounds for requiring a Zone Change Major Amendment.
d. The following Planning Engineering conditions shall apply:
1. Final design of drainage infrastructure shall be based on Rational Method
calculations, except in situations where drainage areas significantly exceed
160 acres.
2. Drainage Waiver case DRB2021002 must be approved prior to issuance of
building permits.
3. Detailed Grading and Drainage Plans showing the new site improvements
must be submitted for the acquisition of building permits. On-site (solar field)
areas must be designed in such a manner so that flows area directed to
retention basin(s). Basin bleed-offs and overflows must be directed to well
defined drainage corridors, to the maximum extent possible.
Z2020075
Page 9 of 12

4. Drainage review of planning and/or zoning cases is for conceptual design only
and does not represent final design approval nor shall it entitle applicants to
future designs that are not in conformance with Section 1205 of the Maricopa
County Zoning Ordinance and the Maricopa County Drainage Policies and
Standards. All development and engineering design shall be in conformance
with Section 1205 of the Maricopa County Zoning Ordinance and current
engineering policies, standards and best practices at the time of application
for construction.
5. Owner or owner’s agent shall be responsible for identifying and procuring any
permit(s) for disturbance of, or work within delineated jurisdictional (404)
washes.
6. Any work within a regulated SFHA (floodplain) will require as Floodplain Use
Permit (issued concurrent with the required building permit(s) for the site
improvements).
7. Pads for inverters and other electrical equipment; and any buildings within the
Zone A or AE Floodplain must be elevated to the regulatory flood elevation or
otherwise designed to meet the requirements of the Floodplain Use
Regulations. All development and engineering design shall be in conformance
with the most current version of the Floodplain Use Regulations for Maricopa
County.
8. The following right-of-way preservations shall be required and shown on the
plans submitted for building permits:
Required Preservation:
a. 65’ half width, 130’ full width right-of-way for Salome Highway
b. 65’ half width, 130’ full width right-of-way for 331st Avenue
c. 55’ half width, 110’ full width right-of-way for Dobbins Road
d. 65’ half width, 130’ full width right-of-way for Baseline Road (east of Salome
Highway)
e. 65’ half width, 130’ full width right-of-way for 339th Avenue (north of Salome
Highway)
f. 100’ half width right-of-way for Southern Avenue
g. 30’ half width right-of-way for 339th Avenue (between Baseline and Dobbins
Road)
h. 40’ half width right-of-way for 335th Avenue (between Dobbins and South
Mountain, and Vineyard and Southern)
i. 40’ half width right-of-way for South Mountain Avenue
j. 40’ half width right-of-way for Vineyard Road
k. 55’ half width right-of-way for Elliot Road
l. 55’ half width right-of-way for Baseline Road (west of Salome Highway)
m. 55’ half width right-of-way for 347th Avenue (section line alignment)
e. The following IND-2 IUPD Zoning District standards shall apply:
Z2020075
Page 10 of 12

1. Min. Front Yard – 25’except as shown on sheet C1.2 of the Site Plan
2. Min. Side Yard – 0’except as shown on sheet C1.2 of the Site Plan
3. Min. Rear Yard – 0’ except as shown on sheet C1.2 of the Site Plan
4. Max. Lot Coverage – 60%; Solar panels shall not be counted as lot coverage
5. Parking Spaces Required – None required
6. Loading and Unloading Spaces Required – None required
7. Landscaping – No landscaping areas required
8. Sight Visibility Triangles – No sight visibility triangles are required at driveways,
mid-section lines intersecting alignments, section line intersecting alignments
9. Article 902.91 – All utility uses shall be permitted to be conducted outdoors
10. Site Enclosure and Screening – Chain-link fencing including 1’ of barbed wire
permitted; Slatted chain-link fencing required in all areas abutting subdivided
parcels in accordance with sheet C1.2 of the Site Plan
f. The IND-2 IUPD shall limit the use of the site exclusively to public utility treatment
and generating plants including sewage, wastewater, power, electrical, nuclear
and solar, and including ancillary offices. Attendant facilities and appurtenances
to the above uses as well as uses associated with service to the public of water,
gas, telephone and cable television. Where an electrical generating plant is in
operation, evaporation ponds and other appurtenances may be permitted
provided such evaporation ponds or appurtenances are associated with the
facility being served. All other site uses shall require a Zone Change Major
Amendment.
g. Noncompliance with any Maricopa County Regulation shall be grounds for
initiating a revocation of this Zone Change as set forth in the Maricopa County
Zoning Ordinance.
h. The property owner/s and their successors waive claim for diminution in value if
the County takes action to rescind approval due to noncompliance with
conditions.
i. The granting of this change in use of the property has been at the request of the
applicant, with the consent of the landowner. The granting of this approval allows
the property to enjoy uses in excess of those permitted by the zoning existing on
the date of application, subject to conditions. In the event of the failure to comply
with any condition, and at the time of expiration of the Zone Change, the property
shall revert to the zoning that existed on the date of application. It is, therefore,
stipulated and agreed that either revocation due to the failure to comply with any
conditions, or the expiration of the Zone Change, does not reduce any rights that
existed on the date of application to use, divide, sell or possess the property and
that there would be no diminution in value of the property from the value it held
on the date of application due to such revocation or expiration of the Special Use
Permit. The Zone Change enhances the value of the property above its value as
of the date the Zone Change is granted and reverting to the prior zoning results in
the same value of the property as if the Zone Change had never been granted.
Z2020075
Page 11 of 12

Presented by: Adam Cannon, Planner
Reviewed by: Matthew Holm, AICP, Planning Supervisor
Attachments: Case Map (1 page)
Site Plan (reduced 8.5”x11”, 20 pages)
Narrative Report (22 pages)
Engineering Comments (2 pages)
MCESD comments (1 page)
City of Buckeye Comments (2 pages)
ADOT ROW Project Management Comments (2 pages)
SHPO Comments (1 page)
Support Correspondence (6 pages)
Opposition - Maricopa Audubon Society Report (44 pages)
Opposition Correspondence (11 pages)
Z2020075
Page 12 of 12

MARICOPA COUNTY
Application Name: Sun Streams Solar Expansion
Legal Description
, TT1N RR5W 32, TT1N RR5W 33, TT1N RR5W 34, TT1S RR5W 04, TT1S RR5W 08, TT1S RR5W 09, TT1S RR5W 18
Applicant Applicant Phone/Email
RANDY SCHROEDER for ENVALUE 303.819.3313 RSCHROEDER@ENVALUE.US Z2020075
Case Address Parcel Primary: 401-42-IPR
33102 W BASELINE Rd
TONOPAH AZ 85354 401-42-030B, 401-42-030C, 401-42-030D+
Generated March 5, 2021 17:48 PM Gross Acres: 3221 approx. Map scale 1:45,742
Supervisor District No. 4
ZONE CHANGE FROM RURAL ZONING (RU-43) TO INDUSTRIAL WITH AN INDUSTRIAL UNIT PLAN OF
DEVELOPMENT (IND-2 IUPD)
Maricopa County Planning & Development - Phoenix, AZ /

602.368.2436
F: / www.hilgartwilson.com
602.490.0535
P:
250
STE.
AVE., 85016
AZ
HIGHLAND PHOENIX,
E.
2141

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

R
R
APN TP
APN 504-33-030Z APN 504-33-144A
504-33-034E APN 504-32-327 APN 504-32-328
APN 504-33-100 APN APN 504-33-030C APN APN 504-33-030F APN
504-33-130 504-33-030K 504-32-037J APN 504-32-043 APN 504-32-042T BUREAU OF LAND MANAGEMENT
APN 504-32-025E APN 504-32-025B UN-ASSESSED STATE OF ARIZONA
R
APN TP
504-34-015B
APN 504-34-021C
APN
504-35-036B
APN 504-34-021A G
APN
APN 504-35-036A
504-34-022 APN 504-35-002
APN
504-35-035B
APN
504-34-019
APN
504-35-035A
APN
APN 504-35-034A
504-34-006V
APN APN
504-35-001M 504-35-034D
APN 504-34-006D APN
504-35-033
APN 504-35-003
APN APN
504-34-006G APN 504-35-019
504-35-001W
APN
APN 504-35-020
APN APN 504-35-022
APN 504-35-026
504-34-006Y 504-35-030 APN 504-35-007 APN 504-35-008 APN APN APN APN
APN APN APN 504-35-032B 504-35-031 504-35-014 504-35-013 APN
504-35-027 504-35-028 504-35-009 504-35-021
R R R R R R R R
APN
504-34-006X
APN
504-34-036
APN
504-34-027B
APN 504-34-027D
APN ARV
504-34-028
APN
504-34-006S
APN
504-34-006F
APN
504-34-008
401-42-629B APN APN APN APN APN APN APN APN 401-42-009 APN 401-42-004
401-42-010E 401-42-010F 401-42-006E 401-42-006F 401-42-006H 401-42-006J
TP
ARV
APN 401-42-619A
NOT A PART
401-30-012B
APN 401-42-619B
APN
TP TP
APN FO
401-42-008H
APN
401-42-008K
401-30-015C
APN
401-42-008E
APN 401-42-008G APN
APN
401-42-008F
AC
R
APN
401-42-005L
APN
401-42-005R
APN
401-94-019
APN
401-94-018
APN
401-94-005U
APN
401-42-690E
APN
401-42-690D
APN
401-42-690B
APN 401-42-669 APN 401-42-668C APN 401-42-670A APN 401-42-671C APN 401-42-673A APN 401-42-975F APN 401-42-976F APN 401-42-976E APN 401-42-005Y APN 401-42-691 APN
401-42-690C
APN
401-30-004E
APN
401-30-005M
R
G
T
T
G
AC
AC
401-42-4028E T
G
APN T
G
TG
T
401-42-028F GT
APN
GT
GT
T
G
GT
G
GT R T
T G
GT
G T
APN 401-42-478B T
GT
TG
APN 401-42-491 TT
G
AC T G X
R X
T
GT
Contact Arizona 811 at least two full
G
working days before you begin excavation
G
T T
T G R
STATE OF ARIZONA
UNSUBDIVIDED
G
CALL 811 or click Arizona811.COM
T
G
T
G
STATE OF ARIZONA
UNSUBDIVIDED
R
AC
X
R
AC

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SALOME
CO. SOUTHERN
HWY
RAILROAD
PACIFIC
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SUN STREAMS
EXPANSION SOLAR
ENERGY PROJECT
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SUN STREAMS EXPANSION SOLAR PROJECT
NARRATIVE REPORT
Case # Z2020075
Vicinity of W. Salome Hwy / Baseline Rd. 2 miles north of Arlington
Submitted by:
Sun Streams Expansion, LLC
Contact: Louis De Rosa
833-367-7890
SunStreamsExpansion@firstsolar.com
Submitted to:
Maricopa County
Planning and Development Department
September 2020
Revised: February 4, 2021
Revised: February 26, 2021

TABLE OF CONTENTS
1.0 INTRODUCTION ......................................................................................................................................... 1
1.1 PROJECT NAME ............................................................................................................................................ 1
1.2 THE APPLICANT ............................................................................................................................................ 1
2.0 PURPOSE OF REQUEST .............................................................................................................................. 1
2.1 INDUSTRIAL UNIT PLAN OF DEVELOPMENT ................................................................................................. 2
3.0 DESCRIPTION OF PROPOSAL ...................................................................................................................... 2
3.1 OVERVIEW .................................................................................................................................................... 2
3.2 THE SOLAR ARRAY FIELD ............................................................................................................................... 2
3.3 ELECTRICAL COLLECTION SYSTEM ................................................................................................................ 3
3.4 ENERGY STORAGE SYSTEM ........................................................................................................................... 4
3.5 INTERCONNECTION FACILITIES..................................................................................................................... 4
3.6 LANDSCAPING .............................................................................................................................................. 5
3.7 PROJECT OPERATION AND MAINTENANCE .................................................................................................. 5
3.7.1 Site Security and Lighting ......................................................................................................................... 6
4.0 RELATIONSHIP TO SURROUNDING PROPERTIES ........................................................................................ 6
5.0 LOCATION AND ACCESSIBILITY .................................................................................................................. 8
6.0 CIRCULATION SYSTEM ............................................................................................................................... 9
7.0 DEVELOPMENT SCHEDULE......................................................................................................................... 9
7.1 PHASING SCHEDULE ..................................................................................................................................... 9
7.2 TEMPORARY FACILITIES AND CONSTRUCTION WORKERS ............................................................................ 9
8.0 COMMUNITY FACILITIES AND SERVICES .................................................................................................. 10
8.1 EMERGENCY RESPONSE PLAN .................................................................................................................... 10
9.0 PUBLIC UTILITIES AND SERVICES .............................................................................................................. 10
9.1 FIRE PROTECTION ....................................................................................................................................... 10
9.2 POLICE PROTECTION .................................................................................................................................. 10
9.3 WATER AND WASTEWATER RESOURCES ..................................................................................................... 11
9.4 ELECTRIC ................................................................................................................................................... ..11
10.0 ENVIRONMENTAL IMPACTS ......................................................................................................................... 11
10.1 HYDROLOGY / WATER RESOURCES ............................................................................................................ 11
10.2 NOISE.......................................................................................................................................................... 11
10.3 AIR QUALITY ............................................................................................................................................... 11
10.4 VISUAL RESOURCES .................................................................................................................................... 12
10.5 BIOLOGICAL RESOURCES ............................................................................................................................ 12
10.6 CULTURAL RESOURCES ............................................................................................................................... 13
11.0 CONCLUSION .............................................................................................................................................. ..13
Sun Streams Expansion Solar Project i

FIGURES
Figure 1 – Site Vicinity and Regional Map
Figure 2 – Site Setbacks and Open Corridors
Figure 3 – Optimization of Undeveloped Habitat at Salome/Baseline Birder Area
TABLES
Table 1 – IUPD Modifications to Development Standards
Sun Streams Expansion Solar Project ii

1.0 INTRODUCTION
1.1 PROJECT NAME
The name of the project is Sun Streams Expansion Solar Project, hereafter referred to as Sun Streams
Expansion or Project in this narrative report.
1.2 THE APPLICANT
The applicant is Sun Streams Expansion, LLC, a wholly owned subsidiary of First Solar, Inc. (Applicant).
First Solar is the leading global provider of comprehensive photovoltaic (PV) solar energy solutions
delivering solar power solutions worldwide.
2.0 PURPOSE OF REQUEST
The Project site is located in unincorporated Maricopa County, Arizona approximately 1.75 miles
north/northwest of the community of Arlington and about 10 miles west/southwest of the City of
Buckeye in the general vicinity of the Palo Verde Nuclear Generating Station (PVNGS) (see Figure 1).
The Applicant requests to rezone approximately 3,221 acres – about 2,597 acres of Arizona State Trust
Land and about 624 acres of private land - from Rural zoning (RU-43) to Industrial (IND-2), with an
Industrial Unit Plan of Development (IUPD), to allow the development of a photovoltaic (PV) solar
energy generating facility with battery energy storage.
The development of a PV solar facility at this location is an appropriate and compatible land use in the
context of the Western Maricopa utility-scale uses that transition to more rural residential uses to the
east. This site is near significant existing power generation projects and energy infrastructure in the Palo
Verde area and other industrially designated lands. It is adjacent to the approved Sun Streams IV Solar
Project, within 0.5 miles of Sun Streams I and II, and less than 3 miles from the PVNGS and multiple
other solar and other power generation projects.
Prior to the submittal of this rezoning application, in May 2020, the Applicant filed a Comprehensive
Plan Amendment (CPA) Case No. CPA2020001 to redesignate the Sun Streams Expansion site to a plan
designation suitable for solar development. This CPA was approved by the Board of Supervisors on
December 9, 2020. The land use designations on these properties were changed from Rural Densities (0-
1 d.u./acre) and Small Lot Residential (2-5 d.u./acre) to Utilities, consistent with the Goals and
Objectives of the Tonopah/Arlington Area Plan and Old U.S. Highway 80 Area Plans that encourage
green-energy development in west Maricopa County where properties are proximate to rail,
transmission corridors and the PVNGS.
The Sun Streams Expansion Project consists of arrays of PV panels that absorb sunlight and directly
produce electricity. PV panels produce electricity without the use of heat transfer fluid or cooling water.
The Applicant’s goal is to produce up to 385 megawatts (MW) of clean solar power with up to 385 MWs
of battery storage from the Sun Streams Expansion Project, which would meet the energy needs of over
92,000 households.
Sun Streams Expansion Solar Project 1

2.1 INDUSTRIAL UNIT PLAN OF DEVELOPMENT
To develop the Sun Streams Expansion Solar Project, the Applicant is seeking several modifications from
County development standards using the Industrial Unit Plan of Development (IUPD) mechanism. Most
of these modifications are related to the relatively remote nature of this site and 1) increasing the
setbacks between the project and adjacent subdivided lots and 2) accommodating the large solar array
fields to maximize the efficiency of the site's solar power capability. Given the site location and low-
intensity and scale of the use, deviations from typical street development standards including setbacks,
improved landscaping, fencing, and site triangles are justified. The Applicant is also using the IUPD
mechanism to confirm the exclusion of arrays and substations from lot coverage calculations.
The specific modifications of County development standards are set forth in Table 1 at the end of this
narrative along with the justifications for the modifications. Locations of applicable setbacks, rights of
way and visual screening are shown on Figure 2 and sheet C1.2 of the site plan.
In addition to the IUPD standards outlined in Table 1, the Project incorporates significant multi-purpose
corridors throughout the site as shown on the site plan and on Figure 2. These corridors represent
approximately 1,200 acres of the 3,221-acre site (or about 37 percent) that would be left undeveloped
to maintain open space, wildlife habitat, wildlife movement corridors, and local drainage.
3.0 DESCRIPTION OF PROPOSAL
3.1 OVERVIEW
This rezoning application includes a description of the following components of the Sun Streams
Expansion Project also detailed on the accompanying Site Plan:
• Solar field of PV modules mounted on a single-axis tracking system, along with supporting
weather monitoring equipment;
• Electrical collection systems, including photovoltaic combining switchgear, power conversion
stations, inverters, transformers, and collection lines;
• A possible on-site substation;
• Energy Storage System (ESS) made up of batteries;
• An operation and maintenance (O&M) building, including a microwave tower for transmission of
live Project data to remote monitoring locations;
• Multiple maintenance / laydown areas; and,
• Associated civil infrastructure including fencing, access driveways and gates, driveways, on-site
parking, drainage channels, retention basins, signage, and possibly a septic tank and leach field.
3.2 THE SOLAR ARRAY FIELD
The solar field will consist of PV modules mounted on a single axis tracking rack system supported by
driven posts, driven concrete piles, ground screws and/or concrete ballasts. The typical height of the
photovoltaic modules, when mounted on the racks, will be approximately eight feet. The maximum
height at full rotation will be approximately 14 feet. The height will also vary because the rack bases will
be allowed to follow the natural contours of the ground to a limited extent. This reduces the need for
grading on the site while allowing a uniform presentation of the panels to the sun.
Sun Streams Expansion Solar Project 2

To ensure optimal solar energy capture, the single-axis tracking system will rotate to follow the sun
throughout the day. The panel rows will be oriented north-south and rotate east-to-west during the day.
As the panels rotate, their height changes with the 14-foot height measured from the maximum point of
rotation. The rotation of the panels will be extremely slow, and essentially noiseless.
Weather monitoring equipment will be installed in appropriately spaced locations to collect critical data
for plant operation. Up to 20 separate stations could be installed within the solar field or along the
perimeter of the site. Stations include electronic instrumentation and transmission antennas for remote
reporting and would be about the size of a traffic signal box with the antennas up to 25 feet tall.
The site plan depicts where the solar array field would be located on the site.
Major drainage channels crossing the site will be left undeveloped as multi-purpose open corridors.
3.3 ELECTRICAL COLLECTION SYSTEM
The panels will be organized into approximately 1-5 MW groups referred to as Array Blocks. The Array
Block defines the system used to efficiently collect the electricity being generated by each of the panels.
A typical 1-5 MW Array Block can be up to 25 acres in size and include more than 20,000 PV panels. The
exact number of panels to be included in each Array Block is not known at this time, as the specific PV
panel to be utilized has not yet been selected. Each panel, including its rack and rotational hardware, is
referred to as a Module. The Modules are aligned in rows referred to as Strings.
The varying sizes of the Array Blocks allow for the site to be utilized in a manner that optimizes the site’s
power generation capability. Installing the PV panels at a consistent height, the north-to-south
orientation of all Strings on the site, and the application of consistent perimeter setback standards will
ensure that the appearance of all Array Blocks is generally uniform and consistent from the site's
perimeter.
Near the center of each Array Block will be a power conversion station (PCS) or its equivalent, consisting
of up to two static power inverters, one inverter step-up transformer, cabling systems, and grounding
systems. The PCS could be installed within prefabricated metal or pre-cast concrete enclosures or have
no enclosures. The electrical equipment within the PCS prepares the solar power to be interconnected
to the electrical grid. The inverters convert the low voltage direct current (DC) electricity generated by
the panels to alternating current (AC) electricity. The inverter step-up transformer then steps up the
voltage of the AC electricity to medium voltage (i.e., 34.5 kV). The PCS locations will be less than nine
feet tall and generally not be visible from the site perimeters. If the Applicant decides to utilize shade
structures instead of enclosures for its PCS sites, the shade structures will be a maximum height of 14
feet.
From each PCS, the electricity will be routed through underground cabling or above-ground cable trays
to a combining switchgear (CS) site, or its equivalent. Equipment in the CS will be mounted to a cast-in-
place or pre-cast concrete foundation, vault or piers and will be metal enclosed or air insulated. Each CS
will be less than 14 feet in height and will occupy up to 500 square feet of land area. The site plan
submitted with this application shows a conceptual illustration of CS locations. Each CS can efficiently
serve 10 MW to 40 MW of power and their exact number and location will be determined during final
design.
Sun Streams Expansion Solar Project 3

Once the voltage is stepped up to 34.5 kV, the electricity will be routed from the CS through above-
ground collection lines supported by wooden or steel poles up to 60 feet tall to the on-site substation.
While located above ground, the visual impact of the on-site collector lines will be minor in comparison
to high-voltage transmission lines throughout the area.
3.4 ENERGY STORAGE SYSTEM
As solar energy becomes a more important part of the nation's energy supply system, the need to store
solar energy for delivery into evening hours has become a growing part of the solar energy production
system. The Sun Streams Expansion Project may have an onsite Energy Storage Systems (ESS) as part of
the Project. The ESS will be able to provide energy storage capacity for up to four hours of up to
approximately 385 MWs.
The ESS may be connected using either an AC-coupled or DC-coupled configuration. When an AC-
coupled configuration is used, a central ESS system is typically connected to the PV plant at the medium
voltage level near the site substation. Bidirectional battery inverters convert the power between AC and
DC electricity. When charging the batteries, the ESS bidirectional inverters convert the AC electricity to
the DC electricity stored by the batteries. When discharging, the bidirectional inverters convert the DC
electricity to the AC electricity output by the plant. Transformers are typically used to match the low-
level AC voltage at the AC side of the inverters to the medium-level voltage necessary to connect to the
substation. An AC-coupled ESS location will occupy approximately four acres of land within the Project
and will consist of self-contained battery storage modules placed in racks, switchboards, integrated
heating, ventilation, and air conditioning (HVAC) units, inverters, transformers, and controls in
prefabricated metal or concrete containers or in a building.
When a DC-coupled configuration is used, multiple smaller ESS systems are distributed through the PV
arrays and situated adjacent to PV inverters located in the interior of the solar field. The BESS units are
electrically connected parallel to the DC outputs of the arrays. The connection is usually made through
the use of bidirectional DC-DC converters that enable the BESS to deliver or receive energy from the DC
PV connections at the optimal voltage for the PV panels.
The battery storage modules, whether AC- or DC-coupled, would use proven storage technologies such
as Lithium Ion, Sodium-Sulphur, or Vanadium-Redox-Flow batteries.
The final ESS design will be completed after a PPA is secured for the facility. The enclosures or buildings
would have appropriate fire suppression systems built to code. The final design would include an apron
incorporating containment features to prevent the escape of liquids or spills from the ESS site. The
construction could include trenching cable runs, placing or pouring concrete vaults or foundations, and
moving the ESS enclosures with a crane or forklift to the appropriate location.
3.5 INTERCONNECTION FACILITIES
Once the power is generated and converted, it will need to interconnect into the regional power grid.
The Sun Streams Expansion site is located close (approximately 2.5 miles) to the existing Chukar
Substation on the Sun Streams I site which already has an approved connection into the Hassayampa
Switchyard. The Sun Streams Expansion Project would interconnect to the Chukar substation via a gen-
Sun Streams Expansion Solar Project 4

tie line from the Sun Streams Expansion on-site substation. The proposed route for the gen-tie would be
on lands occupied by previously approved solar projects (Sun Streams I, II, and IV).
The Arizona Corporation Commission (ACC) regulates lines of 115 kV or more. If required, an application
would be filed with the ACC for a Certificate of Environmental Compatibility (CEC) for the proposed gen-
tie. Off-site transmission lines, unless constructed by an Arizona utility holding a Certificate of
Convenience and Necessity issued by the ACC, are not exempt from local jurisdiction construction code
authority.
3.6 LANDSCAPING
The Sun Streams Expansion Project will not impact the natural desert vegetation outside the site
perimeter and fencing will be chain link. Native vegetation within the site will be managed in accordance
with the requirements of the Arizona Department of Agriculture. The Project would be visible to
passersby on the existing roads that pass through the site. In addition, because this area is so dry, non-
natural landscaping would draw attention and make the site more visible.
As shown on Figure 2 and the IUPD setback sheet in the site plan (sheet C1.2), along the Project
perimeters that abut developed subdivided lots, the panels and perimeter fences will be set back 100
feet from the property lines in the locations shown. In other areas, this setback distance from existing
lots would be further enhanced by the multi-purpose open corridors incorporated into and shown on
the site plan that would leave approximately 37 percent of the site undeveloped.
The fences themselves will be chain link and may be topped with barbed wire in most locations making
them visually porous. Passersby will see natural desert and the low-height panels. The fencing adjacent
to developed subdivided lots where some existing residences abut the site (along Elliott Road, Dobbins
Road, Sunland/Southern Avenue, and South 331st Avenue) would incorporate slats to provide visual
screening as shown on sheet C5.4 of the site plan. This fence treatment would be of an appropriate
color consistent with the surrounding environment and would obstruct the view of the Project from the
nearby residential properties while minimally impacting views of the local mountains.
In addition, drainage basins developed on-site could be partially bermed on their downstream side to a
height up to four feet which could also potentially further screen visual impacts.
3.7 PROJECT OPERATION AND MAINTENANCE
When operational, the Sun Streams Expansion Project would be remotely monitored and controlled by
the Applicant or a contracted O&M company. There will be an O&M facility on site with unpaved
parking provided. There will be up to eight full-time employees employed by the Sun Streams Expansion
Project during project operation. These employees will work normal shift hours (generally 8 a.m. to 5
p.m.) and would normally be working where needed in the solar field.
PV solar energy generating facilities require a limited amount of maintenance. Maintenance activities
include but are not limited to the following:
• Periodic inspections;
• Cleaning PV Modules;
Sun Streams Expansion Solar Project 5

• Dust control;
• Weed control;
• Maintaining electrical collection system components (i.e. inverters, switchgear,
transformers, and ESS); and,
• Maintaining on-site infrastructure (i.e. driveways, drainage channels and retention
basins), as well as responding to issues detected by remote monitoring of the facility.
The only maintenance activities requiring regular water use are the periodic cleaning of PV modules and
controlling dust. As noted above, to allow the modules to function continuously through daylight hours,
some maintenance, including some panel cleaning, if needed, may be performed at night. When night-
time maintenance activities are required, directed lighting would be used. Water use for panel cleaning
is anticipated to require less 5 million gallons per year – generally equivalent to the amount of water
used by 28 Arizona households. When compared to the thousands of homes that could be developed
under the existing zoning, this Project will not only reduce the amount of comparative annual water
usage but will also produce renewable energy sufficient to serve tens of thousands of houses.
No major equipment will be required for maintenance of the facility except as necessary for periodic
equipment replacement. Because the driveways providing access to the site from local paved roads are
to be paved, these surfaces will not require periodic re-grading. Interior roadways providing access to
the solar array field will not be paved. Most of the interior driveways will be native compacted soil and
may require minor grading from time to time. Dust control for these roads will be managed under a dust
control plan approved by the Maricopa County Air Quality Control Department.
3.7.1 Site Security and Lighting
To provide a secure and safe environment, the Project will be enclosed by a chain link fence with all
access points utilizing rolling gates. The fence and gates will include a minimum of six feet of chain link
topped with one foot of barbed wire. Each gate will have a sign identifying the Project as shown on the
site plan. The Applicant plans to use open chain link fencing to maintain a secure but visually open
appearance in most locations except where the 100-foot setbacks are shown on the IUPD setback sheet
in the site plan (C1.2). At the identified locations, the fence treatment would be of an appropriate color
consistent with the surrounding environment and would obstruct the view of the Project from the
residential properties while minimally impacting views of the local mountains. Substations will be
separately fenced as well with project fencing and will include signs warning of the high voltage
equipment within.
For night-time security, the Project may use motion-activated lights or IR illumination with cameras.
Because these security lights will be motion-activated or IR illuminated only and would not react to
animal movement, the Applicant expects the site to be dark at night. To ensure lighting will not be cast
onto neighboring properties, all lighting installed will be directed downward and into the site and will
comply with Maricopa County Zoning Ordinance Article 1112. Additional security measures include use
of cameras to remotely monitor the site and periodic patrols of the Project.
4.0 RELATIONSHIP TO SURROUNDING PROPERTIES
The development of a PV solar facility at this location is an appropriate and compatible land use in the
context of the Western Maricopa utility-scale uses that transition to more rural residential uses to the
Sun Streams Expansion Solar Project 6

east. The area is very rural with minimal nearby population. The nearby existing and approved
developed uses are industrial. The predominant land use in the area is energy production and
transmission. As previously noted, the PVNGS (the largest nuclear power plant in the United States) and
several existing gas-fired power plants and solar projects are located nearby. The Hassayampa
Switchyard is a major energy transfer facility located about two miles west - northwest of the site. The
Applicant already has an access right into the Hassayampa Switchyard through the existing Chukar
substation located just east of the Hassayampa Switchyard.
Indicative of the area's appropriateness for the proposed use, several rezonings, Special Use Permits,
and CPA applications have been previously approved by the Maricopa County Board of Supervisors for
solar energy generating facilities in the area. These solar energy facilities include Sun Streams I, Sun
Streams II, Sun Streams III, Sun Streams IV, Mesquite Solar, Arlington Valley Solar Energy (AVSE) II,
Hassayampa I Solar and the AV Solar Project. Mesquite Solar, Sun Streams I, and AVSE II Solar projects
have been developed and are currently in use and producing power.
Existing non-power generating uses in the area are generally limited to the railroad which runs along the
southern portion of the site, Hickman Egg Farm to the east of the site, a sand and gravel operation west
of the site; rural lot subdivisions along Elliott Road, Dobbins Road, Sunland/Southern Avenue, and South
331st Avenue, and the Arlington Elementary School one mile to the west. As shown on Figure 2 and the
IUPD setback sheet in the site plan (sheet C1.2), setbacks along the Project perimeters that abut
developed subdivided lots would be enhanced to 100 feet so there is greater separation between the
panels and perimeter fences from the adjacent property lines. In addition, in many areas throughout the
site (as shown on the site plan and Figure 2) setbacks from residential lots would be further enhanced
by the open corridors incorporated into and throughout the site plan.
The approved Sun Streams IV Project abuts the southwestern boundary of this proposed Project site.
The addition of this Project complements those uses and, when developed, would have a relatively low
profile, would be noiseless and odorless, and would have infrequent nighttime lighting or activity.
Arizona is the natural solar center of the United States. Factors critical to the siting of PV solar energy
generating facilities include large, contiguous areas of flat or nearly flat land; proximity to existing
electrical substations and transmission infrastructure; and compatibility with nearby land uses. This site
meets each of these criteria. The site is relatively flat and mostly contiguous. There are some larger
washes that flow from the north side of the site and flow to the south and offsite. The Applicant intends
to leave these washes undisturbed.
Because the site is located in proximity to existing electrical substations and transmission infrastructure
including Sun Streams I, Sun Streams II, and Sun Streams IV, it has access to the Hassayampa Switchyard
via a short off-site overhead transmission line to the existing Chukar Substation that would cross lands
occupied by the other existing / approved solar projects.
Solar energy diversifies the energy supply, reduces the country's dependence on foreign oil, improves air
quality, offsets greenhouse gas emissions, and helps avoid the construction of additional fossil fuel
powered plants. In warm climates like Arizona, solar energy is also beneficial for satisfying peak energy
demands as solar energy is generated when the demand for electricity is at its peak (during daylight
hours). In addition to the environmental benefits, construction of a facility of this magnitude stimulates
Sun Streams Expansion Solar Project 7

the local economy by creating construction jobs during installation and by generating fee and tax
revenue for Maricopa County and for State land beneficiaries.
5.0 LOCATION AND ACCESSIBILITY
The Sun Streams Expansion Project is generally located south of Southern Avenue, north of the Southern
Pacific Railroad, and east of 351st Avenue. The site, which is currently unimproved, consists of 3,221
acres including both Arizona State Trust Land (approximately 2,597 acres) and 6 parcels of private land
(approximately 624 acres). The lands that are the subject of this application are within Sections 32, 33,
and 34, Township 1 North, Range 5 West and Sections 4, 8, 9, and 18, Township 1 South, Range 5 West.
The site is located approximately 2 miles north of the community of Arlington, and 10 miles west of the
City of Buckeye. The Vicinity Map provided in Figure 1 depicts the location and boundaries of the site.
Access to the Project will be provided via existing roads and the Traffic Memo shows the local roads in
the vicinity of the Project. The Project does not require improvement of any of these existing roads to
provide required access. Primary access to the Project will be from Salome Highway from the west and
southeast (via Old US Highway 80), additional access to the western part of the Project from 355th
Avenue to Elliott Road, and Baseline Road from the east. The Sun Streams Expansion Project will have
main access driveways at multiple locations. These driveways will be located at points along Salome
Highway, 331st Avenue, 339th Avenue, 341st Avenue, 343rd Avenue, Southern Avenue, Wickenburg Road,
Baseline Road, Dobbins Road, and Elliott Road. These driveways will be paved between the edge of
pavement and the entry gates or at least to the edge of the County right-of-way. The main access
driveways provide access to any supporting civil infrastructure. In addition to these driveways, there
will be multiple internal driveways on the site, which will be of unpaved engineered construction having
a design based on considerations including native soil characteristics, frequency and weight of traffic,
drainage and dust control. Dust control for the entire site will be managed under a dust control plan
approved by the Maricopa County Air Quality Control Department.
Construction activity will generate trips for a limited duration. This traffic will be associated with worker
trips and the delivery of construction materials to the site which will occur during on-peak and off-peak
hours. The Sun Streams Expansion Project's construction will require the delivery of materials from
Interstate 10 and/or Old U.S. Highway 80 that will add approximately 20 daily semi-trucks per day to
current traffic levels. At its peak, the Sun Streams Expansion Project's construction is anticipated to
require a workforce of up to 600 persons. The construction workforce may add approximately 450
vehicles per day to local roads. Due to the distance workers may travel, this number anticipates some
rate of carpooling by the construction workforce. The mobilization and demobilization of equipment
including scrapers, graders, water wagons, compactors, truck-mounted post drivers, skid loaders, and
forklifts, is anticipated to generate a minimal amount of traffic. The on-site parking and staging yards
for the Project will be located in the vicinity of the primary site access points located a distance away
from the residences in the vicinity of the Project site.
The Applicant intends to require all construction traffic, both workforce and deliveries, to access the site
from the Wintersburg exit off I-10 to the north or via Old U.S. Highway 80. As a result, the Applicant
expects to minimize the construction traffic impacts on the Arlington Elementary School and local
residences to the extent possible.
Sun Streams Expansion Solar Project 8

This pattern may require coordination with work shifts at PVNGS. In addition, the Applicant will meet
with Arlington Elementary School District officials in advance of construction to discuss traffic safety.
Following construction, traffic trips generated during normal operations will be minimal, from up to
eight full-time employee and the occasional delivery of materials and supplies.
A Project Traffic Memorandum addressing construction traffic is attached under separate cover. The
projected traffic generation for the Sun Streams Expansion Project is minimal. The memorandum
concluded that there will be negligible impacts on the existing area roadway system resulting from the
construction of the Sun Streams Expansion Project. Because of the undeveloped nature of the site, the
right-of-way dedications expected are also expected to be minimal and no improvements to surrounding
roads would be required for the Project.
6.0 CIRCULATION SYSTEM
Because of the nature of the proposed solar project development, no formal traffic circulation or
coordinated street system is needed to support the Project. As stated above, access to the site is
provided by access driveways from the local existing roads that cross and abut the perimeter of the site.
The proposed locations of these access points are shown on the site plan.
Internal to the site, access to project facilities would be provided via perimeter roads and access ways
between the solar arrays. These are also shown on the site plan. In addition, there will be ROW
preservations and dedications required by MCDOT for some of the section and mid-section roads as
shown on the site plan.
7.0 DEVELOPMENT SCHEDULE
7.1 SCHEDULE
The Applicant will construct the Sun Streams Expansion Project in response to market demand. The
Applicant's design goal for the Sun Streams Expansion Project is to generate at least 385 MW of solar
power. Construction on the Project is planned to be initiated prior to December 2025 (within 5 years of
the approval of the Project CPA). The Applicant does not have a current plan to develop the project in
phases. All construction activities will be subject to applicable County regulations.
7.2 TEMPORARY FACILITIES AND CONSTRUCTION WORKERS
Temporary facilities, such as office trailers, laydown yards, containers, construction warehousing
buildings up to 20 feet in height, parking areas and equipment storage areas will be required from
move-on to completion of construction. The Applicant currently plans to locate its temporary facilities
within the perimeter of one of the identified solar arrays along Salome Highway. Temporary facilities
will be removed upon the completion of construction.
Up to 800 construction workers will be employed during construction and this workforce will vary with
phases of construction. As previously indicated, the Applicant will coordinate construction traffic
management as needed with the Arlington Elementary School District.
Sun Streams Expansion Solar Project 9

8.0 COMMUNITY FACILITIES AND SERVICES
During operations, the Sun Streams Expansion Project will have no impact on community facilities and
services such as schools and parks, as the Project is anticipated to only require a maximum of 8 full-time
employees.
During construction, the Sun Streams Expansion Project is expected to generate a peak workforce of up
to 600 persons. It is not anticipated that this workforce will have a significant impact on the local
community's facilities and services as it is expected the construction workforce will come from the
existing labor pool in Maricopa County.
8.1 EMERGENCY RESPONSE PLAN
The Applicant would prepare an Emergency Response plan for the Sun Streams Expansion Project as
needed. The new plan will specify notification, assembly, accountability, and evacuation planning in the
event of an emergency at the PVNGS, as the site is located within the 10-mile Plume Exposure Pathway
Emergency Planning Zone (EPZ) for PVNGS.
9.0 PUBLIC UTILITIES AND SERVICES
9.1 FIRE PROTECTION
Fire services for the area are provided by the Arizona Fire and Medical Authority (AFMA). On-site
driveways will provide egress for emergency and fire department access. The anticipated level of Project
demand for fire services is low, as PV modules are constructed of non-combustible materials (glass and
steel) and the electricity generation process does not involve combustible fuel, high temperature, or
high pressure. Each ESS location, if constructed, is anticipated to occupy a total of approximately four
acres of land within the Project and would consist of self-contained battery storage modules in
prefabricated metal enclosure units distributed throughout the site or located in a building near the on-
site substation. Building enclosures contain appropriate fire suppression systems built to code. In
addition, materials used and stored on the site will be managed according to applicable federal, state
and local regulations. Native vegetation located beneath PV modules will be periodically monitored and
controlled as needed to ensure that the growth of this vegetation does not have any impact on wildfire
suppression activities.
9.2 POLICE PROTECTION
The Maricopa County Sheriff’s Office, operating out of one main station in Avondale and a satellite
station in Buckeye, provides policing services for the area. The Sun Streams Expansion site is located
within the District II patrol area and the nearest police substation is located at 920 E. Van Buren Avenue
in Avondale.
Sun Streams Expansion Solar Project 10

9.3 WATER AND WASTEWATER RESOURCES
The Sun Streams Expansion Project will not impose any new public water and wastewater requirements
on the area. The site is located within an Arizona Department of Water Resources (ADWR) regulated
Active Management Area (AMA).
Water for construction purposes will be provided from an on-site well or delivered to the site by truck.
Portable toilets will be used during construction.
The need for water on the site during operations is minimal, necessary only for needs of employees and
possible cleaning of the panels. Operations could include up to eight full-time employees on the site.
Potable water needs of these employees will be provided via bottled water or from an ADWR-exempt
well. Cleaning of the panels is infrequent so this IUPD indicates one exempt, potable well on site to
serve these water needs. This volume of water use does not require a Public Water System.
Alternatively, water could be trucked in as needed.
The wastewater generated at the facility during operations will be treated with up to two on-site
conventional septic tank systems or similar alternative systems as regulated by Arizona Department of
Environmental Quality and administered by Maricopa County Environmental Services Department. As an
option, portable toilets could be used during operations.
9.4 ELECTRIC
APS is the electrical service provider for this area.
10.0 ENVIRONMENTAL IMPACTS
10.1 HYDROLOGY / WATER RESOURCES
Storm water generally flows from the north to south across the site in both sheet flow and concentrated
flow in ephemeral desert washes. The Applicant will avoid the larger washes allowing them to be left
undeveloped to maintain current drainage and wildlife movement. The locations of these undeveloped
drainages are shown on the site and drainage plans.
10.2 NOISE
When the Sun Streams Expansion Project is fully operational, there will not be any offsite noise in excess
of the ambient conditions.
10.3 AIR QUALITY
Construction dust control measures to limit fugitive dust emissions from the site will be employed as
required by Maricopa County. Details of the construction dust control plan will be submitted and
approved under a separate permit through the Maricopa County Air Quality Control Department. At a
minimum it will include minimizing areas requiring ground disturbance and applying water as necessary.
Sun Streams Expansion Solar Project 11

The Sun Streams Expansion Project does not produce significant air emissions or noticeable odors during
its operational life.
10.4 VISUAL RESOURCES
The Sun Streams Expansion Project is a low-intensity, low-scale use that is familiar to the character of
the area and consequently, will not adversely impact the visual environment. As a result, the installation
would not be visible from most areas and would not affect views of the local mountains. Subdivided lots
abut the subject property in many locations and where existing residences occur in these areas, visual
screening will be provided by adding slats to the Project perimeter fence as shown on sheet C5.4 of the
site plan. The locations where this screening fence would be employed will coincide with the locations of
the 100-foot perimeter setbacks shown on Figure 2 and sheet C1.2 of the site plan. This fence treatment
will utilize an appropriate color consistent with the surrounding environment and obstructs the view of
the Project from residential properties to minimize impact to visual quality. In addition to the relatively
low height of the PV panels, they absorb sunlight and do not produce substantial glare.
10.5 BIOLOGICAL RESOURCES
Information has been obtained from both the U.S. Fish and Wildlife Service and the Arizona Game and
Fish Department (AGFD) regarding the potential occurrence of special status species within the Sun
Streams Expansion Project Study Area. No critical habitats for sensitive species occur in the area.
Because of lack of suitable habitats, only two sensitive wildlife species, the Western Burrowing Owl and
Le Conte' s Thrasher, could potentially occur on the site. Project impacts to these species are minimized
by implementation of applicable conservation measures.
As requested by AGFD, the Applicant will conduct pre-construction surveys for the western burrowing
owl and, if present, work with the agencies and apply measures identified by AGFD in the Project
Evaluation Program (PEP) to minimize impacts.
The intersection of Salome Highway and Baseline Road has been identified by members of the public as
a location where bird watchers observe Le Conte’s and other thrashers. The Applicant reached out to
each individual who raised this issue to inform them that this specific location would be left
undeveloped as shown on the original site plan. Additionally, discussions regarding this bird watching
area were also conducted with AGFD and multiple representatives of the Audubon Society (at the
national, state, and local levels). In addition to these discussions, the Applicant participated in a field
visit of this area with members of the Maricopa Audubon Society.
In direct response to the input from the parties interested in this topic, the Applicant revised the
proposed site plan to enlarge the area being left undeveloped in the vicinity of this identified bird-
watching area (at Salome and Baseline). Figure 3 shows the specific areas eliminated from the site plan
to optimize this undeveloped area as an open wildlife corridor. This will allow more native vegetation /
habitats in this area to remain in their current condition and continue to be usable by birds and local
wildlife.
Sun Streams Expansion Solar Project 12

10.6 CULTURAL RESOURCES
No significant cultural or historical resources are expected to be affected by implementation of the
Project based on the results of cultural resource surveys conducted on the site. Results of these surveys
have been provided to the Arizona State Land Department (ASLD) as part of the ASLD leasing process
who has forwarded them on to the Arizona State Historic Preservation Office (SHPO).
11.0 CONCLUSION
The development of the proposed Sun Streams Expansion Solar Project at this location is an appropriate
and compatible land use consistent with the context of the western Maricopa utility-scale uses near
PVNGS that transition to more rural residential uses to the east. The area is very rural with minimal
nearby population and the nearby existing and approved developed uses are industrial. In addition,
construction of this project would likely create construction jobs benefiting the local economy and
generate fee and tax revenue for Maricopa County and for State land beneficiaries.
Sun Streams Expansion Solar Project 13

TABLE 1 – SUN STREAMS EXPANSION SOLAR PROJECT
IUPD MODIFICATIONS TO DEVELOPMENT STANDARDS
REGULATION IND-2 ZONING DISTRICT PROPOSED IND-2 IUPD ZONING
STANDARD DISTRICT STANDARD
HEIGHT 40’ 40’
FRONT YARD 10-25’ 25’ except where shown on the IUPD
setback sheet in the site plan (sheet
C1.2), where a 100’ setback is used in
identified locations
FRONT YARD Article 901.4.1: All properties abutting a Landscaping requirements within the
LANDSCAPING public street shall have an open front yard setback not needed with
setback area which shall be landscaped enhanced setbacks and open corridors
extending for the full width of the (as shown on sheet C1.2)
property.
SIDE YARD 3-10’ 0’ except where shown on the IUPD
setback sheet in the site plan (sheet
C1.2)
REAR YARD 25’ 0’ except where shown on the IUPD
setback sheet in the site plan (sheet
C1.2)
LOT AREA 6,000 sq. ft. 6,000 sq. ft.
LOT WIDTH 60’ 60’
LOT COVERAGE 60% maximum Maximum 60%; solar panels not
counted as lot coverage
PARKING Article 1102.1.5: 600 square feet of floor None
REGULATIONS area; 5% of parking spaces shall be
handicapped parking spaces.
LOADING AND Article 1103.2 one loading and unloading None
UNLOADING space for each 10,000 square feet of floor
area, or fraction thereof, devoted to such
use in the building
SIGHT VISIBILITY No obstructions over 2’ in height within No sight triangle limitations at all
TRIANGLES (SVTs) 25’ x 25’ SVTs driveway, section line and mid-section
line intersecting alignments
ARTICLE 902.91 All uses except for parking, loading, A waiver from Article 902.9. as applied
unloading or storage shall be conducted to solar arrays; they will not be located
within a completely enclosed building. inside enclosed buildings
SITE ENCLOSURE AND 6’ CMU wall adjacent to rural and Chain-link fencing, including one foot
SCREENING residential zoning boundaries and for of barbed wire topping, and gates shall
outdoor use of an industrial nature be allowed on the perimeter of the
Project. In areas where the site abuts
developed subdivided parcels (as
shown on the IUPD setback sheet in the
site plan), slats will be added to the
perimeter fence to provide visual
screening as shown on fencing detail
sheet (sheet C5.4) in the site plan.
Sun Streams Expansion Solar Project 14

Justifications for Proposed Zoning District Standards
Front Yard
Enhanced perimeter setbacks of 100 feet are provided in certain locations to ensure that sufficient
distance is provided for where the project is proximate to residential development. Perimeter setbacks
in other locations will be 25 feet. The locations where a 100-foot setback would be employed around
the site perimeter are shown on Figure 2 and on the IUPD setback sheet in the site plan (C1.2). In
addition, in many areas throughout the site (as shown on Figure 2 and the site plan), setbacks from
residential lots would be further enhanced by the multi-purpose open corridors incorporated into the
plan. This results in an increase in the base requirement.
Landscaping within Front Yard Setback
With the addition of the enhanced perimeter setbacks (25 to 100 feet) and open corridors left
undeveloped, the landscaping requirements within the front yard setback would not be necessary.
Native vegetation within the setbacks and also within the open corridors throughout site would remain.
Side Yard
All side yard setbacks would be 0 feet except where identified on the IUPD setback sheet in the site plan.
The inclusion of side yard setbacks would reduce the amount of energy production available from the
Project site. No side yard setback requirements would be needed as there are no lots / parcels on the
site.
Rear Yard
All rear yard setbacks to be 0 feet except where identified on the IUPD setback sheet in the site plan.
The inclusion of rear yard setbacks would reduce the amount of energy production available from the
Project site. No rear yard setback requirements would be needed as there are no lots / parcels on the
site.
Setback Lines
The IUPD setback sheet in the site plan identifies all applicable proposed perimeter setback lines. These
setbacks specifically replace the setbacks required by Sections 1105.1.3 through 1105.1.5 of the
Maricopa County Zoning Ordinance. The Applicant proposes that these setback requirements be waived
to the extent any are contradictory to the right-of-way preservations and dedications required by the
Maricopa County Department of Transportation (MCDOT) as shown on the site plan ROW preservation
exhibit.
Lot Coverage
The site is not a single lot and the solar panel coverage would not be included when calculating the IND-
2 required 60% maximum lot coverage. Consistent with article 1206.3.2, “lot coverage”, only buildings
and other permanent structures would count toward the coverage ratio.
Sun Streams Expansion Solar Project 15

Parking Regulations
The Applicant plans no parking spaces. No regularly occupied buildings will be constructed and workers
will be in the solar field when on-site.
Loading and Unloading
Loading and unloading spaces will not be required for the site as no occupied structures are anticipated
at the facility, no manned Project buildings would be located on site or on public roads, and there would
be no routine deliveries or shipments.
Driveways
Sight triangle limitations would not be needed along all intersecting driveways, section line and mid-
section road alignments on the site. Proposed fencing at all corners would be chain-link, would be left
open (with no visual screening slats), and would, therefore, not obstruct views. Additionally, having no
sight triangle limitations would maximize the area within the perimeter fencing that is useable for solar
development.
Article 902.9.1
The regulation requiring all uses except for parking, loading, unloading, or storage to be conducted
within an enclosed building would not be applicable. Most of the site is planned for solar arrays which
will not be located within enclosed buildings as they are required to be outdoors to generate energy.
Site Enclosure and Screening
As required to ensure public safety required by applicable electrical safety regulations and provide for
the security of this infrastructure project, the Applicant will install chain-link fencing (at least 6 feet in
height) plus barbed wire topping (approximately 1-foot) with gates where needed along the perimeter
of the Project. This fencing would include screening material such as slats where adjacent to developed
subdivided lots in the 100-foot setback locations shown on Figure 2 and on the IUPD setback sheet in
the site plan (C1.2) and using typical specifications shown on the fencing sheet in the site plan (sheet
C5.4). The proposed fencing would allow unimpeded surface flows, be consistent with other industrial
development in the area, and provide site security. The Applicant proposes to use chain link for the
gates also which would be consistent with other adjacent and nearby energy generation projects.
Sun Streams Expansion Solar Project 16

Legend
Valley Interstate Highway
Sun
State Highway
TONOPAH Sun Streams Expansion
§¨¦ 10
BUCKEYE
Sun Streams
Expansion Oglesby
°
PALO VERDE
NUCLEAR 0 0.5 1 1.5 2
GENERATING STATION
Miles
State Plane Coordinate System
U V 85 North American Datum 1983
Arizona Central
Linear Unit: Foot US
PALO VERDE
Maricopa County
Map
ARLINGTON Extent Phoenix
ARIZONA
U V 85
SUN STREAMS EXPANSION
FIGURE 1
PROJECT LOCATION
85
Map Extent: Maricopa County, Arizona
Date: 07-22-20 Author: rnc
G:\Sunstreams/MXD's/Sun Streams Expansion