SERIAL # 210050-CI COMPETITION IMPRACTICABLE CONTRACT: SOUTHEAST JUSTICE CENTER – CIVES STEEL COMPANY 1.0 INTENT 1.1 The intent of this contract is to establish a contract with Cives Steel Company to supply the structural steel and related services for the construction of the Southeast Justice Center, 222 E. Javelina Ave, Mesa, AZ 85210. 2.0 SCOPE OF SERVICES 2.1 Cives Steel Company will supply the structural steel and related services for the Southeast Justice Center in accordance with the contract between Johnson Carlier and Cives Steel Company – Subcontract Agreement 20026-2183 October 5, 2020 (Hereinafter referred as Exhibit A). The contract value is based upon the remaining balance of monies owed as documented in the final pay application from Cives Steel Company to Johnson Carlier and attached as Exhibit B. 2.2 All materials supplied under this contract shall be stored rent free on-site at the Cives Steel Company location until delivery is required by the County or the County’s construction contractor when selected by the County as noted in section 2.3. 2.3 Cives Steel Company agrees that any remaining obligations under this contract (210050- CI) will be assumed by the General Contractor/Construction Manager at Risk AFTER MARICOPA CONTRACT 210048-CMR is AWARDED. 2.4 CONTRACTOR QUALIFICATIONS 2.4.1 Contractor(s) shall be licensed to perform all work contemplated in this contract. 2.4.2 Contractor(s) shall comply with all other requirements listed in the Scope of Services. 2.4.3 Contractor shall be responsible for obtaining and transporting equipment to and from the job site. In this regard, the contractor shall: 2.4.3.1 Ensure that its employees that are assigned to perform the work carry their own tools of the trade or are provided with tools normally carried by the trade on the job site. “Tools of the trade” are generally considered to be vehicles, tools, and equipment (e.g. hand tools, power tools, pickup trucks, vans, ladders, scaffolding, etc.) that are normally used in the course and scope of the contractor’s business and that should be a part of a qualified contractor’s inventory. Costs related to the acquisition, use, or maintenance of tools of the trade should be included as a part of the contractor’s fully‐burdened hourly labor rates and are not, under any circumstances, to be separately or directly billed to County under this contract. 2.4.3.2 Arrange for lease or rental of any special tools and equipment needed to perform the work. “Special tools and equipment” are considered to be tools and equipment (e.g. cranes, towed air compressors, dumpsters with associated tipping fees, etc.) that are not typically maintained in a contractor’s inventory, but that are leased or rented when needed for a specific project/job. Charges for lease or rental of special tools and equipment with associated mark‐up may be directly billed to County provided that the contractor clearly identifies these items in advance as a part of their proposal to perform the work. Charges for lease or rental of special tools and equipment with associated mark‐up that have not SERIAL # 210050-CI been identified in advance as a part the contractor’s proposal to perform the work may not, under any circumstances, be separately or directly billed to County under this contract. 2.4.3.3 Ensure that all vehicles, tools, and equipment are appropriately licensed, as applicable, are in good operating condition, capable of rendering efficient, economical, and continuous service, and are equipped with necessary and required safety devices in accordance with State and Federal laws. While the County reserves the right to inspect any equipment for compliance with these requirements regarding condition, this does not relieve the contractor of the obligation to furnish conforming equipment. If any equipment is found to be deficient or non‐ conforming, the County shall so notify the contractor who shall immediately take action to place the equipment in good operating condition at his own expense. If the contractor does not take corrective action within a reasonable time, the County may require the immediate removal and replacement of the deficient equipment at the contractor’s expense. 2.4.4 The contractor shall perform all services in such a manner that County property is not damaged. 2.4.4.1 In the event damage occurs to Maricopa County property or any adjacent property due to any services performed under this contract, the contractor shall immediately notify the County representative about the damages and shall replace or repair the same at no cost to the County within 48 hours of notifying the County, or by a deadline approved by the County. 2.4.4.2 If damage caused by the contractor has to be repaired or replaced by the County, the cost of such work shall be deducted from the monies due the contractor. Costs of such work that exceed the amount of monies due the contractor shall be the responsibility of the contractor and shall billed to the contractor. 2.4.5 The contractor shall utilize only experienced, responsible, and capable people in the performance of the work. The County may require that the contractor remove from the job covered by this contract, any employee who endangers persons or property or whose continued employment under this contract is inconsistent with the interest of Maricopa County. 2.4.6 All vehicles used by contractor, including personal transportation vehicles, shall be clearly identified with the name of the company on each side of the vehicle. The letters shall be of such size that they are distinguishable at a reasonable distance. 2.4.7 All employees of the contractor shall wear a company uniform identified with the company name/logo and consisting of a minimum of one of the following: • Shirt/blouse • Vest • Cap 2.4.8 Only authorized employees of the contractor are allowed on Maricopa County work sites. Contractor’s employees are NOT to be accompanied in their work area by acquaintances, family members, assistants, or any other person unless said person is an authorized employee of the contractor. SERIAL # 210050-CI 2.4.9 All work must comply with Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and any state, County, or local regulations in effect at each service location. Contractor shall adhere to all regulations, rules, ordinances, and standards set by Federal, state, County, and municipal governments pertaining to safety on the job site. If the contractor is found not to be in compliance with Federal, state, County, and/or municipal safety rules, ordinances, policy, procedure, or codes, the County may, in accordance with the “Suspension of Work” clause of the contract, suspend the work without cost to the County until such non-compliant issues are rectified to the satisfaction of the using agency. Continued non-compliance may result in termination of the contract. 2.4.10 County may conduct audits and performance reviews throughout the term of a contract to ensure contract compliance by the contractor. 3.0 PURCHASING REQUIREMENTS 3.1 DELIVERY 3.1.1 It shall be the Contractor’s responsibility to meet the proposed delivery requirements. Contractor shall notify the County project manager if the requested delivery date and/or the anticipated lead time cannot be met. 3.1.2 Failure to communicate to County changes in the order status may result in default proceedings. 3.2 TESTING Unless otherwise specified, services and related materials purchased will be inspected by the department to ensure they meet the quality and quantity requirements of the specifications. When applicable and deemed necessary by the County, samples of the materials may be taken at random from stock received for submission to a commercial laboratory or other appropriate agency for analysis and tests to determine whether the materials conform in all respects to the specifications. In cases where commercial laboratory reports determine that the materials do not meet the specifications, the expense of such analysis shall be borne by the contractor. 3.3 ACCEPTANCE Upon completion, services shall be deemed accepted and the warranty period shall begin. Successful service delivery shall be defined as a) material(s)/equipment is installed (as necessary) and fully operational; and b) the department has deemed all service/work completed, including but not limited to any inspection, repair, installation, design, development, deployment, operation, and initial training, (as applicable). Additionally, all documentation shall be completed prior to final acceptance. 3.4 WARRANTY All services furnished under this contract shall conform to the requirements of this contract. 3.4.1 Service and/or Repair Warranty 3.4.2 Project and/or New Installation Warranty Project and/or new installation warranty shall cover all parts and labor for a period of one year from formal acceptance by the County. Any manufacturer warranty beyond one year shall be passed on to the County. SERIAL # 210050-CI 3.5 INVOICES AND PAYMENTS (THIS SECTION REPLACES ARTICLE 4 OF THE AGREEMENT BETWEEN CIVES AND JOHNSON CARLIER- TEXTURA-CPM) 3.5.1 Payment terms will be calculated based on the date a properly completed invoice is received by the County. 3.5.2 Contractors shall provide the County with invoices no later than 14 days after services and delivery of goods are completed and accepted by the County rendered final. 3.5.3 Application for Payment will not be accepted and processed until the Owner or Owner’s Representative is satisfied that the Work is satisfactorily completed, including "punch list" items and Commissioning Issues List; and that all manuals, documents, warranties, guarantees, and Record Documents, as required by the Specifications, have been received and accepted by the Owner or Owner’s Representative 3.5.4 PAYMENT FOR OFF-SITE STORED MATERIALS: Payment shall be made for materials and equipment suitably stored, off Project Site at the Cives Steel location as agreed upon by the parties. Payment for materials and equipment stored off the Project Site shall be conditioned upon (1) compliance by the Contractor with procedures satisfactory to County to protect the County’s interest, (2) property insurance, and (3) transportation to the Project Site. The County will not consider requests to pay for items off site that are damaged or otherwise defective. County and/or Project Manager may request inspection of off- site materials prior to the acceptance for payment. All costs associated with inspection of off-site materials and equipment, exclusive of time, shall be borne by Contractor, and Contractor shall be responsible for all arrangements. 3.5.5 Contractor shall submit one legible copy of their detailed invoice before payment(s) will be made. Incomplete invoices will not be processed. At a minimum, the invoice must provide the following information: • 1. Heading completed in full • 2. Original contract sum • 3. Change order summary completed (if applicable) • 4. Net change by Change Order • 5. Contract sum to date • 6. Total completed and stored to date • 7. Total earned, less retainage • 8. Amount of previous payments • 9. Current payment due • 10. Balance to finish 3.5.6 Problems regarding billing or invoicing shall be directed to the department as listed on the purchase order. FMD questions regarding billing or invoicing should go to FMD accounts payable (FMD-AccountsPayable@mail.maricopa.gov). 3.5.7 Payment shall only be made to the contractor by Accounts Payable through the Maricopa County Vendor Express Payment Program. This is an Electronic Funds Transfer (EFT) process. After contract award, the contractor shall complete the Vendor Registration Form accessible through the County Department of Finance Vendor Registration website at https://www.maricopa.gov/5169/Vendor- Information. SERIAL # 210050-CI 3.5.8 Discounts offered in the contract shall be calculated based on the date a properly completed invoice is received by the County. 3.5.9 EFT payments to the routing and account numbers designated by the contractor shall include the details on the specific invoices that the payment covers. Contractor is required to discuss remittance delivery capabilities with their designated financial institution for access to those details. 3.6 APPLICABLE TAXES 3.6.1 It is the responsibility of the contractor to determine any and all applicable taxes and include those taxes in their proposal. The legal liability to remit the tax is on the entity conducting business in Arizona. Tax is not a determining factor in contract award. 3.6.2 The County will look at the price or offer submitted and will not deduct, add, or alter pricing based on speculation or application of any taxes, nor will the County provide contractor any advice or guidance regarding taxes. If you have questions regarding your tax liability, seek advice from a tax professional prior to submitting your bid. You may also find information at https://www.azdor.gov/Business.aspx. Once your bid is submitted, the offer is valid for the time specified in this solicitation, regardless of mistake or omission of tax liability. If the County finds over payment of a project due to tax consideration that was not due, the contractor will be liable to the County for that amount, and by contracting with the County agrees to remit any overpayments back to the County for miscalculations on taxes included in a bid price. 3.6.3 Tax Indemnification: Contractor and all subcontractors shall pay all Federal, state, and local taxes applicable to their operation and any persons employed by the contractor. Contractor shall, and require all subcontractors to, hold the County harmless from any responsibility for taxes, damages, and interest, if applicable, contributions required under Federal and/or State and local laws and regulations, and any other costs including transaction privilege taxes, unemployment compensation insurance, Social Security, and Workers’ Compensation. Contractor may be required to establish, to the satisfaction of County, that any and all fees and taxes due to the City or the State of Arizona for any license or transaction privilege taxes, use taxes, or similar excise taxes are currently paid (except for matters under legal protest). 3.6.4 PERFORMANCE It shall be the contractor’s responsibility to meet the proposed performance requirements. The County reserves the right to obtain services on the open market in the event the contractor fails to perform, and any price differential will be charged against the contractor. 4.0 CONTRACTUAL TERMS & CONDITIONS 4.1 CONTRACT TERM This Invitation for Bids is for awarding a firm, fixed price purchasing for a 365 Calendar Day duration to supply structural steel for the SE Justice Courts. 4.2 CONTRACT COMPLETION In preparation for contract completion, the contractor shall make all reasonable efforts for an orderly transition of its duties and responsibilities to another provider and/or to the County. This may include, but is not limited to, preparation of a transition plan and SERIAL # 210050-CI cooperation with the County or other providers in the transition. The transition includes the transfer of all records and other data in the possession, custody, or control of the contractor that are required to be provided to the County either by the terms of this agreement or as a matter of law. The provisions of this clause shall survive the expiration or termination of this agreement. 4.3 FORCE MAJEURE 4.3.1 Neither party shall be liable for failure of performance, nor incur any liability to the other party on account of any loss or damage resulting from any delay or failure to perform all or any part of this contract, if such delay or failure is caused by events, occurrences, or causes beyond the reasonable control and without negligence of the parties. Such events, occurrences, or causes include, but are not limited to acts of God/nature (including fire, flood, earthquake, storm, hurricane, or other natural disaster), war, invasion, act of foreign enemies, hostilities (whether war is declared or not), civil war, riots, rebellion, revolution, insurrection, military or usurped power or confiscation, terrorist activities, nationalization, government sanction, lockout, blockage, embargo, labor dispute, strike, and interruption or failure of electricity or telecommunication service, and pandemic. 4.3.2 Each as applicable, shall give the other party notice of its inability to perform and particulars in reasonable detail of the cause of the inability. Each party must use best efforts to remedy the situation and remove, as soon as practicable, the cause of its inability to perform or comply. 4.3.3 The party asserting Force Majeure as a cause for non-performance shall have the burden of proving that reasonable steps were taken to minimize delay or damages caused by foreseeable events, that all non-excused obligations were substantially fulfilled, and that the other party was timely notified of the likelihood or actual occurrence which would justify such an assertion, so that other prudent precautions could be contemplated. 4.4 AVAILABILITY OF FUNDS 4.4.1 The provisions of this contract relating to payment shall become effective when funds assigned for the purpose of compensating the contractor as herein provided are actually available to County for disbursement. The County will be the sole judge and authority in determining the availability of funds under this contract. County will keep the contractor fully informed as to the availability of funds. 4.4.2 If any action is taken by any state agency, Federal department, or any other agency or instrumentality to suspend, decrease, or terminate its fiscal obligations under, or in connection with, this contract, County may amend, suspend, decrease, or terminate its obligations under, or in connection with, this contract. In the event of termination, County will be liable for payment only for services rendered prior to the effective date of the termination, provided that such services are performed in accordance with the provisions of this contract. County will give written notice of the effective date of any suspension, amendment, or termination under this section, at least 10 days in advance. 4.5 SUSPENSION OF WORK The procurement officer may order the contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the procurement officer determines appropriate for the convenience of the County. No adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the contractor. No request for adjustment under this clause shall be SERIAL # 210050-CI granted unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract. 4.6 STOP WORK ORDER 4.6.1 The procurement officer may, at any time, by written order to the contractor, require the contractor to stop all, or any part, of the work called for by this contract for a period of 90 calendar days after the order is delivered to the contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop work order issued under this clause. Upon receipt of the order, the contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 calendar days after a stop work order is delivered to the contractor, or within any extension of that period to which the parties shall have agreed, the procurement officer shall either: 4.6.1.1 cancel the stop work order; or 4.6.1.2 terminate the work covered by the order as provided in the Termination for Default or the Termination for Convenience clause of this contract. 4.6.2 The procurement officer may make an equitable adjustment in the delivery schedule and/or contract price, and the contract shall be modified, in writing, accordingly, if the contractor demonstrates that the stop work order resulted in an increase in costs to the contractor. 4.7 TERMINATION FOR CONVENIENCE Maricopa County may terminate the resultant contract for convenience by providing 60 calendar days advance notice to the contractor. 4.8 TERMINATION FOR DEFAULT 4.8.1 The County may, by written Notice of Default to the contractor, terminate this contract in whole or in part if the contractor fails to: 4.8.1.1 deliver the supplies or to perform the services within the time specified in this contract or any extension; 4.8.1.2 make progress, so as to endanger performance of this contract; or 4.8.1.3 perform any of the other provisions of this contract. 4.8.2 The County’s right to terminate this contract under these subparagraphs may be exercised if the contractor does not cure such failure within 10 business days (or more if authorized in writing by the County) after receipt of a Notice to Cure from the procurement officer specifying the failure. 4.9 STATUTORY RIGHT OF CANCELLATION FOR CONFLICT OF INTEREST Notice is given that, pursuant to Arizona Revised Statute (A.R.S.) § 38-511, the County may cancel any contract without penalty or further obligation within three years after execution of the contract, if any person significantly involved in initiating, negotiating, securing, drafting, or creating the contract on behalf of the County is at any time, while the contract or any extension of the contract is in effect, an employee or agent of any other party to the contract in any capacity or consultant to any other party of the contract with respect to the subject matter of the contract. Additionally, pursuant to A.R.S. § 38-511, the SERIAL # 210050-CI County may recoup any fee or commission paid or due to any person significantly involved in initiating, negotiating, securing, drafting, or creating the contract on behalf of the County from any other party to the contract arising as the result of the contract. 4.10 OFFSET FOR DAMAGES In addition to all other remedies at Law or Equity, the County may offset from any money due to the contractor any amounts contractor owes to the County for damages resulting from breach or deficiencies in performance of the contract. 4.11 SUBCONTRACTING 4.11.1 Outside of the sub-contractors identified in Exhibit A, the Contractor may not assign to another contractor or subcontract to another party for performance of the terms and conditions hereof without the written consent of the County. All correspondence authorizing subcontracting must reference the bid serial number and identify the job or project. 4.11.2 The subcontractor’s rate for the job shall not exceed that of the prime contractor’s rate, as bid in the pricing section, unless the prime contractor is willing to absorb any higher rates. The subcontractor’s invoice shall be invoiced directly to the prime contractor, who in turn shall pass-through the costs to the County, without mark- up. A copy of the subcontractor’s invoice must accompany the prime contractor’s invoice. 4.12 AMENDMENTS All amendments to this contract shall be in writing and approved/signed by both parties. Maricopa County Office of Procurement Services shall be responsible for approving all amendments for Maricopa County. 4.13 ADDITIONS/DELETIONS OF SERVICES The County reserves the right to add and/or delete services to a contract through mutual agreement with the contractor. If additional services are required from a contract, prices for such additions will be negotiated between the contractor and the County. 4.14 ACCESS TO AND RETENTION OF RECORDS FOR THE PURPOSE OF AUDIT AND/OR OTHER REVIEW 4.14.1 In accordance with section MC1-373 of the Maricopa County Procurement Code, the contractor agrees to retain (physical or digital copies of) all books, records, accounts, statements, reports, files, and other records and back-up documentation relevant to this contract for six years after final payment or until after the resolution of any audit questions which could be more than six years, whichever is latest. The County, Federal or State auditors and any other persons duly authorized by the department shall have full access to and the right to examine, copy, and make use of, any and all said materials. 4.14.2 If the contractor’s books, records, accounts, statements, reports, files, and other records and back-up documentation relevant to this contract are not sufficient to support and document that requested services were provided, the contractor shall reimburse Maricopa County for the services not so adequately supported and documented. SERIAL # 210050-CI 4.15 AUDIT DISALLOWANCES If at any time it is determined by the County that a cost for which payment has been made is a disallowed cost, the County shall notify the contractor in writing of the disallowance. The course of action to address the disallowance shall be at sole discretion of the County, and may include either an adjustment to future invoices, request for credit, request for a check, or a deduction from current invoices submitted by the contractor equal to the amount of the disallowance, or to require reimbursement forthwith of the disallowed amount by the contractor by issuing a check payable to Maricopa County. 4.16 STRICT COMPLIANCE Acceptance by County of a performance that is not in strict compliance with the terms of the contract shall not be deemed to be a waiver of strict compliance with respect to all other terms of the contract. 4.17 VALIDITY The invalidity, in whole or in part, of any provision of this contract shall not void or affect the validity of any other provision of the contract. 4.18 SEVERABILITY The removal, in whole or in part, of any provision of this contract shall not void or affect the validity of any other provision of this contract. 4.19 RELATIONSHIPS 4.19.1 In the performance of the services described herein, the contractor shall act solely as an independent contractor, and nothing herein or implied herein shall at any time be construed as to create the relationship of employer and employee, co- employee, partnership, principal and agent, or joint venture between the County and the contractor. 4.19.2 The County reserves the right of final approval on proposed staff. Also, upon request by the County, the contractor will be required to remove any employees working on County projects and substitute personnel based on the discretion of the County within two business days, unless previously approved by the County. 4.20 NON-DISCRIMINATION Contractor agrees to comply with all provisions and requirements of Arizona Executive Order 2009-09, including flow down of all provisions and requirements to any subcontractors. Executive Order 2009-09 supersedes Executive Order 99-4 and amends Executive Order 75-5 and is hereby incorporated into this contract as if set forth in full herein. During the performance of this contract, contractor shall not discriminate against any employee, client, or any other individual in any way because of that person’s age, race, creed, color, religion, sex, disability, or national origin. (Arizona Executive Order 2009-09 can be downloaded from the Arizona Memory Project at http://azmemory.azlibrary.gov/cdm/singleitem/collection/execorders/id/680/rec/1.) 4.21 WRITTEN CERTIFICATION PURSUANT to A.R.S. § 35-393.01 If vendor engages in for-profit activity and has 10 or more employees, and if this agreement has a value of $100,000 or more, vendor certifies it is not currently engaged in, and agrees for the duration of this agreement to not engage in, a boycott of goods or services from Israel. This certification does not apply to a boycott prohibited by 50 U.S.C. § 4842 or a regulation issued pursuant to 50 U.S.C. § 4842. SERIAL # 210050-CI 4.22 CERTIFICATION REGARDING DEBARMENT AND SUSPENSION 4.22.1 The undersigned (authorized official signing on behalf of the contractor) certifies to the best of his or her knowledge and belief that the contractor, its current officers, and directors: 4.22.1.1 are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from being awarded any contract or grant by any United States department or agency or any state, or local jurisdiction; 4.22.1.2 have not within a three-year period preceding this contract: 4.22.1.2.1 been convicted of fraud or any criminal offense in connection with obtaining, attempting to obtain, or as the result of performing a government entity (Federal, State or local) transaction or contract; 4.22.1.2.2 been convicted of violation of any Federal or State antitrust statutes or conviction for embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property regarding a government entity transaction or contract; 4.22.1.3 are not presently indicted or criminally charged by a government entity (Federal, State or local) with commission of any criminal offenses in connection with obtaining, attempting to obtain, or as the result of performing a government entity public (Federal, state or local) transaction or contract; 4.22.1.4 are not presently facing any civil charges from any governmental entity regarding obtaining, attempting to obtain, or from performing any governmental entity contract or other transaction; and 4.22.1.5 have not within a three-year period preceding this contract had any public transaction (Federal, State or local) terminated for cause or default. 4.22.2 If any of the above circumstances described in the paragraph are applicable to the entity submitting a bid for this requirement, include with your bid an explanation of the matter including any final resolution. 4.22.3 Contractor shall include, without modification, this clause in all lower tier covered transactions (i.e. transactions with subcontractors) and in all solicitations for lower tier covered transactions related to this contract. If this clause is applicable to a subcontractor, the contractor shall include the information required by this clause with their bid. 4.23 VERIFICATION REGARDING COMPLIANCE WITH A.R.S. § 41-4401 AND FEDERAL IMMIGRATION LAWS AND REGULATIONS 4.23.1 By entering into the contract, the contractor warrants compliance with the Immigration and Nationality Act (INA using E-Verify) and all other Federal immigration laws and regulations related to the immigration status of its employees and A.R.S. § 23-214(A). Contractor shall obtain statements from its subcontractors certifying compliance and shall furnish the statements to the procurement officer upon request. These warranties shall remain in effect through the term of the SERIAL # 210050-CI contract. Contractor and its subcontractors shall also maintain Employment Eligibility Verification forms (I-9) as required by the Immigration Reform and Control Act of 1986, as amended from time to time, for all employees performing work under the contract and verify employee compliance using the E-Verify system and shall keep a record of the verification for the duration of the employee’s employment or at least three years, whichever is longer. I-9 forms are available for download at www.uscis.gov. 4.23.2 The County retains the legal right to inspect documents of contractor and subcontractor employees performing work under this contract to verify compliance with paragraph 4.34.1 of this section. Contractor and subcontractor shall be given reasonable notice of the County’s intent to inspect and shall make the documents available at the time and date specified. Should the County suspect or find that the contractor or any of its subcontractors are not in compliance, the County will consider this a material breach of the contract and may pursue any and all remedies allowed by law, including, but not limited to: suspension of work, termination of the contract for default, and suspension and/or debarment of the contractor. All costs necessary to verify compliance are the responsibility of the contractor 4.24 CONTRACTOR LICENSE REQUIREMENT 4.24.1 Contractor shall procure all permits, insurance, and licenses, and pay the charges and fees necessary and incidental to the lawful conduct of his/her business, and as necessary complete any requirements, by any and all governmental or non- governmental entities as mandated to maintain compliance with and remain in good standing. Contractor shall keep fully informed of existing and future trade or industry requirements, and Federal, State, and local laws, ordinances, and regulations which in any manner affect the fulfillment of a contract and shall comply with the same. Contractor shall immediately notify both Office of Procurement Services and the department of any and all changes concerning permits, insurance, or licenses. 4.24.2 Contractor furnishing finished products, materials, or articles of merchandise that will require installation or attachment as part of the contract shall possess any licenses required. Contractor is not relieved of its obligation to obtain and possess the required licenses by subcontracting of the labor portion of the contract. Contractors are advised to contact the Arizona Registrar of Contractors, Chief of Licensing, to ascertain licensing requirements for a particular contract. Contractor shall identify which license(s), if any, the Registrar of Contractors requires for performance of the contract. 4.25 INFLUENCE 4.25.1 As prescribed in MC1-1203 of the Maricopa County Procurement Code, any effort to influence an employee or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct, may be grounds for disbarment or suspension under MC1-902. 4.25.2 An attempt to influence includes, but is not limited to: 4.25.3 A person offering or providing a gratuity, gift, tip, present, donation, money, entertainment or educational passes or tickets, or any type of valuable contribution or subsidy that is offered or given with the intent to influence a decision, obtain a contract, garner favorable treatment, or gain favorable consideration of any kind. 4.25.4 If a person attempts to influence any employee or agent of Maricopa County, the chief procurement officer, or his designee, reserves the right to seek any remedy SERIAL # 210050-CI provided by the Maricopa County Procurement Code, any remedy in equity or in the law, or any remedy provided by this contract. 4.25.5 ABSOLUTELY NO CONTACT BETWEEN THE RESPONDENT AND ANY COUNTY PERSONNEL, OTHER THAN THE OFFICE OF PROCUREMENT SERVICES, IS ALLOWED DURING THE SOLICITATION PROCESS UNLESS THE COMMUNICATION IS IN REGARD TO PRE-EXISTING BUSINESS WITH THE COUNTY. ANY COMMUNICATIONS REGARDING THE SOLICITATION, ITS PARTICIPANTS, OR ANY DOCUMENTATION PRIOR TO THE CONTRACT AWARD MAY BE GROUNDS FOR DISMISSAL OF THE RESPONDENT FROM THE EVALUATION PROCESS. 4.26 CONFIDENTIALITY In the course of the solicitation process, the County may disclose information that is proprietary or confidential. By submitting a bid to the solicitation, the offeror agrees that, except as necessary to prepare a response to this solicitation, neither it nor its agents or employees will communicate, divulge, or disseminate to any third-party persons or entities, any information that is disclosed to it by the County during the course of these discussions without the express written authorization of the County. If the offeror does disclose County proprietary or confidential information to a third-party in preparing a response to this solicitation, it shall require the third-party to acknowledge and comply with this provision. 4.27 CONFIDENTIAL INFORMATION 4.27.1 Any information obtained in the course of performing this contract may include information that is proprietary or confidential to the County. This provision establishes the contractor’s obligation regarding such information. 4.27.2 Contractor shall establish and maintain procedures and controls that are adequate to assure that no information contained in its records and/or obtained from the County or from others in carrying out its functions (services) under the contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the contract. Contractor’s procedures and controls, at a minimum, must be the same procedures and controls it uses to protect its own proprietary or confidential information. If, at any time during the duration of the contract, the County determines that the procedures and controls in place are not adequate, the contractor shall institute any new and/or additional measures requested by the County within 15 business days of the written request to do so. 4.27.3 Any requests to the contractor for County proprietary or confidential information shall be referred to the County for review and approval, prior to any dissemination. 4.28 PUBLIC RECORDS Under Arizona law, all offers submitted and opened are public records and must be retained by the records manager at the Maricopa County Office of Procurement Services. Offers shall be open to public inspection and copying after contract award and execution, except for such offers or sections thereof determined to contain proprietary or confidential information by the Office of Procurement Services. If an offeror believes that information in its offer or any resulting contract should not be released in response to a public record request, under Arizona law, the offeror shall indicate the specific information deemed confidential or proprietary and submit a statement with its offer detailing the reasons that the information should not be disclosed. Such reasons shall include the specific harm or prejudice which may arise from disclosure. The records manager of the Office of Procurement Services shall determine whether the identified information is confidential pursuant to the Maricopa County Procurement Code. SERIAL # 210050-CI 4.29 INTEGRATION This contract represents the entire and integrated agreement between the parties and supersedes all prior negotiations, proposals, communications, understandings, representations, or agreements, whether oral or written, expressed, or implied. 4.30 GOVERNING LAW This contract shall be governed by the laws of the State of Arizona. Venue for any actions or lawsuits involving this contract will be in Maricopa County Superior Court, Phoenix, Arizona. Order of Precedence If there are any conflicts between the contract and Exhibit A, the contract shall prevail. SERIAL # 210050-CI ATTACHMENT A: AGREEMENT PAGE Cives Corporation (Cives) hereby certifies that it has read, understands, and agrees to this binding contract. Cives agrees to fully comply with all terms and conditions as set forth in the Maricopa County Procurement Code, and amendments thereto, together with the specifications and other documentary forms herewith made a part of this specific agreement. 16-0955800 046545398 CIVES CORPORATION FIRM FEDERAL TAX ID # DUNS # Christopher Bowen - General Manager PRINTED NAME AND TITLE AUTHORIZED SIGNATURE 13501 W. Joe R. Ramirez Rd. 480-535-0133 480-535-0133 ADDRESS TELEPHONE # FAX # El Mirage, Arizona 85335 03/05/2021 CITY STATE ZIP DATE www.cives.com cbowen@cives.com WEBSITE URL EMAIL MARICOPA COUNTY, ARIZONA BY: CHAIRMAN, BOARD OF SUPERVISORS DATE ATTESTED: CLERK OF THE BOARD DATE APPROVED AS TO FORM: 03/05/2021 DEPUTY COUNTY ATTORNEY DATE SERIAL # 210050-CI EXHIBIT A: Subcontractor Agreement No. 20026-2183: October 5, 2020 between Johnson Carlier and Cives Corporation dba Cives Steel Company South-West. SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI SERIAL # 210050-CI EXHIBIT B FINAL PAYMENT APPLICATION BETWEEN CIVES STEEL COMPANY AND JOHNSON CARLIER This payment application shows the original contract value less any payments received by Cives Steel Company for work performed under the now cancelled contract between Cives Steel Company and Johnson Carlier for the Southeast Justice Center Project. Then resulting balance remaining on this payment final application will be used as the initial amount of this contract between Maricopa County and Cives Steel Company for the completion of the contracted services. Retainage will be administered by the County as detailed in the original contract with Johnson Carlier. CIVES STEEL Original Contract $2,412,000.00 Change Orders - CO#2 $7,015.00 Total Contract $2,419,015.00 Cives Steel Completed and Stored to Johnson Carlier Thru Pay App #5 $1,243,670.80 Retention Held $124,367.08 Cives Steel Actually Paid Thru Pay App #5 $1,119,303.72 Cives Steel Maricopa County Contract Amount $1,299,711.28 Conditions to Final Payment. Final Payment to the Contractor shall be made within thirty-five (35) days after compliance by the Contractor. Neither Final Payment nor any remaining retainage shall become due until the Contractor submits to the Owner (1) an affidavit acknowledging that all Subcontractors, payrolls, bills for materials and equipment, and other indebtedness connected with the Work will be paid or otherwise satisfied once final payment is made, (2) the written consent of the Surety to Final Payment, (3) a conditional waiver of liens from the Contractor. The Contractor shall also indemnify, defend, and hold harmless the Indemnities against liens by any Subcontractor (collectively “Final Payment”). Within fourteen (14) days after final payment, the Contractor shall provide an unconditional waiver of all Contractor liens. Release of retention and/or securities in lieu of retention shall not occur until an unconditional waiver has been received for the actual work. If the Owner prefers to accept Work that is not in accordance with the requirements of the Contract, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable for the difference in value together with an allowance for damage or loss of quality. Such adjustment shall be effected whether or not Final Payment has been made. SERIAL # 210050-CI EXHIBIT C SCHEDULE Steel erection dates will be mutually negotiated between the CMR, the County and Cives Steel Company after selection and award of a CMR contract by the County. Within 77 Calendar Days from issuance of NTP, Cives Steel Company will complete the structural steel fabrication. If stairs/rails and deck are also released they will be fabricated in roughly the same time frame and available to support the steel erection. Duration for structural steel erection is 9 weeks once the site is ready and the erector can mobilize (this is in accordance with Cives Steel Company contract with Johnson Carlier). Note that this duration does include deck install, but does not include misc metals (many of the misc metals items are dependent on completion of other trades). Also note, there is an amount of coordination between masonry and structural steel that was not fully developed by Johnson Carlier and will need to be addressed. Depending on sequencing, etc this could extend the steel erection duration but Cives Steel Company will work with all parties to minimize this. If Cives Steel Company is not impeded by the mason or other trades completion of the steel erection would occur in the 9 week duration. As discussed, Cives Steel Company will complete their scope of work per their contract documents from Johnson Carlier and their agreed upon contract price with Johnson Carlier. Cives Steel Company will also store the fabricated materials at their location for a reasonable amount of time (i.e. delivery in 2021) at no additional cost.