IGA FCD-MCDOT SCW AREA CHANNEL CROSSINGS.DOCX
Extracted text (via pymupdf_layout)
21987 characters
INTERGOVERNMENTAL AGREEMENT BETWEEN MARICOPA COUNTY AND THE FLOOD CONTROL DISTRICT OF MARICOPA COUNTY FOR SUN CITY WEST AREA CHANNEL CROSSINGS PROJECT (District C-69-21-_____-X-00, IGA FCD 2021A005 County C-64-21-_____-X -00) This Intergovernmental Agreement (Agreement) is entered into by and between the Flood Control District of Maricopa County, a political subdivision of the State of Arizona (District), and Maricopa County, a political subdivision of the State of Arizona (County). The District and the County are collectively referred to as the Parties or individually as a Party. STATUTORY AUTHORIZATION 1. The District is authorized, pursuant to A.R.S. Section 48-3603 et. seq., to construct, operate and maintain flood control structures and facilities and to enter into this Agreement. 2. The County is authorized, pursuant to A.R.S. Section 11-251 and Sections 28- 6701 et. Seq., to lay out, maintain, control and manage public roads within the County. 3. Public agencies are authorized, pursuant to A.R.S. Section 11-951 et. seq., to enter into Intergovernmental Agreements for the provision of services or for joint or cooperative action. BACKGROUND 4. The Maricopa County Board of Supervisors and the Flood Control District of Maricopa County hereby rescind the Intergovernmental Agreement (C-64-20-167- M-00 and C-69-20-026-3-00/FCD 2019A011) approved on May 6, 2020. 5. The County’s Transportation Department evaluated roadway crossings of drainage channels within the Sun City West community and will develop improvements to address traffic clear zone protection at various locations. Proposed work includes replacing vehicular guardrails with extended safety rails, and extending existing drainage culverts where improvements may be needed. Highway User Revenue Funds (HURF) for the County's project, and the joint effort with the District under this Agreement, are coming from the County Transportation Department’s TIP Project TT0615, Sun City West Canal Crossings. February 17, 2021 Page 1 6. The District has various drainage channel sites in the Sun City West community with distressed channel linings. Some of these locations need new access ramps to the channel bottoms, to better facilitate maintenance and inspection activities by the District and the County. The new ramps are expected to include new access gates, which will also provide increased access control. 7. Scoping activities by the Parties has resulted in mutually beneficial opportunities for channel-area improvements. Given this mutual benefit, the County and the District desire to enter into this Agreement to jointly work on improvements at 18 locations in Sun City West, as listed in the attached Exhibit A, which constitute the Project. The estimated target date for completion of the Project is FY 2023. 8. The Board of Directors of the District approved Resolution FCD2019R005 for Repairs and Improvements to the Channels of Sun City and Sun City West on December 11, 2019. This Resolution includes the authorization to negotiate and prepare intergovernmental agreements with potential project partner agencies. 9. Project construction costs for all project activities presented in Exhibit “A” are currently estimated at $2,000,000: 9.1. Project Construction Costs currently estimated at $2,000,00 will be shared equally between parties. 9.2. Related Project Costs including design, environmental and construction management will be paid by the County. 9.3 The District and the County will share construction cost equally with construction planned for fiscal year 2023. To advance construction to fiscal year 2023, the District will pay all construction costs currently estimated at $2,000,000 and the County will reimburse the District the County cost share currently estimated at $1,000,000 no later than the end of Fiscal Year 2026. PURPOSE OF THE AGREEMENT 10. This Agreement identifies and defines the responsibilities of the District and the County for Project activities, including, but not limited to, cost sharing, design, permitting and construction. TERMS OF AGREEMENT 11. The County shall: 11.1 Develop the primary design plans and specs, conduct the environmental review and manage the construction. February 17, 2021 Page 2 11.2 Design the safety rail extensions and access gates for all locations on Exhibit A and incorporate the District's plans for the access ramps and related fencing into the County’s clear zone safety / culvert extension design plans. 11.3 The District will have a review and comment role in the Design of the County's improvements for all locations under this Agreement. 11.4 Upon completion of the sealed plans, the County shall invoice the District for the estimated Project construction cost currently estimated at $2,000,000. 11.5 Construct the access ramps, access gates and the related safety rail extensions. 11.6 Upon completion of construction, the County will provide the District the final construction cost share for each partner. 11.7 Issue no-cost permits to the District for any additional construction and maintenance activities in the Sun City West community, as needed, for location responsibilities under this Agreement. 11.8 Participate in the final inspection of the Project with the District and provide final acceptance of the Project upon its completion. 11.9 Not later than the end of Fiscal Year 2026, the County shall reimburse the District for its share of the Project construction costs. 11.10 Keep the District informed of the County’s planned construction start date and any change in the Fiscal Year. 12. The District shall: 12.1 Design access ramps and related fencing and forward the design plans to be incorporated into the County’s clear zone safety / culvert extension design plans. 12.2 Review and comment in the Design of the County’s improvements for all locations under this Agreement. 12.3 Upon receipt of an invoice for the estimated Project construction cost currently estimated at $2,000,000, pay the invoice within 30 days of receipt. February 17, 2021 Page 3 12.4 Issue no-cost permits to the County for construction and maintenance activities in the Sun City West community, as needed, for location responsibilities under this Agreement. 12.5 Participate in the final inspection of the Project with the County and provide final acceptance of the Project upon its completion. GENERAL TERMS AND CONDITIONS 13. The District funding for the Project is from secondary flood control tax levy revenue and is contingent upon funding availability within the District’s Capital Improvement Program. 14. The Parties agree to equally share the cost of a Project compliance and cost audit to be initiated within sixty (60) days of Project completion, if requested by either Party. An independent auditing firm agreed to by the Parties will perform the audit. Any payments or reimbursements necessary to bring the Project into compliance with the audit findings shall be made within forty-five (45) days of acceptance by the Parties. 15. To the extent permitted by law, each Party will indemnify, defend and save the other Parties harmless, including any of the Parties’ departments, agencies, officers, employees, elected officials or agents, from and against all loss, expense, damage or claim of any nature whatsoever which is caused by any activity, condition or event arising out of the negligent performance or nonperformance by the indemnifying Party of any of the provisions of this Agreement. By entering into this Agreement, each Party indemnifies the other against all liability, losses and damages of any nature for or on account of any injuries or death of persons or damages to or destruction of property arising out of or in any way connected with the performance or nonperformance of this Agreement, except such injury or damage as shall have been caused or contributed to by the negligence of that other Party. The damages which are the subject of this indemnity shall include but not be limited to the damages incurred by any Party, its departments, agencies, officers, employees, elected officials or agents. In the event of an action, the damages which are the subject of this indemnity shall include costs, expenses of litigation and reasonable attorney’s fees. 16. This Agreement shall become effective as of the date it is executed by the Maricopa County Board of Supervisors and the Flood Control District of Maricopa County Board of Directors, and remain in full force and effect until all stipulations previously indicated have been satisfied, except that it may be amended upon written Agreement by all Parties. 17. This Agreement shall be subject to the provisions of A.R.S. Section 38-511. February 17, 2021 Page 4 18. The Parties warrant that they are in compliance with A.R.S. Section 41-4401 and further acknowledge that: 18.1 Any contractor or subcontractor who is contracted by a Party to perform work on the Project shall warrant their compliance with all federal immigration laws and regulations that relate to their employees and their compliance with A.R.S. Section 23-214(A), and shall keep a record of the verification for the duration of the employee’s employment or at least three (3) years, whichever is longer. 18.2 Any breach of the warranty shall be deemed a material breach of the Agreement for which the breaching party may be liable for penalties including termination of the Agreement. 18.3 The Parties retain the legal right to inspect the papers of any contractor or subcontractor employee who works on the Project to ensure that the contractor or subcontractor is complying with the warranty above and that the contractor agrees to make all papers and employment records of said employee available during normal working hours in order to facilitate such an inspection. 18.4 Nothing in this Agreement shall make any contractor or subcontractor an agent or employee of the Parties to this Agreement. 19. Any contractor or subcontractor who engages in for-profit activity and has 10 or more employees, and if the value of the contract is a minimum of $1,000,000, certify it is not currently engaged in, and agrees for the duration of this Agreement to not engage in, a boycott of goods or services from Israel. This certification does not apply to a boycott prohibited by 50 U.S.C. § 4842 or a regulation issued pursuant to 50 U.S.C. § 4842. 20. Each Party to this Agreement warrants that neither it nor any contractor or vendor under contract with the Party to provide goods or services toward the accomplishment of the objectives of this Agreement is suspended or debarred by any federal agency which has provided funding that will be used in the Project described in this Agreement. 21. Each of the following shall constitute a material breach of this Agreement and an event of default (“Default”) hereunder: A Party’s failure to observe or perform any of the material covenants, conditions or provisions of this Agreement to be observed or performed by that Party (“Defaulting Party”), where such failure shall continue for a period of thirty (30) days after the Defaulting Party receives written notice of such failure from the non-defaulting Party provided, however, that such failure shall not be a Default if the Defaulting Party has commenced to cure the Default within such thirty (30) day period and thereafter is diligently pursuing such cure to completion, but the total aggregate cure period shall not exceed ninety (90) February 17, 2021 Page 5 days unless the Parties agree in writing that additional time is reasonably necessary under such circumstances to cure such default. In the event a Defaulting Party fails to perform any of its material obligations under this Agreement and is in Default pursuant to this Section, the non-defaulting Party, at its option, may terminate this Agreement. Further, upon the occurrence of any Default and at any time thereafter, the non-defaulting Party may, but shall not be required to, exercise any remedies now or hereafter available to it at law or in equity. 22. All notices required under this agreement to be given in writing shall be sent to: Flood Control District Maricopa County of Maricopa County Department of Transportation Attn: Director Attn: Director 2801 West Durango Street 2901 West Durango Street Phoenix, AZ 85009-6399 Phoenix, AZ 85009-6399 All notices required or permitted by this Agreement or applicable law shall be in writing and may be delivered in person (by hand or courier) or may be sent by regular, certified or registered mail or U.S. Postal Service Express Mail, with postage prepaid, and shall be deemed sufficiently given if served in a manner specified in this paragraph. Either Party may by written notice to the other specify a different address for notice. Any notice sent by registered or certified mail, return receipt requested, shall be deemed given on the date of delivery shown on the receipt card, or if no delivery date is shown, the postmark thereon. If sent by regular mail, the notice shall be deemed given 72 hours after the notice is addressed as required in this paragraph and mailed with postage prepaid. Notices delivered by United States Express Mail or overnight courier that guarantee next day delivery shall be deemed given 24 hours after delivery of the notice to the Postal Service or courier. 23. This Agreement does not imply authority to perform any tasks, or accept any responsibility, not expressly stated in this Agreement. 24. Any funding provided for in this Agreement, other than in the current fiscal year, is contingent upon being budgeted and appropriated by the Maricopa County Board of Supervisors and the Flood Control District of Maricopa County Board of Directors in such fiscal year. This Agreement may be terminated by any Party at the end of any fiscal year due to non-appropriation of funds. 25. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assignees. Neither Party shall assign its interest in this Agreement without the prior written consent of the other Party. 26. This Agreement, and all Exhibits attached to this Agreement, set forth all of the covenants, promises, agreements, conditions and understandings related to the February 17, 2021 Page 6 Project between the Parties to this Agreement, and there are no covenants, promises, agreements, conditions or understandings, either oral or written, between the Parties other than as set forth in this Agreement, and those agreements which are executed contemporaneously with this Agreement. This Agreement shall be construed as a whole and in accordance with its fair meaning and without regard to any presumption or other rule requiring construction against the party drafting this Agreement. This Agreement cannot be modified or changed except by a written instrument executed by all of the Parties hereto. 27. The waiver by any Party of any right granted to it under this Agreement is not a waiver of any other right granted under this Agreement, nor may any waiver be deemed to be a waiver of a subsequent right obtained by reason of the continuation of any matter previously waived. 28. Wherever possible, each provision of this Agreement shall be interpreted in such a manner as to be valid under applicable law, but if any provision shall be invalid or prohibited under the law, such provision shall be ineffective to the extent of such prohibition or invalidation but shall not invalidate the remainder of such provision or the remaining provisions. 29. Except as otherwise provided in this Agreement, all covenants, agreements, representations and warranties set forth in this Agreement or in any certificate or instrument executed or delivered pursuant to this Agreement shall survive the expiration or earlier termination of this Agreement for a period of one (1) year. 30. Nothing contained in this Agreement shall create any partnership, joint venture or other agreement between the Parties hereto. Except as expressly provided in this Agreement, no term or provision of this Agreement is intended or shall be for the benefit of any person or entity not a party to this Agreement, and no such other person or entity shall have any right or cause of action under this Agreement. 31. Time is of the essence concerning this Agreement. Unless otherwise specified in this Agreement, the term “day” as used in this Agreement means calendar day. If the date for performance of any obligation under this Agreement or the last day of any time period provided in this Agreement falls on a Saturday, Sunday or legal holiday, then the date for performance or time period shall expire at the close of business on the first day thereafter which is not a Saturday, Sunday or legal holiday. 32. Sections and other headings contained in this Agreement are for reference purposes only and shall not affect in any way the meaning or interpretation of this Agreement. 33. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original but all of which together shall constitute the same instrument. Faxed, copied and scanned signatures are acceptable as original February 17, 2021 Page 7 signatures. 34. The Parties agree to execute and/or deliver to each other such other instruments and documents as may be reasonably necessary to fulfill the covenants and obligations to be performed by such Party pursuant to this Agreement. 35. The Parties hereby agree that the venue for any claim arising out of or in any way related to this Agreement shall be Maricopa County, Arizona. 36. This Agreement shall be governed by the laws of the State of Arizona. 37. The District and County have chosen attorneys employed by the Civil Services Division of the Maricopa County Attorney’s Office (“Civil Services Division”) to act as their attorney for the purpose of reviewing this Agreement. In so doing, by their signature below, each party acknowledges that it is aware that the Civil Services Division will represent these two parties to this Agreement, and each party expressly waives any conflict created thereby. End of Agreement - Signature Pages Follow February 17, 2021 Page 8 IN WITNESS WHEREOF, the Parties have executed this Agreement. FLOOD CONTROL DISTRICT OF MARICOPA COUNTY Recommended by: Michael A. Fulton Date Director Approved and Accepted by: Chairman Date Board of Directors Attest by: Clerk of the Board Date APPROVAL OF GENERAL COUNSEL The foregoing Agreement FCD 2021A005 has been reviewed pursuant to A.R.S. 48- 3603, as amended, by the undersigned General Counsel, who has determined that it is in proper form and within the powers and authority granted to the Flood Control District of Maricopa County under the laws of the State of Arizona. Flood Control District General Counsel Date February 17, 2021 Page 9 IN WITNESS WHEREOF, the Parties have executed this Agreement. MARICOPA COUNTY Recommended by: Jennifer Toth, P.E. Date Transportation Director Approved and Accepted by: Chairman Date Board of Supervisors Attest by: Clerk of the Board Date APPROVAL OF DEPUTY COUNTY ATTORNEY The foregoing Agreement has been reviewed pursuant to A.R.S. 11-952, as amended, by the undersigned Deputy County Attorney, who has determined that it is in proper form and within the powers and authority granted to the County by the Board of Supervisors under the laws of the State of Arizona. Deputy County Attorney Date February 17, 2021 Page 10 EXHIBIT A Road/Channel Crossing FCDMC APN Partnering Scope Location 232-05-817A Old El Mirage Road Shorten proposed concrete barrier to allow FCDMC access. Install fencing and gate for operations and maintenance access. 232-09-282 (north side) Beardsley Road Construct 8-feet wide access ramps to the 232-05-817A (south side) bottom of the channel as part of the new transition aprons. Extend MCDOT safety railing to include a FCDMC access gate. 232-06-481A (north side) Spanish Garden Drive Construct 8-feet wide access ramps to the 232-07-454B (south side) bottom of the channel as part of the new transition aprons. Extend MCDOT safety railing to include a FCDMC access gate. 232-08-681A Wildwood Drive Construct 8-feet wide access ramps to the bottom of the channel as part of the new transition aprons. Extend MCDOT safety railing to include a FCDMC access gate. 232-08-681A Conquistador Drive Extend MCDOT safety railing to include FCDMC access gate(s). 232-08-681A Buntline Drive Extend MCDOT safety railing to include FCDMC access gate(s). 232-15-928 (north side) Gemstone Drive Extend MCDOT safety railing to include 232-15-927 (south side) FCDMC access gate(s). 232-15-225 (north side) Aleppo Drive Extend MCDOT safety railing to include 232-15-928 (south side) FCDMC access gate(s). 232-15-056B 138th Avenue Extend MCDOT safety railing to include FCDMC access gate(s). 232-12-426 (north side) Meeker Blvd Extend MCDOT safety railing to include 232-15-056B (south side) FCDMC access gate(s). 232-12-427 (north side) Cavalcade Drive Extend MCDOT safety railing to include 232-12-426 (south side) FCDMC access gate(s). 232-12-428 (west side) 141st Avenue Extend MCDOT safety railing to include 232-12-427 (east side) FCDMC access gate(s). 232-12-298 (west side) Trail Ridge Drive Extend MCDOT safety railing to include 232-12-428 (east side) FCDMC access gate(s). 232-12-297 (west side) 145th Avenue Extend MCDOT safety railing to include 232-12-298 (east side) FCDMC access gate(s). 232-17-909 (west side) Stardust Blvd Extend MCDOT safety railing to include 232-12-297 (east side) FCDMC access gate(s). 232-17-908 (west side) 147th Drive Extend MCDOT safety railing to include 232-17-909 (east side) FCDMC access gate(s). 232-17-907 (west side) Granite Valley Drive Extend MCDOT safety railing to include 232-17-908 (east side) FCDMC access gate(s). 232-20-817 (north side) RH Johnson Blvd Extend MCDOT safety railing to include 232-17-907 (east side) FCDMC access gate(s). February 17, 2021 Page 11