Extracted text (via pymupdf_layout)
7047 characters
Cox Business Services Field Engineering Project Information Date Initiated 5/11/2020 Revision Date CIR Number CIR 1516850 Project Number 415202000001516850 Project Name MCRSD - Durango Transitional Learning Center Project Address 3131 W DURANGO ST Engineer KYLE PLATCHEK Parcel# 105-17-002 Project Type Fiber LE Permit Required? Yes No Property Contact Information Customer Name Jeff Starr Phone# 602-506-2926 Onsite Access Contact Michael Stewart Onsite 623-764-7104 - Michael.Stewart@mcrsd.org Access Phone# Alt Onsite Contact Alt Onsite Phone# Fiber Electronics Information Primary Electronics Location Circuit IDF G ROOM S-07 TIE POINT: AZFWL_S3312 (CHANGED Structure Legacy (Placing Equipment in Suite) FROM AZFWL_S0270) Additional Fiber APPROVED FOR RING AZFWL_SD New RoW Cabinet GPS Coordinates Specific Notes PHNHAZZUFAA - 3131 W DURANGO ST - FTP Utility Source Approval N/A DMARC Location Information DMARC Location IDF G ROOM S-07 Power Provided By Cox Provided Power Rack/Wall Mount Type 19in Rack (Customer Provided) Outlet Type L5-20R Distance to Power Outlet 15' Outlet Quantity 2 Wallboard Type (If Applicable) Existing Customer Wallboard Outlet Voltage 120 Volt DMARC Location Flooring Type Concrete Ground Provided By Customer Provided Ground DMARC Room A/C YES NO Build Under Construction YES NO BLDG Elevator Available YES NO Cox Keybox to be installed YES NO Additional Project/Installation Notes Acronym Information R&R=Remove and Replace / EMT=Electrical Metallic Tubing / SWB=Side Walk Bore / MDF=Main Distribution Frame / IDF=Intermediate Distribution Frame / FP=Fiber Panel / CPE=Customer Premise Equipment BAA Information (BAA Use Only) Private property construction techniques: 1) Before placing new conduit, Cox will attempt to use any existing empty conduit where possible. Verification of existing empty conduit may be required. 2) If new conduit must be placed, Cox will attempt to bore in heavily landscaped and asphalt/concrete areas. Please note, boring techniques require excavation of the property at strategic locations to bore, receive, turn, and cross existing utilities. 3) Soil conditions and/or existing utility conflicts may require Cox to open cut, including any ground coverings such as gravel, grass, asphalt, concrete, brick, etc. Cox will restore any excavation to a condition as good as, or better than, the original condition and according to Maricopa Association of Governments (MAG) specifications or Central Arizona Governments (CAG) or Pima County Association of Governments (PAG). IDF F S-07 ROOM DRAWING 75’ PLACE 1” EMT FOR ELECTRIC THROUGH DROP CEILING TO ELECTRICAL ROOM S-06. COX TO INSTALL DEDICATED 120V-20AMP, 1- ELECTRICAL SINGLE 3 WIRE TWIST LOCK AND 1- ROOM S-07 DUPLEX ELECTRICAL OUTLETS ON THE SAME CIRCUIT. DOOR USE EXISTING GROUND WITHIN ROOM. DOOR 20’ 25' ROUTE FIBER INSIDE IDF G ROOM S-07 TO SPECIFIED RACK. PLACE LEGACY FP ON RACK. IDF G S-07 10’ NORTH EAST 26' PULL 48CT THROUGH 24CT OCCUPIED 2" CONDUIT FROM TIE POINT FIBER VAULT GNIS LOC<3921501512> TO ID LOC<3921501512>. SPLICE LOC<3921501549>. CASE AZFWL_S3312. WEST 276' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<3921501549> TO LOC<3921501596>. END 26' PULL 48CT LEAVE 100' OF STORAGE THROUGH 24CT OCCUPIED IN FIBER VAULT GNIS ID 2" CONDUIT FROM LOC<3921501549>. LOC<3921501512> TO LOC<3921501549>. WEST 276' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<3921501596> TO LOC<832512132>. LEAVE 100' OF STORAGE IN FIBER VAULT GNIS ID LOC<3921501596>. END 276' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<3921501549> TO LOC<3921501596>. WEST 276' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<3921501596> TO LOC<832512132>. WEST 160' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<832512132> TO LOC<480752719>. END 276' PULL 48CT FIBER LEAVE 100' OF THROUGH 24CT OCCUPIED STORAGE IN FIBER 4" CONDUIT FROM VAULT GNIS ID LOC<3921501596> TO LOC<832512132>. LOC<832512132>. SOUTH 160' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<832512132> TO LOC<480752719>. SOUTH 226' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<480752719> TO LOC<480752712>. LEAVE 100' OF STORAGE IN FIBER VAULT GNIS ID LOC<480752719>. END 160' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<832512132> TO LOC<480752719>. SOUTH 200' PULL 48CT FIBER THROUGH 24CT OCCUPIED 4" CONDUIT FROM LOC<480752712> TO LOC<480752705>. END 226' PULL 48CT LEAVE 100' OF FIBER THROUGH 24CT STORAGE IN FIBER OCCUPIED 4" CONDUIT VAULT GNIS ID FROM LOC<480752719> LOC<480752712>. TO LOC<480752712>. EAST END 200' PULL 48CT FIBER THROUGH 24CT 302' PULL 48CT OCCUPIED 4" CONDUIT THROUGH 4" FROM LOC<480752712> CONDUIT FROM TO LOC<480752705>. LOC<480752705> TO LOC<480752796>. LEAVE 100' OF STORAGE IN FIBER VAULT GNIS ID LOC<480752705>. EAST END 302' PULL 48CT THROUGH 4" CONDUIT FROM LOC<480752705> TO LOC<480752796>. 610' PULL 48CT FIBER THROUGH 4" CONDUIT FROM LOC<480752796> TO LOC<480752789>. LEAVE 100' OF STORAGE IN MANHOLE GNIS ID LOC<480752796>. EAST 475' PULL 48CT FIBER THROUGH 4" LEAVE 100' OF STORAGE CONDUIT FROM IN MANHOLE GNIS ID LOC<480752789> TO LOC<480752789>. LOC<480752782>. END 610' PULL 48CT FIBER THROUGH 4" CONDUIT FROM LOC<480752796> TO LOC<480752789>. NORTH 124' PULL 48CT THROUGH 4" CONDUIT FROM LOC<480752782> TO MDF ROOM S-32. END 475' PULL 48CT FIBER LEAVE 100' OF THROUGH 4" CONDUIT FROM STORAGE IN LOC<480752789> TO MANHOLE GNIS ID LOC<480752782>. LOC<480752782>. NORTH INSIDE MDF ROOM S-32 124' PULL 48CT THROUGH 4" CONDUIT FROM LOC<480752782> TO MDF ROOM S-32. 150' PULL 48CT THROUGH 4" CONDUIT FROM MDF ROOM S-32 TO IDF G ROOM S-07. PLACE WALL MOUNTED NORTH INSIDE FTP INSIDE MDF ROOM MDF ROOM S-32 S-32 FOR FUTURE USE. EXTEND 48CT FIBER. 150' PULL 48CT THROUGH 4" CONDUIT FROM MDF ROOM S-32 TO IDF G ROOM S-07. END 124' PULL 48CT THROUGH 4" CONDUIT FROM LOC<480752782> TO MDF ROOM S-32. NORTH INSIDE IDF G ROOM S-07 25' ROUTE FIBER INSIDE IDF G ROOM S-07 TO SPECIFIED RACK. USE EXISTING END 150' PULL 48CT GROUND THROUGH 4" CONDUIT WITHIN ROOM. FROM MDF ROOM S-32 TO IDF G ROOM S-07. NORTH INSIDE IDF G ROOM S-07 25' ROUTE FIBER INSIDE IDF G ROOM S-07 TO SPECIFIED RACK. EAST INSIDE IDF G ROOM S-07 25' ROUTE FIBER INSIDE IDF G ROOM S-07 TO SPECIFIED RACK. PLACE LEGACY FP ON RACK. EAST INSIDE IDF G ROOM S-07 25' ROUTE FIBER INSIDE IDF G ROOM S-07 TO SPECIFIED RACK. PLACE LEGACY FP ON RACK. NORTH INSIDE IDF G ROOM S-07 75’ PLACE 1” EMT FOR ELECTRIC THROUGH DROP CEILING TO ELECTRICAL ROOM S-06. COX TO INSTALL DEDICATED 120V-20AMP, 1-SINGLE 3 WIRE TWIST LOCK AND 1-DUPLEX ELECTRICAL OUTLETS ON THE SAME CIRCUIT. SOUTH 75’ PLACE 1” EMT FOR ELECTRIC THROUGH DROP CEILING TO ELECTRICAL ROOM S-06. SOUTH INSIDE ELECTRICAL ROOM 75’ PLACE 1” EMT FOR ELECTRIC THROUGH DROP CEILING TO ELECTRICAL ROOM S-06. SOUTH INSIDE ELECTRICAL ROOM 75’ PLACE 1” EMT FOR ELECTRIC THROUGH DROP CEILING TO ELECTRICAL ROOM S-06. COX TO INSTALL DEDICATED 120V-20AMP, 1-SINGLE 3 WIRE TWIST LOCK AND 1-DUPLEX ELECTRICAL OUTLETS ON THE SAME CIRCUIT.