COMPETITION IMPRACTICABLE REQUEST_TT0651.PDF
Extracted text (via pymupdf_layout)
46711 characters
DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 Jennifer Toth 12/18/2020 Kevin Tyne 12/18/2020 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL-TABLE A CONSULTANT COST PROPOSAL SUMMARY (Revision No.2) CONSUL TANT: HDR Construction Control Corporation CONTRACT NO.: 2021-021 PROJECT NAME TT0651 - MC85 at 91st. Ave. DIRECT LABOR Classifications Man-hours Hourly Rates Labor Costs Project Manager/Principal 33 $101.40 $3,346.20 Sr. Resident Engineer 3,186 $91.51 $291,550.86 Inspector V /Chief/ MC 2,329 $51.17 $119,174.93 Inspector IV/ TCS 2,675 $41.93 $112,162.75 Inspector Ill 0 $34.21 $0.00 Accountant 80 $46.57 $3,725.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL HOURS: 8,303 $529,960.34 Consultants Subtotal Direct Labor $529,960.34 Consultant's Overhead @ 120.4486% Direct Labor 120.4486% ---------- $638,329.81 Consultant's Profit @10% of (Direct Labor+ Overhead) 10.00% $116,829.02 Consultant's Total Direct Labor $1,285,119.17 DIRECT AND OUTSIDE EXPENSES Description Expense Amount Plotting (at cost) & Field Supplies (at cost) $1,000.00 Travel (Mileage) @ $0.575/mile or current GSA rate. $627.90 PRE-CONSTRUCTION PHASE. Assume: 1 truck: 1-RE. Its 14 miles round trip from HOR Thomas to MCDOT's Durango office. 1 mtg./wk, 18 months, 78 weeks, 1,092 miles CONSTRUCTION PHASE. Assume 50 miles/work day; 12 months, 264 work-days, 4 trucks = 52,800 $30,360.00 CLOSE-OUT PHASE. Assume: 1 truck: 1-RE.14 miles round trip from HOR Thomas to MCDOT's $708.40 Durango office. 4 months, 88 work-days, 1,232 miles Document Control Software: Microsoft Teams or PlansGrid $5,000.00 Consultant's Total Direct and Outside Expenses $37,696.30 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL - TABLE A CONSULTANT COST PROPOSAL SUMMARY (Revision No.2) SUBCONSUL TANT(S) Name of Subconsultant Task Total Cost EPS Group Construction Survey Staking $115,824.14 Ninyo & Moore Materials Testing Services $123,052.00 WSP Field Office Admin $138,012.34 Total Subconsultant(s) ---------- $376,888.48 Cons u It ant's Total Direct Labor ----------- $1,285,119.17 Consultant's Total Direct and Outside Expenses ----------- $37,696.30 Total $1,322,815.47 Consultant's Totals of Direct Labor and Direct and Outside Expenses ---------- $1,699,703.95 TOTAL PROPOSED FEE $1,699,703.95 (Inclusive of Consultant and Subconsultant[s] total proposed fee) HOR Construction Control Corporation Firm Signature Vice President Title 12/7/2020 Date DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 CONSULTANT/SUBCONSUL TANT SCHEDULED PROJECT MAN-HOURS (Revision No.2) CONSULTANT/SUBCONSULTANT NAME: HDR Construction Control Corporation CONTRACT NO.: 2021-021 PROJECT NAME: TT0651 - MC65 at 91st Ave. ----------- DATE: 1'2llf2020 ESTIMATED MAN-HOURS YEAR 2020/2021 TOTALS (ALL PHASES) PROJECT PERSONNEL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB TOTALS PM/PIC 33 .,. I Plan, RE 3,186 ProjectM;inageriPrlnclpa1 1 1 1 1 4 V 2,329 Sr.Resident Engineer 40 8 8 8 64 IV/MC 2,675 lnspectorV/Chlef/MC 0 111/TCS 0 lnspedorlV/TCS 0 Accl 80 lnspectorlll 0 Accountant 4 2 2 2 10 TOTAL 0 0 0 0 0 0 0 0 45 11 11 11 78 78 YEAR 2021/2022 PROJECT PERSONNEL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB TOTALS 100.00% Beate0 ,._ I 100% Plans& - Advert 95% Plans& ROW Ulinty r.:ampl,Udbj Fo, Plans EnY.CIN Clear Cleat Const. PRE.Const ProjectMo1na.,..rlPrindn11 1 1 1 1 1 1 1 1 1 1 1 1 12 PM/PIC 17 Sr.ResklentEnalneer 8 80 8 8 80 8 8 80 60 40 40 80 500 RE 604 lnsoectorV/ChleffMC 0 V 0 lnsoectorN/TCS 173 173 173 519 IV/MC 519 lnsoectorlll 0 111/TCS 0 Accountant 2 2 2 2 2 2 2 2 2 2 2 2 24 Accl 36 TOTAL 11 83 11 11 83 11 11 83 236 216 216 83 1,055 1,055 1,176 Running Total YEAR I 2022/2023 14.16% PROJECT PERSONNEL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB TOTALS 1 NTPv.19 i.;onst- i.;on,t Const..J l:Oflll-4 Const-o const-ti con,t• Con1I..a Consl..S I c;onst- o Constructioo Prolt!ctManaoerlPrincloal 1 1 1 1 1 1 1 1 1 1 1 1 12 PM/PIC 12 St.ResldentEMlneer 40 173 173 173 173 173 173 173 173 173 173 173 1 943 RE 2 076 lnspectorV/ChleffP.IC 80 173 173 173 173 173 173 173 173 173 173 1 810 V 1983 lnsDecl orlVITCS 80 173 173 173 173 173 173 173 173 173 173 1 810 IV/MC 1 983 lnsaectorm 0 lltfTCS 0 Accouot¶t 2 2 3 3 3 3 3 3 3 3 3 3 34 Accl 35 TOTAL I 43 336 523 523 523 523 523 523 523 523 523 523 5,609 5,609 7,265 Running Total 73.33% VEAR I 2023/2024 Closeout PROJECT PERSONNEL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB TOTALS PM/PIG 4 I Const-11 Con11-12 CloH-OU! Close-out Close-out RE 506 Pro!ec:11,lanaoer/Princi ill 1 1 1 1 1 5 V 346 Sr. Resident Ennioeer 173 173 173 80 80 679 IV/MC 173 lnsoector VI Chief/ MC 173 173 173 519 lllfTCS 0 lnsoector IV/ TCS 173 173 346 Acct 9 lnspedOflll 0 Running Total A=unlanl 3 3 2 2 2 12 12.50% TOTAL I 523 523 349 83 83 0 0 0 0 0 0 0 1,561 1,561 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 CONSULTANT/SUBCONSUL TANT NAME: HDR Construction Control Corporation CONTRACT NO: 2021-021 PROJECT NAME: TT0651 - MC85 at 91st. Ave. DATE: 12/7/2020 DIRECT LABOR CLASSIFICATIONS CONTRACT $101.40 $91.51 $51.17 $41.93 $34.21 $46.57 $0.00 $0.00 $0.00 $0.00 TOTAL TASK/PHASE Inspect V / Inspect Inspect Ill Labor Labor Labor Labor Man-hours TOTAL Labor PM/PIC SRE Chief IV/MC /TCS Acct. Class Class Class Class Preconstruction 17 604 0 519 0 36 0 0 0 0 1,176 $80,434.03 Construction 12 2,076 1,983 1,983 0 35 0 0 0 0 6,089 $377,438.81 Closeout 4 506 346 173 0 9 0 0 0 0 1,038 $72,087.50 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 33 3,186 2,329 2,675 0 80 0 0 0 0 8,303 $529,960.34 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 .. -..~~.---- · ------------·------ MC85 at 91st Avenue HDR PROJECT NO. TT0651 Contract No. 2021-021 DERIVATION OF COST PROPOSAL SUMMARY (Figures Rounded To The Nearest $1) ESTIMATED DIRECT LABOR PERSON BILLING CLASSIFICATION HOURS RATE/HOUR TOTAL Project Principal 15 $ 60.09 $ 901 Project Manager 60 $ 46.15 $ 2,769 Senior Field Technician 800 $ 26.25 $ 21,000 Senior Laboratory Technician 350 $ 23.00 $ 8,050 Clerical 75 $ 22.50 $ 1,688 $ $ $ $ $ $ 1,300 Hours Estimated Labor Cost $ 34,408 Overhead 130% $ 44,730 Subtotal $ 79,138 ESTIMATED DIRECT EXPENSES (Listed By Item At Estimated Actual Cost - NO MARKUP) Travel $ 4,025 Asphalt Coring Equipment $ 6,325 Ice $ 250.00 Miscellaneous Expenses $ 25,400 Total Estimated Expenses $ 36,000 ESTIMATED OUTSIDE SERVICES AND CONSULTANTS Firm Cost $ $ $ Total Estimated Outside Services $ PROFIT (Direct Labor +Overhead) 10% $ 7,914 TOTAL ESTIMATED FEE $ 123,052 CONTRACT TIME 365 Calendar Days 9/23/2020 Date t_ ,· )9123/2020 Page 1 or 1 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 MC85 at 91st Avenue HDR PROJECT NO. TT0651 Contract No. 2021-021 ESTIMATED STAFF HOURS - PHASE TASK Scale No Hours/ Project Project Sen Field or !;; Laboratory Senior Clerlcal Total Shts Sheet Principal Manager echn!cla '" echnfcla Task 3.1 Management Services Task 3.1.1 Administration Initiation #DIV/01 Task 3.1.2 Partnerino Set uo and Faciilation Task 3. 1.3 Partnerino & Precon Meetino ê t:Jrķasĸk!J.j:1.!•ĹGĺ,nĻ"ļatĽeľa);;M:i)a1Ŀ,nŀ·••Łsł,moŃt1,ń,aŅ&ņTŇesňtinʼn,aŊP1ŋ•;;:nŌōŎ•ŏnrnŐ•]Aő19[:cŒ•-;]:o,œ1l====================!====t===!======!======t==:::==:!======t=====:!======t======t=====:t=====j Ŕ f--- ŕ:;;]:Ŗŗ====· =====::::====================!====t===!======!======t=====:t======t=====:t======t======t=====:t=====j Monlhtv Progress Estimates Task 3.1.10 Preoare and rocess Chance Orders as needed Task 3.1.11 Final Pavment & Final lnsoection Task 3.1.12 Preoare and maintain a comclete set of As.Built DrSWV'los Task 3.1.13 Project Close Out F.r"'as7k"°3.°'2.71 Task 3.2 lnsoection ""P,=rti"o,=mŘo,-'thvslc=.c',a1"'0"',""'"'"=,ř.,ecŚ,o'.onś,Ŝ-°'G",.,n and Materials Testino Services e"',a"°I W"'o"rk"'lc-n,"o,ec=oo"n,,-------------+---+--+- - -+----+---+---t- -+----+-- -f-- -+-- -1 f-- Task 3.2.2 Perfocm Specialty Inspections: ITS/TrafficSJona!s f--.Lŝ,Şnd=scş,Š.,,==š-----------------------+- Smart Work Zones -t- +-- -+-- -f---+----+- -+---+-- -+-- -+- ---lf--- t.Tc::as:;:kŢ3.°'2.73ţP,::rtcco,=m-=,.c1 a"',c::,..:51y"Ac:,.., =,anc=e•T-::essc,n:::,o•&•Rc:-,= =Ť·=-"--------------+- -t- -+-- -+-- -f---+--;;;aoo:;;---+- -+---+----+-- -+- ---lť Task 3.2.4 Review and Aoorove al QA laborato,vTestino Results/Re 15 52 75 142.0 Task 3.2.5 Provide and Perform Laboratorv Testi'la Servkes 350 350.0 3.3 Construction Staijng and Surveying Task 3.3.1 Perfocm an Base Survevs - Establish/verifv Controls and ElOsW'ln Cro!:.S Sections hŦ=:7ŧ"°:Ũũ:Ūū5ŬŭŮ:,,7ů,C:Űű=ŲųŴsŵŶ•;ŷ.Ÿ6•ŹźŻżŽ:ž-,=•'ſRƀOƁWƂ&ƃTƄC=E"6•--- - - ------ - - -+---+--+- -+----+---+---t- -+----+- - -f-- -+----lf--- hT=a,7kƅ3.73.745Pr=oƆ=·d,Ce='"=N=evƇ,=n7d=mo=n=,m=eƈnƉt,Ɗt,Ƌƌ-::, ,-------------- - --+--+--+- - +---+---+---t- -+----+- - -f-- -+----lf-- Task3.3.5 Perfotm Fnal Survev and measurements f0< final ouantilies & Record Orawinos Task 7 .0 Additional SeNlces Task 7. 1 Constructab1itv Revlew Task 7.2 Plan-ii-Hand Site lnsnection Task 7.3 Attend Corrvnent Resolution Meelino Task 7.4 Additional Services as Directed I 15 60 soo I 350 75 I II 1300.ol Pa;e1d1 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 MC85 at 91 st Avenue HDR PROJECT NO. TT0651 Contract No. 2021-021 EST/MA TE OF DIRECT EXPENSES Travel A. Local Mileage 1 (Current federal rate) = $.575/mile 7,000.000 0.575 lmiles 175 man trips at 40 miles round trip each Subtotal Travel 4,025 I Plotting B. Exhibits at exhibits C. Plots at cost plots - D. Plan Submittals I Half Size Bond Copies at Cop}es Full Size Bond Copies at I Copies Subtotal Plotting ~$=========· Miscellaneous Expenses C. Other - Asphalt Coring Equipment $ 6,325 C. Other - Ice $ 250 C. Other - laboratory testing costs $ 25,400 Subtotal Miscellaneous Expenses 1$ 31,9751 ESTIMATED OUTSIDE SERVICES & CONSULTANTS - 1: I TOTAL ESTIMATED OUTSIDE SERVICES 1$ - I TOTAL ESTIMATED EXPENSES $ 36,000 3/26/2013 Page 1 of 1 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 Table 1 - Breakdown of Estimated Fee Earthwork Senior Field Technician 300 hours @ $ 26.25 /hour $ 7,875.00 Senior Laboratory Technician 100 hours @ $ 23.00 /hour $ 2,300.00 Subtotal $ 10,175.00 Concrete Senior Field Technician 200 hours @ $ 26.25 /hour $ 5,250.00 Senior Laboratory Technician 80 hours @ $ 23.00 /hour $ 1,840.00 Subtotal $ 7,090.00 Asphalt Paving Senior Field Technician 300 hours @ $ 26.25 /hour $ 7,875.00 Senior Laboratory Technician 170 hours @ $ 23.00 /hour $ 3,910.00 Subtotal $ 11,785.00 Project Management and Data Processing Project Manager 60 hours @ $ 46.15 /hour $ 2,769.00 Project Principal 15 hours @ $ 60.09 /hour $ 901.35 Data Processor 75 hours @ $ 22.50 /hour $ 1,687.50 Subtotal $ 5,357.85 Estimated Direct Labor Cost $ 34,407.85 Overhead (130%) $ 44,730.21 Profit (Direct Labor+ Overhead) (10%) $ 7,913.81 Subtotal $ 87,051.86 Direct Expenses Asphalt Coring Equipment 115 hours @ $ 55.00 /hour $ 6,325.00 Ice 50 bags @ $ 5.00 /bag $ 250.00 On-Site Laboratory w/ Mobilization Allowance @ $ 25,400.00 /each $ 25,400.00 Mileage (40 miles round trip@ $.575/mile) 175 trips @ $ 23.00 /trip $ 4,025.00 Estimated Direct Expenses Subtotal $ 36,000.00 TOTAL ESTIMATED FEE $ 123,051.86 Ninyo & Moore I MC85 at 91st Avenuet Phoenix, Arizona I 605629002 I September 23, 2020 1 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL-TABLE A CONSULTANT COST PROPOSAL SUMMARY CONSULTANT: --------------- EPS Group, Inc. CONTRACT NO.: 2021-021 PROJECT NAME TT0651 - MC85 at 91st. Ave. DIRECT LABOR Classifications Man-hours Hourly Rates Labor Costs Survey Manager 10 $56.11 $561.10 Project Manager RLS 17 $44.67 $759.39 Project Manager 30 $35.00 $1,050.00 CADD Technician II 15 $34.11 $511.65 CADD Technician I 39 $25.25 $984.75 Crew Chief 675 $31.25 $21,093.75 Instrument Person 675 $15.50 $10,462.50 Rod Person 107 $15.00 $1,605.00 Secretary/Clerical 10 $24.50 $245.00 $0.00 $0.00 $0.00 $0.00 TOTAL HOURS: 1,578 $37,273.14 Consultants Subtotal Direct Labor $37,273.14 Consultant's Overhead@ 162.72% Direct Labor 162.7200% -------------- $60,650.85 Consultant's Profit @10% of (Direct Labor+ Overhead) 10.00% $9,792.40 Consultant's Total Direct Labor $107,716.39 DIRECT AND OUTSIDE EXPENSES Description Expense Amount mileage@ $0.575/mile (current GSA rate) = 14,100.43 miles estimated $8,107.75 I Consultant's Total Direct and Outside Expenses $8,107.75 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL - TABLE A CONSULTANT COST PROPOSAL SUMMARY SUBCONSULTANT(S) Name of Subconsultant Task Total Cost None Total Subconsultant(s) ---------- $0.00 _______ __ Cons u It ant's Total Direct Labor $107,716.39 ......,. _______ __ Consultant's Total Direct and Outside Expenses $8,107.75 .....,. Total --------------- $115,824.14 Consultant's Totals of Direct Labor and Direct and Outside Expenses _____ $115,824.14 ....... ____ _ TOTAL PROPOSED FEE $115,824.14 (Inclusive of Consultant and Subconsultant[s] total proposed fee) EPS Group, Inc. Firm David Hargrove Signature Project Manager Title 12/4/2020 Date DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL - TABLE A CONSULTANT COST PROPOSAL SUMMARY CONSULTANT: ------------ WSP USA Inc. CONTRACT NO.: PROJECT NAME TT0651 - MC85 at 91st. Ave. DIRECT LABOR Classifications Man-hours Hourly Rates Labor Costs Office Manager 1,557 $37.09 $57,749.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL HOURS: 1,557 $57,749.13 Consultants Subtotal Direct Labor $57,749.13 Consultant's Overhead@ 117.26% Direct Labor $67,716.63 Consultant's Profit @ 10% of (Direct Labor+ Overhead) $12,546.58 Consultant's Total Direct Labor $138,012.34 DIRECT AND OUTSIDE EXPENSES Description Expense Amount Mileage Consultant's Total Direct and Outside Expenses $0.00 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 FEE PROPOSAL-TABLE A CONSULTANT COST PROPOSAL SUMMARY SUBCONSUL TANT(S) Name of Subconsultant Task Total Cost N/A Total Subconsultant(s) ---------- $0.00 Cons u It ant's Total Direct Labor ----------- $138,012.34 Consultant's Total Direct and Outside Expenses ----------- $0.00 Total ------------- $138,012.34 Consultant's Totals of Direct Labor and Direct and Outside Expenses ---------- $138,012.34 TOTAL PROPOSED FEE $138,012.34 (Inclusive of Consultant and Subconsultant[s] total proposed fee) WSP USA Inc. Firm Signature Project Manager Title 12/02/20 Date DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 1-) December 7, 2020 Lisa Ruane, P.E. Construction Engineer Maricopa County Department of Transportation 2901 W. Durango Street• Phoenix, AZ 85009 Subject: Scope and Fee Proposal Submittal Revision No.2 Contract 2021-021 TT0651 - MC 85 at 91st Ave. Dear Ms. Ruane, Thank you for the opportunity Maricopa County Department of Transportation (MCDOT) has afforded HDR Construction Control Corporation (HDR) to provide Construction Administration Services on TT0651, MC85 at 91st Ave. project. Attached please find HDR's Revision No.2 of scope and fee proposal submittal for CA services during the pre construction, construction, and close-out phases of the project. Included in the package are fee proposals from our three proposed subconsultants. This primary change is inclusive of EPS' revised fee proposal, which necessitated a slight revision to HDR's fee proposal package. All other documents remain unchanged. This submittal is based on HDR's 2019 FAR audit report and labor classifications rates from our MCDOT 2018- 019 contract. We are acknowledging that this submittal is being made early in relation to anticipated construction NTP, thus HDR reserves the right to re-negotiate the classifications wage rates along with incorporation of the overhead rate corresponding with the actual NTP of the project. We appreciate the opportunity to provide these CA services for MCDOT and please let me know should you have any questions or require additional information. I could be reached at either 520.275.8404 or maher.salah@hdrinc.com. Sincerely, HDR CY sZoration Maher Salah, PE Vice President & AZ/NM Field Services Managing Principal C: Cover Letter Fee Proposal (HDR) Scope of Work, Exhibit A Fee Proposals (WSP, EPS, N&M) Project File hdrinc.com 20 East Thomas Road, Suite 2500, Phoenix, AZ 85012··3118 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 EXHIBIT A CONSULTANT'S SCOPE OF WORK CONSTRUCTION ADMINISTRATION SERVICES CONTRACT NO. 2021-021 MC 85 at 91st Avenue- Project No. TT0651 1. DEFINITIONS COUNTY Maricopa Department of Transportation (MCDOT} PROJECT MONITOR The official MCDOT representative who will remain available throughout all phases of the construction project and who shall provide guidance to the Consultant during the administration of the construction contract. CONSULTANT Employee(s} of the Prime firm and/or their Sub Consultants, contracted with MCDOT to represent MCDOT and administer the construction contract in accordance with this Scope of Work; Project Plans and Specifications; MCDOT, MAG and other applicable standard details and specifications; the MCDOT Manual for Construction Management; and MCDOT policies and procedures. CONSTRUCTION The performance of contract management, ADMINISTRATION construction inspection, office procedures, safety monitoring, partnering, documenting the work, and all other duties required to successfully manage the project under this contract. Included is enforcement of the MCDOT Title VI program, and all of the requirements of the construction contract. 2. GENERAL 2.1. CONSULTANT shall provide complete construction administration services to the Maricopa County Department of Transportation, hereinafter referred to as COUNTY, and to serve as an extension of the COUNTY staff. The following outline is not intended as a complete task listing, but as a general outline of the level of service required. 2.2. Assign as Resident Engineer, a Professional Engineer licensed in Arizona in Civil Engineering, or an approved related field. The Resident Engineer must have a minimum of five years of proven experience in all aspects of Construction 1 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 Administration for publically owned roadway projects. This individual will be the Lead for the COUNTY throughout the construction of this project. 2.3. Assist and/or represent the COUNTY during project audits when applicable. The assigned RE shall make him/herself available and be able to produce the necessary documents that are requested for these audits. 2.4. Prior to submittal of Fee Proposal, consult with COUNTY to determine the general nature, scope and extent of the construction administration services required of the WORK, unique situations associated with the project, and to identify the need for, and availability of project data or services. 2.5. The project has existing IGA's with the Cities of Phoenix and Tolleson, and coordinating with these agencies will be necessary per requirements of the IGAs and Special Provisions of the construction contract, Addenda and Change Orders. CONSULTANT will be the lead in coordination with the cities throughout construction, and in assuring the conditions of the agreements are met, including assistance with any final computations for cost sharing between the COUNTY and cities. Payment-in-Lieu Agreements also exist between COUNTY, adjacent private development, and possibly adjoining cities. Assistance in the estimated and final cost calculations may be requested. 2.6. Maintain a field office in facilities provided by Construction Contractor in close proximity to the project site, preferably within the project limits. If a suitable location cannot be found within the project limits, the field office shall be located as close to the project as possible. Assist the Contractor in locating a suitable facility. After written notice to proceed, CONSULTANT shall: 2.7. Assist the Contractor in arranging for access, and securing any permits required to enter upon public and private property, as required, for CONSULTANT to perform services required for the WORK. 2.8. Maintain a project staff for the full duration of the contract that is knowledgeable in all areas of work covered within this Scope of Work and the project's construction contract documents. Employees of the CONSULTANT or any SUB CONSULTANTS who do not perform their work in a safe and knowledgeable manner, or who are intemperate or disorderly, shall be removed immediately from the project at the written request of the COUNTY. 2.9. The CONSULTANT or SUB-CONSULTANTS providing services under this contract cannot have the same parent company or any corporate association with the contractor(s) performing work for these projects. 2 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3. SPECIFIC WORK REQUIREMENTS 3.1 MANAGEMENT SERVICES 3.1.1 The CONSULTANT, as contract administrator, shall have the sole responsibility for communicating or relaying information and/or requests to the contractor. Problems or questions concerning the project or the contractor shall be addressed to, and by, the CONSULTANT. The CONSULTANT will be expected to be actively engaged with the project and respond to project issues in an expeditious manner to meet time constraints of the project. 3.1.2 The CONSULTANT shall provide project field inspection staff with vehicular transportation, cellular telephone, and any other required devices to successfully determine the quality of workmanship of the contractor. Field testing equipment for soils and/or concrete as may be required for work under Section 3.2. All project staff is required to have computer access for effective and comprehensive documentation, reporting, analysis and communication. 3.1.3 Prepare, issue and maintain a list of key personnel assigned to the project including contractor and subs, consultant, and any other sub-consultant personnel by listing telephone numbers, e-mail addresses, affiliation and responsibility. 3.1.4 The CONSULTANT shall have a thorough working knowledge and prior experience with Partnering as it relates to the construction of public projects. The CONSULTANT and the staff shall maintain a professional working relationship with the contractor throughout the duration of the construction project. 3.1.5 Either prior to, or no later than five (5) business days after Notice to Proceed for CONSULTANT, CONSULTANT shall meet with the COUNTY to establish the Partnering needs and direction as it specifically applies to this project and the COUNTY Partnering Program. This meeting will also identify all stakeholders beyond the CONSULTANT, COUNTY, and Contractor; address Partnering budget; address facilitation of the initial Partnering Workshop and Pre-Construction meeting; and identify potential venues or formats. 3.1.6 In accordance with the COUNTY Partnering Program, assist the Partnering facilitator, who shall be mutually agreed upon by COUNTY, CONSULTANT and CONTRACTOR, in making arrangements for, and conducting an Initial Partnering Workshop for the project. This Workshop will review the overall scope and intent of the project; discuss the principles of Partnering; establish the unified goals of the Project and the construction team; identify 3 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 Contractor issues; establish the Project's escalation matrix; identify issues of concern from Stakeholders; and develop action plans to address each issue. The CONSULTANT shall be solely responsible for notifying the Stakeholders of this meeting. 3.1.7 The CONSULTANT shall take the lead in following through with Partnering throughout the duration of the project. Partnering shall be a standard agenda item at weekly construction meetings, and will also entail special meetings to specifically address issue resolution and the effectiveness of the Partnering in achieving resolution and construction team effectiveness. The CONSULTANT shall be responsible for documentation of the Partnering, including details of follow through on the action plans for each issue and the resolution of issues. 3.1.8 Make arrangements for and conduct the pre-construction meeting for the project. To maximize efficiency and attendance of key personnel, the pre construction meeting is to be combined with the Initial Partnering Workshop. Agenda templates for the combined meetings are available and shall be tailored to address the specific needs and requirements of the Project. The conference shall be held in one of the conference rooms at Maricopa County Department of Transportation, located at 2901 West Durango in Phoenix, Arizona, or other venue and/or format as appropriate. The CONSULTANT shall be solely responsible for notifying the Stakeholders of this and all subsequent project meetings. Alternative arrangements may be considered for an off-site location if combined with the initial Partnering Workshop. 3.1.9 Prepare a schedule of shop drawings and material submittals to be expected from the Contractor that is consistent with the project schedule. 3.1.10 Review and approve shop drawings and material submittals. Distribute as necessary to appropriate municipal and/or MCDOT Division if their review is desired or specified. CONSULTANT shall confer with other reviewers of submittals as necessary for project requirements, but shall be the singular responding authority of submittal response. Such submittals shall be stamped either "Approved," "Not Approved." or "Approved as Noted", as appropriate, and returned to Contractor. 3.1.11 Prepare a Material Sampling and Testing Plan with the assistance of MCDOT Material Testing Section outlining the required tests, the frequency of testing and sampling requirements for materials anticipated for use on the project in accordance with the MCDOT Sampling & Testing Guide - non Federal and/or MCDOT's Construction Management Manual Appendix "A". The sampling frequency for Correlation/Verification testing will generally occur at the approximate rate of one per five acceptance tests. 4 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3.1.12 Prepare a Materials Certification Log that lists manufacturer's Certificates of Compliance and Certificates of Analysis that will be required during construction. The manufacturer's certifications shall be reviewed to assure that all materials and manufactured items incorporated into the project conform to the plans and specifications. The certifications shall include as a minimum, the information listed in the format of Appendix "A", page 21 of MCDOT's Construction Management Manual. 3.1.13 The CONSULTANT shall submit written narrative progress reports to the PROJECT MONITOR on a weekly and monthly basis. The weekly reports shall be delivered by 9:00 A.M. Monday morning following the week covered in the report, and they shall contain considerable detail about activities on the project. A detail of the CONSULTANT's anticipated type and number of project personnel to adequately cover the work for the up coming week shall also be included. Project staffing shall be proportional to upcoming work, and expertise shall be appropriately assigned. 3.1.14 Monthly reports shall be delivered by the fifth (5) of each month, and shall consist of a brief recap of the project progress for the previous month including comments on schedule and progress, deficiencies, and any problems, which may result in claims or additional expense to the COUNTY. When seventy percent (70%) of the contract time has been used for the project, the CONSULTANT shall advise the PROJECT MONITOR if the project can be completed within the original time frame. If the CONSULTANT cannot, a detailed analysis outlining the time needed to complete the project must be submitted along with a request for an extension of time to the PROJECT MONITOR. This analysis and request must be completed and received by the PROJECT MONITOR prior to eighty percent (80%) of the contract or work assignment time being used. 3.1.15 Each of the project staff performing inspection or assigned responsibility for any project operation is required to maintain a diary of detailed information concerning the contractor's operations for the specific phase of work they are assigned to. These diaries shall be completed for every day that project staff is actively participating in the contract in accordance with the MCDOT Manual for Construction Management, and shall be kept on file in the project field office, and shall be made available to the COUNTY upon request. 3.1.16 Conduct weekly meetings with Contractor's supervisory personnel to provide close coordination and Contractor's understanding of each aspect of the work. At a minimum, one meeting per month shall include a discussion of the status of the project's Partnering relationship and review the partnering evaluation results. Prepare minutes each weekly meeting and transmit to all concerned parties and Stakeholders. The COUNTY shall approve meeting location and schedule. 5 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3.1.17 Determine quantity of work in-place, obtain Contractor's concurrence, and prepare monthly progress payment report(s) utilizing MCDOT's standard format, and submit to the COUNTY within 5 days after the 20th of each month. All signatures shall be in blue ink. The CONSULTANT shall maintain separate and distinct records, files, all inspection diaries, log books, survey staking records, material tests results and required documentation that justify all payments for quantity of work in-place. A process for electronic signatures, may be considered by the COUNTY in lieu of the blue ink signatures. Electronic signatures would be routed through programming as determined by the COUNTY. 3.1.18 Maintain a subcontractor list and a copy of subcontracts. Verify that prime contractor is maintaining a minimum of 50% self-performance. 3.1.19 Analyze problems, which may arise as the result of any changes, actual field conditions, or alterations. Make appropriate analysis of alternative actions and submit recommended solutions, cost analysis, supporting documents and calculations in writing to the COUNTY for review and approval. If a change order is required, make recommendations for and process change orders for submittal to the COUNTY for final approval. The COUNTY shall be consulted regarding the format of the Change Order. Four (4) original change orders shall be submitted, (five (5) for change orders requiring Board approval) on County forms. All signatures shall be in blue ink. The CONSULTANT shall obtain "concurrence" from MCDOT PROJECT MONITOR and Chief Construction Engineer on Major Change Orders and "notify" the same on all Change Orders. A process for electronic signatures, may be considered by the COUNTY in lieu of the blue ink signatures. Electronic signatures would be routed through programming as determined by the COUNTY. 3.1.20 Arrange and conduct a final inspection when work is complete. Prepare a deficiency list and re-inspect items that required repair, replacement or needed additional attention. Coordinate with additional agencies throughout the progression of the PROJECT to verify CONTRACTOR and COUNTY adherence to all construction Details and methods of construction deviating from, or in addition to MAG, MCDOT, and City Supplemental Standards and Details, as applicable. Representatives from all additional agencies are invited to Final Inspections of affected work. 3.1.21 Make final determination of all contract quantities. Prepare and submit final payment request together with final quantity analysis, change orders, and all necessary certificates of performance documents on COUNTY approved forms. 6 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3.1.22 In accordance with the MCDOT PC&I Division FINAL Record Drawing Standard Operating Procedure, prepare FINAL Record Drawings by updating an electronic PDF master file of the COUNTY "AS-Bid" Plan Set to provide an accurate permanent record of the project's actual constructed features. The Record Drawing master file shall be continuously updated throughout construction as changes are constructed and submitted to the COUNTY within 90-days of construction Final Acceptance. All information concerning changes, additions or deletions to the original design shall be made electronically to the master file and shown in red and clouded, with any deleted item(s) crossed or lined out, but not obscured by the record drawing changes. The CONSULTANT Resident Engineer shall provide a sealed and signed record drawing certification statement on the cover sheet. The Resident Engineer's Registered Professional Civil Engineer seal shall be affixed to the cover sheet with, as a minimum, a certification statement similar to the following: RECORD DRAWING CERTIFICATION To the best of my knowledge and belief, the project was constructed as shown hereon. 3.1.23 Establish and maintain a project file according to the MCDOT PC&I Division Filing Indexing Guide, and submit completed file to the COUNTY and include all shop drawings, daily inspection diaries, maintenance manuals, manufacturer's instructions, parts lists, or other pertinent data applicable to the project. File shall also contain copies of all correspondence, inspection logs, reports, test results, photographs, documentation for cause of delays, payment requests, change orders, field orders and sketches, survey notes, quantity estimates and such other applicable documents necessary to provide a complete and accurate job record from beginning to end. Project Record Documents as defined by the PROJECT MONITOR shall be provided in electronic pdf format on a monthly basis throughout the duration of the project. I 3.1.24 Submit a final report stating that the project has been completed in substantial compliance with the contract requirements with the I recommendation that the project be accepted and final payment made to Contractor. Closeout documents and examples are provided in the MCDOT Manual for Construction Management, and shall be submitted no later than 90 calendar days following final acceptance of the project. 3.1.25 Provide post-construction analysis of the project addressing areas of successful prosecution, and specific types of problems encountered, along with recommendations for prevention of similar problems on future projects. In a lead position, participate in post-construction "Lessons Learned" Workshop. 7 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3.2 INSPECTION AND MATERIALS TESTING SERVICES: CONSULTANT shall provide the following Inspection and Materials Testing Services: 3.2.1 Perform all inspection and field documentation to adequately record the quality of the work and as it is being constructed by the contractor. 3.2.2 Provide at least one qualified inspector on the site, as required, when significant work is being performed by Contractor. Provide additional project staff as necessary to match the production of the contractor, which shall remain consistent with the negotiated staffing plan for the contract. Specialty inspection experience for: electrical components, signal equipment, fiber optic cable installation and equipment will be required. The COUNTY may opt to include Landscape inspection and other related services. The CONSULTANT shall provide an inspector with project specific experience of no less than five prior projects of similar components. The CONSULTANT shall submit the proposed inspectors resume and specialty project experience information for review and consideration. 3.2.3 Inspect work in progress, finished work, and keep Contractor informed of acceptability status of the work. If CONSULTANT'S project personnel observe or are aware of unsafe practices or site safety conditions which are patently unacceptable and jeopardize the life and health of employees on the site, or the public, and endanger property adjacent to the work site, CONSULTANT shall immediately notify Contractor and the COUNTY of such unsafe conditions. Nothing herein is intended to relieve Contractor of his contractual responsibility for safety on the project, or to make CONSULTANT responsible for Contractor safety procedures. 3.2.4 Inspect material stored on-site to verify it is stored properly to prevent damage to the material, and the contractor has adequate security measures in place to prevent theft or vandalism. 3.2.5 Complete photographic coverage of the project during construction is not required; however, complete photographic coverage of the site prior to construction and after completion of construction is mandatory. Critical developments or conditions during construction shall be photographed and included in the inspection record, which shall include but not be limited to, flood damage, accidents, substandard work, structural failure, or any other instance that is deemed pertinent by the Inspector. 3.2.6 Thorough inspections shall be made prior to terminal operations, such as backfilling, concrete pours, pipeline tests, and inspections. All correction orders to contractor shall be made in written form with a copy attached to the inspection record. 8 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 3.2.7 Prepare a Project Materials Sampling and Testing Plan in accordance with Appendix A19 of the Construction Management Manual and submit to COUNTY for review. Perform all quality assurance and acceptance testing and reporting for the PROJECT. 3.2.8 Laboratory, field tests, and reports shall be reviewed and signed by a Professional Engineer registered in the State of Arizona. 3.2.9 CONSULTANT shall maintain close contact with Contractor and keep continuously aware of the current schedule. CONSULTANT shall keep Contractor aware of the inspection and testing requirements and the effect these have on work scheduling, in order to avoid delays and misunderstandings. 3.2.10 Materials testing services, both field and laboratory, shall be provided by an organization which is certified through the AASHTO Accreditation Program in the requisite procedures. 3.2.11 Each supervising materials technician shall be certified by the National Institute for Certification in Engineering Technologies (NICET) at Level Ill or above in the applicable field(s) and/or meet the following requirements: • Registered as a Professional Engineer in the State of Arizona with one year of applicable experience, acceptable to the COUNTY • Certified as an Engineer-in-Training by the State of Arizona with one year of applicable experience, acceptable to the COUNTY • Hold a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology, or Construction, with three years of applicable experience acceptable to the COUNTY. 3.2.12 Technicians shall meet one of the following requirements: • Construction Materials Technician certified at Level II or higher by NICET in appropriate subfield • Construction Materials Technician trainee under direct observation of a Level II or Level Ill technician certified in appropriate subfield 3.2.13 At least eighty percent (80%) of CONSULTANT'S inspection team shall meet the following requirements: • Engineer-in-Training certified by the State of Arizona with two years of highway construction experience, acceptable to the COUNTY. • An individual with three years of highway experience, acceptable to the COUNTY and a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology or Construction Management. 9 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 • "Field" certification by the American Concrete Institute (ACI) and the Arizona Technical Testing Institute (ATTI). • Highway Construction Technician certified by NICET. • A NICET certified Engineering Technician in Civil Engineering Technology with five years of highway experience, acceptable to the COUNTY 3.3 CONSTRUCTION STAKING AND SURVEYING : 3.3.1 Perform all base surveys and cross section of existing conditions that may be required as a basis for quantity determination, and/or establishment of construction lines and grades. 3.3.2 Provide construction staking necessary for Contractor's performance of the work. 3.3.3 Perform surveys and measurements during the course of the work, as may be required, in order to determine the quantity of work in place. 3.3.4 Perform final surveys and measurements for final quantity determination and as required for the preparation of record drawings. 3.3.5 Assign overall responsibility for survey work to a Registered Land Surveyor, licensed in Arizona. 3.3.6 Prior to commencement of the construction work, CONSULTANT shall stake limits of right-of-way, temporary and permanent easements. 4. PROJECT MONITOR COUNTY will assign a staff member to serve as contact person to CONSULTANT. The COUNTY representative will periodically visit the site to keep informed of the job conditions and progress and may from time to time, issue instructions or make suggestions to facilitate the work. The COUNTY representative will not assume the duties or responsibilities of CONSULTANT under this Contract. The COUNTY representative will not perform any of the inspection prior to final inspection and will not solve routine problems for CONSULTANT. Problems of an unusual nature shall be referred to the COUNTY representative together with CONSULTANT'S recommendation for solving the problem. The assigned representative will be CONSULTANT'S primary contact. All transactions with the COUNTY under this Contract shall be conducted through and all correspondence shall be directed to the assigned representative. 5. CORRESPONDENCE AND REPORTS 10 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 In addition to project file requirements, CONSULTANT shall submit copies of all relevant correspondence with Contractor to the COUNTY as soon as possible. Meeting minutes shall be transmitted to the COUNTY weekly. Reporting shall be as detailed in Section 3.1. 6. DURATION OF CONTRACT AND PAYMENT FOR SERVICES 6.1 The performance period of each work assignment shall extend from the date of the Notice to Proceed to CONSULTANT, to Ninety (90) calendar days after final construction project acceptance. The term of each work assignment will be extended by change order to correspond to any extensions to the construction contract. 6.2 Whenever Contractor is prevented from working due to causes beyond its control, CONSULTANT'S presence at the job site may not be required with the same frequency and/or duration as during construction activity. 7. ADDITIONAL SERVICES 7.1 Following express written authorization by the COUNTY, CONSULTANT shall provide jobsite construction administration services on an overtime basis, in accordance with Exhibit B, Consultant's Fee Schedule. 7.2 Constructability Review: Upon the COUNTY'S written request, the CONSULTANT shall provide a constructability review of contract documents. Items to include, but not be limited to: • Plan-in hand inspection of the project site. This on-site inspection will include actual field conditions that may not be accurately depicted on Plans due to date of plan development, omissions, or other reasons. Note any conflicts not identified on the Plans. • Review of the Special Provision wording for continuity as they relate to MAG Standard Specifications, MCDOT Supplement, and other Agency specifications as applicable. • Note any missing bid items MCDOT normally incorporates such as the inclusion of items for Variable Message Boards and Uniformed Off -Duty Officer. • Review and help verify that quantities on the Bid Schedule are in agreement with both those on the Plan Quantity Summary Sheets and the Plan sheet call outs. • Review and note any conflicting information between Plans, Special Provisions, MAG Standards and MCDOT Supplement to MAG. • Note if Special Provisions and their measurement and payment sections adequately address the scope of the work in each bid item? Particular attention should be given to the "Remove and Reconstruct", or "Relocate and Adjust" bid items. • Review results should be listed in orderly fashion and shall be categorized by headings of, in order, "Bid Schedule", "Special Provisions", and "Plans" on the standard MCDOT Comment Review Form provided. Findings that affect in more than one area shall be noted under each heading. For example, if the quantity 11 of 12 DocuSign Envelope ID: 27E39E60-1B1B-491E-A865-8E95867755E6 on the Bid Schedule does not match the total on the Quantity Summary totals, not under both "Bid Schedule" and "Plans". Supplemental plan redlines for approximate locations and types of conflicts may also be submitted. • Attend Comment Resolution or other meetings with COUNTY as required. 7.3 Pre-Construction Activities Specific to TT0651: Based on knowledge attained throughout Construction Administration tenure on TT0345 such as "Lessons Learned", working relationships with and standards of !GA Agencies, Utilities within corridor, Existing businesses and new Development construction: • Assist MCDOT Project Management and Consultant Design Engineer in development of the final PS&E package. This will also include attendance at monthly Design meetings, and other meetings on-site, or in office as necessary. • Consult with MCDOT Project Management and Intergovernmental Relations for development of Amendments to existing IGA's with Cities of Phoenix and Tolleson. • Work with MCDOT Utilities Branch in identifying required utility relocations, determining their final locations in relation to final roadway configuration, inspection and documentation of relocations in advance of construction. Utilities anticipated to include SRP (separate divisions for Distribution, Transmission, and Irrigation), Telecommunications (Century Link, Cox, and MCI), water for Cities of Phoenix and Tolleson. • Coordinate with MCDOT Permits, and possibly Cities of Phoenix and Tolleson, on permit applications by third parties, within project Construction and Traffic Control limits. • Assist in the review of estimated quantities and costs for Payment-in-Lieu Agreements with developments within limits of work. Verify as-built quantities and costs. 7.4 Provide other additional services as may be required, upon written authorization by the COUNTY in accordance with SECTION V - AMENDMENTS of the Contract Agreement. (END OF SCOPE OF WORK) 12 of 12