MARICOPA COUNTY OFFICE OF PROCUREMENT SERVICES
ARTICLE 5 CONTRACT LOAD REQUEST
Please provide the following information with your request to have the Price Agreement loaded or modified in the Advantage
system. Omissions or incorrect information will result in the delay of the ability to use this contract for procurements or payments.
™ NewContract © Contract Change Order\Extension\Modification\ Change Order #:
.MA5 D730 190015
Document Code (MAS, CT5, SC5): Department Code: Advantage Contract ID#:
Select Contract Type: @ pBB (JOC (°CMAR (CA/E © Simplified Construction ( Limited Scope
CONSOUDATED JUSTICE COURTS SOUTHEAST.
Contract Document Description: (max 60 characters) :
12/13/2018 3/30/2019
Effective Begin Date: Expiration/Revised Expiration Date:
Retention
$258,118.00
Thresholds/Not to Exceed Amount: (Note: Retainage is applicable only for DBB, CMAR Limited Scope,
and Simplified Construction)
CHAE , NOlte Exmee. AMBUnE . $3,138,562.00
C Securities held in Lieu of retention
Revised . Not to Exceed Amount: 7 $3,396,680.00
(© Completion < 50%, 10% retention Completion > 50%,
5% retention
Accounting Information:
Ph
ivaniage FY Fund Department | Unit | Appr. Unit | Object Baie Activity Program Eiahat| Amount
: (
17
18
19 |445 D470 47 fj | SRIC 9150 }11 FACM SRIC CAPBLD 3,396,680.00
Vendor Number; Y©9000008202 Vendor Name; GOULD EVANS Discount Information: % © Days 30
Vendor Number: Vendor Name: Discount Information:% Days
Vendor Number: Vendor Name: Discount Information:% Days
Vendor Number: Vendor Name: Discount Information:% Days
NIGP Code (Commodity Code); 20510
CHAD ELMS
ipo
Departmental Article 5 Procurement Officer: De Grized Signature:
Print Form | | Reset Form

Maricopa County
Facilities Management Department
Article 5 Delivery Order/Change Order Routing Rev. 10/2018
(J Original Delivery Order \y R) Change Order # 2 CJ Pre -Enc Valication ————
Date: 3/4/19 Project Manager: = Angel Miranda
Vendor Name: Gould Evans Phone #: 602-527-3538
Contract #: 190015-ROQ Work Order#: N/A
4,
Delivery Order #: DO, 190000009331-1 Project : 2895-19-0005
s,
Location Name: Mesa, Az
Project Name: — SE Consolidated Justice Courts
Amount: $3,138,562.00
Funding Source: [J MMs [X] CIP [J Annual Funds (] User Funds
UND DEPT UNIT ACTIVITY |APPR UNIT] OBJ/SUB | DEPT OBJ | LOCATION PROGRAM *PHASE PROG PERIOD AMOUNT
™ 445 ~ D470 ~ 4713 + FACM |X SRJC W 9150-11 \ SRJC ‘. CAPBLD $3,138,562.00
APPROVAL OR REVIEW REQUIRED DATE INIFIAL
1. Allinformation has been reviewed by Project Manager
———1
2. FMD Design & Construction Division Manager Approval
KU
Soul
3. FMD Director Approval
3| 3/ IP (2.
4. Budget Analyst Review (*Phase to be completed by Budget Analyst)
Qcey. on S
Prppevirng Wg, 4
q y y)
5. Article 5 Procurement Review
6. Additional Special or Requested Review (Specify)
7. Article 5 Change Order Processing by OPS
8. Delivery Order Processing
9. CFD Administration Processing
_2,206,;Sse-—.
Delivery Order Total to Date: ~~ $ 248,040.00 $10,078.00 + $3,138.562.00= $3,396,680.00
Project Start Date: 12/10/18 | Project End Date: 3/30/19
DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER:
Remaining Design scope for 2895-19-0005 Southeast Consolidated Justice Courts
(Schematic design, Design Development, 50% CD's, 100% CD's, Construction Administration, Additional Services and a
reimbursable Expense Allowance)
Required Attachments 1. Change Order Package 2. Project Information Sheet w/ Complete Scope 3. Vendor Proposal with Supporting
Documentation 4. Schedule 5. Budget Summary Sheet

eat) CHANGE ORDER
Couns
PROJECT: SE Consolidated Justice Courts CHANGE ORDER NO.: 2
Mesa, AZ
INITIATION DATE: March 4, 2019
TO CONTRACTOR: Gould Evans CONTRACT NO.: 190015-ROQ
521 $.3rd Street, STE 100
Phoenix AZ 85004 CONTRACT DATE: December 10, 2018
Ttem #1 Remaining Design scope for 2895-19-0005 Southeast Consolidated Justice Courts $3, 138,562.00
TOTAL THIS CHANGE ORDER = $3,138,562.00
This Change Order shall constitute-a final settlement of all matters relating to the change in the Work which is the subject of the Change Order, including
but not limited to all direct or indirect co8ts associated with such change, aity impact such change may have on unchanged Work, and any and all
adjustments fo the Contract Sum or the Contract Time. ‘This Change Order supersedes all prior reservations stated or implied.
Not Valid Until Signed By Maricopa County, Architect (if applicable) and Contractor.
The original Contract Sum was $248,040.00
Net Change by previously authorized Change Orders $10,078.00
The Contract Sum. prior to this Change Order was $258,118.00
The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order $3,138,562,00
The new Contract Sum including this Change Order is $3,396,680.00
The Contract Time will be Gnereased} {decreased} (unchanged) by 0 Days
The date of Substantial Completion as of the date of this Change Order therefore is February 28, 2019
The date of Final Completion.as of the date of this Change Order therefore is March 30, 2019
N/A
Contractor Date Architect Date
({Contractorg’ Nanie) (Architect Name
[/ tt A> oe LP
3-4-17 Zi
4
Pré altager’ Date ea AAD Piréctor Date
MARJCOPA COUNTY MARICOPA.COUNTY
Chief Procurement Officer Date
MARICOPA COUNTY
DEPUTY COUNTY ATTORNEY DATE
BY:
CHAIRMAN, BOARD OF SUPERVISORS DATE
ATTESTED:
CLERK OF THE BOARD DATE

MARICOPA COUNTY SE CONSOLIDATED JUSTICE COURTS
EXHIBIT 'A' - Cost Summary Sheet
Basic Services Gould Evans Dibble GBTwo MBI HEI
Total Fee for Phase Architect Consultants {Civil Landscape __|Structural MEP.FP.SEC.IT
Schematic Design § 457,172|$ 349,255]$ 107,917|/$ 34,317/$ 6,000/S 17,020|/$ 50,580
Design Development $ 565,447|§ 360,170/$ 205,277/$ 39,007/$ 10,900/$ 35,300] $ 120,070
50% Construction Documents S 488,452|$ 276,295|$ 212,157|$ 25,452}S 10,800]$ 30,820] $ 145,085
100% Construction Documents 5 592,407] $ 356,460]$ 235,947/$ 35,432]$ 12,100/$ 43,480|/$ 144,935
Construction Administration S 761,586} $ 539,360|]$ 222,226|S 34,976|S$ 8,400}$ 58,980] 5 119,870
$ 2,865,064 $ 1,881,540 $ 983,524 $ 169,184 $ 48,200 $ 185,600 $ 580,540
Additional Services Gould Evans Dibble GBTwo MBJ HEI
Total Fee for Phase Architect Consultants {Civil Landscape —_|Structural MEP.FP.SEC.IT
FF+E coordination S 27,500 | $ 27,500 | $ - s - S - S . S .
Wayfinding & Building Signage $ 19,500 | $ 19,500] $ - $ - 5 - S$ - § -
Renovation; Existing Superior court s 184,720} $ 117,000}$ 67,720] $ - $ - $ 8,000}$ 59,720
Supplemental Campus Survey/
Water Easement $ 6,310 $ 6,310 | $ 6,310
Record of Survey / Aerial Mapping -
South Parking Area ($3500 incl. for
mapping) $ 9,968 | $ - [$ 9,968 | $ 9,968
Fire Flow Test S 500 $ 500 | $ 500
$ 248,498 $ 164,000 $ 84,498 $ 16,778 $ - § 8,000 $ 59,720
Reimbursable Expense Allowance
(SD-CA phases) Gould Evans Dibble GBTwo MBI HEI
Total Fee for Phase Architect Consultants _|Civil Landscape {Structural MEP.FP.SEC.IT
Allowance s 25,000 | $ 25,000 | $ - S - $ - S$ - fs -
§ 25,000 § 25,000 $ - § « § « € ~ § .
Total Summary
Basic Services, Add Service and Expenses Gould Evans Dibble GBTwo MBJ HEI
Total Fee Architect Consultants |Civil Landscape __|Structural MEP.FP.SEC.IT
$ 3,138,562 ]$ 2,070;/540|$ 1,068,022|$ 185,962 | $ 48,200 | $ 193,600] $ 640,260
EXHIBIT A - FEE COST SUMMARY SHEET 1OF1

MARICOPA COUNTY SE CONSOLIDATED JUSTICE COURTS
EXHIBIT ‘B' - Hourly Breakdown - ADDITIONAL SERVICES
Architect Fee Summary - FF&E, WAYFINDING & RENOVATION
Role Hourly Rate | FF&E Coord. | FF&E Coord. | Wayfinding & | Wayfinding & | Renovation | Renovation Fee
Hours Fee Signage Hours| Signage Fee Hours
Principal $ 220,00 - {5s - - 1s - 10.0 | $ 2,200
Sr. Project Manager $ 185,00 - $ - - $ - 40.0 | $ 7,400
Sr. Technical Architect $ 165.00 : $ - - $ - 160.0]$ 26,400
Project Designer $ 155.00 - $ - 16.0}$ 2,480 80.0]/5 12,400
Interior Designer $ 155,00 60.0} $ 9,300 40.0} $ 6,200 130.0]$ 20,150
Project Architect $ 140.00 - 8 - - $ - 158.0|$ 22,120
Designer $ 130.00 - $ - - $ - 80.0|/$ 10,400
Designer $ 130,00 120.0 | $ 15,600 50.0} $ 6,500 80.0} $ 10,400
Designer $ 70.00 38.0|$ 2,600 62.0] $ 4,320 79.0 |$ 5,530
218.0 $ 27,500 168.0 $ 19,500 817.0 $ 117,000
TOTAL ARCHITECT FEE $ 164,000
Civil Engineer Fee Summary - Campus Survey & South Parking Area
Role Hourly Rate |Supp. Campus|Supp. Campus] SouthLot [South Lot Srvy
Survey Hours | Survey Fee | Survey Hours Fee
Project Manager $ 187.00 $ - $ -
QA/QC Manager $ 182,00 $ - $ -
Project Engineer $ 160,00 $ - $ -
Ast. Project Engineer $ 130.00 $ = $ -
Designer $ 116,00 $ - $ -
Land Surveyor (RLS) $174.00 19]$ 3,306 als 1,392
Survey Technician $ 96.00 12] $ 1,154 24) $ 2,304
Survey Crew $ 185,00 10} $ 1,850 i5}$ 2,772
41.0 $ 6,310 47.00 $ 6,468
TOTAL CONSULTANT FEE $ 12,778
Structural Engineer Fee Summary - RENOVATION
Role 100 Renovation | Renovation Fee
Hours
Principal/QA-QC $ 165,00 $ -
Project Manager/EOR $ 140,00 7.0] $ 980
Project EI $ 125.00 28.0] $ 3,500
Engineer $ 110,00 24.0] $ 2,570
Designer $ 95,00 10.0] $ 950
Special Structural Inspector
69.0 § 8,000
TOTAL CONSULTANT FEE $ 8,000
Mechanical, Plumbing, Electrical, Fire Protection, Security & IT Fee Summary - RENOVATION
Role Hourly Rate | Renovation | Renovation Fee
Hours
Principal $ 190,00 0.0] $ -
Project M $ 140.00 64.0] $ 8,960
Lead Mechanical Engineer $140.00 21.0] $ 2,940
Mechanical Engineer $ 130,00 92.0] $ 11,960
Lead Electrical Engineer $ 140.00 21.0] $ 2,940
Electrical Engineer $130.00 92.0]$ 11,960
Lead Plumbing Engineer $ 140,00 11.0] $ 1,540
Plumbing Engineer $ 130.00 46.0) $ 5,980
Fire Protection Engineer $140.00 32,0] $ 4,480
1T/Telecomm Engineer $ 140.00 32.0] $ 4,480
Electronic Security Engi $ 140.00 32.0] $ 4,480
BIM/Cadd Tech $ 85.00 0.0] $ -
Admin $ 85.00 0.0} $ -
443.0 $ 59,720
TOTAL CONSULTANT FEE $ 59,720
EXHIBIT B - HOURS BY PHASE 10F41

EXHIBIT Irrigation Landscape Designer Ast. Project QA/QC Project Civil Designer Designer Designer Project Interior Project Sr. Sr. Principal Architect
B Landscape Project Technical Project
HOURS - design Design Role Engineer Manager Manager Role Engineer Architect Designer Designer Manager Role Fee
Engineer Architect
BY Architect Fee
PHASE Summary
Fee Summary
$ $ s iS S S S S S S S S S S S S
Hourly Summary Hourly Hourly
100.00 100.00 Rate 116.00 130.00 160.00 182.00 187.00 Rate 70.00 130.00 130.00 140.00 155.00 155.00 165.00 185.00 220.00 Rate
SD SD SD
0.0 0.0] 60.0) Hours 231.0 60.0] 55.0] 54.0] 8.0] 54.0] Hours 2328.0 75.0] 447.0] 447.0|}S 249.0}S 124.0/}S 398.0] 99.0}S 340.0] 149.0}$ Hours MARICOPA
$ $ $ $ $ $ $ $ $ S$ $ S S S
SD SD SD
6,000 6,000 Fee 34,317 6,960 7,163 8,640 1,456 10,098 Fee 349,255 5,250 58,110 58,110 34,860 19,220 61,690 16,335 62,900 32,780 Fee
-
COUNTY
DD DD DD
12.00 12.0] 97.0] Hours 266.00 76.0] 62.0] 64.0] 2.0} 62.0] Hours 2618.0 381.0|$ 458.0|S 458.0|S 254.0}S5 254.0|}S 254.0}5 254.0|S 254.0|S 51.0|S$ Hours EXHIBIT SE
$ $ $ S$ S$ S$ 5S $ S$ $ 'B'
DD DD DD -
10,900 1,200 9,700 Fee 39,007 8,749 8,060 10,240 364 11,594 Fee 360,170 26,670 59,540 59,540 35,560 39,370 39,370 41,910 46,990 11,220 Fee Hours
By CONSOLIDATED
CD CD CD Phase
100.0] Hours (50%) 173.00 49.0] Hours (50%) 2017.0 103.0 Hours (50%)
8.00 8.0] 40.0|5$ 40.0|5$ 2.0|$ 42.0|5$ 309.0|}S 370.0|S 206.0|S 370.0}S 206.0}$S 206.0}$ | 206.0}$ 41.0|$
S $ $ CD $ 5 CD $ $ CD JUSTICE
10,800 10,000) (50%) Fee 25,452 5,634 5,200 6,400 364 7,854 (50%) Fee 276,295 21,630 48,100 26,780 51,800 31,930 31,930 16,995 38,110 9,020 (50%) Fee
800 | | |
permit permit permit COURTS
CD(100%)+ CD(100%)+ CD(100%)+
18.00 18.0] 103.0| Hours 242.00 69.0| 56.0|$ 60.0 3.0|$ 54.0|$ Hours 2525.7 308.6|S 370.3|5 205.7|$ 573.7|$ 205.7|S 231.1]}$ 307.4]}S 282.0|$ 41.1]5$ Hours
$ $ $ | | CD S$ S$ |S | | CD $ | | CD
TOTAL permit (100%) TOTAL permit (100%) 356,460 permit (100%)
12,100 1,800 10,300 Fee + 35,432 7,908 7,280 9,600 546 10,098 Fee + TOTAL 21,600 48,137 26,743 80,320 31,886 35,827 50,726 52,170 9,051 Fee +
CONSULTANT CA CONSULTANT CA ARCHITECT CA
FEE 12.00 12.0] 72.0] Hours FEE 233.00 60.00 48.00 55.00] - 70.00 Hours FEE 3732.0 - 2,488.0 - - - - 711.0 533.0] - Hours
$ $ $ $ S$ S$ | $ | $ 5$ S | $ $ $ S | S$ S 5 $ S$ | $ S$ S
CA CA CA
48,200 8,400 1,200 7,200 Fee 169,184 34,976 6,846 6,240 8,800 = 13,090 Fee 1,881,540 539,360 é 323,440 E = 2 = 117,315 98,605 = Fee
OF
2

Admin BIM/Cadd Electronic Fire Plumbing Lead Electrical Lead Lead Project Principal Special Designer Engineer Project Project
IT/Telecomm Mechanical Mechanical, Principal/QA-QC Structural
Protection Plumbing Electrical Mechanical
Tech Security Engineer Engineer Manager Role Structural Engineer Manager/EOR Role
Engineer Engineer Engineer Engineer Engineer Engineer
Engineer Engineer Plumbing, Inspector
Fee
S S |$ S S S S S S S$ S$ S$ S S S S S$ S
Hourly Electrical, 100 Summary
85.00 85.00 140.00 140.00 140.00 130.00 140.00 130.00 140.00 130.00 140.00 140.00 190.00 Rate 95.00 110.00 125.00 140.00 165.00
Fire
SD SD
Hours Protection, Hours
8.00} 16.00] 18.00] 26.00] 18.00] 24.00) 16.00] 40.00] 32.00] 48.00| 36.00] 56.00] 30.00] 136.0 36.0] 8.0] 24.0] 60.0] 8.0]
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
SD SD
- 680 1,360 2,520 3,640 2,520 3,120 2,240 5,200 4,480 6,240 5,040 7,840 5,700 Fee Security 17,020 3,420 880 3,000 8,400 1,320 Fee
&
DD IT DD
Hours Fee Hours
35.0| 35.0] 64.0} 64.0] 64.0] 58.0] 54.0] 92.0] 86.0] 92.0] 86.0] 129.0] 32.0] 288.0 84.0] 24.0] 48.0] 124.0] 8.0]
$ $ $ $ $ $ $ $ $ $ $ $ $ $ Summary $ $ $ $ $ $
DD DD
Fee 35,300 Fee
- 2,975 2,975 8,960 8,960 8,960 7,540 7,560 11,960 12,040 11,960 12,040 18,060 6,080 7,980 2,640 6,000 17,360 1,320
CD CD
Hours (50%) Hours (50%)
17.0] 68.0] 78.0| 78.0} 78.0| 112.0] 26.0] 195.0] 26.0] 195.0] 26.0] 155.0] 38.0] 256.0 84.0) 24.0| 48.0] 92.0| 8.0]
Ss $ $ $ $ $ $ $ $ $ $ $ $ $ CD $ $ $ $ $ $ CD
(50%) (50%)
- 1,445 5,780 10,920 10,920! 10,920} 14,560 3,640 25,350 3,640 25,350} 3,640 21,700 7,220 Fee 30,820 7,980 2,640) 6,000) 12,880 1,320 Fee
| |
permit CD permit
(100%)+ CD(100%)+
17.0] 34.0] 78.0] 78.0] 52.0] 106.0] 26.0] 167.0] 26.0] 167.0] 26.0] 155.0] 114.0] Hours 364.0 120.0] 28.0] 96.0] 112.0] 8.0] Hours
$ $ $ $ $ $ $ $ $ $ $ $ $ $ | | CD $ $ $ $ $ $ | | CD
permit permit
(100%) TOTAL (100%)
5 1,445 2,890 10,920 10,920) 7,280 13,780 3,640 21,710 3,640 21,710 3,640 21,700 21,660 Fee + 43,480 11,400 3,080 12,000 15,680 1,320 Fee +
CA CONSULTANT CA
Hours Hours
35.0] 35.0] 64.0] 64.0] 64.0} 92.0] 21.0) 162.0] 21.0] 162.0] 21.0] 129.0] 32.0] FEE 112.0 16.0] 24.0] 24.0] 44.0] 4.0]
S $ $ $ $ $ $ S$ $ $ S$ $ $ $ $ $ S $ $ $ $ $
CA CA
2,975 2,975 8,960 8,960 8,960 11,960 2,940 21,060 2,940 21,060 2,940 18,060 6,080 Fee 185,600 58,980 45,000 1,520 2,640 3,000 6,160 660 Fee
4	1	54	5	15	0	830	1058	43	2015	-1	
5	1	54	5	15	1	844	1058	26	52	89.438370	368
5	1	54	5	15	2	840	1138	33	15	84.966469	$
5	1	54	5	15	3	839	1215	29	98	88.657242	50,580
5	1	54	5	15	4	842	1476	25	52	91.632484	891
5	1	54	5	15	5	837	1566	33	15	86.950584	$
5	1	54	5	15	6	836	1626	30	116	96.642723	120,070
5	1	54	5	15	7	835	1878	29	77	92.361923	1,092
5	1	54	5	15	8	835	1994	32	15	80.885338	$
5	1	54	5	15	9	833	2055	30	113	95.913055	145,085
5	1	54	5	15	10	832	2306	30	78	90.684464	1,046
5	1	54	5	15	11	833	2423	33	15	84.883636	$
5	1	54	5	15	12	832	2483	29	114	95.543556	144,935
5	1	54	5	15	13	836	2760	24	53	85.272583	902
5	1	54	5	15	14	832	2851	32	15	54.499191	§$
5	1	54	5	15	15	830	2958	29	115	96.856537	119,870
4	1	54	5	16	0	738	2463	33	610	-1	
5	1	54	5	16	1	745	2463	24	96	96.728394	TOTAL
5	1	54	5	16	2	734	2577	43	180	96.572060	CONSULTANT
5	1	54	5	16	3	743	2778	25	48	92.608528	FEE
5	1	54	5	16	4	739	2851	32	15	59.191879	$
5	1	54	5	16	5	738	2957	29	116	96.514824	580,540
2	1	55	0	0	0	723	234	27	2860	-1	
3	1	55	1	0	0	723	234	27	2860	-1	
4	1	55	1	1	0	723	234	27	2860	-1	
5	1	55	1	1	1	723	234	27	2860	95.000000	 
2	1	56	0	0	0	102	240	28	420	-1	
3	1	56	1	0	0	102	240	28	420	-1	
4	1	56	1	1	0	102	240	28	420	-1	
5	1	56	1	1	1	105	240	25	112	93.233612	EXHIBIT
5	1	56	1	1	2	105	362	24	15	89.677612	B
5	1	56	1	1	3	112	393	4	4	89.677612	-
5	1	56	1	1	4	103	408	26	103	96.457504	HOURS
5	1	56	1	1	5	103	523	25	34	96.076714	BY
5	1	56	1	1	6	102	568	25	92	96.076714	PHASE
2	1	57	0	0	0	88	3023	24	89	-1	
3	1	57	1	0	0	88	3023	24	89	-1	
4	1	57	1	1	0	88	3023	24	89	-1	
5	1	57	1	1	1	88	3023	24	89	71.129265	20F2

PROPOSED FEE SUMMARY
The design professional’s fee is presented as a lump sum fee with a list of possible additional services
as needed in Exhibit A. The projected fee for each phase in basic services is listed below. The total for
all basic services, excluding reimbursables, is $2,865,064 based on the scope identified herein. The
DP must request approval from FMD for use of the allowance and the DP must submit backup invoices
with the associated monthly billings.
SCHEMATIC DESIGN $457,172
DESIGN DEVELOPMENT $565,447
50% CONSTRUCTION DOCUMENTS $488,452
100% CONSTRUCTION DOCUMENTS/BIDDING/PERMIT $592,407
CONSTRUCTION ADMINISTRATION $761,586
TOTAL $2,865,064
Reimbursables $25,000
Please refer to Exhibits ‘A’ and ‘B’ for detailed fee calculations for all team members and phases.
Additional Services are also Included for reference and review.
PROPOSED MONTHLY BILLING CASH FLOW SCHEDULE
(based on fourteen (14) months of design phases through permitting)
MONTH 1 $152,390
MONTH 2 $152,391
MONTH 3 $152,391
MONTH 4 $188,482
MONTH 5 $188,482
MONTH 6 $188,483
MONTH 7 $211,371
MONTH 8 $211,372
MONTH 9 $211,372
MONTH 10 $211,372
MONTH 11 $211,372
MONTH 12 $ 8,000
MONTH 13 $ 8,000
MONTH 14 $ 8,000
$2,103,478
A monthly billing cash flow schedule can be provided for the Construction Administration phase at the
appropriate time.
02.25.19
| d evans
Page 2 of 13 Qou

1630 South Stapley Drive
e
Suite 123
| @ Mesa, Arizona 85204
p 602.957.1155
Engineering
www.dibblecorp.com
February 28, 2019
Melissa Farling, FAIA, LEED AP
Principal
Gould Evans521 South 3rd Street
Suite 100
Phoenix, Arizona 85004
RE: Maricopa County Southeast Justice Courts in Mesa, Arizona
Civil Engineering Services Proposal
Melissa,
The following is a clarification of the attached original survey and civil engineering proposal submitted to
Gould Evans on February 11, 2019 for the Maricopa County Southeast Justice Courts in Mesa, Arizona.
This letter also includes the additional scope requested by the County for this project and the
reallocation of our fees per the format requested.
1. Dibble Engineering included a limited number of site meetings/visits during construction in our
original proposal. The County has requested that Dibble Engineering be on-site as needed to
manage the General Contractor and thus we have added an additional fee of $3,980 for
additional site meetings/visits during construction to accommodate this request. This additional
fee will be used as necessary on a time & material basis for any additional site meetings/visits
during construction.
2. The fee spreadsheet included a fire flow test and reimbursable costs that were not in our
original proposal. We have included $500 for a fire flow test and $1,500 for reimbursable
expenses as an allowance that will be used as needed on a time & material basis.
3. Site utility relocations are included in our fee. However, the relocation of any utilities within the
private drive to the east of the site and any of the other surrounding roadways are not included.
Utility relocations are not expected to be required in these areas, therefore we have excluded
this from our fee calculations.
4. Itis anticipated that Gould Evans will coordinate the site & building submittals with support
from Dibble Engineering. In addition, Dibble Engineering will coordinate as necessary with the
City of Mesa and the Maricopa County Flood Control District.
5. Dibble Engineering has also included an additional fee of $1,508 for the abandonment of an
existing water easement and the preparation of a new easement.
FEES:
Basic Services
Supplemental Campus Survey/Water Easement S 6,310
Record of Survey - South Parking Area S 6,468
Schematic Design S 34,317
Design Development S 39,007
50% Construction Documents S 25,452
100% Construction Documents S 35,432
Construction Administration S 34,976
Subtotal $181,962

Melissa Farling
Gould Evans
February 28, 2019
Page 2
Allowances/Reimbursable Expenses
Aerial Mapping — South Parking Area $3,500
Fire Flow Test $ 500,
pil
Reimbursable Expenses wee
Subtotal $5,500
4
Total Fee $187,462
If you have any questions, please feel free to call us at (602) 957-1155.
Sincerely,
Dibble Engineering
Bb-E Unseen
Kent E. Norcross, PE
Vice President, Land Development
If this proposal including the attached back-up documents is acceptable, please so indicate by signing and
dating below. The return of this signed document shall serve as our notice to proceed with this project.
Name (Print), Title
Signature Date
Gould Evans

GBtw
LANDSCAPE ARCHITECTURE, INC.
February 21, 2019
Melissa Farling
GouldEvans
521 S. 39 St., Ste. 100
Phoenix AZ 85004
Re: Contract Proposal for Landscape Architecture Services:
Maricopa County Southeast Justice Courts
Dear Melissa —
GBtwo Landscape Architecture, Inc. (herein GBtwo) is pleased you are considering our firm for landscape architectural
services for your project. We are excited about the possibility of continuing our working relationship with GouldEvans.
- Our scope of services is understood to include schematic design through construction observation for a new Justice
Center and its associated site. Our scope includes hardscape, planting and irrigation design and detailing, as well as
our typical close coordination with Civil Engineering. We have based our scope on the exhibit emailed to us on
02/08/19.
Basic Services:
Schematic Design $ 6,000
Design Development $ 10,900
Construction Documentation (50%) $ 10,800
Construction Documentation (100%) $ 12,100
Construction Observation $8,400
$ 48,200
Jo
Reimbursable Expense Allowance:
Lue
General Expenses $ 1800 Ke
Total Summary $ 49,200
We appreciate the opportunity to make this submittal and look forward to working together on this project.
Respectfully submitted,
GBtwo Landscape Architecture, Inc.
Ufp—-M
Leah Manbeck
President
6115 N. Cattletrack Road Scottsdale, AZ 85250 t 480-991-3384 www.GBtwo.com

MEYER | BORGMAN | JOHNSON
>TRUCTURAL DESIGN + ENGINEERING
February 22, 2019
MS. Melissa Farling, FAIA
Gould Evans
521 S. 3rd St., Suite 100
Phoenix, Arizona 85004
RE: Maricopa County Southeast Consolidated Justice Courts
Northwest Corner Javelina and South Mesa Drive
Mesa, AZ
Dear Melissa:
Please see attached summary of fees for structural engineering services for the above project. Our
understanding of the project is based upon the email received on February 1, 2019 with the project
scope document for full structural design services.
We understand the project will include a new 116,000 sf facility on 2 floors that will be the
consolidation of 4 existing county courts and one adult probation department. The new building will
be located to the north of the existing Superior Court building, either completely detached or
connecting to the existing facility. The design schedule has a planned duration of 11 months and an
estimated construction schedule of 21 months with a design-bid-build project delivery. The estimated
construction cost is $27 to $30 million.
If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours,
MEYER BORGMAN JOHNSON
Ve ji
Kurt Kindermann, P.E., S.£.,LEED AP
Managing Principal
1438 West Broadway Road, Suite 212 Tempe, AZ 85282 www.mbjeng.com 480.747.6737 SEE STRUCTURE.

MEYER BORGMAN | JOHNSON
Basic Services MB3J
Structural
Schematic Design 5 17,020
Design Development $ 35,300
50% Construction Documents $ 30,820
100% Construction Documents $ 43,480
Construction Administration
(including Special Structural Inspection) | 58,980
Uy 185,600
Additional Services MBI
Structural
Renovation; Existing Superior court S 8,000
$ 8,000
Reimbursable Expense Allowance
(SD-CA phases) MBI
Structural
General Expenses S 2,500 J
7
Fire Flow Test ~
$ 250
“d
Total Summary
Basic Services, Add Service and Expenses MBI
Structural
$ 196,100
EXHIBIT A - FEE COST SUMMARY SHEET 1 OF 1

HENDERSON
i
ENGINEERS
February 22, 2019
Melissa Farling
Gould Evans
521 S. 3rd Street, Suite 100
Phoenix, AZ 85004
RE: Maricopa Country Southeast Justice Consolidated Courts SD through CA
Project No.
Dear Melissa:
We are happy and appreciative to be working with Gould Evans and Maricopa County on the Southeast Justice
Consolidated Courts project located in Mesa, AZ.
We are partners with both Gould Evans and Maricopa County in this project and dedicate ourselves to making the
design a great process. However, that dedication doesn’t stop at design. We are committed to helping resolve
problems that occur during construction. If a meeting on site is necessary to resolve a problem, we will be there.
We appreciate Gould Evans’ and Maricopa County’s efforts in ensuring that those on-site meetings are minimal
and that they don’t result in frivolous, inefficient meetings that could be resolved in the field, over the phone, or
through the normal RFI process.
The detailed scope of work for this project is included in the “Agreement for Design Services” document. The
following table represents the fees, which are also in the Agreement for Design Services” document, for each
stage of the project.
5343 N 16™ Street, Suite 460 (602) 336-5200 HENDERSONENGINEERS.COM
Phoenix, AZ 85016

Page 2 of 2
Basic Services
MEP.FP.SEC.IT
Schematic Design S 50,580
Design Development S 120,070
50% Construction Documents S 145,085
100% Construction Documents S 144,935
Construction Administration S 119,870
$ 580,540
Additional Services 0
MEP.FP.SEC.IT
Renovation; Existing Superior court S 59,720
S 59,720
Reimbursable Expense Allowance
(SD-CA phases) 0
MEP.FP.SEC.IT
General Expenses S 2,000 <a = us
a
§ 3:80
,
Total Summary
Basic Services, Add Service and Expenses 0
MEP.FP.SEC.IT
$ 642,260
Please contact me if you have any questions.
Sincerely,
Henderson Engineers, Inc.
Marcus Sanchez
Vice President
Director of Phoenix Operations
5343 N 16™ Street, Suite 460 (602) 336-5200 HENDERSONENGINEERS.COM
Phoenix, AZ 85016

400%
LIGIHX3 ASVL JS 4qIYyXy
ne] o0}]f%
Die 1616 Is |S
3 jo le
5 D,
- a |8 |g ~
g |e &
s.
LO3rOud = alodg
Pajopl|Osuo7
sujal!
SNN3WIL
N je |r [yp feo fe
o J2@l/2# {14 /eIts MONTHS
o/c je solo }]ca
SUNO7)
= |=
& Iz |g |F |e |3
a tee: Pe OS
START
ze |$ 1% lz |& [8
(sells I< lo
ao I~ IR 18 [8 I=
16-Feb-19
23-Feb-19
wa
s
=
7
es 6-Aprl?
13-Apr-19
or} 20-Apr-19
a 27-Apr-19
a
a
a
Ca
wy 1-Jun-19
= B-Jun-19
= 15-Jun-19
22-Jun-19
a 29-Jun-19
a
u
a
a
3-Aug-19
a 10-Aug-19
Os 17-Aug-19
a 24-Aug-19
a 31-Aug-19
Ot
a ———S
a t
ot
a 5-Oct-19
a 12-04-19
Ct 19-Oct-19
a 26-Oct-19
i
we
a
a
a f
= 7-Dec-19
a 14-Dece19
x 21-Dec-19
oI 2B-Dec-19
i
=
wr
=
a 1-Feb-20
or BFeb-20
a 15-Feb-20
a 22-Feb-20
= 29-Feb-20
a
a
a f
a
Z 4-Apr-20
a 11-Apr-20
18-Apr-20
Enar 25-Apr-20
eee
6-Jun-20
eee 13-Jun-20
20-Jun-20
27-Jun-20
ee
eee
1-Aug-20
eee B-Aug-20
15-Aug-20
22-Aug-20
ee
29-Aug-20
eee
eee
3-0c-20
eee
10-Oct-20
17-Oct-20
24-Oct-20
31-04-20
5-Dee-20
12-Dec-20
19-Dec-20
26-Dec-20
Beg
T
740

EXHIBIT cA CD CD DD SD TASK weok SE Exhibit
permit
C - (100%) (50%) 'C' -
review
PROJECT Project
Consolidated Timeline
TIMELINE
21.00] 3.00 2.50 2.50 3.00 3.00 g =
| | Courts
Wed, Fri, Wed, Mon, Wed, Fri,
Aor Jan Nov Aug May Mor 3 7
15 17 06 26 29 01
f= geeer sa5a-
==
= s$3235 saa
$233, nea5
ae
=
f343 aTI5E
|
PERE anaad
lll
agai ages
Page
2
2 of

gouldevans
February 28, 2019
Mr. Angel Miranda
Capital Project Manager
Maricopa County Facilities Management Department
AQ] W Jefferson St, Phoenix, Arizona 85003
Re: Maricopa County Southeast Consolidated Justice Courts Project
Dear Angel,
On behalf of our entire team, we are pleased to present our fee and scope proposal
for the abovementioned project. Per your request, we have prepared our fee for
Schematic Design through Construction Administration services. We have also included
a separate line item for the possible renovation of the existing Southeast Facility cafeteria
and adjoining lobby areas.
We look forward to reviewing this with you and the opportunity to continue our
relationship with FMD and Maricopa County. In the meantime, should you have any
questions, please feel free to contact me at 480.231.1382.
Sincerely,
Melissa M. Farling, FAIA, LEED AP
Principal, Gould Evans
521 8 3°" STREET #100
PHOENIX, AZ 85004
602.234.1140
KANSAS CITY LAWRENCE PHOENIX SAN FRANCISCO NEW ORLEANS
WWW.GOULDEVANS.COM

PROPOSED FEE SUMMARY
The design professional's fee is presented as a lump sum fee with a list of possible additional services
as needed in Exhibit A. The projected fee for each phase in basic services is listed below. The total for
all basic services, excluding reimbursables, is $2,865,064 based on the scope identified herein. The
DP must request approval from FMD for use of the allowance and the DP must submit backup invoices
with the associated monthly billings.
SCHEMATIC DESIGN $457,172
DESIGN DEVELOPMENT $565,447
50% CONSTRUCTION DOCUMENTS $488,452
100% CONSTRUCTION DOCUMENTS/BIDDING/PERMIT $592,407
CONSTRUCTION ADMINISTRATION $761,586
TOTAL $2,865,064
Reimbursables $25,000
Please refer to Exhibits ‘A’ and ‘B’ for detailed fee calculations for all team members and phases.
Additional Services are also Included for reference and review.
PROPOSED MONTHLY BILLING CASH FLOW SCHEDULE
(based on fourteen (14) months of design phases through permitting)
MONTH 1 $152,390
MONTH 2 $152;391
MONTH 3 $152,391
MONTH 4 $188,482
MONTH 5 $188,482
MONTH 6 $188,483
MONTH 7 $211,371
MONTH 8 $211,372
MONTH 9 $211,372
MONTH 10 $211,372
MONTH 11 $211,372
MONTH 12 $ 8,000
MONTH 13 $ 8,000
MONTH 14 $ 8,000
YO
$2,103,478
A monthly billing cash flow schedule can be provided for the Construction Administration phase at the
appropriate time.
02.28.19
gouldevans
Page 2 of 13

PROJECT INFORMATION — BASIS OF PROPOSAL
Assumed Project Information:
Construction Cost Range: $27,000,000 to $30,000,000
Building Area: 115,000 sf (approx.)
Approximately 13 acres of site work including relocating and redeveloping displaced parking
Site: Located at the Maricopa Superior Court Campus, 222 E Javelina Ave, Mesa, AZ 85210.
Program elements; 4 new Justice courts, Adult probation suite, jury assembly, associated office and
support spaces and a connection to the existing Southeast Facility with shared security screening.
Site includes public parking, reserved staff and secured staff parking. No in-custody spaces are
required.
e The proposal is based on Concept | in the programming document dated 02.15.19.
e Method of project delivery is design-bid-build and the permit set will be one package.
e Renovation of the cafeteria and lobby is based on approximately 10,000-12,000 sf. (refer to
additional services in Exhibit A).
SCOPE OF WORK
The project will include design and construction phase services: Schematic Design, Design
Development, Construction Documentation, Bidding/Permitting and Construction Administration. The
base fee is for the new building. Fees for the renovation scope of work, as well as other potential
additional services. are listed separately.
1.0 Architecture / Interiors Scope of Work
1.1 Schematic Design
The Schematic Design Documents shall consist of site and floor plans, elevations, sections, etc,
more specifically identified in the list of deliverables that follow:
a. Preliminary site plan showing walks, parking drives, landscaped areas, retention and detention
areas
Schematic floor plans; all floor levels
Reflected ceiling plan
moan Exterior elevations
Diagrammatic building sections, each direction through building with structure indicated.
Typical wall sections to show materials, relationships, and construction intent, including
structure.
Narrative of design rationale
Preliminary life safety / code review
Room materials list
Preliminary draft of project manual including specification table of contents
Net assignable and gross area calculations
02.28.19
gouldevans
Page 3 of 13