Extracted text (via pymupdf_layout)
19516 characters
Office of Procurement Services GOODS AND SERVICES COMPETITION IMPRACTICABLE FORM This form is to be used when an agency believes an acquisition is a single source and the acquisition dollar amount is above $5,000. The Chief Procurement Officer can approve purchases up to $100,000. Board of Supervisors approval is required if the acquisition is over $100,000. This form must be submitted for approval to: Office of Procurement Services l 320 W. I ...I.-v. tit I Drn,k, f 01/,111fly A7 . ‘S... CICIlf) ,.....f,111., I 4.1A, 11,4111,, ,I. uvc...e...,..,.,/,. 4n1 "Ico I C -73 71— i I I, ati I.,' z-- lui 11111 ItAJL L.+G IGLOIIICU t....L.- III WC pUll.111119 - IIIC. DEPARTMENT NAME DEPARTMENT RX# Transportation PROPOSED CONTRACT VENDOR NEED IDENTIFIED Date: Jan 24 2019 Company: Aztec Engineering REQUESTED DELIVERY Address: 4561 E. McDowell Rd Date: Feb 14 , 2019 City, State: Phoenix, AZ QUOTED PRICE: 81,487 Zip/Postal Code: 85008 Phone: (602) 454-0402 Accounting String: Fax: (602) 454-0403 Contact Name: Mark Gilliland DESCRIPTION OF GOODS OR SERVICE REQUIRED: The estimated cost of this Procurement is: (7:5_ $100k (> $1 00k Is this a Technology Procurement? C.Yes *No The category of >$1001< is selected because the total procurement request is over the Chief Procurement Officer's signature authority. SINGLE SOURCE CATEGORY (Check applicable box, attach documentation or provide explanation below.) Marlcopa County Procurement Code MC1-351 states: "Single source" means an acquisition where, competition is impractical because of standardization, warranty, or other factors as approved by the Board of Supervisors. NOTE: The following are unlikely to be sufficient single source justifications: • Personal or agency preference for a product or vendor • Agency perception that the vendor is the best qualified (this should be determined through a competitive process) • Lack of agency planning resulting in limited time to conduct a competitive procurement • Special incentive or deal offered (can be assessed in open and competitive solicitation) • Agency convenience C)Grant specified (supporting documents attached) r, Software license renewals, additions, or upgrades available from ' ' only one source C)Mailing lists, subscriptions or media advertising n Brand compatibility available from only one source (no other distributors) nWarranty voided if service provided by other contract vendor ()Other proprietary situation *Other (Provide written explanation below) THIS PROCURMENT IS A SINGLE SOURCE BECAUSE (attach additional page if needed): Provide additional design services and coordination as a result of required bridge design updates to be in conformance with current design specifications, design practice and construction standards. The original scope intended for Aztec Engineering to utilize previously completed bridge plans (completed in year 2012). Aztec Engineering has the project history and detailed design knowledge of the project for the updated bridge plans, and associated specifications, and engineer's estimate. The continuation of their services adds efficiency and consistency to the project. The project schedule would be impacted severely should a different consultant be contracted. SEARCH A search was conducted consisting of: (check all that RESULTS apply) LI Market research rj Public notice given, list El no alternatives were Identified El Other vendors contacted El Other x no alternatives were deemed acceptable because (explain below): Describe the search from above in *kg:native Is to use another design consultant and this is not acceptable because of the unfamiliarity other consultants have to this project, as well as additional delay to the project schedule. Aztec Engineering has the history and detailed knowledge of the project issues to complete this design. PRICE MC1-352-B states: The Using Agency requesting a Competition Impracticable Procurement shall provide written evidence to support a Competition Impracticable determination containing an explanation of why the proposed procurement process is Advantageous to the County; and the scope, durat on, and estimated total dollar value of the procurement. Price has been fairly and reasonably established Comparison to public sector contract pricing by: f—i Comparison to previous comparable purchases 171 Discount off published catalog pricing 1-j from a different vendor III Market survey El Independent estimate El Other, explain: Describe methodology and results (attach any written supporting data, e.g., survey or market analysis): The fee for this work is consistent with other approved contract rates for this type of work. CERTIFICATIONS 1 certify: 1) I recognize that the Maricopa County Procurement Code requires the use of competitive solicitations unless exempted by law. I have reviewed the information and materials relevant to this procurement of goods and services, and am requesting approval of an exception to the competitive process for the reasons described; 2) the price to be paid to the proposed single source vendor is fair, reasonable, and provides the best value to Maricopa County; and 3) this request for an exception to the competitive solicitation process is not the result of inadequate advance planning or for purposes of securing the services of a preferred vendor. Agency Head or Agency Head Delegate Signature (Required) Printed Name Ygnat re Date Office of Procurement Services The CPO can approve procurements up to $100,000. This request is over $100,000 and must be submitted as an agenda item to the Board of Supervisors for consideration. Ki Recommended to BOS for approval. Printed Name Signature Date Email Save Scope of Services — Project Specific Scalping and Final Design Deer Valley Road: El Mirage Road to 109th Avenue Work Assignment No. 3 Consultant: AZTEC Project No: TT0248 Contract No.: 2015-032 Maricopa County Department of Transportation 2901 W. Durango Street Phoenix AZ 85009 December 2018 Scope of Services Project Specific Table of Contents SCOPE OF SERVICES — PROJECT SPECIFIC 3 Project Overview 3 Project Location 3 Project Background 3 Project Purpose 3 Length of Services 3 100.3.3 Matrix of Responsibilities 3 100.3.4 Matrix of Deliverables 5 100,3.5 Communication Plan 6 100,4 Design Criteria 7 400.1 Stakeholder Meetings 7 1200.1 Project Submittals 7 List of Tables Table 1 — Matrix of Responsibilities 3 Table 2'— Matrix of Deliverables 6 Table 3 — Contact Table 6 Table 4—Design Criteria 7 Table 5 — Project Submittals Table 7 Project No.: TT0248 Contract No.: 2015-032 Revised: December 2018 Page 2 of 7 Scope of Services Project Specific SCOPE OF SERVICES - PROJECT SPECIFIC Project Overview Project Location The Deer Valley Road: El Mirage Road to 109' 1' Avenue (DVR) project is located in the northwest Valley and is approximately 2.5 miles in length. Specifically, the project lies within Sections 18 and 19, Township 4 North, Range I East and Sections 13 and 14, Township 4 North, Range 1 West of the Gila and Salt River Baseline & Meridian, Maricopa County, Arizona, Project Background The DVR area is mainly comprised of undeveloped open desert surrounding the Agua Fria River (A FR). There are residential developments in the western portion of the area. The existing Williams Drive roadway provides local Access from El mirage Road to 117 11' Avenue. Several active sand and gravel raining operations are located in the AFR. Project Puipose The DVR project will provide an additional crossing of the AFR between Bell Road and Happy Valley Parkway, Bell Road is currently the only bridged east-west crossing of the river between Olive Avenue and Happy Valley Parkway, a span of 10 miles. This Scope of Services and Cost Proposal for additional design services are being submitted as a Change Order to Work Assignment No. 3. Length of Services The length of additional design services is estimated to be six months from Notice to Proceed (NTP). Post design services are estimated to be another 15 months once construction is awarded. 100.3.3 Matrix of Responsibilities Table 1— Matrix of Responsibilities Scope Item Consultant MCDOT Other (Identify) Section 100 Project Management N/A 200 Data Acquisition N/A 300 Land Survey N/A 400 Project Coordination X 500 Utilities and Railroad N/A 600 Environmental N/A 700 Alternatives Analysis N/A 800 Technical Memoranda and N/A Reports 900 Plans, Specifications and Estimate X 1000 Right-of-Way N/A 1100 Value Engineering N/A 1200 Submittals N/A 1300 Bidding Phase N/A 1400 Post Design N/A Project No.: TT0248 Contract No.: 2015-032 Revised: December 2018 Page 3 of 7 Scope of Services Project Specific AZTEC originally completed the final design of this project for MCDOT in 2013. Sealed plans, specifications, estimate and bid schedule were submitted at that time Subsequently, MCDOT approved the use of roundabouts at the 117 th Avenue and 109' Avenue intersections with DVR. In addition, mining activities have continued in the AFR changing the existing ground conditions. AZTEC was then tasked to provide Final Design Update with Roundabouts through a previous Work Assignment. This previous scope of work included revising the original construction documents to incorporate the roundabouts and change in existing ground conditions by adding new sheets and revising original sheets to meet current MCDOT standards. The eurrent construction standard details were to be referenced in the plan set. The original plans were not to be changed if possible. The pre-30% and 30% submittals were made in accordance with this previous scope of work. The 60% submittal was enhanced to include the new and revised sheets, and the original sheets at the request of MCDOT to provide a complete plan set for reference of the review team, Extensive comments were received on the combined plan Set and several comment resolution meetings have been held, including a sepal 'ate constructability review. The 95% and Sealed PS&E submittals are pending ongoing Utility Coordination primarily concerning APS's design of their joint trench, MCDOT has requested an additional submittal of the 95% plans to the utilities labeled as the 60% resubmittal. MCDOT has also requested that the Agua Fria River (AFR) Bridge and Agua Fria Truck Road Reliever (AFTRR) Underpass designs be reviewed and updated per current ADOT and AASI-1TO design criteria and standards, The bridge design and sheet revisons will not be included in the 60% resubmittal. Additional efforts are required to complete the bridge design based on the 60% review comments and requests received to date and as follows. 100 Project Management No additional AZTEC support is required. 200 Data Acquisition No additional AZTEC support is required. 300 Land Survey No additional AZTEC support is required. 400 Project Coordination A maximum of Mk) AZTEC staff members will attend three Stakeholder Meetings concerning the bridge designs. No additional AZTEC support is required. 500 Utilities and Railroad No additional AZTEC support is required. 600 Environmental No additional AZTEC support is required. 700 Alternatives Analysis No additional AZTEC support is required, 800 Technical Memoranda and Reports No additional AZTEC support is required. 900 Plans, Specifications and Estimate MCDOT has requested that the Agua Fria River Bridge and Agua Fria Truck Road Reliever Underpass designs be reviewed and updated per current ADO'!' design criteria and standards. Additional efforts are required to complete the bridge design based on the 60% review comments and requests received to date and as follows: Project No.: TT0248 Contract No.: 2015-032 Revised: December 2018 Page 4 of 7 Scope of Services Project Specific • Update design to current LRFD Bridge Design Specifications (7' Edition with 2016 Interim Revisions) is excluded • Add list of current ADOT SD Sheets (Both Bridges) • Change approach slab (SD 2.01) quantities to VSQ.FT (Both Bridges) • Barrier, Curb & Approach Slab Concrete to be 4000 psi (per ADOT typical concrete strengths) • Perform AFR Exterior Girder Re-Design • Use SD 1.05 Pedestrian Fence (Both Bridges) • Perform AFR Pier and Abutment Cap Design Evaluation • Evaluate Both Bridge DeSignS for Operating Rating of 2.0 or Larger and provide a Load Rating Report o Request Bridge Numbers from ADOT • Add AFR Minimum and Maximum Dimensions (Abut Caps, Wingwalls and Pier Caps) • Change AFR Girder Stirrup Spacing to 15" Centers • Evaluate Joint Installation Table • Re-Evaluate AFTRR Design for ADOT Standard Concrete Strengths • Add Minimum and Maximum Sidewalk Dimensions to AFTRR Typical Section • Add 44" F-Shaped Barrier as ADOT SD 1.0 on AFTRR • Use #4 Spiral Bar for AFTRR Drilled Shafts • Add AFTRR Minimum and Maximum Dimensions (Sidewalk, Abutment and Wingwalls) • Add Reference Callouts as Needed (Both Bridges) • PrOvide Cross References to Bridge Plans as Required for Dimensioning • Evaluate AFTRR Abutment and. Wingwall Design • Evaluate AFTRR Span Reinforcing. Design No additional AZTEC support is required. 1000 Right-of-Way No additional AZTEC support is required. 1100 Value Engineering No additional AZTEC support is required. 1200 Submittals No additional AZTEC support is required, 1300 Bidding Phase Na additional AZTEC support is required. 1400 Post Design No additional AZTEC support is required. 100.3.4 Matrix of Deliverables MicroStation will be used to develop CADD deliverables and will use MCDOT'S CADD Standards, Project No.: TT0248 Contract No,: 2015-032 Revised: December 2018 Page 5 of 7 Scope of Services Project Specific Table 2 Matrix of Deliverables Item Deliverable 60% 95% 100% Sealed Resubtnittal Allowance PS&E Bridge Plans DF S D = Draft, F Final & S Sealed 100.3.5 Communication Plan Table 3 — Contact Table Phone Name Role Agency Mailing Address Email Address Number Ben Project 2901 W. Durango Street benmarkert@mail, MCDOT 602-506-8651 Marken Manager Phoenix, AZ 85009 maricopa.gov Jimmy Bridge 2901 W. Durango Street jimmycarnp@mall. MCDOT 602-506-4880 Camp Engineer Phoenix, AZ 85009 maricopa.gov Bassem 2901 W. Durango Street bassemnaba@mail. Drainage MCDOT 602-506-1713 Naba Phoenix, AZ 85009 maricopa.gov Jessy Utility 2901 W. Durango Street jessyernert@mail.m MCDOT 602-506-4681 Emert Coordinator Phoenix, AZ 85009 aricopa.gov Greg 2901 W. Durango Street greghunter@marico Survey MCDOT 602-506-4679 Hunter Phoenix, AZ 85009 pa.gov Environmental 2901 W. Durango Street joepinto@maricopa Joe Pinto MCDOT 602-506-8068 Manager Phoenix, AZ 85009 .gov Right-of-Way 2901 W. Durango Street patmertz@maricop Pat Mertz MCDOT 602-506-4639 Manager Phoenix, AZ 85009 a.gov Bryan Communicatio 2901 W. Durango Street bryanpahia@marico MCDOT 602-506-0543 Pahia ns Phoenix, AZ 85009 pa.gov 2901 W. Durango Street johnshl@maricopa. John Shi Materials MCDOT 602-506-8658 Phoenix, AZ 85009 goy Brian 2901 W. Durango Street brianneves@marico Traffic MCDOT 602-506-4626 Neves Phoenix, AZ 85009 pa.gov David 9875 North 85 th Avenue, charles.andrews@P Roadway MCDOT 602-506-2826 Fritz Peoria, AZ 85345 eoriaaz.gov Charles 2901 W. Durango Street davidfritz@maricop Peoria 623-773-7358 Andrews Phoenix, AZ 85009 a.gov Mark Project 4561 East McDowell Rd AZTEC 602-659-9351 mgilliland@aztec.us Gilliland Manager Phoenix, AZ 85008 Felipe Project 4561 East McDowell Rd AZTEC 602-458-9273 fmedrano@aztec.us Medrano Engineer Phoenix, AZ 85008 Tony 4561 East McDowell Rd Drainage AZTEC 602-458-7487 tboldch@aztecus Bokich Phoenix, AZ 85008 Andrew Traffic AZTEC 602-659-9309 4561 East McDowell Rd amoreno@aztec.us Project No.: TT0248 Contract No,: 2015-032 Revised: December 2018 Page 6 of 7 Scope of Services Project Specific Moreno Phoenix, AZ 85008 Mario 4561 East McDowell Rd mcolecchia@aztec. Bridge AZTEC 602-458-7494 Colecchia Phoenix, Al 85008 US Dan 4561 East McDowell Rd dwoelzlein@aztec.0 Woelzlei Landscape AZTEC 602-659-9317 Phoenix,. AZ 85008 s n Justin 4561 East McDowell Rd jhopprnann@aztec. Hoppman Environmental AZTEC 602-458-9261 Phoenix, AZ 85008 US n 100.4 Design criteria Table 4 — Design Criteria Criterion Reference Section Current ADOT Bridge Design Criteria and As Applicable Standards Current MAG Specifications and Details with MCDOT As Applicable Supplements 400.1 Stakeholder Meetings A maximum of two AZTEC staff members will attend three Stakeholder Meetings concerning the bridge desighs. The Meetings shall be held in MCDOT's office, located at 2901 West Durango Street. All Meetings will last approximately two hours. 1200.1 Project Submittals Table 5 —Project Submittals Table Legend: Copies H# - Number of Hard Copies Requested Name TBD) Name E - Indicates Electronic Sul3mittal is Requested TBD) Hard Markert Manager) Last Company Last of Name, Representative Name, (Stakeholder Ben (Project (Utility Number First First Submittal Document Total 95% Plans, Specs and Estimate (P ojec ) E E E 5 Sealed Plans, Specs and Estimate (Project) E E E RAPItoenix\ProjectslAZE1574_MCDOT On-CaII_Eng_pes\ProjAdmin \ Work Assignment 3 Contract Modification 2\2018 I 219mkg- DeerValleyRoadScopeRnvO.docx Project No.: TT0248 Contract No.: 2015-032 Revised: December 2018 Page 7 of 7 Deer Valley Road: El Mirage Road to 109th Avenue AZTEC PROJECT NO. TT0248 Contract No. 2015-032 DERIVATION OF COST PROPOSAL SUMMARY (Figures Rounded To The Nearest $1) ESTIMATED DIRECT LABOR PERSON BILLING CLASSIFICATION HOURS RATE/HOUR TOTAL Project Principal 86.59 Project Manager 4 $ 62.49 250 Senior Engineer 116 $ 65.02 7,542 Project Engineer 202 $ 52.13 10,530 Engineer/Designer 150 $ 38,52 5,778 CADD/Technician 100 $ 30.59 3,059 Project Administration 19.43 572 Hours Estimated Labor Cost 27,159 Overhead 172,7% 46,898 Subtotal 74,057 ESTIMATED DIRECT EXPENSES (Listed By Item At Estimated Actual Cost - NO MARKUP) Travel 24 Plotting Miscellaneous Expenses Total Estimated Expenses 24 ESTIMATED OUTSIDE SERVICES AND CONSULTANTS Firm Cost Total Estimated Outside Services PROFIT (Direct Labor +Overhead) 10% 7,405.72 TOTAL ESTIMATED FEE $ 81,487 CONTRACT TIME 730 Calendar Days 12/19/2018 Date June 2017 Page 1 013 12.0 260.0 220.0 60.0 572.0 3 AZTEC 2015-032 Total of 2 Paw No. Contract Project Administra tInn , CADDITech niclan 80 20 100 I I I Engineer/D esigner 80 60 10 150 Project Engineer 2 120 60 20 202 I I Senior Engineer 6 80 20 10 116 I Project Manager 4 4 Project Principal _ 5.8 1.6 Hours/ Sheet --...—, No Shts 38 38 PHASE Scale - HOURS STAFF Avenue ESTIMATED 109th to TASK Road Mirage El Reports Estimate TT0248 and Road: Meetings and Evaluation NO. Management Coordination Railroad Memoranda Specifications Design Revisions Plans Phase Valley Acquisition Stakeholder and Plans Design PROJECT Project Project Utilities Technical Plans, 95% Bridge Sheet Sealed Right-of-Way Submittals Bidding Post 2017 Deer Data 400.1 900.6 900.8 June 100 200 400 500 600 900 1000 1200 1300 1400 Deer Valley Road: El Mirage Road to 109th Avenue AZTEC PROJECT NO. 110248 Contract No. 2015-032 ESTIMATE OF DIRECT EXPENSES Travel A. Local Mileage at 0.54 Subtotal Travel Plotting B. Exhibits at $ exhibits C. Plots at plots D. Plan Submittals Half Size Bond Copies at Copies Full Size Bond Copies at Copies Subtotal Plotting Miscellaneous Expenses C. Other 5,5 x 11 0 @ $0,03/copy (3000 copies) 11.0 x 170 @ $0.06/copy (7500 copies) Full Size Mylars 0 @ $9.25 Full Size Vellums 0 @ $3.30 Messenger 6 @ $21.95 Subtotal Miscellaneous Expenses ESTIMATED OUTSIDE SERVICES & CONSULTANTS TOTAL ESTIMATED OUTSIDE SERVICES TOTAL ESTIMATED EXPENSES 24 June 2017 Page 3 of 3