EXHIBIT D TORTILLA SITE CONNECTION DIAGRAM (OPTION 2) AND RACK PRINT.PDF

Maricopa County — Formal (2019-02-13)

View PDF Item 56 Meeting page

Extracted text (via pymupdf_layout) 1739 characters
SAGUARO LAKE (COUNTY)
ROUTER
SW
M/W
STEWART MTN DAM COMM ROOM (SRP)
STWEART MTN COUNTY CABINET
(COUNTY)
ACCESS, AC POWER (HYDRO
INVOLVEMENT) M/W
SRP
SW
M/W
NETWORK
ROUTER DSX MUX
2 DS1s
10 Mbps 5 Mbps
POLE SPLICE BY SRP POLE SPLICE BY SRP
KYRENE REGEN (SRP) KYRENE 500 CONTROL HOUSE (SRP) TORTILLA FLAT (COUNTY) FISH CREEK (COUNTY)
2 DS1s
2 FIBERS
NEW NEW NEW
FP FP MUX ROUTER ROUTER
ROUTER FP FP
18 Mbps
MULTIMODE MULTIMODE
15 Mbps SW JUMPER JUMPER
NEW NEW NEW
FP LC JMUX JMUX LC
MIW NODE NODE
NEW FIBER
CANYON LAKE (COUNTY)
KYRENE (COUNTY)
NEW
MIW
FP
SINGLEMODE SC-APC
JUMPER SW
ROUTER
ROUTER
LEGEND:
SRP RESPONSIBILITY
COUNTY RESPONSIBILITY
COUNTY SRP CONNECTION DIAGRAM. VSD
Exhibit D page 1 of 2

48 BLANK
47
46
45 NOTES:
44
1- SRP WILL
43 TERMINATE A 12 FIBER
42 CABLE.
41 2- SRP WILL ASSIGN 4
40 FIBER STRANDS.
39
3- AT THE TIME THAT
38 SRP INSERTS THE
37 NEW JMUX NODE INTO
THE RING; SRP WILL
36 PERFORM THE POLE
35 SPLICE.
34
4- SRP WILL INSTALL A
33 JMUX NODE AND A
32 FIBER PANEL.
31 5- SRP WILL NEED
30 ACCESS TO THIS
BUILDING TO
29
MAINTAIN NETWORK &
28 FIBER EQUIPMENT.
27
6- COUNTY WILL
26 PROVIDE AS
25 FOLLOWS:
A) RACK SPACE AS
24 SHOWN IN BLUE.
TO
23 B) ACCESS TO SITE.
COUNTY’S EQUIPMENT
22 C) 2-48VDC, 1 1/3 AMP
FROM A FUSE DIST.
FIBER 21 PANEL TO POWER
JUMPER 20 JMUX COMMON SHELF D JMUX EQUIP.
RING 93 D) GROUND
19 MF-HM CONNECTION TO A
18 GROUND BAR.
E) FIBER JUMPER TO
17
COUNTY’S EQUIP.
16 (CONNECTORS AT SRP
15 EQUIP. ARE LC)
14 REQUIRED BLANK FOR E
13 FUTURE EQUIP.
12
11
10
9 SRP FIBER PANEL F
8
7 BLANK SITE: TORTILLA FLAT
6
RACK: LAYOUT
5
4 DATE: 1-5-2017
3
2 FILE: TORTRACK.VSD
1
RACK ARRANGEMENT
(REAR VIEW)
1 RACK UNIT = 1.75" SHELF IDENTIFIER
Exhibit D page 2 of 2
#1 ISSUE FOR CONST. T3001042 1-5-17 /AXM