Fee Proposal
For
Maricopa County East Animal Welfare Improvements
Animal Care and Control Facility - Maricopa County
REV. 1 December 23, 2018
December 18, 2018
Line and Space, LLC 627 East Speedway, Tucson, AZ 85705 520-623-1313

Line and Space, LLC
627 East Speedway
Tucson, Arizona 85705
520.623.1313
520.623.1303 fax
henrytlineandspace.com
December 23, 2018
Angel Miranda, Capital Project Manager
Maricopa County Facilities Management
401 W. Jefferson Street
Phoenix, Arizona 85003
RE: Fee Proposal REV. 1
Maricopa County East Animal Welfare Improvements
Dear Mr. Miranda:
Enclosed is our revised Fee Proposal for the East Animal Care location of the Maricopa
County Central Animal Welfare Improvements Project. Our fee is based on our
understanding of the project, per the Program Document dated 11/30/18 and the DBB
Professional Services Contract dated 11/2017.
Please note the following regarding our proposal:
- Fee is for Conceptual Design through Construction Administration
- Project requires no LEED submittal/certification
- Permit Fees paid by Maricopa County
- Submittal effort to governing jurisdictions for approval is not included
- Off site utility and improvement plans are not included
- CLOMR/LMOR Preparation and Processing is not included
- All printing requirements by Maricopa County vendor
- Furniture Selection by Maricopa County
- Project Construction Budget is approximately $15,800,000.00
- Project size is approximately 43,000sf of new facility space.
- Fee is based on a Design/Bid/Build project delivery method, if a CMAR is used
additional fee will be required
- Fee Includes a $25,000.00 allowance
The following pages outline our fee and effort for Conceptual Design through
Construction Administration. Please call if you have any questions.
An American Institute of Architects Western Mountain Region Firm of the Year

Maricopa East Animal Welfare Improvements
Fee Summary Line and Space, LLC
Line and Space, LLC 12/18/2018 REV. 1 12/23/18
Cost Summary
Consultant L and S Subtotal Koret AA Speedie Presidio McGann MWG KWA M3 Dibble
Basic Services Total Fee for Phase Profit/Fee @ 0% Architects Consultants Consult Consult Geotech Civil Landscape Structural Mechanical Electrical Cost Est. Survey
Programming - Complete $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Conceptual and Schematic Design $248,705.39 $0.00 $160,172.39 $88,533.00 $0.00 $2,325.00 $0.00 $14,753.00 $5,405.00 $21,950.00 $26,200.00 $17,900.00 $0.00 $0.00
Design Development $370,584.29 $0.00 $202,437.29 $168,147.00 $0.00 $3,825.00 $0.00 $31,277.00 $10,645.00 $29,050.00 $40,600.00 $35,500.00 $17,250.00 $0.00
Construction Documents $765,274.14 $0.00 $499,040.14 $266,234.00 $0.00 $4,575.00 $0.00 $36,324.00 $30,745.00 $66,400.00 $52,900.00 $53,750.00 $21,540.00 $0.00
Bidding $22,735.72 $0.00 $7,859.72 $14,876.00 $0.00 $0.00 $0.00 $4,936.00 $2,075.00 $470.00 $3,220.00 $4,175.00 $0.00 $0.00
Geotechnical Investigation/Perc Test $6,522.95 $0.00 $973.78 $5,549.17 $0.00 $0.00 $5,549.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Survey $13,451.78 $0.00 $973.78 $12,478.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $12,478.00
Construction Administration $365,515.65 $0.00 $265,924.65 $99,591.00 $0.00 $0.00 $0.00 $22,786.00 $8.220.00 $22,780.00 $33,480.00 $12,325.00 $0.00 $0.00
Total Fee for Basic Services $1,792,789.92 $0.00 $1,137,381.75 $655,408.17 $0.00 $10,725.00 $5,549.17 $110,076.00 $57,090.00 $140,650.00 $156,400.00 $123,650.00 $38,790.00 $12,478.00
Consultant L and S Subtotal Koret AA Speedie Presidio McGann MWG KWA M3
Additional Services Total Fee for Phase Profit/Fee © 0% Architects Consultants Consult Consult Survey Civil Landscape Structural Mechanical Electrical Cost Est
Presentation Model (not included) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Rendeiings (5 total) $13,647.06 $0.00 $13,647.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Signage Design $29,430.74 $0.00 $29,430.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CLOMR/LOMR (not included) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Fee for Additional Services $43,077.80 $0.00 $43,077 80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Consultant L and S Subtotal Koret AA Speedie Presidio McGann MWG KWA M3
Reimbursable Expenses Total Expenses for Phase Profit/Fee 0% Architects Consultants Consult Consult Survey Civil Landscape Structural Mechanical Electrical Cost Est.
Programming $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Conceptual and Schematic Design $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Design Development $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction Documents $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Bidding $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction Administration $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Expenses (allowance) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Services and Expenses Each Discipline $1,180,459.55 $655,408.17 $0.00 $10,725.00 $5,549.17 $110,076.00 $57,090.00 $140,650.00 $156,400.00 $123,650.00 $38,790.00 $12,478.00
Total Fee Services and Expenses $1,835,867.72
Allowance $25,000.00
TOTAL $1,860,867.72

Project Schedule
Maricopa County East Animal Welfare Improvements
Animal Care and Control Facility
Line and Space, LLC
November 21, 2018
November 28, 2018 Rev. 1
November 29, 2018 Rev. 2
Date Phase/Meetings/Location
2018
November 30 Program Complete
December 3-7 Program Review and Approval by MC
December 7 Project Scope and Budget Finalized by MC
2019
January 4 Design Fee Finalized
January 15 MC BOS Approve Contract
January 16 NTP from MC
February 11 Conceptual Design Presentation to MC — Phoenix
February 12 Conceptual Design Approval by MC
March 4 Schematic Design Progress Presentation to MC - Phoenix
April 1 Schematic Design Final Presentation to MC — Phoenix
April 2-8 Schematic Design Final Review by MC
April 9 Schematic Design Review and Approval Meeting with MC - Phoenix
May 1 Design Development Progress Presentation to MC - Phoenix
June 12 Design Development Final Presentation to MC — Phoenix
June 13-19 Design Development Final Review by MC
June 20 Design Development Review and Approval Meeting with MC - Phoenix
September 13 CD 50% Complete
September 16-20 CD 50% Review by MC
September 23 CD 50% Review and Approval with MC - Phoenix
2020
December 17 CD 100% Complete
December 18-31 CD 100% Review by MC
January 2 CD 100% Review and Approval with MC — Phoenix
January 17 CD Final Complete Submitted to MC
January 20-February 7 Permitting Initial
February 10-14 Permitting Response
February 28 Permitting Resubmit

Maricopa County East Animal Welfare Improvements
Hourly Rate Schedule Line and Space, LLC
12/18/2018
Personnel Classification 2018 Hourly Rate
Architectural - Line and Space, LLC
Principal III - Designer $173.89
Principal II - Senior Associate $168.10
Principal I - Project Manager $150.70
Project Architect III $144.91
Project Architect ll $139.11
Project Architect I $133.04
Staff Architect III $123.54
Staff Architect II $114.04
Staff Architect I $104.53
Staff IV - Senior CADD $95.03
Staff III - Junior CADD $85.53
Staff II- GADD $76.02
Staff I - CADD $66.52
Interior Design $114.04
Specification Writer $133.04
Student Intern ll $47.52
Student Intern I $38.01
Clerical $57.02
Animal Facility Design Consultant - Animal Arts Design
Principal I $165.00
Principal II $140.00
Associate $125.00
Project Manager I $115.00
Project Manager II $85.00
Drafting and Production $65.00
Civil Engineering - Presidio Engineering
Principal $150.00
Sr. Project Manager $139.00
Sr. Project Engineer $118.00
Sr. Civil Designer $102.00
Sr. GADD Operator $87.00
Administrator II $100.00
Admin Assistant $62.00
Landscape Architect - McGann and Associates
Principal Landscape Architect $140.00
Project Landscape Architect $105.00
Landscape Architect $75.00
Landscape Designer $55.00
Specification Writer $140.00
CAD Technician $55.00
Clerical $50.00

Personnel Classification 2018 Hourly Rate
Structural - Martin White Griffis
Principal $175.00
Senior Structural Engineer $150.00
Structural Engineer $125.00
Engineer EIT/Designer $110.00
CAD $90.00
Mechanical Engineering (HVAC, Plumbing and Fire Protection) - Kelly Wright & Associates
Principal $180.00
Project Manager $150.00
Project Engineer $135.00
Spec. Writer $135.00
CAD Drafter $75.00
Clerical/Admin $65.00
Electrical Engineering - M3
Electrical Project Manager $130.00
Electrical Designer IV $85.00
Electrical Designer II $65.00
Clerical $65.00
Cost Estimating - CCMC
Certified Cost Professional $130.00
Senior Cost Estimator $110.00
Clerical $45.00
Survey - Dibble
Land Survey Manager $179.00
Land Surveyor $155.00
CADD Technician $113.00
Survey Crew $190.00
Admin Assistant $82.00

Maricopa County East Animal Welfare Improvements
Line and Space

Maricopa County East Animal Welfare Improvements
Line and Space, LLC 12/18/2018 REV. 1 12/23/18
PHASE HOURS RATES FEE SUBTOTAL
PROGRAMMING
Principal III 0 $173.89 $0.00
Project Architect III 0 $144.91 $0.00
Project Architect II 0 $139.11 $0.00
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 0 $76.02 $0.00
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$0.00
CONCEPTUAL and SCHEMATIC DESIGN
Principal III 112 $173.89 $19,475.68
Project Architectl III 403 $144.91 $58,398.73
Project Architect II 453 $139.11 $63,016.83
Staff Architect III 0 $123.54 $0.00
Staff III 51 $85.53 $4,362.03
Staff II 128 $76.02 $9,730.56
Stafff I 78 $66.52 $5,188.56
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$160,172.39
DESIGN DEVELOPMENT
Principal III 74 $173.89 $12,867.86
Project Architectl III 222 $144.91 $32,170.02
Project Architect II 597 $139.11 $83,048.67
Staff Architect III 80 $123.54 $9,883.20
Staff III 294 $85.53 $25,145.82
Staff II 386 $76.02 $29,343.72
Staff I 30 $66.52 $1,995.60
Spec. Writer 60 $133.04 $7,982.40
Studnt Intern II 0 $47.52 $0.00
$202,437.29
CONSTRUCTION DOCUMENTS
Principal III 27 $173.89 $4,695.03
Project Architect III 498 $144.91 $72,165.18
Project Architect II 1358 $139.11 $188,911.38
Staff Architect III 442 $123.54 $54,604.68
Staff III 889 $85.53 $76,036.17
Staff II 1105 $76.02 $84,002.10
Staff I 0 $66.52 $0.00
Spec. Writer 140 $133.04 $18,625.60
Studnt Intern II 0 $47.52 $0.00
$499,040.14

PHASE HOURS RATES FEE SUBTOTAL
Construction Administration
Principal III 16 $173.89 $2,782.24
Principal ll 80 $168.10 $13,448.00
Project Architect II 1631 $139.11 $226,888.41
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 300 $76.02 $22,806.00
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Support Expenses 0 $0.00 $0.00
$265,924.65
Bidding
Principal III 2 $173.89 $347.78
Project Architect III 0 $144.91 $0.00
Project Architect II 54 $139.11 $7,511.94
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 0 $76.02 $0.00
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$7,859.72
Geotechnical
Principal III 4 $173.89 $695.56
Project Architect III 0 $144.91 $0.00
Project Architect II 2 $139.11 $278.22
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 0 $76.02 $0.00
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$973.78
Survey
Principal III 4 $173.89 $695.56
Project Architect! III 0 $144.91 $0.00
Project Architect II 2 $139.11 $278.22
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 0 $76.02 $0.00
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$973.78

PHASE HOURS RATES FEE SUBTOTAL
RENDERINGS - 5 Renderings
Principal III 2 $173.89 $347.78
Project Architect III 4 $144.91 $579.64
Project Architect II 4 $139.11 $556.44
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 160 $76.02 $12,163.20
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$13,647.06
Signage Design
Principal III 6 $173.89 $1,043.34
Project Architect III 14 $144.91 $2,028.74
Project Architect II 78 $139.11 $10,850.58
Staff Architect III 0 $123.54 $0.00
Staff III 0 $85.53 $0.00
Staff II 204 $76.02 $15,508.08
Stafff I 0 $66.52 $0.00
Spec. Writer 0 $133.04 $0.00
Studnt Intern II 0 $47.52 $0.00
$29,430.74
REIMBURSABLES
$0
$0
TOTAL 9692 $1,180,459.55

Maricopa East Animal Welfare Improvements
Conceptual Design through Schematic Design
Line and Space. LLC
Line and Space, LLC 12/18/2018
floors PrImipahl P Arch.III P 81ch II P Arch.I Staff Arch. Ill Staff With II Staff Ill Staff II Staff I Spec. Writer Student Intern II
1 Site Analysis
Work cocedination - Scheduling, develop strategy and work list 0
Coordination of consultants 0
Preparation for site analysis feed weak 0
Site Forces Ma/polo- field work
Site Forces Analysis - documentation and Info/Inaba organization 0
Site Anal c dInge all Information and produce document 0
Dually Control - checking of completed document 0
Presentation of $tie Analysis findings - Combine with Concept Presentation 0
Staff Hours 0 0
Rate 0 0 0 0 0
$173.88 $168.10 $ison $144.91 $139.11 $133.04 $12354 $114.04 $135.53 $78.02 $88.52 $133.04 $47.52
00.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 00 $0.00 $0.00 $0.00 $0.00 $000 $000
Total Direct Labor
$0.00
/Ur Hotel Food
travelers cost Total rooms nights cost/night Total Rental Car Materials ReprorelallIng/Phone LD
Misc. Materials for field work, site maps, existing plans, surveys 0 $0.00 $0.00 P0,0000 days cost/day Total Cars days cost/day Total Total Total TOTAL
Printing site analysis document 0 $ox 0 $189.00 $000 0 $59.00 $0.00 0 0 $85.00 $0 $0.00 $0.00 $0.00
Site Analysis woo 0 0 $169.00 $000 0 0 $59.00 $0.00 0 0 $85.00 $0 $ow $0.00
0 $0.00 woo 0 0 $169.00 $0.00 0 0 $59.00 MOO 0 $0.00
Site Analysts Support Expenses - Internal to LS $85.00 $o $ow $0.00 $0.00
$0.00
Hark Princlpal-III Principal-II Principal P Arch.III P Arch. II P 0000.1 Staff ArCh. HI Staff Arch. II Staff III Staff II Staff I Spec. Whirr Student Intern II
2 Conceptual Design
Phase coordination - Scheduling, develop 5040069 004 work fist 2 2
Phase Protect Scheduling 0
Coordination of engineering consultants 12
12
Dmign meetings with engineenng consultants 24 12 12
Quality control - checking of consultant work 0
0
Pregect nwearch 004 090000 prMect Planation 2 1
Concept designs 100 30 80 80
Concept presentation drwrIngs 74 12 40
Conceptual budget statements 0 8 16
Quality Control submPais 2 1 1
Prepare Conceptual Progress presentation 34 4 8
Conceptua1 progress Meeting 24 8 6 16
8 8
Document Conceptual Progress Meeting k Distiibuticr, 0
Admin 2 2
0
Staff Hours 366 42 118 162 0 0 12
Rate $173.119 $168.10 $150.70 $144.91 $130.11 $133.04 $123.54 $114.04 $85.53 $7002 32 0
$66.52 $133.04 $47.52
$7,303.38 $0.00 50.00 017,091738 022.535.82 00.00 WOO 00.00 51,026.36 82,432.84 $0.00 $0.00
Total Direct Labor $0.30
$50,397.58
At, Hotel Food
travelers cost Total morns cosalght Total Rental Car Materials ReprolMallIng/Phone LD
Final Concept P100010 0 $0.00 MOH persons days cost/day Total Cars days costreay Total Total Total TOTAL
Written Matedal Printing (20 Copies) 0 $0.00 $0.00 60.00 $169.00 $0.00 0 $59,00 $oot) 0 0 $85.00 $O SOSO $0.00 woo
Misc. Coordination, Meeting Materials and Misc mailings for Phase $0.00 0 0 $169.00 $ow 0 0 $59.00 $000 0 0 $85.00 $0 00.00 $0.00 $0.00
Concept Presentation - Pro. $000 0 0 $160.00 $000 0 0 $50.00 $000 0 $85.80 $0 $0.00
0 $0.00 woo 0 $169.00 $000 0 0 $50.00 $000 $000 $0,00
Conceptual Design Support Expenses - Interest 10 1.0 0 0 $85.00 $o woo 53.00 WOO
$0.00
Al, Hotel Food Rental Car
trawlers cost Total !COTS cost/right Total persons days cost/day Materials ReprorelrellIng/Ptione LO
Conceptual Design - Animal Arts 0 $500.00 $ow 0 Total Cars days cosUday Total Total Total TOTAL
Conceptual Design Support Expenses $83.00 $000 0 0 558.00 $0.00 0 0 $80.00 $O
WOO
$0.00
Page 1

Maricopa Animal Welfare Improvements
Conceptual Design through Schematic Design
Line and Space, LLC
Line and Space. LLC
Hours Principal-111 Principal-11 Principal-I P ArohIII P Arch. II P Arch .1 Staff Arch. III Start Arch. II Staff III Staff II Staff I Spam Writer Student Intern II
3 Schematic Design
Phase coordination - Scheduling, develop strategy and work list 3 1 I
Phase Prolect Scheduling 1 1
Coordination of engineering consultants 8 4
Design meetings with engineering consultants 31 16 10
Design meetings with AA 48 24 24
Duality control - checking of consultant work 8 4 4
Peeled research AA obtain prolect information 2 1
Schematic design 293 40 100 100
8 45
Schema6c Study Models 44 3 3
38
Schematic presentation drawings 200 50 50
15 45 40
Schematic narratlyes (outline specs) 0
0 0
Schematic design reMse es 8 30 30
Schematic design review 5 AA 48 24 24
Duality Control submittals 4 2 2
50% Schematic phase progress Prepared. 19 4 4
B 3
50% Schematic phase progress Meeting 24 8 8 8
50% Schematic Document Progress Meeting 0 Distribution 5 1 4
Find Schematic phase progress Preparation 10 4 4
8
Final Scher.00 phase progress Meeting 24 s 0 8
Final Schematic Document Progress Meeting -i- Distribution 5 1 4
Present...1 Modal 0 0
0
Minh 4 4 0
Staff Hours 859 70 0 0 285 291 0 0 0 39 96 0
Rate 78 0
517360 $16810 0150.70 $144.91 $139.11 $133.04 $123.54 $114.04 $85.53 576.02 900.52 0133.04
$47.52
512,172.30 00 00 $0.00 541,299.35 940.481.01 $0.00 $0.00 00.00 $3.335.67 87.297.92 $5,188.56 50.00
Total Direct Labor $0.00
$109,774.61
Alr Food Rental Car
travelers cost Total rooms fig coot/night Total persons days cost/day Material. Reprollitellng/Phone ID
Consultant Printing and Internal Progress and Coordinator Printing $0.00 $0.00 Total Gars days cost/day Total Total Total TOTAL
Schematic Printing $15.00 $0.00 $5000 $aoo 0 $85.00 $0 $0.00 $005 $0.00
Schematic 0040589 AA $0.00 $0.00 $169.00 WOO $59.00 saoo 0 $85.00 $0 $0.00 $0 00 moo
50% Schematic Progress 0 Present In Pike $0.00 $0.00 $10998 0000 $59.00 $aoo 0 $8600 50 0000 $0.00 $aw
$0.00 $0.00 $169.00 $0 00 $59.00 $0.00 0 $85.00
Final Schematic *Present in Plot. $0.00 00.00 $0 $0.00 $0.00 $0.00
Study Model Builerg Material $169.00 $0 05 $50.00 $0.00 0 $8500 $0 $0.00 $0.00 $aw
$0.00 $090 91139.00 $0 00 $59.00 WOO 0 $85.00
Meeting Mats/As end Misc. mailings $3.00 50.00 $0 $0.00 $0.00 50.00
Schematic Support Expenses • Internal to IS $169.00 00 00 $59.00 $0 0 $85.00 $O $0 00 $0.00 taw
$0.00
Hotel Food Rental Car
travelers cost Total 1.7115 nghts cost/night Total Persons days cost/day Total Materials Repro/Melling/Phone LD
Schematic Trawl 0 050000 5000 Cars dew cost/day Total Total Total TOTAL
Schematic Support Expenses 0 0 5169.00 0900 0 0 55000 moo 0 $85.00 $o $0.00 $0.00
WOO
$0.00
7 SUMMARY
Hours Principal-I Principal-11 Principal-Ill P Arch/It P Arch. It P Arch.1 Staff Arch. II Steff Arch. I Staff III Staff II Slot/S1 Spec Writer Sturkint Intern II
Staff Hours 1225 112 01 4031
Rate 01 51i 128 78 0
$173.89 I 0108.10 1 $150.70 1 $144.91 I 513S 453 11 1 $133.04 01 $123 54 1 $11404 $85.53 $70,02 $60.52 $133.045 1
019,475.68 00.00 $900 069,398.73 $83.016.83 50.00 0900 90.00 54.362.03 59,730.56 1 55,188.56 $47.52
Total Dire. Labor 00.00 $900
Total Support Expenses - Internet to L$ $160.172.30
Total Support Expenses $0.00
$0.00
Total $160,172.39
Page 2

Maricopa East Animal Welfare Improvements
Design Development
Line and Space, LLC
12/18/2018
Line and Space, LLC
Hours Pnncipai.lIl _Principal-If Pnnolpal-1 P Arch III P Arch. II P Arch I Staff Arch. Ill Staff Arch II Staff III Staff II Staff I Spec Wntw Student Intern II
1 Design Development
Phase coordination - Scheduling, develop strategy and work list 3
Phase Prciect Scheduling
Phase kickoff and Misc Coordination 0
Coordination and Design with engineenng consultants 8 4 4
Design meetings with engineering consultants 30 12 12
8
Design meetings with AA 54 24 24
8
Cludity control - checking of consultant work 13 1 6
6
Project research and obtainpt4ect Information 2 1 1
DO - Code Check 48 3 3 40
DO - Plans 200 20 40 100
50 80
DO - Sections 102 8 24 80
40 40
DO - Elevafions 204 8 it 100
40 40
OD -Typical Details 298 16 80
40 80 80
05 - Final Material selections (materials ard color boards) 86 8 12 16
30
01) - Equipment Layouts 92 12 40
40
DD - Outline Specifications 90 8 14
OD - 00451015 204 8 16 80 60
60 60
Statement of Probable Construction Cost. Coordination Only 10 4 6
65% DO Progress 2 4 4
4
85% DO phase progress Preparation 32 4 4
12 12
65% SD phase progress Meeting 24 8 8 8
85% DD Document Progress Meeting + Distribution 7 I 6
Find OD phase progress PreParfltion 32 4 4
12 12
Final OD phase progress Meebng 24 8 El 8
Final DO Document Progress Meeting a Distribution 7 1 6
Admin 4 4
Staff Hours 1743 74 222 SO7 0 80 294 386 30 60
Path $173.89 $168.10 $15070 $144.91 $139.11 $133.04 $12354 $11404 $8553 $78.02 068.52 $133.04
$47.52
$12,887.86 $000 $aoo $32,170.02 $53.048.67 $0.00 $988320 $0.00 $25 145 82 929,343.72 $1.995 60 97.982 40 $000
Total Direct Labor
$202,437.29
Hotel Food Rental Car Materials Repro/Mailing/Phone Lb
cost Total rooms nights cost/night Total Petals days cost/day Total Cars days cost/day Total Total
Consultant Ponung and Internal Progress and Coxthnation Pnnting $0.00 moo $18950 Total TOTAL
As Bull Drawing Confirmation $0.00 $000 60.00 $5900 $000 0 $85.00 $O $0.00 $0.00 $0 .00
65% DD Progress Meeting 0 9189 00 $0.00 O 650.00 60,00 0 O $85.00 00 $0.00 $000 $0.00
$0.00 $ODO 0 $18908 $000 O $59.00 $000 0 O $85.00
Final 00 Presentation - Meeting $0.00 $0.00 0 $18908 $000 $0 $0.00 $000 $000
Material and Cola Boards Material O $5900 $0 00 0 O $85.00 $0 $ODO $000 $000
$0.00 $000 0 $15900 $0.08 O 65900 $0 00 0 O $8500 $0 $aoo $0.00
Meeting Materials and Misc. mailings $0.00 Woo 0 $18900 $0.00 $0 00
Design Development Support Expenses -Internet to LS O $59.00 $0 .00 0 O $9500 $0 $0.00 moo $0.00
$0.00
Alr Hotel Food Rental Ger
travelers cost Total r00m, mghts cost/night Total persons days cool/day Materiels Repro/Melling/Phone Li)
Design Devekernent - Animal Arts $500.00 Total Cars days cost/day Total Total Total TOTAL
$800 $8300 $0 00 $5650 $000
Design Development Support Expanses $0000 $0 $000 8000 00 00
$0.00
2 SUMMARY
Hours Pneolpar411 Principal II Principd-I P Arch It P Arch P Arch I Staff Arch III Staff Arch. II Staff III Staff II Staff 1 SpecWriter Student Intern II
Staff Hours 1743 74 01 0 222 597 o 1 80 0 294 386
Rate 60 0
$=391 $168.10 $15070 $144.91 $139.11 $133.04 $123.54 $11404 $8553 97802 966.52 $133.04
$47.52
912,897.8e 60.00 6000 $32,170.02 883,04867 $0.00 $9.883.20 $0.00 $25145.82 929.343.72 s9560 97.962 40 $0 00
Total Direct Labor
Total Support Expenses - Internal to LS $202,43729
Total Support Expenses 90.09
$0.05
Total $202,437.29
Page 1

Maricopa East Animal Welfare Improvements
Contract Documents
Line and Space, LLC
12/18/2018
Line and Space, LLC
Hours Principal-Ill Principal-II P Arch Ill P Arch. II P Arch.I Staff Arca III Staff Arch. II Staff III Staff 3 Staff I Spec Writer Student Intern II
1 Construction Documents
Pha. coordination' Scheduling, develop strategy and work list 3 1
Phase Project Scheduling 1
Phase kickoff and MIsc Coordination 5 i 2 2
Coordination of engineering consultants 48 tO 16
18
Design meetings with engineering consultants 84 24 24 le
Design meetings WM AA 38 12 24
Quality control - checking &consultant work 80 30 30
Project research and obtain project information 30 8 12
12
CS- Cover/Project Info. 24
24
CD - Code Check 42 12 30
CD -Arch Site Plan 108 8 80
40
CD - Floor Plans - Reference 234 14 80
80 00
CD - Floor Plans - Dimensions 204 14 80
70 40
CD -0153611000 239 20 85 34 100
CD - Sections 230 20 80 50 50 50
CS- Finish SOhncA 100 10 40
50
CD - Enlarged Plans 230 20 70
70 70
CD - Wall Secfions 230 30 60 80
40 40
CD - Typical Details 270 30 60 80 60 60
CD - Renovation Details 340 30 80 80 85 85
CD - Animal Housing Details 270 20 80
85 85
CD - Doors/Windows 171 20 50
85 10
CD - Doors/Windows Details 188 20 50 00 40 18
CD - Rest Room Plans Details Schedules 141 6 50
85
CD - Millwork 218 8 50
100
CD .RCP 184 20 42 42 80
CD-Roof Plan 105 15 30 30
CD -Specifications 150 8 8
140
Statement of Probable Construction Cost (coordination only) 20 a 14
Quality control 128 12 24 00 30
Specialty equipment plans 134 4 50
BO
Coordination with interior designer 44 12 32
50% CD phase progress Preparation 64 4 20
20 20
50%CD phase progress Meeting 32 le 18
50% CD Document Progress Meeting k Distibubon It 3 8
100% CD phase progre. Preparation 04 4 20
20 20
100% CD.phase progress Meeting le 8 8
100% CD Document Progress Meeting 0 Distribubon 3 e
Admin 12 12
0
blatt Hours 4459 27 0 408 1358 442 0 880 1105 140
0
Rate $173.813 $108.10 $150.70 $144.81 $13011 $133.04 $12354 $114.04 $85.53 378.02 866.52 $133.04 $4752
Total Direct Labor 04.605.03 $000 S000 $72.165 18 81883311 35 $000 $54,1304.68 $000 178.038 17 684.002.10 $0 00 $18,825 80 $050
$499,040.14
Alr Hotel Food Rental Car
Materials ReprolMailingtPhona LD
travelers cost Total rooms nights cost/night Total persons days cost/day Total Cars days cost/day Total Total Total
Consultant Printing and Internal Progress and Coordination Printing 0 $000 0 0 $lmoo $050 0 $50.00
S0% CD Review $0.00 O 0 $85.00 $0 $0.00 $000
0 $0.00 0 0 $16000 $0.00 0 0 $5800 $aw O 0 $85.00 $0 $000
100% CD Review 0 $000 0 0 $10900 $0.00 0 $5800 $0 00 $000
X. Ray consultant O 0 $8500 $0 $050 $000
0 $000 0 $160.00 $000 0 0 $59.00 $050 O 0 $8500 $0 $000
CD Support Expenses 'Internal to LS $088
2 SUMMARY
Hours Principal-111 Principal-II Principal-I P Arch.111 P Arch. 11 P Arch! Staff Arch. III Staff Arch. II Staff III Staff II Staff 1 Spec Writer Student Intern II
Staff Hours 4459 27 0 498 1358 442 0 880 1105 140
Rate 0
5173 80 $168.10 $150 70 $14401 $13811 $13304 $123.54 $114.04 $0553 $78.02 $86.521 ° $133.04 $47.52
54,000.03 $0.00 $0.00 $72.105.18 $188.911.38 $000 $54 804 08 $0 00 570,038.17 $8488210 $088 $18,1325.80 $000
Total Otrect Labor
Total Support Expense,. Internal to LS 3489,040.14
$8.00
Total $499,040.14
Page 1

Maricopa East Animal Welfare Improvements
Construction Administration
Line and Space, LLC
1211812018 REV 1.12/23(18
Line and Space, LLC
Hours Principakill Princ9a1-11 P Arch Ill P Arch II P Arch Staff Arch, III Staff Arch. II Staff Ill Staff II Staff I Spec. Writer Student Intern II
1 Construction Administration
Phase coordination - Scheduling, develop strategy and work list 1 t
CA - Submittal Services 300 240 oo
CA - Observation Services ( 1 person 50 asks) 448 448
CA - Observation Services ( 1 person 28 visits) 224 224
CA - Observation SenAces ( 1 person 10 visits) 80 80
CA- Observation Reports (84 x 5 ) 420 420
CA- Supplemental Documentation 110 50 80
CA - Quotation Request/Change Orders 90 50 40
CA- interpretation and decisions 90 50 40
CA - Project Closeout (Initial Punch, Final and 100% Final) 120 00 60
CA - Application for payment approval se 56
CA - Record drawings 72 32 40
CA - Administrative 10 10
0
Staff Hours 2027 18 80 0 0 1631 0 0 0 300 0
Rate $173.89 5168.10 $150.70 $144.91 $139.11 $133.04 $123.54 $114.04 $85.53 $76.02 $66.52 $133.04 $47.52
Total Direst Labor $2,782.24 $13.448.00 80.00 00.00 $22688841 00 05 00.00 $000 00.00 $22.806.00 WOO $000 $0 00
8265,924.65
Air Hotel Food Rental Car Materials Reproratialling/Phone LD
travelers cost Total rooms nights cost/night Total persons days cosVday Total Cars days costiday Total Total Total TOTAL
Submittals 0 $150.00 $0.00 0 0 $100.00 80.00 0 0 040.00 $0 00 0 O $85.00 $0 $0.00 $am
Allis. Copies/printing 0 $150.00 $0.00 0 0 $100.00 $0 00 0 0 840.00 $am 0 O 085.00 $0.00
Record drawings printing 0 $15000 EOM 0 0 $100.00 $0.00 0 0 $40.00 $000 80 $0.00 $0.00 $000
CA Support Expenses Waal Moo 0 O $85.00 $O 00 00 $000 $aoo
0 0 $10000 05 50 0 0 $40 00 $0 00 0 O $85.00 $0 $0 00 Woo Moo
CA Support Expenses
$0.00
Alr Hotel Food Rental Car Material, Repro/Maillng/Phone LD
travelers cost Total rooms nights cost/night Total persons cost/day Total Cars days cost/day Total Total Total
CA - Animal 0,10 (0 trips) 0 $500.00 $000 0 $83.00 $0.00 0 $58.00 $0.00 0 0 TOTAL
CA Support Expenses $00.00 $0 60.00 $0.00 $0 50
$0.00
2 SUMMARY
Hours Principakl Princlpal-II P k05.111 P Arch. II P Arch .l Staff Arch. II Staff Arch I Staff Ill Staff II Slaff I Intem Clerical
Staff Hours 16 80 0 0 1031 0 0 300 0 1 0
Rate 20271 $173.80 8168.10 $150.70 $14401 $130.11 $133.04 $12354 $114.04 $_8550_1 0 576.02 I 066.52 $133.04 847.52
$2.782 24 013.448.00 00.00 Moo $220,888 41 80.00 $000 s0.00 Moo 022,806.00 $0 00 $0.00 $0.00
Total Direct Labor
$265,924.65
Total Support Expenses
Total $0.00
$265,924.65
Page 1

Maricopa East Animal Welfare Improvements
Bidding
Line and Space. LLO
12/18/2018
Line and Space, LLC
Hours Principal-Ill Principal-II Principal-! P Arch.III P Arch. II P Arch.I Staff Arch. III Staff Arch. II Staff III Staff II Staff I Spec. Writer Student Intern II
1 Biddin
Bid materials services - organieng and handling 4 4
Addendes tn 18
Pre-Bid Conference 0 8
Meeting 000umentation 4 4
Analysis of Alternates and Substitutions 24 24
Admirtstrative 2 2
0
-
54 0 0 0 0 0
Rate $173.89 $108.10 $150.70 $144.91 $139.11 $133.04 $123.54 $114.04 $85.53 $78.02 $88.52 $133.04 $47.52
Total Direct Labor 6347.78 $0.00 $0.00 $0.00 $7,511.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$7,869.72
Air Hotel Food Rental Car Materials Repro/Mailing/Phone LD
travelers cost Total rooms nights cost/night Total persons days cost/day Total Cars days cost/day Total Total Total TOTAL
Bidding - Prebid Conference 0 $0.00 0 0 $189.00 $0.00 0 $59.00 $000 S $85.00 $0 $0.00 $000
Bidding Support Expenses $0.00
$0.00
2 SUMMARY
Hours Principal-Ill Principal-II Principal-I P Arch/II P Arch. II P Arch.I Staff Arch. III Staff Arch. II Staff III Staff II Staff I Spec. Writer Student Intern II
Staff Hours 58 2 0 0 54 01 0 0 0
Rate $173.89 I $188.10 ° $15070 $144.91 $139.11 $133.04 $123.54 0114.04 $85.53 I $78.02 see52 $133.04 $47.52
$347.78 $0.00 $0.00 $0.00 $7,511.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Direct Labor $7,869.72
Total Support Expenses - Internal to L$
$0.00
Total $7,869.72
Total $7,859.72
Page 1

Maricopa East Animal Welfare Improvements
Geotechnical Investigation
Line and Space. LLC
12/1 8/2 018
Line and Space, LLC
Hours Principal-111 Principal-II Principal-I P Arch .III P Arch. 11 P Arch.' Staff Arch. 111 Staff Arch. II Staff III Staff II Staff I Spec. Writer Student Intern II
1 Geotechnical Investigation
Coordination 2 2
Site • Accommodate 0 0
0
0
Admit, 4 4
0 _
Staff Hours 4 2 0 0 0 0 0 0 0
Rate 017180 $188.10 $15070 0144.91 $139.11 $133.04 $123.54 $114.04 $85.53 $70.02 $88.52 $133.04 $47.52
Total Dim( Labor $89950 $0.00 Moo $aw $278.22 $000 $RCIO $0.00 $0.00 $0 00 $0.00 $0.00 $0.00
$973.70
All Hotel Food Rental Car Materiels
travelers cost Total MOMS nights cost/night Total persons days cost/day Total Cars days Repro/Mailing/Phone LO
Geotech 0 $0.00 0 0 $10900 $0 00 0 $59.00 cost/day Total Total Total TOTAL
Geoteeh Support Expenses $005 0 $8500 $0 $000 $0.00 $0.00
$0.00
2 SUMMARY
Hours Principal-III Principal-II Pdncipal-1 P Arch/i1 P Arch. II P Arch .1 Staff Arch. ni Staff Arch. II Staff III Staff 11 Staff I Spec. Writer Student Intern II
Staff Hours 4 0 01 01
Rate 01 0
$173.80 I $188.10 I $150.70 $144.91 1 $139.111 $133.04 I $123 54 I $114.04 1 $85.53 I $70.02 1 $88.52 1 $133.04 _I S47 52
$095.58 $0.00 $0.00 $000 $278.22 $am $0.00 $0.00 50.00 00.00 $000 $0.00 $0.00
Total Direct Labor
Total Support Expenses - Internal to L$ 0973.78
Total $0.00
$873.70
Total $973.78
Page 1

Maricopa East Animal Welfare Improvements
Survey
Line and Space, LLC
Line and Space, LLC 12/18/2018
Hours PrincipaI411 Principa14 P Arch.III P Arch. II P Arch .I Staff Arch, III Staff Arch. II Staff III Staff II Staff I Spec. Writer Student Intern II
1 Surve
Coordination 2 2
Site - Accommodate 0
0
0
Admits 4 4
0
Staff Hours 4 0 0 0 2 0 0 0 0 0
Rate $173.89 $188.10 $150.70 $144.91 $139,11 $133.04 $123.54 $11404 $85.53 $78.02 $80.52 $133.04 $4782 0
Total Direct Labor $095.58 $0.00 $0.00 $0.00 $27812 $0.00 $000 $0.00 $0.00 50.00 50.00
$0.00 $0.00
Air Hotel 8978.78
Food Rental Car Materials ReprolMallInp/Pbone ID
Geotech Save/en cost Total rooms nights cost/night Total persons o days o cost/day Total Cars days cost/day Total Total
$050 0 $10000 0000 $59.00 $0.00 0 0 Total TOTAL
Geotech Support Expenaes $85.00 $0 $0.00 $0.00 $0.00
80.00
2 SUMMARY
Hours Principal-Ill Princlpatill PtlnSpaI.I P Arch.III P Arch. II P Arch.I Staff Arch. III Staff Arch II Staff III Staff II Staff I Spec. Writer Student Intem II
Staff Hours 4 01 01 2 0 0
Rate $173.89 I $108.10 $1.70 50 1 $144.91 1 $139.11 $133.04 5123.54 $11404 $85.53 $78.02 see.52 01 I 0
1 ° I °I $133.04 $47.5:
$69550 $0.00 $aw Moo $278.22 $0.00 $0.05 $0.00 $0.00 $0.00 $aw $000 00.00
Total Direct Labor
Total Support Expenses -Internal to LS $973.71:1
Total $0.00
$973.78
Total $973.78
Page 1

Maricopa East Animal Welfare Improvements
Presentation Renderings
Line end Space. LLC
12/18/2018
Line and Space, LLC
Hoofs Principal-111 Principal-II Principal-I P 8rch.111 P Arch. II P4000.1 Staff Arch. III Staff Arch. 11 Staff III Staff II Staff I Spec. Writer Student Intern II
1 Presentation Renderings
Renderdenng Development - Assume 5 renderings 180 2 4
150
Printing and coordination
10
Staff Hours 170 2 0 0 4 4 0 0 0 0 180
Rate $173.80 $188.10 $150.70 $144.91 $139.11 $133.04 $123.54 $114.04 385.53 078.02 $88.52 $133.04 $47.52
1347.70 10,00 $0.00 $579.84 $558.44 $0.00 $0.00 $0.00 $0.00 $12,183.20 $0.00 $0.00 30.00
Total Direct Labor
$13,847.08
Cr Hotel Food
Rental Car Materials ReproftaallIng/Phono Lb
trawlers cost Total moms cost/night Total persons Iso cost/day Total Ca or s days cost/day Total
Rendering Printing and Mounting 0 $150.00 $0.00 Total Total TOTAL
$10000 30.00 0 0 $40.00 50.00 $80.00 soso woo
$150.00 $0.00 0 $100.00 00.03 0 $40.00 00.00 0 0 $eam so Woo 1.0.00
Presentation Renderings Expenses $000 TAMO
$0.00
2 SUMMARY
Hours Principal-III Principal-II Principal-1 P0100.111 P Arch. 9 P0105.1 Staff Arch. 111 Staff Arch. II Staff III Staff II Staff I Spec, W Student Intern II
Staff Hours 01 4 4 01 01 01 180 0
Rate 17°F1 173.89 $188.10 3150.70 i 0144.91 I $139.11 $133.04 $123.54 I $114.04 j 085.53 378.02 388.52 0133041
$4752
$347.78 $000 00.00 5579,84 0558.44 00.00 0000 00,00 50.00 312,1133.20 30.00 $0.00 10.00
Total Direct Labor
Total Support Expenses 613,547.06
$0.00
Total $13,647.06
Page 1

Maricopa East Animal Welfare Improvements
Signage Design
Line and Space, LLC
Line and Space, LLC 12/1 872018
Hours Principal-III Principal-II P40ch.11l P4005 P Arch.l Staff Arch. III Staff Arch. II Staff III Staff II Staff I Spec. Writer Student Inlem II
1 Sionaoe Design
SIgnege Development and Design 118 4 4 50
Signage Re.aw Meeting 10 60
4 6
Signage DesIgn Revisions 38 2 12
Signage Complefee Flnal Documents 130 24
2 8 120
SC 4 2 2
2 2
0
Staff Hours 302 6 0 14 78 0 0 0 0
Rate 204 0 0
$173.89 $168.10 $150.70 $144.91 $13011 9133.04 $123.54 $114.04 $85 53 $76.02 $66.52 $133.04
$47.52
$1.043 34 $0.00 MOO $2.028.74 $10,850.58 $0.00 $0 00 $000 $e00 $15,508.08 $0,00 40.00
Total Direct Labor WOO
$20 430.74
Air Hotel Food
trawlers cost 10101 rooms Rental Car Materials ReprorttaMnplPhone Lb
cost/nIght Total persons days cost/day 74441 Cars ccaVday Total Total Total
0 $150.00 $0.00 $100.00 $0.00 TOTAL
$40.00 $0.00 0 $60.00 so 09,00 $0.00
0 0150.00 00.00 0 4100.00 $0.00 $40.00 00.00 $0.00
%snags Support Expenses 0 Waco 00 30.00 $0.00 $0.00
$ODO
2 SUMMARY
Hours Principal-III Ptincipal-II Plincipal-I P5005111 P Arch. II P Arch.' Staff Arch. III Staff Arch. II Staff III 01.6 11 Staff I Spec. WM. Student Intern II
Staff Hours 3021 61 0 0 14 78 0 01 0
Rate 0 204 0
$173.89 $188.10 1 $150.70 1 $144.91 $13911 I $133.04 $123.54 1 $114.04 $85.53 $7902
586.52 0133 04 I $4752
$1.043.34 $0.00 $e00 52.028.74 510.850.58 s0.00 $0.00 50.00 00.00 015508.08 80.00 WOO
10t0113I1e01 Labor $0.00
TotatSuppert Expenses $29.430.74
$0.00
Total $29,430.74
Page 1

Maricopa County East Animal Welfare Improvements
Animal Arts — Animal Facility Design Consultant

Maricopa County East Animal Welfare Improvements
Firm: Animal Arts Design Date: 12/17/2018
Discipline: Animal Facility Design Consultants
PHASE HOURS RATES FEE SUBTOTAL
PROGRAMMING
Principal I 0 $165 $0
Principal ll 0 $140 $0
Associate 0 $125 $0
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$0
SCHEMATIC DESIGN
Principal I 5 $165 $825
Principal II 0 $140 $0
Associate 12 $125 $1,500
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$2,325
DESIGN DEVELOPMENT
Principal I 5 $165 $825
Principal II 0 $140 $0
Associate 24 $125 $3,000
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$3,825
CONSTRUCTION DOCUMENTS
Principal I 5 $165 $825
Principal ll 0 $140 $0
Associate 30 $125 $3,750
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$4,575
CONSTRUCTION ADMINISTRATION
Principal I 0 $165 $0
Principal II 0 $140 $0
Associate 0 $125 $0
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$0
POST CONSTRUCTION
Principal I 0 $165 $0
Principal II 0 $140 $0
Associate 0 $125 $0
Project Manager I 0 $115 $0
Project Manager II 0 $85 $0
Drafting and Production 0 $65 $0
$o
REIMBURSABLES
$0
$o
TOTAL 81 $10,725

Maricopa County East Animal Welfare Improvements
Speedie and Associates — Geotechnical Engineering

SPEC:)IM
AN ASSOC livras
Geotechnical • Environmental • Materials Engineers
Revised: December 14, 2018
Henry Tom, AIA
Line & Space, LLC
627 East Speedway Boulevard
Tucson, AZ 85705
RE: Proposal for Geotechnical Investigation
MCEAWI
1920 South Lewis
Mesa, AZ
Proposal No. 67267 S
Mr. Tom:
We are pleased to provide our cost estimate to conduct a soil investigation at the above referenced site that will
satisfy site development and foundation design requirements. All work on this project will be carried out under the
overall supervision of a registered Professional Engineer in the state of Arizona.
We understand that construction will consist of a 42,000+/- square foot animal welfare facility on a 6.5 acre property
with an existing warehouse building. Details of the facility are not known at this time however for this proposal we
will assume one or two stories with slab on grade and masonry construction. Structural loads are expected to be
light to moderate and no special considerations regarding settlement tolerances are known at this time. Adjacent
areas will be landscaped or paved to support moderate passenger and light truck traffic. Landscaped areas will be
utilized for storm water retention and disposal.
Geotechnical Investigation-We will drill and sample sufficient test borings to adequately determine subsoil
conditions and provide samples for laboratory testing. Sufficient laboratory tests will be conducted to properly
classify the soils encountered and provide data for engineering design. We presently anticipate drilling four to five
(4 to 5) structural borings to depths 10 to 20 feet below existing ground surface, or refusal, whichever comes first.
Access to the site by conventional truck-mounted drilling equipment is assumed to be free and unencumbered. Due
to the existing facilities, a private utility locator will be subcontracted to locate privately owned traceable
underground utilities in the vicinity of the borings. S&A is not responsible for damage and/or repair of untraceable
underground utilities.
Percolation Tests-An add-alternate fee is provided to excavate and conduct shallow percolation/infiltration tests
meeting the SRP-MIC requirements. SRP-MIC now requires dual ring percolation tests per ASTM D3385 be
conducted, same as Maricopa County. This method requires a backhoe to excavate test pits, install large ring devices
and a minimum of 6 hours of continuous readings. Tests would be conducted at the proposed depths of the retention
basins per the Grading and Drainage plans. These tests would need to be conducted in unpaved areas.
We will analyze the data obtained from field and laboratory testing and prepare a report presenting all data obtained,
together with our conclusions and recommendations regarding:
1. Design data, allowable bearing pressure and depth, for shallow spread footings.
2. Alternate foundation systems and design data, if indicated by soil conditions.
3. Settlement estimate for each foundation system considered.
3331 East Wood Street • Phoenix, AZ 85040 • Phone 602-997-6391 • Fax 602-943-5508 • www.soeedie.net
PHOENIX TUCSON FLAGSTAFF

SPMEDIE
AN ASSOC IATES
Geotechnical • Environmental • Materials Engineers
4. Lateral pressures on temporary and permanent retaining and foundation walls.
5. Seismic Site Classification based on borings and published ground motion data.
6. Groundwater conditions, if any, to the depths which will influence design and/or construction of the
proposed development.
7. Swell potential of in-situ and compacted soils and recommendations for control if highly expansive.
8. Pavement design to provide economy and adequate service.
9. Suitability of site soils for use as compacted fill and preferred earthwork methods, including clearing,
stripping, excavation and construction of engineered fill.
10. Local excavation and trenching conditions and stability considerations.
11. Percolation/Infiltration testing for design of storm water basins.
We propose to provide the design services set forth herein for the following estimated amount, which includes all
testing, engineering, reimbursable expenses, one hard copy of the report and an electronic PDF format file to be
emailed upon completion. The fees have been developed utilizing our Maricopa County On-Call Fee and Rate
Schedule. Should we be informed that additional hard copies of the report are needed after it has been finalized,
there will be an additional charge of $25.00 per report.
Description Fee
Geotechnical Investigation & Report $ 3,949.17 Accept 0 Decline CI
Add-Alternate: Percolation Tests $ 1, 600. 00 First Test' Accept 0# Decline El
$ 600.00 Additional Tests'
Notes: 1 The first test incorporates the cost of the backhoe service.
2 Conducted on the same mobilization as the initial percolation test.
We have the staff available to begin work immediately upon notice to proceed. Once we finalize the boring location
plan, 10 working days are required to mark, obtain utility clearances and begin auger borings. Fieldwork for auger
borings should take one day (weather & access permitting) and lab testing 2-3 weeks. The complete report will be
issued within 7 days of lab testing completion. As always, we stand ready to make reasonable adjustments to this
schedule to meet our clients' needs.
We appreciate the opportunity to submit this proposal for your consideration. If the terms set forth are satisfactory,
please attached copy of this scope of work to your standard Professional Consulting Services Contract and return it
for our records.
Respectfully submitted, APPROVED AND ACCEPTED
SPEEDIE & ASSOCIATES, INC. For: Line and Space, LLC
By:
KennetliM. Euge II (Printed Name & Position)
Project Coordinator
(Signature)
(Date)
Line and Space, LLC Proposal No. 67267 S
MCEAWI Revised: December 14, 2018 - Page 2

pm SPEEDIE & ASSOCIATES, INC. COST PROPOSAL DETAIL
MCEAWI
67267s
December 6,2018
Labor
Billing
Maricopa County On-Call 2013-2018 ftUnits Unit Rate Rate. Direct Cost Labor
Task I - Project Preparation
Principal $50.00 hr $147.95 $0.00
Project Manager/Sr. Geologist/Sr. Engineer $34.67 hr $102.95 $0.00
Project Engineer 3c@ $31.50 hr $93.21 $279.63
Project Geologist $34.67 hr $102.95 $0.00
Staff Geologist $23.80 hr $70.42 $0.00
Secretarial $15.50 hr $45.86 $0.00
Drafting Technician 1 @ $24.00 hr $71.02 $71.02
Mileage 16 @ $0.550 mile $8.80 $8.80
Subtotal $8.80 $359.45 1368.25
Task 2- Field Investigation
Project Engineer 4.75 @ $31.50 hr $93.21 $442.75
Project Geologist (Pere Test each test) $31.50 hr $93.21 $0.00
GS! Phoenix-CME 75 Auger Drill 3.75 @ $150.00 hr $562.50 (1/1/08 rates)
GSI Phoenix-CME 75-Mobe/Demobe 2.5 @ $150.00 hr $375.00
05I-Track Rig CME 75 $210.00 hr $0.00
GS1-CMS-95 $225.00 hr $0.00
Baclthoe Contractor (Pere Test) $85.00 hr $0.00
Hurricane Holes hr $0.00
coring $150.00 $0.00
Locator l@ $200.00 $200.00
Mileage l6@ $0.550 $8.80
Reimbutsables
Traffic Control (Shadow Truck) $45.00 day $0.00
Pennit $250.00 each $0.00
Backhoe $850.00 week 50.00
Equipment delivery Backhoe, Water Truck $100.00 ea. way $0.00
mile $0.00
week
Subtotal 51,146.30 $442.75 51,58005
Laboratory Testing (As of Feb 2006)
Water Content $10.00 ea $0.00
Grain Size Analysis $55.00 ea $165.00
Hydrometer Analysis $175.00 ea $0.00
Water content and Dry Density $20.00 ea $0.00
Atterburg Limits $50.00 ea $150.00
Direct Shear Test (Soil) $350.00 3-points $0.00
Unconfined Compressive Strength (Soil) $40.00 ea $0.00
Unconfined Compressive Strength (Rock) $25.00 ea $0.00
Consolidation Test $115.00 ea $345.00
R-Value $283.00 ea $0.00
Moisture Density (Proctor) $100.00 ea $100.00
Moisture Density (Modified) $110.00 ea $0.00
Resistivity $70.00 ea $0.00
pH $30.00 ea $0.00
Chloride $40.00 ea $0.00
Sulfate $40.00 ea $0.00
Swell $130.00 ea $130.00
Percent Sand Silt Clay ea $0.00
Subtotal $890.00
Report
Principal $50.00 hr $147.95 $0.00
Project Manager/Sr. Geologist/Sr. Engineer 3 @ $34.67 hr $102.95 $308.85
Project Engineer 6@ $31.50 hr $93.21 $559.26
Project Geologist $34.67 br $102.95 $0.00
Staff Geologist $23.80 hr $70.42 $00.00
Secretarial 2@ $15.50 hr $45.86 $91.72
Drafting Technician 2@ $24.00 hr $71.02 $142.04
Mileage 50.550 mile $0.00
Subtotal $0.00 $1,101 87
.1.0bor Hang Rate considered overhead (169%) end 19661(10%)
Task Subtotals $2,045.10 $1,904.07
Estimated Total Project Cost $3,949.17

Maricopa County East Animal Welfare Improvements
Presidio Engineering — Civil Engineering

CIVIL • LAND DEVELOPMENT • WATER RESOURCES
p
Presidio
Revised December 17, 2018
December 13, 2018
Mr. Henry Tom
Line and Space
627 E. Speedway Blvd.
Tucson, AZ 85705
Subject: Revised Professional Services Agreement for
Maricopa County East Animal Welfare Improvements (MCEAWI)
(Tax Parcel No. 139-49-020 Maricopa County Assessor)
Presidio Engineering Job No. 118042-01-0010
Dear Mr. Tom:
In accordance with your December 17, 2018 request, we have revised our original Professional
Services Agreement (Agreement) for providing professional civil site engineering assistance for
the above referenced project to include Civil Site Construction Administration Services.
We appreciate the opportunity to submit this Agreement to you and look forward to providing
you and Line and Space with quality service.
Further, our services are billed monthly. Payment is due 30 days net. Please see our Standard
Conditions (Exhibit "A") attached to our Professional Services Agreement for additional details.
Please review this Agreement carefully noting those items that we will need to receive from Line
and Space in order to ensure a successful project.
Accordingly, should you find the Agreement acceptable, please execute the attached copy
provided including initialing those sheets as indicated and return it to our office for processing.
Upon our acceptance, a copy of the fully executed Agreement will be returned to you for your
files.
Please do not hesitate to contact me with any questions that you may have. We look forward to
being of service to you and we are ready to begin work immediately.
Sincerely,
PRES1D 0 ENGINEERING,
John . Wood, P.E., LEED-AP
PRESIDENT
Attachments
JDWitaw 190 S. STRATFORD DR. SUITE #105
TUCSON, AZ 85716
K.iPENGUOBSIJobs20181118042l4greementslAgreements1 - PrelintICL118042 Revised 2018.1217 docx TEL 520.795.7255
FAX 520.795.6747
WWW.PRESIDIOENGINEERING COM

CIVIL • LAND DEVELOPMENT • WATER RESOURCE
r,)
Presidio
REVISED
PROFESSIONAL SERVICES AGREEMENT
FOR
MARICOPA COUNTY EAST ANIMAL WELFARE IMPROVEMENTS (IVICEAWI)
(Tax Parcel No. 139-49-020 Maricopa County Assessor)
Revised December 17, 2018
December 13, 2018
Presidio Engineering Job No. 118042-01-0010
I. PROJECT UNDERSTANDING
In accordance with a request from Henry Tom at Line and Space (Client) Presidio
Engineering, Inc. (Presidio) is pleased to submit this Professional Services Agreement
(Agreement) for providing Professional Civil Site Engineering Assistance in support of the
above referenced MCEAWI project located within the City of Mesa, Maricopa County,
Arizona.
Presidio understands that:
A. The Client is contracting with Maricopa County on a design bid build basis to provide
AE services for the Maricopa County East Animal Welfare Improvements (MCEAWI)
project.
B. The MCEAWI project is to consist of the construction of a new 42,000 SF facility on a
6.5 +/-acre parcel of land located at the southwest corner of S. Lewis Road and E.
Javelina Avenue as depicted within the attached December 5, 2018 email from Henry
Tom attached as Exhibit "D".
C. The Client is unaware if the project is exempt from the City of Mesa Administrative
Code and thus the scope of work and fees of this Agreement is based upon the
assumption that the project is to be processed in accordance with the City of Mesa
standards.
D. Currently, the site is fully developed as an industrial facility. However, the Client has
indicated that for purposes of the development of our scope of work and fees that
Presidio is to assume that all existing site improvements will be removed prior to our
commencement of work and thus the preparation and permitting of demolition plans
and permits are not included in this Agreement.
E. Although the existing buildings on the site are not located within a FEMA Flood Zone,
a portion of this site lies within a FEMA Flood Zone "All" per FIRM Map
04013C264M map effective date November 4, 2015.
1 of 12 190 S. STRATFORD DR. SUITE #105
TUCSON. AZ 85716
KAPENGUOBSUobs2018 \ I 18042 \Agreements \Agreements I - Prelim \ PI I8042.Revised 2018.1217.docx TEL 520.795.7255
FAX 520.795.6747
WWW.PRESIDIOENGINEERING.COM

Further, the location of the new building's footprint relative to the existing Flood Zone
has not yet been determined and thus it is unknown as to whether a Conditional Letter
of Map Revision (CLOMR)/Letter of Map Revision (LOMR) will need to be prepared
to support the new development. Consequently, for the purposes of this Agreement we
have excluded the preparation of any CLOMR/LOMR documents from our scope of
work and fees.
F. The Client has indicated that should the site not be able to accommodate all of its
parking needs on-site that the existing parking lot located east of the site will be used to
meet the needs of the project and that the Client does not anticipate the need to do any
improvements to this off-site parking and thus no work associated with this off-site lot
has been included in this Agreement.
G. Additionally, there appears to be existing public sewer and water mains on-site. This
Agreement does not include the preparation of any new public utility extensions nor
relocation plans as a part of Presidio's scope of work and/or fees as contained herein.
H. Again, for the purposes of preparing the scope of work and fees for this Agreement, it
is assumed that all necessary supporting utilities both wet and dry along with storm
water conveyance facilities exist at the boundary of the project and are sufficient size to
properly serve the proposed improvements. Further, it is assumed that no off-site
paving, parking and access and/or grading improvements are required. Therefore, this
Agreement does not include the preparation and processing of any off-site
improvement plans.
I. Presidio understands that the Client will be making all submittals for the project
including the processing of all of Presidio's work products as well as scheduling all
required pre-submittal/application meetings as well as handling public notice
requirements.
J. Presidio also understands that the Client will, at their own expense, have at a minimum
the following plans, studies, calculations and designs prepared in order to support
Presidio's work product as described in the scope of work within this Agreement:
1. Supporting land surveying services to provide, at a minimum, boundary/rights-of-
way verification, on and off-site topography, design survey, Blue Stake results,
above ground utilities along with City of Mesa required as-built data including
elevation certificates in accordance with Presidio's requirements. Further, the
surveyor will also provide all supporting legal descriptions including exhibits.
2. Supporting Phase I and II environmental reports.
3. Geotechnical analysis and recommendations.
4. Title services (as needed).
5. Supporting approved landscape documents including Landscape and Irrigation
Plans.
6. Supporting Architectural along with MP&E Plans and calculations.
7. Supporting structural design.
8. Supporting Traffic Impact Analysis.
2 of 12
INITIAL
KAPENG \JOBS \Jobs20181118042kAgreements\Agreements1 - Prelim\ P118042.Revised 2018.1217.clocx

Finally, in accordance with the project requirements as stated above, Presidio proposes to
provide the following professional services:
H. SCOPE OF WORK
A. Schematic Design (SD) Phase. The following services will be provided under this
task.
I. Site Visit. Presidio will make a site visit to visually assess above ground existing
site conditions.
2. As-Built Document Review. Presidio will review as-built civil site documentation
as made available by:
D Client, including previously approved site plans.
D Public agencies.
3. Preliminary Drainage Recommendations. Presidio will provide schematic site
drainage recommendations.
4. Schematic Site Plan. Based upon the existing conditions site land survey and
schematic building/site elements, as provided by the Client, along with project
development requirements, Presidio will prepare a Schematic Site Plan and provide
it to the Client for review.
5. Pre-Application Meeting. Presidio will attend a pre-application meeting at
Maricopa County Planning and Development.
6. Coordination Meetings. Presidio will attend the following coordination meetings:
a. Attend one team meeting at Line and Space.
b. Attend one pre-application meeting at Maricopa County Planning and
Development.
Client Provided Items:
• Current site land survey in AutoCAD Civil 3D 2018 compatible format which
includes boundary, topography and culture.
• Previously approved site plans along with previously processed site
development and improvement plans in .pdf format.
• Schematic gross building areas, floor area ratios, maximum building height,
number of stories and building use data.
• Existing and proposed wet and dry utility demand requirements.
• Schematic Foundation Plan in AutoCAD Civil 3D 2018 compatible format.
• Review fees.
3 of 12
INITIAL
K: \ PENG1JOBStlobs2018 \ 118042 \Agreements \Agreenients1 - Prelim \ P118042.Rev sed 2018.1217.docx

Deliverables:
• All plans and reports in .pdf format along with plans in AutoCAD Civil 3D
(2018) format.
• Meeting and comment responses in .pdf format.
• Schematic site drainage recommendations in .pdf format.
B. Design Development (DD) Phase. The following services will be provided under this
task.
1. Refined Site Plan. Based upon the completion of the SD Phase and updated
site/building information provided by the Client, Presidio will prepare a Refined
Site Plan. The Site Plan will be provided to the Client for submittal to Maricopa
County Planning and Development for review in a preliminary site plan meeting.
2. Refined Drainage Recommendations. Presidio will refine the previously
provided preliminary drainage recommendations to meet current project
requirements.
3. Improvement Plans. Presidio will prepare the following improvement plans in
support of the project. The plans will be prepared to a 30% completion stage and
will be submitted to the Client for review.
On-Site Plans
a. On-Site Private Grading, Drainage and Paving Plans. These plan sheets will
be included with the Site Plan and will be per Maricopa Development
Standards.
b. On-Site Private Sewer Service Plans. It is assumed that sufficient conveyance
and treatment capacity exists and that there is an existing viable public sewer
connection at the project's boundary line that can provide service to the site.
Consequently, a 6" private sewer service line will be shown to be extended from
the boundary connection point to within 5' of the exterior wall of the new
building.
c. On-Site Potable Private Water Service Line Plans. It is assumed that there is
an existing viable potable water connection at the project's boundary line that
can provide service to the site. Consequently, the private cold water service line
will be shown to be extended from the boundary to within 5' of the exterior wall
of the new building. All meter, line and backflow preventer design and sizing is
to be provided by the Client's MP&E.
d. On-Site Private Fire Service Line Plans. A separate set of Private Fire
Service Line Plans will be prepared per the requirements of the State Fire
Marshal Standards. The Client's MP&E will need to supply all line sizes and
hydraulic modeling as well as design of any valving, reduced pressure back
flow preventer, fire risers and/or other appurtenances. Presidio's design is only
for the fire service line and will be extend from the project's boundary to within
5' of the new building's exterior wall.
4 of 12
INITIAL
K: \ PENG \JOBS Vobs2018 118042 \Agrectnents1Agreements I - Prelim P118042.Revised 2018.1217.docx

e. On-Site Storm Water Pollution Prevention Plan (SWPPP). Presidio will
assist the Client in preparing a SWPPP and narrative. Presidio's work will
include the preparation of an Erosion and Sediment Control Plan along with the
SWPPP narrative and assistance with providing the Client with known project
data for their use in filing the NOT with ADEQ.
This Agreement assumes that this site is not located within VI mile of a currently
designated impaired, unique or outstanding Arizona water body.
It is important to note that the Client and or their designated site operator is
responsible for implementing the SWPPP program and installing, maintaining,
inspecting, modifying and correcting BMPs during construction along with
completing final site stabilization and NOT filing.
f. Specifications. For the purposes of this Agreement, it is assumed that
Presidio's plans will contain enough detail such that the preparation of a
separate set of "book" specifications is not included in either the scope of work
or fees of this Agreement.
Off-Site Plans
It is assumed for the purposes of this Agreement that the successful development of
this project will not require the preparation of any Off-Site Improvement Plans and
as such this Agreement does not include in its fees or scope of work the preparation
and processing of any Off-Site Improvement Plans.
4. Coordination Meetings. Presidio will attend the following coordination meetings:
I. Attend one team meetings at Line and Space.
2. Attend one pre-submittal meeting at the City of Mesa.
3. Attend one document review meeting at Maricopa County Facilities
Management
Client Provided Items:
• Dimensionally stable Foundation Plan (one hard copy and AutoCAD Civil 3D
2018).
• Wastewater fixture unit counts.
• Supporting landscape documents (Landscape and Irrigation Plans including
irrigation meter locations and sizes in AutoCAD Civil 3D 2018 compatible file
and .pdf format).
• Gross building area, floor area ratio, maximum building height and number of
stories.
• ADA Accessible Route Plan.
• Geotechnical Report recommendations including on and off-site pavement
design and percolation test results for retention/detention basin design.
5 of 12
INITIAL
KAPENC.NOBSVobs2018\ I 18042 \Agreements\Agreements I - Prelim\ P118042.Revised 2018.1217.docx

• Any supporting structural design/plans.
• Hardscape Plan in AutoCAD Civil 3D 2018 compatible format.
• Pipe size along with horizontal and vertical points of connection for BCS.
• Clarifier (grease interceptor) sizing, design and agency processing along with
horizontal and vertical points of connection for reference only.
• Review fees.
• Updated demand requirements.
• Domestic meter sizing, fire service line sizes and hydraulic modeling along with
horizontal and vertical points of connection.
• Reduced pressure backflow preventer sizing and design.
• Preferred SWPPP procedures/process/installations.
Deliverables:
• All plans and reports in .pdf format along with plans in AutoCAD Civil 3D
2018 .dwg format.
C. Construction Documents (CD) 50%, 90% and 100% Phase. The following services
will be provided under this task.
1. Improvement Plans. Based upon completion of the DD phase, Presidio will
provide refinements to the 30% Improvement Plans prepared within the DD phase.
These refinements will be provided at the 50%, 90% and 100% completion stages.
2. Drainage Report. Presidio will prepare a final Drainage Report in support of the
project for the Client to use in the submittal and processing of the site civil CDs.
3. Dry Utility Coordination Sheets. Presidio will also provide grading, paving and
drainage information to the Client's electrical, mechanical and plumbing
consultants as well as the dry utility providers as they design their facilities to
service this project. The Client will need to have their Surveyor provide the
necessary supporting utility easement legal descriptions. The cost of legal
description preparation and processing is not included in the fees associated with
this Agreement.
4. Coordination Meetings. Presidio will attend the following coordination meetings:
a. Attend three team meetings at Line and Space.
b. Attend two document review meetings at Maricopa County Facilities
Management.
Client Provided Items:
• Updates, addendums to any information provided to Presidio in the DD design
phase.
• Electrical/Gas/Voice/Data site design including site lighting design.
6 of 12
INITIAL
KAP ENG VOBS\Jobs2018118042 \Agreements \Agreements1 - Prelim \ P118042.Revised 2018.1217.docx

Deliverables:
• 50%, 90% and 100% Construction Documents in .pdf and AutoCAD Civil 3D
2018 .dwg formats.
D. Bidding Phase. Presidio will assist the Client in evaluating one round of requests for
information from bidders/contractors and interpreting bids within the limits of the fee
contained within this Agreement.
Client Provided Items:
• RFIs in .pdf file format.
Deliverables:
• Written recommendations in .pdf file format.
E. Construction Administration (CA). Presidio will provide site surveillance at
appropriate intervals to observe the general conformance of the grading and paving
work to the plans and specifications.
Presidio's surveillance will be ongoing during construction and will include punchlist
preparation and final walk-through. Presidio will, upon receipt of the following listed
items and at Presidio's acceptance of said information, provide a letter of substantial
conformance for the processing with the City.
• Surveyor's as-builts (as-built information to be provided in redline format to
existing plans as well as AutoCAD line work, line and grade of curbs, ramps and
sidewalk, storrnwater basins and systems).
• Certification letters from the Surveyor, Geotechnical Engineer, Structural Engineer,
Landscape Architect and Contractor that the project was built in substantial
conformance with the approved plans and specifications along with any as-
built/approved modifications.
Further, this Agreement is based upon the Client having the contractor provide a
construction schedule ten working days prior to the start of construction and that the
contractor attend all meetings called by Presidio.
In addition, the Client will need to ensure in their construction contract with the general
contractor that Presidio and its sub-consultants, will be indemnified and will be made
additional insured under the Client's general contractor's general liability insurance
policy.
7 of 12
INITIAL
KAP ENGVOBSUobs20181118042 \Agreements \Agreements I - P118042.Revised 2018.12I7.docx

It should also be noted that this Agreement does not cover conducting detailed
inspections or providing exhaustive or continuous project review and observation
services. Presidio's services do not include inspection services. In addition, Presidio
does not guarantee the performance of, and shall have no responsibility for, the acts or
omissions of any contractor, sub-contractor, supplier or any other entity furnishing
materials or performing any work on the project. If the Client desires more extensive
project observation or full-time project representation, such services may be provided
by Presidio as additional services under a separate agreement to be agreed upon by the
Client and Presidio.
Additionally, the preparation and processing of sewer as-builts is the responsibility of
the Client's project Surveyor and is not included within the Scope of Work or fees of
this Agreement.
Further, it should be noted that Presidio is not responsible for the construction methods
employed on-site nor is Presidio responsible for the safety of any workers associated
with the project.
By the execution of this Agreement, the Client acknowledges that they will contract
with a qualified geotechnical firm to:
Observe site preparation activities so as to confirm that the soil conditions
encountered are as expected within the project's Geotechnical Report.
Conduct materials testing to ensure conformance with the project's plans and
specifications.
Provide copies of these test results be supplied to Presidio on a weekly basis.
Additionally, it is important to state that this Agreement is based upon the
understanding that it is the responsibility of the Client, his representatives and his
contractor to contact the Geotechnical Engineer at the appropriate stages of the project
to ensure materials testing is conducted such that conformance with the project plans
and specifications is ensured.
By the execution of this Agreement, the Client acknowledges that they will contract
with an Arizona Registered Land Surveyor to provide construction staking/as-built
information and that the Client's contract with the Surveyor stipulate that the Surveyor
provide any as-built data required by the jurisdiction having authority and by Presidio
and that the Surveyor will respond to a request for surveying services no later than 48
working hours from the time the request has been made.
The amount of effort expended by Presidio in providing construction services is heavily
dependent on items not under our control, such as the contractor's management,
schedule, sequence of activities, quality of workmanship as well as inclement weather
and other unforeseen circumstances.
8 of 12
INITIAL
K MENG VOBSUobs201811 I 80421Agreements \Agreements I - Prelim \P I 18042.Revised 2018.1217.docx

Consequently, Presidio's construction services are provided on a time and materials
basis within the framework of an initial budget established within this Agreement.
The initial budget is based upon our assumption of the number of site visits that will be
required as shown within the following table along with an allowance (detailed within
the "Fees" section of this Agreement) for addressing RFIs and providing a closeout
package through the governing jurisdiction.
Site Visits Location/Duration
One (1) pre-construction meeting On-Site/1-hour meeting
plus 4 hours travel time
Fifteen (15) site observation visits during construction of On-Site/1-hour meeting
the project plus 4 hours travel time
One (1) walk through with owner/contractor and prepare On-Site/1-hour meeting
punchlist plus 4 hours travel time
One (1) walk through visit to verify Presidio's punchlist On-Site/1-hour meeting
items have been addressed plus 4 hours travel time
However, should the construction period and/or number of visits estimated above be
accelerated or extended, due to unforeseen circumstances, or should extensive RFIs
(more than ten) and/or record drawing work be required beyond Presidio's initial
budget, Presidio will prepare a CO to provide these additional construction services to
the Client. The CO is to be agreed upon by both the Client and Presidio prior to
providing these additional services.
Finally, construction observation during construction is a continuation of our design
services and not a separate and unique function. Field observation during construction
allows for evaluation of the design conditions and confirmation or revision of the
assumptions and extrapolations made in formulating the design parameters and
recommendations. If an engineering firm other than Presidio is contracted to provide
observation during construction, they should notify the owner, project designers, the
appropriate regulatory agencies and this office that they have assumed responsibility for
all phases (design and construction) of the project within the purview of the Engineer of
Record. Notification should indicate that have reviewed the improvement plans and
any subsequent addenda and either agree with the conclusions and recommendations or
will provide new recommendations.
Client Provided Items:
• Construction schedule.
• Conduct on-site pre-construction meeting.
• Surveyor's as-builts (vertical & horizontal as-built information to be provided in
redline format to the existing plans as well as in AutoCAD Civil 3D 2018 format
line work, line and grade of curbs, ramps, sidewalks, channel banks/inverts and all
other elements as required by the governing jurisdiction)
9 of 12
INITIAL
KAPENGUOBS\Jobs2018 \ 118042 \Agreements \Agreements! - Prelim \PI18042.Revised 2018.1217.docx

• Surveyor's elevation certificate in .pdf format.
• Certification letters from the Surveyor, Geotechnical Engineer, Structural Engineer
Landscape Architect and Contractor that the project was built in substantial
conformance per the approved plans and specifications along with any as-
builts/approved modification.
• Review fees.
Deliverables:
• Substantial conformance letter in .pdf format (upon completion of project and
receipt of required closeout documents).
• Record Civil Site Documents in AutoCAD Civil 3D 2018 .dwg format.
III. EXCLUDED SERVICES
As previously mentioned, this Agreement covers only those services detailed within the
"Scope of Work" section contained within this Agreement. All other services are
considered to be excluded.
Additionally, in order to assist the Client with the understanding of the Excluded Services,
the following summary has been prepared. The following summary contains the typical
items not included within this Agreement that have not been previously excluded within the
scope of work for this project. However, this list may vary based upon circumstances out
of Presidio's control.
• Preparation of an existing conditions land survey including ALTA, topography and
design survey.
• Preparation and processing of any off-site improvement plans including roadway,
drainage public/private sewer and water facilities.
• Preparation of Opinions of Probable Construction Costs.
• Preparation and processing of any underground stormwater storage.
• Preparation and processing of any NPPP, Landscape/Irrigation and Storm Water
Harvesting Plans.
• Preparation and processing of any dry utility design/improvement plans.
• Preparation and processing of any jack and bore plans.
• Preparation and processing of any existing utility relocation plans.
• CLOMR/LOMR preparation and processing.
10 of 12
INITIAL
KAPENG \JOBS 1.Jobs2018 \ 1180421Agreements\Agreements I - Prelim \P118042.Revised 2018.1217.docx

IV. FEES
Accordingly, Presidio's fees for the above services are as follows:
SCOPE OF WORK ITEMS FEES
A. Schematic Design Phase Services, Civil (0102)fixedfee $14,753.00
B. Design Development Phase Services, Civil (0104)fixedfee $31,277.00
C. On-Site Construction Document Phase Services, Civil (0500) fixed fee $36,324.00
D. Bidding Services, Civil (0501) fixed fee $4,936.00
E. Construction Admin Services, Civil (1300) time and materials basis (*Initial Budget) $22,786.00
*Not to exceed without written permission.
Accordingly, our fees will be billed on an hourly basis in accordance with our attached
standard hourly rates (see attached Exhibit "B").
Further, The Standard Conditions set forth in Exhibit "A" on the attached pages are
incorporated herein and made a part of the Agreement. These Standard Conditions contain
a limitation of liability clause as identified as Article No. 7 within Exhibit "A". This
limitation of liability clause is negotiable should the Client choose to do so. Further,
execution of this Aizreement indicates that the Client has read, understands and accepts all
of the Terms and Conditions associated with this Agreement including but not limited to
Exhibit "A".
The above fees are based upon our current understanding of the scope to complete this
project. These fees do not include any review fees, reproduction costs, long distance phone
charges, etc., as detailed under Item 10 of Exhibit "A". The above services will be billed
monthly based upon the percentage of work completed. Any changes in the scope of work
will be considered additional services to be agreed upon by the Client and Presidio.
Additionally, Presidio reserves the right to change the terms of this Agreement at the
beginning of each calendar year to accommodate changes in hourly rates, delivery
schedule, etc.
If the above-described arrangements are satisfactory, please so indicate in the space
provided below, initial each page and return to our office. Upon acceptance, a copy of the
fully executed Agreement will be returned to the Client for the Client's files. This
Agreement is to be signed, each page initialed as indicated and returned to Presidio within
15 calendar days or Presidio may, at its sole discretion, declare this offer null and void.
{SIGNATURES FOLLOW ON NEXT PAGE}
11 of 12
INITIAL
KAPENG \JOBS \Jobs2018 \1180421Agreernents\Agreements1 - Prelim \ P118042.Revised 2018.1217.docx

EXHIBIT "B"
Presidio
190 S. Stratford Dr., Suite #105, Tucson, AZ 85716
(520) 795-7255 voice (520) 795-6747 fax
REVISED
Maricopa County East Animal Welfare Improvements (MCEAWI)
Civil Fee Estimates
Presidio Engineering Job No. 118042-01-0010
Revised 12/17/18
12/13/2018
Task Labor Category Hours Rate Total
A. Schematic Design Phase Services, Civil (0102)
Principal 6 $150.00 $900.00
Sr. Project Manager 12 $139.00 $1,668.00
Sr. Project Engineer 52 $118.00 $6,136.00
Sr. Civil Designer 26 $102.00 $2,652.00
Sr. CADD Operator 19 $87.00 $1,653.00
Administrator II 10 $100.00 $1,000.00
Admin Asst. 12 $62.00 $744.00
Total Schematic Design Phase Services (Civil) $14,753.00
Task Labor Category Hours Rate Total
B. Design Development Phase Services, Civil (0104)
Principal 13 $150.00 $1,950.00
Sr. Project Manager 20 $139.00 $2,780.00
Sr. Project Engineer 48 $118.00 $5,664.00
Sr. Civil Designer 91 $102.00 $9,282.00
Sr. CADD Operator 99 $87.00 $8,613.00
Administrator II 15 $100.00 $1,500.00
Admin Asst. 24 $62.00 $1,488.00
Total Design Development Phase Services (Civil) $31,277.00
Task I Labor Category Hours Rate Total
C. Construction Document Phase Services, Civil (0500)
Principal 22 $150.00 $3,300.00
Sr. Project Manager 32 $139.00 $4,448.00
Sr. Project Engineer 44 $118.00 $5,192.00
Sr. Civil Designer 90 $102.00 $9,180.00
Sr. CADD Operator 92 $87.00 $8,004.00
Administrator II 31 $100.00 $3,100.00
Admin Asst. 50 $62.00 $3,100.00
Total Construction Document Phase Services (Civil) $36,324.00
Page 1 of 2

„
'Task j Labor Category Hours Rate Total
D. Bidding Phase Services, Civil (0501)
Principal 4 $150.00 $600.00
Sr. Project Manager 6 $139.00 $834.00
Sr. Project Engineer 8 $118.00 $944.06
Sr. Civil Designer 8 $102.00 $816.00
Sr. CADD Operator 6 $87.00 $522.00
Administrator II 6 $100.00 $600.00
Admin Asst. 10 $62.00 $620.00
Total Bidding Phase Services (Civil) $4,936.00
Task Labor Category Hours Rate Total
E. Construction Admin Services, Civil (1300)
Principal 8 $150.00 $1,200.00
Sr. Project Manager 22 $139.00 $3,058.00
Sr. Project Engineer 90 $118.00 $10,620.00
Sr. Civil Designer 12 $102.00 $1,224.00
Sr. CADD Operator 12 $87.00 $1,044.00
Administrator II 44 $100.00
Admin Asst. 20 $62.00 $1,240.00
Sub-Total
Direct Cost
Construction Administration Services (Civil) 2 7--, 7e4,..619
TOTAL COMBINED FEES I .06, 0 76 . en
TOTAL COMBINED DIRECT COSTS en. oc,
GRAND TOTAL FEES AND DIRECT COSTS $110,076.00 1
Page 2 of 2

EXHIBIT "A"
STANDARD CONDITIONS
Client agrees to cooperate in any and every way or manner with PRESIDIO ENGINEERING, INC. (PRESIDIO) on the services to be performed
by PRESIDIO hereunder.
All sketches, drawings, tracing, computations, survey notes and other original documents are and shall remain the property of PRESIDIO, subject
to the requirements of public agencies.
All agreements on PRESIDIO's part are contingent upon and subject to the fact that PRESIDIO shall not be responsible for damages, or be in
default or deemed to be in default by reason of delays in performance by reason of strikes, lockouts, accidents, acts of God, shortages of materials,
unavailability of labor at established area wage rates, delays caused by failure of Client, other contractors or governmental agencies, the
performance of whose work is precedent to or concurrent with the performance of PRESIDIO's services hereunder and other unavoidable delays or
any causes beyond reasonable control of PRESIDIO. In the case of the happening of any such cause of delay, the time of completion shall be
extended accordingly. In the event PRESIDIO's services hereunder arc not completed within six (6) months from the date of this agreement,
PRESIDIO reserves the right to adjust its fee for the uncompleted portion of its services to reflect any increases in wages, salaries or benefits to be
paid by PRESIDIO to its employees in the performance of this Agreement.
In the event that any staking, as provided by PRESIDIO, is destroyed by an act of God or parties other than PRESIDIO, the cost of restaking shall
be paid for by Client. Such cost shall be in addition to the compensation otherwise payable to PRESIDIO hereunder.
5 PRESIDIO makes no representation concerning soil conditions, and has not, unless expressly set forth in the description of the scope of work set
forth in this Agreement, undertaken any responsibility to furnish any reports or to secure performance of any tests concerning the character of soils
or their suitability for construction. In the event that PRESIDIO agrees to secure performance of soil tests, it is agreed that the service shall be for
the convenience of the Client, and PRESIDIO's only obligation shall be to coordinate performance of soil tests and preparation of soil reports for a
soil testing lab, which reports and tests shall be for exclusive use of and dissemination to Client. PRESIDIO shall not be responsible for any
claims, liabilities, or damages which arise or arc alleged to arise out of the making or failure to make soil surveys, compaction tests or other
subsurface soil tests of any kind or nature.
6. PRESIDIO's responsibility in performing this contract is limited solely to the scope of services to be performed by PRESIDIO as expressly set forth
in this contract, and PRESIDIO, its agents and/or employees shall have no liability of any kind to the Client or to any construction contractor or
subcontractor or any person having contractual relationships with them for any actions, errors and/or omissions of PRESIDIO, its agents and/or
employees which are not within the scope of the services to be performed by PRESIDIO. Additional services requested by the Client shall be
covered by letter or memorandum and constitute an addendum to this Agreement.
7. In recognition of the relative risks and benefits of the Project to both the Client and PRESIDIO, the risks have been allocated such that the
Client agrees, to the fullest extent permitted by law, to limit the liability of PRESIDIO and PRESIDIO'S officers, directors, partners,
employees, shareholders, owners and sub-consultants for any and all claims, losses, costs, damages of any nature whatsoever or claims
expenses from any cause or causes, including attorneys' fees and costs and expert-witness fees and costs, so that the total aggregate liability
of PRESIDIO and PRESIDIO'S officers, directors, partners, employees, shareholders, owners and sub-consultants shall not exceed
$165,114.00, or PRESIDIO'S total fee for services rendered on this Project, whichever is greater and in no event shall PRESIDIO's
liability exceed the amount of available insurance proceeds. It is intended that this limitation apply to any and all liability or cause of
action however alleged or arising, unless otherwise prohibited.
8. No conditions or representations altering, detracting from or adding to the terms hereof shall be valid unless printed or written herein or evidenced
in writing by either party to this Agreement and accepted in writing by the other.
9. The Client agrees that, in accordance with generally accepted construction practices, the construction contractor will be required to assume sole and
complete responsibility for job site conditions during the course of construction of the project, including, without limitation, prosecution of work
and the safety of all persons and property and that this requirement shall be made to apply continuously and not be limited to normal working
hours. Client further agrees to defend, indemnify and hold PRESIDIO harmless from any and all liability, real or alleged, in connection with the
performance of work on the project.
10. Client shall pay the cost of all expenses incurred or to be incurred by PRESIDIO directly or indirectly in connection with the Project for:
transportation and subsistence incidental thereto; obtaining bids or proposals from contractors; toll telephone calls and telegrams; and all charges to
be paid or incurred for fees, permits, bond premiums, title company charges, delivery charges, blueprints and reproduction of reports, drawings,
specifications and all other charges and expenses not specifically itemized in this paragraph, but which are reasonable and necessary for the proper
completion of the services hereby covered. In the event such reimbursable items are paid directly by PRESIDIO, then client shall be obligated to
reimburse PRESIDIO therefore, and such charges and expenses shall be invoiced by PRESIDIO to Client at direct cost, plus fifteen percent (15%)
for handling.
Invoices will be issued monthly, are due and payable upon receipt and are delinquent thirty (30) days after the invoice date. When an invoice
becomes delinquent, PRESIDIO may, at its option, suspend or stop performance hereunder until such time as all delinquent invoices, together with
accrued late charges, attorneys fees, litigation or collection expenses, whether taxable or not, have been paid. If an invoice remains delinquent for a
period of forty-five (45) days, PRESIDIO may, at its option, terminate this Agreement by giving written notice of its termination to the Client.
Termination shall take effect on the date of the notice of termination. In the event of termination under the provisions of this paragraph, PRESIDIO
shall be entitled to payment for all services rendered and costs incurred hereunder through the date of termination and for recovery of all expenses
which arc attributable to said termination or described in paragraph 22 hereof.
l2. The rates and multiples set forth for services shall be annually adjusted in accordance with normal salary review practices of the Consultant,
K:IPENGIJOBSUbbs201811180421AgreernenislAgreenionsi - PrelimlExhA.StdCond.illonthlr bitting Revised.docx

13. Client shall promptly review invoices and notify PRESIDIO of any objection thereto. Absent such objection in writing within ten (10) days of the
date of the invoice, the invoice and the services covered thereby shall be deemed proper and acceptable.
14. If invoices are not paid in full prior to delinquency, Client agrees to pay a late charge on the unpaid amount at a monthly rate equivalent to the
prime lending rate then being charged by Wells Fargo, plus eight (8) percentage points, said late charge to accrue from the date on which each such
invoice becomes delinquent. PRESIDIO reserves the right to increase or reduce the late charge rate by giving written notice to Client. Notice of
any such increase or reduction shall become effective thirty (30) days following the date of the notice. All payments received by PRESIDIO shall
first be credited to payment of any late charges and then to the principal balance.
15. In the event any term or provision of this Agreement is held to be invalid, or unenforceable, the validity of the other provisions hereof shall not be
affected, and this Agreement shall be construed and enforced as if it did not contain the particular term or provision held invalid or unenforceable.
16. In an effort to resolve any conflicts that arise during the design and construction of the Project or following the completion of the Project, the Client
and PRESIDIO agree that all disputes between them arising out of or relating to this Agreement or the Project shall be submitted to nonbinding
mediation.
The Client and PRESIDIO further agree to include a similar mediation provision in all agreements with independent contractors and consultants
retained for the Project and to require all independent contractors and consultants also to include a similar mediation provision in all agreements
with their subcontractors, subconsultants, suppliers and fabricators, thereby providing for mediation as the primary method for dispute resolution
among the parties to all those agreements.
17. In the event of a change of rule, regulation or policy by any governmental agency or agencies after the date of this Agreement, which change alters
the plans, specifications and/or field work to be prepared or performed hereunder, any additional office or field work required as a result of such
change shall be deemed additional services, shall be payable by Client, and shall be invoiced and paid for as provided herein.
18. Upon written request, each of the parties hereto shall execute and deliver or cause to be executed and delivered such additional instruments and
documents as may be necessary and proper to carry out the terms of this Agreement.
19. Should litigation be necessary to enforce any term or provision of this Agreement, then all reasonable litigation and collection expenses, including,
without limitation, witness fees, court costs, attorneys fees and other expenses, whether taxable or not, shall be paid to the prevailing party.
20. This agreement binds PRESIDIO and Client and their successors, assigns and partners. Neither party shall assign, sublet or transfer interests, rights
or obligations in this Agreement without the prior written consent of the other party hereto.
21. This Agreement shall be construed and enforced in accordance with the laws of the State of Arizona.
22. Either Client or PRESIDIO may terminate this Agreement without penalty at any time with or without cause upon giving the other party ten (10)
calendar days' prior written notice. Client shall within fifteen (15) calendar days of termination pay PRESIDIO for all services rendered and all
costs incurred up to the date of termination, in accordance with the compensation provisions of this Agreement. Client shall also reimburse
PRESIDIO for all of PRESIDIO's termination expenses, including, but not limited to, those associated with demobilization, reassignment of
personnel, and space and equipment costs.
23. This Agreement sets forth the entire agreement of Client and PRESIDIO with respect to the services to be performed hereunder. There are no
understandings or agreements except as expressly stated herein.
'END OF STANDARD CONDITIONS'
Professional:
Acknowledgment of receipt and agreement of the Standard Conditions
K:IPENG1.1011Stiobs20181 I l 80421AgreemenislAgreemenis I - PrelinilExhA.StdCond.Monihly billing Revised.docx

CLIENT:
LINE AND SPACE (referred to as Client)
NAME: HENRY TOM TITLE:
ADDRESS: 627 E. SPEEDWAY BLVD. TEL: (520) 615-1313
CITY: TUCSON ST AZ ZIP 85705 FAX: (5201615-1303
AUTHORIZED BY: DATE:
(Signature)
PRESIDIO ENGINEERING, INC. (referred to as Presidio)
NAME: JOHN D. WOOD. P.E.. LEED-AP TITLE: PRESIDENT
ADDRESS: 190 S. STRATFORD DR.. SUITE #105 TEL: 520-795-7255
CITY: TUCSON ST AZ ZIP 85716 FAX: 520-795-6747
ACCEPTED BY: DATE:
(Signature)
12 of 12
INITIAL
KAPENGUOBS \Jobs20 18 \1180421AgreementskAgreements1 - Prelim\P118042.Revised 2018.1217.docx

EXHIBIT "C"
Presidio
190 S. STRATFORD DRIVE, SUITE 105, TUCSON, ARIZONA 85716
(520) 795-7255 FAX (520) 795-6747
MEMORANDUM
TO: CAD Data Preparer
FROM: Presidio Engineering
DATE: Revised August 1, 2017
SUBJECT: AutoCAD Specifications
The following is a summary of our requirements for the preparation and submission of CAD
Drawings:
1. Provide Presidio with contact information regarding the CAD technician assigned to
this project.
2. All electronic data submitted to Presidio shall be in a format compatible with
AutoCAD Civil 3D 2018.
3. Include all, if any, drawing files used as XREFS in the submitted drawings. All
drawings, XREFS, aerial photos, etc. are to be in the same coordinate space and
ready for insertion at 0,0,0.
4. Include all non-resident ACAD text fonts and shape (shx) files with the dwg file.
5. Include any "post-script" fonts you may have used in the drawing.
6. Deliver, with the data, the plotting parameters of the drawing, include color to pen
settings, and "screened" colors when used.
7. If the files being submitted are "ZIPPED" files, the names of all drawings
contained therein should be noted by separate document.
K:V3ENGIADMIN1FORMS DOC MSWORDICAD3.doc
Page 1 of 2

8. Electronic information can be submitted on a CD, e-mailed to
jroulnapresidioengineering.com or uploaded to Presidio's FTP site. If using the
FTP site, please contact Tanya Washington at Tanyaippresidioenuinecring.com and
request the usemame and password.
9. DO NOT explode contour and/or polylines.
10. Be certain that all entities reside upon the correct layer(s). DO NOT put several
different line types together on one layer (i.e. easement lines, right-of-way lines, X-
EP lines should all be on separate layers). Contact Presidio for a list of our layers.
11. All blocks that have been inserted should be inserted with the same X, Y, & Z scale.
12. If Presidio is requested to insert data into your title block and border, submit your
electronic border to us in both CAD and .pdf format
13. Purge all non-essential items from the drawing prior to submittal.
14. Determine the drawing scale and sheet size. Include this information in written
form.
15. All drawing entities, other than polylines depicting topographic elevations and
survey points shall be at an elevation of zero and shall be parallel to "world" UCS.
16. All entity colors shall be "ByLayer -. Use additional layers if needed to make
entities a different color than the layer they normally reside upon.
17. All graphic entities shall be true AutoCAD objects. All non-AutoCAD entities
must be converted to true AutoCAD object.
18. Avoid true type fonts. They slow AutoCAD drawings down.
Your assistance in compiling the requested information and electronic data in the above-
mentioned format will help to assure the client of receiving quality documents, produced with
minimal amount of revisions.
If you are unable to comply with these requests, please advise us five working days prior to your
submittal deadline so that we may advise our client accordingly.
Thank you.
K :\PENG1A UM FOR A4S DOC 4 ,ISWORDICAD3 floc
Page 2 of 2

EXHIBIT "1)"
Tanya Washington
From: John Wood
Sent: Thursday, December 13, 2018 2:32 PM
To: Tanya Washington
Subject: FW: MCEAWI Project Fee Proposal
Attachments: MCEAVVI-SiteMicroLRjpg; MCEAWI-SiteMacroLRjpg
Tanya,
FYI
John
From: Henry Tom <henryt@lineandspace.com>
Sent: Wednesday, December 05, 2018 3:38 PM
To: John Wood <john@presidioengineering.com >
Cc: Bob Clements <bobc@lineandspace.com >; Mike Anglin <mikea@lineandspace.com >
Subject: MCEAWI Project Fee Proposal
Hi John:
Maricopa County has decided to build a new animal care facility on the east side of town. The project will be in Mesa,
Arizona.
The property owned by MC has an existing building that will be demolished (see site aerial photos). We have completed
the program for the project and will be moving forward with design early next year.
Some parking is anticipated to be located on our site west of Lewis.
The project entails the following:
Proiect Name
Maricopa County East Animal Welfare Improvements
Discipline
Civil Engineering (including site utilities)
PROJECT SIZE
42,000sf
BUDGET
Project Construction Budget: $15,800,000
LEED/GREEN GLOBE
No
DRAWING FORMAT
AutoCAD 2007 or higher
PROJECT CONSTRUCTION DELIVERY METHOD
Design Bid Build, but may change to CMAR
FEE SUBMITTAL
Submit fee for Schematic Design through Construction Administration, utilize format from previous submittal
1

Submit Fee and Hourly Rates to Line and Space by 4:00pm. December 13, 2018.
Thanks.
Henry
Henry Tom, FAIA, NCARB I Principal
Line and Space, LLC 627 E. Speedway, Tucson, AZ 85705 1(520) 623-1313
www.lineandspace.com I Facebook I Instagram I LinkedIn
40 40
40 YEARS x 40+ PROJECTS

Maricopa County East Animal Welfare Improvements
McGann & Associates — Landscape Architects

*4111° McGann & Associates
4 Landscape Architects and Planners
ra. A 6814 North Oracle Road, Suite 210, Tucson AZ 85704 Tel 520-297-9540 Fax. 520-297-9545 www.mcgannland corn
December 12, 2018
Henry Tom
Line and Space Architects
627 East Speedway Boulevard
Tucson, Arizona 85705
Ref: Agreement between Landscape Architect and Client
Maricopa County East Animal Welfare Improvements (MCEAWI) Project
Dear Henry,
McGann & Associates (the Landscape Architect) is pleased to submit this proposal for professional
landscape architectural services related to the Maricopa County East Animal Welfare Improvements
Project (the Project). The services to be provided to Line & Space Architects (the Client) and the
conditions of this proposal are as outlined herein. When signed and executed by both parties, this
document shall serve as an Agreement between Landscape Architect and Client.
PROJECT DESCRIPTION
The landscape architectural component of this project involves the preparation of site development,
landscape, and irrigation improvement plans for a new 42,000 SF Animal Control / Care Facility to be
constructed near Baseline Road and South Lewis Street in Mesa, Arizona. The project work is being
performed for Maricopa County (the Owner).
SERVICES TO BE PROVIDED BY McGANN & ASSOCIATES INC.
Task 1: Schematic Design
McGann & Associates will:
• Participate in a kick-off meeting with the Owner
• Conduct an inspection of the project site
• Research applicable City of Mesa and Maricopa County site / landscape development codes and
ordinances
• Prepare conceptual design for site / landscape improvements for Client and Owner review
• Coordinate with other project consultants
• Prepare Schematic Design documents as outlined in the Scope of Work
• Provide the Client with pdf files of the Schematic Design documents
Task two: Design Development Submittal
McGann & Associates will:
• Provide written responses to comments received from the Owner and Client related to the Schematic
Design Submittal
• Participate in a telephonic review conference with the Owner and Client
• Participate in coordination meetings with the Client and other members of the NE design team

Mr. Henry Tom
December 12, 2018
Page 2
• Update and coordinate CAD files for site development
• Prepare Design Development level drawings for the landscape and related hardscape improvements
• Prepare calculations, etc. as required to demonstrate compliance with applicable site / landscape
development codes
• Prepare Design Development level drawings for the irrigation improvements
• Prepare draft specifications for the landscape, irrigation, and related site improvements
• Prepare a preliminary cost estimate for the landscape, irrigation, and related site improvements
• Provide the Client with pdf files for the Design Development Documents
Task 3: Construction Documents - 50% Submittal
McGann & Associates will:
• Provide written responses to comments received from the Owner and Client related to the Design
Development Submittal
• Participate in a telephonic review conference with the Owner and Client
• Participate in coordination meetings with the Client and other members of the NE design team
• Update and coordinate CAD files for site development
• Prepare 50% complete construction drawings, details, and schedules for the landscape and related
hardscape improvements
• Prepare updated calculations, etc. as required to demonstrate compliance with applicable site /
landscape development codes
• Prepare 50% complete construction drawings, details, and schedules for the irrigation improvements
• Prepare pre-final specifications for the landscape, irrigation, and related site improvements
• Prepare a pre-final cost estimate for the landscape, irrigation, and related site improvements
• Provide the Client with pdf files for the 50% Construction Documents
Task 4: Construction Documents - 100% Submittal
McGann & Associates will:
• Provide written responses to comments received from the Owner and Client related to the 50%
Construction Document Submittal
• Participate in a telephonic review conference with the Owner and Client
• Participate in coordination meetings with the Client and other members of the NE design team
• Update and coordinate CAD files for site development
• Prepare 100% complete, sealed drawings for the landscape and related hardscape improvements
• Prepare final calculations, etc. as required to demonstrate compliance with applicable site / landscape
development codes
• Prepare 100% complete, sealed drawings for the irrigation improvements
• Prepare 100% complete sealed specifications for the landscape, irrigation, and related site
improvements
• Prepare a final cost estimate for the landscape, irrigation, and related site improvements
• Provide the Client with pdf files for the 100% complete, sealed Construction Documents

Mr. Henry Tom
December 12, 2018
Page 3
Task 5: Services During Bidding
McGann & Associates will:
• Participate in a Pre-Bid Conference
• Respond to potential bidder questions related to the proposed landscape and irrigation improvements
• Prepare Addenda as-needed for clarifications related to the landscape / irrigation plans and
specifications
• Provide the Client with pdf files of addenda
Task 6: Services During Construction
McGann & Associates will:
• Participate in a Pre-Construction Conference
• Review the Contractor's material and equipment submittals
• Respond to Requests-for-Information (RFI's) related to the landscape and irrigation improvements
• Make up to two (2) Construction Observation site visits and prepare a summary report f each visit
• Inspect the landscape and irrigation improvements at the time of Substantial Completion
• Prepare a Punch List for the landscape and irrigation improvements
• Make a Final Inspection of the landscape and irrigation improvements to verify completion of the Punch
List items
• Prepare Record Drawings based on the Contractor's As-Built Drawings
INFORMATION AND SERVICES TO BE PROVIDED BY LINE AND SPACE ARCHITECTS
The Client, shall provide the following information and services or shall be responsible for the acquisition of
specified information and services from the Owner and/or other project consultants. All drawings shall be
provided in digital (AutoCAD .dwg file) format.
• Drawing showing property lines, easements, and other boundaries impacting landscape development
• Drawing showing existing site topography
• Drawing showing the location of existing buildings, structures, utilities, and other site improvements
• Drawing showing proposed new buildings, structures, utilities, and other site improvements
• Drawing showing proposed site grading, paving, drainage structures and related site development
• Coordination with the Project Owner
• Coordination with other parties / agencies / neighborhood associations / etc., as applicable
• Coordination of submittals to reviewing agencies including payment of applicable fees
• Acquisition of permits as may be required for construction of the proposed improvements
• Payment of all applicable permit fees
• Landscape and irrigation construction budget information, as applicable
PROJECT SCHEDULE
All work outlined above will be completed in accordance with a schedule to be prepared jointly by the
Landscape Architect and the Client.

Mr. Henry Tom
December 12, 2018
Page 4
FEES AND PAYMENT
McGann & Associates' fees for services identified above shall be as follows:
Task 1: Programming and Schematic Design $ -5,5131,0 5,44 0
Task 2: Design Development Submittal $ 10,645.00
Task 3: 50% Construction Document Submittal $ 15,085. 00
Task 4: 100% Construction Document Submittal $ 15,660.00
Task 5: Services during Bidding $ Z075.00
Task 6: Services during Construction $ -876-1-eree 22 e . Oc7
Total: $ 57,594.00
Invoices will be submitted monthly with invoiced amounts based on percentage of project completion.
Payment shall be due within 30 days of receipt of invoice.
EXCLUSIONS
Specifically excluded from the Landscape Architect's scope of work are:
• Professional design services required by statute or regulation to be performed by other professionals
such as electrical engineer, structural engineer, or geotechnical engineer
• Special studies, investigations, reports, or documents not specifically identified herein
• Preparation of Native Plant Preservation Plans, Water Harvesting Plans, or similar documents (not
identified in the Scope of Work)
ADDITIONAL SERVICES
McGann & Associates Inc. will provide project related services other than those identified above if requested
in writing by the Client. Such services shall be considered Additional Services. McGann & Associates' fees
for Additional Services shall be based on an amendment to this Agreement or on the firm's standard hourly
rates ranging from $50.00 to $140.00 per hour. Expenses incurred in conjunction with the provision of
Additional Services shall be reimbursed at cost.
ACCEPTANCE
Henry, please acknowledge your acceptance of this proposal, including Attachment A, by signing the
attached copy and returning it to my attention at the address on the above letterhead. We look forward to
working with you on this project.

Mr. Henry Tom
December 12, 2018
Page 5
Line and Space Architects McGann & Associates Inc.
By: By:
Authorized Signature orized Signature
Domsrpt3
Signer's Name (Typed or Printed) Signer's Name (Typed of
Title: Title: pitilOgwr
Date: Date: a-la-lit

ATTACHMENT A: AGREEMENT BETWEEN LANDSCAPE ARCHITECT AND CLIENT- GENERAL PROVISIONS
Miscellaneous Provisions
1. If this Agreement is not signed and returned to the Landscape Architect (McGann & Associates) within 90 days of the date
noted, the offer to perform the described services may, at the Landscape Architect's sole discretion, be withdrawn and be null
and void.
2. This agreement is governed by the laws of the State of Arizona.
3. This Agreement is the entire and integrated agreement between the Client and the Landscape Architect and supercedes all
prior negotiations, statements, or agreements, either written or oral. The parties may amend this agreement only by a written
instrument signed by both the Client and the Landscape Architect.
4. In the event that any term or provisions of this Agreement is found to be unenforceable or invalid for any reason, the remainder
of this Agreement shall continue in full force and effect, and the parties agree that any unenforceable or invalid term or provision
shall be amended to the minimum extent required to make such term of provision enforceable and valid.
5. Neither the Client or Landscape Architect shall assign this Agreement without the written consent of the other.
6. Nothing in this Agreement shall create a contractual relationship for the benefit of any third party.
Scope of Work:
7. All services not specifically identified in this Agreement are excluded from the scope of services to be provided by the
Landscape Architect.
Implementation of the Specified Work:
8. The Landscape Architect will provide professional services related to this project in accordance with generally accepted
standards of the landscape architectural profession.
9. McGann & Associates may rely on the accuracy and completeness of documents provided by the Client, the Owner, and/or
other design professionals involved in the design and engineering of the project.
10. The Client shall render project decisions in a timely manner so as not to delay the orderly and sequential progress of the
Landscape Architect's services.
Soil and Other Site Conditions:
11. The Client and/or Owner shall be solely responsible for determining the suitability of project soils for the proposed landscape,
irrigation, and related site improvements, for determining the presence of soil contaminants, and for the design and
implementation of programs for the removal and/or handling of contaminated soil.
12. The Client and/or Owner agrees to advise the Landscape Architect of any known soil contaminants or other contaminants at the
project site.
13. Except as may be specifically identified in this Agreement, the Client and/or Owner shall be solely responsible for determining
the nature of subsurface soil conditions on the project site.
Engineering and Design Work by Others:
14. Except as may be specifically identified herein, the Landscape Architect shall not be responsible for the engineering and/or
design of site grading and drainage improvements including grading and drainage work to be performed within landscaped
areas. The Client shall be responsible for identifying project areas where special landscape treatments may be needed to
protect grading and drainage improvements.
Project Construction and Construction Phase Services:
15. Irrespective of any other term of this agreement, the Landscape Architect shall not control or be responsible for construction
means, methods, techniques, schedules, sequences, or procedures; or for construction safety or other related programs; or for
another party's errors and omissions or; for another party's failure to complete their work in accordance with the Landscape
Architect's documents.
16. Although the Landscape Architect may observe, discuss, and/or report on potential problems with the construction of project
improvements in conjunction with site visits, these visits are not construction inspections or a guarantee that there will not be
construction deficiencies.
17. The Landscape Architect's review of construction contractor submittals, such as shop drawings and samples, will be only to
determine if they conform to the Landscape Architect's visual and aesthetic design intent.
18. Review of the construction contractor's payment applications will be to determine if the amount of work represented as complete
is generally consistent with the Landscape Architect's observations during site visits and shall be subject to noted qualifications
by the Landscape Architect. The Client / Owner understands that the frequency of the Landscape Architect's visits may limit the
Landscape Architect's ability to review certain payment applications. The Landscape Architect's review shall not be a
representation that the Landscape Architect has supervised the work, or that the Landscape Architect has reviewed how, or for
what purpose, the construction contractor intends to use the Owner's payment.
Attachment A - Page 1 of 2

ATTACHMENT A: AGREEMENT BETWEEN LANDSCAPE ARCHITECT AND CLIENT- GENERAL PROVISIONS
19. To the extent damages are covered by property insurance during construction, the Client and Landscape Architect waive all
rights against each other and against contractors, consultants, agents, and employees of the other for such damages. Client
and Landscape Architect, as appropriate, shall require of the contractors consultants, agents, and employees of any of them
similar waivers in favor of the other parties described in this paragraph.
Termination:
20. Either Client or Landscape Architect may terminate this Agreement upon seven days written notice.
21. If terminated, Client agrees to pay Landscape Architect for all basic and additional services rendered and reimbursable
expenses incurred up to the date of termination.
22. Upon not less than seven day's written notice, Landscape Architect may suspend the performance of its services if the client
fails to pay Landscape Architect in full for services rendered or expenses incurred. Landscape Architect shall have no liability
because of such suspension of services or termination due to Client's nonpayment.
Dispute Resolution:
23. Client and Landscape Architect agree to mediate claims or disputes arising out of or relating to this Agreement before initiating
litigation. The mediation shall be conducted by a mediation service acceptable to the parties. A party shall make a demand for
mediation within a reasonable time after a claim or dispute arises, and the parties agree to mediate in good faith. In no event
shall any demand for mediation be made after such claim or dispute would be barred by applicable law. Mediation fees shall be
shared equally.
24. Should any legal proceeding be commenced between the parties to this Agreement seeking to enforce any of its provisions,
including, but not limited to, fee provisions, the prevailing party in such proceeding shall be entitled, in addition to such relief as
may be granted, to a reasonable sum for attorney's and expert witnesses' fees, which shall be determined by the court or forum
in such a proceeding or in a separate action brought for that purpose. For purposes of this provision, "prevailing party" shall
include a party that dismisses an action for recovery hereunder in exchange for payment of the sum allegedly due, performance
of covenants allegedly breached, or consideration substantially equal to the relief sought in the action or proceeding.
25. Client and Landscape Architect waive consequential damages for any claims, disputes or other matters in question arising out
of or relating to this Agreement. Landscape Architect's waiver of consequential damages is, however, contingent upon the
Client requiring the contractor and subcontractor to waive all consequential damages against the Landscape Architect for
claims, disputes or other matters in question arising out of or relating to the Project.
Maintenance of improvements:
26. The Client / Owner acknowledges that proper maintenance of the project is required after construction of the project is complete
and that lack of proper maintenance may result in damage to property or persons. The Client / Owner further acknowledges
that, as between parties to this Agreement, the Client / Owner is solely responsible for the results of any lack of or improper
maintenance.
Indemnification:
27. The Client agrees to indemnify, defend, and hold the Landscape Architect harmless from and against any and all claims,
liabilities, suits, demands, losses, costs, and expenses including but not limited to, reasonable attorneys' fees and all legal
expenses and fees incurred through appeal, and all interest thereon, accruing or resulting to any and all persons, firms or any
other legal entities on account of any damages or losses to property or persons, including injury or death, or economic losses,
arising out of the Project and/or this Agreement, except that the Landscape Architect shall not be entitled to be indemnified to
the extent such damages or losses are found by a court or forum of competent jurisdiction to be caused by Landscape
Architect's negligent errors or omissions.
Use and Ownership of the Landscape Architect's Documents:
28. Upon the parties signing this Agreement, Landscape Architect grants the Client a nonexclusive license to use Landscape
Architect's documents as described in this Agreement, provided the Client performs in accordance with the terms of this
Agreement. No other license is implied or granted under this Agreement. All instruments of professional service prepared by
Landscape Architect, including but not limited to drawings and specifications, are the property of the Landscape Architect.
These documents shall not be reused on other projects without Landscape Architect's written permission. Landscape Architect
retains all rights, including copyrights, in its documents. Client or others cannot use Landscape Architect's documents to
complete this project with others unless Landscape Architect is found to have materially breached this Agreement.
Attachment A - Page 2 of 2

Maricopa County Animal Welfare Improvements
Firm: McGann & Associates Date: 12/12/2018
Discipline: Landscape Architecture
Phase Hours Rates Fee Subtotal
PROGRAMMING
Principal Landscape Architect 0 $140 $0
Project Landscape Architect 0 $105 $0
Landscape Architect 0 $75 $0
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 0 $55 $0
Clerical 0 $50 $0
SCHEMATIC DESIGN
Principal Landscape Architect 9 $140 $1,260
Project Landscape Architect 32 $105 $3,360
Landscape Architect 0 $75 $0
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 12 $55 $660
Clerical 2.5 $50 $125
$5,405
DESIGN DEVELOPMENT
Principal Landscape Architect 11 $140 $1,540
Project Landscape Architect 56 $105 $5,880
Landscape Architect 0 $75 $0
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 55 $55 $3,025
Clerical 4 $50 $200
$10,645
CONSTRUCTION DOCUMENTS (50% AND 100%)
Principal Landscape Architect 40 $140 $5,600
Project Landscape Architect 155 $105 $16,275
Landscape Architect 0 $75 $0
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 154 $55 $8,470
Clerical 8 $50 $400
$30,745
BIDDING PHASE SERVICES
Principal Landscape Architect 2 $140 $280
Project Landscape Architect 15 $105 $1,575
Landscape Architect 0 $75 $0
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 4 $55 $220
Clerical 0 $50 $0
$2,075

Maricopa County Animal Welfare Improvements
Firm: McGann & Associates Date: 12/12/2018
Discipline: Landscape Architecture
Phase Hours Rates Fee Subtotal
CONSTRUCTION PHASE SERVICES
Principal Landscape Architect 4 $140 $560
Project Landscape Architect 62 $105 $6,510
Landscape Architect 8 $75 $600
Landscape Designer 0 $55 $0
Specifications Writer 0 $140 $0
CAD Technician 10 $55 $550
Clerical 0 $50 $0
$8,220
REIMBURSIBLES (REPRODUCTION) $0.00
CLI-R
TOTALS 559.5 $5-77594110-
sP.,, A00 57 090 .or

Proposal Worksheet Summary
Project: Maricopa County Animal Welfare Improvements
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Materials &
Labor: Supplies Repro. Misc. Sub-Con Auto Use Task Total
Task One:
Schematic Design $5,405.00 $0.00 $0.00 $0.00 $0.00 $108.00 $5,513.00
Task Two:
Design Development $10,645.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10,645.00
Task Three:
50% Construction Doc. $15,085.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,085.00
Task Four:
100% Construction Doc. $15,660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,660.00
Task Five:
Bid Phase Services $2,075.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,075.00
Task Six:
Construction Ph. Services $8,220.00 $0.00 $0.00 $0.00 $0.00 $396.00 $8,616.00
Task Seven:
N/A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Task Eight:
N/A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Task Nine:
N/A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Task Ten:
N/A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Totals: $57,090.00 $0.00 $0.00 $0.00 $0.00 ----51214199--
Project Total: 46749409-0
07, /NO (rCi

Proposal Worksheet
I I
Project: Maricopa County Animal Welfare Improvements
Task! Phase Task 1: Schematic Design
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Kick Off Meeting w/ Owner + Travel 4.0 4.0 0.0 0.0 0.0 8.0
2 Site Inspection 1.0 1.0 0.0 0.0 0.0 2.0
3 Research! Document Code Requirements 0.5 4.0 0.0 0.0 0.0 4.5
4 Conceptual Design 0.5 8.0 0.0 0.0 0.0 8.5
5 Coordination with NE Team 0.0 2.0 0.0 0.0 0.0 2.0
6 SD Landscape Plan / Details 0.0 6.0 0.0 6.0 0.0 12.0
7 SD Irrigation Plan! Details 0.0 4.0 0.0 4.0 0.0 0.0
8 Outline Specifications 2.0 0.0 0.0 0.0 2.0 4.0
9 Preliminary Cost Estimate 0.5 2.0 0.0 1.0 0.0 3.5
10 Q.0 Review! Revisions 0.5 0.5 0.0 1.0 0.0 2.0
11 Transmit SD Documents (.pdf files) to Clien 0.0 0.5 0.0 0.0 0.6 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 9.0 32.0 0.0 12.0 2.5 46.5
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $1,260.00 $3,360.00 $0.00 $660.00 $125.00
Labor Cost This Page $5,405.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use! Car Rental $108.00
Rented $0.00
Miscellaneous Expenses - Total $0.00 -Perseeel------240---$19750-TT787017r'
Other $0.00
Other $0.00
*
TASK TOTAL f$575444* -C,5--. ea

Proposal Worksheet
I I
Project: Maricopa County Animal Welfare Improvements
Task / Phase Task 2: Design Development
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Prepare Comment Responses 0.5 2.0 0.0 0.0 0.0 2.5
2 Review Conference with Owner 0.0 6.0 0.0 0.0 0.0 6.0
3 Coordination and Mtgs. w/ NE Team 0.0 4.0 0.0 0.0 0.0 4.0
4 CAD File Coordination 0.0 1.0 0.0 2.0 0.0 3.0
5 Code Review / Documentation 1.0 6.0 0.0 2.0 0.0 9.0
6 DD Landscape Plan, Details, Schedules 1.0 16.0 0.0 24.0 0.0 41.0
7 DD Irrigation Plans, Details, Schedule 1.0 16.0 0.0 24.0 0.0 41.0
8 Draft Specifications 6.0 0.0 0.0 0.0 4.0 10.0
9 Preliminary Cost Estimate 0.0 2.0 0.0 2.0 0.0 4.0
10 Q.0 Review! Revisions 1.5 2.0 0.0 1.0 0.0 4.5
11 Transmit DD Documents (pdf files) to Client 0.0 1.0 0.0 0.0 0.0 1.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 11.0 56.0 0.0 55.0 4.0 126.0
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $1,540.00 $5,880.00 $0.00 $3,025.00 $200.00
Labor Cost This Page $10,645.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use / Car Rental $0.00
Rented $0.00
Miscellaneous Expenses - Total $0.00 Personal 0 $0.45 $0.00
Other $0.00
Other $0.00
TASK TOTAL $10,645.00

Proposal Worksheet
I I
Project: Maricopa County Animal Welfare Improvements
Task / Phase Task 3: 50% Construction Doc.
Date: 1211212018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Prepare Comment Responses 1.0 2.0 0.0 0.0 0.0 3.0
2 Review Conference with Owner 0.0 6.0 0.0 0.0 0.0 6.0
3 Coordination and Mtgs. w/ NE Team 2.0 8.0 0.0 0.0 0.0 10.0
4 CAD File Coordination 0.0 1.0 0.0 2.0 0.0 3.0
5 Code Review / Documentation 1.0 4.0 0.0 0.0 0.0 5.0
6 50% CD Landscape Plan, Details, Sch 2.0 24.0 0.0 32.0 0.0 58.0
7 50% Irrigation Plans, Details, Schedule 2.0 24.0 0.0 32.0 0.0 58.0
8 Pre-Final Specifications 8.0 0.0 0.0 0.0 4.0 12.0
9 Pre-Final Cost Estimate 1.0 4.0 0.0 4.0 0.0 9.0
10 Q.0 Review! Revisions 1.0 4.0 0.0 4.0 0.0 9.0
11 Transmit DD Documents (pdf files) to Client 0.0 2.0 0.0 0.0 0.0 2.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 18.0 79.0 0.0 74.0 4.0 175.0
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $2,520.00 $8,295.00 $0.00 $4,070.00 $200.00
Labor Cost This Page $15,085.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use / Car Rental $0.00
Rented $0.00
Miscellaneous Expenses - Total $0.00 Personal 0 $0.45 $0.00
Other $0.00
Other $0.00
TASK TOTAL $15,085.00

Proposal Worksheet
I I
Project: Maricopa County Animal Welfare Improvements
Task! Phase Task 4: 100% Construction Doc.
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Prepare Comment Responses 0.5 2.0 0.0 0.0 0.0 2.5
2 Coordination and Mtgs. w/ NE Team 2.0 8.0 0.0 0.0 0.0 10.0
3 CAD File Coordination 0.0 1.0 0.0 4.0 0.0 5.0
4 Code Review! Final Documentation 0.5 4.0 0.0 0.0 0.0 4.5
5 100% CD Landscape Plan, Details, Sch 4.0 24.0 0.0 32.0 0.0 60.0
6 100% Irrigation Plans, Details, Schedule 4.0 24.0 0.0 32.0 0.0 60.0
7 Final Specifications 8.0 0.0 0.0 0.0 4.0 12.0
8 Final Cost Estimate 1.0 4.0 0.0 4.0 0.0 9.0
9 Q.0 Review! Revisions 2.0 8.0 0.0 8.0 0.0 18.0
10 Transmit DD Documents (pdf files) to Client 0.0 1.0 0.0 0.0 0.0 1.0
11 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 22.0 76.0 0.0 80.0 4.0 182.0
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $3,080.00 $7,980.00 $0.00 $4,400.00 $200.00
Labor Cost This Page $15,660.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use / Car Rental $0.00
Rented 0
Miscellaneous Expenses - Total $0.00 Personal 0 Miles x $0.45 $0.00
Other $0.00
Other $0.00
TASK TOTAL $15,660.00

Proposal Worksheet
I I
Project: Maricopa County Animal Welfare Improvements
Task / Phase Task 5: Bid Phase Services
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Participate in Pre-Bid Conference + Travel 0.0 6.0 0.0 0.0 0.0 6.0
2 Respond to Bidder Questions 1.0 4.0 0.0 0.0 0.0 5.0
3 Prepare Addenda 1.0 4.0 0.0 4.0 0.0 9.0
4 Coordination with NE Team 0.0 1.0 0.0 0.0 0.0 1.0
5 0.0
6 0.0
7 0.0
8 0.0
9 0.0
10 0.0
11 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 2.0 15.0 0.0 4.0 0.0 21.0
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $280.00 $1,575.00 $0.00 $220.00 $0.00
Labor Cost This Page $2,075.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use / Car Rental $0.00
Rented $0.00
Miscellaneous Expenses - Total $0.00 Personal 0 Miles x $0.45 $0.00
Other $0.00
Other $0.00
TASK TOTAL $2,075.00

Proposal Worksheet
I I I
Project: Maricopa County Animal Welfare Improvements
Task / Phase Task 6: Construction Ph. Services
Date: 12/12/2018
Client: Line and Space Architects
Reviewed by: DKM
Task: Principal Land.Arch. Land. Des. CAD Tech Clerical Task Hrs.
1 Pre-Construction Conference 0.0 6.0 0.0 0.0 0.0 6.0
2 Review Contractor Submittals 0.0 4.0 0.0 0.0 0.0 4.0
3 Respond to RFI's / Prepare ASI's 2.0 8.0 0.0 2.0 0.0 12.0
4 Review Shop Drawings 0.0 2.0 0.0 0.0 0.0 2.0
5 Construction Observation Visits (2) 0.0 12.0 0.0 0.0 0.0 12.0
6 Construction Observation Reports (2) 0.0 2.0 0.0 0.0 0.0 2.0
7 Substantial Completion Inspection 0.0 8.0 8.0 0.0 0.0 16.0
8 Punch List 0.0 4.0 0.0 0.0 0.0 4.0
9 Final Inspection 0.0 8.0 0.0 0.0 0.0 8.0
10 Review As-Builts 0.0 2.0 0.0 0.0 0.0 2.0
11 Prepare Record Drawings 0.0 4.0 0.0 8.0 0.0 12.0
12 Miscellaneous Project Close-Out 2.0 2.0 0.0 0.0 0.0 4.0
13 0.0
14 0.0
15 0.0
16 0.0
17 (4 Trips to Site Total) 0.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 0.0
25 0.0
Total Hours 4.0 62.0 8.0 10.0 0.0 84.0
Hourly Rate $140.00 $105.00 $75.00 $55.00 $50.00
Cost $560.00 $6,510.00 $600.00 $550.00 $0.00
Labor Cost This Page $8,220.00
Materials and Supplies - Total $0.00 Subconsultants - Total $0.00
Misc. $0.00 Civil $0.00
Electrical $0.00
Reproduction - Total $0.00 Structural $0.00
In-House Plotting $0.00 Biological $0.00
Large Format Copies $0.00 Other $0.00
Xerox $0.00
Other $0.00 Auto Use / Car Rental $396.00
Rented $0.00
Miscellaneous Expenses - Total $0.00 -:-: ::I k4 - . '. ..:g
Other $0.00
Other $0.00
at
TASK TOTAL streis.so IS z.I., o . CO

Maricopa County East Animal Welfare Improvements
Martin White Griffis — Structural Engineers

December 12, 2018
(Revised December 17, 2018)
Henry Tom, AIA, NCARB
Line and Space, LLC MARTI N
627 East Speedway Boulevard
WHITE
Tucson, AZ 85705-7433
GRIFFIS
Re: Maricopa County East Animal Welfare Improvements(MCEAWI) STRUCTURAL
MWG #: 18081.00 ENGINEERS,INC
Dear Henry:
We are pleased to submit our proposal to provide structural engineering services for the new animal care facility for
Maricopa County. Our understanding relative to the project scope and details of the services which we propose to
provide, are as follow:
1. Scope:
a. New animal care facilities constructed in Mesa near Baseline Road and South Lewis. Approximate
project size is 42,000 SF.
b. The project budget for construction by the General Contractor is approximately $15,800,000.00.
2. Design Services:
a. Schematic Design:
1. Participate in design workshops establishing materials of construction and structural
systems.
2. Develop schematic level foundation and framing plans.
3. Provide a structural narrative and outline specifications.
4. Provide building load information for geo-technical investigation and report.
5. Attend in-house quality review session with the design team prior to submission to the
County.
6. Attend a document review session with the County, Project Team and the Consultant's
team.
b. Design Development:
1. Further progress the structural systems design, sizing major structural components,
establish lateral load resisting systems locating shear walls and/or frames.
3240 E UNION HILLS DR., SUITE 145 I PHOENIX, AZ 85050 I PH 480.382.7370 I MWGSTRUCTURAL.COM

Mr. Henry Tom, AIA, NCARB
December 12, 2018
(Revised December 17, 2018)
MWG #: 18081.00
Page 2
2. Develop REVIT structural model.
3. Produce 90% structural specifications.
4. Progress foundation and framing plans and incorporate typical details.
5. Coordinate with ALE team and attend coordination meetings.
6. Attend in-house quality review session with the design team prior to submission to the
County.
7. Attend a document review session with the County, Project Team and the Consultant's
team.
c. Contract Documents:
1. Provide final REVIT structural model and details for construction.
2. Provide final structural calculations and project specifications.
3. Provide progress submittals at 50% and 90%.
4. Attend coordination meetings.
5. Review cost estimate.
6. Attend in-house quality review session with the design team prior to submission to the
County.
7. Attend a document review session with the County, Project Team and the Consultant's
team.
d. Bidding:
1. Respond to contractor questions and review substitution requests.
2. Issue addenda's if required.
e. Construction Administration:
1. Review shop drawings, material submittals and test reports. Maximum of two reviews of
the same shop drawing will be provided, after this amount the additional reviews will be
considered additional services.
2. Respond to structural RFI's.
3240 E UNION HILLS DR., SUITE 145 I PHOENIX, AZ 85050 I PH 480.382.7370 I MWGSTRUCTURAL.COM

Mr. Henry Tom, AIA, NCARB
December 12,2018
(Revised December 17, 2018)
MWG #: 18081.00
Page 3
3. Site Visits: A maximum of four site visits will be provided in our basic services. Additional
visits, if requested, will be charged on a per trip basis.
4. Record documents will be provided utilizing contractor mark-ups at the end of the project.
5. An estimate of special structural inspections services to be provided by Martin, White &
Griffis at an hourly rate is provided for use in estimating the construction administrative
services.
3. Fees and Payments
a. The following are lump sum fees, u.n.o., by phase:
Schematic Design $ 21,950.00
Design Development $ 29,050.00
Construction Documents $ 66,400.00
Bidding $ 470.00
Construction Administration $ 22.780.00
Lump Sum $140,650.00
b. Additional site visits, beyond the four provided as basic service, will be performed at the rate of
$500.00 per visit.
c. Our services will be billed monthly and are due and payable within 7 days after receipt of payment
by your client for work performed for which payment has been made. Non-payment could result in
actions pursuant to ARS statute 32-128 C 5.
4. Additional Services:
a. The following services are not included in the Design Phase Services. Martin, White & Griffis shall be
additionally compensated for work hereunder when such services are authorized by the Architect
on an hourly basis as outlined below.
1. The final Structural Special Inspections which are required by the Building Code.
2. Any changes to plans and specifications concerning any portion of the structural systems
after approval of the owner have been obtained.
3. Work resulting from corrections, revisions or substitutions required because of errors or
omissions in construction by the building contractor.
4. Preparation of construction cost estimates.
5. Formal value engineering studies.
6. Site visits in addition to those listed in Paragraph 2.g shall be provided per paragraph 3.b.
7. Scope of work for canopies, ramadas, shade sails, and light poles is limited to foundation
design only as the main structure is assumed to be a manufactured, pre-engineered system.
8. Structural design, detailing and/or drafting services in connection with any other
improvements to the structure other than as outlined in this proposal.
9. Any analysis, details and/or calculations for seismic restraint or special anchorage of
equipment.
b. Fee for additional services will be on an hourly basis at the billing rates as follows:
3240 E UNION HILLS DR., SUITE 145 I PHOENIX, AZ 85050 I PH 480.382.7370 I MWGSTRUCTURAL.COM

Mr. Henry Tom, AIA, NCARB
December 12, 2018
(Revised December 17, 2018)
MWG #: 18081.00
Page 4
Principal $175.00 / hr.
Senior Structural Engineer: $150.00 / hr.
Structural Engineer: $125.00! hr.
Engineer Eli/Designer $110.00 / hr.
CAD: $ 90.00 / hr.
c. Payment of the fee for additional services will be due and payable on the same basis as that for
design phase services, outlined in paragraph 3 above.
d. No additional service shall be provided without prior written authorization to proceed from the
Architect.
5. Delays: Should the project be terminated or have an extended delay at any time, the payment of fee shall
be a proportional fee for services performed to termination date or date of delay.
If, for any reason, the project design is completed but no contract awarded the fee basis shall be the full lump
sum fee indicated.
6. Termination of Agreement: This agreement is terminated if and when the agreement between the Owner
and Architect is terminated. The engineer shall be promptly notified of the termination. It also may be
terminated by either party upon seven day's written notice should the other party fail substantially to
perform in accordance with its terms through no fault of others than the engineer, the engineer shall be paid
for services performed to termination date, including reimbursements then due.
Thank you for the opportunity of submitting this proposal. If you find it satisfactory, please indicate so by signing
and returning one copy, so that we will be able to proceed with the work.
Sincerely, Agreed To:
c_7;07000,
Thomas C. Griffis, PE
Principal Line and Space, LLC
Date
TCG:mjo
Attachment
3240 E UNION HILLS DR., SUITE 145 I PHOENIX, AZ 85050 I PH 480.382.7370 I MWGSTRUCTURAL.COM

Maricopa County East Animal Welfare Improvements Project
Martin, White & Griffis Structural Engineers
PHASE RATES HOURS FEE SUBTOTAL
Schematic Design
Principal $ 175.00 10 1,750.00
Senior Structural Engineer $ 150.00 30 $ 4,500.00
Structural Engineer $ 125.00 48 $ 6,000.00
Engineer Eli/Designer $ 110.00 44 $ 4,840.00
CAD 90.00 54 $ 4,860.00
21,950.00
Design Development
Principal $ 175.00 10 1,750.00
Senior Structural Engineer $ 150.00 32 $ 4,800.00
Structural Engineer $ 125.00 64 $ 8,000.00
Engineer Eli/Designer $ 110.00 68 $ 7,480.00
CAD 90.00 78 $ 7,020.00
29,050.00
Construction Documents
Principal $ 175.00 14 $ 2,450.00
Senior Structural Engineer $ 150.00 68 $ 10,200.00
Structural Engineer $ 125.00 134 $ 16,750.00
Engineer Eli/Designer $ 110.00 176 $ 19,360.00
CAD 90.00 196 $ 17,640.00
66,400.00
Bidding
Structural Engineer $ 125.00 2 250.00
Engineer Eli/Engineer $ 110.00 2 220.00
470.00
Construction Administration
Principal $ 175.00 4 700.00
Senior Structural Engineer $ 150.00 40 $ 6,000.00
Structural Engineer $ 125.00 60 $ 7,500.00
Engineer Eli/Designer $ 110.00 78 $ 8,580.00
22,780.00
TOTAL 140,650.00

Maricopa County East Animal Welfare Improvements
Kelly Wright & Associates — Mechanical Engineers

KELLY • WRIGHT
ASSOCIATES • PC
HVAC • PLUMBING
al FIRE PROTECTION
PROPOSAL
Project Name: Maricopa County East Animal Welfare Improvements
Project Address: 1920 S Lewis, Mesa, Arizona
Job Number: 17102
Date: December 13, 2018
Client: Line & Space, LLC
627 E. Speedway Blvd. Tucson, Arizona 85705
Engineer: Kelly, Wright & Associates, P.C.
Project Description:
New 42,000 square feet new animal care facility to be constructed in place of an existing building at the project site.
Project construction budget is $15.8M with design-bid-build or CMAR delivery method.
Scope of Basic Services:
GENERAL:
• This project will be drawn in AutoCAD as 2D. 3D drawings are not included.
• Project specifications will be included in project manual (book specs).
• Attend two team meetings in Phoenix at milestone progress levels dictated by the Client.
• Revise drawings and issue written response letters to Authority Having Jurisdiction review comments.
• Preparation of mechanical portion of the Model Energy Code report for project.
HVAC:
• Design of heating, cooling, and ventilation system for the new building. Systems anticipated to include air
conditioning, evaporative cooling, space heating (no in-floor), energy recovery systems, and exhaust systems.
• Design DDC control system for new HVAC equipment, per Owner EMCS guidelines.
Plumbing:
• Design of domestic water systems, waste and vent systems for the new building. The design shall be
extended to five feet out from the exterior wall of the building.
• Design of natural gas piping systems for the new building. The design shall be extended to five feet out from
the exterior wall of the building.
• Design of a solids, hair, and/or grease interceptor systems to accommodate the new work scope.
Fire Protection:
• Provide a performance specification for a wet-pipe automatic fire sprinkler system including design criteria as
required by the Authority Having Jurisdiction. The contractor shall be responsible to prepare the system
design and submit to the authority having jurisdiction.
Construction Administration:
• Nine construction field observation visits with written reports are included. Engineer will perform visits
based on Client requests.
• Review of mechanical Submittals.
• Review and response to RFI's.
• Record drawing documentation (drafting of contractor-provided as-built conditions in CAD).
Commissioning: TO BE NEGOTIATED IN THE FUTURE
Assumptions:
7337 FAST TANQUE VERDE, TUCSON, AZ 85715 (520) 887-1919 FAX (520) 696-0280
WWW.KWMECTUCOM

Line and Space 17102 MEAWI
December 13, 2018 Page 2 of 3
• Commissioning per the IECC will be required but is not included in the Engineer's scope at this time.
• No Measurement and Verification (M&V) scope.
• Project will not be certified / rated by LEED or Green Globe or other agency and basic services does not
include calculations & documentation for LEED or other similar programs — no report generation required.
• Solar thermal hot water heating system designs are not required.
• Adequate sewer capacity and invert depth will be available to the project to design the waste systems
utilizing gravity only.
• Adequate water pressure and water supply capacity will be available to the project to design the domestic
water supply system and the fire protection system(s) without requiring booster pumps or water storage
facilities.
• Adequate electrical service will be available to accommodate the HVAC, fire protection, and plumbing
systems.
• Specifications for animal care specialties that may require mechanical connections, such as washing stations,
housing units, etc. will be provided by Others with information provided to the Engineer for rough-in design.
• Life Cycle Reports, System Comparison Reports, Feasibility Studies, and similar documents are not included.
Deliverables:
The Engineer's instruments of service will be provided in electronic form. Hard copies are not included. Documents
will be provided in PDF format. Copies of CAD files will be provided at the direction of Client.
Compensation for Basic Services:
The Engineer will be compensated for the basic services based on a fixed fee basis of one hundred fifty six thousand
four hundred dollars ($156,400). Itemized fee is attached.
Client's Responsibility:
• The Client shall make available to the Engineer full information on the Client's intent with regard to the project's
requirements.
• The Client will keep the Engineer advised of any changes to the project requirements that may affect the
Engineer's work.
• The Client shall provide architectural, civil, structural, electrical, and other consultant's drawings, design
information, and/or documents to the Engineer for review and use during the project design.
Additional Services:
• Services and/or consultation not specified and/or in excess of those indicated in the Scope of Basic Services.
• Revisions to previously approved drawings and documents.
• Client requested field trips will be billed at nine hundred dollars ($900) per trip.
Reimbursable Expenses:
The Client will reimburse the Engineer for the direct cost of each of the following:
• Printing, reproduction, and duplication of documents not used for Engineer's own purposes.
• Postage and special delivery service.
• Any tax imposed on the Engineer's services shall be reimbursed at 100% of the actual cost.
Hourly Rates:
Engineering Director $ 150.00 Designer $ 75.00
Engineer $ 100.00 Clerical $ 30.00
Project Manager / Senior Designer $ 85.00
Other Conditions:
This agreement entered into as of the date indicated on the first page.
The laws of the State of Arizona shall govern this Agreement.
The Engineer will not begin work on the project or perform any additional services without an executed Agreement.
The terms and conditions set forth in the Agreement shall be in effect for a period not to exceed six (6) calendar months from the date of
acceptance. In the event that terms and conditions of this Agreement have not been completed in that time, the terms of this Agreement
shall become negotiable by both parties.
The Engineer will invoice the Client monthly, based upon the percentage of completion, and/or at the time of submission of each phase of
service. Payment is due upon presentation of the invoice unless a separate signed contract between the Client & Engineer establishes a
different arrangement for payment.
Interest may be charged on past due accounts at the rate of one and one half percent per month to accounts outstanding more than 30 days.

Line and Space 17102 MEAWI
December 13, 2018 Page 3 of 3
• The Engineer reserves the right to suspend the performance of services, without waiving any claim or right against the Client, and without
liability whatsoever to the Client, if invoices have not been paid within 30 days.
• The Engineer shall not be responsible for the acts or omissions of the Client, Client's other consultants, Contractors, Subcontractors, their
agents or employees, or other persons performing any of the Work. The Client agrees, to the fullest extent permitted by law, to indemnify
and hold harmless the Engineer from any liabilities, damages and costs (including reasonable attorney fees and cost of defense) to the extent
caused by the negligent acts, errors or omissions or the Client, Client's other consultants, Contractors, Subcontractors, their agents or
employees, or other persons performing any of the Work.
• Engineer is not responsible or liable for any hazardous materials found on the project site, job site safety, or construction means and methods.
All hazardous materials encountered on the site are the responsibility of the owner(s). Job site safety and construction means and methods
are the responsibility of the contractor(s).
• Cost estimates, life cycle reports, energy calculations, water consumption estimates, and similar calculations performed by the Engineer
represent the Engineer's experience and best judgment and are not guarantees.
• In recognition of the relative risks, rewards, and benefits of the project to both the Client and Engineer, the risks have been allocated such that
the Client agrees that, to the fullest extent permitted by the law, Engineer's total liability to the Client for any and all injuries, claims, losses,
expenses, damages, or claim expenses arising out of this agreement from any cause or causes, including attorneys' fee and costs and expert
witness fees and costs, shall not exceed ten times our fee or $50,000, whichever is less. Such causes include, but are not limited to, Engineer's
negligence, errors, omissions, strict liability, breach of contract, or breach of warranty.
• The parties agree that there shall be no assignment of this contract unless mutually agreed upon in writing.
• The Agreement may be terminated by either party upon seven (7) calendar days written notice should the other party fail substantially to
perform in accordance with its terms through no fault of the party initiating the termination. The Engineer shall be due compensation for
services rendered up to date of notification of termination, reimbursable expenses and reasonable termination expenses.
• All disputes arising out of or related to this Agreement shall be submitted to non-binding mediation as a condition precedent to litigation. If
any dispute that is submitted to mediation is not successfully resolved, the matter may be resolved through litigation in a court of competent
jurisdiction in Pima County, Arizona.
• In the event of any litigation arising from or related to the services provided under this Agreement, the prevailing party will be entitled to
recovery of all reasonable costs incurred, including staff time, court costs, expert fees, attorney's fees, and other related expenses.
• Engineer is entitled to rely on the accuracy and completeness of information, documents, and/or designs provided by others. Engineer shall
have no obligation to verify the information or design's correctness. Client and Owner shall waive all claims against Engineer relating to
information, documents, and designs provided by others and shall indemnify Engineer for all losses, cost and damages incurred.
• Client shall obtain Engineer's prior written consent before making any changes to plans and specifications prepared by the Engineer. Client and
Owner shall waive all claims against Engineer relating to unauthorized changes to plans and specifications prepared by the Engineer and shall
indemnify Engineer for all losses, cost and damages incurred.
• Engineer shall retain ownership of the instruments of service and the information contained in them. Client & Owner shall not modify the
instruments of service and/or reuse them in connection with any other project.
• ELECTRONIC FILES: Client agrees not to reuse electronic files, created by the Engineer, in whole or in part, for any purpose or project other
than the project that is the subject of this Agreement. Client agrees not to transfer these electronic files to others without the prior written
consent of Engineer. Client further agrees to waive all claims against Engineer resulting in any way from any unauthorized changes or reuse of
these electronic files for any other project by anyone other than Engineer. Client is aware that differences may exist between the electronic
files delivered and the printed hard copy construction documents. In the event of a conflict between the signed construction documents
prepared by Engineer and electronic files, the signed and stamped or sealed hard copy construction documents shall govern. In addition,
Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless Engineer, its officers, directors, employees, agents and
subconsultants against all damages, liabilities or costs, including reasonable attorneys' fees, court costs and defense costs, arising from the use
of the electronic files.
If the scope of services contained in this Agreement does not include construction-phase services for this project, Client acknowledges such
construction-phase services will be provided by Client or by others and Client assumes all responsibility for interpretation of the contract
documents and for construction observation and supervision and waives any claim against Engineer that may in any way be connected
thereto. In addition, Client agrees to indemnify and hold Engineer harmless from any loss, claim, or cost, including reasonable attorneys' fees
and costs of defense, arising or resulting from the performance of such services by other persons or entities and from any and all claims arising
from the modifications, clarification, interpretation, adjustments or changes made to the contract documents to reflect changed field or other
conditions, except for claims arising from the sole negligence or willful misconduct of Engineer.
Please let us know if you wish additional information or clarification of our proposal. If you are in agreement with and
wish to authorize us to proceed with the project as delineated herein, please sign one copy and return to our office.
We sincerely appreciate your consideration of our firm. We look forward to helping you with this challenging and
important project.
Sincerely, Accepted By:
Kelly, Wright & Associates, P.C. Line and Space, LLC
Digitally signed by Donovan F. Kelly
Donovan F. ON: cn=Donovan F. Kelly, o=Kelly,
Wright and Associates, PC, ou,
Kelly ernail=donovan@kwrnech.com , c=US Client Signature
Date: 2018.12.13 14:14:56-0700
Donovan F. Kelly, P.E.
President Printed Name and Title

Maricopa County East Animal Welfare Improvements
Firm: Kelly, Wright & Associates, PC Date: December 17, 2018
Phase Hours Rates Fee Subtotal
SCHEMATIC DESIGN
Principal 20 $ 180 $ 3,600
Project Manager 40 $ 150 $ 6,000
Project Engineer 60 $ 135 $ 8,100
Specifications Writer 20 $ 135 $ 2,700
CAD Drafter 60 $ 75 $ 4,500
Clerical 20 65 $ 1,300
$ 26,200
DESIGN DEVELOPMENT
Principal 20 $ 180 $ 3,600
Project Manager 80 $ 150 $ 12,000
Project Engineer 80 $ 135 $ 10,800
Specifications Writer 40 $ 135 $ 5,400
CAD Drafter 100 $ 75 $ 7,500
Clerical 20 $ 65 $ 1,300
$ 40,600
CONSTRUCTION DOCUMENTS
Principal 40 $ 180 $ 7,200
Project Manager 100 $ 150 $ 15,000
Project Engineer 100 $ 135 $ 13,500
Specifications Writer 40 $ 135 $ 5,400
CAD Drafter 140 $ 75 $ 10,500
Clerical 20 $ 65 $ 1,300
$ 52,900
BIDDING
Principal 3 $ 180 $ 540
Project Manager 5 $ 150 $ 750
Project Engineer 10 $ 135 $ 1,350
Specifications Writer 0 $ 135 $ -
CAD Drafter 6 $ 75 $ 450
Clerical 2 $ 65 $ 130
$ 3,220
CONSTRUCTION ADMINISTRATION
Principal 37 $ 180 $ 6,660
Project Manager 55 $ 150 $ 8,250
Project Engineer 110 $ 135 $ 14,850
Specifications Writer 0 $ 135 $ -
CAD Drafter 34 $ 75 $ 2,550
Clerical 18 $ 65 $ 1,170
$ 33,480
TOTAL $ 156,400

Maricopa County East Animal Welfare Improvements
M3 — Electrical Engineers

# ARCHITECTURE
nri4
ENONEERINO
CONSTRUCTION MANAGEMENT
December 13, 2018
Mr. Henry Tom
Line and Space, LLC
627 E. Speedway Blvd.
Tucson, Arizona 85705
Re: Maricopa County East Animal Welfare Improvements (MCEAWI)
M3-M0
Dear Henry:
The following is a fee proposal to provide electrical engineering services for the above referenced $15.8 million
Animal Care Center in accordance with Maricopa County Scope of Work sent to us via email on 12/06/18.
SCOPE OF WORK
1. Provide Site Investigations.
2. Provide power, lighting, and fire alarm for approximate 42,000 square feet new animal care facility to be
located in Mesa, Arizona. The design will be broken up in three phases.
3. Provide special systems design which consist of the following:
a. Tele/Data communications cabling design.
b. Security cabling design.
4. Provide a generator design for the entire new building loads.
5. Attend up to 2 review meetings, with Maricopa County during the design phase, one at 50% CD, and
another at 100% CD.
6. Provide bidding services consisting of attending a prebid meeting, answering questions and providing
addenda information.
7. Provide performance specifications for Paging/Intercom and Music system.
8. Construction Administration consisting of answering request for information (RFI's), shop drawing review,
and three site observation trips during construction.
ASSUMPTIONS AND EXCLUSIONS
1. All bulk construction document reproduction/printing is by others.
2. All electrical design and construction shall comply with the 2017 National Electrical Code (NEC) as
adopted by the Mesa, Arizona building department.
3. Architectural backgrounds shall be provided to M3 in AutoCAD format.
4. Electrical cost estimating is excluded.
5. The tele/data, and security design will be in accordance with the Maricopa County IT Department design
2051 W. Sunset Rc and specifications.
Suite 101
Tucson, Arizon, 6. Design for UPS type electrical power supplies and associated distribution systems are excluded.
8570 ,1
t 5.20293.1488
sr 293.8349
www.m3eng.com

Mr. Henry Tom Page 2 of 2
M3-M0 December 13, 2018
7. Drafting of Project electrical "As-built" drawings from Contractor furnished red-lined drawings is excluded.
8. All Permitting submittal effort and associated fees are excluded other than providing written responses to
the Authority Having Jurisdiction (AHJ) Plans Examiner review comments and associated drawing
revisions required to address said comments.
9. Arc-Flash and Selective Coordination studies are excluded.
10. Construction Administration consisting of answering request for information (RFI's), shop drawing review,
and site observation trips is excluded.
ELECTRICAL ENGINEERING FEE
SD TOTAL $ 17,900
DD TOTAL $ 35,500
100% CD $ 53,750
BIDDING $ 4,175
CA $ 8,500
SITE OBSERVATION TRIPS $ 3,825
TOTAL FEE $123,650
Please see attached breakdown
Please call me directly at 445-7241 if you have any questions, comments or concerns regarding this fixed fee
proposal.
Sincerely,
M3 ENGINEERING & TECHNOLOGY CORPORATION
c-- - zia."..4.4frt?t.
Pablo I. Pinuelas, P.E.
Electrical Department Manager
Accepted:
Line and Space, LLC
By:
Date:

Maricopa County East Animal Welfare Improvements
Firm: M3 Engineering & Technology Corp Date: 12/13/18
PHASE HOURS RATES FEE SUBTOTAL
SCHEMATIC DESIGN
Elec Project Manager 10 $130 $1,300 $17,900
Elec Designer IV 100 $85 $8,500
Elec Designer II 60 $65 $3,900
Elec Designer II 60 $65 $3,900
Clerical 5 $60.00 $300
DESIGN DEVELOPMENT
Elec Project Manager 10 $130 $1,300 $35,500
Elec Designer IV 200 $85 $17,000
Elec Designer ll 130 $65 $8,450
Elec Designer ll 130 $65 $8,450
Clerical 5 $60.00 $300
CONSTRUCTION DOCUMENTS
Elec Project Manager 15 $130 $1,950 $53,750
Elec Designer IV 300 $85 $25,500
Elec Designer II 200 $65 $13,000
Elec Designer ll 200 $65 $13,000
Clerical 5 $60.00 $300
BIDDING
Elec Project Manager 5 $130 $650 $4,175
Elec Designer IV 30 $85 $2,550
Elec Designer II 15 $65 $975
CONSTRUCTION ADMINISTRATION
Elec Designer IV 100 $85 $8,500 $8,500
SITE OBSERVATION TRIPS
Elec Designer IV 45 $85 $3,825 $3,825
TOTAL 1625 $123,650

Maricopa County East Animal Welfare Improvements
CCMC — Cost Estimators

Construction Cost Management Consultancy
3402 East Came!back Road
Phoenix, AZ 85018
Phone (602) 633-2105
Fax (602) 237-5748
13`11 December, 2018
Line and Space LLC
627 E. Speedway Blvd.
Tucson, AZ 85705
Attention: Henry Tom
Re: Maricopa County East Animal Welfare Improvements - Fee Proposal for Cost Estimating
Dear Henry,
The project is comprised of:
• Demolition of existing building
• New facility, approximately 42,000 SF
• Site work
• Design / bid / build construction delivery method, but may change to CMAR
• Project construction budget $ 15.8 M
We propose to provide Cost Control services on the above project for a Lump Sum of Thirty Eight
Thousand Seven Hundred and Ninety ($ 38,790) as summarized below:
• Design Development Phase:
Attend consultant meetings
Prepare a DD cost estimate in CSI divisions format
Certified Cost Professional 48 hours @ $ 130.00 / hour $ 6,240.00
Senior Cost Estimator 96 hours @ $ 110.00 / hour $ 10,560.00
Clerical 10 hours @ $ 45.00 / hour $ 450.00
$ 17,250.00 $ 17,250.00
• 50% Construction Documents Phase:
Attend consultant meetings
Prepare a 50% CD cost estimate in CSI divisions format
Certified Cost Professional 60 hours @ $ 130.00 / hour $ 7,800.00
Senior Cost Estimator 120 hours @ $ 110.00 / hour $ 13,200.00
Clerical 12 hours @ $ 45.00 / hour $ 540.00
$ 21,540.00 $ 21,540.00
TOTAL FEE for Design / Bid / Build delivery method $ 38,790.00

CC
Construction Cost Management Consultancy
3402 East Comeback Road
Phoenix, AZ 85018
Phone (602) 633-2105
kix (602) 237-5748
Add-Fee:
Additional fee if project delivery method is changed to CMAR to cover for time associated
with reconciliation and updates of cost estimates with the CMAR at DD and 50% CD phases
Certified Cost Professional 30 hours @ $ 130.00 / hour Total Add-Fee $ 3,900.00
Reimbursable - direct expenses for printing, copying, etc. will be billed at cost with no mark-
up; travel will be billed at approved mileage rates
Notes: (i) all cost estimates will be broken down into multiple sections to separately identify the
costs of new facility and site work
(ii) CSI format - work will be quantified and priced in line items under CSI divisions
(iii) the level of detail in each of the cost estimates will be compatible with the degree of
project definition in the design package and will include any supplemental information
provided by the project consultants
(iv) time for attending meetings with consultants at all phases is included in the fee
breakdown
Exclusions: cost estimating for: (i) cost estimating at Schematic Design phase
(ii) major changes or increase in project scope
(iii) F.F.E.
(iv) installation of cabling and equipment for special systems
(data, telephone, A/V, security, etc., assumed N.I.C., by Owner),
cost estimating rough-in for special systems is included
(v) cost estimating during Construction Administration phase.
Review of change orders, if required, will be chargeable as an
additional service
Additional services will be performed at the specified hourly rates or for a mutually agreeable fee.
We thank you for giving CCMC the opportunity to participate on this project. We trust our proposal
will meet with your approval and look forward to working with you and the team. If you have any
questions regarding this proposal, please contact me.
Sincerely,
•—_----
Adriana V. Crnjac
Certified Cost Professional

Maricopa County East Animal Welfare Improvements
ccmc - Cost Estimating
PHASE HOURS RATES FEE SUBTOTAL
PROGRAMMING
Principal Architect 0 $180 $0
Project Manager 0 $150 $0
Project Architect 0 $135 $0
Specifications Writer 0 $135 $0
CAD Drafter 0 $75 $0
Clerical 0 $65 $0
$0
SCHEMATIC DESIGN
Principal Architect 0 $180 $0
Project Manager 0 $150 $0
Project Architect 0 $135 $0
Specifications Writer 0 $135 $0
CAD Drafter 0 $75 $0
Clerical 0 $65 $0
$0
DESIGN DEVELOPMENT
Certified Cost Professional 48 $130 $6,240
Senior Cost Estimator 96 $110 $10,560
Clerical 10 $45 $450
$17,250
CONSTRUCTION DOCUMENTS
Certified Cost Professional 60 $130 $7,800
Senior Cost Estimator 120 $110 $13,200
Clerical 12 $45 $540
$21,540
CONSTRUCTION ADMINISTRATION
Principal Architect 0 $180 $0
Project Manager 0 $150 $0
Clerical 0 $65 $0
$0
POST CONSTRUCTION
Principal Architect 0 $180 $0
Project Manager 0 $150 $o
CAD Drafter 0 $75 $0
Clerical 0 $65 $0
$0
REIMBURSABLES
$0
$0
TOTAL 346 $38,790

Maricopa County East Animal Welfare Improvements
Dibble Engineering — Survey

7878 North 16th Street, Suite 300
Dibble Phoenix, Arizona 85020
P 602.957.1155
Engineering F 602.957.2838
December 8, 2018
Client: Line and Space, LLC
Contact: Henry Tom, AIA, NCARB
Regarding: Survey Services Proposal
Project Name: MCEAWI Site Survey
Project Location: 1920 S. Lewis Rd. Mesa AZ 85210
SURVEY SCOPE OF SERVICES
Dibble Engineering is pleased to offer the following professional services proposal agreement to
provide land surveying services for the project noted above.
A. Site Survey and Results of Survey
1. Dibble Engineering will perform a topographic survey of APN 139-49-020 in Maricopa County
for the purposes of engineering design. Dibble will utilize RTK GPS and a robotic total station
to tie control and locate site features and elevations.
2. Dibble Engineering will perform a boundary survey and set boundary corners not found.
3. Dibble Engineering will prepare a Results of Survey (R.O.S.) following the Arizona Minimum
Standards of Boundary Surveying showing boundary and topographic features located.
B. Additional Allowance: ALTA/ACSM Land Title Survey
1. Dibble Engineering will prepare an ALTA/NSPS Land Title Survey in accordance with the
2016 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys of APN
139-49-020 in Maricopa County.
2. This survey shall include Table A items 1-5, 7a, 8, 9, 11, 13, 15, & 16.
3. The herein proposed ALTA/NSPS Survey is for the site as surveyed above, and does not include
locating newly constructed features built after the date of the above referenced Results of
Survey.
C. Exclusions
1. Subsurface exploration to locate underground structures and utilities is not included in this
scope of services. If it is determined that the potholing and pothole coordination/mapping is
required for this project it will be performed as an additional service, subject to Client
approval.
2. Cost and acquisition of title report.
D. Deliverables
1. Autocad Civil 3D base mapping files to include linework and site features, surface data,
survey points, and property lines.
2. (1) Results of Survey signed and sealed by an Arizona Registered Land Surveyor on 24"x36"
bond paper and in PDF Format.
3. Additional Allowance: (1) ALTA/NSPS Land Title Survey signed and sealed by an Arizona
Registered Land Surveyor on 24" x 36" bond paper and in PDF format.
Dibble Engineering Page 1 of 2 MCEAW Site Survey
Survey Scope of Services Survey Services

7878 North 16th Street, Suite 300
Dibble Phoenix, Arizona 85020
P 602.957.1155
Engineering F 602.957.2838
E. Schedule
Dibble Engineering anticipates having the Site Survey and R.O.S. completed for review within
15 working days from receiving written authorization to proceed along with all other
appropriate data and information.
Additional Allowance: Dibble Engineering anticipates having the ALTA/NSPS Survey
completed for review within 10 working days from receiving written authorization to proceed
along with complete title report. The Client, upon receiving the ALTA/NSPS Survey, shall acquire
a written composite of revision requests from all parties concerned and deliver to Dibble
Engineering. Upon written receipt of said composite, Dibble Engineering will make a one-time
revision of the Survey to incorporate client comments which is included in this scope of services.
Any additional revisions will be billed hourly per our Standard Billing Rate Schedule. The client
comment resolution and Survey will be completed within 5 working days of receiving the
composite of revision requests from the client or written notification that there are no revisions
necessary.
F. Compensation
Dibble Engineering will provide the above scope of services for the Lump Sum Fee of $9,872
inclusive of travel, printing, shipping, etc.
Additional Allowance: Dibble Engineering will provide the above scope of services for the
Lump Sum Fee of $2,606 inclusive of travel, printing, shipping, etc.
Should additional work be required outside the scope of services noted above, said additional work
will be mutually agreed to prior to commencing and billed hourly per our Standard Billing Rate
Schedule.
We appreciate the opportunity to provide this proposal and look forward to working with you on this
project.
Sincerely,
Dibble Engineering
Jason P Grahar'n, RPLS Authorizing Agent (Print and Sign)
Survey Department Manager
Dibble Engineering Page 2 of 2 NIC:EAV,/ Site Survey
Survey Scope of Services Survey Services

82
Total
740-Admin Assistant
127-QA/QC Manager
Sum Materials
Sum Lump and
Lump Task Time 322-Survey Crew Member
X 320-Survey Crew 4 16 4 4 28
Proposal
Format: 315-Survey Technician
Fee Survey
Space Billing
ourvey Site 150-CAD Technician 12 6 10 10 38
and 1
Line in Page
Project:MCEAWI 310-Land Surveyor Training (LSIT)
Engineering Client:
305-Land Surveyor (RLS)
Dibble Tom Graham
N/A 300-Land Surveyor Manager (RLS) 2 4 2 4 4 16
Henry Jason
Task
#: by: by: Task
Project Prepared By TOTAL By
Requested Hours Fee
prep HOURS
Staff Descriptions Crew Mons, Linework STAFF Labor
Survey & Survey Corners / Fieldwork
Task Research Rdwy Preparation
Engineering Cntrl, Boundary Work Research Mapping Research Preparartion Additional Engineering
Topographic Records V Topographic Basemap Prep
H & Set Office Utility Utility Parcel ROS ALTA
Dibble Task Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Dibble

$358 $760 $3,040 $760 $2,072 $1,036 $1,846 $9,872 $1,846 $760 $2,606 $12,478
Total Total
I
82.00 Survey Survey
740-Admin Assistant Cost/Unit
$ Site ALTA
127-QA/QC Manager 187.00 Unit Sum
Sum Materials $ Lump
Sum Lump and -
Lump Task Time 322-Survey Crew Member Quantity 1
$
X 320-Survey Crew 190.00 $760 $3,040 $760 $760 $5,320
Proposal $
Format: 315-Survey Technician 99.00
Fee Survey Billing $
Space I
ourvey Site 150-CAD Technician 113.00 $1,356 $678 $1,130 $1,130 $4,294
and $ Description 2
in Page
Client:Line Project:MCEAWI 310-Land Surveyor Training (LSIT) 113.00 Task
Engineering $
305-Land Surveyor (RLS) 155.00
$
Dibble Tom Graham 179.00
300-Land Surveyor Manager (RLS) $358 $716 $358 $716 $716 $2,864
N/A Henry Jason $
#: by: by: Rates
Project Prepared TOTAL
Requested Billing
Staff prep FEE Task
Descriptions Crew Mons, Linework LABOR By
Task Survey & Rdwy Survey Corners Preparation / Fieldwork Fee
Research Cntrl, Boundary Work Research Mapping Research Preparartion Additional
Topographic Records V Topographic Basemap Prep
H & Set Office Utility Utility Parcel ROS ALTA Subconsultants Name
Task Number 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Vendor

Total
TOTAL Cost/Unit TOTAL
FEE
ALLOWANCES
Unit Day Night
Sum Materials SUBCONSULTANT
Sum Lump and AND 12,478 - - 12,478
Lump Task Time Quantity COSTS
, Fee
DIRECT
X
Proposal $ $ $ I $
Format:
Fee Survey
Space Billing
...,urvey Site
and Clairification Summary 3
Line TOTAL Page
Project:MCEAWI Item Fee Item Allowances
Engineering Client: and
Dinner Labor Costs COMPENSATION
and Subconsultants
Lunch Dibble Direct
Dibble Tom Graham XXXX Total Total Total
N/A Henry Jason Breakfast, Hotel in Project Project Project PROJECT
#: by: by:
Project
Requested Prepared
Allowances
and
Costs
Direct Item Food Hotel