15063-CHANGE ORDER #8 10-11-18.PDF
Extracted text (via pymupdf_layout)
32046 characters
MAR1COPA COUNTY OFFICE OF PROCUREMENT SERVICES ARTICLES CONTRACT LOAD REQUEST Please provide the following information with your request to have the Price Agreement loaded or modified in the Advantage system, Omissions or incorrect information will result in the delay of the ability to use this contract for procurements or payments. C: New Contract re' Contract Change Order\ Extension\ Modification\ Change Order #: 8 Document Code (MA5, CT5, SC5): MA5 Department Code: D730 Advantage Contract 1D#: 15063-R Select Contract Type: C DBB C JOC C CMAR 61 A/E C Simplified Construction C Limited Scope Contract Document Description: (max 60 characters) : INTAKE TRANSFER & RELEASE FACILITY Effective Begin Date: 11/4/2015 Expiration/Revised Expiration Date: 11/8/2021 Thresholds/Not to Exceed Amount: 14' 156' 117.88 Change in Not to Exceed Amount: $135,100..00 Revised Not to Exceed Amount: 14,291,217,88 Accounting Information: Advantage FY Fund Department Unit Appr. Unit Object Sub Activity Program Phase Amount Object (optional) 17 18 19 455 D470 47ka ITRJ 9150 11 FACM ITRJ CAPBLD 14,291,217.88 Vendor Number: VC0000008080 Vendor Name: ARRINGTON VVATKINS ARCH1TE Discount Information:% Days 3° Vendor Number: Vendor Name: Discount Information:% Days Vendor Number: Vendor Name: Discount Information:°/0 Days Vender Number: Vendor Name: Discount I nformation:% Days NIGP Code (Commodity Code): 90610 CHAD ELMS Departmental Article 5 Procurement Officer: Department Authorized Signature: Print Form I Reset Forrli Maticopa County Facilities Management Department Article 5 Change Order Routing Change Order # 8 Project Manager Phone # : Don Bump_(602)903-0819 Date: 10/09/18 Work Order #: NA Vendor Name: Arrington Watkins (W000002045X) Project It: 1973-16-0001 Contract #: 15063-R Location Name: ITR (Durango Campus) Purchase Order #: D0170000002372-12 Project Name: ITR- Detention Facility Amount Funding Source 0 MIA n CIP 0 Annual Funds 0 User Funds Requested: $ 135,100.00 FUND DEPT UNIT ACTIVITY APPR UNIT OBJ/SUB LOCATION PROGRAM *PHASE FUNCTION AMOUNT (Not Required) s, 465 IN 0470 N. 4713 sN, FACM ITRJ 14 9150/11 1973 "N4 ITRJ 1. CAPBLD Nt $135,100.00 APPROVAL OR REVIEW REQUIRED DATE INITIAL 1. All information has been reviewed by Proiect Manager /qA/A. XS 2. Budget Analyst Review (These to be completed by Budget Analyst) 1 01104)% 3, Article 5 Procurement Review 4. Additional Special or Requested Review (Specify) 5, 0 & M Division Manager Approval (if Annual Funds or Tech Review) N4 6. CFD Manager or Planning Manager Approval 7. FMD Director Approval 8. CFD Administration Processing 9. Article 5 Change Order Processing by OPS 10. Purchase Order Processing 2/7 Purchase Order Total to Date: $ 14,156,1 7.88 +$135,100.00 :_- $1.4426731-7,te— Project Start Date: Project End Date: 11/8/2021 DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER: NOTE: BOARD of SUPERVISORS APPROVAL REQUIRED Includes: AW DCN#12 - Change ITR Telephone System AW DCN#19 - Site Perimeter Security Fencing (Durango) Required Attachments 1. Change Order Package 2. Project Information Sheet wir Complete Scope 3. Vendor Proposal with Supporting MARICOPA COUNTY APPROVED AS TO FORM: ____________________________ _______ ____________________________ ________ CHAIRMAN, BOARD OF SUPERVISORS DATE DEPUTY COUNTY ATTORNEY DATE ATTESTED: ________________________ __________ CLERK OF THE BOARD DATE ARTICLE 5 CONTRACT MODIFICATION AUTHORITY Arrington Watkins Architects . C.O. #8- ITR Facility Design NON-CONSTRUCTION CONSTRUCTION Original Contract Fee Modification Limit Original Contract Modification Limit Value 1 - 1000 CAPA Ceiling 1-1,000 CAPA Ceiling 0 10,000 $ 6,000 10,000 6,000 0 0 100,000 $ 40,000 100,000 40,000 0 0 200,000 $ 60,000 200,000 60,000 0 () 300,000 $ 75,000 300,000 75,000 0 400,000 $ 85,000 400,000 90,000 0 0 500,000 $ 90,000 500,000 107,500 0 750,000 $ 93,750 1,000,000 200,000 () 1,000,000 $ 97,500 2,000,000 245,000 0 1,500,000 $ 100,000 3,000,000 250,000 Insert Original Contract Insert Original Value Here: Contract Value Here: Maximum Maximum Cumrnulative $250,000.00 Cummulative Change Change Order Authority for Order Authority for FMD Director FMD Director amenseasimastessmassW CUM C.O.s 1,2,3,4,5,6,7,8 $6,687,342.88 INSTRUCTIONS 1. Insert the ORIGINAL value of your contract into the RED box. 2. The maximum CUMMULATIVE change order authority for the FMD Director will appear in the BLUE box. 3, If your contract exceeds $3,000,000, the maximum cummulative change order authority for the FMD Director is $250,000. 4, If your cummulative change orders exceed the amount in the BLUE box, but are less than $1 Million, the change order roust be signed by the Chief Procurement Officer, 6. If your cummulative change orders exceed $1 Million, then the change order must be signed by the Board of Supervisors. 6. Deductive change orders, changes to time only or changes to the terms of a contract only can be signed by the FMD Director even if the cummulative dollar amount for the Director has been exceeded. 7. Any major changes to the scope of the project, as determined by FMD Management, require approval by the Board of Supervisors regardless of the dollar amount of the change. 8. Print this page and attach to change order routing sheet. Arrington Watkins Architects October 8th„ 2018_revision Donald Bump Maricopa County Office of Facilities Management Division 401 W Jefferson Street Phoenix, AZ 85003 RE: Maricopa County Intake Transfer and Release Facility/Detention Facility Design az Design Change Notification 12— MCSO Telephony Modifications Mr. Bump: Arrington Watkins Architects (AW) has been asked to provide additional scope for modifications to the currently designed integrated MC OET IPT telephone system. MCSO feels that the MCSO Legacy Avaya telephony solution will save the County initial install capitol, will better support MCSO operations, and will allow for timely and seamless updates as staff functions, positions, and locations change frequently. After coordination with FMD and HP we have a firm grasp of the required scope to redesign this system. SCOPE OF WORK Our understanding of this scope of work is as following: 1. Review Voice Requirements with each user group (Coordinated with FM D) a. Confirm that an 876-phone number is appropriate for each user group at ITR. i. There may be concern that Courts and Attorney wanted to NOT be on the MCSO phone system. This may result in a split phone system. NON-MCSO OET and MCSO Legacy (separate network) b. With using "floor plan — Layer 1 end points" review each user group area for phone count. (coordinate with LSW and FMD) i. No new network drop locations will be added. 2. Provide MCSO information collected in #1. a. This allows MCSO to provide accurate information to Windstream so they can provide a high-level single-line diagram 3. Summarize information collected inn and #2 in order to properly plan changes. 4, Coordinate changes to TR/MER rooms, 5. Review and understand impact to the OET network. 6. Receive single-line diagram from Windstream and incorporate information into the specifications and drawings, 7. Develop and Update passive communications system (cable plant, TR, and ME R rooms) 8. Develop and Update active communications systems (network infrastructure, 'PT, integration) 9. Issue updated drawings and specifications 5240 N. 16" Street Suite 101 Phoenix, Arizona 85016 Telephone: (602) 279-4373 FAX: (602) 279-9110 A Limited Liability Company Page 2 Don Bump October 8th, 2018 This notification assumes: O No cabling changes from the workstations to the MEWTR rooms. The present configuration of three Cat 6 cables at each workstation will remain as designed. O No mechanical design changes are anticipated. The present design will support the additional heat load of new equipment. O No electrical design changes are anticipated. Present design will support the additional electrical load of new equipment. • Technology design will require re-working of the equipment in the rack elevations, verification of data station cabling quantity, phone locations, and review of the existing backbone cabling to confirm fiber strand availability. • Technology design revisions will also require coordination with MCSO phone system design. PROFESSIONAL FEE Attached you will find a spreadsheet for professional services summary, and pages for LSW engineers and Inspired Networks. Should the need arise that additional support is required, or additional scope is needed, an additional service fee will be developed based on standard hourly rates for the respective individuals required to perform the work. Total Professional Services Fee: $ 19,290.00 Feel free to contact me with any questions, or to review in detail any part of this proposal. Thank you again for this opportunity. Sincerely, Arrington Watkins Architects, LLC Digitally signed by Mike Reason: I am the author of this document Dale: 2018.10.08 07:58:54-0700' Principal Architect AW FEE PROPOSAL CLIENT: Maricopa County Office of Procurement Services DATE: 10/08118r 401 W Jefferson Phoenix, AZ 85003 Attn: Donald Bump PROJECT: MC ITR/Jail DCW12 • MCSO Phone Changes_revision AWA NO. 2015.048 Item Hours Rate Fee Totals A DC:N 12 Concept, Oversight and Management Project Manager 1 $ 160.00 160.00 Project Architect 4 $ 145.00 580,00 Project Coordinator/All 0 $ 125,00 CAD Drafter 0 $ 85.00 Admin $ 75.00 Subtotal 5 740.00 8 DUI 12 Construction Documents Project Manager 0 $ 160,00 Project Architect 0 $ 145.00 Project Coordinator/AIT $ 125,00 CAD Drafter $ 85.00 Admin 0 $ 75.00 Subtotal TOTAL ARRINGTON WATKINS ARCHITECTS: 740.00 LSW Engineers (see attached) 5,350.00 Inspired Networks (see attached) 13,200.00 Dibble Engineering (see attached) BGA (see attached) Pangolin Structural (see attached) TOTAL PROFESSIONAL SERVICES FEE: 19,290.00 ESTIMATED REIMBURSABLE EXPENSES FEE THIS PROPOSAL: $ 19,290.00 Hourly Rates for Additional Services Principal Architect $ 190.00 Project Manager $ 160.00 Project Architect $ 145.00 Specificaiton Writer $ 145.00 Project Coordinator / AIT $ 125.00 CAD Drafter $ 85.00 Clerical $ 75.00 S .1 diricer • • - AFIZOVIA, INCORPOEATUD August 20, 2018 Arrington Watkins 5240 N. 16th St., Suite 101 Phoenix, AZ 85016 Attn: Mike Quinn Re: Maricopa County Inmate Transfer and Release Facility and Medium-Security Detention Center LSW 2015415.000 Authorization for Additional Services No, 12 We have been asked to perform the following additional services: Provide technology design changes to support the addition of a MCSO Avaya Telephone electronics design change. MCSO has selected to separate the MCSO Telephone system from MC OET telephone system. No cabling changes from the workstations to the MER/TR rooms. Present configuration of three Cat 6 cables at each workstation will remain as designed. This change will impact all MER and TR rooms. No mechanical design changes are anticipated. The present design will support the additional heat load of new equipment. No electrical design changes are anticipated. Present design will support the additional electrical load of the new equipment. Technology design will require re-working of the equipment in the rack elevations, verification of data station cabling quantity and MCSO phone locations, review of the existing backbone cabling to confirm fiber strand availability. Technology design revisions will also require coordination with MCSO phone system design. We have included three meetings for the coordination of the CSO phone system equipment. Our fee for the above referenced work shall be: Principal 16 hrs. @ $165/hr. = $2,640 Senior Designer 24 hrs. @ $110/hr. = $2,640 Clerical 1 hrs. @ $ 70/hr. = $ 70 Total $5,350 2333 \V North,rn Ave„#9 . Phoenix, A rir.,,oria 85021-9334 Telephont• 602.2-19.1320 Rics ruilc 602.336.3276 Arrington Watkins LSW Project No. 2015415.000 August 20, 2018 Page 2 All other terms and conditions of our original agreement shall apply. Please sign and return the original of this authorization to our office promptly so we may begin the work as requested. Regards, LSW ENGINEERS ARIZONA, INC. Gerald E Katafiasz, P.E. RCDD Vice President GEK:sm APPROVED: DATE: F:\Proj \2015\2015-115.000\ADMINV015-115.000 add 3 MC ITR - Courts IT equip.docx Proposal Name: Maricopa County Detention Faciftly - R intake I Transportation / Release CHANGE ORILlii.A. Prepared for: Arrington Watkins Architects Presented on: 5-October-2018 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR able of ConterL ts 1 Privacy Statement 3 2 Document Control 4 3 Introduction 5 4 Scope 6 5 Scope of Work 6 6 Administration 7 6.1 Training 7 62 Security Clearance 7 6.3 Office Accommodation 7 7 Assumptions 7 8 Project Timelines and Pricing 8 8.1 Project Timelines 8 8.2 Pricing for Services 8 8.3 Pricing for Travel and Expense (T&E) 8 8.4 Terms and Conditions 9 8.5 Billing Policies 9 8.6 Pricing and Execution 9 9 Proposal Approval 10 5-October-2018 Inspired Networks, Inc. Page 2 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR Privacy Statement CONFIDENTIAL AND PROPRIETARY - This proposal contains confidential and proprietary information. The contents of this proposal are not to be disclosed to any individual or organization that is not a direct recipient and/or authorized reviewer of this proposal. The reproduction, transmission or use of this document or contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved, 5-October-2018 Inspired Networks, Inc. Page 3 of 10 CHANGE ORDER- Arrington Watkins Architects - Maricopa County Detention Facility ITR 2 Document Control Issue Control Document Reference N/A Date 5 October 2018 Issue 1.2 Authors Richard Donnelly Arrington Watkins Architects - Maricopa County Project/Customer Name Detention Facility ITR Document Title CHANGE ORDER - Arrington Watkins Architects - Maricopa County Detention Facility 1TR - 002 Owner Details Name Richard Donnelly Contact Number 978-930-3122 rdonnellyPinspirednetworks.com E-mail Address salesOnsoirednetworks,corn Revision History Issue Date Author Comments 1.0 20 August 2018 Richard Donnelly Internal Draft Li 21 August 2018 Richard Donnelly Submission 1.2 5 October 2018 Richard Donnelly Re-submission 5-October-2018 Inspired Networks, Inc. Page 4 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility 1TR 3 Introduction Inspired Networks, Inc. is a professional services firm focused on delivering cost effective and scalable IT solutions through state-of-the-art network, system and security architectures. Inspired Networks, Inc. offers time and materials as well as project based consulting services in various facets of IT infrastructure design, implementation, training and support. INSPIRED NETWORKS At Inspired Networks, Inc., we understand that, although CORE VALUES many businesses use the same technology tools, each Client Satisfaction business has unique goals, obstacles and needs. That's why we provide IT consulting services customized to fit our clients' Build mutually rewarding long- business model rather than cookie-cutter solutions. term relationships with our clients Services are structured for all project sizes and complexities, and tailored to opportunity, scope, and timeline. Inspired Meeting our client's business Networks prides itself in delivering value propositions in challenges by combining an which scope, timelines, project deliverables and milestones understanding of our client's are measured against overall project-related costs. objectives with the industry experience, technical Our mission is to provide the highest quality consulting expertise, and project services to our clients. Our approach, based on successful management aptitude past experience and a proven track record, is customized to fit the unique requirements of each client challenge. Responsive and dedicated professionals taking complete We are committed to "Providing Value through Service" ownership of all aspects of measuring project success not just in terms of milestones and client engagements deliverables, but in total client satisfaction. i* Strong consultative approach At Inspired Networks, Inc., we pride ourselves on delivering to client engagements beyond the expectation of professional service, striving for personal service in all of our success. Depth of technical expertise and experience Technology Vendor independence gives Inspired Networks the flexibility to provide our clients with an objective technology solution that meets their needs, not the vendors We pride ourselves on delivering beyond the expectation of professional service, striving for personal service in all of our success Full project life cycle management 5-October-2018 Inspired Networks, Inc. Page 5 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR 4 Scope In agreement with Arrington Watkins and Maricopa County FMD, Inspired Networks has prepared the following Change Order, The Change Order is required for the potential re-design of ITR Telephony from an OET IPT solution to either MCSO Legacy Avaya solution or a hybrid of OET IPT and MCSO Legacy Avaya. The potential re-design was initiated after multiple discussions between MCSO, OET, FMD, and the Arrington Watkins design team. This document describes the project scope and the services that Inspired Networks will render to Arrington Watkins Architects in support of the Maricopa County Detention Facility ITR Project. 5 Scope of Work • Review Voice Requirements with each user group (Coordinated with FMD) group at ITR. I believe Courts and Attorney wanted to NOT be on the MCSO phone system. This may result in a split phone system. o With using "floor plan — Layer 1 end points" review each user group area for phone count (coordinate with LSW and FMD) No new network drop locations will be added. User groups will work with what is already designed. they can provide a high level single line diagram • Coordinate with LSW on changes to TR/MER rooms. • Review and understand impact to the OM - network. Not making any recommendations at this time to downsize the OET network. • Receive single-line diagram from Windstream and incorporate information into the specifications and drawings. Inspired Networks will coordinate and work with LSW Engineering. LSW Engineering the development of systems and specifications for the communication systems, LSW Engineering will take lead with the passive communications systems (e.g., cable plant, communication rooms). Inspired Networks will take lead with "active" communications systems (e.g., network infrastructure, IPT, integration). 5-October-2018 inspired Networks, Inc. Page 6 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR 6 ilicinninistration 6.1 Training Not applicable. 6.2 Security Clearance Not applicable. 6.3 Office Accommodation In coordination with LSW Engineering, Inspired Networks will establish a base of operation at LSW Engineering Phoenix office. As required for the duration of the program the Arrington Watkins Architects may provide for office space for Inspired Networks, The office shall be furnished to perform the necessary activities associated with this scope of work. Office Accommodations shall include: internet access, local LAN or Wi-Fi, LAN or Wi-Fl access to data repositories and printers, desk, chairs, white board, office supplies, fixed line telephony. Access to conference room facilities for coordination meetings, the conference room shall Include: desk, chairs, white boards, audio-visual system (projector, etc.) conference phone, and LAN access. Printing and plotting services available on-site, 7 Assumptions Arrington Watkins Architects shall provide Inspired Networks access to all relevant program documentation, drawings, plans, and data stores in order to execute the defined scope of work. • Arrington Watkins Architects will provide Inspired Networks access to relevant program personnel. )> Arrington Watkins Architects will provide Inspired Networks access to the key stakeholders for Maricopa County. D All costs for office accommodation (Section 6.3) including, power, Internet access, lighting, rental of office space, desks, chairs, meeting rooms and fixed line telephony for use in relation to the statement of work, will be borne by Arrington Watkins Architects. 5-October-2018 Inspired Networks, Inc, Page 7 of 10 CHANGE ORDER Arrington Watkins Architects — Maricopa County Detention Facility ITR 8 Project Timelines and Pricing 8.1 Project Timelines Project is expected to "kick-off" August 2018 and be completed September 2018. 8.2 Pricing for Services Inspired Networks, Inc. has developed an estimated cost for the Maricopa County Detention Facility 1TR project based on the information provided. Inspired Networks utilizes a Professional Services hourly rate of $165,00/hour rate. PRINCIPAL TASK NAMES TOTAL $165.00 HOURS (TOTAL LABOR RATE) Design Services 80 $13,200 TOTAL COST OF SERVICES $13,200 8.3 Pricing for Travel and Expense (T&E) No additional T8tE are expected for the scope of the change order. EXPENSES COST Estimated T&E for the Project Duration $0 TOTAL COST FOR T&E $0 In accordance to Maricopa County policy actual accrued costs will be expensed as a pass-through. 5-October-2018 Inspired Networks, Inc. Page 8 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR 8.4 Terms and Conditions Term This Agreement commences on 15 October 2018 (the "Effective Date") and will continue unless terminated in accordance with its terms, until 2 November 2018 (such period and any renewal term pursuant to the original signed proposals, if applicable, shall be referred to as the "Term"). Termination Clause Performance Either party may terminate this Agreement at any time by giving the other party Ninety (90) day notice of such termination. Both parties will act with reasonable commercial practices to resolve the cause for termination, if applicable, If after Thirty (30) days from acknowledged receipt of a termination notice, the parties are unable to resolve the reason for termination to the mutual satisfaction of the parties, a transition plan, if applicable, shall be initiated for the remaining Sixty (60) days of the termination period. Project Cancelled or De -scoped In the event of Arrington Watkins Architects' client cancelling the project or de- scoping the project or cancelling contracts associated with the project then a Thirty (30) day notice of such termination or a mutually agreed upon time beyond Thirty (30) as required by Arrington Watkins Architects and its client. 8.5 Billing Policies > Arrington Watkins Architects will issue a contract to Inspired Networks, as part of the contract document a signed copy of Inspired Networks proposal will be included. > Inspired Networks, Inc. will invoice on a monthly for services rendered and expenses accrued. Pass-thru Expenses will be invoiced on a monthly basis or at the completion of each scheduled trip. > Invoices are due 45-days from submission. 8.6 Pricing and Execution For Acceptance please sign proposal and forward by the designated Arrington Watkins Architects signing authority provided to Inspired Networks Richard Donnelly — rdonnellyPinspirednetworks.com ) and Sales at Inspired Networks (sales@inspirednetworks.com ) on or before 15 October 2018 to formally execute this agreement. 5-October-2018 Inspired Networks, Inc. Page 9 of 10 CHANGE ORDER — Arrington Watkins Architects — Maricopa County Detention Facility ITR 9 Proposal Approval Inspired Networks, Inc.: Arrington Watkins Architects: Richard Donnelly Name Name Managing Director Title Title Signature Signature 5-October-20113 Date Date PO# (if applicable) 5-October-2018 Inspired Networks, Inc. Page 10 of 10 Artingten Watkins Architects August 9 th, 2018 Donald Bump Maricopa County Office of Facilities Management Division 401 W Jefferson Street Phoenix, AZ 85003 RE: plaricopa County Intake Transfer and Release Facility/Detention Facility Design /Design Change Notification 19 — Site Perimeter Security Mr. Bump: Arrington Watkins Architects (AW) has been asked to provide additional scope for the design of a complex perimeter system on the Durango Campus. Since the scope for this work in not fully programmed at this time our team has made some assumptions as to the effort required to complete this work. If this work is to be incorporated into the project, and the final scope differs from this we will request a scope modification. SCOPE OF WORK Our understanding of the expansion scope of work is as following: a Approximately 2.5 miles of 12 foot detention chain-link fencing with Razor top a Assume two vehicle sally ports: one at the end of Gibson near Durango, and one on Watkins near new staff parking entry. o Guard shacks in each — with search room, restroom, and small office (conditioned) o Multiple vehicle gates (controls, operators, monitoring,. OSC, and remote operation) o Multiple man-gates o Cameras o Badge and remote controls o Intrusion protection (if this scope is not needed remove $30K) PROFESSIONAL FEE Attached you will find a spreadsheet for professional services summary, and pages for each of our team members. This proposal includes only hours that we associated with the perimeter security. Should the need arise that additional support is required, or additional scope is needed, an additional service fee will be developed based on standard hourly rates for the respective individuals required to perform the work. Total Professional Services Feet $ 115,810.00 / Feel free to contact me with any questions, or to review in detail any part of this proposal. Thank you again for this opportunity. Sincerely, Arrington Watkins Architects, LLC Diiilally signed by Mike Reason: I am the author of this document .6" Date: 2018.08.09 16:47:46-0700' Michael D. Quinn Principal Architect 5240 N. 16th Street Suite 101 Phoenix, Arizona 85016 Telephone: (602) 279-4373 FAX (602) 279-9110 A limited Liability Company AW FEE PROPOSAL CLIENT: Maricopa County Office of Procurement Services DATE: 7/23/18 401 W Jefferson Phoenix, AZ 85003 Attn: Donald Bump PROJECT: MC ITR/Jail DCN19 - Durango Perimeter Security AWA NO. 2015.048 Item Hours Rate Fee Totals DCN 19 Concept, Oversight and Management Project Manager 8 $ 160.00 $ 1,280.00 Project Architect 8 $ 145.00 $ 1,160.00 Project Coordinator/AIT 20 $ 125.00 5 2,500.00 CAD Drafter 40 $ 85,00 5 3,400.00 Admin 20 $ 75.00 $ 1,500.00 Subtotal 96 9,840.00 B DCN 19 Construction Documents Project Manager 8 $ 160.00 $ 1,280.00 Project Architect 40 $ 145.00 $ 5,800.00 Project Coordinator/Aft 40 $ 125.00 $ 5,000.00 CAD Drafter 120 $ 85.00 $ 10,200.00 Admin 20 $ 75.00 $ 1,500.00 Subtotal 228 23,780.00 TOTAL ARRINGTON WATKINS ARCHITECTS: 33,620.00 LSW Engineers (see attached) 9,520.00 SAECO (see attached) 7,140.00 Dibble Engineering (estimated) 8,300.00 BGA (see attached) 46,230.00 Pangolin Structural (estimated) 10,500.00 TOTAL PROFESSIONAL SERVICES FEE: 115,310,00 ESTIMATED REIMBURSABLE EXPENSES 500.00 FEE THIS PROPOSAL: $ 115,810.00 Hourly Rates for Additional Services Principal Architect $ 190.00 Project Manager $ 160.00 Project Architect $ 145.00 Specificaiton Writer $ 145,00 Project Coordinator! AIT $ 125.00 CAD Drafter $ 85.00 Clerical $ 76.00 LSW Engin e ers ARIZONA, iNCi5 PPORATED July 14, 2018 Arrington Watkins 5240 N. 16th St., Suite 101 Phoenix, AZ 85016 Attn: Mike Quinn Re: Maricopa County Inmate Transfer and Release Facility And Medium-Security Detention Center LSW 2015-115.000 Atithorization for Additional Services No, 9 We have been asked to perform the following additional services: Mechanical, electrical and technology design changes to support the Campus Security upgrade: Secure perimeter around entire Durango Campus a, Approximately 2.5 miles of 12-foot detention chain-link fencing with Razor top b. Assume two vehicle sally ports: one at the end of Gibson near Durango, and one on Watkins near new staff parking entry. i. Guard shacks in each with search room, restroom, and small office (conditioned) ii. Multiple vehicle gates (controls, operators, monitoring, OSC, and remote operation) iii. Multiple man-gates iv. Cameras v. Badge and remote controls We will provide HVAC, plumbing, power and data for each of the two-vehicle sally port guard shacks as defined above. Our fee for the above referenced work shall be: Principal 4 hrs. @ $165/hr, = $ 660 Engineers 8 hrs. @ $140/hr. = $ 1,120 Senior Designer 40 hrs, @ $110/hr. = $ 4,400 CAD Operator 40 hrs. @ $ 80/hr. = $ 3,200 Clerical 2 hrs. @ $ 70/hr. = $ 140 Total $9,520 2333 W Northern Aye, #9 . Phoenix, Arizona 25021-9334 Telephone 602.249.1320 Facsimile 602336,3276 Arrington Watkins LSW Project No. 2015-115.000 July 14, 2018 Page 2 All other terms and conditions of our ori ginal agreement shall appl y. Please si gn and return the original of this authorization to our office promptly so we may be gin the work as req uested. Regards, LSW ENGINEERS ARIZONA, INC, —5,544 611\15 Justin Holmes, PE. Vice President JMI-knj APPROVED: DATE: FAProA2019\2015-115.000 ADMIN V015-115.000 'acid 9 MC ITR Campus Security Upgrade.docx Campus Security Upgrade (Item No. 9 from 6/13/18 Mike Quinn email) Description - Design Related Quantity Cost Total Geotechnical Recommendations for Guard Shacks 1 3,500.00 $ 3,500.00 Description - Construction Related Quantity Cost Total Misc. FDT - Engineering Technician, per hour 20 44.00 880.00 Concrete Testing - Engineering Technician, per hour 40 44.00 1,760.00 Concrete Cylinders, each set of 4 10 100.00 1,000.00 3,640.00 Total for Design and Construction $ 7,140.00 BGA FEE PROPOSAL CLIENT: Maricopa County Office of Procurement Services DATE: 818/2018 401 W Jefferson PhoeniX, AZ 85003 Attn: Donald Bump PROJECT: MC ITR/Jail DCN19 - Durango Secure Perimeter AWA NO. 2015.048 Item Hours Rate Fee Totals A DCN 19 Contruction Documents Sr Engineer 48 $ 175.00 $ 8,400.00 Engineer 126 $ 135.00 $ 17,010.00 Sr. GADD 240 $ 80.00 $ 19,200.00 Admin 36 $ 45.00 $ 1,620.00 Subtotal 450 46,230.00 BGA: 46,230.00 ESTIMATED REIMBURSABLE EXPENSES FEE THIS PROPOSAL: $ 46,230.00 Hourly Rates for Additional Services Principal 185.00 Sr Engineer 175.00 Engineer 135.00 Sr. CADD 80.00 Admin 45.00 Maticopa Colin Facilities Management Departmen nide 5 Change Order Routing Change Order Project Manager & Phone 4 : Don Bump (602)903-0819 Date: 10/02/18 Work Order it: NA Vendor Name: Arrington Watkins (W000002045X) Project #: 1973-16-0001 Contract #: 15063-R Location Name: ITR (Durango Campus) Purchase Order 4: D0170000002372-12 Project Name: 1TR- Detention Facility Amount Funding Source MM CIP 0 Annual Funds D User Funds Requested: $ 115,810,00 FUND DEPT UNIT ACTIVITY APPR UNIT OBJ/SUB LOCATION PROGRAM *PHASE FUNCTION AMOUNT (Not Required) 455 0470 4713 FACNI 1TRJ 9150/11 1973 ITRd CAPBLD $115,810.00 APPROVAL OR REVIEW REQUIRED DATE INITIAL 1. All information has been reviewed by Proiect Manager 2. Budget Analyst Review (*Phase to be completed by Budget Analyst) 3, Article 5 Procurement Review 4, Additional Special or Requested Review (Specify) 5, 0 & M Division Manager Approval (if Annual Funds or Tech Review) 6. CFD Manager or Planning Manager Approval 7, FMD Director Approval 8. CFD Administration Processing 9. Article 5 Change Order Processing by OPS 10, Purchase Order Processing Purchase Order Total to Date: $ 4,156,117.88 +$115,810.00 = $14,271,927.88 Project Start Date: Project End Date: 11/8/2021 DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER: NOTE: BOARD of SUPERVISORS APPROVAL REQUIRED Includes AW DCN#19 - Site Perimeter Security Fencing (Durango) Required Attachments 1. Change . Order Package 2. Project Information Sheet w/ Complete Scope 3. Vendor Proposal with Supporting