3-15-18 CHID PERMIT MARICOPA COUNTY FINAL.DOCX
Extracted text (via pymupdf_layout)
13942 characters
United States Department of the Interior FISH AND WILDLIFE SERVICE Post Office Box 1306 Albuquerque, New Mexico 87103 In Reply Refer To: LA - Arizona FWS/R2/NWRS/RE Maricopa County Cabeza Prieta NWR Permit (M-21) C-78-18-_____-___-00 RIGHT-OF-WAY PERMIT DATE: , 2018 GRANTOR: THE UNITED STATES OF AMERICA, through the Secretary of the Interior, and his authorized representative, the Regional Director, U.S. Fish and Wildlife Service, Southwest Region. GRANTOR’S MAILING ADDRESS: P.O. Box 1306 Albuquerque, NM 87103 PERMITTEE: The County of Maricopa, Arizona a political subdivision of the State of Arizona PERMITTEE’S MAILING ADDRESS: Maricopa County 2801 W. Durango Street Phoenix, Arizona 85009 THE UNITED STATES OF AMERICA, through the Secretary of the Interior, and his authorized representative, the Regional Director, United States Fish and Wildlife Service, hereinafter referred to as “Service” and/or “Grantor”, in accordance with applicable authorities and in accordance with regulations published in 50 CFR 29.21, does hereby grant a right-of-way (permit) to the County of Maricopa, hereinafter referred to as “Permittee” to use and occupy certain lands of the Cabeza Prieta National Wildlife Refuge (“Refuge”) to install facilities and equipment associated with the upgrade of a radio communications system (system) located on Childs Mountain, Pima County, Arizona. The upgraded system will tie into the existing countywide communication grid and provide improved radio communication for Maricopa County employees working along Arizona Highway 85. It will also provide prompt and reliable communications between Maricopa County deputies and other Federal, State, and County law enforcement officers in the area. The communications site is located in the NE 1/4 of projected section 26, Township 11 South, Range 7 West of the Gila and Salt River Base and Meridian, Pima County Arizona, containing 2,902.52 square feet or 0.0666 acres, more or less, and is confined to the existing Arizona Department of Public Safety (AZDPS) Facilities site as shown and legally described on “EXHIBIT A” (the “Permitted Area”), which is attached hereto and made a part of this permit. Permittee’s initial work related to the upgrade project is described and depicted in “EXHIBIT B” (the “Plans”) attached hereto and made a part of this right-of-way permit, which includes installation of the following: (i) Two panel-style land mobile antennas on the existing communications tower operated by the AZDPS. (ii) A prefabricated equipment shelter adjacent to the existing AZDPS shelter. The 12’ x 16’ (192 sq. ft.) shelter will be mobile and placed on skids rather than being constructed on a permanent concrete foundation. A prefabricated above grade concrete stoop by the shelter entrance will facilitate entry into the shelter. The shelter will be painted with a color to be determined by the refuge manager to blend in with the surroundings. (iii) A backup electrical generator and propane fuel tank on separate, above-grade, prefabricated concrete slabs. The generator and propane tank will be painted with a color to be determined by the Refuge Manager to blend in with the surroundings and replace the existing AZDPS generator and fuel tank. The existing AZDPS generator and fuel tank will be removed from the site by Permittee and delivered to AZDPS. (iv Approximately 45 ft. of new cable bridge from the Maricopa County communications shelter to the existing AZDPS tower. The cable bridge support poles will be placed on above ground prefabricated cement blocks. (v) A new overhead power line from the existing utility pole to the Maricopa County communications shelter. (vi) A lightning protection grounding system, which will be attached to existing above grade ground leads. (vii) In addition to the installation of the facilities and equipment list above, approximately ¼ mile of the east access road leading directly to the AZDPS site will undergo some leveling and road grading in order to transport the materials and supplies to the site. The permit is granted for a term of fifty (50) years, or for as long as it is used for the purpose as described herein, commencing on ___________________ 2018 and terminating on _________________________, 2068. Grantor and Permittee further agree that, if the Permittee no longer needs to utilize the Permitted Area for the purposes stated herein, then the Permittee shall have the right to terminate this permit upon ninety (90) days advance written notice to Grantor. This permit is also subject to A.R.S. § 38-511 and may be cancelled pursuant thereto by either Grantor or Permittee. This Permit may also be terminated by Permittee at the end of any fiscal year due to non- appropriation of funds without any penalty or liability to Permittee. County and State fiscal years end June 30, Federal fiscal year ends September 30. By accepting this right-of-way permit, Permittee agrees to the following terms and conditions: 1. The Refuge Manager is the coordinating official having immediate jurisdiction over and administrative responsibility for Refuge lands. 2. The fair market value consideration is waived by the Service’s Regional Director, Southwest Region, in accordance with the authority contained in 50 CFR 29.21-7 (a). 3. The administrative cost incurred in processing the application and granting this right- of-way permit is waived by the Regional Director in accordance with the authority contained in 50 CFR 29.21-2(a)(2)(B). 4. To comply with Federal laws applicable to the project for which the right-of-way permit is granted, and to the lands which are included in the right-of-way permit, and lawful existing regulations there under. 5. To clear and keep clear the lands within the Permitted Area to the extent and in the manner directed by the Refuge Manager in charge; and to dispose of all vegetative and other material cut, uprooted, or otherwise accumulated during any construction or maintenance of the system in such a manner as to decrease the fire hazard and also in accordance with such instructions as the Refuge Manager may specify. 6. To prevent the disturbance or removal of any public land survey monument or project boundary monument unless and until the Permittee has requested and received from the Service’s Regional Director approval of measures the Permittee will take to perpetuate the location of aforesaid monument. 7. To take such soil and resource conservation and protection measures, including weed control on the land covered by the right-of-way permit, as the Refuge Manager may request. 8. To do everything reasonably within its power, both independently and on request of any duly authorized representative of the United States, to prevent and suppress fires on or near lands to be occupied under the right-of-way permit, including making available such construction and maintenance forces as may be reasonably obtainable for the suppression of such fires. 9. To rebuild and repair such roads, fences, structures, and trails as may be destroyed or altered by construction work and to build necessary and suitable crossings for all roads and trails that intersect the system constructed, maintained, or operated under the right-of-way permit. 10. To pay the Grantor the full value for all damages to the lands or other property of the United States caused by Permittee’s employees, contractors, or employees of the contractors, and to indemnify the United States, to the extent permitted by law, against any liability for damages to life, person, or property arising from the occupancy or use of the lands under this right-of-way permit except where a right-of-way is granted hereunder to a State or other governmental agency which has no legal power to assume such a liability with respect to damages caused by it to lands or property, such agency in lieu thereof agrees to repair all such damages. 11. That all or any part of the permit granted may be terminated by the Service’s Regional Director for failure to comply with any or all of the terms or conditions of the right-of- way permit, or for abandonment. A rebuttable presumption for abandonment is raised by deliberate failure of the Permittee to use for any continuous 2-year period the permit for the purpose for which it was granted or renewed. In the event of non-compliance or abandonment, the Service’s Regional Director will notify the Permittee in writing of their intention to suspend or terminate such right-of-way permit sixty (60) days from the date of the notice, stating the reasons therefor, unless prior to that time the holder completes such corrective actions as are specified in the notice. The Service’s Regional Director may grant an extension of time within which to complete corrective actions when, in his judgment, extenuating circumstances not within the Permittee’s control such as adverse weather conditions, disturbance to wildlife during breeding periods or periods of peak concentration, or other compelling reasons warrant. Failure to take corrective action within the sixty (60) day period, or an extension, will result in a determination by the Service’s Regional Director to suspend or terminate the right-of-way permit, in which case, an administrative proceeding may be required. 12. To restore the land to a condition as similar to its condition immediately prior to the Permittee’s entry to the satisfaction of the Service’s Regional Director so far as it is reasonably possible to do so upon revocation and/or termination of the permit, unless this requirement is waived in writing by the Service’s Regional Director. 13. To keep the Refuge Manager informed at all times of the name and address of the County representative that is responsible for managing and overseeing this right-of-way permit, and, in case of corporations, of the address of its principal place of business and the names and addresses of its principal officers. 14. That the grant of the right-of-way permit shall be subject to the express condition that the exercise thereof will not unduly interfere with the management, administration, or disposal by the United States of the land affected thereby. The Permittee agrees and consents to the occupancy and use by the United States, its grantees, permittees, or lessees of any part of the Permitted Area not actually occupied for the purpose of the granted rights to the extent that it does not interfere with the full and safe utilization thereof by the Permittee The Permittee also agrees that authorized representatives of the United States shall have the right of access to the Permitted Area for the purpose of making inspections and monitoring the construction, operation and maintenance of facilities. After construction is complete, if Grantor desires entry into secured portions of the Permitted Area, Grantor shall, except in the case of an emergency, provide forty-eight (48) hours’ advance notice of the entry to Permittee. 15. That the right-of-way permit herein granted shall be subject to the express covenant that any facility constructed thereon will be modified or adapted, if such is found by the Service’s Regional Director to be necessary, without liability or expense to the United States, so that such facility will not conflict with the use and occupancy of the land for any authorized works which may hereafter be constructed thereon under the authority of the United States. 16. That the right-of-way permit herein granted shall be for the specific use described herein and may not be construed to indicate the further right to authorize any other use within the Permitted Area unless approved in writing by the Regional Director. Please provide a copy of this right-of-way permit to all contractors that may work in the Permitted Area. All persons working on the Refuge as well as the person signing below are responsible for abiding by the conditions of this permit. Failure to abide by any or all of the conditions of this permit could result in fines or stoppage of work on the Refuge. IN WITNESS WHEREOF, the Parties have hereto signed their names and affixed their respective seals, on the date first above written. PERMITTEE: MARICOPA County a political subdivision of the State of Arizona By ___________________________________ Steve Chucri Chairman, Maricopa County Board of Supervisors APPROVED AS TO FORM: Deputy County Attorney Date ACKNOWLEDGEMENT STATE OF ARIZONA ) ) COUNTY OF MARICOPA ) On this _______ day of ________________ 2018, Steve Chucri, Chairman of the Maricopa County Board of Supervisors, personally appeared before me, and is personally known to me to be the signer of the foregoing document, and he acknowledged that he, being authorized to do so in his official capacity, executed the foregoing instrument for the purpose therein contained. ___________________________________ Notary Public ____________________________________ Notary’s Printed Name My Commission Expires: ______________ GRANTOR: The United States of America Department of the Interior By: __________________________ Regional Director, Southwest Region U.S. Fish and Wildlife Service ACKNOWLEDGEMENT STATE OF NEW MEXICO ) ) COUNTY OF BERNALILLO ) On this _______ day of ________________ 2018, ________________________, personally appeared before me, who is personally known to me to be the signer of the foregoing document, and he/she acknowledged that he/she being authorized to do so in his/her official capacity executed the foregoing instrument for the purpose therein contained. ___________________________________ Notary Public ____________________________________ Notary’s Printed Name My Commission Expires: ______________ Exhibit “A” Map of Permitted Area Exhibit “A” continued Legal Description of Permitted Area Exhibit “B” Plans PLANS CAN BE VIEWED IN THE OFFICE OF THE MARICOPA COUNTY CLERK OF THE BOARD OF SUPERVISORS 301 WEST JEFFERSON STREET, 10TH FLOOR PHOENIX, ARIZONA 85003