TT0593 - FY 2018 Rehab - SV Pkwy - I10 to Tartesso 1320 Remove full depth of AC. Regrade the exposed AB so that the top of the grade is 5" below the gutter lip and the final profile. New pavement should be 1.5" of ARAC on 3.5" of 3/4" Superpave AC for high traffic. Project Limit: 1320 ft north of Tartesso Pkwy. Millings from AC removal should not be re-used in RAP AC mix or as AB material, due to out of spec LA abrasion results. Project Limit: County maintenance start point. September 26, 2017 1:66,296 0 0.5 1 2 mi RMSlayerFL 0 0.75 1.5 3 km Plan 1 - Rehab - SV Pkwy - I10 to Camelbk 5280 Maricopa County Department of Transportation mcdot.maricopa.gov