TT0593 - REHAB - SUN VALLEY PKWY - I10 TO TARTESSO PKWY 1320.PDF
Extracted text (via pymupdf_layout)
1453 characters
MCDOT Pavement Management Program 09/26/2017 Road Management System Maintenance Plan FY2018 - TT0593 - Rehab - SV Pkwy - I10 to Tartesso Pkwy 1320' Worksheet Existing ADA On road From road From offset To road To offset Width Miles PCR IRI Ramps Inter SY T-Bays SY Sq yds Northwest, Arterial, Sun Valley Pkwy I 10 (Negative Roadwa 1444 Van Buren St 0 39 0.452 74 120 2 640 360 10,331 Van Buren St 0 McDowell Rd 0 39 1.023 78 120 2 640 360 23,400 Roosevelt St. Intersection - 0 0 360 McDowell Rd 0 Thomas Rd 38 1.000 74 123 0 0 360 22,293 Thomas Rd 0 Indian School Rd 0 38 0.989 78 114 0 0 550 22,057 Indian School Rd 0 Indian School Rd 1320 38 0.250 78 114 0 0 5,573 Sun Valley Pkwy (Negative Roadway) I 10 (Negative Roadwa 1430 Van Buren St 0 39 0.451 73 122 2 320 360 10,326 Washington St. Intersection - S/B (West Only) 2 0 0 Van Buren St 0 McDowell Rd 0 39 1.023 76 120 2 320 360 23,404 Roosevelt St. Intersection - S/B (West Only) 2 260 360 McDowell Rd 0 Thomas Rd 0 38 1.000 69 118 0 260 360 22,294 Thomas Rd 0 Tartesso Pkwy 0 38 0.989 73 114 2 460 550 22,040 Tartesso Pkwy 0 Tartesso Pkwy 1320 38 0.25 73 114 0 550 5,573 7.427 14 167,291 2,900 4,530 7,430 Total Project SY: 174,721 Cost per SY: $30.00 Total Estimated Project Cost: $5,241,630.00 Foot Notes: Negative Rdway - are SB or WB lanes ONLY of a Multi-lane road with landscaped medians and multiple names 2018 - TT0593 - Rehab - Sun Valley Pkwy - I10 to Tartesso Pkwy 1320.xlsx Page 1 of 1