Reservation #: ___18420_____
Request to Amend kWh Production or System Equipment Information
1.) Original Reservation Application Information:
Estimated number of PV Panels__2212_____ PV Module Manufacturer____Suntech_____________
Model #___Pluto 245W ________________ UL Listing____1703____________________________
What is the DC Watt rating per panel? _245W_
(If multiple PV module manufacturers, break out panel count per manufacturer): ______________________________
Estimated number of Inverters___2_______ Inverter Manufacturer__Advanced Energy__________
Model#(s)_Solaron 333kW (1) & PVPowered 100kW (1) UL Listing__1741______________________________
What is the AC Watt rating per inverter? 333kW & 100kW
(If multiple Inverter Manufacturers break out inverter count per manufacturer): __1 each________________________
Original Total Project Costs (“TPC”) $2,557,973 Original Ranking Score:_850________
System Size: 541.94 kWdc Estimated Annual kWh per kWdc: _1710________kWh
Original Anticipated Annual kWh Production (system size x est. annual kWh production/kWdc): 926,717
Estimated Annual Incentive Payment (annual estimated kWh x $ 0.085 incentive per kWh): $78,771_____________
2.) Revised System Information or Est kWh Production (based on Interconnection Agreement):
Estimated number of PV Panels 1568__ PV Module Manufacturer__Trina Solar____________
Model #_TSM-240PA05___________________ UL Listing_______1703_________________________
What is the DC Watt rating per panel? _240____
(If multiple PV Module Manufacturers break out panel count per manufacturer): __N/A_________________________
Estimated number of Inverters___7____ Inverter Manufacturer___ABB____________________
Model#(s) _TRIO 50-TL-OUTD-US_____________ UL Listing_____1741___________________________
What is the AC Watt rating per inverter? _50kW________
(If multiple Inverter Manufacturers, break out inverter count per manufacturer): _N/A___________________________
New Total Project Costs (“TPC”): $2,856,181.57__ **New Ranking Score:__850_______
New TPC Cap (TPC x 40%) $1,142,472.63__
New Anticipated Annual kWh Production: _926,717__________________________
Difference from original anticipated kWh production: _0___________________
New Estimated Annual Incentive Payment (annual estimated kWh times $ 0.085 incentive per kWh): $__78,771_____
3.) Customer/Owner Agreement to new kWh?
Customer: System Owner:
Name (please print): Maricopa County____________ Name (please print): Maricopa County ____________
Title/Business Name: Maricopa County___________ Title/Business Name: Maricopa County____________
Signature*: ________________________________ Signature: ___________________________________
Date: _____________________________________ Date: _______________________________________
*Customer signature signifies customer approval of new annual production and that this addendum will supersede the original Credit
Purchase Agreement – Section 6 Contract Quantity.
**Submit a new Ranking Score calculation sheet. Ranking score must not be higher than original. If awarded in prior year, please contact
your APS Project Manager for assistance in generating a new prior year ranking score.
Notes:
- Changes in system size may also change the method used to reimburse/credit for excess generation placed back onto the APS grid.
- Changes in system size or kWh production cannot increase the per kWh incentive amounts paid for the production of the system.
_____________APS Approval__________________________________________________________APS Approval_____________
4.) Approval of Amended annual kWh production approved by APS? Yes No
APS Representative: Name: _________________________________
Title: _________________________________
Date: _________________________________