COMPETITION IMPRACTICABLE FORM - 23JUN17.PDF

Maricopa County — Formal (2017-07-26)

View PDF Item 101 Meeting page

Extracted text (via tesseract_tsv) 32229 characters
~~
eee
ae
.
Office:of Procurement Services
GOODS AND SERVICES
COMPETITION IIMPRACTICABLE FORM
This form is to be used when.an agency believes-an-acquisition is a-single source and the acquisition dollar amount is above
$5,000, The Chief Procurement Officer can approve purchases up to’$100,000. Board of Supervisors approval is required if
the acquisition is over $100,000. This fornh must be-submitted for approval to: Office of Procurement Services | 320 W..
Lincoln | Phoenix, AZ 85003..Fax number; 602;258,1573. The signed form must be retained In the purchasing file.
DEPARTMENT NAME DEPARTMENT RX#
MCDOT - Permit, Construction & Inspection Div.
| PROPOSED CONTRACT VENDOR NEED IDENTIFIED Date: June 15,2017
Cotnpany: WSP USA (formerly Parsons Brinckerhoff tpequestes
cewer
ASAP
Address; 350 West Washington Stréet, Suite300 . |] Dates
|eity, state: empe, AZ |] quote phice, 59,554.31
_
Zip/Postal Code:|85281 - : .
: :
Phone: (000) 000-0000 Accouriting String: 234-D640-6440-TSYS-9400-14
Fax: :
Contact Name: Jay Guertin
[DESCRIPTION OF GOODS OR SERVICE REQUIRED:
;
The estimated cost of this Procurement is: Cs$100k @>5100k
_ ; / .
is this'‘a Technology Procurement? CYes .@No
Professional construction management firm has been issued work: assignments on two on-call contracts for
services ond single construction project for construction management & inspection. Construction.encountered -
a lot of extra work and extended tinie due to extensive utility conflicts, Continuous coverage by CM firm has
forced both extefided time. and additional funds. Cumulative funding requested has exceeded the $500,000.00.
threshold:by the-above amount. All required ‘services by CMfirm will be completed on or before July 31, 2017.
See attached documentation.
SINGLE SO URCE CATEGORY {Checlc applicable box, attach documentation or provide explanation below,).
| * Maricopa:County Procurement Code. MC1-351 states: “Single-source” means an acquisition where, competition is impractical because
of standardization, warranty, oF other factors as‘approved by the Board of Supervisors.
‘NOTE: The following are Unlikely to be:sufficient single source justifications:
+ Personal or agency preference fora product or vendor
- Agency perception that the vendors the best qualified (this should: be determined through a competitive process)
a Lak of agency planning resulting in litited time to: ‘conduct.a competitive procurernent
* Special incentive-or deal offered (can be assessed in-open and:competitive solicitation)
Agency convenience
_»
0) SoftwaréJicense‘reriewals, additions, of upgrades’ available:
(Grant specified (supporting:documents attached). ‘from
only one source
‘Brand compatibility available from-only ane-source (ho other
C)Mailing lists, subscriptionis or media advertising 6
distributors)
Qy)Warranty voided if service provided by other contract vendor | (Other proprietary situation
@i Other (Provide written explanation below):

THIS PROCURMENT IS A SINGLE SOURCE BECAUSE (attach additional page if needed):
WSP (formerly Parsons Brinckerhoff) has been providing continuous construction management and
inspection services for the TT0463 project since March 2016. All construction has been completed,
but WSP has not been able to invoice for all hours they have applied to the project. They hold all
records, documentation, project history, and are currently in the process of closing out the
construction contract and project. Approval of this request will provide consistency in completing
the close of of the construction phase and the project. Without approval, County will not be able to
reimburse vendor for services already rendered, or those services still required for project close-out.
SEARCH
A search was conducted consisting of: (check all that apply) RESULTS
list ["] no alternatives were identified
[7] Market research [[] Public notice given,
no alternatives were deemed acceptable
Other vendors contacted Other —,
C] vs because (explain below):
Describe the search from above in detail:
Available alternatives are: 1) Completing the remaining CM services in-house. This is impractical as
MCDOT construction does not have the staffing, this would involve the complete transfer of all
electronic files as everything is built on a single electronic platform, and MCDOT would still be unable
to reimburse for hours already expended on this project. 2) Procuring another consulting firm to
complete project close-out. This too is impractical as there would be a major learning curve,
electronic files would still need to be transferred, and MCDOT still would be unable to reimburse for
hours already expended.
PRICE
MC1~352-B states: The Using Agency requesting a Competition Impracticable Procurement shall provide written evidence
to support a Competition Impracticable determination containing an explanation of why the proposed procurement
is Advantageous to the County; and the scope, duration, and estimated total dollar value of the procurement.
process
Price has been fairly and reasonably established by: [-] Comparison to public sector contract pricing
[_] Discount off published catalog pricing
Comparison to previous comparable purchases
q from a different vendor ["] Market survey
[_] Independent estimate Other, explain:
Describe methodology and results (attach any written supporting data, e.g., survey or market analysis):
WSP (formerly Parsons Brinckerhoff) has provided a fee proposal consistent with the original scope of
work, and with the rates matching those in on-call Contract No. 2016-014 that was a qualifications
based the in summer of 2016, and executed on 9/7/2016. The fee proposal which is
procurement
attached for reference, includes hours required to close project, and previous hours they were unable
to bill for due to insufficient funds remaining. This work assignment received approval of Chief
Procurement Officer in January 2017 for additional funds in the amount of $68,270.54. The quoted
above reflects the delta between funds previously approved and the projected final cost of work
price
assignment.

CERTIFICATIONS
I certify:
1) | récognize that the Maricopa County Procurement Code requirés the use of competitive solicitations unless
by law. | have reviewed the information and materials relevant to this procurement of goods and services,
exempted
and am requesting approval of an exception to the competitive procéss for the reasons described;
2) the price to be paid to the proposed single source vendor is fair, reasonable, and provides the best value to Maricopa
County; and ;
3) this request for an exception to the competitive solicitation process is not the result of inadequate advance planning
or for purposes of securing the services of a preferred vendor.
Agency Head or Agency Head Delegate Signature (Required)
\yuite leh, SL ois |2017.
- | ,
eS Date
Printed Name Signature}
Office of Procurement Services
The CPO can procurements up to $100,000. This request Is over $100,000 and must be submitted as an agenda
approve
item to the Board of Supervisors for consideration.
[-] Recommended to BOS for approval.
Kevin Tye Mur To
bbl?
'
Printed Name Signature 7

WS]
June 14, 2017 ‘
‘Lisa Ruane, P.E.
Construction. Engineer
Maricopa Gounty Department of Transportation- Project Management and Construction
2901.W. Durango St.
Phoenix, AZ; 85009
SUBJECT: — Contract 2016-014 On-Call CM WA #3.
Union Hills and 99" Ave Intersection Improvement
MCDOT WO No. TT463
Task Modification Request ‘
lact?
tg
yi
Dear Ms, Ruane: ALen!§ ce
Enclosed please find WSP’s modification request for work-assignment 3 to complete the construction
administration services for the above subject project.
As know, the construction was delayed due to the discovery. of canflicting utilities. The project was
you
veset’,
5	1	9	1	2	2	658	1639	113	40	79.280060	issues
5	1	9	1	2	3	783	1648	83	28	93.084862	Were
5	1	9	1	2	4	881	1640	219	35	30.037584	resolvedand
5	1	9	1	2	5	1114	1633	214	42	94.241920	Construction
5	1	9	1	2	6	1341	1627	208	46	94.810677	commenced
5	1	9	1	2	7	1564	1630	62	35	88.494560	late
5	1	9	1	2	8	1636	1628	86	36	96.587349	2016
5	1	9	1	2	9	1734	1633	64	31	96.829170	and
5	1	9	1	2	10	1810	1634	68	31	96.174515	was
5	1	9	1	2	11	1891	1628	175	36	96.174515	scheduled
5	1	9	1	2	12	2078	1630	31	30	96.936783	to
5	1	9	1	2	13	2123	1628	40	31	96.936783	be
5	1	9	1	2	14	2176	1627	159	39	96.819794	complete
4	1	9	1	3	0	525	1674	1719	62	-1	
5	1	9	1	3	1	525	1700	27	33	95.762474	in
5	1	9	1	3	2	567	1697	158	39	95.762474	February
5	1	9	1	3	3	740	1699	30	31	96.715996	of
5	1	9	1	3	4	777	1695	99	33	94.666435	2017:
5	1	9	1	3	5	901	1695	67	32	96.259331	Due
5	1	9	1	3	6	980	1696	32	30	96.925636	to
5	1	9	1	3	7	1024	1692	210	33	95.814209	coordination
5	1	9	1	3	8	1246	1690	67	32	96.756752	with
5	1	9	1	3	9	1326	1688	185	40	96.928802	community
5	1	9	1	3	10	1522	1676	125	52	96.020210	events,
5	1	9	1	3	11	1669	1686	53	31	96.020210	and
5	1	9	1	3	12	1739	1684	130	39	94.459183	multiple
5	1	9	1	3	13	1883	1683	61	33	96.852234	rain
5	1	9	1	3	14	1956	1680	123	39	96.576637	events,
5	1	9	1	3	15	2091	1681	54	32	96.969299	the
5	1	9	1	3	16	2243	1674	1	3	8.185263	.
4	1	9	1	4	0	525	1735	794	53	-1	
5	1	9	1	4	1	525	1747	210	41	96.921440	construction
5	1	9	1	4	2	748	1753	68	29	95.611092	was
5	1	9	1	4	3	831	1742	132	46	95.611092	delayed
5	1	9	1	4	4	977	1749	31	29	96.889442	to
5	1	9	1	4	5	1019	1747	52	35	96.717247	the
5	1	9	1	4	6	1085	1746	64	32	96.918564	end
5	1	9	1	4	7	1163	1735	34	41	96.967445	of
5	1	9	1	4	8	1205	1745	114	34	96.768181	March.
2	1	10	0	0	0	518	1804	1804	170	-1	
3	1	10	1	0	0	518	1804	1804	170	-1	
4	1	10	1	1	0	526	1804	1768	57	-1	
5	1	10	1	1	1	526	1831	56	29	83.428116	CO
5	1	10	1	1	2	599	1829	39	32	70.751732	10
5	1	10	1	1	3	650	1828	54	32	95.903458	will
5	1	10	1	1	4	718	1823	44	35	96.832428	be
5	1	10	1	1	5	770	1822	54	36	78.071922	the
5	1	10	1	1	6	834	1824	72	33	78.071922	final
5	1	10	1	1	7	916	1824	179	33	96.207146	contractor
5	1	10	1	1	8	1103	1823	127	36	96.207146	change
5	1	10	1	1	9	1242	1821	97	31	72.324753	order:
5	1	10	1	1	10	1367	1812	156	48	91.536407	Following
5	1	10	1	1	11	1548	1808	110	57	96.268768	County
5	1	10	1	1	12	1674	1813	174	40	96.950302	approvals,
5	1	10	1	1	13	1864	1812	52	33	96.906525	the
5	1	10	1	1	14	1928	1804	71	40	96.088654	final
5	1	10	1	1	15	2012	1813	61	41	94.603447	pay
5	1	10	1	1	16	2085	1810	146	35	94.572083	estimate
5	1	10	1	1	17	2241	1810	53	31	94.572083	will
4	1	10	1	2	0	518	1862	1804	57	-1	
5	1	10	1	2	1	518	1884	50	35	89.053116	‘be
5	1	10	1	2	2	577	1882	101	32	96.870193	made
5	1	10	1	2	3	690	1881	33	32	96.941025	to
5	1	10	1	2	4	736	1881	52	30	97.001678	the
5	1	10	1	2	5	800	1877	174	37	92.419373	contractor
5	1	10	1	2	6	985	1876	61	33	93.215515	and
5	1	10	1	2	7	1059	1875	90	32	93.041725	WSP
5	1	10	1	2	8	1160	1873	52	33	96.375687	will
5	1	10	1	2	9	1225	1874	88	32	96.375687	close
5	1	10	1	2	10	1320	1873	57	36	96.935333	the
5	1	10	1	2	11	1390	1872	126	38	84.116760	project.
5	1	10	1	2	12	1536	1869	60	31	96.242683	We
5	1	10	1	2	13	1609	1868	166	39	96.119347	anticipate
5	1	10	1	2	14	1787	1867	51	31	96.197273	the
5	1	10	1	2	15	1850	1863	74	35	96.593918	time
5	1	10	1	2	16	1935	1865	32	31	95.545341	to
5	1	10	1	2	17	1982	1863	32	33	95.545341	do
5	1	10	1	2	18	2028	1858	61	53	96.402435	this
5	1	10	1	2	19	2101	1858	54	53	96.402435	will
5	1	10	1	2	20	2169	1862	119	42	96.744064	require
5	1	10	1	2	21	2302	1869	20	24	96.744064	a
4	1	10	1	3	0	526	1926	821	48	-1	
5	1	10	1	3	1	526	1936	75	38	95.612968	time
5	1	10	1	3	2	613	1933	166	40	96.462044	extension
5	1	10	1	3	3	793	1940	41	23	96.462044	on
5	1	10	1	3	4	848	1935	56	28	96.083450	our
5	1	10	1	3	5	914	1930	70	34	96.083450	task
5	1	10	1	3	6	996	1932	30	30	96.944626	to
5	1	10	1	3	7	1038	1929	53	33	96.718758	the
5	1	10	1	3	8	1106	1927	111	34	92.460182	middle
5	1	10	1	3	9	1231	1927	29	38	96.653091	of
5	1	10	1	3	10	1273	1926	74	39	93.363625	July.
2	1	11	0	0	0	527	2073	570	59	-1	
3	1	11	1	0	0	527	2073	570	59	-1	
4	1	11	1	1	0	527	2073	570	59	-1	
5	1	11	1	1	1	527	2088	111	38	94.262177	Thank
5	1	11	1	1	2	649	2090	61	35	96.391373	you
5	1	11	1	1	3	723	2086	47	31	96.672241	for
5	1	11	1	1	4	780	2087	78	45	95.981392	your
5	1	11	1	1	5	868	2073	229	45	96.365364	consideration
2	1	12	0	0	0	531	2169	220	41	-1	
3	1	12	1	0	0	531	2169	220	41	-1	
4	1	12	1	1	0	531	2169	220	41	-1	
5	1	12	1	1	1	531	2169	220	41	96.202339	Respectfully,
2	1	13	0	0	0	658	2326	319	164	-1	
3	1	13	1	0	0	658	2326	319	164	-1	
4	1	13	1	1	0	658	2326	319	164	-1	
5	1	13	1	1	1	658	2326	319	164	95.000000	  
2	1	14	0	0	0	532	2478	669	102	-1	
3	1	14	1	0	0	532	2478	669	102	-1	
4	1	14	1	1	0	532	2478	199	50	-1	
5	1	14	1	1	1	532	2478	199	50	72.911514	Jay}Guertin
4	1	14	1	2	0	534	2532	667	48	-1	
5	1	14	1	2	1	534	2544	46	30	94.977829	Sr.
5	1	14	1	2	2	591	2538	206	42	95.712715	Supervising
5	1	14	1	2	3	805	2535	222	34	95.712715	Construction
5	1	14	1	2	4	1042	2532	159	42	96.947395	Engineer
2	1	15	0	0	0	534	2614	603	86	-1	
3	1	15	1	0	0	534	2614	603	86	-1	
4	1	15	1	1	0	535	2614	364	46	-1	
5	1	15	1	1	1	535	2622	35	38	92.324905	C:
5	1	15	1	1	2	585	2619	49	32	92.933540	file
5	1	15	1	1	3	649	2614	133	36	55.558022	41676C
5	1	15	1	1	4	792	2615	107	36	84.936455	task
5	1	15	1	1	5	877	2610	23	54	84.936455	3
4	1	15	1	2	0	534	2660	603	40	-1	
5	1	15	1	2	1	534	2665	208	35	94.878525	Attachment:
5	1	15	1	2	2	814	2662	65	32	92.219002	Fee
5	1	15	1	2	3	892	2661	173	32	90.733002	Schedule-
5	1	15	1	2	4	1078	2660	59	36	96.038765	PB,
2	1	16	0	0	0	254	2834	393	145	-1	
3	1	16	1	0	0	255	2834	133	24	-1	
4	1	16	1	1	0	255	2834	133	24	-1	
5	1	16	1	1	1	255	2834	133	24	20.437855	WSP'USA
3	1	16	2	0	0	256	2871	140	31	-1	
4	1	16	2	1	0	256	2871	140	31	-1	
5	1	16	2	1	1	256	2871	72	26	96.152718	Suite
5	1	16	2	1	2	337	2874	59	28	88.945007	300.
3	1	16	3	0	0	254	2910	393	69	-1	
4	1	16	3	1	0	254	2910	393	30	-1	
5	1	16	3	1	1	254	2912	57	28	79.332123	-350
5	1	16	3	1	2	319	2914	69	22	87.379776	West
5	1	16	3	1	3	394	2910	158	29	96.057076	Washington
5	1	16	3	1	4	562	2910	85	21	95.284035	Street
4	1	16	3	2	0	261	2951	225	28	-1	
5	1	16	3	2	1	261	2955	102	24	89.747688	Tempe;
5	1	16	3	2	2	370	2953	36	22	88.931183	AZ
5	1	16	3	2	3	414	2951	72	22	71.292191	65281
2	1	17	0	0	0	263	3030	271	109	-1	
3	1	17	1	0	0	263	3030	271	109	-1	
4	1	17	1	1	0	263	3030	271	26	-1	
5	1	17	1	1	1	263	3032	49	24	60.899197	Tels
5	1	17	1	1	2	320	3033	83	23	60.805546	41480
5	1	17	1	1	3	410	3030	124	24	73.857971	966°8295
4	1	17	1	2	0	265	3066	268	29	-1	
5	1	17	1	2	1	265	3074	49	21	23.485798	Fax:
5	1	17	1	2	2	322	3072	22	21	23.485798	#1
5	1	17	1	2	3	357	3066	44	27	65.527817	480
5	1	17	1	2	4	410	3069	123	24	59.891590	966-9234
4	1	17	1	3	0	264	3112	120	27	-1	
5	1	17	1	3	1	264	3112	120	27	48.336166	Wsp.com
2	1	18	0	0	0	2544	575	5	445	-1	
3	1	18	1	0	0	2544	575	5	445	-1	
4	1	18	1	1	0	2544	575	5	445	-1	
5	1	18	1	1	1	2544	575	5	445	95.000000

FEE PROPOSAL - TABLE A
CONSULTANT and SUB CONSULTANT
TOTAL COST PROPOSAL SUMMARY
CONSULTANT: WASP USA, Inc, CONTRACT NOs 2016-014
CONTRACT NAME: On-Call CM for non-KA projects - Task 3,
PROJECT NAME: TT463 Union Wills: ‘and 99th Ave Com pletion PB PROJECT NO.: 11576C
G/13/2017
Bue) ULE ane eee e _ SUB CONSULTANTS)
:
NAME or *SURCONSUDTANT. oh » TASK eee
Tnvirorimental ~~ 0.00
_J2(DBE) a wed
“QT dE Materials Inspection ; 0,00
Total Sub consultarit(s) $0.00
Consultant’s total Direct Labor $30,540.55
Consultant’s Total Direct and Otitside Expenses $1,166.40
Total $31,706.95
Consultant’s Totals of Direct Labor and ;
Direct and Outside Expenses $31,706.95
Total Proposed Feé _ $31,706.95
(Consultant and Sub copisultant{s}-total propised fee.)
Overtime Allowance
NEWTOTALPROPOSED FEE_ $31,706.95
_WSP DSA, Inc. —
a ae ; NEW TOTAL ASSIGN $31,706.95
aa
- CK. ES Project Scope Desc «PB will Provide Construction management and
: 2 oe Inspection (including civil inpsection (PB), Materials testing (QT), Traffic
Signature Signal Inspeotion(QT), and SWPPP. Inspection (12) for ant intersection
a
Apis ves eee Improvement Project, MCDOT will provide Survey: “This Task Will serve to
Consfruction Services Arizona ee Manager complete T1463 project which suffercd Utility Delays.
Title
han G-tS- 17
Date
Coit Proposal ——
Maricopa County Depariineat Of Transpoitation

FEE PROPOSAL - TABLE A
CONSULTANT
COST PROPOSAL SUMMARY
CONSULTANT: WSP USA, Ine; ‘CONTRACT NO.:_ 2016-014
CONTRACT NAME: On-Call CM for non- -RA projects = Task 3
PROJECLNAME:* PB PROJECT NO. 145766
6/13/2017
ae
5	1	42	1	3	4	963	888	17	30	21.605850	Be
5	1	42	1	3	5	1122	890	18	16	31.978573	~-
5	1	42	1	3	6	1164	886	125	43	88.968491	DIRECT:
5	1	42	1	3	7	1291	871	151	50	31.470919	LABOR
5	1	42	1	3	8	1559	888	15	2	0.000000	rages
5	1	42	1	3	9	1664	894	2	3	35.526245	2
5	1	42	1	3	10	1817	910	71	5	29.250793	See:
4	1	42	1	4	0	564	902	1430	82	-1	
5	1	42	1	4	1	564	961	3	2	5.764236	;
5	1	42	1	4	2	706	935	223	37	0.000000	Chssifications
5	1	42	1	4	3	1040	902	78	66	0.000000	=
5	1	42	1	4	4	1137	947	11	5	0.000000	~
5	1	42	1	4	5	1171	937	161	47	7.012882	Man-hours
5	1	42	1	4	6	1345	935	8	12	5.396137	”
5	1	42	1	4	7	1375	933	76	32	27.829323	oes
5	1	42	1	4	8	1462	936	113	46	86.919769	Hourly.
5	1	42	1	4	9	1575	913	118	68	35.116276	Rates
5	1	42	1	4	10	1761	915	122	45	33.201641	“Labor
5	1	42	1	4	11	1889	912	105	51	18.587084	Coats.
4	1	42	1	5	0	576	942	1452	77	-1	
5	1	42	1	5	1	576	984	42	2	0.000000	i
5	1	42	1	5	2	688	988	32	24	63.569088	Sr.
5	1	42	1	5	3	733	977	109	46	3.145018	Resident
5	1	42	1	5	4	845	977	105	46	3.145018	Engineer
5	1	42	1	5	5	1233	982	30	23	74.830650	81
5	1	42	1	5	6	1477	979	10	3	0.000000	“
5	1	42	1	5	7	1582	942	158	66	29.231234	ek
5	1	42	1	5	8	1746	976	17	3	26.965971	“
5	1	42	1	5	9	1869	1001	2	2	0.000000	__
5	1	42	1	5	10	1899	974	129	33	52.376984	$5,774,49
4	1	42	1	6	0	710	1013	1319	45	-1	
5	1	42	1	6	1	710	1025	105	24	95.985397	Resident
5	1	42	1	6	2	822	1024	107	34	91.021149	Engineer
5	1	42	1	6	3	1246	1021	13	23	94.743652	0
5	1	42	1	6	4	1618	1014	92	32	66.265717	$64.24
5	1	42	1	6	5	1958	1013	71	31	96.371353	$0.00
4	1	42	1	7	0	796	1053	1233	38	-1	
5	1	42	1	7	1	796	1061	61	30	32.483521	Ett
5	1	42	1	7	2	1245	1061	14	22	94.166344	0
5	1	42	1	7	3	1638	1056	74	26	0.000000	$0.00]
5	1	42	1	7	4	1957	1053	72	29	96.422638	$0.00
4	1	42	1	8	0	685	1093	1343	42	-1	
5	1	42	1	8	1	685	1128	12	4	41.958588	__
5	1	42	1	8	2	714	1104	81	31	59.646229	Prdjéck
5	1	42	1	8	3	805	1095	123	44	43.058071	Siipérvisor
5	1	42	1	8	4	1239	1101	27	21	95.967545	35
5	1	42	1	8	5	1621	1094	86	29	45.030979	$4161]
5	1	42	1	8	6	1740	1122	2	2	38.480980	|
5	1	42	1	8	7	1900	1093	128	32	50.409657	$),456.35
4	1	42	1	9	0	716	1130	1313	43	-1	
5	1	42	1	9	1	716	1144	54	28	96.717209	Lead
5	1	42	1	9	2	783	1135	99	43	96.717209	Inspector
5	1	42	1	9	3	900	1144	23	21	69.968903	II.
5	1	42	1	9	4	1246	1140	13	22	89.130417	0
5	1	42	1	9	5	1622	1134	90	30	90.995293	$38.55
5	1	42	1	9	6	1878	1136	34	2	30.443306	~~
5	1	42	1	9	7	1941	1130	88	31	15.045328	*-$0:00
4	1	42	1	10	0	721	1170	1308	43	-1	
5	1	42	1	10	1	717	1175	58	43	68.196396	Lead
5	1	42	1	10	2	785	1183	112	30	68.196396	Inspector
5	1	42	1	10	3	904	1183	12	22	32.877922	1
5	1	42	1	10	4	1245	1173	24	30	12.354193	oO
5	1	42	1	10	5	1620	1173	92	28	47.203087	$31.37;
5	1	42	1	10	6	1957	1170	72	29	85.479668	$0.00
4	1	42	1	11	0	750	1212	1278	40	-1	
5	1	42	1	11	1	750	1222	135	30	24.875473	Inspector
5	1	42	1	11	2	871	1212	24	47	0.000000	It
5	1	42	1	11	3	1120	1221	41	25	41.446594	~
5	1	42	1	11	4	1238	1215	27	26	41.446594	28
5	1	42	1	11	5	1456	1212	36	8	12.333078	i
5	1	42	1	11	6	1621	1212	92	32	72.346153	$38.55
5	1	42	1	11	7	1886	1212	142	30	0.000000	$1,079.40
4	1	42	1	12	0	756	1248	1273	49	-1	
5	1	42	1	12	1	756	1252	105	45	94.256119	Inspector
5	1	42	1	12	2	872	1263	9	22	73.923203	I
5	1	42	1	12	3	1155	1258	3	2	42.864460	:
5	1	42	1	12	4	1246	1258	14	22	82.949257	0
5	1	42	1	12	5	1620	1252	90	31	80.828545	$27.24
5	1	42	1	12	6	1866	1248	11	2	0.000000	-
5	1	42	1	12	7	1957	1251	72	29	94.458191	$0.00
4	1	42	1	13	0	686	1290	1343	42	-1	
5	1	42	1	13	1	686	1302	86	30	95.629433	Project
5	1	42	1	13	2	780	1298	169	28	96.067657	Administrator
5	1	42	1	13	3	1233	1296	40	23	96.804192	105
5	1	42	1	13	4	1620	1291	91	30	69.417961	$33.04
5	1	42	1	13	5	1900	1290	129	33	68.527687	$3,469.20
4	1	42	1	14	0	767	1329	1262	39	-1	
5	1	42	1	14	1	767	1342	64	23	95.802322	Class
5	1	42	1	14	2	844	1341	26	27	86.182053	(0
5	1	42	1	14	3	1246	1338	14	21	95.917412	0
5	1	42	1	14	4	1616	1335	18	27	81.347336	~
5	1	42	1	14	5	1648	1330	63	30	95.802811	$0.00
5	1	42	1	14	6	1929	1351	3	2	44.033768	.
5	1	42	1	14	7	1951	1329	78	27	57.620106	.$0,00
4	1	42	1	15	0	767	1368	1262	37	-1	
5	1	42	1	15	1	767	1380	65	25	96.158539	Class
5	1	42	1	15	2	841	1380	23	23	84.655258	1
5	1	42	1	15	3	1246	1376	13	22	87.872925	9
5	1	42	1	15	4	1637	1371	75	26	90.167587	$0.00
5	1	42	1	15	5	1956	1368	73	30	89.830742	$0.00
4	1	42	1	16	0	747	1408	1308	37	-1	
5	1	42	1	16	1	747	1431	18	11	57.892605	--
5	1	42	1	16	2	767	1419	65	26	72.580078	Class
5	1	42	1	16	3	841	1419	35	23	83.245399	12.
5	1	42	1	16	4	1246	1416	31	21	91.012543	0.
5	1	42	1	16	5	1590	1424	6	14	18.250742	-
5	1	42	1	16	6	1637	1410	75	29	70.533195	$0.00)
5	1	42	1	16	7	1957	1408	72	29	23.010273	$0.00]
5	1	42	1	16	8	2052	1419	3	1	87.803925	-
4	1	42	1	17	0	1137	1525	890	35	-1	
5	1	42	1	17	1	1137	1551	31	9	9.683475	--.
5	1	42	1	17	2	1884	1525	143	28	92.316673	$11,779.44
4	1	42	1	18	0	1038	1570	383	38	-1	
5	1	42	1	18	1	1038	1571	59	37	95.834694	Days
5	1	42	1	18	2	1197	1572	86	4	30.043192	meee
5	1	42	1	18	3	1319	1571	78	28	26.943497	BAS
4	1	42	1	19	0	947	1637	930	69	-1	
5	1	42	1	19	1	947	1640	163	66	0.000000	Consultant's
5	1	42	1	19	2	1120	1648	103	52	49.070972	Subtotal
5	1	42	1	19	3	1232	1642	82	58	61.556046	Direct
5	1	42	1	19	4	1319	1641	79	35	84.147408	Labor
5	1	42	1	19	5	1723	1637	154	40	45.633659	$11,779.44.
4	1	42	1	20	0	679	1695	1193	71	-1	
5	1	42	1	20	1	679	1735	161	29	45.934441	Cortsultant’s
5	1	42	1	20	2	850	1733	126	30	95.379005	Overhead
5	1	42	1	20	3	986	1731	161	35	96.653435	(Negotiated)
5	1	42	1	20	4	1156	1737	30	20	95.645561	on
5	1	42	1	20	5	1194	1728	80	27	91.209167	Direct
5	1	42	1	20	6	1285	1726	112	36	89.687576	Labor
5	1	42	1	20	7	1379	1722	16	48	92.103844	@
5	1	42	1	20	8	1414	1728	58	26	96.434128	135.
5	1	42	1	20	9	1467	1695	71	60	61.175140	70%
5	1	42	1	20	10	1723	1726	149	34	27.400764	$15,984-70
4	1	42	1	21	0	936	1771	602	33	-1	
5	1	42	1	21	1	936	1773	163	31	38.938858	CGonsultant’s
5	1	42	1	21	2	1109	1774	123	29	12.659616	Overhead
5	1	42	1	21	3	1241	1774	59	27	90.141281	W/O
5	1	42	1	21	4	1309	1769	89	31	74.256760	FCC.=
5	1	42	1	21	5	1416	1768	122	32	90.813324	135.70%
4	1	42	1	22	0	1315	1813	170	32	-1	
5	1	42	1	22	1	1315	1818	113	27	72.353188	Diff=
5	1	42	1	22	2	1413	1813	72	35	84.790031	0,0%
4	1	42	1	23	0	738	1858	1118	40	-1	
5	1	42	1	23	1	738	1867	165	39	56.159439	Consultant's
5	1	42	1	23	2	910	1866	78	33	94.481361	Profit
5	1	42	1	23	3	996	1874	33	24	96.039528	on
5	1	42	1	23	4	1030	1865	86	31	86.834457	Direct
5	1	42	1	23	5	1124	1862	105	30	60.673779	Labor+
5	1	42	1	23	6	1236	1864	122	30	93.742317	Overhead
5	1	42	1	23	7	1367	1860	37	36	92.749817	@
5	1	42	1	23	8	1415	1858	94	37	81.015808	10.0%:
5	1	42	1	23	9	1722	1860	134	32	50.339428	$2,776.41
4	1	42	1	24	0	716	1908	208	34	-1	
5	1	42	1	24	1	716	1902	72	40	79.258644	(ECC
5	1	42	1	24	2	797	1908	127	34	95.519554	Adjusted)
4	1	42	1	25	0	1110	1936	906	43	-1	
5	1	42	1	25	1	1110	1944	173	35	88.830200	Consultant’s
5	1	42	1	25	2	1298	1944	72	32	96.529411	Total
5	1	42	1	25	3	1382	1939	81	31	96.522667	Direct
5	1	42	1	25	4	1471	1941	85	27	96.937668	Labor
5	1	42	1	25	5	1871	1936	145	36	96.567818	$30,540.55
2	1	43	0	0	0	1717	1971	319	6	-1	
3	1	43	1	0	0	1717	1971	319	6	-1	
4	1	43	1	1	0	1717	1971	319	6	-1	
5	1	43	1	1	1	1717	1971	319	6	95.000000	 
2	1	44	0	0	0	530	2008	1508	18	-1	
3	1	44	1	0	0	530	2008	1508	18	-1	
4	1	44	1	1	0	530	2008	1508	18	-1	
5	1	44	1	1	1	530	2008	1508	18	95.000000	 
2	1	45	0	0	0	536	2015	1482	87	-1	
3	1	45	1	0	0	536	2015	1482	87	-1	
4	1	45	1	1	0	536	2015	1482	87	-1	
5	1	45	1	1	1	536	2015	1482	87	95.000000	 
2	1	46	0	0	0	531	2083	1507	17	-1	
3	1	46	1	0	0	531	2083	1507	17	-1	
4	1	46	1	1	0	531	2083	1507	17	-1	
5	1	46	1	1	1	531	2083	1507	17	95.000000	 
2	1	47	0	0	0	536	2102	1507	57	-1	
3	1	47	1	0	0	536	2102	1507	57	-1	
4	1	47	1	1	0	536	2102	1507	57	-1	
5	1	47	1	1	1	536	2102	1028	57	95.000000	 
5	1	47	1	1	2	1853	2102	190	57	95.000000	 
2	1	48	0	0	0	1531	2097	322	59	-1	
3	1	48	1	0	0	1531	2097	322	59	-1	
4	1	48	1	1	0	1531	2097	322	59	-1	
5	1	48	1	1	1	1531	2109	183	32	28.039833	__EXPENSE
5	1	48	1	1	2	1736	2103	117	42	28.039833	AMOUN
2	1	49	0	0	0	531	2145	1506	17	-1	
3	1	49	1	0	0	531	2145	1506	17	-1	
4	1	49	1	1	0	531	2145	1506	17	-1	
5	1	49	1	1	1	531	2145	1506	17	95.000000	 
2	1	50	0	0	0	536	2159	1507	20	-1	
3	1	50	1	0	0	536	2159	1507	20	-1	
4	1	50	1	1	0	536	2159	1507	20	-1	
5	1	50	1	1	1	536	2159	1507	20	95.000000	 
2	1	51	0	0	0	532	2184	1505	17	-1	
3	1	51	1	0	0	532	2184	1505	17	-1	
4	1	51	1	1	0	532	2184	1505	17	-1	
5	1	51	1	1	1	532	2184	1505	17	95.000000	 
2	1	52	0	0	0	536	2179	1023	69	-1	
3	1	52	1	0	0	536	2179	1023	69	-1	
4	1	52	1	1	0	536	2179	1023	69	-1	
5	1	52	1	1	1	536	2179	1023	69	95.000000	 
2	1	53	0	0	0	532	2222	1505	16	-1	
3	1	53	1	0	0	532	2222	1505	16	-1	
4	1	53	1	1	0	532	2222	1505	16	-1	
5	1	53	1	1	1	532	2222	1505	16	95.000000	 
2	1	54	0	0	0	1583	2179	268	82	-1	
3	1	54	1	0	0	1583	2179	387	82	-1	
4	1	54	1	1	0	1647	2179	160	52	-1	
5	1	54	1	1	1	1647	2179	133	52	15.587273	$864.00
ih wee
il
; $302:40
$1,166.40"
Assumptions:
Sce Total Surimary Sheet
Cost'Proposal:Summary
Maricopa County Department Of Transportation.

105 OPOLoO|o 249 of ———
TOTALS Page —
DEC
|
2016-014 11576C NOV
0
NO,: OCT-|
NO.:
2017 | SLOP OL os osoyoyOoO!|o 0
PROJECT for SEP
B CONTRACT |; 0}:
CO] OJP oOfo]lolpolyoyol,o
PB ‘AUG
MAN-HOURS
TABLE = SpfoOpop,oC]o]oy;oyolo )
MAN-HOURS 5
40 DPOPN][ Oy o}Poyo 45 90
- ‘ESTIMATED JUN
| 41 0 0 30 0 0 0 0 60 131
CONSULTANT MAY
PROJECT
SLO] Oo] OPOPoO;o]o|}o
PROPOSAL APR
OD] OO} oO] ololo 28 Oo 28
MAR
SCHEDULED
Completion : DO] oOpPOpoO,OCpojyoyo
FEB
FEE
Ave DIOL OpPOs;OPOPOoO}c]|oC
99th JAN
and
Inc. DEC OPO] OPOLpopyoyol,olo Transportation
Hills
USA,
Union Of
WSP
TT463 Engineer Engineer II i IT I Department
PERSONNEL Supervisor Inspector Inspector Administrator 10 11 12 Summary
NAME: EIT Inspector Inspector Class Class Class TOTAL
Resident Resident Project Lead Lead County
Project Proposal
CONSULTANT: MAN-HOURS Sr.
PROJECT 6/13/2017 PROJECT Maricopa
Cost

36,859.74 $4,919.70 $11.779.44 $15.984.70
oO] Sof S|] Sl Sy ofpayfe 149 100 249
0 $0.00
2016-014 11576C it
___$0.00 Cisss
NO-:
TNO.: ; 0}
$0.00
PROJECT 10
$0.00 Chess
col
55 50 105
$2.469.20
$33.04 Project Administrator ,
0 it] $2.00
d
C LABOR S274
4
: 28 28 40
1 31,079
TABLE DIRECT $38.55 :
Inspector
- AND 0 i} 0 30.00
Inspector
CONSULTANT $3137 i a A
Lead
PROPOSAL MAN-HOURS CLASSIFICATIONS... 0 q A
50.00
Inspector
SSESS ie}
Lead
LABOR 25 10 35 35 AS
FEE ESTIMATED SIAE6
S4L.61 Project Supervisor’
DIRECT
9 ie] 0 S000
Er
__|-__$0.00
‘ ty Q 0
x00
564.24. Resident Engineer
41 40 81 81 49 :
Resident SS.7TA
571.29 Enzineer
Ss Sr.
.
WSP. 135.7%
TASK/PHASE Closeout
@
5 / Hours 135.7% FCC
CONTRACT Construction @ WO
Revicw Pre-construction Cost
CONSULT, ‘Construction ‘|Sub-Total Overhead ‘POverhead
: Plan Post ‘|Labor
i |
5	1	36	1	3	2	1411	2933	21	59	0.000000	Profit
5	1	36	1	3	3	1406	2907	35	9	90.011833	@
5	1	36	1	3	4	1412	2849	20	43	95.903252	10%
5	1	36	1	3	5	1411	2817	20	24	95.903252	of
5	1	36	1	3	6	1411	2758	20	55	86.521622	DL
5	1	36	1	3	7	1406	2758	35	10	84.469368	+
5	1	36	1	3	8	1411	2715	21	37	84.469368	OH
5	1	36	1	3	9	1411	2650	22	57	95.789528	(FCC
5	1	36	1	3	10	1410	2597	24	47	46.728256	Adj)
5	1	36	1	3	11	1410	404	20	100	60.955929	$2,776.41
2	1	37	0	0	0	1353	2826	9	172	-1	
3	1	37	1	0	0	1353	2826	9	172	-1	
4	1	37	1	1	0	1353	2826	9	172	-1	
5	1	37	1	1	1	1353	2826	9	172	95.000000	 
2	1	38	0	0	0	1339	388	27	2477	-1	
3	1	38	1	0	0	1339	388	27	2477	-1	
4	1	38	1	1	0	1339	388	27	2477	-1	
5	1	38	1	1	1	1339	388	27	2477	95.000000	 
2	1	39	0	0	0	1378	388	28	2514	-1	
3	1	39	1	0	0	1378	388	28	2514	-1	
4	1	39	1	1	0	1378	388	28	2514	-1	
5	1	39	1	1	1	1378	388	28	2514	95.000000	 
2	1	40	0	0	0	303	3300	105	0	-1	
3	1	40	1	0	0	303	3300	105	0	-1	
4	1	40	1	1	0	303	3300	105	0	-1	
5	1	40	1	1	1	303	3300	105	0	95.000000	 
2	1	41	0	0	0	1418	387	27	2220	-1	
3	1	41	1	0	0	1418	387	27	2220	-1	
4	1	41	1	1	0	1418	387	27	2220	-1	
5	1	41	1	1	1	1418	387	27	2220	95.000000	 
2	1	42	0	0	0	1458	387	31	2613	-1	
3	1	42	1	0	0	1458	387	31	2613	-1	
4	1	42	1	1	0	1458	387	31	2613	-1	
5	1	42	1	1	1	1458	387	31	2613	95.000000	 
2	1	43	0	0	0	516	741	1005	14	-1	
3	1	43	1	0	0	516	741	1005	14	-1	
4	1	43	1	1	0	516	741	1005	14	-1	
5	1	43	1	1	1	516	741	1005	14	95.000000	 
2	1	44	0	0	0	517	571	1004	12	-1	
3	1	44	1	0	0	517	571	1004	12	-1	
4	1	44	1	1	0	517	571	1004	12	-1	
5	1	44	1	1	1	517	571	1004	12	95.000000	 
2	1	45	0	0	0	556	2995	967	13	-1	
3	1	45	1	0	0	556	2995	967	13	-1	
4	1	45	1	1	0	556	2995	967	13	-1	
5	1	45	1	1	1	556	2995	967	13	95.000000	 
2	1	46	0	0	0	555	2589	968	13	-1	
3	1	46	1	0	0	555	2589	968	13	-1	
4	1	46	1	1	0	555	2589	968	13	-1	
5	1	46	1	1	1	555	2589	968	13	95.000000	 
2	1	47	0	0	0	553	2422	970	11	-1	
3	1	47	1	0	0	553	2422	970	11	-1	
4	1	47	1	1	0	553	2422	970	11	-1	
5	1	47	1	1	1	553	2422	970	11	95.000000	 
2	1	48	0	0	0	553	2255	968	12	-1	
3	1	48	1	0	0	553	2255	968	12	-1	
4	1	48	1	1	0	553	2255	968	12	-1	
5	1	48	1	1	1	553	2255	968	12	95.000000	 
2	1	49	0	0	0	553	2087	968	12	-1	
3	1	49	1	0	0	553	2087	968	12	-1	
4	1	49	1	1	0	553	2087	968	12	-1	
5	1	49	1	1	1	553	2087	968	12	95.000000	 
2	1	50	0	0	0	553	2085	968	14	-1	
3	1	50	1	0	0	553	2085	968	14	-1	
4	1	50	1	1	0	553	2085	968	14	-1	
5	1	50	1	1	1	553	2085	968	14	95.000000	 
2	1	51	0	0	0	552	1920	969	13	-1	
3	1	51	1	0	0	552	1920	969	13	-1	
4	1	51	1	1	0	552	1920	969	13	-1	
5	1	51	1	1	1	552	1920	969	13	95.000000	 
2	1	52	0	0	0	552	1754	969	13	-1	
3	1	52	1	0	0	552	1754	969	13	-1	
4	1	52	1	1	0	552	1754	969	13	-1	
5	1	52	1	1	1	552	1754	969	13	95.000000	 
2	1	53	0	0	0	551	1588	969	12	-1	
3	1	53	1	0	0	551	1588	969	12	-1	
4	1	53	1	1	0	551	1588	969	12	-1	
5	1	53	1	1	1	551	1588	969	12	95.000000	 
2	1	54	0	0	0	552	1409	968	12	-1	
3	1	54	1	0	0	552	1409	968	12	-1	
4	1	54	1	1	0	552	1409	968	12	-1	
5	1	54	1	1	1	552	1409	968	12	95.000000	 
2	1	55	0	0	0	551	1241	970	13	-1	
3	1	55	1	0	0	551	1241	970	13	-1	
4	1	55	1	1	0	551	1241	970	13	-1	
5	1	55	1	1	1	551	1241	970	13	95.000000	 
2	1	56	0	0	0	551	1076	969	12	-1	
3	1	56	1	0	0	551	1076	969	12	-1	
4	1	56	1	1	0	551	1076	969	12	-1	
5	1	56	1	1	1	551	1076	969	12	95.000000	 
2	1	57	0	0	0	552	908	969	12	-1	
3	1	57	1	0	0	552	908	969	12	-1	
4	1	57	1	1	0	552	908	969	12	-1	
5	1	57	1	1	1	552	908	969	12	95.000000	 
2	1	58	0	0	0	721	2423	802	9	-1	
3	1	58	1	0	0	721	2423	802	9	-1	
4	1	58	1	1	0	721	2423	802	9	-1	
5	1	58	1	1	1	721	2423	802	9	95.000000	 
2	1	59	0	0	0	719	742	802	10	-1	
3	1	59	1	0	0	719	742	802	10	-1	
4	1	59	1	1	0	719	742	802	10	-1	
5	1	59	1	1	1	719	742	802	10	95.000000	 
2	1	60	0	0	0	719	571	802	10	-1	
3	1	60	1	0	0	719	571	802	10	-1	
4	1	60	1	1	0	719	571	802	10	-1	
5	1	60	1	1	1	719	571	802	10	95.000000	 
2	1	61	0	0	0	720	386	801	11	-1	
3	1	61	1	0	0	720	386	801	11	-1	
4	1	61	1	1	0	720	386	801	11	-1	
5	1	61	1	1	1	720	386	801	11	95.000000	 
2	1	62	0	0	0	1491	402	63	2592	-1	
3	1	62	1	0	0	1491	402	63	2592	-1	
4	1	62	1	1	0	1491	402	32	2592	-1	
5	1	62	1	1	1	1493	2879	22	115	89.403236	Consultant
5	1	62	1	1	2	1492	2817	23	56	96.807228	Total
5	1	62	1	1	3	1491	2745	24	68	90.495430	Direct
5	1	62	1	1	4	1492	2676	31	64	94.926300	Labor
5	1	62	1	1	5	1511	2237	3	3	61.676353	3
5	1	62	1	1	6	1500	1695	5	3	33.122261	2
5	1	62	1	1	7	1491	402	24	116	61.535564	$30,540.55
4	1	62	1	2	0	1532	443	22	180	-1	
5	1	62	1	2	1	1532	541	22	82	68.667816	PAGE..
5	1	62	1	2	2	1534	443	20	37	85.081230	OF
2	1	63	0	0	0	1502	385	29	2556	-1	
3	1	63	1	0	0	1502	385	29	2556	-1	
4	1	63	1	1	0	1502	385	29	2556	-1	
5	1	63	1	1	1	1502	385	29	2556	95.000000	 
2	1	64	0	0	0	2251	2487	59	506	-1	
3	1	64	1	0	0	2251	2487	59	506	-1	
4	1	64	1	1	0	2251	2741	25	252	-1	
5	1	64	1	1	1	2252	2946	20	47	96.786308	Cost
5	1	64	1	1	2	2251	2850	25	89	44.459465	Propose]
5	1	64	1	1	3	2251	2741	25	101	70.431198	Summary
4	1	64	1	2	0	2282	2487	28	506	-1	
5	1	64	1	2	1	2283	2894	27	99	96.955879	Maricopa
5	1	64	1	2	2	2283	2811	26	77	6.699514	Country
5	1	64	1	2	3	2283	2681	26	124	89.860443	Deparment
5	1	64	1	2	4	2282	2644	22	29	95.548790	Of
5	1	64	1	2	5	2283	2487	25	154	95.548790	Transportation
2	1	65	0	0	0	2543	877	5	407	-1	
3	1	65	1	0	0	2543	877	5	407	-1	
4	1	65	1	1	0	2543	877	5	407	-1	
5	1	65	1	1	1	2543	877	5	407	95.000000