CONSULTANT CHANGE ORDER - BOS APPROVAL
Maricopa County Department of Transportation
Change Order Number: 10
Date: 4/19/2017 Amount:] $ 252,395.61 Agenda Item No.| C6414124500
Contract No:| 2013-041 | Work Order No:[__TT0347
Consultant Name:| Stanley Consultants, Inc.
Project Name:| Northern Parkway: Dysart Road to 111th Avenue
Initial Amount:| $1,250,103.68 Contract Award Date:| 5/7/2014 Total Prior Change orders $808,424.36
By mutual agreement of the parties, the following contract change(s) are incorporated into the above-identified contract. All other contract terms and conditions
remain unchanged.
Change Order No. 10 shall increase the contract amount $252,395.61 for additional roadway design, structural design, and updates. Much of the
changes resulted from the agency management direction and has been agreed to by the Northern Parkway Executive Committee. The attached
Scope of Work and Cost Proposal include additional labor and direct expenses required to complete the remaining tasks. Also, this change
order shall extend the contract performance period an additional 254 calendar days.
By reason of this change 254 days extension of time will be allowed.
The contract completion date is: February 1, 2018.
The following financial information is submitted:
Initial Contract Amount $ 1,250,103.68
Amended Contract Amount wW/ previous change orders $ 2,058,528.04
Current Change Order Request $ 252,395.61
Amended Contract Amount w/ current change order $ 2,310,923.65
We, the undersigned Consultant, do hereby agree that upon execution of this Change Order that we will perform all work as identified above, and as may be described in
attachment(s) and will accept the above specified amount(s) as full payment thereof.
IN WITNESS WHEREOF, the parties herein have executed this Contract Change Order:
Principal (Signature) Federal Tax ID Number: 4 2 | 3 2o i Ss B
Printed Name
Title:
Date Ac 2.20 (79
CITY of XXXXXXXXXX APPROVAL
I certify that this change is required for this contract.
Project Manager: Date:
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION
1.
I certify that this change is required for this contract
Ben Maho 4-19- [7 Yfeoff 7
EZ
Project Manager Date AA * Date
@ available ish this Change Order
EZ y,
CIP Cash Flow Manager Date Division Manager i S| Date
| certify that this change is within the limits authorized by the Maricopa Ld
/
COUNTY APPROVAL
ACCEPTED AND APPROVED:
Chairman, Board of Supervisors Date
ATTEST:
LEGAL REVIEW
Approved as to form and within the powers and authority granted under the
laws of the State of Arizona to the Maricopa County Department of Clerk of the Board Date
Transportation.
Deputy County Counsel Date
Distribution: Originals - Consultant, Contracts Branch, Clerk of the Board Copies - Finance, Project Manager, City Partner (if applicable)
Revised 4/19/2017

S>
Consultants
Stanley inc
A Staniey Group Company
Enginessing, Endtonmental ard Construction Services - Wordivide
April 5, 2017
Mr. Benjamin Markert, P.E.
Project Manager
Maricopa County Department of Transportation
2901 West Durango Street
Phoenix, Arizona 85009
Re: MCDOT Contract No: 2013-041
Project No. TT347,
Northern Parkway Phase II:
Dysart Road to 111" Ave
Proposed Change Order No. 10
Supplemental Agreement -- $252,395.61
Dear Mr. Markert:
Enclosed is our proposed change order request for changes to the scope of the project as outlined in the attached Scope of
Services for Contract Modification No. 10 on the Northern Parkway Phase II Design Project.
To address these scope changes, we are requesting a change order addition to our current contract and increasing the
“Not to Exceed” contract amount by $ 252,395.61. Documentation of the derivation of this fee is attached. All
salaries and rates used to establish the increase are in conformance with the contract.
Sub consultants will be used for 22.09% for this contract modification.
DBE Participation in this contract modification is 0%. The contract DBE goal is 4.82%. The updated composite
project DBE participation inclusive of Modifications 1 thru 10 is 5.34% which is conformance with the stipulated
contract DBE goal. The proposed scope changes do not include elements of work impacting the work of our DBE
consultant.
Should you questions or should you require further information, please contact me at (602) 291-7801.
Sincerely,
STANLEY CONSULTANTS INC.
Michael R. Chase, P.E.
Vice President
CC: Project Files (25303)
1661 East Camelback Road, Suite 400 » Phoenix, AZ 85016 + phone 602.333.2200 + fax 602.333.2333
internet: www.stanleyconsultants.com

CONTRACT SUMMARY
Contract 2013-041
Change Order #10
TT 347 Northern Parkway Phase Il - Dysart Road to 111th Avenue
Amount Description
$1,250,103.68
$0.00 Add Subconsultant AZTEC Environmental to contract
$0.00 Contract Time Extension
$0.00 Add Terracon CAD Operator classification to contract
$72,954.57 Terracon Fissure Field Investigation
$208,068.43 Aztec PISA and Environmental/Cultural Field work
$332,251.37 Scope Modifications and additional design
$66,660.99 Aztec Additional Cultural Field Work
$0.00 Contract Time Extension
$128,489.00 Aztec Compl Activities Cultural Field Work
$252,395.61 NP Scope revisions, bridges, walls, drainage
$2,310,923.65
Contract 2013-041
Project: TT347 Change Order #10

SCOPE OF SERVICES
Design Change Order No. 010
NORTHERN PARKWAY: DYSART ROAD TO 111TH AVENUE
PROJECT NO. TT347
CONTRACT NO. 2013-041
TRACS NO. 0000 MA MMA SZ046 03D
FEDERAL AID NO. STP-MMA-0(239)F
STANLEY CONSULTANTS:
Basis for Contract Modification
This change order package is for additions, revisions, and updates associated with the design
of roadway, structures, and drainage work elements for Northern Parkway — Dysart Road to
111% Avenue. The original design services are specified in the Design Services Project No.
TT347, Northern Parkway: Dysart Road to 111'" Avenue dated May 7, 2014.
General:
Item 1. Project Management and Coordination: Stanley will perform additional project
coordination and project management services for an additional six (6) months resulting from
extension of the design schedule.
Stanley will attend coordination meetings with MCDOT as requested to support resolutions of
R/W or other development coordination of unforeseen items including Marbella drainage,
Premier RV access, and CMEX / Inert landfill access discussions.
Stanley will attend six (6) additional monthly progress meetings resulting from the extended
design schedule and prepare meeting notes per the requirements of the original contract. The
original contract end date was set at January 18, 2015 which was extended to September 15,
2015 by zero dollar Change Order no. 2 —and extended to May 23, 2017 by zero dollar
Change order no. 8. Additional contract time extension will be needed to address completion
of the project.
Project: TT347 Contract 2013-044
Change Order #10

Item 2. Quantity Take-Offs: Stanley will perform quantity take-offs on all additional scope of
work items in this contract modification per the requirements of the original project contract.
Item 3. QA/QC: Stanley will perform QA/QC on additional scope of work items in this scope
modification per the requirements of the project QA/QC plans.
Roadway:
Item 1. Roadway Modeling:
Update roadway modeling for the addition of Dysart Road retaining walls
Update earthwork calculations and report for adding mainline embankment to full height at
Dysart Road approaches
Item 2. Plan Revisions:
Update roadway typical sections for addition of Dysart Road retaining walls and final grading in
ramp / wall infields.
Update topo base file for partial basin excavation and soil stockpile from El Mirage storm drain
construction.
Item 3. Waterline Extensions:
Prepare waterline extension plans from El Mirage to Dysart to serve landscaping services
north of the Northern Avenue section line with El Mirage water system.
Drainage:
A preliminary drainage memo and box culvert weir analysis was performed to establish the
basis of modifications to the 127th Ave box culvert and Hanson Channel offsite drainage
system. Drainage work hours were estimated for drainage modifications to the Northern
Parkway Project - Dysart Road to 111th Avenue. Proposed modifications include alternative
analysis for realignment and resizing of the 127th Ave box culvert and inclusion of a weir
outfall for the reconfigured 127th Ave box culvert. The new weir outfall will be designed
between Dysart Road and 127th Ave to match the existing roadway weir overflow condition in
existing Northern Parkway. Modifications to the onsite storm drain systems include separating
the onsite and offsite flows with the inclusion of storm drain trunk line(s) that will outfall to the
El Mirage Basin. First Flush for these roadway improvements will be relocated and treated in
the El Mirage Basin.
The following work descriptions detail the required drainage design efforts required for the
proposed modifications to the drainage plans, report and estimate. These work efforts include
updating the Pre-Final Plans for a 95% and 100% submittal of the modifications.
Project: TT347 Contract 2013-041
Change Order #10

Item 1: Alternatives Analysis - 127th Avenue RCBC and Hanson Channel:
e Preliminary Box Culvert and Weir Analysis (CulvertMaster, Existing Condition Analysis):
Work efforts to develop the existing condition flow patterns during a 100-year return
event using a culvert and weir analysis approach. Effort also include alternative analysis
for downsizing and reconfiguring the 127th Avenue box culvert.
e Drainage Memo and Exhibit for Weir Alternative: Work efforts to develop a Preliminary
Drainage Memo and Exhibit to present the findings of the analysis.
e Alternative Storm Drain Analysis (Trunk Line(s) - Dysart to El Mirage): Work efforts
needed to develop the proposed hydraulic analysis and layout for the storm drain trunk
line system needed to separate onsite and offsite flows.
e First Flush Treatment Alternatives (El Mirage Basin): Efforts needed to develop an
alternative for the First Flush Treatment of onsite flows at the El Mirage Basin.
Item 2: Final Design Analysis - 127th Avenue RCBC and Hanson Channel:
e Final Weir Hydraulic Analysis (HEC-RAS Existing Condition): Efforts needed to develop
the existing condition for 100-year flows crossing Northern Parkway between Dysart
Roan and 127th Avenue.
e Final Weir Hydraulic Analysis (HEC-RAS Proposed Condition): Efforts needed to
develop the proposed condition for 100-year flows crossing Northern Parkway between
Dysart Road and 127th Avenue.
e Storm Drain Hydraulic Analysis (StormCAD, Proposed Condition): Efforts needed for
the hydraulic analysis of the preferred alternative storm drain configuration between
Dysart Road and El Mirage Road.
Item 3: Drainage Modifications - Dysart Road to El Mirage Road:
e Summary of Estimated Drainage Quantities (2 Sheets): Work hours to update the
drainage quantities for changes to the storm drain system, box culvert and proposed
weir between Dysart Road and 127th Avenue.
Project: TT347 Contract 2013-041
Change Order #10

e Street Transportation Storm Drain Design Summary Sheet (1 Sheet): Work hours
needed to update the storm drain parameters on the design summary sheet.
¢ Storm Drain Profiles (6 Sheets, 30 Pipe Profiles): Work hours estimated to prepare the
updated storm drain profiles between Dysart Road and 127th Avenue.
e Box Culvert (127th Ave) Plan and Profile (1 Sheet): Effort needed to update the box
culvert plan and profile for the realigned and reconfigured box culvert at 127th Avenue.
Results from the alternative analysis will be used to potentially reduce the number of
cells in the box.
e Weir Detail (Dysart Road to 127th Avenue) (1 Sheet): Work hours needed to develop a
concrete and riprap weir detail that will be integral to the south edge of the Dysart Road
Southeast First Flush Basin.
e Drainage Plan (6 Sheets): Work hours estimated to update the drainage plan sheets for
the new storm drain system, box culvert, weir analysis and first flush treatment.
e Update Final Drainage Report: Efforts needed to update the Final Drainage Report for
the modified storm drain system, box culvert, weir analysis and first flush treatment.
Structures:
Item 1 Agua Fria River Bridge Design - Modifications:
Revise the current bridge design and construction plans to construct the bridge with six lanes
(3 + 3 with shoulders) and an open median.
The substructure and foundations shall remain as currently designed for the ultimate bridge
width.
The revised design shall consider the future expansion of the bridge to close the median and
elements needed to facilitate ease of median closure will be included in the updated design.
The future widening will require removal of interior barriers; placement of additional girders,
construction of diaphragms, widened deck and a new median barrier. Lighting will be moved
to the outside of the bridge to eliminate need for future replacement.
item 2 Wall Design - Plans - Dysart:
Add retaining wall plans at the Dysart Road approaches to eliminate/minimize future disruption
of interim traffic flow on the adjacent roadways in following phases of construction.
Project: TT347 Contract 2013-041
Change Order #10

Wall plans will include General Notes, key plan and quantities, wall location plan, plan sheets,
wall elevations, sections and details, initial concept development for future Dysart Road Bridge
to ensure compatibility with the walls, quantities, estimate and special provisions.
Traffic Signals
Change traffic signals at Dysart Road and El Mirage Road to MCDOT equipment and design
standards and revise plans to MCDOT signal formats. Revise signal specifications to MCDOT
standards.
Sub-consultant — Parsons Brinckerhoff
(see supplemental scope of work with Parsons Brinckerhoff backup)
Project: TT347 Contract 2013-041
Change Order #10

FEE PROPOSAL - TABLE A
CONSULTANT
COST PROPOSAL SUMMARY
CONSULTANT NAME: STANLEY CONSULTANTS, INC. CONTRACT No. CY 2013-04]
PROJECT NAME: NORTHERN PARKWAY: DYSART ROAD TO I1ITH AVENUE
EEE DIRECT: LABOR En
Classi: n-hours $220" Hourly Rates a Labor: Casts
: ~
Project Principal 0 $ 84.25] $ -
Project Manager 36 $ 82,93 | $ 2,985.48
Senior Engineer 116 $ 65.50 | $ 7,598.00
Project Engineer 505 $ 50.57 | $ 25,537.85
Engineer/ Designer 432 $ 36.77 | $ 15,834.64
Cadd Technician 403 $ 31,8815 12,847.64
Admin is] $ 28.80 | $ -
Consultant's Subtotal Direct Labor $ 64,853.61
Consultant's Overhead @ 175.63% S$ 113,902.40
Consultant's Profit @ 10% of Direct Labor + Overhead $ 17,875.60
Consultant's Total Direct Labor s 196,631.61
= cae TSIDE EXPENSES
een
| Quanti
Description © Rate. - ‘Expense Amount.
Vehicle Mileage $ 0.56 0 $ -
Photo Copies, 8 1/2" x 11" Ea(B&W) $ 0.05 0 $ -
Photo Copies, 11" x 17" Ea (B&W) $ 0.17 0 $ -
Photo Copies, 22" x 34" Ea (B&W) $ 1.20 0 $ -
Full Size Bond (ea 24X36) S 1.20 0 $ -
Binding, Each s 15.00 0 $ -
Deliveries S$ 20.00 0 $ ~
Consultant's Total Direct and Outside Expenses $ -
ee SUBCONSULTANT(s) 2 : pera
NAME OF SUBCONSULTANT: = TASK “TOTAL COST:
~
Parsons Brinckerhoff Roadway, Drainage, Traffic s 55,764.00
Terracon
Total Subconsultant(s) $ 55,764.00
Consultant's Total Direct Labor $ 196,631.61
Consultant's Total Direct and Outside Expenses s -
Total: $ 196,631.61
Consultant's Totals of Direct Labor and
Direct and Outside Expenses $ 252,395.61
Optional Task Fee 0
*TOTAL PROPOSED FEE $ 252,395.61
(inclusive of C liant and Subc Hant{s} total proposed fee.)
* Contract Type Not
5	1	71	1	1	5	1327	2513	37	22	95.773552	To
5	1	71	1	1	6	1374	2511	116	24	95.750008	Exceed
Stanley Consultants, Inc.
Fi
(Signature) Michael! R. Chase
Vice President
Title
04-05-17
Date
Contract 2013-041
Project: TF347 Change Order #10

#10
36] 116) 505 432) 403 1492) 2013-041 Order
[Totals Contract Change
0:
2013-041
Dec
#10
NO:
Order
CONTRACT Nov Q
Change
Oct
Sep 42. 18 127
26°": . .
Aug 80 “2150 142 402
B MAN-HOURS Boor
Jul 4 8 78 36 162
TABLE MAN-HOURS
ESTIMATED
- Jun B.. 26 120 . 150 142 446
CONSULTANT/SUBCONSULTANT PROJECT
PROPOSAL
SCHEDULED May 14 80 36 182
FEE
Apr 26 68 40 25 163
AVENUE 20
INC.
stist[ st) stpt
111TH
CONSULTANTS, TO
ROAD Feb
STANLEY DYSART Jan
NAME: 81.25 82.93 65.50 S0.57 36.77 31.88 28.80
PARKWAY; For] vo
EM) n|wfaianfion
NORTHERN
CONSULTANT/SUBCONSULTANT 2017 PERSONNEL Designer Total
NAME: 5, Principal Manager Engineer Engineer Technician T1347
April
PROJECT DATE: MAN-HOURS PROJECT Project Project Senior Project Engineer/ Cadd Admin Project:

#10
2013-041 Order
$0.00 $2,776.32 $0.00 $995.16 $2,606.52 $0.00 $3,726.98 $22,718.80 $27,449.75 $2,442.72 $0.00 $2,137.36 $64,853.61 Contract Change
2013-041 TOTAL LABOR
NO: 0 36 0 12 48 100 562 616 52 1,492
CONTRACT TOTAL MAN-HOURS
Admin ($/HR) 28.80 Sfolol/a
$
Cadd Tech (SAAR) 31.88 18 124 229 32 403
$
Eng/Dsg nr (S/H) 36.77 72 282 10 28 40 432
$
LABOR Proj Engr ($/HR) 50.57 36 10 122 329 $05
$
DIRECT Eng ($/EIR) 65.50 0 12 12 0 34 Ag 6 4 116
Sr
C AND PM (S/R) 82.93 0 24 0 12 0 PlLOfeElo oO
TABLE CONSULTANT/SUBCONSULTANT | $
MAN-HOURS CLASSIFICATIONS PP (S/BRR) 81.25 0
AVENUE $
INC.
ESTIMATED 111TH R/W
CONSULTANTS, TO LABOR
ROAD DIRECT Hrs) Development
@ 3
STANLEY DYSART Mtgs Adjacent MOT)
TASK/PHASE (6 for Walls Signals,
NAME: PARKWAY; Meetings Hours
MCDOT/Land Dysart Lighting, Total
CONTRACT Progress /
Bridge
with
NAME:_NORTHERN Coordination Monthly Fria (Signing,Marking,
CONSULTANT/SUBCONSULTANT 2017 Meetings Aqua
5, Project MCDOT & Administration Design Design Design Take-off
April Control Design T1347
PROJECT DATE: Additional Additional Coordination Project Quality Roadway Drainage Structure Traffic Quantity Project:

#10
$1,287.04 $0.00 $421.68 $210.84 $1,807.42 $3,726.98 2013-041 Order
2013-041 TOTAL LABOR
Contract Change
NO: 50 50
MAN
CONTRACT HOURS
TOTAL
Admin (S/HR)} 28.80
S$
Admin ($/HR) 28.80 0
| $
Tech 31.88
(S/R) 12 18
Cadd $
|
Dsgnr 36.77
(S/R) 72
Eng/ |S
Engr $0.57
(S/HR) 10
Proj 1 $
CLASSIFICATIONS Eng (S/HR) 65.50
Sr | $
PM (S/BIR) 82.93
LABOR
| $
DIRECT PP (S/HR) $1.25
AVENUE
ENC. Constr. Dysart
111TH SD to
CONSULTANTS, TO Mirage Mirage
ROAD El E]
from line
STANLEY DYSART TASK/PHASE stockpile Section
soil Ave Hours
NAME: PARKWAY: and Northern Total
CONTRACT earthwork excavation of
north
recalc basin
NAME:_NORTHERN irrigation
CONSULTANT/SUBCONSULTANT 2017 Iten adjustment/ revisions partial
5, Design Modeling for Additions serve
April Walls Revisions Sections plans to TT347
PROJECT DATE: Roadway Roadway Dysart Pian Typical Update ‘Waterline Waterlines Project:

.
#10
LABOR $248.22 $275.82 $2,116.76 $627.44 $0,00 $1,254.88 $774,52 $2,803.92 $1,797.12 $834,80 $5,284.44 $1,029.56 1,093.32 2,957.68 1,620.32 $22,718.80 2013-041 Order
Contract Change
2013-041 TOTAL
NO: MAN 6 6 o w 14 0 28 18 64 48 22 138 26 28 76 38 $62
CONTRACT HOURS
|TOTAL
28.80
Admin (S/HR)
2880]$
Admin (S/HR) 0
Tech] 31.88]5
(S/HR) QO, olea 0 0 6 16 6 60 8g 10 24 0 124
Cadd
Dsgnr| 36.77]8
(S/HR) 32 16 12 40 24 12 48 12 12 36 24 282
|Eng/
Engr 50.57]5
(S/HR) s) = 8 7+ 16 & 4 24 4 + 12 2 122
j{Proj
Eng 65.50)8
(S/HR) Slo] NIN TENTS DENT AT SE 34
Sr
CLASSIFICATIONS 82.93|]%
PM (S/HR) 0
LABOR ) $81.25]S
sur 0
¢ $
DIRECT
INC. AVENUE Analysis)
111TH Condition Channel}
CONSULTANTS, TO Channe!
ROAD TASK/PHASE Hanson Existing Mirage) Hanson Road Sheet)
El to and Condition) Condition) Condition) Mirage (i Hours
STANLEY DYSART and (CulvertMaster, Dysart RCBC El Sheet Total
CONTRACT RCBC - Basin) Existing Proposed Proposed to Sheets) Summary Sheet) Sheet)
NAME: PARKWAY: Avenue Altemative Line(s) Mirage Avenue Road (2 Profiles) (1 (1
Analysis (Trunk (El th (HEC-RAS (HEC-RAS (StormCAD, Dysart Quantities Design Pipe Profile Avenue)
127th - Weir Weir for 127 - - Drain 30 and 112th
NORTHERN Analysis and Exhibit Analysis Altermatives Analysis Analysis Analysis Analysis Modifications Drainage Storm Sheets, Plan to Report
Culvert Drain (6 Ave) Road Sheets)
CONSULTANT/SUBCONSULTANT NAME:_ 2017 5, Box and Storm Treatment Design Hydraulic Hydraulic Hydraulic Estimated Profiles (112th (Dysart (6 Drainage
April Alternatives Memo Final Drain Drainage of Transportation Drain Plan Final
Preliminary Alternative Flush Weir Weir Culvert Detail T1347
PROJECT DATE: 1: Hem Drainage First 2: Item Final Final Storm 3: Item Summary Street Storm Box Weir Drainage Update Project:

#10
2013-041
Order
$1,450.20 $863.62 $169.18 $0.00 $0.00 $496.44 $496.44 $0.00 $0.00 $464.56 $0.00 $266.04 $532.08 $363.42 $395.30 $395.30 $0.00 $0.00 $363.42 $183.59 $399.06 $399.06 $790.60 $0.00 $1,386.44 $1,450.20 $3,410.48 2,750.88 $1,725.50 $1,725.50 1,749.24 $470,06 $1,929.52 $267.78 $698.72 $1,857.12 $27,449.75 Contract Change
LABOR
2013-041 TOTAL
NO: 34 19 5 0 0 11 11 0 0 Q — DOLD coal ID FOS 60 | tr Hi H[Opo pant 32 34 36 68 39 39 34 9 42 5 16 32 $68
MAN
CONTRACT TOTAL HOURS
|
28.80
Admin waR)
| 28.80)$ 0}
Admin (mR
|
Tech] 3188]1s 229
GR 16 6 3 4 4 nm pst pea] st [sr ey me ben fem | CO 14 16 48 40 14 14 12
Cadd
| 36.77|/$ 10
Dsgnr]
GR) 2 8
Engr]Eng/ |
5057|$ 329
(sR) 16 12 6 6 6 SPypoa sr pst dsr ST] FO PO] CO 16 16 32 24 wt N 24 32 8 28 4 8 or =
{Proj
CLASSIFICATIONS | 65.50]$ 48
Eng (rar) 2 1 ] 1 ] I I 1 i 2 CUED SD ESE PE Fraps oO =
Sr
| 82.93] 0
LABOR
PM (S/R)
DIRECT | g125}8 0
PP (s/eoR)
5
AVENUE
INC.
111TH
CONSULTANTS. TO
ROAD
STANLEY DYSART
TASK/PHASE
Modifications Hours
NAME: PARKWAY: - Evaluation/Selection Update Total
CONTRACT Design Plan Evaluation Memo Estimate
Details Dysart
Bridge Quantities Elevation Elevation Details Details Joint - & Key Concept Type Selection
NAME:_NORTHERN River Elevation Geometrics & and & Details Plans - scale) Details Details Wall
CONSULTANT/SUBCONSULTANT 2017 5, & Notes Details and and Elevation Details Section Details Details Expansion 1 2 Design Quantities Plan sheets) (10 and Wall Bridge Bridge Bridge Provisions Take-off/Construction
April Fria and Section Plan, Plan Plan 1 Plan 2 Sections Details & Plan Details Details & Details Elevations Elevations Structure Notes, (4 Elevations OP OP OP
Agua Plan Shaft Wall & Sections Details Deck Diaphraem Pad Pour Wall Location Sheets Sections Rd Rd Rd Special T1347
PROJECT DATE: Item 1 General Typical Location Foundation Drilled Abutment Abutment Abutment Wing Plan Pier Pier Girder Framing Typical ‘Diaphragm Pier Restrainer Bearing (Deck Camber Screed Screed Drainage 2 Item General Wall Plan ‘Wall Walls Miscellaneous Dysart Dysart Dysart Wali Quantity QA/OC Project:

2013-041 #10
Order
TOTAL LABOR $1,082.32 $1,082.32 $278.08 $2,442.72 Contract Change
2013-041
NO: MAN 30 30 6 66
CONTRACT TOTAL HOURS
|
Admin (S/H) 28.80
$
Admin GR) 28.80
|
Tech} GAR) 31.88] 16 16
Cadd
| | 3677/8
Dsgnur Gar 2 an “4 4
Engr] | 5057/8
(aR)
|Proj |
CLASSIFICATIONS Eng 655015
Gar) aot 2
Sr
| 8293/8
LABOR PM (HR)
DIRECT | si2s|s
PP aR) 0
s
AVENUE
111TH Format
TO & Format
INC. ROAD Equipment & Equipment
Equipment
DYSART
CONSULTANTS, TASK/PHASE MCDOT MCDOT Specifications, Hours
to
PARKWAY: Revise to Total
CONTRACT - Revise MCDOT
STANLEY Mirage - to
NORTHERN El Dyasrt Update
NAME: & & -
NAME: 2017 5, Items Northern Northen
CONSULTANT April Design Plans, Plans, Specificaitons TT347
PROJECT DATE: [Traffic Signals Signal Signal Signal Project:

2013-041 #10
Order
2013-041 $0.00 Contract Change
TOTAL LABOR $496.44 $496.44 $1,144.48 $2,137.36
NO:
CONTRACT | 12 12 28 0 52
TOTAL MAN |HOURS|
|
Admin (SHR) 28.80
Tech| | 31.88]S
Cadd (mR)
Dsgnr| | 36.7718 8 8 24
(HR)
Engr|Eng/ | 50571$ 4 4
($mmR)
{Proj | 655018 4
Eng (S/R)
Sr
| | 829318
pM (sR)
g1.25]$
SAR)
$
INC. AVENUE
111TH
CONSULTANTS, TO
ROAD Walls
STANLEY DYSART Retaining
TASK/PHASE
Dysart Hours
NAME: PARKWAY: and Total
CONTRACT Bridge
Fria
NORTHERN Agua Plans
CONSULTANT/SUBCONSULTANT 2017 Plans Plans Plans Control
NAME: 5, April Roadway Drainage Structure Traffic
T1347
PROJECT DATE: Revised Revised Revised Revised Project:

2013-041 #10
Modification
2013-041 TOTAL LABOR $666.56 $1,089.46 $1,071.12 $0.00 $0.00 $2,776.32 $303.42 $995.16 $6,902.04 Contract Contract
NO:
CONTRACT 12 22 20 0 54 0 36 6 12 34 108
TOTAL MAN HouRS|
wr st
INC. AVENUE Subtotal 2hrs) Subtotal
111TH @ Mtgs
CONSULTANTS, TO (3
ROAD Hrs) Technical
3 @
STANLEY DYSART TASK/PHASE Mtgs MCDOT
(6 & Hours
NAME: PARKWAY; Meetings Total
CONTRACT MCDOT/ROW
QC/OA Progress
NORTHERN OC/OA QC/QA OC/OA. Plans Coordination Monthly with
CONSULTANT/SUBCONSULTANT 2017 Plans Plans Plans Control Meetings
NAME: 5, April Roadway Drainage Structure Traffic Project MCDOT & Administration
T1347
PROJECT DATE: Revised Revised Revised Revised Additional Additional Coordination Project Project:

BoWSP | caicktuorr
350 W. Washington Street
Suite 300
Tempe, AZ 85281
Main: 480-966-8295
Fax: 480-966-9234
www.pbworld.com
March 14, 2017
Mr. Mike Chase, P.E.
1661 E. Camelback Rd, Suite 400
Phoenix, AZ 85016
Re: Northern Parkway: Dysart Road to 111 Ave
Contract Modification No. 2
MCDOT Contract No.: 2013-41
Dear Mr. Chase,
Attached please find our scope and cost proposal for Contract Modification No. 2 for the
project. The design modifications included are based on direction provided by Stanley on
February 15‘" and comments provided on March 13".
Please contact me if you have any questions or need additional information. We look forward
to working with you on this project.
Sincerely,
Parsons Brinckerhoff
“Ad bi
Zahit Katz, P.E.
CC: Cari Clark; PB

BWSP | BB as0er
Stanley
Contract No. 2013-041
T1347 Northern Parkway: Dysart Rd to 111 Ave
Contract Modification (CM) No. 2 - Revisions to Final Design Tasks
March 14, 2017
SCOPE OF SERVICES:
The TT347 project consists of advancing the conceptual plans documented in the August 14, 2013
Final Scoping Plans prepared by Parsons Transportation Group to the final design stage, providing
bid ready sealed documents. The project limits are along Northern Parkway from Dysart Road to
111% Avenue. The work to be performed by PB under this CM is documented in the Work Tasks
described below. PB will be a sub-consultant to Stanley Group (Prime).
On February 10, 2015, Stanley Group (Stanley) requested that Parsons Brinckerhoff (PB) prepare
CM 1 for revisions to the design shown on the Pre-Final submittal (October 2014). These changes
were based on direction provided by MCDOT. The CM 1 was executed, however, MCDOT put the
project on hold.
On February 13, 2017, a design meeting was held with Stanley to discuss the status of the project
and Stanley provided an update on the design modifications to be implemented on the project. This
CM incorporates requested changes that were not included with CM 1.
WORK TASKS:
Task 1A: Revisions to El Mirage Rd
e Revise El Mirage Rd design to assume MCDOT’s El Mirage Rd Project (connecting to the
north leg of El Mirage Rd being constructed with this project) will be completed at the time
this project is under construction.
e Revise the on-site drainage system along El Mirage Rd to connect to the drainage system
that is currently being built by MCDOT. The system that is currently under construction will
be shown as an existing drainage system on PBs plans.
The following shall be incorporated into the design:
Revise typical sections
Revise connection of El Mirage Rd at north leg to match El Mirage Rd project
Revise El Mirage Rd plan sheets
Revise El Mirage Rd curb and gutter profile sheets
YVUUGUUYUY New Driveway Plan and Profile Sheets
Revise driveway entrance to Premier parcel and modify median configuration
Revise drainage sheets as needed to connect to the drain system built by MCDOT
Revise drainage profile sheets
Revise signing and striping plans
Project: TT347, CM No. 2 1

BWSP | BSS vor
DELIVERABLES
=> 95%, 100% and Sealed plans, specs and estimates for the above listed elements of work.
Task 1B: Revisions to Northern Parkway from New Aqua Fria Structure to Existing Roadway
at 111" Ave.
e Revise connection from Agua Fria Bridge to Northern Parkway based on new bridge
configuration (by Stanley)
e There will be a total of 2 deceleration and acceleration lanes along the Northern Parkway with
driveway connections (Stanley to provide exact locations)
The following sheets will be updated to incorporate new design at 115" Ave and at 111" Ave:
=> Design, model and add deceleration and acceleration lanes at above said locations.
=> Update the Typical Section Sheets
= Update Roadway Plan Sheets for new alignment
= Create new driveway plan and profile sheets
= Update Roadway Profile Sheets
= Update Sign Summary Sheets
=> Update drainage as needed for the new alignment
=> 2 new Driveway Plan and Profile Sheets
DELIVERALBLES
e 95%, 100% and Sealed plans, specs and estimates for the above listed elements of work.
Task 2: Additional Miscellaneous Revisions
The following additional design items shall be incorporated in the design:
e Update north leg of Dysart Rd to connect to a 4-lane ultimate section.
e Update all Removals Sheets to reflect new conditions and removals that have taken place.
Stanley will provide PB with the necessary changes to be incorporated.
e Update MOT and construction phasing for entire project.
e One additional plan submittal is anticipated that was not previously scoped (Pre-Final, Final
and Sealed to Pre-Final, 95%, 100% and Sealed). Added hours for attendance of meeting,
review comments and incorporation of comments in the bid documents.
DELIVERALBLES
e 95%, 100% and Sealed, specs and estimates for the above listed elements of work.
Task 3: Project Coordination
Due to delays in the completion of the project (original date was February 2015), it is assumed the
project schedule will be finalized in September 2017. It is assumed that 1 member of PB will attend
4 additional progress meetings at the County and 1 additional meeting at Stanley to discuss design
and progress efforts.
Schedule:
Project: TT347, CM No. 2 2