C-17-09-052-3-00 PROGRAMMATIC AGREEMENT WITH CITY OF GLENDALE.PDF
Extracted text (via pymupdf_layout)
30449 characters
C-6860 04/14/2009 PROGRAMIVIAT1C AGREEMENT between the CITY OF GLENDALE and the ARIZONA STATE HISTORIC PRESERVATION OFFICE regarding HUD-FUNDED PROGRAM ACTIVITIES WHEREAS, in response to the numerous programs undertaken by the City of Glendale (CITY) with the U.S. Department of Housing and Urban Development (HUD) funding sources; WHEREAS, Maricopa County is the entity that certifies reviews and has acknowledged the Agreement and the participation of the other parties in the Agreement; WHEREAS, the CITY has determined that implementation of these HUD-funded programs will result in Undertakings, as defined in 36 CFR Part 800.16, that may affect properties listed in or eligible for the National Register of Historic Places (Historic Properties) and/or culturally-significant sites, and the CITY has consulted with the Arizona State Historic Preservation Officer (SHPO) pursuant to 36 CFR Part 800, implementing Sections 106 and 110(f) of the National Historic Preservation Act (NHPA), 16 U.S.C. Part 470; WHEREAS, as a result of funding sources administered by the CITY, the CITY will in turn provide monies and other assistance to programs. subrecipients and eligible applicants to alleviate the effects of housing deterioration and facilitate infrastructure improvements, demolition, new construction, renovation, reconstruction and acquisition activities. The CITY through its Community Revitalization Division (CRD) will be responsible for administering the terms of this Programmatic Agreement (Agreement); WHEREAS, any and all activities that involve less than one acre shall be exempt from any required archeological environmental study; and WHEREAS, no adverse effects will result in adhering to these standards to any eligible properties or listed eligible properties listed in the State of Arizona or National Register of Historic Places. NOW, THEREFORE, the CITY and SHP° (also sometimes hereinafter referred to as "Party" or "Parties') agree that these HUD-funded programs will be administered in accordance with the following stipulations to satisfy the CITY's Section 106 responsibilities for all Undertakings for achieving the national policy of providing affordable housing and preserving historic resources. The CITY will not approve funding of any Undertaking until it is reviewed pursuant to this Agreement. STIPULATIONS To the extent of its legal authority, and in coordination with SHPO, the CITY shall require that the following measures are implemented: I. LEAD AGENCY COORDINATION A. When the CITY is determined to be the Lead Agency in any HUD-funded activities, the CITY will coordinate the Section 106 review activities. Programmatic Agreement — City of Glendale/SHPO/Ad yisory Council 1 APPLICABILITY OF AGREEMENT II. UNDERTAKING WILL ADHERE TO THE SECRETARY OF THE INTERIOR STANDARDS FOR REHABILIATION FOR HISTORICAL BUILDINGS AS MODIFIED WITH THE FOLLOWING ENUMERATED EXHIBITS: A. This Agreement applies only to CITY program activities implemented and funded in part or in whole using HUD funds. Standard for Undertaking Activities in the Housing Rehabilitation Program are enumerated in Exhibit "A". An Undertaking consisting of activities enumerated in Exhibit "A" as well as activities not listed in Exhibit "A" and shall be reviewed pursuant to the terms of this Agreement. Standard for Undertaking Activities is set forth in the Emergency Home Repair Program to ensure the health and safety of the occupants. These may include interior work, replacement or repair of existing mechanical units, plumbing repair or replacement, electrical repair or replacement, and minor structural repair. The types of Undertakings are enumerated in Exhibit "B". D. Standards for Undertaking Activities are set forth in the Roof Replacement Program and are limited to the roof on an existing building which is deteriorated. The types of Undertakings are enumerated in Exhibit "C". Standards for Undertaking Activities in the Exterior Program are enumerated in Exhibit "D". Standards for Undertaking Activities are set forth in the Voluntary Demolition Program. The types of Undertakings are enumerated in Exhibit "E". Standards for Undertaking Activities are set forth in the Replacement Housing Program. The types of Undertakings are enumerated in Exhibit H. Standards for Undertaking Activities are set forth and limited to the Glendale Home Accessibility Program. The types of Undertakings are enumerated in Exhibit "G". Standards for Undertaking Activities are set forth, and limited to. the Neighborhood Stabilization Program. The types of Undertakings are enumerated in Exhibit ' H". J. For HUD-related activities not covered in this Agreement, the CITY will conduct a Section 106 review in accordance with 36 CFR Part 800. II. GENERAL A Except as detailed elsewhere in this Agreement, the CITY's responsibilities are: 1. The CITY will provide SHPO with an annual report for the previous calendar year by June 30th of each year that this Agreement is in effect. The report will summarize the actions taken to implement the terms of this Agreement, and recommend any actions or revisions that should be considered during the next year. B. Except as detailed elsewhere in this Agreement, SHPO's responsibilities are: Programmatic Agreement — City of Glendale/SHPO/Advisory Council 1 SHP° will review submitted annual report information to determine if amendments to the Agreement are necessary. IV. INITIAL COORDINATION FOLLOWING DECLARATION OF A FEDERAL EMERGENCY RELATING TO THIS AGREEMENT A The CITY will: 1. Determine with SHPO those historic properties (standing structures) that have not retained integrity. This Agreement will only apply to historic properties that retain integrity, in the aftermath of the declared federal emergency, pursuant to 36 CFR Part 60. If the CITY and SHP° do not agree on whether a listed property has retained integrity, the CITY will review all Undertakings that may affect the property in accordance with standards and stipulations set forth in Section ll above. 2. Consult with other federal agencies having jurisdiction for Undertakings related to the various housing programs to ensure compliance with applicable historic laws and regulations. 3. Develop with SHP() a feasible plan for involving the public in the Section 106 review process. B. SHP° will: 1 Provide the CITY with available information about historic properties within a declared Disaster Area or designated Emergency Assistance Zone, including: a. Properties listed in, or previously determined eligible, for the National Register through a Section 106 review; b. Properties listed in the State of Arizona and National Register for Historical Places; and c. Geographic areas with high potential for archaeological resources, and areas where it is known that there are not any archaeological resources. 2. Work with the CITY to jointly compile a list of previously identified or unevaluated historic properties, and geographic areas with a high potential for unidentified historic properties. Identify SHP° staff or consultants to assist the CITY staff with its Section 106 responsibilities, and to identify, in coordination with the CITY, specific activities that SHP° may perform at the CITY's request for specific projects. 4. Assist the CITY in identifying any organizations or individuals that may have an interest in historic properties affected by the declared Disaster. The CITY and SHP° will jointly contact these interested parties to inform them of this Agreement and to request information on the location of damaged historic properties. 5. Assist the CITY in identifying staging and landfill sites for debris disposal, and sites for chipping of vegetation debris, (if applicable), that will have a minimal or no effect on historic properties. Programmatic Agreement — City of Glendale/SHPO/Ad yisory Council 3 V. DURATION, AMENDMENTS, AND TERMINATION A. Unless terminated pursuant to Stipulation V(D) below, this Agreement shall remain in effect from the date of implementation as long as the CITY, in consultation with all other signatories, determines that the terms of this Agreement have been satisfactorily fulfilled. Upon a determination that this Agreement is not being fulfilled, this Agreement will terminate, and the CITY will provide all other signatories with written notice of the determination and termination. C. If any signatory to the Agreement determines that the Agreement cannot be fulfilled, the signatories will consult to seek amendment of the Agreement. Any amendment will be specific to the dispute being resolved unless otherwise agreed to by the signatories. The CITY or SHP° may terminate this Agreement by providing a 90-day written notice to the other interested parties. This Agreement may be terminated by the implementation of a subsequent Agreement that explicitly terminates or supersedes this Agreement, or by the CITY's implementation of Alternate Procedures, pursuant to 36 CFR 800.14(a). VI. NON-DISCRIMINATION The parties agree to comply with Chapter 9, Title 41, Arizona Revised Statutes (Civil Rights), Arizona Executive Orders 75-5 and 99-4 and any other federal or state laws relating to equal opportunity and non-discrimination, including the Americans with Disabilities Act. VII. CONFLICT OF INTEREST This agreement is subject to cancellation by the State under A.R.S. § 38-511 if any person significantly involved in the Agreement on behalf of the State is an employee or consultant of the contractor at any time while the Agreement or any extension of the Agreement is in effect. VIII. IMMIGRATION LAW COMPLIANCE Each Party, and on behalf any subcontracting Party, warrants, to the extent applicable under A.R.S. § 41-4401, compliance with all federal immigration laws and regulations that relate to their employees as well as compliance with A.R.S. § 23-214(A) which reqikes registration and participation with the E-Verify Program. B. Any breach of warranty under subsection A above is considered a material breach of this Agreement and is subject to penalties up to and including termination of this Agreement. C. Each Party retains the legal right to inspect the papers of any Party or subcontracting Party's employee who performs work under this Agreement to ensure that the Party or any subcontracting Party is compliant with the warranty under subsection A above. Each Party may conduct random inspections, and upon request, the Parties shall provide copies of papers and records demonstrating continued compliance with the warranty under subsection A above. The Parties agree to keep papers and records available for inspection during normal business hours and will cooperate with each Programmatic Agreement — City of Glendale/SHPO/Advisory Council 4 other in exercise of their respective statutory duties and not deny access to business premises or applicable papers or records for the purposes of enforcement of this section VIII. The Parties agree to incorporate into any subcontracts under this Agreement the same obligations imposed upon each Party and expressly accrue those obligations directly to the mutual benefit of the Parties. Each Party's warranty and obligations under this section to each other continues throughout the term of this Agreement or until such time as the Parties determine, in their sole discretion, that Arizona law has been modified and that compliance with this section is no longer a requirement. G. The "E-Verify Program" above means the employment verification program administered by the United States Department of Homeland Security, the Social Security Administration, or any successor program IX. PROHIBITIONS Each Party, and on behalf any subcontracting Party, certify, to the extent applicable under A.R.S. §§ 35-391 et. seq. and 35-393 et. seq., that neither has "scrutinized" business operations, as defined above, in Sudan or Iran. X. NON-AVAILABILITY OF FUNDS This Agreement shall be subject to available funding, and nothing in this Agreement shall bind the State of Arizona or CITY to expenditures in excess of funds appropriated and allotted for the purposes outlined this Agreement. XI. ARBITRATION To the extent required by A.R.S. §§ 12-1518 (B) and 12-133, the Parties agree to resolve any dispute arising out of this agreement by arbitration. XII. RECORDS Pursuant to A.R.S. §§ 35-214, 35-215 and 41-2548, all books, accounts, reports, files and other records relating to this Agreement shall be subject, at all reasonable times, to inspection and audit by the State of Arizona for five years after the termination of this Agreement. XIII. IMPLEMENTATION OF THIS PROGRAMMATIC AGREEMENT This Agreement may be implemented in counterparts, with a separate page for each signatory, and the CITY will ensure that each Party is provided with a complete copy. This Agreement will become effective on the date of the last signature. Programmatic Agreement — City of Glendale/SHPO/Advisory Council 5 CITY OF GLENDALE PROGRAMMATIC AGREEMENT FOR HUD-FUNDED PROGRAM ACTIVITIES CITY OF GLENDALE: By: ATTEST: - Title: A.404,t, (1/\ Ot. citt. 11/C Citjr Clerk (Seal)/L Date: APPROVED AS TO FORM: City Attorney STATE OF ARIZONA ) ) ss County of Maricopa ) On this the 51-4-1day of CL,Ori 1 2009, before me, the undersigned Notary Public, personally appeared Al — City of Glendale, who acknowledged that I(s)he executed the foregoing consideration therein expressed. IN WITNESS WHEREOF, I hereunto set my hand and official seal. OFFICIAL SEAL TIFFANY A. HUSKEY NOTARY PUBLIC - Slate of Arizona MARICOPA COUNTY Iffir-091•1=17.1M07 My Comm. Expires Aug. 29, 2011 Programmatic Agreement — City of Glendale/SHPO/Advisory Council 6 CITY OF GLENDALE PROGRAMMATIC AGREEMENT for HUD-FUNDED PROGRAM ACTIVITIES ARIZONA STATE HISTORIC PRESERVATION OFFICER: By: Date: Title: STATE OF ARIZONA ) ) ss County of Maricopa ) On this the day of 2009, before me, the undersigned Notary Public, personally appeared who acknowledged that (s)he executed the foregoing for the purpose and consideration therein expressed. IN WITNESS WHEREOF, I hereunto set my hand and official seal. Notary Public ProgrammatIc Agreement — City of Glendale/SHPO/Advisory Council 7 CITY OF GLENDALE PROGRAMMATIC AGREEMENT for HUD-FUNDED PROGRAM ACTIVITIES Concurring Party: Maricopa County Consortium: By: ATTEST: Title: Clerk of the Board Date: PPRO /A-ela4---- Depaiii County Attorney STATE OF ARIZONA ) ) ss. County of Maricopa On this the day of 2009, before me, the undersigned Notary Public, personally appeared who acknowledged that (s)he executed the foregoing for the purpose and consideration therein expressed. IN WITNESS WHEREOF, I hereunto set my hand and official seal. Notary Public Programmatic Agreement — City of Glendale/SHPO/Advisory Council 8 Exhibit "A" City of Glendale Programmatic Agreement for Housing Rehabilitation Program The following standards shall apply to all single family / owner occupied rehab projects, taking into consideration economic and technical feasibility 1) Exterior Coverings: (1) Retain and repair existing period exterior walls, including their materials and features (remove substituted siding and repair original); (2) Replace deteriorated components and replace same to match as close as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive, alternative materials may be used (i.e.: new siding /stucco materials). 2) Foundations: (1) Retain and repair masonry, block, brick foundations, chimneys and exterior steps; (2) Remove deteriorated masonry, block, brick and replace to match original as close as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive, alternative materials may be substituted or the feature removed permanently. 3) Flatwork: (1) Repair existing concrete, brick driveways/walkways with matching material and form; and (2) Replace driveways/walkways with aggregate gravel or concrete. 4) Windows: (1) Retain and repair significant sash and frames, including their materials and features; (2) If all or parts of a window are missing or too badly deteriorated to repair, remove any severely deteriorated components and replace them to match the original as closely as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive, alternative materials, as indicated below, may be substituted. (i.e.: metal, dual glaze, energy-efficient type) to match the original in style as close as possible. 5) Doors (Exterior): (1) Retain and repair existing doors, including their materials and features; and (2) Replacement of door with 1 solid core metal type that matches characteristics of original as close as possible. 6) Exterior Trim: (1) Retain and repair significant period trim work (door casings, cornice moldings, brackets, skirt boards and pilasters), including their materials and features (remove, if any, substituted siding and repair original); (2) Replace deteriorated components and replace them to match as close as possible; (3) Install new trim work, to match as close as possible original; and (4) Where replacement with same material is cost prohibitive, alternative materials may be substituted or the feature removed permanently. 7) Interior Wall Coverings: (1) Repair existing wall coverings; and (2) Replace and install new drywall, with finished surface. 8) Doors (Interior): (1) Retain and repair interior doors and frames, including their materials and features; and (2) Replacement of door with hollow core wood type that matches characteristics of original as close as possible. 9) Flooring: (1) Repair wood flooring; and (2) Remove and install VCT floor tile in wet areas and FHA-approved carpet in all other areas. 10)Interior Trim: (1) Retain and repair significant period trim work (door casings, corner blocks, chair rails, picture moldings and crown moldings), including their materials and features; (2) Replace deteriorated components, replace them to match as close as possible; and (3) Install new trim work throughout. 11)Cabinetry: Replace with new cabinets, as approved by National Kitchen and Bath Association. 12)Countertops: Replace with new countertop, Formica, Wilson Art, equal or better product. 13)Insulation: Apply blown insulation into attic areas and batt insulation into exterior walls. 14)Lead: (1) All residences built prior to 1978 shall be tested for Lead Base Paint; and (2) Residences testing positive for Lead Based Paint shall follow all HUD requirements per title 24 of the Code of Federal Regulations 24 CFR Part 35. 2 15) Electrical work: (1) Repair of existing system, and (2) New electrical system installed per 2006 International Residence Code or current adopted code. 16) Plumbing work: (1) Repair of existing system; and (2) New plumbing system installed per 2006 International Residence Code or current adopted code. 17) Mechanical work: (1) Repair of existing works; and (2) New mechanical system installed per 2006 International Residence Code or current adopted code. 18) Roof: (1) Replacement of existing clay tile, wood shake, metal or shingle type roof, with like roofing-type material; (2) Where replacement with like roofing-type material is cost prohibitive; program will install 20 year — 3 tab, self sealing shingles, over 30 lb. felt; or if necessary, (3) Referral to Glendale Roof Replacement Program. 3 Exhibit "B" City of Glendale Programmatic Agreement for Emergency Home Repair Program The following standards shall apply to all single family / owner occupied Emergency Home Repair projects: Emergency Repairs: (1) Emergency electrical repair to primary residence wiring and service panel.* (2) Emergency repair/replacement of existing heating/cooling equipment.* (3) Emergency repair to stabilize building structures.* (4) Emergency temporary roof repair for stick build dwellings and manufactured-home roofs.** (5) Emergency repair/replacement of interior/exterior water supply lines.* *- Referral to Rehabilitation Program. ' - Referral to Roof Replacement Program. Exhibit "C" City of Glendale Programmatic Agreement for Roof Replacement Program The following standards shall apply to all single family / owner occupied Roof Replacement projects taking into consideration economic and technical feasibility. (1) Main Residence: (1) Replacement of existing clay tile, shake or shingle pitched, with like type roofing material; (2) Where replacement with like type roof material is cost prohibitive, program will install roof 20 year - 3 tab self sealing shingles over 30 lb. felt. (2) Patio Porches: Replacement of existing rolled asphalt type roof w/ 90 lb, rolled asphalt roofing over 15 lb. felt. (3) Flat roof (finished) additions: Replacement of existing rolled roof w/ Modified Bitumen Membrane "Torch down" roof covering. (4) Misc. roofing components: (1) Repair of any/all damaged decorative fascia, to match as close as practicable to original; (2) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; (3) Where replacement with same design features is cost prohibitive, program will Install new fascia, drip edge and flashing to industry standards or remove feature. Exhibit °I:0" City of Glendale Programmatic Agreement for Exterior Improvement Programs The following standards shall apply to all single family/ owner occupied Exterior Improvement projects taking into consideration economic and technical feasibility. 1) Painting: Repainting of existing painted surfaces. 2) Exterior Finish: (1) Repair of existing siding, stucco, or other finish material to match existing as close as possible;(2) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; or (3) Where replacement with same material is cost prohibitive, alternative materials, as indicated below may be substituted. 3) Landscape Installation of new xeriscape-type landscape materials. 4) Flatwork: (1) Repair of existing concrete, brick driveways/walkways with matching material and form; (2) Replace driveways walkways with new concrete; and (3) Where replacement with same material is cost prohibitive, alternative materials may be substituted. 5)Fence: (1) Repair existing wood/block or chain link fencing with like materials to match existing as close as possible; or if necessary,(2) Replace wood, block or chain link fencing with new wood, block or chain link materials. Exhibit "E" City of Glendale Programmatic Agreement for Voluntary Demolition Program The following standards shall apply to all single family / commercial Voluntary Demolition projects: 1) Demolition: (1) Demolish homeowner-requested single family structures which are beyond economic repair and have no historical significance. (2) Demolish property-owner-requested commercial structures, which are beyond economic repair and have no historical significance. Exhibit "F" City of Glendale Programmatic Agreement for Replacement Housing Program The following standards shall apply to all single family / owner occupied Replacement Housing projects: 1) Replacement Housing: (1) Demolish existing structures which are beyond economic repair and have no historical significance and build new single family homes on existing properties. Exhibit "G" City of Glendale Programmatic Agreement for Home Modification Program-ABIL Program The following standards shall apply to all single family! owner occupied Home Modification (ADA) projects and shall follow ADA Guidelines for Buildings and Facilities: Taking into consideration economic and technical feasibility, deteriorated exterior features shall be repaired rather than replaced: (1) Ramps: Installation of new wood, concrete or steel ramps to front or side entry doors of residence. (2) Stairs: Installation of new stairways, with continuous handrail on both sides to front or side entry doors of residence (3) Bath Tubs: Installation of new in-tub seat, grab bars, controls and shower units in to existing bath tub. (4)Showers: Installation of new seat, grab bars, controls, shower unit and wheelchair accessible shower stall. (5)Toilets Installation of new handicap toilets and grab bars. (6) Doors: Installation of new lever, push-type or U-shaped handles. Installation of new motorized door opener or closer. (7) Sinks: Installation of new wall mounted, wheelchair-accessible sinks and controls (8) Kitchen Cabinets/ Countertops: Installation /modification of cabinets/countertops to accommodate wheelchair accessibility needs. Exhibit "H" City of Glendale Programmatic Agreement for Neighborhood Stabilization Program The following standards shall apply to all foreclosed, abandoned, blighted property eligible activities: o Acquisition, o Rehabilitation o Conversion o Construction of Housing Units o Homeownership Assistance o Infrastructure for housing as part of redevelopment o Demolition o Acquisition • Land Banks o Rental housing: o New construction o conversion o Acquisition o Rehabilitation Taking into consideration economic and technical feasibility, the following improvements may be made: 1)Exterior Coverings: (1) Retain and repair existing period exterior walls, including their materials and features (Remove substituted siding and repair original); (2) Replace deteriorated components and replace them to match as close as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive, alternative materials may be used. (i.e.: new siding /stucco materials). 2) Foundations: (1) Retain and repair masonry, block, brick foundations, chimneys and exterior steps; (2) Remove deteriorate masonry, block ; brick and replace to match original as close as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive ; alternative materials may be substituted or the feature removed permanently. 3) Flatwork: (1) Repair of existing concrete, brick driveways/walkways with matching material and form; and (2) Replace driveways/walkways with aggregate gravel or concrete. 1 4) Windows: (1) Retain and repair significant sash and frames, including their materials and features; (2) If all or parts of a window are missing or too badly deteriorated to repair, remove any severely deteriorated components and replace them to match the original as closely as possible; (3) When the severity of deterioration requires replacement of a feature, the new feature shall match the old in design, color, texture and where possible, materials; and (4) Where replacement with same material is cost prohibitive, alternative materials, as indicated below may be substituted. (i.e.: metal, dual glaze, energy efficient type) to match the original in style as close as possible. 5) Doors (Exterior): (1) Retain and repair existing doors, including their materials and features; and (2) Replacement of door with solid core metal type that matches characteristics of original as close as possible. 6) Exterior Trim: (1) Retain and repair significant period trim work (door casings, cornice moldings, brackets, skirt boards and pilasters), including their materials and features (Remove, if any substituted siding and repair original); (2) Replace deteriorated components and replace them to match as close as possible; (3) Install new trim work, to match as close as possible original; and (4) Where replacement with same material is cost prohibitive, alternative materials may be substituted or the feature removed permanently. 7) Interior Wall Coverings: (1) Repair existing wall coverings; and (2) Replace and install new drywall, with finished surface. 8) Doors (Interior): (1) Retain and repair interior doors and frames, including their materials and features; and (2) Replacement of door with hollow core wood type that matches characteristics of original as close as possible. 9) Flooring: (1) Repair wood flooring; and (2) Remove and install VCT floor tile in wet areas and FHA-approved carpet in all other areas. 10) Interior Trim: (1) Retain and repair significant period trim work (door casings, corner blocks, chair rails, picture moldings and crown moldings), including their materials and features; (2) Replace deteriorated component, replace them to match as close as possible; and (3) Install new trim work throughout. 2 11)Cabinetry: Replace with new cabinets as approved by the National Kitchen and Bath Association. 12)Countertops: Replace with new countertop, Formica, Wilson Art, equal or better materials. 13)Insulation: Apply blown insulation into attic areas and batt insulation into exterior walls. 14)Lead: (1) All residences built prior to 1978 shall be tested for Lead Base Paint: and (2) Residences testing positive for Lead Based Paint shall follow all HUD requirements per title 24 of the Code of Federal Regulations 24 CFR Part 35. 15)Electrical work: (1) Repair of existing; and (2) New electrical system installed per 2006 International Residence Code or current adopted code. 16) Plumbing work: (1) Repair of existing, and (2) New plumbing system installed per 2006 International Residence Code or current adopted code. 17)Mechanical work: (1) Repair of existing; and (2) New mechanical system installed per 2006 International Residence Code or current adopted code. 18)Roof: (1) Replacement of existing clay tile, wood shake, metal or shingle type roof, with like roofing type material; (2) Where replacement with like roofing type material is cost prohibitive, program will install 20 year — 3 tab, self sealing shingles, over 30 lb. felt; and (3) referral to Glendale Roof Replacement Program, 3