15063-CHANGE ORDER #6 04-12-17.PDF

Maricopa County — Formal (2017-04-12)

View PDF Item 55 Meeting page

Extracted text (via pymupdf_layout) 39153 characters
MARICOPA COUNTY OFFICE OF PROCUREMENT SERVICES
ARTICLES CONTRACT LOAD REQUEST
Please provide the following information with your request to have the Price Agreement loaded or modified in the Advantage
system. Omissions or incorrect information will result in the delay of the ability to use this contract for procurements or payments.
New Contract (1 Contract Change Order\ Extension \Modification \ Change Order #: 6
Document Code (MA5, CT5, SC5): MA5 Department Code: D700 Advantage Contract ID#: 15063R0Q
Select Contract Type: C DBB C JOC r CMAR C A/E 6+ Simplified Construction C Limited Scope
Contract Document Description: (max 60 characters) : INTAKE TRANSFER & RELEASE FACILITY
Effective Begin Date: 11/4/2015 Expiration/Revised Expiration Date: 6/23/2017
Retention
Thresholds/Not to Exceed Amount: $7'603'875'00 (Note: Retainage is applicable only for DBB, CMAR Limited Scope,
and Simplified Construction)
Change in Not to Exceed Amount: $6'470'419'00
C Securities held in Lieu of retention
Revised Not to Exceed Amount: 14,074,294 Completion <50%, 10% retention Completion > 50%,
5% retention
Accounting Information:
Advantage Sub Phase
3.10 FY Fund Department Unit Appr.Unit Object Object Activity Program (optional) Amount
17 455 D470 4711 ITRJ 9150 11 FACM ITRJ CAPBLD 6470419
18
19
Vendor Number: VC0000008080 Vendor Name: ARRINGTON WATKINS Discount Information:% Days 30
Vendor Number: Vendor Name: Discount Information:% Days
Vendor Number: Vendor Name: Discount I nformation:°/0 Days
Vendor Number: Vendor Name: Discount Information:% Days
NIGP Code (Commodity Code): 9061°
3 (7
DON JEFFERY
Departmental Article 5 Procurement Officer:
Print Form Reset Form

CHANGE ORDER
PROJECT: Intake Transfer & Release Facility CHANGE ORDER NO.: 006
197346-0001
INITIATION DATE: January 30, 2017
TO CONTRACTOR: Arrington Watkins Architects CONTRACT NO.: 15063-ROQ
5240 N, 16th St., #101, Phx, AZ 85016
(W00002045X) CONTRACT DATE: November 4, 2015
Intake Transfer & Release/Detention Facility-Construction Administration
1. DCNO8 $5,679,674.00
Services
Arrington Watkin's original contract was based on a fee structure through the permit submision of the
Construction Documents (Phases 1 through IV). At that time it was unclear what the extent of the scope
would be for the Construction Administration Services would be so they wore not included, The
Construction Administration Services scope is outlined in the attached proposal dated March 9, 2017.
TOTAL THIS CHANGE ORDER $5,679,674.00
This change Order shall constitute a fittal settlement of all matters relating to the change in the Work which isthe subject of the Change Order, including but
not limited to all direct or indirect costs associated with such change, any impact such change may have on unchanged Work, and any and all adjustments to the
Contract Sum or the Contract Time. This Change Order supercedes alLarior reservations stated or implied,
Not Valid Until Signed By Marieopa County, Architect (if applicable) and Contractor.
The original Contract Sum was .. _ . - - $7,603,875.00
Net Change by previously authorized Change Orders 1/2/314/5 . . ... . . $790,745.00
The Contract Sum prior to this Change Order was 1 . .. . $8,394,620.00
The Contract Sum will be (increased) (doeteased)-(anehanged) by this Change Order $5,679,674.00
The new Contract Sun! including this change Order is 1 . .. . . „. ...,_ $14,074,294,00
The Contract Time will be (Increased) (deer-eased) (unchanged) by .. 0 Days
The date of Substantial Completion as Of the date of this Cherie Order therefore is NA
The date of Final Completion as of the date Of this Change Order therefore is , NA
-
Date Senior Project Manager - Don it Pate
IvIARICOPA COUNTY
MD Director -tichWegele Date Deputy County Attorney Date
MAR1COPA COUNTY
Chairman, Board of Supervisors Date Clerk of the Board Date

ARTICLE 5 CONTRACT MODIFICATION AUTHORITY
Arrington Watkins Architects C.O. #6- ITR Facity Design
NON-CONSTRUCTION CONSTRUCTION
Original Contract Fee Modification Limit Original Contract Modification Limit
Value
1 - 1000 CAPA Ceiling 1-1000 CAPA Ceiling
0 0
10,000 $ 6.000 10,000 $ 6,000
0
100,000 $ 40,000 100,000 $ 40,000
0 0
200,000 60,000 200,000 $ 60,000
300,000 75,000 $ 300,000 $ 75,000
0 0
400,000 85,000 400,000 $ 90,000
0 0
500,000 90,000 500,000 $ 107,500
0
750,000 93,750 1 1,000,000 $ 200,000
0 0
1,000,000 $ 97,500 2,000,000 $ 245,000
0 0
1,500,000 $ 100,000 3,000,000 $ 250,000
Insert Original Contract $7,603,875.00 Insert Original $0.00
Value Here: Contract Value Here:
Maximum
Maximum Cummulative $250,000.00 Cummulative Change
Change Order Authority for Order Authority for
FMD Director FMD Director
CUM C.O.s 1,2,3,4,5,6 $6,470,419.00
INSTRUCTIONS
1. Insert the ORIGINAL value of your contract into the RED box.
2. The maximum CUMMULATIVE change order authority for the FMD Director will appear in the BLUE
box.
3. If your contract exceeds $3,000,000, the maximum cummulative change order authority for the FMD
4. Director If your is $250,000. cummulative change orders exceed the amount in the BLUE box, but are less than $1
Million, the change order must be signed by the Chief Procurement Officer.
5. If your cummulative change orders exceed $1 Million, then the change order must be signed by the
Board of Supervisors.
6. Deductive change orders, changes to time only or changes to the terms of a contract only can be
signed by the FMD Director even if the cummulative dollar amount for the Director has been exceeded.
7. Any major changes to the scope of the project, as determined by FMD Management, require
approval by the Board of Supervisors regardless of the dollar amount of the change.
8. Print this page and attach to change order routing sheet.

ssoco,, PO NUMBER #: TRACKING CODE:
4-Ticaken'y D0,170000002372-4 15063R0Q
ISSUE DATE: COUNTY CONTACT:
1 riR .-r-V, PURCHASE ORDER 02/08/2017 (MST) DON BUMP
Nil w X2-0330
otri4
VENDOR: REFERENCE NUMBER: MODIFICATION NAME & DATE:
ARRINGTON WATKINS ARCHITECTS MA515063R0Q flahertyi 02/08/2017
VC0000008080
5240 N 16TH ST 101
PHOENIX AZ 85016 F.O.B FREIGHT:
MICHELLE DIAZ FOB Destination, Freight Prepaid
602-279-4373
DOCUMENT DESCRIPTION:
INTAKE TRANSFER AND RELEASE FACILITY DETENTION FACILITY - DE
C,0.#3 TO INCREASE P.O. BY $135,215 TO NEW TOTAL OF $4,082,150.77
C.0.#4 TO INCREASE P.O. BY $107,340 TO NEW TOTAL OF $4,189,490.77 FOR PLAT DEVELOPMENT, ADDITION OF PROJECT SIGNAGE
PACKAGE, TASK C DELETE, DESIGN FOR CENTRAL PLANT EXPANSION,
C.0.#5 TO INCREASE P.O. BY $49,365 TO NEW TOTAL OF $4,238,855,77
COMM SUPPLIER DELIVERY CONTRAC" EXTENDED COMM
CODE # PART # DESCRIPTION DATE QTY UNIT AMOUNT TOTAL TAX LINE TOTAL
90610 Buildings - Architectural 06/30/2017 0 $4,238,855. $4,238,855.77 $0.00 1 $4,238,855.77
Design
BILL TO: SHIP TO: SPECIAL INSTRUCTIONS PAYMENT TERMS
Maricopa County Facilities Management Maricopa County Facilities 0.0000%
401 W JEFFERSON ST Management 30 Days
PHOENIX AZ 85003 401 W JEFFERSON ST
PHOENIX AZ 85003
SUB DEPT ACTG
FUND DEPT UNIT APPR UNIT OBJECT OBJ OBJ ACTIVITY PROGRAM-PHASE LINE LINE TOTAL
455 D470 4713 ITRJ 9150 11 FACM ITRJ-CAPBLD 1 $4,238,855.77
ADDITIONAL LINE ITEM INFO:
C-73-16-019-5-00
INTAKE TRANSFER AND RELEASE FACILITY DETENTION FACIL-DESIGN
VENDORS MAY USE THE COUNTY'S VSS PORTAL TO SUBMIT AN INVOICE GRAND TOTAL
https://azdom-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService $4,238,855,77

Maricopa County
Facilities Management Department
Article 5 Change Order Routing
Change Order # 6
Date: 3/21/17 Work Order #: NA
Vendor Name: Arrington Watkins Archs. - W000002045X Project #: 1973-16-0001
Contract #: 15063-ROQ Location Name: ITR (Durango)
Purchase Order #: DO 170000002372-4 Project Name: ITR - Detention Facility
Amount
Funding Source [I Mm E] GIP D Annual Funds El User Funds Requested: $ 5,679,674.00
FUND DEPT UNIT ACTIVITY APPR UNIT OBJ/SUB LOCATION PROGRAM *PHASE FUNCTION AMOUNT
(Not Required)
455 D470 4713 FACM ITRJ 9150/11 1973 ITRJ CAPBLD $5,679,674.00
APPROVAL OR REVIEW REQUIRED DATE INITIAL
R-15
1. All information has been reviewed by Project Manager
2. Budget Analyst Review (*Phase to be completed by Budget Analyst)
3t2787-
3. Article 5 Procurement Review
4, Additional Special or Requested Review (Specify)
5. 0 & M Division Manager Approval (if Annual Funds or Tech Review)
6. CFD Manager or Planning Manager Approval NA
7. FMD Deputy Director Approval 3 MMd-
-ze-/77-1
8. FMD Director Approval
9. CFD Administration Processing
10. Article 5 Change Order Processing by OPS
11. Purchase Order Processing
Purchase Order Total to Date: $ 8,394,620.00 + $5,679,674.00 = $14,074,294.00
Project Start Date: NA I Project End Date: NA
DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER:
:* BOARD of SUPERVISORS APPROVAL REQUIRED
Arrington Watkins Watkins DCNO8 = Intake Transfer & Release / Detention Facility - Construction Administration Services,
proposal dated March 9, 2017.
Required Attachments 1. Change Order Package 2. Project Information Sheet w/ Complete Scope 3. Vendor Proposal with Supporting
Documentation 4. Schedule 5. Budget Summary Sheet

Arrington Watkins Architects
March 9th, 2017
Donald Bump
Maricopa County Office of Facilities Management Division
401 W Jefferson Street
Phoenix, AZ 85003
RE: Maricopa County Intake Transfer and Release Facility/Detention Facility Design
Design Change Notification 08 — Construction Administration
Dear Donald:
Arrington Watkins Architects would like to request additional professional services fees for the above
referenced project. Per Arrington Watkins' (AW) original contract, our team developed a fee structure
through the permit submission of the Construction Documents (Phases I through IV). At the time of
scoping, it was not clear what the extent or duration of Construction Administration would be. Therefore,
CA fees were not included in our original purchase order. Based on schedule review with the contractor
we anticipate 32 months of construction and 3 months of close-out and as-built documentation for a total
of 35 months of construction administration.
Scope of Work
Included in Construction Administration Services are the following:
• Construction Administration Services:
o Office Construction Administration
▪ Distribution of all documents to Owner, Contractor, and/or Architects' field
representatives as required.
a Construction related communications.
Development, processing and issuance of Supplemental Documents:
supplemental instructions, addenda, conforming documents, clarifications,
construction change directives, proposal requests, and related construction
documents.
• Responding to, tracking, distribution, and reconciliation of; RFIs, field questions,
requests for clarifications, and related field questions
• Forwarding Owner's Instructions on the owner's behalf relative to changed
requirements and schedule revisions.
• Quotation Requests/Change Orders: preparations; review of quantities, costs,
and schedule; negotiations on behalf of Owner, coordination of approvals.
• Project schedule monitoring
• Construction Cost Accounting: maintenance of payment records, evaluation of
payment requests, review, and evaluation of expense data.
o Submittal Review
a Shop Drawings
▪ Product Data
5240 N. 16' Street
Suite 101
Phoenix, Arizona 85016
Telephone: (602) 279-4373
FAX: (602) 279-9110
A Limited LiebilityCompany

Page 2
Don Bump
March 9th, 2017
• Fabrication Details
• Samples
u Draw Downs and Color Selections
g Maintenance of Master File of Submittals
o Field Observations
'1 Two full-time project representatives (Architectural).
▪ Part-time project representatives (Architectural).
Periodic project representation (Design Consultants).
• Administration and coordination of field testing required by the Contract
Documents.
• Recommending scope, standards, procedures, and frequency of testing and
inspections.
Evaluating compliance by testing and inspection agencies with required scope,
standard, procedures, and frequency.
• Review of reports on inspections, test, and field observations, and notifications
to Owner and Contractor(s) of observed deficiencies in the Work.
o Construction Meetings
u Attend weekly construction meetings.
• Coordinate attendance of key design consultants as necessary.
• Update tracking documents.
▪ Respond to trending and developing upcoming coordination items,
o Close Out
u Detailed inspection with the Owner's construction manager for conformity of
the work to the Contract Documents to verify the list submitted by the
Contractor of items to be completed or corrected.
• Determination of amounts to be withheld until final completion
• Securing and receipt of consent of surety or sureties, if any, to reduction in or
partial release of retainage or the making of final payments
• Issuance of Certificate(s) of Substantial Completion
• Inspection(s) upon notice by the Contractor that the Work is ready for final
inspection and acceptance
• Notification to Owner and Contractor of deficiencies found in the follow-up
inspection(s), if any.
▪ Final Inspection with the Owner's construction manager to verify final
completion of work.
Receipt and transmittal of warranties, affidavits, receipts, releases, and waivers
of lien or bonds indemnifying the Owner against liens.
▪ Securing and receipt of consent of surety or sureties, if any, to the making of
final payments(s).
▪ Issuance of final Certificate(s) for Payment.
o Post Construction Services
M Start-up assistance: On-site observation, assistance with training, coordination
of remedial work by contractor after final completion

Page 3
Don Bump
March 9'h, 2017
Record Drawings: obtaining Contractor as-builts, reviewing contactor as-builts
for general accuracy, updating CD electronic files, providing CADD record
drawings.
Warranty Review: Consultation on issues during warranty period in connection
with inadequate performance of materials, systems, and equipment, inspection
prior to expiration of warranty period (11-month walk), documenting defects or
deficiencies in preparing instructions to the contractor for corrective action
prior to close of warranty.
PROFESSIONAL FEE
Attached you will find a spreadsheet for professional services summary, and pages for each of our team
members. This proposal includes only hours that we associated with the extended scope of construction
administration as described in the scope of work. Should the need arise that additional support is
required, or additional scope is needed, an additional service fee will be developed based on standard
hourly rates for the respective individuals required to perform the work,
Professional Services Fee: $ 4,439,119.00
Travel Allowance: $ 79,978.00
Materials and Testing Allowance: $ 738,296.00
Special Structural Inspections Allowance: $ 422,281.00
Total Construction Services Fee: $ 5,679,674.O0
Feel free to contact me with any questions, or to review in detail any part of this proposal.
Thank you again for this opportunity.
Sincerely,
Arrington Watkins Architects, LLC
Digitally DN: C=US, signed Errmquinn@assarch,com, by Michael D Quinn
OsAnington OtPArchilecture, Watkins CN=Michnel Architects, D Quinn
Reason: Dale: 2017.03,10 I ern the author 12,30:58-07'00' of this document
Michael D. Quinn
Principal Architect

_ ......
SSI Pangolin ALLOWANCE ...
Geotech SAECO ALLOWANCE
_
°
7,120 4,250 7,000 5,320 2,920 1,725 $2433
Food Foodesign
$ 5 $ $ $ $
- 24,850 27,780 42770 17,860 4,992 $110,262 3%
Code Fisher
$ $ $ 8 5 $ $
- 105,600 26,400 8,700 36,305 112,200 6,500 $415,800
FEE Integration IN
6 $ $
CONSULTANTS 37,470 50,580 680 17 13,220 4,920 4,190 $128,050
Security BOA
$ $ $ $ $ $
- -
58,900 72,450 30,000 13.650 $176,000
Structural Pangolin
$ $ $ $ $ $
E 151,900 41,760 228,550 207,900 26,600 10,600 $667,510
MP LSVV
$ _ $ $ $ j S
35,490 13,540 13,370 9,972 5,790 4,450 $82612 2%
Civil Dibble
$ $ $ $
421,330 236,760 468,070 280,572 157,422 41,415 $1,615,669 36% 2
Summary CONSULTS TOTALS Page
- 412,650 164,640 1,912,400 117.800 148,560 67,500 $2,823,669 64%
ARCHITECTS TOTALS
i i FEE - _ . $ - _ SO 0%
Administration
ARCHITECTS CGL
! $ $ 5
- 412,650 16040 1,912,400 117,800 146,560 67,500 $2,023,650 64%
AW
Construction 9 $ $
TOTAL - 833,980 401,400 2,380,470 406,372 305,982 108,915 $4439119 $79,978 $738,296 4422,281 $6,679,674
V PHASE
PHASE
- ADMIN ALLOWANCE
Jail FEE AMOUNT
MEETINGS
and CONSTRUCTION REVIEW OBSERVATIONS PROFESSIONAL ALLOWANCE TESTING
ITR PHASES POST-CONSTRUCTION ALLOWANCE CONTRACT
SUBMITTAL CONSTRUCTION CLOSE-OUT TRAVEL MATERIALS
OFFICE FIELD TOTAL $91 TOTAL
County
V8 Vb Vc V4 Ve VI
_ PHASE PHASE PHASE PHASE PHASE PHASE
Summary
Maricopa _ 61%
Fee _ 0% 19% 9% 54% 9% 7% 2%
, -

Arrington Watkins Architects, LLC FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and JaII PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048
Item HOURS RATES FEE SUBTOTALS
Principal Architect 5 190 5
Project Manager S 160 $
Project Architect $ 145 5
Specification Writer $ 145 $ -
Project Coordinator/ MT $ 125 5
CAD Drafter 5 85 5 -
Clerical 5 75 5
$
V. OFFICE CONSTRUCTION ADMINISTRATION
Principal Architect 35 5 190 $ 6,650
Project Manager 1120 5 160 $ 179,205
Project Architect, 280 $ 145 $ 90,600
Specification Writer 0 $ 145 $ -
Project Coordinator/ AIT 560 $ 125 5 70,000
CAD Drafter 1120 5 85 $ 95,200
Clerical 280 5 75 5 21,000
3395 $ 412,650
Mb SUBMITTAL REVIEW
Principal Architect 0 $ 190 $ -
Project Manager 96 S 160 5 15,360
Project Architect 384 5 195 $ 55,680
Specification Writer 0 $ 145 5 -
Project Coordinator / AIT 576 $ 125 5 72,000
CAD Drafter 0 $ 85 $ -
Clerical 280 $ 75 $ 21,600
1344 $ 164,640
v. FIELD OBSERVATIONS
Principal Architect 0 $ 190 $ -
Project Manager 2240 5 160 5 358,400
Project Architect 5600 5 145 5 812,008
Spedficalton Writer 0 5 145 5 -
Project Coordnator / AIT 5600 $ 125 $ 700,1300
CAD Drafter 0 $ 85 5 -
Clerical 560 $ 75 5 42,000
14000 $ 1,912,400
va CONSTRUCTION MEETINGS
Principal Ardfilect 0 S iso $ -
Project Manager 152 $ 160 $ 24,320
Project Architect 304 5 145 5 44,080
Specificalton Writer 0 5 145 5 ..
Project Coorrfinalor / MT 304 0 125 $ 38,000
CAD Drafter 0 5 85 $ -
Clerical 152 5 75 5 11,900
912 $ 117,1308
ve CLOSE OUT
Prindpal Architect 0 $ 190 5 -
Project Manager 96 5 160 $ 15,360
Project Architect 480 $ 145 $ 69,600
Spedficalion Writer 0 5 145 5 -
Project Coordinator / AIT 480 5 125 $ 60,000
CAD Drafter 0 $ 85 $ -
Gledcal 48 $ 75 5 3,600
1104 $ 148,560
Vt POST CONSTRUCTION SERVICES
Prindpal Architect 0 5 iso $ -
Project Manager 90 0 160 5 6,400
Project Architect 80 5 145 $ 11,600
Specificallon WrIter 0 $ 145 $ -
Project Coordinator / AIT 100 $ 125 5 12,500
CAD Drafter 400 $ 85 5 34,000
Clerical 40 5 75 $ 3,000
660 $ 67,600
TOTAL 21415 2,823,550
Hourly Rates
Frinwpol Architect 1900¢
Project Manager 160.00
Project Architect 14500
Specificaiton Writer $ 1.4500
FrojeM Coordinator AIT $ 125.00
CAD Drafter s 85.80
Cie FIR...0 s 75,00
3/1.017 170309J.ICSO no CA SERVICES FEES_AIALd.

CGL FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA No. 2015.049
HOURS RATES FEE SUBTOTALS
SOP 295
SVP 250
Senior Planner 225
Project Designer 200
Project Architect 180
Architect 165
Achnte 95
Va OFFICE CONSTRUCTION ADMINISTRATION
SOP 295
SOP 250
Scoter Planner 22$
Project Designer 200
Project/nth/led 180
Architect 165
Adrnin 95
Vb SUBMITTAL REVIEW
SOP 295
Syp 250
Senior Planner 225
Project Destuner 200
Project Architect 180
Archftect 165
Mean 95
Vu FIELD OBSERVATIONS
EVP 295
SOP 250
Senior Planner 225
Project Designer 200
Project Architect 180
Architect 165
Adnin 95
Vd CONSTRUCTION MEETINGS
EVP 295
SOP 250
Senior Planner 225
Project Designer 200
Project Architect 180
Archftect 165
Adtrin 95
Vu CLOSE OUT
SOP 205
SVP 250
Senior Planner 225
Project Designer 290
Project Architect 180
Architect 165
Adrnin 95
VI POST CONSTRUCTION SERVICES
EVP 295
SOP 250
Senior Planner 225
Project Designer 200
Project Archftect 180
Aachhect 165
Adrrin 95
TOTAL 0
Hourly Rates
FOP 2155,0
500 25050
Senior Planner $ 22250
Project Designer $ 20550
Project A rchtlect 5 150,00
Architect 5 155.50
Adrnin 5 55.50
61012017 170305 01050)10 09 outwit-Bs rtes_rearehr
4 0116

Dibble and Associates FEE PROPOSAL
CLIENT: Maricopa County DATE: March 3, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048
Rem HOURS RATES FEE SUBTOTALS
Principal Engineer 5 185
Senior Project Manager 5 175
Project Engineer (PE) 5 145
Designer 5 110
Structural Manager 5 1E5
Structural Engineer 5 140
Structural Technician 5 65
Ma OFFICE CONSTRUCTION ADMINISTRATION
Principal Engineer 14 $ 185 2,500
Senior Project Manager 26 3 175 3 4000
Project Engineer (PE) 140 5 145 0 20$00
Designer 70 5 110 7,700
Structural Manager 0 5 166
Structural Engineer 0 S 140 5 -
Structural TechnOen 0 S 65 5 -
252 $ 35,490
Mb SUBMITTAL REVIEW
Principal Engineer 0 5 185 S -
Settler Project Manager 2 5 175 5 420
Project Engineer (PE) 24 5 145 3 3,480
Designer 12 5 110 S 1,320
Structural Manager 6 5 165 5 930
Structural Engineer 44 $ 140 5 6,160
Structural Technician 18 $ 65 $ 1,170
105 $ 13,540
Vc FIELD OBSERVATIONS
Principal Engineer 0 5 185
Senior Project Manager 14 5 175 5 2450
Project Engineer (PE) 28 9 145 S 4,060
Designer 14 $ 110 2 1,540
Structural Manager 0 5 165
Structural Engineer 38 5 140 2 5,320
Structural Technician 0 5 65
. 04 $ 13,370
lid CONSTRUCTION MEETINGS
Principal Engineer 5 185
Senior Project Manager $ 175
Project Engineer (PE) 4 5 145 5 6,612
Designer 5 110
Structural Manager $ 165
Structural Engineer 4 5 140 5 3,360
Structural Technician 9 65 5
7 $ 9,972
Mn CLOSE OUT
Principal Engineer 0 5 185 5 -
Senior Project Manager 6 5 175 5 1,050
Project Engineer (PE) 12 5 145 5 1,740
Designer 12 $ 110 0 1,320
Structural Manager 0 $ 165
Struclurel Engineer 12 5 140 C 1,680
Strudurol Technician 0 5 65 5 -
42 $ 5,790
W POST CONSTRUCTION SERVICES
Principal Engineer 0 $. 185 5 -
Senior Project Manager 6 $ 175 $ 875
Project Engineer (PE) 5 5 145 5 725
Designer 5 5 110 5 550
Structural Manager 3 $ 165 5 413
SU-natan) Engineer 10 5 143 5 1,400
Structural Technician 8 5 65 5 488
35 $ 4,450
TOTAL 599 82,612
Hourly Mos-
Principal Engineer 150.00
Senior Project Monaco, 190.0.0
Project Engineer (PE) i40.50
Designer
Structural Manager tas.oa
Structure) Enoinem 14;),ou
Structural Techniciar 5200
Administrative Assisicar soze
sais emeriti

LSW Engineers FEE PROPOSAL
CLIENT: Madonna County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO, 2015,048
hem HOURS RATES FEE SUSTOTAI_S
Senior Engineer/Principal 165
Engineer 140
Observer 110
Sr Designer 110
Designer 90
CADDIRevit 80
Clerical 70
Vs OFFICE CONSTRUCTION ADMINISTRATION
Senior EngineerfPrincipal 140 165 23,100
Engineer 700 140 98,1300
Observer 0 110 -
Sr Designer 290 110 30,800
Designer 90
CADDiRev8 00
Clerical 70
151,900
Vh SUBMITTAL REVIEW
Senior Engineer/Principal 24 165 3,960
Engineer 160 140 22.400
Observer 110
Sr Designer 140 110 16.4130
Designer 0 O 90
CADD/Reva 0 O 80
Clerical 0 70
324 41,760
Vu FIELD OBSERVATIONS
Senior Engineer/Principal 70 165 11,550
Engineer 70 140 9,800
Observer 168D 110 184,800
Sr Desioner 70 110 7,700
Designer 90
CADDIRevti 80
Clerical 210 70 14,700
2100 228,550
Vd CONSTRUCTION MEETINGS
Senior Engineer/Principal 105 S 207,900
Engineer 140
Observer 110
Sr Designer 110
Designer 90
CADD/Revit /10
Clerical 70
1280 207,800
Ve CLOSE OUT
Senior Engineer/Principal 24 165 3,960
Engineer BD 140 11.200
Observer BD 110 8,800
Sr Designer 24 110 2640
Designer 0 90
CADD/Revit 0 80
Clerical 0 7G
200 26,600
VI POST CONSTRUCTION SERVICES
Senior Engineer/Princtpal 165
Engineer 190
Observer 110
Sr DestIner 110
Designer 120 90 10800
CADD/Revit 80
Clerical 70
120 10,800
TOTAL 5132 667,510
Hourly Rates
Senior EnglnenriPrinslpn 10000
Engineer -140.SS
Observer 110.;30
Sr Designer 1 tO.S0
Designer 00,00
CAODIRevit 00,00
Clerical 70,00
0 3/1.017 170109 JAGS° UR CA SERVICES FEES_AW,M

Pangolin Structural FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 201E048
Rein HOURS RATES FEE SUBTOTALS
Principal Enoineeer 170
Project Manager 125
Engineer 100
CAD Drafter 85
Clerical 75
Va OFFICE CONSTRUCTION ADMINISTRATION
Principal Engineeer 40 170 6.600
Proled Manager 0 125
Engineer 200 100 20,000
CAD Drafter 360 as 30,600
Clerical 20 75 1.500
0
620 56,900
Vi, SUBMITTAL REVIEW
Principal Engineeer 35 170 5.950
Project Manager 75 125 9,375
Engineer 551 100 55,100
CAD Drafter 0 85
Clerical 27 75 2.025
0
0
688 72,450
Vc FIELD OBSERVATIONS
Principal Engineeer 20 170 3,401
Project Manager BD 125 10,000
Engineer 166 $ 100 16,600
CAD Drafter 0 85
Clerical 0 75
ft
266 30,000
Vd CONSTRUCTION MEETINGS
Principal Engineeer 170
Project Manager 125
Engineer 100
CAD Drafter 65
Clerical 75
Ve CLOSE OUT
Principal Engineeer 170
Prefect Manager 125
Engineer 100
CAD Drafter 85
Clerical 75
yr POST CONSTRUCTION SERVICES
Principal Engineeer 170 850
Project Manager 125 625
Engineer 100 5,000
CAD Drafter 55 6,800
Clerical 75 375
145 13,650
TOTAL 1719 175,000
Hourly Rale.
Principal Engineeer
Project Mananer
Engineer 102.50
CAD Drafter
Clnrical 75,00
31109017 170.3_1,CSO ITR CS SERVICES FEES_AWA1”
Dr IS

BGA FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9,2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADM1N AWA NO 2015.048
Item HOURS RATES FEE SUBTOTALS
Principal 0 5 185 5
Sr Engr 5 175 5
Engineer 5 135 $
Sr. CADD $ 05 $
Adrnin 5 65 5 -
_ S - $
— $ - 5 -
-
Va OFFICE CONSTRUCTION ADMINISTRATION
Principal 40 $ 185 S 7,400
50 9891 0 $ 175 5 -
Engineer 210 $ 135 5 28.350
Sr. CADS 8 5 85 5 680
Admin 16 $ 65 5 1,040
_ 0 5 - 5
0 5 - 5 -
— 274 37,470
VI, SUBMITTAL REVIEW
Principal 16 5 185 5 2,965
Sr Eng' a 4 175 5
Engineer 340 5 135 5 46900
Sr. CAOD 8 5 85 5 5130
Admin 16 5 65 $ 1,040
_ 0 5 - 5
— 0 $ - 5
360 50,560
Vc FIELD OBSERVATIONS
Principal 8 $ 1135 5 1,480
Sr Ergt 0 5 175 $
Engineer 120 5 135 5 16,200
Sr, CADD 0 5 85 5
Admin 0 $ 65 $ -
_ 0 S - $ -
— 0 s - $ -
128 $ 17,680
Vd CONSTRUCTION MEETINGS
Principal 16 5 185 S 2,960
Sr Engr 0 5 175 5 -
Engineer 76 5 135 5 10,260
Sr, CAM 0 5 85 5 -
Admin 0 S 65 $ -
0 S - 5 -
0 S - 5 -
92 $ 13,229
%re CLOSE OUT
Principal 4 $ 185 5 740
Sr Engr i3 5 175 5 -
Engineer 24 $ 135 5 3,240
Sr. CADD 0 $ 85 5 680
Admin 4 5 65 5 260
0 S - 5
0 5 - 5 _
40 4,920
VI POST CONSTRUCTION SERVICES
Principal 4 5 185 5 740
Sr Engr 0 $ 175 5 -
Engineer 20 S 135 5 2,700
Sr, CADS 5 5 85 5 425
Adrnin 5 5 65 5 325
-, 0 $ - 5 -
_ 0 $ - 5 _
34 5 4,190
TOTAL 948 128,060
Hourly Rates
Principal In.oc
Sr Env O
Enaineer O ,35.00
St, CADS 00.00
Admin S 0.0.00
31100017 170309_,..00 UR CA 551iVICES

Inspired Networks FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048
Item HOURS RATES FEE SUBTOTALS
Principal 165
va OFFICE CONSTRUCTION ADMINISTRATION
Principal 640 165 105,600
0
0
640 105,600
Vb SUBMITTAL REVIEW
Principal 160 165 26,400
0
0
160 26,400
Vc FIELD OBSERVATIONS
Principal 780 165 128,700
0
0
780 128,700
Vd CONSTRUCTION MEETINGS
Principal 220 6 $ 165 $ 36,300
0 - $
a Is - I $
220 36,300
Ve CLOSE OUT
Principal 680 165 112,200
It
0
680 112,200
Vf POST CONSTRUCTION SERVICES
Principal 40 165 6,600
It
It 0
40 6,600
TOTAL 2520 $ 415,800
Hourly Rates
Principal $ 165.00
a $
9 of 16 311012017 170309_MCSO ITS CA SERVICES FEES_AW:xlsx

Fisher Engineering, Inc. FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: I TR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.0413
Item HOURS RATES FEE SUBTOTALS
Principal Engineer 0 190 S
Senior Engineer IliPM 0 180 5
Senior Engineer I S 165 $ -
Project Engineer 5 145 5
Engineer in Training 5 135 $
CAD 5 105 0
Adrnin 5 100 5 -
Ma OFFICE CONSTRUCTION ADMINISTRATION
Principal Engineer 14 5 190 $ 2,660
Senior Engineer IIPAI 112 S 1130 5 28,160
Senior Engineer I 0 0 165 5
Project Enginee: 14 145 5 2,030
Engineer in Training 0 5 135 5
CAD 0 105 5
Admit] 0 103 5
140 0 24,800
Mb SUBMITTAL REVIEW
Principal Engineer 6 S 190 5 1,140
Senior Engineer IIPPM 24 5 180 5 4,320
Senior Engineer I 12 5 165 5 1,980
Project Engineer 132 5 145 5 19,140
Engineer in Training 0 5 135 $ -
CAD 0 0 105 5 -
Adrnin 12 3 100 5 1,200
186 $ 27,780
Mc FIELD OBSERVATIONS
Principal Engineer 14 0 190 5 2,600
Senior Engineer WPM 91 S 180 $ 16,380
Senior Engineer I 0 S 165 5
Project Engineer 154 145 5 22330
Engineer in Training 0 5 135 5
CAD 0 5 105 5 -
Adele 14 S 100 5 1,400
273 5 42,770
Vd CONSTRUCTION MEETINGS
Principal Engineer 0 5 190 S -
Senior Engineer litPM 38 S 180 5 6,840
Senior Engineer I 0 5 165 0
Project Engineer 76 5 145 $ 11,020
Engineer in Training 0 5 135 5
CAD 0 6 105 5 -
Admin 0 0 100 5 -
114 5 17,860
Me CLOSE OUT
Principal Engineer 0 5 190 S -
Senior Engineer II/PM 8 S 180 $ 1,512
senior Engineer! 0 2 165 5
Project Engineer 24 7 145 $ 8,480
Engineer in Training 0 S 135 5
CAD 0 S 105 5 -
Addle 0 5 100 5
32 4,992
Vt POST CONSTRUCTION SERVICES
Principal Engineer S 190 5 -
Senior Engineer 11/Pht S 180 5
Senior Engineer I S 165 5
Project Engineer 5 145 5
Engin.r in Training 5 135 5
CAD S 105 5
Admin 3 100 5
5 _
TOTAL 745 118,252
Hourly Rates
Principal Engineer M£7-0
Seniot Engineer 11100 115000
Senior Engineer 1 165,00
Proj.t Engineer 140,00
Engineer in Training 1.35,00
CAD 'M5.00
Adralri 105.50
In et 16 311072017

Foodesign Associates FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO, 2015.048
Rem HOURS RATES FEE SUBTOTALS
DESIGN PRINCIPAL S 140 5
DESIGN ASSOCIATE S 110 5 -
PROJECT MANAGER $ 95 S -
DRAFTING TECH S 70 S -
CLERICAL S 40 0
_ 0 - 0
_ 5 - 0
$
Va OFFICE CONSTRUCTION ADMINISTRA
DESIGN PRINCIPAL 5 140 5 2,220
DESIGN ASSOCIATE 5 110 $ 1,760
PROJECT MANAGER 5 95 $ 1,330
DRAFTING TECH 5 70 5 490
CLERICAL $ 40 0 220
_ $ - S -
_ 5 -
Ze, 7,120
VI3 SUBMITTAL REVIEW
DESIGN PRINCIPAL S 140 5 080
Nh
DESIGN ASSOCIATE 9 110 5 770
PROJECT MANAGER 5 95 0 52130
DRAFTING TECH $ 70 5 140
CLERICAL gNNO0 S 40 5 130
_ S - S _
_ $ -
4,250
Sc FIELD OBSERVATIONS
DESIGN PRINCIPAL S 140 0 7,000
DESIGN ASSOCIATE 5 110
PROJECT MANAGER $ 95
DRAFTING TECH 0 70
CLERICAL $ 40
_ 5 -
_ $ ..
7,000
vd CONSTRUCTION MEETINGS
DESIGN PRINCIPAL 5 140 0 5,320
DESIGhl ASSOCIATE 5 110 5 -
PROJECT MANAGER 5 95 $ -
DRAFTING TECH 5 70
CLERICAL 5 40
_ S -
_ $ -
38 6,320
Se CLOSE OUT
DESIGN PRINCIPAL 8 S 140 5 1,120
DESIGN ASSOCIATE 6 S 110 5 660
PROJECT MANAGER 12 5 95 5 1,140
DRAFTING TECH 0 $ 70 5
CLERICAL 0 5 40 0 -
_ 0 $ - 5
_ a s - s -
26 2,920
VI POST CONSTRUCTION SERVICES
DESIGN PRINCIPAL 5 5 140 5 700
DESIGN ASSOCIATE 5 S 110 S 550
PROJECT MANAGER 5 0 95 5 475
DRAFTING TECH 0 5 70 5 -
CLERICAL 0 5 40 5
_ 0 S -
_ 0 5 - 5 -
15 $ 1,725
TOTAL 239 28,335
Hourly Rates
DESIGN PRINCIPAL
DESIGN ASSOCIATE
PROJECT MANAGER
DRAFTING TECH
CLERICAL
•II
II 016 560/211t7 170329 1,1030 ITR Ch SERVICES FEES_AWNice

SAECO FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail PHASE V: CONSTRUCTION AMAIN AWA NO. 2015.048
Hem HOURS RATES FEE SUBTOTALS
Va OFFICE CONSTRUCTION ADM
Principal Engg neer 30 3 190 0 5,700
Senior Geolechnicel Engineer 200 S 165 0 33,005
Project Engineer 400 5 150 5 60,000
field Engineer or Geologist 0 5 192
Labotalery Manager 650 s 95 0 64,600
Engineering/laboralow Techoldan 0 $ 68
Adminstrative Staff 152 $ 58 S 8,816
1462 $ 172,116
Vi, LABORATORY TESTING
Proctor (ASTM 06513 or ASTM D1557) 20 0 105 S 2,300
Remolded Swell (per soils report me00d) 4 s 05 0 380
Sieve Analysts (ASTM C136/C117) 20 5 95 5 1900
PidElidLY index fASTM 04318) 20 S 65 $ 1,305
Laboratory Asphalt DensIW (AASITTO 7245) 40 5 115 $ 4,600
Mas. Theoretical Specific Density 40 5 135 0 6,400
Asphalt Content and Gradation 40 5 135 $ 5,400
Bulk Density of Asphalt Concrete Core 50 s 40 0 2400
Camp. Strength of Concrete CAnders 560 0 100 5 56,000
Comp. Strength of Grout 120 S 100 $ 12.000
Camp. Strength of Mortar so 5 75 5 4,500
Camp. Strength/Abs. of CM1.1 ao 5 350 0 28,000
1054 $ 124,180
Vu SUBMITTAL REVIEW
Principal Engineer 190
Senior Geolechnical Engineer 5 165
Project Ensi..., 5 150 _
Field Engineer or Geologist S 192
Laboratory Manager s 95
Engineering/Laboratow Technician 3 68
Adminsbalfie Staff 0 58 3 -
Vd FIELD OBSERVATIONS
Principal Engineer 0 190 5
Senior Geotechnical Engineer 5 165 $
Project Engineer 5 150 5
Feld Engineer or Geologist 5 192 5
Laboratory Manager 5 95 5 -
Engineedrigt,..aboralory Technician 600 s 68 5 442.000
Admin.-nth. Staff 5 58 5
65 0 5 442,000
Vu CONSTRUCTION MEETINGS
Principal Engineer 5 190
Senior Geolechnical Engineer S 165
Project Enjneer 3 150
Field Engineer or Geolonist 5 192 5-
Laboratory Manager S 95
Engineering/Laboratory Technician 4 65
AdrWnstratiere Staff 5 58
Vli CLOSE OUT
Principal Endues, 5 190
Smiler Deolechnical Engineer 5 165
Project Engineer 150
Field Engineer or Geologist 192
Laboratory Manager 3 95
Engineeringfiaboratory Technician s 68
Adminstrathre Staff 5 58
-
Vg POST CONSTRUCTION SERVICES
Principal Engineer $ 190 5
Senior GeWechnical Engineer 0 165 $
Project Epos:neer 5 150 0
Reid Engineer PI Geologist 5 192
laboratory bOrtagn 0 95
EngineeringLaboratory Technician 68
Adminstrative Staff 5 58
-
TOTAL 9026 738,296
Hourly Rates
Principal Engirt ter • 100.06
Senior Geotechsical Engineer $ 160,05
Project Engineer 5 106,00
Field Engineer or Geologist • 162,60 Includes SAECO statf and drilling sub
Laboratory Menage/ S 05.00 (dell fig, crew, traffic control,
PagloringtLaborotery Twainicia O 6902 and sampling eqaipmantI
Adminstratbre Staff 5302
12.316 3H.C17 170,09_14.0 MCA SERVICES FEES_AWA.

Pangolin Structural FEE PROPOSAL
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: FIR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.049
Item HOURS RATES FEE stiaTOTALs
Principal Erigineeer S 170
Protect Manager 5 125
Engineer 5 100
CAD Drafter 5 85
Clerical 5 75
Special Inspector 5 es 5 -
_ $ -
-
Va OFFICE CONSTRUCTION ADMINISTRATION
Principal Engineeer S 5 170 5 -
Project Manager 8 S 125 5
Engineer 8 $ 100
CAD Drafter S s es
clerical S 5 75
Special Inspector 0 5 85 S
_ _ S - s
Vb SUBMITTAL REVIEW
Principal Engineeer 5 170 $
Project Manager 5 125 5
Engineer 5 100 5
CAD Drafter 5 85 5
Clerical 5 75 5
Special Inspector s 85 S
_ s - s _
_
v. FIELD OBSERVATIONS
Principal Engineeer 384 $ 170 5 65281
Project Manager 0 5 125 5
Engineer 0 $ 100 5 -
CAD Drafter 0 5 85 $ _
Clerical 0 $ 75 $ ._
Special Inspector 4200 5 85 5 357000
_ 0 5 - $
4584 S 422,281
Vd CONSTRUCTION MEETINGS
Principal Engineeer 5 170 5
Project Manager 5 125 $
Engineer 5 100 5 -
CAD Drafter s 85 $
Clerical s 75 $
Special Inspector S 05 $ -
_ 5 - $
_
Va CLOSE OUT
Principal Engineeer 5 170 5
Project Manager 5 125 S
Engineer $ 100 S
CAD Drafter S 85 4
Clerical $ 75 5
Special Inspector s 85 5
-. s - s
-
yr POST CONSTRUCTION SERVICES
Principal Engineeer $ 170 5
Project Manager 5 125 5
Engineer 5 100 5
CAD Drafter 5 85 5
Clerical 5 75 5
Special Inspector 5 85 5
_ S - 5
3
TOTAL 4584 422,281
Hourly Rates
Principal Engin...et 170 00
Piolecr Manager 1205 5
Engin.r 10000
CAD Drafter 8500
7500
Specter Irispicir 00.00
13°,16 60660067 170309 14.01TFIC,ASERVMES FEES AW.O.

Design Team Estimated Travel Allowance/Expenses
CLIENT: Maricopa County DATE: March 9, 2017
PROJECT: ITR and Jail AWA NO. 2015.048
Item Airfare Hotel Taxes Car Meals Misc 44/Staff Days/Trip Sub-Tot Trips Total/Trip
$1,000 $141 $35 $83 $71 $35
Vc Submittal Review
CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0
BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 2 1,730 1,730
Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0
Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1,730
Phase Vc Total: $ 3,460
Vd Field Observations
CGL $1,000 $141.00 $35,00 $83.00 $71.00 $35,00 0 0 0
BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 3 2,095 4 $ 8,380
Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 3 $ 5,190
Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 24 41,520
Phase Vd Total: 55,090
Ve Construction Meetings
CGL $1,000 $141.00 $35.00 $83,00 $71.00 $35.00 0 0 0
BGA $1,000 $141.00 $35.00 $83.00 $71,00 $35.00 1 2 1,730 2 3,460
Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1 1,730
Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 2 3,460
Phase Ve Total: $ 8,650
Vf Close Out
CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 0
BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 0
Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1 1,730
Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 2 2 3,294 2 6,588
Phase Vf Total: $ 8,318
Additional Potential Trips
CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 a 0
BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35,00 2 1,730
Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 1,365 1,365
Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 1,365 1,365
Phase Total: $ 4,460
Total Estimate Travel Allowance: $ 79,978
14 of 16 3/1012017 170309_MCSO ITR CA SERVICES FEES_AW.xlsz

Exhibit A - Rates
Arrington Watkins Architects, LLC
Principal Architect $190.00
Project Manager $160.00
Project Architect $145.00
Specificaiton Writer $145.00
Project Coordinator! AIT $125,00
CAD Drafter $ 85.00
Clerical $ 75.00
CGL BGA
EVP $295.00 Principal $185.00
SVP $250,00 Sr Engr $175.00
Senior Planner $225.00 Engineer $135.00
Project Designer $200.00 Sr. CADD $ 85.00
Project Architect $180.00 Admin $ 65.00
Architect $165.00
Admin $ 95.00
Dibble and Associates SAECO
Principal Engineer $185.00 Principal Engineer $190.00
Senior Project Manager $175.00 Senior Geotechnical Engineer $165.00
Project Engineer (PE) $145.00 Project Engineer $150.00
Designer $110.00 Field Engineer or Geologist $192.00
Structural Manager $165.00 Laboratory Manager $ 95.00
Structural Engineer $140.00 Engineering/Laboratory Techr $ 68.00
Structural Technician $ 65.00 Adminstrative Staff $ 58.00
Administrative Assistant $ 60.00
LSW Engineers Fisher Engineering, Inc.
Senior Engineer/Principal $165.00 Principal Engineer $190.00
Engineer $140.00 Senior Engineer II/PM $180.00
Observer $110.00 Senior Engineer I $165.00
Sr Designer $110.00 Project Engineer $145.00
Designer $ 90.00 Engineer in Training $135.00
CADD/Revit $ 80.00 CAD $105.00
Clerical $ 70.00 Admin $100.00
Pangolin Structural Foodesign Associates
Principal Engineeer $170.00 DESIGN PRINCIPAL $140.00
Project Manager $125.00 DESIGN ASSOCIATE $110.00
Engineer $100.00 PROJECT MANAGER $ 95.00
CAD Drafter $ 85.00 DRAFTING TECH $ 70,00
Clerical $ 75.00 CLERICAL $ 40.00

Principals Working on Project
Architecture and Project Management
Arrington Watkins Architects, LLC
David Watkins, RA
Mike Quinn, RA
Planning and Architecture Security Electronics
CGL BGA
Robert Glass, RA Keith E Summer, PE
Civil Engineering Geotechnical Engineering
Dibble and Associates SAECO
Kent Norcross, PE Michael E. Smith, RE.
Michael S. Annala, R.G.
Bryan W. Reed, RE.
Daniel C. Rosenbalm, Ph. D., P.E.
Mechanical, Plumbing, and Electrical Engineering Fire Protection and Life Safety Engineering
LSW Engineers Fisher Engineering, Inc.
Lance Jones, PE Doug Fisher, PE
Justin Holmes, PE
Darrel Miller, PE
Gerry Katafiasz, PE
Mike Barkley, PE
Spencer Cook, PE
Structural Engineering Food Service Consultant
Pangolin Structural Foodesign Associates
Jeff Novak, PE John Barja
Crystal Blanton, PE Kris Morphis