15063-CHANGE ORDER #6 04-12-17.PDF
Extracted text (via pymupdf_layout)
39153 characters
MARICOPA COUNTY OFFICE OF PROCUREMENT SERVICES ARTICLES CONTRACT LOAD REQUEST Please provide the following information with your request to have the Price Agreement loaded or modified in the Advantage system. Omissions or incorrect information will result in the delay of the ability to use this contract for procurements or payments. New Contract (1 Contract Change Order\ Extension \Modification \ Change Order #: 6 Document Code (MA5, CT5, SC5): MA5 Department Code: D700 Advantage Contract ID#: 15063R0Q Select Contract Type: C DBB C JOC r CMAR C A/E 6+ Simplified Construction C Limited Scope Contract Document Description: (max 60 characters) : INTAKE TRANSFER & RELEASE FACILITY Effective Begin Date: 11/4/2015 Expiration/Revised Expiration Date: 6/23/2017 Retention Thresholds/Not to Exceed Amount: $7'603'875'00 (Note: Retainage is applicable only for DBB, CMAR Limited Scope, and Simplified Construction) Change in Not to Exceed Amount: $6'470'419'00 C Securities held in Lieu of retention Revised Not to Exceed Amount: 14,074,294 Completion <50%, 10% retention Completion > 50%, 5% retention Accounting Information: Advantage Sub Phase 3.10 FY Fund Department Unit Appr.Unit Object Object Activity Program (optional) Amount 17 455 D470 4711 ITRJ 9150 11 FACM ITRJ CAPBLD 6470419 18 19 Vendor Number: VC0000008080 Vendor Name: ARRINGTON WATKINS Discount Information:% Days 30 Vendor Number: Vendor Name: Discount Information:% Days Vendor Number: Vendor Name: Discount I nformation:°/0 Days Vendor Number: Vendor Name: Discount Information:% Days NIGP Code (Commodity Code): 9061° 3 (7 DON JEFFERY Departmental Article 5 Procurement Officer: Print Form Reset Form CHANGE ORDER PROJECT: Intake Transfer & Release Facility CHANGE ORDER NO.: 006 197346-0001 INITIATION DATE: January 30, 2017 TO CONTRACTOR: Arrington Watkins Architects CONTRACT NO.: 15063-ROQ 5240 N, 16th St., #101, Phx, AZ 85016 (W00002045X) CONTRACT DATE: November 4, 2015 Intake Transfer & Release/Detention Facility-Construction Administration 1. DCNO8 $5,679,674.00 Services Arrington Watkin's original contract was based on a fee structure through the permit submision of the Construction Documents (Phases 1 through IV). At that time it was unclear what the extent of the scope would be for the Construction Administration Services would be so they wore not included, The Construction Administration Services scope is outlined in the attached proposal dated March 9, 2017. TOTAL THIS CHANGE ORDER $5,679,674.00 This change Order shall constitute a fittal settlement of all matters relating to the change in the Work which isthe subject of the Change Order, including but not limited to all direct or indirect costs associated with such change, any impact such change may have on unchanged Work, and any and all adjustments to the Contract Sum or the Contract Time. This Change Order supercedes alLarior reservations stated or implied, Not Valid Until Signed By Marieopa County, Architect (if applicable) and Contractor. The original Contract Sum was .. _ . - - $7,603,875.00 Net Change by previously authorized Change Orders 1/2/314/5 . . ... . . $790,745.00 The Contract Sum prior to this Change Order was 1 . .. . $8,394,620.00 The Contract Sum will be (increased) (doeteased)-(anehanged) by this Change Order $5,679,674.00 The new Contract Sun! including this change Order is 1 . .. . . „. ...,_ $14,074,294,00 The Contract Time will be (Increased) (deer-eased) (unchanged) by .. 0 Days The date of Substantial Completion as Of the date of this Cherie Order therefore is NA The date of Final Completion as of the date Of this Change Order therefore is , NA - Date Senior Project Manager - Don it Pate IvIARICOPA COUNTY MD Director -tichWegele Date Deputy County Attorney Date MAR1COPA COUNTY Chairman, Board of Supervisors Date Clerk of the Board Date ARTICLE 5 CONTRACT MODIFICATION AUTHORITY Arrington Watkins Architects C.O. #6- ITR Facity Design NON-CONSTRUCTION CONSTRUCTION Original Contract Fee Modification Limit Original Contract Modification Limit Value 1 - 1000 CAPA Ceiling 1-1000 CAPA Ceiling 0 0 10,000 $ 6.000 10,000 $ 6,000 0 100,000 $ 40,000 100,000 $ 40,000 0 0 200,000 60,000 200,000 $ 60,000 300,000 75,000 $ 300,000 $ 75,000 0 0 400,000 85,000 400,000 $ 90,000 0 0 500,000 90,000 500,000 $ 107,500 0 750,000 93,750 1 1,000,000 $ 200,000 0 0 1,000,000 $ 97,500 2,000,000 $ 245,000 0 0 1,500,000 $ 100,000 3,000,000 $ 250,000 Insert Original Contract $7,603,875.00 Insert Original $0.00 Value Here: Contract Value Here: Maximum Maximum Cummulative $250,000.00 Cummulative Change Change Order Authority for Order Authority for FMD Director FMD Director CUM C.O.s 1,2,3,4,5,6 $6,470,419.00 INSTRUCTIONS 1. Insert the ORIGINAL value of your contract into the RED box. 2. The maximum CUMMULATIVE change order authority for the FMD Director will appear in the BLUE box. 3. If your contract exceeds $3,000,000, the maximum cummulative change order authority for the FMD 4. Director If your is $250,000. cummulative change orders exceed the amount in the BLUE box, but are less than $1 Million, the change order must be signed by the Chief Procurement Officer. 5. If your cummulative change orders exceed $1 Million, then the change order must be signed by the Board of Supervisors. 6. Deductive change orders, changes to time only or changes to the terms of a contract only can be signed by the FMD Director even if the cummulative dollar amount for the Director has been exceeded. 7. Any major changes to the scope of the project, as determined by FMD Management, require approval by the Board of Supervisors regardless of the dollar amount of the change. 8. Print this page and attach to change order routing sheet. ssoco,, PO NUMBER #: TRACKING CODE: 4-Ticaken'y D0,170000002372-4 15063R0Q ISSUE DATE: COUNTY CONTACT: 1 riR .-r-V, PURCHASE ORDER 02/08/2017 (MST) DON BUMP Nil w X2-0330 otri4 VENDOR: REFERENCE NUMBER: MODIFICATION NAME & DATE: ARRINGTON WATKINS ARCHITECTS MA515063R0Q flahertyi 02/08/2017 VC0000008080 5240 N 16TH ST 101 PHOENIX AZ 85016 F.O.B FREIGHT: MICHELLE DIAZ FOB Destination, Freight Prepaid 602-279-4373 DOCUMENT DESCRIPTION: INTAKE TRANSFER AND RELEASE FACILITY DETENTION FACILITY - DE C,0.#3 TO INCREASE P.O. BY $135,215 TO NEW TOTAL OF $4,082,150.77 C.0.#4 TO INCREASE P.O. BY $107,340 TO NEW TOTAL OF $4,189,490.77 FOR PLAT DEVELOPMENT, ADDITION OF PROJECT SIGNAGE PACKAGE, TASK C DELETE, DESIGN FOR CENTRAL PLANT EXPANSION, C.0.#5 TO INCREASE P.O. BY $49,365 TO NEW TOTAL OF $4,238,855,77 COMM SUPPLIER DELIVERY CONTRAC" EXTENDED COMM CODE # PART # DESCRIPTION DATE QTY UNIT AMOUNT TOTAL TAX LINE TOTAL 90610 Buildings - Architectural 06/30/2017 0 $4,238,855. $4,238,855.77 $0.00 1 $4,238,855.77 Design BILL TO: SHIP TO: SPECIAL INSTRUCTIONS PAYMENT TERMS Maricopa County Facilities Management Maricopa County Facilities 0.0000% 401 W JEFFERSON ST Management 30 Days PHOENIX AZ 85003 401 W JEFFERSON ST PHOENIX AZ 85003 SUB DEPT ACTG FUND DEPT UNIT APPR UNIT OBJECT OBJ OBJ ACTIVITY PROGRAM-PHASE LINE LINE TOTAL 455 D470 4713 ITRJ 9150 11 FACM ITRJ-CAPBLD 1 $4,238,855.77 ADDITIONAL LINE ITEM INFO: C-73-16-019-5-00 INTAKE TRANSFER AND RELEASE FACILITY DETENTION FACIL-DESIGN VENDORS MAY USE THE COUNTY'S VSS PORTAL TO SUBMIT AN INVOICE GRAND TOTAL https://azdom-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService $4,238,855,77 Maricopa County Facilities Management Department Article 5 Change Order Routing Change Order # 6 Date: 3/21/17 Work Order #: NA Vendor Name: Arrington Watkins Archs. - W000002045X Project #: 1973-16-0001 Contract #: 15063-ROQ Location Name: ITR (Durango) Purchase Order #: DO 170000002372-4 Project Name: ITR - Detention Facility Amount Funding Source [I Mm E] GIP D Annual Funds El User Funds Requested: $ 5,679,674.00 FUND DEPT UNIT ACTIVITY APPR UNIT OBJ/SUB LOCATION PROGRAM *PHASE FUNCTION AMOUNT (Not Required) 455 D470 4713 FACM ITRJ 9150/11 1973 ITRJ CAPBLD $5,679,674.00 APPROVAL OR REVIEW REQUIRED DATE INITIAL R-15 1. All information has been reviewed by Project Manager 2. Budget Analyst Review (*Phase to be completed by Budget Analyst) 3t2787- 3. Article 5 Procurement Review 4, Additional Special or Requested Review (Specify) 5. 0 & M Division Manager Approval (if Annual Funds or Tech Review) 6. CFD Manager or Planning Manager Approval NA 7. FMD Deputy Director Approval 3 MMd- -ze-/77-1 8. FMD Director Approval 9. CFD Administration Processing 10. Article 5 Change Order Processing by OPS 11. Purchase Order Processing Purchase Order Total to Date: $ 8,394,620.00 + $5,679,674.00 = $14,074,294.00 Project Start Date: NA I Project End Date: NA DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER: :* BOARD of SUPERVISORS APPROVAL REQUIRED Arrington Watkins Watkins DCNO8 = Intake Transfer & Release / Detention Facility - Construction Administration Services, proposal dated March 9, 2017. Required Attachments 1. Change Order Package 2. Project Information Sheet w/ Complete Scope 3. Vendor Proposal with Supporting Documentation 4. Schedule 5. Budget Summary Sheet Arrington Watkins Architects March 9th, 2017 Donald Bump Maricopa County Office of Facilities Management Division 401 W Jefferson Street Phoenix, AZ 85003 RE: Maricopa County Intake Transfer and Release Facility/Detention Facility Design Design Change Notification 08 — Construction Administration Dear Donald: Arrington Watkins Architects would like to request additional professional services fees for the above referenced project. Per Arrington Watkins' (AW) original contract, our team developed a fee structure through the permit submission of the Construction Documents (Phases I through IV). At the time of scoping, it was not clear what the extent or duration of Construction Administration would be. Therefore, CA fees were not included in our original purchase order. Based on schedule review with the contractor we anticipate 32 months of construction and 3 months of close-out and as-built documentation for a total of 35 months of construction administration. Scope of Work Included in Construction Administration Services are the following: • Construction Administration Services: o Office Construction Administration ▪ Distribution of all documents to Owner, Contractor, and/or Architects' field representatives as required. a Construction related communications. Development, processing and issuance of Supplemental Documents: supplemental instructions, addenda, conforming documents, clarifications, construction change directives, proposal requests, and related construction documents. • Responding to, tracking, distribution, and reconciliation of; RFIs, field questions, requests for clarifications, and related field questions • Forwarding Owner's Instructions on the owner's behalf relative to changed requirements and schedule revisions. • Quotation Requests/Change Orders: preparations; review of quantities, costs, and schedule; negotiations on behalf of Owner, coordination of approvals. • Project schedule monitoring • Construction Cost Accounting: maintenance of payment records, evaluation of payment requests, review, and evaluation of expense data. o Submittal Review a Shop Drawings ▪ Product Data 5240 N. 16' Street Suite 101 Phoenix, Arizona 85016 Telephone: (602) 279-4373 FAX: (602) 279-9110 A Limited LiebilityCompany Page 2 Don Bump March 9th, 2017 • Fabrication Details • Samples u Draw Downs and Color Selections g Maintenance of Master File of Submittals o Field Observations '1 Two full-time project representatives (Architectural). ▪ Part-time project representatives (Architectural). Periodic project representation (Design Consultants). • Administration and coordination of field testing required by the Contract Documents. • Recommending scope, standards, procedures, and frequency of testing and inspections. Evaluating compliance by testing and inspection agencies with required scope, standard, procedures, and frequency. • Review of reports on inspections, test, and field observations, and notifications to Owner and Contractor(s) of observed deficiencies in the Work. o Construction Meetings u Attend weekly construction meetings. • Coordinate attendance of key design consultants as necessary. • Update tracking documents. ▪ Respond to trending and developing upcoming coordination items, o Close Out u Detailed inspection with the Owner's construction manager for conformity of the work to the Contract Documents to verify the list submitted by the Contractor of items to be completed or corrected. • Determination of amounts to be withheld until final completion • Securing and receipt of consent of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payments • Issuance of Certificate(s) of Substantial Completion • Inspection(s) upon notice by the Contractor that the Work is ready for final inspection and acceptance • Notification to Owner and Contractor of deficiencies found in the follow-up inspection(s), if any. ▪ Final Inspection with the Owner's construction manager to verify final completion of work. Receipt and transmittal of warranties, affidavits, receipts, releases, and waivers of lien or bonds indemnifying the Owner against liens. ▪ Securing and receipt of consent of surety or sureties, if any, to the making of final payments(s). ▪ Issuance of final Certificate(s) for Payment. o Post Construction Services M Start-up assistance: On-site observation, assistance with training, coordination of remedial work by contractor after final completion Page 3 Don Bump March 9'h, 2017 Record Drawings: obtaining Contractor as-builts, reviewing contactor as-builts for general accuracy, updating CD electronic files, providing CADD record drawings. Warranty Review: Consultation on issues during warranty period in connection with inadequate performance of materials, systems, and equipment, inspection prior to expiration of warranty period (11-month walk), documenting defects or deficiencies in preparing instructions to the contractor for corrective action prior to close of warranty. PROFESSIONAL FEE Attached you will find a spreadsheet for professional services summary, and pages for each of our team members. This proposal includes only hours that we associated with the extended scope of construction administration as described in the scope of work. Should the need arise that additional support is required, or additional scope is needed, an additional service fee will be developed based on standard hourly rates for the respective individuals required to perform the work, Professional Services Fee: $ 4,439,119.00 Travel Allowance: $ 79,978.00 Materials and Testing Allowance: $ 738,296.00 Special Structural Inspections Allowance: $ 422,281.00 Total Construction Services Fee: $ 5,679,674.O0 Feel free to contact me with any questions, or to review in detail any part of this proposal. Thank you again for this opportunity. Sincerely, Arrington Watkins Architects, LLC Digitally DN: C=US, signed Errmquinn@assarch,com, by Michael D Quinn OsAnington OtPArchilecture, Watkins CN=Michnel Architects, D Quinn Reason: Dale: 2017.03,10 I ern the author 12,30:58-07'00' of this document Michael D. Quinn Principal Architect _ ...... SSI Pangolin ALLOWANCE ... Geotech SAECO ALLOWANCE _ ° 7,120 4,250 7,000 5,320 2,920 1,725 $2433 Food Foodesign $ 5 $ $ $ $ - 24,850 27,780 42770 17,860 4,992 $110,262 3% Code Fisher $ $ $ 8 5 $ $ - 105,600 26,400 8,700 36,305 112,200 6,500 $415,800 FEE Integration IN 6 $ $ CONSULTANTS 37,470 50,580 680 17 13,220 4,920 4,190 $128,050 Security BOA $ $ $ $ $ $ - - 58,900 72,450 30,000 13.650 $176,000 Structural Pangolin $ $ $ $ $ $ E 151,900 41,760 228,550 207,900 26,600 10,600 $667,510 MP LSVV $ _ $ $ $ j S 35,490 13,540 13,370 9,972 5,790 4,450 $82612 2% Civil Dibble $ $ $ $ 421,330 236,760 468,070 280,572 157,422 41,415 $1,615,669 36% 2 Summary CONSULTS TOTALS Page - 412,650 164,640 1,912,400 117.800 148,560 67,500 $2,823,669 64% ARCHITECTS TOTALS i i FEE - _ . $ - _ SO 0% Administration ARCHITECTS CGL ! $ $ 5 - 412,650 16040 1,912,400 117,800 146,560 67,500 $2,023,650 64% AW Construction 9 $ $ TOTAL - 833,980 401,400 2,380,470 406,372 305,982 108,915 $4439119 $79,978 $738,296 4422,281 $6,679,674 V PHASE PHASE - ADMIN ALLOWANCE Jail FEE AMOUNT MEETINGS and CONSTRUCTION REVIEW OBSERVATIONS PROFESSIONAL ALLOWANCE TESTING ITR PHASES POST-CONSTRUCTION ALLOWANCE CONTRACT SUBMITTAL CONSTRUCTION CLOSE-OUT TRAVEL MATERIALS OFFICE FIELD TOTAL $91 TOTAL County V8 Vb Vc V4 Ve VI _ PHASE PHASE PHASE PHASE PHASE PHASE Summary Maricopa _ 61% Fee _ 0% 19% 9% 54% 9% 7% 2% , - Arrington Watkins Architects, LLC FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and JaII PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048 Item HOURS RATES FEE SUBTOTALS Principal Architect 5 190 5 Project Manager S 160 $ Project Architect $ 145 5 Specification Writer $ 145 $ - Project Coordinator/ MT $ 125 5 CAD Drafter 5 85 5 - Clerical 5 75 5 $ V. OFFICE CONSTRUCTION ADMINISTRATION Principal Architect 35 5 190 $ 6,650 Project Manager 1120 5 160 $ 179,205 Project Architect, 280 $ 145 $ 90,600 Specification Writer 0 $ 145 $ - Project Coordinator/ AIT 560 $ 125 5 70,000 CAD Drafter 1120 5 85 $ 95,200 Clerical 280 5 75 5 21,000 3395 $ 412,650 Mb SUBMITTAL REVIEW Principal Architect 0 $ 190 $ - Project Manager 96 S 160 5 15,360 Project Architect 384 5 195 $ 55,680 Specification Writer 0 $ 145 5 - Project Coordinator / AIT 576 $ 125 5 72,000 CAD Drafter 0 $ 85 $ - Clerical 280 $ 75 $ 21,600 1344 $ 164,640 v. FIELD OBSERVATIONS Principal Architect 0 $ 190 $ - Project Manager 2240 5 160 5 358,400 Project Architect 5600 5 145 5 812,008 Spedficalton Writer 0 5 145 5 - Project Coordnator / AIT 5600 $ 125 $ 700,1300 CAD Drafter 0 $ 85 5 - Clerical 560 $ 75 5 42,000 14000 $ 1,912,400 va CONSTRUCTION MEETINGS Principal Ardfilect 0 S iso $ - Project Manager 152 $ 160 $ 24,320 Project Architect 304 5 145 5 44,080 Specificalton Writer 0 5 145 5 .. Project Coorrfinalor / MT 304 0 125 $ 38,000 CAD Drafter 0 5 85 $ - Clerical 152 5 75 5 11,900 912 $ 117,1308 ve CLOSE OUT Prindpal Architect 0 $ 190 5 - Project Manager 96 5 160 $ 15,360 Project Architect 480 $ 145 $ 69,600 Spedficalion Writer 0 5 145 5 - Project Coordinator / AIT 480 5 125 $ 60,000 CAD Drafter 0 $ 85 $ - Gledcal 48 $ 75 5 3,600 1104 $ 148,560 Vt POST CONSTRUCTION SERVICES Prindpal Architect 0 5 iso $ - Project Manager 90 0 160 5 6,400 Project Architect 80 5 145 $ 11,600 Specificallon WrIter 0 $ 145 $ - Project Coordinator / AIT 100 $ 125 5 12,500 CAD Drafter 400 $ 85 5 34,000 Clerical 40 5 75 $ 3,000 660 $ 67,600 TOTAL 21415 2,823,550 Hourly Rates Frinwpol Architect 1900¢ Project Manager 160.00 Project Architect 14500 Specificaiton Writer $ 1.4500 FrojeM Coordinator AIT $ 125.00 CAD Drafter s 85.80 Cie FIR...0 s 75,00 3/1.017 170309J.ICSO no CA SERVICES FEES_AIALd. CGL FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA No. 2015.049 HOURS RATES FEE SUBTOTALS SOP 295 SVP 250 Senior Planner 225 Project Designer 200 Project Architect 180 Architect 165 Achnte 95 Va OFFICE CONSTRUCTION ADMINISTRATION SOP 295 SOP 250 Scoter Planner 22$ Project Designer 200 Project/nth/led 180 Architect 165 Adrnin 95 Vb SUBMITTAL REVIEW SOP 295 Syp 250 Senior Planner 225 Project Destuner 200 Project Architect 180 Archftect 165 Mean 95 Vu FIELD OBSERVATIONS EVP 295 SOP 250 Senior Planner 225 Project Designer 200 Project Architect 180 Architect 165 Adnin 95 Vd CONSTRUCTION MEETINGS EVP 295 SOP 250 Senior Planner 225 Project Designer 200 Project Architect 180 Archftect 165 Adtrin 95 Vu CLOSE OUT SOP 205 SVP 250 Senior Planner 225 Project Designer 290 Project Architect 180 Architect 165 Adrnin 95 VI POST CONSTRUCTION SERVICES EVP 295 SOP 250 Senior Planner 225 Project Designer 200 Project Archftect 180 Aachhect 165 Adrrin 95 TOTAL 0 Hourly Rates FOP 2155,0 500 25050 Senior Planner $ 22250 Project Designer $ 20550 Project A rchtlect 5 150,00 Architect 5 155.50 Adrnin 5 55.50 61012017 170305 01050)10 09 outwit-Bs rtes_rearehr 4 0116 Dibble and Associates FEE PROPOSAL CLIENT: Maricopa County DATE: March 3, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048 Rem HOURS RATES FEE SUBTOTALS Principal Engineer 5 185 Senior Project Manager 5 175 Project Engineer (PE) 5 145 Designer 5 110 Structural Manager 5 1E5 Structural Engineer 5 140 Structural Technician 5 65 Ma OFFICE CONSTRUCTION ADMINISTRATION Principal Engineer 14 $ 185 2,500 Senior Project Manager 26 3 175 3 4000 Project Engineer (PE) 140 5 145 0 20$00 Designer 70 5 110 7,700 Structural Manager 0 5 166 Structural Engineer 0 S 140 5 - Structural TechnOen 0 S 65 5 - 252 $ 35,490 Mb SUBMITTAL REVIEW Principal Engineer 0 5 185 S - Settler Project Manager 2 5 175 5 420 Project Engineer (PE) 24 5 145 3 3,480 Designer 12 5 110 S 1,320 Structural Manager 6 5 165 5 930 Structural Engineer 44 $ 140 5 6,160 Structural Technician 18 $ 65 $ 1,170 105 $ 13,540 Vc FIELD OBSERVATIONS Principal Engineer 0 5 185 Senior Project Manager 14 5 175 5 2450 Project Engineer (PE) 28 9 145 S 4,060 Designer 14 $ 110 2 1,540 Structural Manager 0 5 165 Structural Engineer 38 5 140 2 5,320 Structural Technician 0 5 65 . 04 $ 13,370 lid CONSTRUCTION MEETINGS Principal Engineer 5 185 Senior Project Manager $ 175 Project Engineer (PE) 4 5 145 5 6,612 Designer 5 110 Structural Manager $ 165 Structural Engineer 4 5 140 5 3,360 Structural Technician 9 65 5 7 $ 9,972 Mn CLOSE OUT Principal Engineer 0 5 185 5 - Senior Project Manager 6 5 175 5 1,050 Project Engineer (PE) 12 5 145 5 1,740 Designer 12 $ 110 0 1,320 Structural Manager 0 $ 165 Struclurel Engineer 12 5 140 C 1,680 Strudurol Technician 0 5 65 5 - 42 $ 5,790 W POST CONSTRUCTION SERVICES Principal Engineer 0 $. 185 5 - Senior Project Manager 6 $ 175 $ 875 Project Engineer (PE) 5 5 145 5 725 Designer 5 5 110 5 550 Structural Manager 3 $ 165 5 413 SU-natan) Engineer 10 5 143 5 1,400 Structural Technician 8 5 65 5 488 35 $ 4,450 TOTAL 599 82,612 Hourly Mos- Principal Engineer 150.00 Senior Project Monaco, 190.0.0 Project Engineer (PE) i40.50 Designer Structural Manager tas.oa Structure) Enoinem 14;),ou Structural Techniciar 5200 Administrative Assisicar soze sais emeriti LSW Engineers FEE PROPOSAL CLIENT: Madonna County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO, 2015,048 hem HOURS RATES FEE SUSTOTAI_S Senior Engineer/Principal 165 Engineer 140 Observer 110 Sr Designer 110 Designer 90 CADDIRevit 80 Clerical 70 Vs OFFICE CONSTRUCTION ADMINISTRATION Senior EngineerfPrincipal 140 165 23,100 Engineer 700 140 98,1300 Observer 0 110 - Sr Designer 290 110 30,800 Designer 90 CADDiRev8 00 Clerical 70 151,900 Vh SUBMITTAL REVIEW Senior Engineer/Principal 24 165 3,960 Engineer 160 140 22.400 Observer 110 Sr Designer 140 110 16.4130 Designer 0 O 90 CADD/Reva 0 O 80 Clerical 0 70 324 41,760 Vu FIELD OBSERVATIONS Senior Engineer/Principal 70 165 11,550 Engineer 70 140 9,800 Observer 168D 110 184,800 Sr Desioner 70 110 7,700 Designer 90 CADDIRevti 80 Clerical 210 70 14,700 2100 228,550 Vd CONSTRUCTION MEETINGS Senior Engineer/Principal 105 S 207,900 Engineer 140 Observer 110 Sr Designer 110 Designer 90 CADD/Revit /10 Clerical 70 1280 207,800 Ve CLOSE OUT Senior Engineer/Principal 24 165 3,960 Engineer BD 140 11.200 Observer BD 110 8,800 Sr Designer 24 110 2640 Designer 0 90 CADD/Revit 0 80 Clerical 0 7G 200 26,600 VI POST CONSTRUCTION SERVICES Senior Engineer/Princtpal 165 Engineer 190 Observer 110 Sr DestIner 110 Designer 120 90 10800 CADD/Revit 80 Clerical 70 120 10,800 TOTAL 5132 667,510 Hourly Rates Senior EnglnenriPrinslpn 10000 Engineer -140.SS Observer 110.;30 Sr Designer 1 tO.S0 Designer 00,00 CAODIRevit 00,00 Clerical 70,00 0 3/1.017 170109 JAGS° UR CA SERVICES FEES_AW,M Pangolin Structural FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 201E048 Rein HOURS RATES FEE SUBTOTALS Principal Enoineeer 170 Project Manager 125 Engineer 100 CAD Drafter 85 Clerical 75 Va OFFICE CONSTRUCTION ADMINISTRATION Principal Engineeer 40 170 6.600 Proled Manager 0 125 Engineer 200 100 20,000 CAD Drafter 360 as 30,600 Clerical 20 75 1.500 0 620 56,900 Vi, SUBMITTAL REVIEW Principal Engineeer 35 170 5.950 Project Manager 75 125 9,375 Engineer 551 100 55,100 CAD Drafter 0 85 Clerical 27 75 2.025 0 0 688 72,450 Vc FIELD OBSERVATIONS Principal Engineeer 20 170 3,401 Project Manager BD 125 10,000 Engineer 166 $ 100 16,600 CAD Drafter 0 85 Clerical 0 75 ft 266 30,000 Vd CONSTRUCTION MEETINGS Principal Engineeer 170 Project Manager 125 Engineer 100 CAD Drafter 65 Clerical 75 Ve CLOSE OUT Principal Engineeer 170 Prefect Manager 125 Engineer 100 CAD Drafter 85 Clerical 75 yr POST CONSTRUCTION SERVICES Principal Engineeer 170 850 Project Manager 125 625 Engineer 100 5,000 CAD Drafter 55 6,800 Clerical 75 375 145 13,650 TOTAL 1719 175,000 Hourly Rale. Principal Engineeer Project Mananer Engineer 102.50 CAD Drafter Clnrical 75,00 31109017 170.3_1,CSO ITR CS SERVICES FEES_AWA1” Dr IS BGA FEE PROPOSAL CLIENT: Maricopa County DATE: March 9,2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADM1N AWA NO 2015.048 Item HOURS RATES FEE SUBTOTALS Principal 0 5 185 5 Sr Engr 5 175 5 Engineer 5 135 $ Sr. CADD $ 05 $ Adrnin 5 65 5 - _ S - $ — $ - 5 - - Va OFFICE CONSTRUCTION ADMINISTRATION Principal 40 $ 185 S 7,400 50 9891 0 $ 175 5 - Engineer 210 $ 135 5 28.350 Sr. CADS 8 5 85 5 680 Admin 16 $ 65 5 1,040 _ 0 5 - 5 0 5 - 5 - — 274 37,470 VI, SUBMITTAL REVIEW Principal 16 5 185 5 2,965 Sr Eng' a 4 175 5 Engineer 340 5 135 5 46900 Sr. CAOD 8 5 85 5 5130 Admin 16 5 65 $ 1,040 _ 0 5 - 5 — 0 $ - 5 360 50,560 Vc FIELD OBSERVATIONS Principal 8 $ 1135 5 1,480 Sr Ergt 0 5 175 $ Engineer 120 5 135 5 16,200 Sr, CADD 0 5 85 5 Admin 0 $ 65 $ - _ 0 S - $ - — 0 s - $ - 128 $ 17,680 Vd CONSTRUCTION MEETINGS Principal 16 5 185 S 2,960 Sr Engr 0 5 175 5 - Engineer 76 5 135 5 10,260 Sr, CAM 0 5 85 5 - Admin 0 S 65 $ - 0 S - 5 - 0 S - 5 - 92 $ 13,229 %re CLOSE OUT Principal 4 $ 185 5 740 Sr Engr i3 5 175 5 - Engineer 24 $ 135 5 3,240 Sr. CADD 0 $ 85 5 680 Admin 4 5 65 5 260 0 S - 5 0 5 - 5 _ 40 4,920 VI POST CONSTRUCTION SERVICES Principal 4 5 185 5 740 Sr Engr 0 $ 175 5 - Engineer 20 S 135 5 2,700 Sr, CADS 5 5 85 5 425 Adrnin 5 5 65 5 325 -, 0 $ - 5 - _ 0 $ - 5 _ 34 5 4,190 TOTAL 948 128,060 Hourly Rates Principal In.oc Sr Env O Enaineer O ,35.00 St, CADS 00.00 Admin S 0.0.00 31100017 170309_,..00 UR CA 551iVICES Inspired Networks FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.048 Item HOURS RATES FEE SUBTOTALS Principal 165 va OFFICE CONSTRUCTION ADMINISTRATION Principal 640 165 105,600 0 0 640 105,600 Vb SUBMITTAL REVIEW Principal 160 165 26,400 0 0 160 26,400 Vc FIELD OBSERVATIONS Principal 780 165 128,700 0 0 780 128,700 Vd CONSTRUCTION MEETINGS Principal 220 6 $ 165 $ 36,300 0 - $ a Is - I $ 220 36,300 Ve CLOSE OUT Principal 680 165 112,200 It 0 680 112,200 Vf POST CONSTRUCTION SERVICES Principal 40 165 6,600 It It 0 40 6,600 TOTAL 2520 $ 415,800 Hourly Rates Principal $ 165.00 a $ 9 of 16 311012017 170309_MCSO ITS CA SERVICES FEES_AW:xlsx Fisher Engineering, Inc. FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: I TR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.0413 Item HOURS RATES FEE SUBTOTALS Principal Engineer 0 190 S Senior Engineer IliPM 0 180 5 Senior Engineer I S 165 $ - Project Engineer 5 145 5 Engineer in Training 5 135 $ CAD 5 105 0 Adrnin 5 100 5 - Ma OFFICE CONSTRUCTION ADMINISTRATION Principal Engineer 14 5 190 $ 2,660 Senior Engineer IIPAI 112 S 1130 5 28,160 Senior Engineer I 0 0 165 5 Project Enginee: 14 145 5 2,030 Engineer in Training 0 5 135 5 CAD 0 105 5 Admit] 0 103 5 140 0 24,800 Mb SUBMITTAL REVIEW Principal Engineer 6 S 190 5 1,140 Senior Engineer IIPPM 24 5 180 5 4,320 Senior Engineer I 12 5 165 5 1,980 Project Engineer 132 5 145 5 19,140 Engineer in Training 0 5 135 $ - CAD 0 0 105 5 - Adrnin 12 3 100 5 1,200 186 $ 27,780 Mc FIELD OBSERVATIONS Principal Engineer 14 0 190 5 2,600 Senior Engineer WPM 91 S 180 $ 16,380 Senior Engineer I 0 S 165 5 Project Engineer 154 145 5 22330 Engineer in Training 0 5 135 5 CAD 0 5 105 5 - Adele 14 S 100 5 1,400 273 5 42,770 Vd CONSTRUCTION MEETINGS Principal Engineer 0 5 190 S - Senior Engineer litPM 38 S 180 5 6,840 Senior Engineer I 0 5 165 0 Project Engineer 76 5 145 $ 11,020 Engineer in Training 0 5 135 5 CAD 0 6 105 5 - Admin 0 0 100 5 - 114 5 17,860 Me CLOSE OUT Principal Engineer 0 5 190 S - Senior Engineer II/PM 8 S 180 $ 1,512 senior Engineer! 0 2 165 5 Project Engineer 24 7 145 $ 8,480 Engineer in Training 0 S 135 5 CAD 0 S 105 5 - Addle 0 5 100 5 32 4,992 Vt POST CONSTRUCTION SERVICES Principal Engineer S 190 5 - Senior Engineer 11/Pht S 180 5 Senior Engineer I S 165 5 Project Engineer 5 145 5 Engin.r in Training 5 135 5 CAD S 105 5 Admin 3 100 5 5 _ TOTAL 745 118,252 Hourly Rates Principal Engineer M£7-0 Seniot Engineer 11100 115000 Senior Engineer 1 165,00 Proj.t Engineer 140,00 Engineer in Training 1.35,00 CAD 'M5.00 Adralri 105.50 In et 16 311072017 Foodesign Associates FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO, 2015.048 Rem HOURS RATES FEE SUBTOTALS DESIGN PRINCIPAL S 140 5 DESIGN ASSOCIATE S 110 5 - PROJECT MANAGER $ 95 S - DRAFTING TECH S 70 S - CLERICAL S 40 0 _ 0 - 0 _ 5 - 0 $ Va OFFICE CONSTRUCTION ADMINISTRA DESIGN PRINCIPAL 5 140 5 2,220 DESIGN ASSOCIATE 5 110 $ 1,760 PROJECT MANAGER 5 95 $ 1,330 DRAFTING TECH 5 70 5 490 CLERICAL $ 40 0 220 _ $ - S - _ 5 - Ze, 7,120 VI3 SUBMITTAL REVIEW DESIGN PRINCIPAL S 140 5 080 Nh DESIGN ASSOCIATE 9 110 5 770 PROJECT MANAGER 5 95 0 52130 DRAFTING TECH $ 70 5 140 CLERICAL gNNO0 S 40 5 130 _ S - S _ _ $ - 4,250 Sc FIELD OBSERVATIONS DESIGN PRINCIPAL S 140 0 7,000 DESIGN ASSOCIATE 5 110 PROJECT MANAGER $ 95 DRAFTING TECH 0 70 CLERICAL $ 40 _ 5 - _ $ .. 7,000 vd CONSTRUCTION MEETINGS DESIGN PRINCIPAL 5 140 0 5,320 DESIGhl ASSOCIATE 5 110 5 - PROJECT MANAGER 5 95 $ - DRAFTING TECH 5 70 CLERICAL 5 40 _ S - _ $ - 38 6,320 Se CLOSE OUT DESIGN PRINCIPAL 8 S 140 5 1,120 DESIGN ASSOCIATE 6 S 110 5 660 PROJECT MANAGER 12 5 95 5 1,140 DRAFTING TECH 0 $ 70 5 CLERICAL 0 5 40 0 - _ 0 $ - 5 _ a s - s - 26 2,920 VI POST CONSTRUCTION SERVICES DESIGN PRINCIPAL 5 5 140 5 700 DESIGN ASSOCIATE 5 S 110 S 550 PROJECT MANAGER 5 0 95 5 475 DRAFTING TECH 0 5 70 5 - CLERICAL 0 5 40 5 _ 0 S - _ 0 5 - 5 - 15 $ 1,725 TOTAL 239 28,335 Hourly Rates DESIGN PRINCIPAL DESIGN ASSOCIATE PROJECT MANAGER DRAFTING TECH CLERICAL •II II 016 560/211t7 170329 1,1030 ITR Ch SERVICES FEES_AWNice SAECO FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail PHASE V: CONSTRUCTION AMAIN AWA NO. 2015.048 Hem HOURS RATES FEE SUBTOTALS Va OFFICE CONSTRUCTION ADM Principal Engg neer 30 3 190 0 5,700 Senior Geolechnicel Engineer 200 S 165 0 33,005 Project Engineer 400 5 150 5 60,000 field Engineer or Geologist 0 5 192 Labotalery Manager 650 s 95 0 64,600 Engineering/laboralow Techoldan 0 $ 68 Adminstrative Staff 152 $ 58 S 8,816 1462 $ 172,116 Vi, LABORATORY TESTING Proctor (ASTM 06513 or ASTM D1557) 20 0 105 S 2,300 Remolded Swell (per soils report me00d) 4 s 05 0 380 Sieve Analysts (ASTM C136/C117) 20 5 95 5 1900 PidElidLY index fASTM 04318) 20 S 65 $ 1,305 Laboratory Asphalt DensIW (AASITTO 7245) 40 5 115 $ 4,600 Mas. Theoretical Specific Density 40 5 135 0 6,400 Asphalt Content and Gradation 40 5 135 $ 5,400 Bulk Density of Asphalt Concrete Core 50 s 40 0 2400 Camp. Strength of Concrete CAnders 560 0 100 5 56,000 Comp. Strength of Grout 120 S 100 $ 12.000 Camp. Strength of Mortar so 5 75 5 4,500 Camp. Strength/Abs. of CM1.1 ao 5 350 0 28,000 1054 $ 124,180 Vu SUBMITTAL REVIEW Principal Engineer 190 Senior Geolechnical Engineer 5 165 Project Ensi..., 5 150 _ Field Engineer or Geologist S 192 Laboratory Manager s 95 Engineering/Laboratow Technician 3 68 Adminsbalfie Staff 0 58 3 - Vd FIELD OBSERVATIONS Principal Engineer 0 190 5 Senior Geotechnical Engineer 5 165 $ Project Engineer 5 150 5 Feld Engineer or Geologist 5 192 5 Laboratory Manager 5 95 5 - Engineedrigt,..aboralory Technician 600 s 68 5 442.000 Admin.-nth. Staff 5 58 5 65 0 5 442,000 Vu CONSTRUCTION MEETINGS Principal Engineer 5 190 Senior Geolechnical Engineer S 165 Project Enjneer 3 150 Field Engineer or Geolonist 5 192 5- Laboratory Manager S 95 Engineering/Laboratory Technician 4 65 AdrWnstratiere Staff 5 58 Vli CLOSE OUT Principal Endues, 5 190 Smiler Deolechnical Engineer 5 165 Project Engineer 150 Field Engineer or Geologist 192 Laboratory Manager 3 95 Engineeringfiaboratory Technician s 68 Adminstrathre Staff 5 58 - Vg POST CONSTRUCTION SERVICES Principal Engineer $ 190 5 Senior GeWechnical Engineer 0 165 $ Project Epos:neer 5 150 0 Reid Engineer PI Geologist 5 192 laboratory bOrtagn 0 95 EngineeringLaboratory Technician 68 Adminstrative Staff 5 58 - TOTAL 9026 738,296 Hourly Rates Principal Engirt ter • 100.06 Senior Geotechsical Engineer $ 160,05 Project Engineer 5 106,00 Field Engineer or Geologist • 162,60 Includes SAECO statf and drilling sub Laboratory Menage/ S 05.00 (dell fig, crew, traffic control, PagloringtLaborotery Twainicia O 6902 and sampling eqaipmantI Adminstratbre Staff 5302 12.316 3H.C17 170,09_14.0 MCA SERVICES FEES_AWA. Pangolin Structural FEE PROPOSAL CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: FIR and Jail PHASE V: CONSTRUCTION ADMIN AWA NO. 2015.049 Item HOURS RATES FEE stiaTOTALs Principal Erigineeer S 170 Protect Manager 5 125 Engineer 5 100 CAD Drafter 5 85 Clerical 5 75 Special Inspector 5 es 5 - _ $ - - Va OFFICE CONSTRUCTION ADMINISTRATION Principal Engineeer S 5 170 5 - Project Manager 8 S 125 5 Engineer 8 $ 100 CAD Drafter S s es clerical S 5 75 Special Inspector 0 5 85 S _ _ S - s Vb SUBMITTAL REVIEW Principal Engineeer 5 170 $ Project Manager 5 125 5 Engineer 5 100 5 CAD Drafter 5 85 5 Clerical 5 75 5 Special Inspector s 85 S _ s - s _ _ v. FIELD OBSERVATIONS Principal Engineeer 384 $ 170 5 65281 Project Manager 0 5 125 5 Engineer 0 $ 100 5 - CAD Drafter 0 5 85 $ _ Clerical 0 $ 75 $ ._ Special Inspector 4200 5 85 5 357000 _ 0 5 - $ 4584 S 422,281 Vd CONSTRUCTION MEETINGS Principal Engineeer 5 170 5 Project Manager 5 125 $ Engineer 5 100 5 - CAD Drafter s 85 $ Clerical s 75 $ Special Inspector S 05 $ - _ 5 - $ _ Va CLOSE OUT Principal Engineeer 5 170 5 Project Manager 5 125 S Engineer $ 100 S CAD Drafter S 85 4 Clerical $ 75 5 Special Inspector s 85 5 -. s - s - yr POST CONSTRUCTION SERVICES Principal Engineeer $ 170 5 Project Manager 5 125 5 Engineer 5 100 5 CAD Drafter 5 85 5 Clerical 5 75 5 Special Inspector 5 85 5 _ S - 5 3 TOTAL 4584 422,281 Hourly Rates Principal Engin...et 170 00 Piolecr Manager 1205 5 Engin.r 10000 CAD Drafter 8500 7500 Specter Irispicir 00.00 13°,16 60660067 170309 14.01TFIC,ASERVMES FEES AW.O. Design Team Estimated Travel Allowance/Expenses CLIENT: Maricopa County DATE: March 9, 2017 PROJECT: ITR and Jail AWA NO. 2015.048 Item Airfare Hotel Taxes Car Meals Misc 44/Staff Days/Trip Sub-Tot Trips Total/Trip $1,000 $141 $35 $83 $71 $35 Vc Submittal Review CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 2 1,730 1,730 Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1,730 Phase Vc Total: $ 3,460 Vd Field Observations CGL $1,000 $141.00 $35,00 $83.00 $71.00 $35,00 0 0 0 BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 3 2,095 4 $ 8,380 Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 3 $ 5,190 Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 24 41,520 Phase Vd Total: 55,090 Ve Construction Meetings CGL $1,000 $141.00 $35.00 $83,00 $71.00 $35.00 0 0 0 BGA $1,000 $141.00 $35.00 $83.00 $71,00 $35.00 1 2 1,730 2 3,460 Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1 1,730 Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 2 3,460 Phase Ve Total: $ 8,650 Vf Close Out CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 0 BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 0 0 0 Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 2 1,730 1 1,730 Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 2 2 3,294 2 6,588 Phase Vf Total: $ 8,318 Additional Potential Trips CGL $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 a 0 BGA $1,000 $141.00 $35.00 $83.00 $71.00 $35,00 2 1,730 Foodesign $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 1,365 1,365 Inspired Networks $1,000 $141.00 $35.00 $83.00 $71.00 $35.00 1 1,365 1,365 Phase Total: $ 4,460 Total Estimate Travel Allowance: $ 79,978 14 of 16 3/1012017 170309_MCSO ITR CA SERVICES FEES_AW.xlsz Exhibit A - Rates Arrington Watkins Architects, LLC Principal Architect $190.00 Project Manager $160.00 Project Architect $145.00 Specificaiton Writer $145.00 Project Coordinator! AIT $125,00 CAD Drafter $ 85.00 Clerical $ 75.00 CGL BGA EVP $295.00 Principal $185.00 SVP $250,00 Sr Engr $175.00 Senior Planner $225.00 Engineer $135.00 Project Designer $200.00 Sr. CADD $ 85.00 Project Architect $180.00 Admin $ 65.00 Architect $165.00 Admin $ 95.00 Dibble and Associates SAECO Principal Engineer $185.00 Principal Engineer $190.00 Senior Project Manager $175.00 Senior Geotechnical Engineer $165.00 Project Engineer (PE) $145.00 Project Engineer $150.00 Designer $110.00 Field Engineer or Geologist $192.00 Structural Manager $165.00 Laboratory Manager $ 95.00 Structural Engineer $140.00 Engineering/Laboratory Techr $ 68.00 Structural Technician $ 65.00 Adminstrative Staff $ 58.00 Administrative Assistant $ 60.00 LSW Engineers Fisher Engineering, Inc. Senior Engineer/Principal $165.00 Principal Engineer $190.00 Engineer $140.00 Senior Engineer II/PM $180.00 Observer $110.00 Senior Engineer I $165.00 Sr Designer $110.00 Project Engineer $145.00 Designer $ 90.00 Engineer in Training $135.00 CADD/Revit $ 80.00 CAD $105.00 Clerical $ 70.00 Admin $100.00 Pangolin Structural Foodesign Associates Principal Engineeer $170.00 DESIGN PRINCIPAL $140.00 Project Manager $125.00 DESIGN ASSOCIATE $110.00 Engineer $100.00 PROJECT MANAGER $ 95.00 CAD Drafter $ 85.00 DRAFTING TECH $ 70,00 Clerical $ 75.00 CLERICAL $ 40.00 Principals Working on Project Architecture and Project Management Arrington Watkins Architects, LLC David Watkins, RA Mike Quinn, RA Planning and Architecture Security Electronics CGL BGA Robert Glass, RA Keith E Summer, PE Civil Engineering Geotechnical Engineering Dibble and Associates SAECO Kent Norcross, PE Michael E. Smith, RE. Michael S. Annala, R.G. Bryan W. Reed, RE. Daniel C. Rosenbalm, Ph. D., P.E. Mechanical, Plumbing, and Electrical Engineering Fire Protection and Life Safety Engineering LSW Engineers Fisher Engineering, Inc. Lance Jones, PE Doug Fisher, PE Justin Holmes, PE Darrel Miller, PE Gerry Katafiasz, PE Mike Barkley, PE Spencer Cook, PE Structural Engineering Food Service Consultant Pangolin Structural Foodesign Associates Jeff Novak, PE John Barja Crystal Blanton, PE Kris Morphis