CCSA USDAFS MOD 1 SCOPE OF WORK WITH MARICOPA TRAIL SEGMENT 22.PDF
Extracted text (via pymupdf_layout)
1765 characters
U.S. Forest Service Tonto National Forest Maricopa Trail Segment 22 Trail Construction Mod 1 Scope of Work Scope: Maricopa County proposes to contract trail construction on the Cave Creek Ranger District for Segment 22 of the Maricopa Trail per Forest Service Challenge Cost Share Agreement No. 15-CS-11031201-001 with Maricopa County, Arizona. Project Location and Site: Cave Creek Ranger District 40202 N. Cave Creek Rd Scottsdale, AZ, 85262 Background: The project consists of constructing a 15.5 mile trail using existing power line maintenance roads, social trails and new trails. The breakdown is as follows: Existing Power Line Maintenance Roads: 6.52 Miles Existing (Social) Trails 1.70 Miles New Trail 7.31 Miles The project also includes the re-construction of an existing bridge whose deck was destroyed by fire. The route is in the draft Environmental Assessment stage of the NEPA process. Standards: New trail construction will follow the Standard Specifications for Construction of Trails and Trail Bridges on Forest Service Projects 2014. Trail construction Trail/Road rehabilitation Bridge rehabilitation Sign placement The trail location will be staked in the field prior to the start of construction. Deliverables: The contractor shall deliver to the Forest Service and its partner: A sustainable trail that will only require light maintenance. A rehabilitated bridge Trail sign placement at ½ Mile intervals and at key intersections. Interpretive sign placement at the Bronco Trailhead and the Cave Creek Ranger District. Schedule: The contractor shall have 120 calendar days to complete the project, once the “Notice to Proceed” has been issued. Payment: Payment will be made on 30 day progress milestones by Maricopa County. 1