Extracted text (via pymupdf_layout)
44639 characters
NOTICE OF INTENT (NOI) for Arizona Pollutant Discharge Elimination System (AZPDES) Small Municipal Separate Storm Sewer System (MS4) General Permit (AZG2016-002) Regulated small Municipal Separate Storm Sewer Systems (MS4s) must submit a Notice of Intent (NOI) to the Arizona Department of Environmental Quality (ADEQ) to obtain MS4 general permit coverage. Permittees must complete a NOI form and submit the original, ink-signed document to the address below: Arizona Department of Environmental Quality Surface Water Section/ Stormwater & General Permits Unit (5415A-1) 1110 West Washington Street Phoenix, AZ 85007 A. SMALL MS4 INFORMATION Legal Name of Municipality or Organization: Maricopa County` Choose one: Existing Permittee Operator Type: County New Permittee Mailing Address: County: 301 W. Jefferson St. Maricopa City: State: Zip Code: Phoenix Arizona 85004 Latitude/ Longitude at approximate geographic center of MS4 (D/M/S): 33.446673 -112.078357 B. PRIMARY MS4 PROGRAM MANAGER CONTACT PERSON Name: Title: Carl D’Acosta Environmental Health Supervisor Department: Environmental Services Mailing Address: 1001 N. Central Avenue, STE 300 City: State: Zip Code: Phoenix Arizona 85004 Phone Number: Fax Number: Email Address: 602-506-6944 602-506- cdacosta@mail.maricopa.gov 6862 Has another governmental entity agreed to satisfy any of Yes No your permit obligations? If “yes” to the above question, name the other governmental entity and describe the agreement(s) between entities: Click here to enter text. C. BILLING INFORMATION Same as Primary MS4 Program Manager Contact Person Information? Yes No If “yes,” proceed to Section D. Name: Title: Gus Martinez Finance Manager Department: Environmental Services Mailing Address: 1001 N Central Ave, STE 401 City: State: Zip Code: Phoenix Arizona 85004 Phone Number: Fax Number: Email Address: 602-506-6703 602-506-5141 gmartinez@mail.maricopa.gov D. ENFORCEMENT AUTHORITY OR OTHER MECHANISM Illicit Discharge Detection and Elimination (IDDE) Enforcement Authority or other Yes No mechanism established? Describe IDDE Enforcement Authority or other mechanism: Maricopa County is empowered to enact a stormwater regulation pursuant to A.R.S. 11-251 (66) and A.R.S. 49-371. In 2009, Maricopa County adopted the Maricopa County Stormwater Quality Management and Discharge Control Regulation. This regulation is designed to implement and enforce a program to improve to the maximum extent practicable the quality of Stormwater in the County’s Stormwater conveyance system within the unincorporated urbanized area of the County. Name of Enforcement Authority or other mechanism: Maricopa County Stormwater Quality Management and Discharge Effective Date or Estimated Date of Adoption: 5/6/2009 Control Regulation. Construction Site Stormwater Runoff Enforcement Authority or other mechanism Yes No established? Describe Construction Site Stormwater Enforcement Authority or other mechanism: Maricopa County is empowered to enact a stormwater regulation pursuant to A.R.S. §11-251 (66) and A.R.S. §49- 371. This regulation is called the Maricopa County Stormwater Quality Management and Discharge Control Regulation. Chapter 6 of this regulation is titled “Construction Site Stormwater Runoff Pollution Control”. Name of Enforcement Authority or other mechanism: Maricopa County Stormwater Quality Management and Discharge Effective Date or Estimated Date of Adoption: 5/6/2009 Control Regulation. Post-Construction Stormwater Management Enforcement Authority or other Yes No mechanism established? Page 2 of 23 NOI for Small MS4 September 2016 Describe Post-Construction Enforcement Authority or other mechanism: Maricopa County is empowered to enact a stormwater regulation pursuant to A.R.S. 11-251. (66) and A.R.S. 49- 371. This regulation is called the Maricopa County Stormwater Quality Management and Discharge Control Regulation. Chapter 11 of this regulation is titled “Post-Construction Stormwater Management”. Name of Enforcement Authority or other mechanism: Maricopa County Stormwater Quality Management and Discharge Effective Date or Estimated Date of Adoption: 5/6/2009 Control Regulation Page 3 of 23 NOI for Small MS4 September 2016 E. MAPPING COMPONENTS 1. Stormwater Sewer Mapping (including roads with drainage system, municipal streets, catch basins, curbs, gutter, ditches, man-made Percent Complete at time of NOI submission channels, or storm drains that are owned or operated by the permittee 90% and convey stormwater to Waters of the US) If 100% of requirements are NOT met for an existing permittee and for all new permittees, include a timeline, measurable goals, and estimated date of completion (MM/YY) for Stormwater Sewer Mapping: Stormwater system mapping is in progress and will be completed before September 29, 2017. The entire jurisdictional area has received inspection activities and all Receiving Waters have been identified and mapped. The majority of all stormwater structures and outfalls have been identified and all remaining will be identified in the process of system mapping. To ensure map completion, the County has identified all areas remaining to be mapped and will track and recorded the amount of square miles mapped on a monthly basis. 2. Outfall Mapping Percent Complete at time of NOI submission 90% If 100% of requirements are NOT met for an existing permittee and for all new permittees, include a timeline, measurable goals, and estimated date of completion (MM/YY) for Outfall Mapping: The majority of all outfalls have been identified and all remaining will be identified in the process of system mapping. All outfalls will be mapped by September 29th, 2017. To ensure map completion, the County has identified the areas remaining to be mapped and will track and recorded the amount of square miles mapped on a monthly basis. 3. Identification of Receiving Waters (names and locations of all the Waters Percent Complete at time of NOI submission of the US that receive discharge from those outfalls) 100% If 100% of requirements are NOT met for an existing permittee and for all new permittees, include a timeline, measurable goals, and estimated date of completion (MM/YY) for Receiving Water Identification: All Receiving Waters and locations have been identified and mapped. F. SUMMARY OF RECEIVING WATERS Does the MS4 have outfalls that discharge to Waters listed in A.A.C. R18-11 Yes No Article 1, Appendix B? If “yes” the MS4 discharges to receiving water(s) listed in A.A.C. R18-11 Article 1, Appendix B, then the following section must be completed. If “no” discharges occur to receiving water(s) listed in A.A.C. R18-11 Article 1, Appendix B, then the following section does not need to be filled out, proceed to Section G. If you answer “yes,” the receiving water segment is Impaired, Not-Attaining or an Outstanding Arizona Water (OAW), you must also complete Part H.3- Impaired, Not-Attaining and OAWs and BMPs. Identify Appendix B Number of Is the receiving water listed Does the surface water(s) that outfalls as an Impaired, Not- receiving discharging to List Pollutant(s) causing the receives discharge(s) from receiving Attaining or OAW (choose water have a the MS4 one)? Impairment(s): TMDL? water? Agua Fria >10 No na No Cave Creek 4 No na No McMicken Wash 6 No na No Page 4 of 23 NOI for Small MS4 September 2016 New River 4 No na No Queen Creek 1 No na No Salt River 4 No na No Page 5 of 23 NOI for Small MS4 September 2016 G. STORMWATER MANAGEMENT PROGRAM (SWMP) SUMMARY G-1. MCM 1: Public Education and Outreach For MCM 1- Public Education and Outreach, use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP, including the targeted audience such as commercial, construction, industrial or residential for MCM 1. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. BMP Category (enter Start Date your own text to BMP Description (include Measurable Goals (include milestones, (MM/YY) (enter override the drop personnel position or timeframes and frequencies) and your own text to down menu) department responsible) include the Targeted Audience override the drop down menu) The Environmental Ensure the distribution of educational Services Department will materials annually. The general distribute print material, public, commercial and residential Educational brochures, promotional activities are the targeted audience. 12/2006 Materials items and other items to The type and number of educational increase awareness of materials will be reported annually. stormwater pollution prevention. Ensure the website is maintained with current and useful information. The Environmental Website activity reported annually. Services Department will The general public, commercial and maintain a website that residential activities are the targeted Webpage provides useful audience. The type and number of 12/2006 information to the public educational materials will be reported on stormwater pollution annually. Website activity including prevention. the number of page views and downloads will be reported annually. The Environmental Multimedia outreach activities will be Services Department will provided.The general public is the maintain multimedia targeted audience. A description of Multimedia activities that include but the activities conducted, including 12/2006 Outreach are not limited to type, estimated population reached newspapers articles, ads, and duration will be reported and facebook outreach. annually. A report titled, Annual Summarization of Outreach Programs will be created The Environmental and submitted to the program Modification of Services Department will supervisor each year. A tool called the Ineffective review, modify and record 9/2016 Efficiency Matrix has been developed Messages modifications of any and can be used as a tool to aid in ineffective messages creating the report. The report will be used to assess the effectiveness of Page 6 of 23 NOI for Small MS4 September 2016 outreach messages. All modifications of messages will be reported annually. A minimum of 4 manned educational The Environmental booth events will be held each year. Services Department will The name of the event, message and Outreach Events 12/2006 maintain general public an estimated number of people outreach event program. reached will be reported annually The Environmental Services Department will maintain a student The message, the location served, Student audience education number of educational programs Audience program, called The School conducted and the number of 12/2006 Outreach Outreach Program. This students reached will be reported Program program focuses on annually. inperson classroom education. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. MCM 1: Public Education and Outreach Use this space to add any additional information for MCM1: NA Page 7 of 23 NOI for Small MS4 September 2016 G-2. MCM 2: Public Involvement and Participation For MCM 2- Public Involvement and Participation, use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. BMP Category (enter Start Date your own text to BMP Description (include Measurable Goals (include milestones, (MM/YY) (enter override the drop personnel position or timeframes and frequencies) your own text to down menu) department responsible) override the drop down menu) The Stormwater Quality Website with The Environmental information that includes the SWMP, Services Department will Public Records NOI, Annual Report and other records make available the SWMP, 12/2006 Made Available will be maintained and updated. The Annual Report and other number of website downloads will be records online. reported annually. The Environmental Public The date of the stake holder Services Department will Participation of workshop and the number of 12/2006 host a stake holder the SWMP attendees will be reported annually. workshop annually. The Environmental Services Department will provide surveys to the general public. These surveys are used to help Public The amount of surveys provided and spread the message of Participation the amount of surveys received will 12/2009 stormwater pollution Through Surveys be reported annually. prevention and aids in providing feedback to the Maricopa County Stormwater Quality Program. Public Participation Through a The Environmental The participation in the stormwater Stormwater Services Department will related contest will be reported Related Contest organize at least 1 annually, which will include the 12/2009 for School stormwater related contest number of participants, submittals Children and annually. and other applicable data. Local Communities. The Environmental Public involvement activities will be Public Services Department and reported annually. Items to be Involvement the Department of reported annually will include the 12/2011 Activities Transportation will number of cleanup activities, number encourage public of private sponsors and the number Page 8 of 23 NOI for Small MS4 September 2016 involvement in activities of volunteer participants. such as participation in the stormwater contest for school children and local communities and participation in clean-up events, such asTres Rios clean up event. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. MCM 2: Public Involvement and Participation Use this space to add any additional information about MCM2: NA Page 9 of 23 NOI for Small MS4 September 2016 G-3. MCM 3: Illicit Discharge Detection and Elimination (IDDE) Program For MCM 3- Illicit Discharge Detection and Elimination (IDDE) Program, use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. BMP Category (enter Start Date your own text to BMP Description (include Measurable Goals (include milestones, (MM/YY) (enter override the drop personnel position or timeframes and frequencies) your own text to down menu) department responsible) override the drop down menu) The County will maintain and update the multifaceted Illicit Discharge and Improper Disposal Detection and The Environmental Elimination Program through an Implement IDDE Services Department will inspection program. The County has Program, develop an illicit discharge defined was constitutes an illicit 12/2009 Definitions and and improper disposal discharge in the Maricopa County Prohibitions detection and elimination Stormwater Quality Management and program. Discharge Control Regulation. The IDDE program is written and recorded in the most recent Stormwater Management Plan. Stormwater system mapping is in progress and will be completed by September 2017. The entire jurisdictional area has received inspection activities and all Receiving The Environmental Waters have been identified and Services Department and mapped. The majority of all the Flood Control District stormwater structures and outfalls Stormwater will maintain a storm have been identified and all 12/2009 Sewer Mapping sewer system map with remaining will be identified in the locations of outfalls and process of system mapping. To receiving WoUS. ensure map completion, the County has identified all areas remaining to be mapped and will track and record the amount of square miles mapped on a monthly basis. The Environmental Services Department will enforce the Maricopa The number of citations and legal Eliminating Illicit County Stormwater actions issued will be reported 12/2009 Discharges Quality Management and annually. Discharge Control Regulation through Page 10 of 23 NOI for Small MS4 September 2016 enforcement actions as detailed in the regulation and through enforcement procedures enacted by the Environmental Services Enforcement Program. The Environmental The report will include a detailed Eliminating Illicit Services Department will description of the discharge and the 9/2016 Discharges record and report all illicit means of elimination or mitigation. discharges found annually. The Environmental Services Department will review and update if Legal authority will be maintained needed the Maricopa Legal Authority and any modifications will be 12/2009 County Stormwater reported annually. Quality Management and Discharge Control Regulation. A Statement of A Statement of Responsibilities has Responsibilities will be been drafted and will be maintained Statement of drafted and maintained by over time. This document is titled the 9/2016 Responsibilites the Environmental Services Communication Plan Statement of Department. IDDE Program Responsibilities. The Environmental All complaints will be investigated Services Department and and responded to within 15 days of Complaint the Department of the complaint received date. The 12/2009 Hotline Transportation will number and type of complaints will maintain a complaint be reported annually. hotline. Educational and stormwater pollution The Environmental prevention pamphlets and brochures Services Department will Educational and other forms of outreach will be create and distribute 12/2009 Materials distributed annually. The type and educational materials and number of educational materials pamphlets. distributed will be reported annually. A minimum of 20% of all outfalls will be inspected annually. The number of The Environmental outfalls inspected, violations and re- Services Department will Visual Outfall inspections will be reported annually. maintain a visual outfall 12/2009 Monitoring Written outfall procedures and monitoring program. reports will be stored on the Stormwater Geographical Information System Data Base. Page 11 of 23 NOI for Small MS4 September 2016 Five (5) representative outfalls will be identified for the visual wet weather monitoring program. Each representative outfall will be The Environmental inspected twice (2) during each wet Visual Wet Services Department will season. The number of outfalls Weather Outfall develop and implement a 9/2016 inspected, violations and re- Monitoring wet weather outfall inspections will be reported annually. monitoring program. Written outfall procedures and reports will be stored on the Stormwater Geographical Information System Data Base. The self-evaluation will include tracking employee performance standards and managing for results The Environmental standards. Other indicators, such as Indicators of Services Department will complaint response times, number of IDDE Program 9/2016 conduct a self-evaluation proactive inspections, public survey Progress annually. responses and analyzing complaints may also be incorporated into the self-evaluation. The findings will be reported annually. The Environmental Services Department will incorporate IDDE training Training sessions will be provided into existing pollution annually. The number of trainings prevention and good conducted, type of training, the Training housekeeping training in Department that received trainings 12/2009 the county-wide employee and the number of employees trained education and training will be reported annually. program. In-person trainings and online classes will be utilized. MCM 3: Illicit Discharge Detection and Elimination (IDDE) Program Use this space to add any additional information about MCM3: Unpermitted (illicit) Discharges to the MS4. The Environmental Services Department will create and implement a program to find facilities and activities that discharge to the MS4 without AZPDES/NPDES permit coverage. A list of AZPDES/NPDES permit holders will be created, mapped and stored on the stormwater GIS database. This List will be subject to review in order to verify the status of permit coverage using online audit tools. During routine inspections of the County owned MS4, commercial facilities that appear to need permit coverage will be flagged for further investigations. These facilities will be contacted in the form of a letter or email and a list of facilities that are contacted will be sent to ADEQ on an annual basis. Page 12 of 23 NOI for Small MS4 September 2016 G-4. MCM 4: Construction Activity Stormwater Runoff Control For MCM 4- Construction Activity Stormwater Runoff Control, use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. BMP Category (enter Start Date your own text to BMP Description (include Measurable Goals (include milestones, (MM/YY) (enter override the drop personnel position or timeframes and frequencies) your own text to down menu) department responsible) override the drop down menu) The Environmental Services The Environmental Department has adopted the Services Department will Maricopa County Stormwater Quality Legal Authority Management and Discharge Control maintain legal authority to for Construction Regulation. This regulation will be Activity enforce stormwater runoff evaluated annually for compliance 12/2009 Compliance during construction and any new rules or newly adopted activities. legal authority will be reported annually. The Environmental Services Department has adopted the The Environmental Maricopa County Stormwater Quality Services Department and Management and Discharge Control Ordinance for the Flood Control District Regulation and the Flood Control Erosion Control will maintain an ordinance District of Maricopa County has 12/2009 Practices that requires the use of adopted the Drainage Design Manual sediment and erosion (Erosion Control). Ordinances will be control practices. reviewed and updated as needed for compliance. Any updates will be reported annually. An online inventory of all The Environmental construction activities was developed Services Department will in June of 2016. This online inventory create and maintain an will be maintained and updated Inventory 9/2016 inventory of construction annually. The online inventory is activities. stored and maintained in the Stormwater Program’s Geographical Information Systems Data Base. Site inspection procedures have been The Environmental in place since 2009 and formalized in Services Department will Written a Standard Operating Procedure formalize written Procedures for (SOP). This SOP was created May 11, 12/2009 procedures in the form of Site Inspection 2010 and updated November 3, 2015. Standard Operating The SOP has subsequently been Procedures. updated in 2016 to incorporate a Page 13 of 23 NOI for Small MS4 September 2016 prioritization schedule. Re-inspection and enforcement procedures are outlined and detailed The Environmental Re-Inspection in a program SOP, and in the Services Department will and enforcement Maricopa County Stormwater Quality 12/2009 maintain re-inspection and Procedures Discharge and Control Regulation. enforcement procedures. The Environmental Site plan review procedures have Site Plan Review Services Department will been established since 2009 and 12/2009 Procedures create and maintain site updated in 2016. plan review procedures. The Environmental Services Department will The number of applications received Site Plan Review record the number of and reviewed will be reported 12/2009 permit applications annually. received and reviewed. The Environmental Services Department will develop, implement and incorporate into the Training sessions will be provided existing training program, annually. The number of trainings education and training conducted, type of training, the specifically on construction Training Department that received trainings 9/2016 activity stormwater runoff and the number of employees trained for employees who will be reported annually. conduct activities related to implementing the construction activity stormwater runoff control program. An active webpage with educational The Environmental material will be maintained. The Services Department will Education/ Public number of webpage hits and the make available educational 12/2009 Involvement quantity and type of educational materials for the materials distributed will be tracked development community. and reported annually. At a minimum, 1 stake holder The Environmental workshop will be held annually. The Education/ Public Services Department will number of workshops and the 12/2009 Involvement host a stake holder number of participants will be workshop annually. reported annually. The Environmental The number of construction Tracking and Services Department will inspections, re-inspections, and 12/2009 Recordkeeping maintain a tracking and violations documented and the Page 14 of 23 NOI for Small MS4 September 2016 recordkeeping program for number of enforcement actions will the construction program. be reported annually. MCM 4: Construction Activity Stormwater Runoff Control Use this space to add any additional information about MCM4: Complaint Response Program. The Environmental Services Department will maintain a complaint response (hotline) program. The type and number of complaints received will be reported annually. The Environmental Services Department will respond and investigate all complaints within 15 days of the complaint received date. 12/2009. Page 15 of 23 NOI for Small MS4 September 2016 G-5. MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment For MCM 5- Post-Construction Stormwater Management in New Development and Redevelopment, use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. BMP Category (enter Start Date your own text to BMP Description (include Measurable Goals (include milestones, (MM/YY) (enter override the drop personnel position or timeframes and frequencies) your own text to down menu) department responsible) override the drop down menu) Maricopa County has developed and Maricopa County Planning will enforce the following ordinances: and Development, Flood Regulatory Stormwater Quality Management and Control District and the Mechanism for Discharge Control Regulation, Environmental Service Post-Construction Drainage Policies and Standards 12/2009 Stormwater Department will maintain Manual, Drainage Regulations and Controls and enforce programs to Floodplain Regulations. Legal address post-construction mechanisms and ordinances will be stormwater runoff. maintained and updated as needed. The Environmental Guidance and educational materials Services Department will Technical will be made available on the develop and distribute Guidance and Stormwater webpage. The number of technical guidance and 12/2009 Educational materials distributed and the number educational materials for Materials of webpage hits and downloads will post construction be reported annually. stormwater management. A staff of at least 1 will be assigned to The Environmental conduct post construction plan Services Department will reviews. The number of staff Site Plan Reviews 12/2009 implement and maintain a performing reviews and the number site plan review process. of applications received and reviewed will be reported annually. Post-construction permits will be The Environmental inspected annually. The number of Services Department will post-construction inspections, the Inspections maintain the post number of violations observed, 12/2009 construction inspection number of re-inspections and any program. enforcement actions will be reported annually. The Environmental An inventory of post-construction Services Department will structural stormwater control maintain an up to date measures will be maintained. Inventory inventory of post- Inventory is stored both in paper 9/2016 construction structural application format and is available on stormwater control the Geographical Information System measures. database. Page 16 of 23 NOI for Small MS4 September 2016 Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. Choose an item. Click here to enter text. Click here to enter text. Choose an item. MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment Use this space to add any additional information about MCM5: NA Page 17 of 23 NOI for Small MS4 September 2016 G-6. MCM 6: Pollution Prevention and Good Housekeeping For MCM 6- Pollution Prevention and Good Housekeeping, Insert the Facility Name applicable to the MS4. Use the pull down menu to indicate the BMP Category (column 1). You may override the selection and type in your own BMP. Include a brief description of the BMP (column 2) including the personnel position or department(s) responsible. Describe the Measureable Goals (column 3) for each BMP. Column 3 should include milestones, timeframes and frequencies. Insert the month and year (MM/YY) in the Start Date (column 4) to indicate the date the BMP was initiated or enter your own text to override the selection. For those BMPs that are not Facility specific, use the rows after the Facility Name inserts. Start Date BMP Category (enter BMP Description (include (MM/YY) (enter your own text to Measurable Goals (include milestones, personnel position or your own text to override the drop timeframes and frequencies) department responsible) override the drop down menu) down menu) Insert Facility Name: South West Service Center The Equipment Services All actions, schedules, objectives and Department will obtain and obligations are outlined in the SWPPP maintain a Stormwater SWPPP. Therefore, the measurable 12/2010 Pollution Prevention Plan. goal is to fulfill the requirements as detailed in the approved SWPPP. Insert Facility Name: Durango Service Center The Equipment Services All actions, schedules, objectives and Department will obtain and obligations are outlined in the SWPPP maintain a Stormwater SWPPP. Therefore, the measurable 12/2010 Pollution Prevention Plan. goal is to fulfill the requirements as detailed in the approved SWPPP. Insert Facility Name: North Valley Service Center The Equipment Services All actions, schedules, objectives and Department will obtain and obligations are outlined in the SWPPP maintain a Stormwater SWPPP. Therefore, the measurable 12/2010 Pollution Prevention Plan. goal is to fulfill the requirements as detailed in the approved SWPPP. Insert Facility Name: Southeast Service Center The Equipment Services All actions, schedules, objectives and Department will obtain and obligations are outlined in the SWPPP maintain a Stormwater SWPPP. Therefore, the measurable 12/2010 Pollution Prevention Plan. goal is to fulfill the requirements as detailed in the approved SWPPP. Insert Facility Name: Morristown Transfer Station Waste Resources and All actions, schedules, objectives and Recycling Management obligations are outlined in the SWPPP Department will obtain SWPPP. Therefore, the measurable 12/2010 and maintain a Stormwater goal is to fulfill the requirements as Pollution Prevention Plan. detailed in the approved SWPPP. Insert Facility Name: New River Transfer Station Page 18 of 23 NOI for Small MS4 September 2016 Waste Resources and All actions, schedules, objectives and Recycling Management obligations are outlined in the SWPPP Department will obtain SWPPP. Therefore, the measurable 12/2010 and maintain a Stormwater goal is to fulfill the requirements as Pollution Prevention Plan. detailed in the approved SWPPP. Insert Pollution Prevention and Good Housekeeping BMPs that are not facility specific below The number of miles swept will be reported annually. The current The Department of frequency and schedule for street Transportation will Street Sweeping sweeping is as follows: 12/2009 maintain a regular street 16 weeks for arterial streets sweeping program 8 weeks for residential streets 2 weeks for special cycle streets The Environmental Services Department, Risk Management and The inventory will be maintained and Inventory 12/2011 Equipment Services will updated annually. keep an inventory of all county owned or leased facilities. The Environmental Services Department will A priority facility inventory was Facility prioritize facilities through created in 2016. This inventory will 9/2016 Prioritzation an internal evaluation be maintained and updated annually based on their associated based on inspection findings. risk of potential pollutant discharge. A minimum of 20% of all facilities will The Environmental be inspected annually by the Services Department and Environmental Services Department. the Equipment Services The Equipment Services Department Inspections Department will maintain will maintain a regular inspection 12/2011 an inspection program for program of 4 facilities that receive County owned or leased inspections daily, quarterly and facilities. annually. The number of inspection conducted will be reported annually. The Environmental 100% of all priority facilities will be Services Department will Priority inspected annually. The number of maintain an inspection 9/2016 Inspections inspections conducted will be program for Priority reported annually. Facilities. The Environmental Training sessions will be provided Training 12/2009 Services Department will annually. The number of trainings Page 19 of 23 NOI for Small MS4 September 2016 maintain the County wide conducted, type of training, the education and training Department that received trainings program on Stormwater and the number of employees trained Pollution Prevention. In- will be reported annually. person trainings and online classes will be utilized. The Department of Transportation and the Flood The Department of Transportation will Control District will maintain maintain a fully staffed roadway a maintenance program of operation division and the Flood Control County owned infrastructure. Maintenance and District will maintain a fully staffed The Environmental Services 9/2016 Inspections. operation and maintenance division. The Department will maintain the Environmental Services Department will proactive inspection program maintain staff to preserve to the of the entire MS4 to identify proactive MS4 inspection program. potential sources of pollution. MCM 6 Pollution Prevention and Good Housekeeping Use this space to add any additional information about MCM6: New River Transfer Station. SWPPP. Waste Resources and Recycling Management Department will obtain and maintain a Stormwater Pollution Prevention Plan. All actions, schedules, objectives and obligations are outlined in the SWPPP. Therefore, the measurable goal is to fulfill the requirements as detailed in the approved SWPPP. 12/2010. Hassayampa Transfer Station. SWPPP. Waste Resources and Recycling Management Department will obtain and maintain a Stormwater Pollution Prevention Plan. All actions, schedules, objectives and obligations are outlined in the SWPPP. Therefore, the measurable goal is to fulfill the requirements as detailed in the approved SWPPP. 12/2010. Rainbow Valley Transfer Station. SWPPP. Waste Resources and Recycling Management Department will obtain and maintain a Stormwater Pollution Prevention Plan. All actions, schedules, objectives and obligations are outlined in the SWPPP. Therefore, the measurable goal is to fulfill the requirements as detailed in the approved SWPPP. 12/2010. Cave Creek Transfer Station. SWPPP. Waste Resources and Recycling Management Department will obtain and maintain a Stormwater Pollution Prevention Plan. All actions, schedules, objectives and obligations are outlined in the SWPPP. Therefore, the measurable goal is to fulfill the requirements as detailed in the approved SWPPP. 12/2010. Aguila Transfer Station. SWPPP. Waste Resources and Recycling Management Department will obtain and maintain a Stormwater Pollution Prevention Plan. All actions, schedules, objectives and obligations are outlined in the SWPPP. Therefore, the measurable goal is to fulfill the requirements as detailed in the approved SWPPP. 12/2010. Page 20 of 23 NOI for Small MS4 September 2016 H. MONITORING 1. DRY WEATHER VISUAL OUTFALL MONITORING Has a dry weather visual discharge monitoring program been developed? Yes No If the above answer is “yes,” provide the actual date of implementation: 12/1/2009 If the above answer is “no,” provide estimated date of completion: Click here to enter a date. Estimated total number of municipal stormwater Percent of total number of municipal stormwater outfalls to be outfalls monitored each year 394 20% 2.A VISUAL STORMWATER DISCHARGE MONITORING Below identify a minimum of five outfalls or field screening points for the visual stormwater discharge monitoring program Is the receiving water listed as an Outfall or field screening Name of receiving water Impaired, Not-Attaining or OAW point identification number (choose one)? MCSW-ANTHEM-011 Deadman Wash No MCSW-EAST-032 Un-Named Wash No MCSW-EAST-049 Sonoqui Wash No MCSW-SCITY-005 McMicken Wash No MCSW-SCITY-014 Agua Fria River No 2.B VISUAL STORMWATER DISCHARGE MONITORING ALTERNATIVE Are you proposing a visual stormwater discharge monitoring alternative? Yes No If “yes” a visual stormwater discharge monitoring alternative is being proposed, provide a description of the proposed alternative and how the proposed alternative is as effective as, or is more effective than, visual stormwater discharge monitoring in the space below. Click here to enter text. 3. IMPAIRED, NOT-ATTAINING AND OAW MONITORING AND BMPS Part H.3 is to be completed only if the MS4 has outfalls that discharge to an Impaired, Not-Attaining or Outstanding Arizona Water (OAW), or a combination there of. Has a Sampling and Analysis Plan (SAP) been developed in accordance with permit Part 5.1.g? Yes No If the above answer is “no,” provide an estimated date of completion for the SAP: Click here to enter a date. How Provide a description of how the List each individual receiving many List selected BMPs will specifically water that is Impaired, Not- List outfall ID or outfalls parameter(s) to address the pollutant(s) causing the Attaining or an OAW that the unique identification will be be analyzed impairments or how the BMPS will MS4 discharges to sampled? be protective of the OAW Page 21 of 23 NOI for Small MS4 September 2016 Click here to enter Click here to Click here to enter text. Click here to enter text. text. enter text. Click here to enter Click here to Click here to enter text. Click here to enter text. text. enter text. Click here to enter Click here to Click here to enter text. Click here to enter text. text. enter text. Click here to enter Click here to Click here to enter text. Click here to enter text. text. enter text. Click here to enter Click here to Click here to enter text. Click here to enter text. text. enter text. I. NOTES AND ADDITIONAL INFORMATION Use the space below to provide any additional information about the MS4 program. Click here to enter text. J. FEES Fill out either Part A for a New Permittee or Part B for an Existing Permittee. If a New Permittee, choose one check box below to indicate the MS4s population and applicable initial permit fee. Insert the total payment included with the NOI in the text box. If an Existing Permittee, choose one check box below to indicate the MS4s population. Note: The estimated MS4 population should be based on latest Decennial Census by the Bureau of Census. Part A Part B New Permittee. Existing Permittee. I confirm the correct fee payment is included with the NOI. No fee is required for NOI submission. You will continue to be <or = to 10,000: $2,500 invoiced on your current annual fee billing cycle. >10,000 but ≤ 100,000: $5,000 <or = to 10,000 > 100,000: $7,500 >10,000 but ≤ 100,000 Non-traditional MS4 such as hospital, college or > 100,000 military: $5,000 Non-traditional MS4 such as hospital, college or military Total fee payment included: Click here to enter text. K. CERTIFICATION Pursuant to A.R.S. § 41-1030: (1) ADEQ shall not base a licensing decision, in whole or in part, on a requirement or condition not specifically authorized by statute or rule. General authority in a statute does not authorize a requirement or condition unless a rule is made pursuant to it that specifically authorizes the requirement or condition. (2) Prohibited licensing decisions may be challenged in a private civil action. Relief may be awarded to the prevailing party against ADEQ, including reasonable attorney fees, damages, and all fees associated with the license application. (3) ADEQ employees may not intentionally or knowingly violate the requirement for specific licensing authority. Violation is cause for disciplinary action or dismissal, pursuant to ADEQ’s adopted personnel policy. ADEQ employees are still afforded the immunity in A.R.S. §§ 12-821.01 and 12-820.02. I certify under penalty of law that I have met the eligibility conditions of this permit and that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I certify that I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Page 22 of 23 NOI for Small MS4 September 2016 Printed Name: Title: Click here to enter text. Click here to enter text. Ink Signature Date: Page 23 of 23 NOI for Small MS4 September 2016