Run Date: 09/19/2022 U.S. DEPARTMENT OF TRANSPORTATION Report: FMISD05A
Run Time: 12:44:41 FEDERAL HIGHWAY ADMINISTRATION Page 1 of 2
FEDERAL-AID PROJECT AGREEMENT
RECIPIENT: 4-Arizona FEDERAL PROJECT NO: MMA0287
UEI (SAM): MSVMLAKEYJC5 RECIPIENT PROJ. NO(S): T029001X
1. The State through its department of transportation, or other recipient, has complied, or hereby agrees to comply, with the applicable terms and conditions
set forth in (a) Title 23, U.S. Code, highways; (b) The regulations issued pursuant thereto, and the policies and procedures promulgated by the
Federal Highway Administration; and (c) All other applicable federal laws and regulations.2. The State, or other recipient, stipulates that as a
condition to payment of the Federal funds obligated, it accepts and will comply with the provisions set forth in 23 CFR 630.112. These provisions
incorporate by reference all other federal laws and regulations pertaining to the project or the activity for which the funds are obligated. Solely for the
purposes of emphasis, such applicable provisions include, but are not limited to, the requirements of Appendix A to 2 CFR Part 170—Award terms for
Reporting subaward and executive compensation information, and 2 CFR 200, including for those funds for which such amount will be subawarded to a
subrecipient, 2 CFR 200.331.3. Relative to the above designated project, the FHWA has authorized certain work to proceed as evidenced by the date entered
opposite the specific item of work. For such authorized work, the federal funds obligated or advance-construction authorized, are not to exceed the amount
shown herein. The balance of the estimated total project cost is an obligation of the State or other direct recipient.4. Such authorization of Federal funds
extends only to project costs incurred by the State, or other recipient, following Federal Highway Administration’s authorization to proceed with the project.
PROJECT TITLE: MCDOT Traffic Management Center, Various Locations, Maricopa County
PROJECT DESCRIPTION: Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe, Phoenix, Mesa,
Glendale, Scottsdale, Peoria, and Chandler; implement inter-operable communications pilot; conduct inter-agency
training; implement pilot integration of Tempe Police CAD; operate REACT O&M for three years. This is a procurement
only project.
DUNS#:
SUB-ORG UEI (SAM):
SUB-ORG NAME:
PROJECT END DATE: 12/31/2025
CLASSIFICATION OF PHASE OF WORK EFFECTIVE DATE OF
TO BE PUT UNDER AGREEMENT AUTHORIZATION
HIGHWAY PLANNING & RESEARCH
PRELIMINARY ENGINEERING
RIGHT-OF-WAY
CONSTRUCTION
OTHER 09/16/2022
PROGRAM FAIN URBAN/ TOTAL COST FEDERAL FEDERAL FUNDS ADVANCED
CODE WITH SHARE UNDER CONST. FUNDS
AGREEMENT
Y400 693JJ22230000Y400AZMMA0287 $575,959.00 94.30% $543,129.00 $0.00
TOTAL $575,959.00 $543,129.00 $0.00
ESTIMATED TOTAL COST: $575,959.00
TOTAL AUTHORIZED FOR PROJECT: $543,129.00
TRANSPORTATION, ARIZONA DEPARTMENT OF
AVAILABLE FUNDS CERTIFIED BY: Maria Coronado DATE: 08/18/2022
APPROVED AND REQUESTED BY: Alison Hill DATE: 08/18/2022
AGRMT/MODIFY REQUESTED BY: Alison Hill DATE: 08/18/2022
FEDERAL HIGHWAY ADMINISTRATION
PROJECT INFORMATION REVIEWED BY: Roman Moreno DATE: 08/18/2022
APPROVAL RECOMMENDED BY: Kimberly Utley DATE: 09/16/2022
APPROVED AND AUTHORIZED BY: Thomas Deitering DATE: 09/19/2022
RECIPIENT REMARKS: *OTHER
Project End Date: 12/31/2025
CFDA Number: 20.205
FY23 ICAP Rate: 10.50%, not applicable to this project
DIVISION REMARKS: Project End Date: 12/31/2025
Run Date: 09/19/2022 U.S. DEPARTMENT OF TRANSPORTATION Report: FMISD05A
Run Time: 12:44:41 FEDERAL HIGHWAY ADMINISTRATION Page 2 of 2
FEDERAL-AID PROJECT AGREEMENT
CFDA Number: 20.205
FY23 ICAP Rate: 10.50%, not applicable to this project
OTH authorized on 9/16/22 by KUtley.
FEDERAL HIGHWAY ADMINISTRATION - ARIZONA DIVISION OFFICE LETTER OF AUTHORIZATION AND PROJECT AGREEMENT
ARIZONA DEPARTMENT OF TRANSPORTATION Authorization Modified Project Agreement
Project Agreement Grant Agreement
The state agrees that as a condition to payment of the Federal funds obligated, it accepts and will
"The FHWA and ADOT Stewardship and Oversight Agreement for Arizona (April, 2015)" comply with the agreement provisions set forth in 23 CFR 630.112; and its signature constitutes
the making of the certificates.
UEI (SAM): MSVMLAKEYJC5
FEDERAL AID PROJECT NO. SUFFIX PROGRAM / PHASE (ADOT) COUNTY
MMA-0(287) D T0290 01X MARICOPA
DATE AUTHORIZATION EFFECTIVE FMIS DATE
GENERAL LOCATION
MCDOT Traffic Management Center, Various Locations, Maricopa County
GENERAL DESCRIPTION OF WORK
Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe, Phoenix, Mesa, Glendale, Scottsdale, Peoria, and Chandler; implement
inter-operable communications pilot; conduct inter-agency training; implement pilot integration of Tempe Police CAD; operate REACT O&M for three years. This is a
procurement only project.
YOU ARE AUTHORIZED TO PROCEED WITH THE WORK CHECKED BELOW:
PHASE I: PRELIMINARY ENGINEERING - SCOPING, LOCATION STUDIES, CONSTRUCTION - ADVERTISE FOR RECEIPT OF BIDS
ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN
PHASE II: PRELIMINARY ENGINEERING - FINAL DESIGN/PREPARATION OF CONSTRUCTION - PROCEED ON AN AGREED PRICE
CONTRACT PLANS AND/OR FORCE ACCOUNT BASIS
ACQUISITION OF RIGHT-OF-WAY Other: Pilot for Arterial Traffic Incident
Management Program
FUNDING TOTAL ESTIMATED PROJECT FEDERAL PARTICIPATION AMOUNT($) FEDERAL FUNDS($) APPN CODE RATIO(%)
COST($)
PREVIOUS
AUTHORIZATIONS:
THIS AUTHORIZATION $575,959 $575,959 $543,129 Y400 94.30%
PROJECT TOTALS $575,959 $575,959 $543,129
OTHER (SPECIFY)
Project End Date: 12/31/2025
CFDA Number: 20.205
FY23 ICAP Rate: 10.50%, not applicable to this project
C & S Engineer email contact # Authorization
A Madhav Mundle Mmundle@azdot.gov 602-712-2132 F by
D Project Manager email contact # H for Division Administrator
O Maria Coronado mcoronado@azdot.gov 602-712-8428 8/17/2022 W
Prepared by email contact # date Agreement
T 8/18/2022 A
Authorized by Date by
Resource Administration for Division Administrator
Title
Form AZPR2X (03/2012) - Approved by FHWA for use by ADOT
FEDERAL AID REQUEST FOR AUTHORIZATION - CONSTRUCTION
ADOT OFFICE OF RESOURCE ADMINISTRATION
1 Date: August 12, 2022 4 Org Number: 4983
2 Project Manager: Madhav Mundle 5 Org Name: IDO Project Management
3 Project Manager Phone #: 602-712-8495 6 Org Manager: Steve O'Brien
EMAIL eprosnier@azdot.gov
7 Federal Aid Project No.: MMA-0(287)D 8 ADOT Project No. T0290 01X
MCDOT Traffic Management Center, Various
9 Location: Locations, Maricopa County 10 Route/County/MP: 0000 MA MMA
Description of Work: Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe,
Phoenix, Mesa, Glendale, Scottsdale, Peoria, and Chandler; implement inter-operable communications
pilot; conduct inter-agency training; implement pilot integration of Tempe Police CAD; operate REACT O&M
for three years. This is a procurement only project
11
12 STIP Year: 2022 14 ADOT Estimate: $575,959 15 Program Estimate: $575,959
13 STIP/TIP #: MAG 22-03 16 Estimate Cost Variance by $ and %: $0 / 0.00%
17 Local Matching Funds Received? (Yes No N/A): N/A 18 Est. Constr. Date:
Project End Date: 12/2025
19 Required Agreement Numbers JPA: N/A / Execution date or Status:
Utility: / Execution date or Status:
Other (identify): / Execution date or Status:
20 Additional Information: CA Agency 21 Advertising Area: Local
21 Activity: 22 Sub / Ph: 23 Item# 24 Sub Project Funds: 25 ICAP (CAX): 26 Total Costs:
Other 01X 80401 543,129 0 543,129
Other 01X 60000 32,830 0 32,830
0 0
27 Totals: $575,959 $0 $575,959
28 Responsible Manager: Madhav Mundle 8/12/2022 Add Rows
Name Date
THIS SECTION RESERVED FOR PROGRAM FINANCE USE ONLY:
Funding Type Program/Provider: Amount:
Federal: 94.30% Y400 $543,129
Local: 5.70% Maricopa County $32,830
Local: 0.00% $0
ICAP: 0.00% $0
Total: $575,959
Funds Available From: (listed in order of Activity):
Item # Program Yr: Amount
80401 / 2022 / $543,129
60000 / 2022 / $32,830 MARIA CORONADO 8/17/2022
/ / $0 Program Budget Date
/ / $0
/ / Program Finance Date
/ /
Totals: $575,959 Finance Remarks:
Approving Official: 8/18/2022
Signature Date
FHWA - ARIZONA DIVISION FMIS4 CODING FORM
Federal Aid Project No.: MMA-0(287)D ADOT Project No. T0290 01X
(Conventional, Emergency
Project Type: C - Conventional Relief, Demo, STP, SIB) Route/County/MP 0000 MA MMA
Project Description & MCDOT Traffic Management Center, Various Locations, Maricopa County
Type of Work: Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe,
Phoenix, Mesa, Glendale, Scottsdale, Peoria, and Chandler; implement inter-operable communications pilot;
conduct inter-agency training; implement pilot integration of Tempe Police CAD; operate REACT O&M for
three years. This is a procurement only project
Standard Place Code: Inventory Rte No.: N/A
Mile Point Number: Begin: N/A Ending: N/A Est Constr Date:
((EIS, Catg Excl-(Programmatic-
Environmental State Docs- FHWA Docs),
STIP/TIP #: MAG 22-03 STIP Year: 2022 Document: 2A - CE, Prog Environ Assess, FONSI))
Enviro Doc County
Date: Name: Maricopa Urbanized Area: 033 - Phoenix Urban/Rural: Urban
(Freeway & Exprwy, Local, Major Collector, Minor
Arterial, Minor Collector,Other Principal Arterial, No
Functional System: L Functional Class)
(Interstate, NHS not on Interstate, Not on Federal Aid System,
Fed Aid System: O Other Federal Aid Hwy)
Congressional District(s) & %: 7 100.00% % % %
Safety Matching Indian
Toll Road? 100%: ? Resv? FTA? Construction?
Contracts and Specifications Engineer: Madhav Mundle 602-712-8495 FHWA Area: A-4
GREYED OUT SECTIONS TO BE COMPLETED BY PROGRAM FINANCE:
IMPROVEMENT PROG
LINE ITEM TYPE CODE FEDERAL AMT OTHER SRC OTHER AMT TOTAL AMT NBI #
1 44 Y400 $543,129 Local $32,830 $575,959
2
3
4
5
6
7
8
9
10
11
12
13
14
Eng & Cont LOCAL
Eng & Cont LOCAL
Consult Svs LOCAL
Consult Svs STATE
DPS Sfty
Incentives
Smoothness STATE
Incentive
Other STATE
GRAND TOTAL: $543,129 $32,830 $575,959
AZFMIS4 FMIS4FORM
DETAILED ESTIMATE
RECAPITULATION
Maricopa County Department of Transportation (MCDOT) Traffic Management Center and Tempe Traffic Management Center
LOCATION:
DESCRIPTION OF WORK:
Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe, Phoenix, Mesa, Glendale,
Scottsdale, Peoria, and Chandler; implement inter-operable communications pilot; conduct inter-agency training; implement pilot
integration of Tempe Police CAD; operate REACT O&M for three years. This is a procurement only project
Sheet 1 of 1
Federal Aid Project No. MMA-0(287) D 6/6/2022
ADOT Project Number T0290 01X MCDOT
FHWA ESTIMATED FEDERAL FEDERAL LOCAL LOCAL
DESCRIPTION CODE COST PARTICIPATING FUNDS FUNDS FUNDS
94.3 94.30% 5.70% 100.00%
Traffic Management 44 $575,959 $575,959 $543,129 $32,830
SUBTOTAL $575,959 $575,959 $543,129 $32,830 $0
PROJECT TOTAL: $575,959 $575,959 $543,129 $32,830 $0
TOTAL FEDERAL (100%) $543,129
TOTAL LOCAL (5.74%) $32,830
TOTAL LOCAL (100%) $0
TOTAL $575,959
DocuSign Envelope ID: 70898C62-DA39-4566-B7ED-794259093004
Our True North: Safely Home
Infrastructure Delivery and Operations Douglas A. Ducey, Governor
John S. Halikowski, Director
Greg Byres, Deputy Director for Transportation
09/12/2022 Steve Boschen, Division Director
Ms. Karla S. Petty
Division Administrator
Federal Highway Administration
4000 N. Central Ave., Suite 1500
Phoenix, Arizona 85012-1906
RE: ADOT PROJECT NO.: T0290 01X
FEDERAL PROJECT NO.: MMA-0(287)D
PROJECT TERMINI: N/A
PROJECT LOCATION: Procurement Only
X CONTRACT TIME: 365 ( WORKING DAYS or X CALENDAR DAYS), or
FIXED DATE:
ESTIMATED CONTRACT COST: $ 575,959.00
Dear Ms. Petty,
The Arizona Department of Transportation (ADOT) is ready to request authorization for the above mentioned
Certification Acceptance Agency project.
The final set of Plans, Specification and Estimate (PS&E) for this project was approved on: 05/01/2022
by: April Wire and verified by ADOT on: N/A
The Proposed Work is:
Pavement Preservation:
Pavement Preservation – Surface treatments less than two-inches.
Pavement Rehabilitation (3R) – Mill and Fill greater than two-inches.
X Other (Indicate Type of Work): Procurement Only
X Procurement:
X Materials only procurement – Installation will be completed by Local Agency forces without any Federal
participation or reimbursement for installation. Cost of installation is included as non-participating.
Materials only procurement – Installation will be completed by Contractor without any Federal participation
or reimbursement for installation. Cost of installation is included as non-participating.
Procurement of materials and installation completed by Contractor using Federal funds.
Procurement of materials and resources for the Safe Routes to School (SRTS) Support Program.
Rev. 09/22 ARIZONA DEPARTMENT OF TRANSPORTATION 1 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
DocuSign Envelope ID: 70898C62-DA39-4566-B7ED-794259093004
The Project Description is:
Pilot for Arterial Traffic Incident Management Program for ICM in cooperation with the Cities of Tempe, Phoenix,
Mesa, Glendale, Scottsdale, Peoria, and Chandler; implement inter-operable communications pilot; conduct inter-
agency training; implement pilot integration of Tempe Police CAD; operate REACT O&M for three years. This is a
procurement only project
X No.
Yes, a 5% increase in Federal Aid participation for Innovative Technology Deployment (ITD) is included in this
request. ITD funds will be used for:
Project Funding:
X The project is included in the approved 5-Year program.
X The project is included in STIP Number 36783 approved by FHWA on: N/A
The STIP amendment number if applicable was approved by FHWA on:
X The project is included in TIP Number 22-03
Is this project using HSIP funding? X No. Yes, eligibility approved on: by:
Is there a Local / 3rd Party contribution of funds above the required match?
X No.
Yes, all work is eligible. The Local / 3rd Party is committed to funding $ of the project. Should the bids
come in low, no local funding will be deobligated.
Yes, the total Local / 3rd Party contribution above the required match is $
Of this amount:
$ is eligible for Federal reimbursement, including if bids are low or major changes occur.
$ is not eligible for Federal reimbursement; should bids be low or any major changes occur, this
portion cannot be replaced with Federal Aid. The reason for the overmatch is:
Design Exceptions: X Were not required for this project.
Were approved for this project on: by:
System Engineering: X Was not required on this project.
Was approved for this project on: by:
Is a Utility Clearance Letter required for this project? No.
X Yes.
If Yes, the Utility Clearance Letter for this project was issued on: 11/23/2020
Rev. 09/22 ARIZONA DEPARTMENT OF TRANSPORTATION 2 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
DocuSign Envelope ID: 70898C62-DA39-4566-B7ED-794259093004
Choose the appropriate statement:
X Type 1 – All utilities have been cleared and relocated prior to construction.
Type 2 – Conditional Certification – Project can be authorized but will not be advertised prior to completion
of utility relocation.
Type 3 – Conditional Certification – Utilities will be cleared during construction either by the contractor or by
the Utility under the ADOT/LPA direction. Prior to the ADOT/LPA issuing a notice to proceed with
construction to the contractor, the ADOT/LPA shall provide an updated notification to FHWA identifying all
location where utilities have not been relocated along with a realistic date when physical relocation is
anticipated.
Type 4 – Conditional Certification – Utilities must be cleared or relocated prior to bid opening.
Choose the appropriate statement:
X There is no railroad within ½ mile of the project limits.
There is a railroad within ½ mile of the project limits, but there is no railroad work on this project. The
railroad was notified and has approved the project plans.
There is a railroad within the project limits. The railroad work was complete prior to advertisement of this
project.
There is a railroad within the project limits. The railroad work will be completed with this project by the
Contractor. See the attached special provisions for required coordination with the railroad and impacts to
this project.
There is a railroad within the project limits. The railroad work will be completed with this project by the
Railroad. See the attached special provisions for required coordination with the railroad and impacts to this
project.
Is a Right of Way Clearance Letter required for this project? No.
X Yes.
If yes, the Right of Way Clearance Letter for this project was issued on: 12/01/2020
The Conditional Clearance, if applicable was approved by FHWA on:
Choose the appropriate clearance type:
X Type 1 – In accordance with 23 CFR 635.309(c)(1) – All property rights including legal and physical possession
have been obtained to construct the project and all relocation has been completed.
Type 2 – is considered a Conditional Clearance: In accordance with 23 CFR 635.309(c)(2) – All property rights
have not been fully acquired, but the right to occupy and to use all rights of way required for the proper
execution of the project has been acquired. Trial or appeal of some parcels may be pending in court and on
other parcels full legal possession has not been obtained but the right of entry has been obtained.
Type 3 – is considered a Conditional Clearance: In accordance with 23 CFR 635.309(c)(3)-All property rights
have not been obtained, but appropriate notification will be provided in the request for bids, identifying all
locations where right of occupancy and use has not been obtained. FHWA has received appropriate
notification identifying all locations where right of occupancy and use has not been obtained. Prior to the
ADOT/LPA issuing a notice to proceed with construction to the contractor, the ADOT/LPA shall provide an
updated notification to FHWA identifying all locations where right of occupancy and use has not been
obtained along with a realistic date when physical occupancy and use is anticipated.
Business Engagement and Compliance (BECO) has established a DBE participation rate of 0.00 % for this phase of
the project.
Department Furnished Materials: X Are not required for this project.
Were approved for this project on:
Rev. 09/22 ARIZONA DEPARTMENT OF TRANSPORTATION 3 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
DocuSign Envelope ID: 70898C62-DA39-4566-B7ED-794259093004
A VE Study: X Was not conducted on this project.
Was conducted on this project on:
The NEPA Approval for this project was issued on: 12/4/2020
A formal Re-Evaluation (CE, EA, EIS), if applicable, was issued on:
X 326 MOU 327 MOU
ADOT certifies that NEPA requirements consistent with the scope of work of the project have been met and the
project incorporates all environmental commitments per 23 CFR 771.109(d).
Project Environmental Clearance information provided by Environmental Planner:
______________________________ ___________________ 09/12/22
Signature of Environmental Planner Date
____________________________ Katie Rodriguez
Printed Name
The Department respectfully requests authorization to proceed with advertisement of bids for construction work on
this project.
Sincerely,
_____________________________ 09/12/2022 ___________________
Signature of Project Manager Date
____________________________ Dana Cherry
Printed Name
Rev. 09/22 ARIZONA DEPARTMENT OF TRANSPORTATION 4 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
DocuSign Envelope ID: C3293C20-7A9D-4EA6-B191-86773D74F4F5
Systems Engineering Checklist
41-2000
Prior to design, complete or update a Systems Engineering and Architecture Compliance Checklist or report (depending on
the complexity of the project) for projects containing any Intelligent Transportation Systems (ITS) elements. Submit the
checklist or report to the Arizona Department of Transportation (ADOT) Systems Technology Group manager for review
and approval. If federally funded, submit the approved checklist or report to the Federal Highway Administration (FHWA)
as part of the federal authorization paperwork.
Section 1 – Project Information
1.1a ADOT Project Manager and Contact Information:
Eric Prosnier, (602) 712-8495, eprosnier@azdot.gov
1.1b Consultant Project Manager and Contact Information: N/A
1.1c Local Public Agency Project Manager and Contact Information: N/A
April Wire april.wire@Maricopa.gov 602.506.7174
1.2 Project Location:
Loop 101 Corridor along Phoenix, Glendale, Peoria, Scottsdale, Tempe, and Chandler
Federal-Aid: YES NO
1.3 ADOT Project Number (also known as TRACS):
Federal-Aid Project Number: N/A
T0290 (sub-phases 01D/01X) MMA-0-(287)D
1.4 Project Description, Title, and Type of Work:
REACT Integrated Corridor Management (ICM) Arterial Traffic Incident Management (TIM) Pilot: Procure additional REACT
equipment to support arterial TIM along the Loop 101corridor; establish interoperable communications during ICM events. Integrate
Tempe CAD into RADS.
1.5 Funding and Source of Each (Including State and Federal):
Federal: $ 575,959
Fiscal Year: 2021
Other (Please Specify):
1.6 Nature of Work (select all appropriate boxes):
Software/Integration Planning
Construction Equipment Upgrades
Operations Preliminary Engineering
Evaluations Other (Please Specify):
1 Version Date:March 29, 2019 14-461
DocuSign Envelope ID: C3293C20-7A9D-4EA6-B191-86773D74F4F5
Systems Engineering Checklist
41-2000
Section 2 – ITS Architecture Conformance
National, Arizona, MAG, and PAG all have ITS Architectures available online.
If the project is located on a local jurisdiction facility within MAG, search MAG 2013 Architecture.
If the project is located on a local jurisdiction facility within PAG, search PAG 2004 Architecture.
All others, search Arizona 2018 Architecture.
2.1 Service Packages identified in MAG Architecture
http://azmag.gov/Programs/Transportation/Road-Safety-and-Technology/MAG-Regional-ITS-Architecture/MAG-ITS-
Architecture
Service (formerly “market”) Packages identified in PAG Architecture
http://www.pagnet.org/documents/its/2004-ITS-SDP.pdf
Service Packages identified in Arizona 2018 Architecture
https://apps.azdot.gov/files/its-architecture/services.htm
Search the online architectures to identify the service packages in the project.
List the service packages in the space provided:
DM01, PS02
Identify which ITS elements are not already included in the relevant architecture and list them here so they can be
2.2
identified in future Architecture updates:
N/A
Section 3 – Participating Agencies and Their Roles
3.1 Lead Agency:
Maricopa County Department of Transportation (MCDOT)
3.2 Participating Agencies:
Phoenix, Glendale, Peoria, Scottsdale, Tempe, Chandler, and in coordination with ADOT.
3.3 Is an Intergovernmental Agreement (IGA/JPA) Needed for This Project?
Existed To Be Developed IGA # No
Please describe operational and budgetary relationships:
IGAs completed for cities of Phoenix, Scottsdale, Chandler, Peoria, and Glendale. There are no monetary obligations necessary by the
partners listed in the IGAs as there is no match associated with this project.
2 Version Date:March 29, 2019 14-461
DocuSign Envelope ID: C3293C20-7A9D-4EA6-B191-86773D74F4F5
Systems Engineering Checklist
41-2000
Section 4 – Requirements Definitions and Alternatives Analysis
4.1 Project Purpose and Need Summary:
Is there a project scoping document defining the issue? Yes No
If “No,” please provide information:
Is there a project scoping document defining proposed alternatives? Yes No
If “No,” please provide information:
(Tip: List what types of planning documents have been or will be completed.)
List the name and date of the existing document or what
4.2 Project Documentation
is to be developed in the space below:
Design Concept Report: Sections - Alternatives Section G
Feasibility Study with alternatives Existing
and cost benefits
Existing to Be Modified
(Tip: List what types of planning
documents have been or will be
completed.) To Be Developed
Existing Design Concept Report
Concept of Operations Existing to Be Modified
To Be Developed
Existing Scope of Work within RFP
Requirements Existing to Be Modified
To Be Developed
Associated equipment (including radios and message boards)
Existing design requirements provided in RFP.
Design / Post-Design Existing to Be Modified
To Be Developed
3 Version Date:March 29, 2019 14-461
DocuSign Envelope ID: C3293C20-7A9D-4EA6-B191-86773D74F4F5
Systems Engineering Checklist
41-2000
Section 5 – Procurement
5.1 Procurement Methods:
Construction Contract Procurement Contract
Request for Proposal Other (Please Specify):
Invitation to Bid
5.2 Equipment to Be Purchased:
REACT Equipment to support interoperable communications between responders.
5.3 Procurement Contract Numbers to Be Used: app.az.gov (if using existing contract)
Not using existing contract
Section 6 – ITS Standards
Which specific National ITS Standards will be used in this project such as NTCIP and IEEE?
6.1 These standards are online: https://www.standards.its.dot.gov/DevelopmentActivities/PublishedStandards. Identify the
project specific ones:
ITE TMDD for Center to Center Communications, IEEE-1512
If no National ITS Standards can be identified please explain why not:
Section 7 – Systems Testing
List the name of the existing document or what is to be
7.1 Systems Testing Documentation
developed in the space below:
Existing
System Test Plan Existing to Be Modified
To Be Developed
Existing
System Validation Existing to Be Modified
To Be Developed
4 Version Date:March 29, 2019 14-461
DocuSign Envelope ID: C3293C20-7A9D-4EA6-B191-86773D74F4F5
Systems Engineering Checklist
41-2000
Section 8 – Operational Resources
Procedures and Resources Needed for the Operation and Maintenance:
8.1 (Tip: If the operation is expanding, how will existing agreements, staff, processes, or networks manage the additional
equipment? If the operation is new, what agreements, staff, processes, or networks will ensure success?)
Operations are new and agreements are being established with the partner agencies and anticipated to be completed in April 2022.
MCDOT REACT will maintain all associated equipment.
Operation/Maintenance Staff Contact Information:
8.2
(Tip: Once the construction is completed who will operate/maintain the equipment?)
MCDOT REACT will maintain all associated equipment. MCDOT ITS will maintain the Tempe CAD integration.
Section 9 – Schedule
9.1 Expected Design Completion Date and Construction Completion Date:
No construction. REACT Arterial TIM 3 Year Pilot - Completed by Nov 2025. Tempe CAD - Completed by Nov 2022.
Relationship to Other Federal, State, County, and Local Projects and Phases (within TIP and/or Five-Year Program):
9.2 (Tip: Does this project depend on another project to operate successfully? Is the project one of a series or projects for a
phased approach?)
This project will build on the existing REACT Incident Management Program. The Tempe CAD integration will integrate into the
existing Regional Archive Data System (RADS).
Section 10 – Strategic Plans for System Update
List the name and date of the existing document or what
10.1 Plans for Systems Upgrade and Lifecycle
is to be developed in the space below:
Existing Existing to be Modified. REACT Strategic Plan and RADS
Assessment Study
System Update Plan Existing to Be Modified
To Be Developed
Section 11 – Completed and Approved
11.1 Name of person completing the form, contact information, date when submitting:
April Wire
april.wire@maricopa.gov
602.506.7174
11.2 ADOT Systems Technology Group Manager Signature and Date:
3/3/2022
Signature Date
5 Version Date:March 29, 2019 14-461
DocuSign Envelope ID: D6D9CFED-47D7-42DC-8566-A82E25D94D0B
Arizona Department of Transportation
Categorical Exclusion (CE) Checklist
for Actions Approved Under
23 CFR 771.117(c) & (d)
Project Information:
Project Name: REACT Arterial ICM Pilot Project Construction Project Administration
ADOT Project Number: 0000 MA T0290 01C ADOT CA Agency
Federal-Aid Number: MMA-0(287)D Categorical Exclusion Approval for FMIS
Estimated Project Construction Cost: N/A 2A - (c) Listed
Planning Requirements: 2B - (d) Listed
STIP/Line Item 2C - (d) Unlisted
ADOT Sub-program
CE Start Date: 11/20/2020
Re-evaluation:
This project has been re-evaluated pursuant to 23 CFR 771.129 due to a change in the project scope, location, or
termini or because of the need to evaluate new impacts not previously considered, or because five years have passed
since the date of the CE Approval. The information on this form reflects all updates to the project information.
Location and Limits:
This procurement project is for the Loop 101 corridor that runs through the cities of Phoenix, Glendale, Scottsdale, Peoria,
Tempe, Mesa, and Chandler in Maricopa County, AZ.
Purpose and Description (scope of work):
The project includes procurement of vehicles and equipment; exploring opportunities to establish inter-operable
communications with local agency PD and TMCs for during- and after-business hours operations; conducting training for all
Loop 101 partner agencies on the role of REACT, and piloting integration of local Police Computer-Aided Dispatch System.
Type of CE - Choose one from (c) or (d) or Appendix A drop-down lists:
(c) - list: (d) - list:
(c)(1) Non-Construction
If the project qualifies for a (c)(1) CE then no Technical Sections review is required and the CE is complete. Proceed to NEPA
Certification and Determination and Categorical Exclusion Approval.
CE and NEPA Assignment V1 – 04/16/2019 1
DocuSign Envelope ID: D6D9CFED-47D7-42DC-8566-A82E25D94D0B
Environmental Review Section
Each category below will be reviewed and a determination from a drop-down menu will be selected for each. The checkbox
will indicate review has been completed and the appropriate documentation placed in the Project File as applicable.
Air Quality – Clean Air Act
Select a determination from the drop-down menu
Noise – 23 CFR 772
Select a determination from the drop-down menu
Biological Resources – Endangered Species Act
Select a determination from the drop-down menu
Cultural Resources – Section 106
Select a determination from the drop-down menu
Section 4(f)
Select a determination from the drop-down menu
Section 404 – Clean Water Act
Select a determination from the drop-down menu
Section 401 – Clean Water Act
Select a determination from the drop-down menu
Hazardous Materials
Select a determination from the drop-down menu
Environmental Justice
Select a determination from the drop-down menu
Public Involvement
Select a determination from the drop-down menu
2
CE and NEPA Assignment V1 – 04/16/2019
DocuSign Envelope ID: D6D9CFED-47D7-42DC-8566-A82E25D94D0B
Other Considerations
Other potential environmental impacts such as Prime and Unique Farmlands, Sole Source Aquifers, Wild and Scenic
Rivers, visual resources, etc. have been considered if needed. Additional documentation as applicable is contained in
the Project File.
Briefly cite if there are other applicable considerations and reference the appropriate file documentation:
n/a
Complete this section only for CEs determined under 23 CFR 771.117(c)(26), (c)(27) and (c)(28) for
evaluation of the constraints under 23 CFR 771.117(e):
If the answer to all questions 1 through 11 below is No then the project can be approved as a (c)(26), (c)(27) or (c)(28) CE.
If the answer to any question 1through 11 for a project listed under (c)(26), (c)(27) or (c)(28) is Yes then the project
exceeds the constraints listed under 23 CFR 771.117(e) and must be processed under (d)(13). Additional information
regarding any constraint exceeded is included below.
Constraints: Yes No
1. Does the project involve the permanent acquisition of more than a minor amount of right-of-
way?
2. Does the project involve any residential or non-residential displacements?
3. Does the project require a bridge permit from the U.S. Coast Guard?
4. Does the project require an Individual Permit under Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act?
5. Does the project have a finding of “Adverse Effect” on historic properties protected by Section
106 of the NHPA by FHWA?
6. Does the project involve the use of a resource protected under Section 4(f) except for actions
resulting in de minimis impacts?
7. Does the project have a finding of “may affect, likely to adversely affect” threatened or
endangered species or critical habitat under the Endangered Species Act?
8. Does the project involve construction of temporary access, or the closure of an existing road,
bridge, or ramp, that would result in major traffic disruptions?
9. Does the project involve a change in access control on a controlled access highway?
10. Does the project involve a floodplain encroachment for other than functionally dependent uses
(e.g. bridges, wetlands) or actions that facilitate open space use (e.g. recreational trails, bicycle
and pedestrian paths)?
11. Does the project involve construction activities in, across, or adjacent to a river component
designated or proposed for inclusion in the National System of Wild and Scenic Rivers?
3
CE and NEPA Assignment V1 – 04/16/2019
Project Project ADOT Project Name: Information: Number: REACT Arterial T0290 ICM Pilot Project
NEPA Federal-Aid Class of Document Action: Number: Categorical or Re-evaluation MMA-0(287)D Exclusion Date: under 12/4/2020 the 326 MOU
Reason MCDOT is for removing the Note “procurement to File: of vehicles” from the SOW.
NEPA documentation This Document project has Validation is been required. reviewed [chose Additional pursuant one]: changes to 23 to CFR the 771.129(c) project may and require the NEPA further Document evaluation remains and validation. valid. No additional
This included to the project project in the has may project been require reviewed file. further With pursuant this evaluation additional to 23 and documentation, CFR validation. 771.129(c) the and NEPA further Document documentation remains has valid. been Additional prepared changes and is
Validation of CE Determination
Katie Prepared Environmental Rodriguez By: Planning Date: 04/11/2022
ADOT Environmental Planning – 04/16/19 1
Intergovernmental Relations September 9, 2022
2901 W. Durango Street
Phoenix, AZ 85009
Phone: 602-506-8600
Fax: 602-506-4750
www.mcdot.maricopa.gov Dana Cherry
Transportation Engineering Specialist
Arizona Department of Transportation
205 S. 17th Ave., MD 614E
Phoenix, Arizona 85007
Subject: MCDOT REACT Arterial ICM Pilot Project
Federal-aid Project # MMA-0(287) D
TRACS # T0290 01X
MAG TIP # MMA21-810
MCDOT Project # TE067
Maricopa County Department of Transportation
Request for Obligation Authority of $543,129
Dear Ms. Cherry:
On behalf of the Maricopa County Department of Transportation (MCDOT), I am
respectfully requesting obligation authority in the amount of $543,129 in
Congestion Mitigation and Air Quality (CMAQ) funding for the project referenced
above.
The total estimated cost of the project at this time per the Engineer’s Sealed
Construction Estimate is $575,959. Please see Additional Information (on the next
page) for further details.
This MCDOT project scope of work shall consist of pilot for Arterial Traffic Incident
Management Program for ICM in cooperation with the Cities of Tempe, Phoenix,
Mesa, Glendale, Scottsdale, Peoria, and Chandler; implement inter-operable
communications pilot; conduct inter-agency training; implement pilot integration of
Tempe Police CAD; operate REACT O&M for three years. This is a procurement only
project.
Enclosed is a highlighted excerpt of the current MAG TIP December 8, 2021, which
reflects this project’s still-current programmed construction funds.
Clearances
Environmental: Approval was granted by the Arizona Department of
Transportation (ADOT) on December 4, 2020. A copy of the
clearance is included with this letter and in the enclosed Bid
Package.
Utilities: The County issued a comprehensive utility clearance on November
23, 2020. This document is included. Individual utility clearance
Page 2
response letters can be provided upon request. There are no
railroad facilities within ½ mile of the project limits.
Right of Way: Right of way clearance was executed on December 1, 2020 and is
attached.
Additional Information Included with this Submittal
• The County will be use proprietary products on this project, ADOT approval
is included.
• The County has no design exceptions on this project.
• Engineer-stamped, detailed cost estimate
• Agreement Estimate Recapitulation
• Project Location Map is included
• Complete copy of the full bid package
• DBE Goal Assessment Response
• SE Checklist has been included
• IGA’s with partnering agencies
The County is prepared to work towards soliciting bids promptly upon
approval by ADOT and the Federal Highway Administration and notice of
the federal funds obligation.
We greatly appreciate your review and subsequent approval of the
obligation package. If you need additional information, please contact me
at (602) 506-1630 or at kimberly.richards@maricopa.gov. Thank you for
your prompt attention to this matter.
Sincerely,
Kimberly Richards
Intergovernmental Coordinator
Enclosures
Cc: April Wire-MCDOT; David Lucas-MCDOT
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION
UTILTIES & RAILROAD COORDINATION SECTION
UTILITY & RAILROAD CLEARANCE LETTER
DATE: 11/23/2020
TO: Rob Barbere, Project Manager
Nicolass Swart, Traffic Management Division Manager
Chuck Williams, Finance Support Supervisor
FROM: Kelly Roy, Utility & Railroad Coordination Branch Manager
Engineering Division
SUBJECT: Project Name: REACT Integrated Corridor Management (ICM)
Pilot (FY21)
Federal ID #: MMA-0(287)D
MCDOT Project #: TE067
MAG Project #: MMA21-810
The Utility & RR Coordination Branch has reviewed the above referenced project and
determine that there are no utility conflicts.
Project activities will not occur within one-half mile of a rail road track.
Please be aware that this letter includes all known utilities as provided by AZ811 and the
maps/information provided by the known utility companies. Service Drops and Utility
crossings are not always identified by AZ811.com services or on as-built drawings and
will be dealt with on a case by case basis if they are discovered during construction
activity.
______________________________ 11/23/20
Utility Branch Manager/Date
Kimberly Richards (DOT)
From: ADOT - Do Not Reply <noreply@azdot.gov>
Sent: Wednesday, June 8, 2022 11:12 AM
To: Kimberly Richards (DOT)
Cc: DBEContractGoals@azdot.gov
Subject: MEMO: Completed goal setting assessment for contract T029001X
Date: 6/8/2022 11:12:23 AM
Memo To: Kimberly Richards
Representing: Maricopa County DOT
Regarding Goal Request for Contract #: T029001X
Project Title/Description: REACT Arterial ICM Pilot Project
DBE Goal Assessment: 0.00%
The DBE goal assessed for the above referenced project is 0.00% and expires 120 calendar days from this date. This goal
CANNOT be used in an advertisement after 10/6/2022; however, the project can be re‐submitted so it can be assessed
again, if necessary. To do so, you must log‐in to the DBE Contract Goal Setting System and re‐submit the project,
allowing 10 business days for BECO to re‐assess the goal.
Contact ADOT Business Engagement and Compliance Office at (602)712‐7761 if you have any questions regarding this
goal assessment.
Sincerely,
DBE Contract Goal Setting Team
ADOT Business Engagement and Compliance Office (BECO)
(602)712‐7761 (Direct)
www.azdot.gov
1
()*+,- =7,>9:7+ J*KP 4(5 J0H J8+, 47K* ./0 23 ! Q M 4(5 M O M$ 23 R S T 678+9- S U S 4:;*< N F*G7@* =>+*< (G9*@ H9>98< S % 0@7)@>I Q /20 23 J*K*@>; 23 (3L/ 23 ?7@ABC><*D<E [\ 3*<,@:B9:7+ ] ^ _ % ?7@A ! O S J8+K:+) ""#$ T`Z (I78+9D<E W W"" % X X " & '& WM" /79>; X "
()*+,- 4(5 J0H 0@7V*,9 =7,>9:7+ J*KP 0@7V*,9 Y<9P 67IB;*9:7+ aQT J8+, 47K* ./0 /79>; /79>; " 23 M b e W# a WM" Q M X 4(5 X Z[ d MMMc X S #d 23 R ^ S T S 678+9- S Q Z U S """ 4:;*< N F*G7@* =>+*< (G9*@ d H9>98< S S % % 0@7)@>I O O /20 23 M M ""M ""M Tb f J*K*@>; 23 (3L/ 23 ?7@ABC><*D<E b b 3*<,@:B9:7+ % % hT hT T T iUj iUj % % g g % % ` ` ?7@A M e O e O b b S S J8+K:+) (I78+9D<E hWMX# WMX# hWM'MXc WM'MXc X X dj d j /79>; W W
()*+,- J*KP 4(5 J0H =7,>9:7+ Y<9P 67IB;*9:7+ aQT J8+, 47K* ./0 23 M a e Q i M 4(5 Z[ M R S ##' i 23 R ^ S T S 678+9- S Q $" U S R 4:;*< MN % R F*G7@* d =>+*< (G9*@ c H9>98< S % 0@7)@>I O /20 23 d "M Zf J*K*@>; 23 (3L/ 23 ?7@ABC><*D<E Z 3*<,@:B9:7+ i R i ?7@A d O S J8+K:+) (I78+9D<E W"X X W"X /79>; X
()*+,- =7,>9:7+ J*KP 4(5 J0H 0@7V*,9 Y<9P 67IB;*9:7+ J8+, 47K* ./0 /79>; 23 ! W$X$M'Xc## e T " M[ 4(5 kla Mc#'M e [i O ] 23 c 678+9- 4:;*< N F*G7@* =>+*< (G9*@ H9>98< S % 0@7)@>I e mQ /20 23 " '" J*K*@>; h 23 '#jZ (3L/ $ 23 ?7@ABC><*D<E e 3*<,@:B9:7+ i S i ii S ] i % X i S X \X S S ]] n i % n i US X ] S S % % i %S % ] S X ?7@A O S p J8+K:+) (I78+9D<E W WM dMX" X'M $ W # /79>; X$ $
0@7V*,9 Y<9P 67IB;*9:7+ /79>; W Q # M X$ Z[ $ R S M T S U S S Zn N he Qo"djN T[ ] Q` i ] S
Zh]i Hjhk\l HIJK T[h\a Kl
h T[h\a }]h [~ah T[h\a Zac Ihc\
a[kyoqv ¥¦§¨© ¾x MI Vmnopqrm uv{o{uv mnoqtz W qv NONPQR {tor{uv ª«¬ sVW¿ qpmvoqu qn qpmvoquz Wnv{nom sqtuvw ¯°«±²© nmuzrqnvmvoqu r{{uv quYW r{poop nmop Y sovo{z uv{nqr{nm{ upo{uv wzv{z q {r{f Vmum{{uv pqtuopmvoquz yq{uof +,, V{zmf ynqnm ./01234/505641 X{um{f roqv qn sV pqutpv pqvvzm{f u pqqr{nmvoqu ¥±³°± ouv{nm{upw Y 783/49:8:15 y{qnom ª´µ¶µµ ov vnmouou mu de|QfNRg v{ smu{n sovo{z r{{uv ;/4</08= ª´µ¶µ· q {r{f Y roqv >>?@A yq{uof ouv{nmvoqu kj STJUKMT b[ka]\a H ª´µ¶µ¸ ~]^al Ica\as Y +8:1B8:15 V{zmf q {r{ VWX xnop x{rv X{um{f ª´µ¶µ¹ ynqzuo{n Y RRYOQ yqop{ pqvvzm{f >@>>?>@>C _ORY`NRYP|ge sW ª´µ¶µº Y r{nmv{ y{qnom xWs mu ª«»«±© Z[\]^ HIJK KbS Y smu{n MI }~h V qn rnqptn{ vn{{ Q_`PQ ORgO xWs w{mnz¡ b[~kal K[a]^ b[kca~\a[k ¢V£N|¤ D {op{z ;/4E:F52 b[ca mu de`efgeg Vmnopqrm W de|QfNRg ,625:B ¼°»§½
Òqv ¾x qpmvoqu r{poop qpm Xq ÁÂÃÄÅ ÇÈÂÉÈÄÊÊËÌ K[a]^ JaÀh Y Y Í de`efgeg ιϹÐÑ¹Ñ dQRfPQO Y Y Í Y Y Í Ó©±¨³°¬ Y Y Í Ô³¨»°±Õ Y Y Í Y Y Í de`efgeg ιϹÐÑ¹Ñ dQRfPQO
Ø~kikj ÛÜÈÈËÝà s¾xáx qvm KMT ROYOO RNYOO RNYO` RRYOQ I[\~hka rnqæ{pv ÛÞÄÝÉË bÀ]kjhãcäå pqzv âáX Wqrvoqu Wqrvoqu W{u{uv W{u{uv ßËÄàÂÝ zvmwz v{ ROROYROR| RORNYRORe zm{ syx RORNYRORe RORRYROR_ de`efgeg Y v{n zp{t{ pmu{ {zpno{ {q OgRRRORN NROPRORN STJ OgNNRONg OQRORORO H
[Ö]^ gRQRORN ONR_RORR ×a]ah NOR`RORO NONRONg H
[Ö]^ NONeRORN ORO|RORR ØÙÚH QN_RONg ORORRORN H
[Ö]^ W ORO`RORR ØKH W ORORRORN H
[Ö]^
! "# $%&' # % ()%' "#)
MMA-0(288)D