2023-03-15_MC-85-PHASE-2A-LETTER.PDF
Extracted text (via pymupdf_layout)
3039 characters
DocuSign Envelope ID: 57CA77C8-CF26-4DD9-8D80-2F2E3453E280 afflu' Delivering water and power p.o. Box 52025 Mail Station: SSW303 Phoenix, Arizona 85072-2025 (602) 236-5900 www.srpnet.com File: RD-12940 Coord: 0.75 E 4.00 N February 6, 2023 MCDOT Attn: Ms. Kelly Roy 2901 W Durango St Phoenix, AZ 85009 RE: MC85 - 107th Avenue To 75th Avenue Buckeye Rd, 107th Ave To 79th Ave Dear Ms. Roy: In order to proceed with construction of your project, we have prepared for your review and acceptance our standard AGREEA/IENT FOR CONSTRUCTION OF SRP FACILITIES. Also enclosed are one copy of final SRP irrigation plans and one copy of the specifications for your project. We propose to construct the irrigation facilities shown on orir plans, as detailed on the Engineering Costs ai'id Construction Bid Summary. Please review Agreement. Return a signed copy of the agreement to Andrew Johnson, Water Engineering Manager, at the above address. Note that our cost proposal is only valid until April 1, 2023. If the signed Agreement is not received by this date a new Agreement with updated costs will be necessaiy if you wish to proceed with the project at a later date. If yori choose SRP to do the construction, and in order to meet your construction schedule, please allow sufficient lead-time for the manufacture of pipe and scheduling of our work crews. The Notice to Proceed for construction by your contractor, if applicable, will be available approximately two weeks after receipt of the agreement and resolution of any land issues. In the preparation of these plans, considerable efforts have been made to identify and avoid conflicts with other major underground utilities. The costs of unanticipated conflicts, which require changes during construction, are not pait of the cost estimate. We will request a change order to cover our increased costs, should conflicts occur. Prior to requesting bids for construction of the irrigation modifications, please contact tlie Inspector, Jerry Crawford at (602) 236-5096 to coordinate your construction schedule with available diy-ups of the SRP irrigation system. Dry-ups may be impractical during certain times of the year. lPa=c DocuSign Envelope ID: 57CA77C8-CF26-4DD9-8D80-2F2E3453E280 Ms. Kelly Roy Februaiy 6, 2023 Page 2 We appreciate the opportunity to provide engineering and construction services for your project. If you have any questions concerning the agreement, plans or specifications, contact the Project Leader, Brannon Maldonado, at (602) 236-4943 or email at Brannon.Maldonado@srpnet.com. Biyan Mutchler at (602) 236- 4947, can answer questions concerning scheduling or the construction proposal. Please reference our file number RD-12940 on any correspondence regarding this project. Sincerely, aate General Manager, Customer Operations JP:wd Enclosures: Agreement for Construction of SRP Facilities SRP Irrigation Plans and Specifications Delivering water and power" DocuSign Envelope ID: 57CA77C8-CF26-4DD9-8D80-2F2E3453E280 bc: West - Bryan Mutcliler WVS226 l i P it g c