Extracted text (via pymupdf_layout)
49969 characters
DS - 99T41701 - 0 Page 1 GRANT NUMBER (FAIN): 99T41701 U.S. ENVIRONMENTAL MODIFICATION NUMBER: 0 DATE OF AWARD PROGRAM CODE: DS 09/23/2016 PROTECTION AGENCY TYPE OF ACTION MAILING DATE New 09/30/2016 Cooperative Agreement PAYMENT METHOD: ACH# ASAP 90179 RECIPIENT TYPE: Send Payment Request to: County Las Vegas Finance Center email: lvfc-grants@epa.gov RECIPIENT: PAYEE: Maricopa County Air Quality Department Maricopa County Air Quality Department 1001 North Central Avenue 1001 North Central Avenue Phoenix, AZ 85004 Phoenix, AZ 85004 EIN: 86-6000472 PROJECT MANAGER EPA PROJECT OFFICER EPA GRANT SPECIALIST Philip McNeely Lauren Maghran Elizabeth Armour 1001 North Central Avenue 75 Hawthorne Street, AIR-8 Grants Management Section, EMD-6-1 Phoenix, AZ 85004 San Francisco, CA 94105 E-Mail: armour.elizabeth@epa.gov E-Mail: philmcneely@mail.maricopa.gov E-Mail: Maghran.Lauren@epa.gov Phone: 415-947-4264 Phone: 602-506-6701 Phone: 415-947-4107 PROJECT TITLE AND DESCRIPTION STATE CLEAN DIESEL GRANT PROGRAM Maricopa County's Air Quality Department plans to use this FY 2017 State Clean Diesel Grant to create a Grant Sub Award Program to retrofit approximately 37 medium/heavy duty diesel vehicles operating in the metropolitan Phoenix area with Diesel Oxidation Cayalyst (DOC) technology. This assistance agreement provides federal funding in the amount of $217,069. See Terms and Conditions. BUDGET PERIOD PROJECT PERIOD TOTAL BUDGET PERIOD COST TOTAL PROJECT PERIOD COST 10/01/2016 - 09/30/2017 10/01/2016 - 09/30/2017 $217,069.00 $217,069.00 NOTICE OF AWARD Based on your Application dated 04/27/2016 including all modifications and amendments, the United States acting by and through the US Environmental Protection Agency (EPA) hereby awards $217,069. EPA agrees to cost-share 100.00% of all approved budget period costs incurred, up to and not exceeding total federal funding of $217,069. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry out this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with the award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions specified in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the EPA award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds provided by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and statutory provisions, all terms and conditions of this agreement and any attachments. ISSUING OFFICE (GRANTS MANAGEMENT OFFICE) AWARD APPROVAL OFFICE ORGANIZATION / ADDRESS ORGANIZATION / ADDRESS U.S. EPA, Region 9 U.S. EPA, Region 9 Grants Management Section, EMD 6-1 Air Division, AIR-1 75 Hawthorne Street 75 Hawthorne Street San Francisco, CA 94105 San Francisco, CA 94105 THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY Digital signature applied by EPA Award Official Craig A. Wills - Grants Management Officer DATE 09/23/2016 EPA Funding Information DS - 99T41701 - 0 Page 2 FUNDS FORMER AWARD THIS ACTION AMENDED TOTAL EPA Amount This Action $ $ 217,069 $ 217,069 EPA In-Kind Amount $ $ $ 0 Unexpended Prior Year Balance $ $ $ 0 Other Federal Funds $ $ $ 0 Recipient Contribution $ $ $ 0 State Contribution $ $ $ 0 Local Contribution $ $ $ 0 Other Contribution $ $ $ 0 Allowable Project Cost $ 0 $ 217,069 $ 217,069 Assistance Program (CFDA) Statutory Authority Regulatory Authority 66.040 - State Clean Diesel Grant Program (B) Diesel Emissions Reduction Act of 2010 2 CFR 200 codified at 42 U.S.C. 16131 et seq 2 CFR 1500 and 40 CFR 33 Fiscal Site Name Req No FY Approp. Budget PRC Object Site/Project Cost Obligation / Code Organization Class Organization Deobligation - 1609M6S107 16 E4 09M1 102AH4 4123 - - 217,069 217,069 (PageBreak) DS - 99T41701 - 0 Page 3 Budget Summary Page Table A - Object Class Category Total Approved Allowable (Non-construction) Budget Period Cost 1. Personnel $14,477 2. Fringe Benefits $5,820 3. Travel $70 4. Equipment $0 5. Supplies $1,380 6. Contractual $10,813 7. Construction $0 8. Other $177,150 9. Total Direct Charges $209,710 10. Indirect Costs: % Base See Term and Condition $7,359 11. Total (Share: Recipient 0.00 % Federal 100.00 %.) $217,069 12. Total Approved Assistance Amount $217,069 13. Program Income $0 14. Total EPA Amount Awarded This Action $217,069 15. Total EPA Amount Awarded To Date $217,069 (PageBreak) DS - 99T41701 - 0 Page 4 Administrative Conditions The recipient agrees to comply with the current EPA general terms and conditions available at: https://www.epa.gov/grants/epa-general-terms-and-conditions-effective-march-29-2016-or-later. These terms and conditions are in addition to the assurances and certifications made as a part of the award and the terms, conditions or restrictions cited throughout the award. The EPA repository for the general terms and conditions by year can be found at http://www.epa.gov/grants/grant-terms-and-conditions. A. Annual Federal Financial Report (FFR) - SF 425 For awards with cumulative project and budget periods greater than 12 months, the recipient will submit an annual FFR (SF 425) covering the period from "project/budget period start date" to September 30 of each calendar year to the U.S. EPA Las Vegas Finance Center (LVFC). The FFR will be submitted electronically to lvfc-grants@epa.gov no later than December 30 of the same calendar year. The form with instructions can be found on LVFC’s website at http://www2.epa.gov/financial/forms. B. Procurement The recipient will ensure all procurement transactions will be conducted in a manner providing full and open competition consistent with 2 CFR Part 200.319. In accordance 2 CFR Part 200.323 the grantee and subgrantee(s) must perform a cost or price analysis in connection with applicable procurement actions, including contract modifications. C. Six Good Faith Efforts 40 CFR Part 33, Subpart C Pursuant to 40 CFR Section 33.301, the recipient agrees to make the following good faith efforts whenever procuring construction, equipment, services and supplies under an EPA financial assistance agreement, and to require that sub-recipients, loan recipients, and prime contractors also comply. Records documenting compliance with the six good faith efforts shall be retained: (a) Ensure DBEs are made aware of contracting opportunities to the fullest extent practicable through outreach and recruitment activities. For Indian Tribal, State and Local and Government recipients, this will include placing DBEs on solicitation lists and soliciting them whenever they are potential sources. (b) Make information on forthcoming opportunities available to DBEs and arrange time frames for contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation by DBEs in the competitive process. This includes, whenever possible, posting solicitations for bids or proposals for a minimum of 30 calendar days before the bid or proposal closing date. (c) Consider in the contracting process whether firms competing for large contracts could subcontract with DBEs. For Indian Tribal, State and local Government recipients, this will include dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by DBEs in the competitive process. (d) Encourage contracting with a consortium of DBEs when a contract is too large for one of these firms to handle individually. (e) Use the services and assistance of the SBA and the Minority Business Development Agency of the Department of Commerce. (f) If the prime contractor awards subcontracts, require the prime contractor to take the steps in paragraphs (a) through (e) of this section. D. Utilization of Disadvantaged Business Enterprises General Compliance, 40 CFR Part 33 The recipient agrees to comply with the requirements of EPA’s Disadvantaged Business Enterprise (DBE) Program for procurement activities under assistance agreements, contained in 40 CFR Part 33. Fair Share Objectives, 40 CFR Part 33, Subpart D A recipient must negotiate with the appropriate EPA award official, or his/her designee, fair share objectives for MBE and WBE participation in procurement under the financial assistance agreements. In accordance with 40 CFR Section 33.411 some recipients may be exempt from the fair share objective requirements as described in 40 CFR Part 33, Subpart D. Recipients should work with their DBE coordinator if they think their organization may qualify for an exemption. The dollar amount of this assistance agreement, or the total dollar amount of all of the recipient’s financial assistance agreements in the current federal fiscal year from EPA is $250,000 or more. The recipient accepts the applicable MBE/WBE fair share objectives/goals negotiated with EPA by the Arizona Department of Environmental Quality as follows: MBE WBE Construction 12% 5% Equipment 4% 4% Services 3% 2% Supplies 1% 1% The recipient accepts the fair share objectives/goals stated above and attests to the fact that it is purchasing the same or similar construction, supplies, services and equipment, in the same or similar relevant geographic buying market as ADEQ. Negotiating Fair Share Objectives/Goals, Section 33.404 The recipient has the option to negotiate its own MBE/WBE fair share objectives/goals. If the recipient wishes to negotiate its own MBE/WBE fair share objectives/goals, the recipient agrees to submit proposed MBE/WBE objectives/goals based on an availability analysis, or disparity study, of qualified MBEs and WBEs in their relevant geographic buying market for construction, services, supplies and equipment. The submission of proposed fair share goals with the supporting analysis or disparity study means that the recipient is not accepting the fair share objectives/goals of another recipient. The recipient agrees to submit proposed fair share objectives/goals, together with the supporting availability analysis or disparity study, to the Regional MBE/WBE Coordinator, Joe Ochab at Ochab.Joe@epa.gov, within 120 days of its acceptance of the financial assistance award. EPA will respond to the proposed fair share objective/goals within 30 days of receiving the submission. If proposed fair share objective/goals are not received within the 120 day time frame, the recipient may not expend its EPA funds for procurements until the proposed fair share objective/goals are submitted. Contract Administration Provisions, 40 CFR Section 33.302 The recipient agrees to comply with the contract administration provisions of 40 CFR Section 33.302. Bidders List, 40 CFR Section 33.501(b) and (c) Recipients of a Continuing Environmental Program Grant or other annual reporting grant, agree to create and maintain a bidders list. Recipients of an EPA financial assistance agreement to capitalize a revolving loan fund also agree to require entities receiving identified loans to create and maintain a bidders list if the recipient of the loan is subject to, or chooses to follow, competitive bidding requirements. Please see 40 CFR Section 33.501 (b) and (c) for specific requirements and exemptions. E. MBE/WBE Reporting General Compliance, 40 CFR Part 33, Subpart E – Reporting Condition MBE/WBE reporting is required annually. Reporting is required for assistance agreements where there are funds budgeted for procuring construction, equipment, services and supplies, including funds budgeted for direct procurement by the recipient or procurement under subawards or loans in the “Other” category, that exceed the threshold amount of $150,000, including amendments and/or modifications. Based on EPA’s review of the planned budget, this award meets the conditions above and is subject to Disadvantaged Business Enterprise (DBE) Program reporting requirements. Conversely, the recipient must submit to the GrantsRegion9@epa.gov a justification and budget detail within 21 days of the award date demonstrating that this award is not subject to the DBE reporting requirements. The recipient agrees to complete and submit a “MBE/WBE Utilization under Federal Grants, Cooperative agreements” report (EPA Form 5700-52A) on an annual basis. All procurement actions that are reportable, not just that portion which exceeds $150,000. When completing the annual report, recipients are instructed to check the box titled “annual:” in section 1B of the form. For the final report, recipients must check the box indicated for the “last report” of the project in section 1B of the form. Annual reports are due by October 30 th of each year. Final reports are due by October 30 th or 90 days after the end of the project period, whichever comes first. The reporting requirement is based on total procurements. Recipients with expended and/or budgeted funds for procurement are required to report annually whether the planned procurements take place during the reporting period or not. If no budgeted procurements take place during the reporting period, the recipient should check the box in section 5B when completing the form. MBE/WBE reports should be sent to GrantsRegion9@epa.gov . The current EPA Form 5700-52A can be found at the EPA Office of Small Business Program’s Home Page at http://www.epa.gov/osbp/dbe_reporting.htm . This provision represents an approved deviation from the MBE/WBE reporting requirements as described in 40 CFR Part 33, Section 33.502; however, the other requirements outlined in 40 CFR Part 33 remain in effect, including the Good Faith Effort requirements as described in 40 CFR Part 33, Subpart C, and Fair Share Objectives negotiation as described in 40 CFR Part 33, Subpart D. F. Indirect Costs If the recipient does not have a previously established indirect cost rate, it agrees that it will prepare its indirect cost rate proposal and/or cost allocation plan in accordance with the Cost Principles under 2 CFR Part 200, Subpart E. For proposal preparation, the recipient may use the appropriate completeness checklist located at: http://www.aqd.nbc.gov/services/ICS.aspx The local government recipient whose cognizant federal agency has been designated by the Office of Management and Budget (OMB) must develop and submit its indirect cost rate proposal to its cognizant agency within six (6) months after the close of the governmental unit’s fiscal year. If the cognizant federal agency has not been identified by the OMB, the local government recipient must still develop (and when required, submit) its proposal within that period. The interstate agency recipient must send its proposal to its cognizant federal agency within six (6) months after the end of its fiscal year. If EPA is the cognizant federal agency of the interstate agency, local government, or special district, the recipient must send its indirect cost rate proposal within six (6) months after the end of its fiscal year to: Regular Mail Office of Grants and Debarment U.S. Environmental Protection Agency 1200 Pennsylvania Avenue, NW, MC 3903R Washington, DC 20460 Attn: OGD Indirect Cost Rate Proposal Control Desk Mail Courier (e.g. FedEx, UPS, etc.) Office of Grants and Debarment U.S. Environmental Protection Agency 1300 Pennsylvania Avenue, NW, 5th floor Washington, DC 20004 Attn: OGD Indirect Cost Rate Proposal Control Desk Electronic submissions of proposals may be sent via email to OGD_IndirectCost@epa.gov. Recipients are entitled to reimbursement of indirect costs, subject to any statutory or regulatory administrative cost limitations, if they have a current rate agreement or have submitted an indirect cost rate proposal to their cognizant federal agency for review and approval. Recipients are responsible for maintaining an approved indirect cost rate throughout the life of the award. Recipients may draw down grant funds once a rate has been approved, but only for indirect costs incurred during the period specified in the rate agreement. Recipients are not entitled to indirect costs for any period in which the rate has expired. Recipients with differences between provisional and final rates are not entitled to more than the award amount. Recipients may request EPA approval to rebudget funds from direct cost categories to the indirect cost category (to grants which have not expired or been closed out) to cover increased indirect costs. The recipient agrees to comply with the audit requirements prescribed in 2 CFR Part 200, Subpart F, Audits of States, Local Governments, and Non-Profit Organizations. Programmatic Conditions DERA FY16 State Program A. Substantial Federal Involvement for Cooperative Agreements EPA will provide substantial involvement in the form of technical assistance, development of outputs, and oversight. Specifically, substantial federal involvement will take the form of monitoring the recipient’s project, participation and collaboration between EPA and the recipient in program content, review of project progress, and quantification and reporting of results. B. Emissions Control Technologies Emissions Reduction Projects funded by the recipient pursuant to this assistance agreement must use verified technologies and/or must use engines and engine configurations certified by EPA and, if applicable, CARB. Technologies are verified under EPA or California’s Retrofit Technology Verification Programs. A list of eligible, EPA verified exhaust control technologies and engine upgrade technologies is available at: www.epa.gov/verified-diesel-tech/verified-technologies-list-clean-diesel and a list of eligible, California Air Resources Board (CARB) verified exhaust control technologies is available at: www.arb.ca.gov/diesel/verdev/vt/cvt.htm. A list of eligible, EPA verified idle reduction technologies is available at: www.epa.gov/smartway/forpartners/technology.htm#tabs-4. A list of eligible, EPA verified aerodynamic technologies is available at: www.epa.gov/smartway/forpartners/technology.htm#tabs-2. A list of EPA verified low rolling resistance tires is available at: www.epa.gov/smartway/forpartners/technology.htm#tabs-3. Lists of EPA certified engines and certified remanufacture systems for locomotives and marine engines are available at: www.epa.gov/otaq/certdata.htm. Lists of certified and compliant clean alternative fuel conversion systems, and additional guidance, can be found at www.epa.gov/otaq/consumer/fuels/altfuels/altfuels.htm . Vehicles operating in California must follow conversion rules issued by CARB. Any question as to the eligibility or preference of a retrofit technology, including vehicle/equipment replacement and repowers, should be directed to the EPA Project Officer. Technology changes may not be allowed after a final workplan has been approved. If technology compatibility issues arise, EPA may elect to terminate the cooperative agreement, at which time unobligated assistance funds must be returned to EPA. C. Quarterly Reporting and Environmental Results Quarterly progress reports will be required. Quarterly reports are considered project status reports and will address the progress made achieving the work plan goals. In general, quarterly reports will include summary information on technical progress and expenditures, and planned activities for next quarter. A template for the quarterly report is available at www.epa.gov/cleandiesel/clean-diesel-state-allocations#report. Quarterly reports are due according to the following schedule. If a due date falls on a weekend or holiday, the report will be due on the next business day. April 1 – June 30 Reporting Period: report due date July 30 July 1 – September 30 Reporting Period: report due date October 30 October 1 – December 31 Reporting Period: report due date January 30 January 1 – March 31 Reporting Period: report due date April 30 If a project start date falls within a defined Reporting Period the recipient must report for that period by the given due date. This quarterly reporting schedule shall be repeated for the duration of the award agreement. D. Final Report: The final project report will include all categories of information required for quarterly reporting, including a final, detailed fleet description. The final project report will also include a narrative summary of the project or activity, project results (outputs and outcomes) including final emissions benefit calculations, and the successes and lessons learned for the entire project. To the extent possible, final emission benefit calculations should be based on the actual number and type of technologies, vehicles, equipment and engines implemented under the award and actual vehicle miles traveled, idling and/or operating hours, and fuel use. If actual vehicle miles traveled, idling and/or operating hours, and fuel use are not available, the final report will include a detailed explanation of how these values are derived, as well as any assumptions or default values used, for the purposes of emissions benefit calculations. The final report will also detail the methodologies used for the emission benefit calculation. For projects involving vehicle/equipment replacement and repowers the recipient must provide in the final report: 1) Evidence that the replacement activity is an “early replacement,” and would not have occurred through normal attrition/fleet turnover (i.e. without the financial assistance provided by EPA) within three years of the project period start date. Supporting evidence can include verification that the vehicles or equipment being replaced have useful life left and fleet characterization showing fleet age ranges and average turnover rates per the vehicle or fleet owner’s budget plan, operating plan, standard procedures, or retirement schedule; 2) Evidence of appropriate scrappage (see E.3.5 and E.3.6 below); and 3) Specification of the model years and the emission standard levels for PM and NOx, for both the engine being replaced and the new engine. For projects that take place in an area affected by, or includes vehicles, engines or equipment affected by federal law mandating emissions reductions, the recipient must provide in the final report evidence that emission reductions funded with EPA funds were implemented prior to the effective date of the mandate and/or are in excess of (above and beyond) those required by the applicable mandate. The final report shall be submitted to the EPA Project Officer within 90 days after the project period end date or termination of the assistance agreement. A template for the final report is available at www.epa.gov/cleandiesel/clean-diesel-state-allocations#report. E. Use of Funds Restriction: E.1. Mandated Measures: Recipient agrees that funds under this award cannot be used for emissions reductions that are mandated under federal law. This refers to specific compliance dates within the mandate, not when the mandate is passed. Voluntary or elective emissions reductions measures shall not be considered “mandated”, regardless of whether the reductions are included in the State Implementation Plan of a State. E.2. Normal Attrition: Recipient agrees that funds under this award cannot be used for emission reductions that result from vehicle/equipment replacements or repowers that would have occurred through normal attrition/fleet turnover within three years of the project start date (e.g. FY14 award funds, including recipient cost-share, shall not be used for replacements/repowers that would have occurred through normal fleet turnover prior to September 30, 2017; FY15 award funds, including recipient cost-share, shall not be used for replacements/repowers that would have occurred through normal fleet turnover prior to September 30, 2018; FY16 award funds, including recipient cost-share, shall not be used for replacements/repowers that would have occurred through normal fleet turnover prior to September 30, 2019). Any question as to eligibility of a vehicle/equipment replacement or repower should be directed to the EPA Project Officer. E.3. Fleet Expansion: Recipient agrees that funds under this award, including subawards/subgrants, cannot be used for the purchase of vehicles, engines, or equipment to expand a fleet. The recipient agrees that: E.3.1. The repowered or replacement vehicle, engine, or equipment must be of similar size and/or horsepower, and will perform the same function and operation as the vehicle, engine, or equipment that is being repowered or replaced (e.g., an excavator used to dig pipelines would be replaced by an excavator that continues to dig pipelines). E.3.2. For Engine Repowers : Horsepower increases of more than 25 percent will require specific approval by the EPA Project Officer prior to purchase, and the applicant may be required to pay the additional costs associated with the higher horsepower engine E.3.3. For Nonroad Replacements : Horsepower increases of more than 25 percent will require written approval by the EPA Project Officer prior to purchase, and the applicant may be required to pay the additional costs associated with the higher horsepower equipment. E.3.4. For Highway Replacements : The replacement vehicle must not be in a larger weight class than the existing vehicle (Class 5, 6, 7, or 8). The engine’s primary intended service class must match the replacement vehicle’s weight class (i.e. a LHD diesel engine is used in a vehicle with GVWR 16,001 – 19,500 pounds, a MHD diesel engine is used in a vehicle with a GVWR of 19,501 – 33,000 pounds, and an HHD diesel engine is used in a vehicle with a GVWR greater than 33,000 pounds.) Exceptions may be granted for vocational purposes, however the GVWR must stay within 10 percent of the engine’s intended service class and any exceptions will require written approval by the EPA Project Officer prior to purchase. E.3.5. For Engine Repowers : The engine being replaced will be scrapped or rendered permanently disabled within ninety (90) days of the replacement. Cutting a three inch by three inch hole in the engine block is the preferred scrapping method. Other methods may be considered and will require prior written approval by the EPA Project Officer. Evidence of appropriate disposal is required in a final assistance agreement report submitted to EPA and includes a signed certificate of destruction (to be provided by the EPA Project Officer) and digital photos of the engine tag (showing serial number, engine family number, and engine model year) and the destroyed engine block. If scrapped or salvaged engines are to be sold, program income requirements apply. E.3.6. For Nonroad and Highway Replacements : The vehicle/equipment being replaced will be scrapped or rendered permanently disabled within ninety (90) days of the replacement. Disabling the engine may be completed as described in E.3.5 above. Disabling the chassis may be completed by cutting completely through the frame/frame rails on each side of the vehicle/equipment at a point located between the front and rear axles. Other acceptable scrappage methods may be considered and will require prior written approval by the EPA Project Officer. Evidence of appropriate disposal is required in a final assistance agreement report submitted to EPA and includes a signed certificate of destruction (to be provided by the EPA Project Officer) and digital photos of the engine tag (showing serial number, engine family number, and engine model year), the destroyed engine block, and cut frame rails or other cut structural components as applicable. Vehicle/equipment components that are not part of the engine or chassis may be salvaged from the unit being replaced (e.g. plow blades, shovels, seats, etc.). If scrapped or salvaged vehicle/equipment chassis or components are to be sold, program income requirements apply. E.3.7 For Tire Replacements : The original tires should be scrapped according to local or state requirements, or the tires can be salvaged for reuse or retreading. If salvaged tires are sold, program income requirements apply. E.4. Federal Matching Funds: Recipient agrees that funds under this award cannot be used for matching funds for other federal grants unless expressly authorized by statute. Likewise, recipient may not use federal funds as cost-share funds for the State Clean Diesel Grant Program, including funds received under EPA’s National Diesel Emissions Reduction Programs and federal Supplemental Environmental Project (SEP) funds. E.5. Expenses Incurred Prior to the Project Period: Recipient agrees that, except for eligible pre-award costs as defined in 2 CFR §200.458, and as authorized by 2 CFR §200.309 and 2 CFR §1500.8, funds under this award cannot be used to cover expenses incurred prior to the project period and that expenses incurred prior to the project period cannot be used as a cost-share for projects funded under this award. E.6. Administrative Cost Expense Cap: No more than 15 percent of the recipient’s total project costs may be used to cover administrative type costs (e.g. personnel, benefits, travel, and office supplies). Total project costs include the federal share as well as any cost-share provided by the recipient. The recipient’s indirect costs are not considered as administrative type costs and do not count towards the 15 percent maximum. E.7. Formerly Verified Technologies: No funds awarded under the Program shall be used for retrofit technologies on EPA’s or CARB’s, “Formerly Verified Technologies” lists. EPA’s formerly verified list can be found at: www.epa.gov/verified-diesel-tech/list-formerly-verified-technologies-clean-diesel, and CARB’s formerly verified lists can be found at: www.arb.ca.gov/diesel/verdev/vt/fv1.htm, www.arb.ca.gov/diesel/verdev/vt/fv2.htm, and www.arb.ca.gov/diesel/verdev/vt/fv3.htm. E.8. Emissions Testing: Recipient agrees that funds under this award cannot be used for emissions testing and/or air monitoring activities (including the acquisition cost of emissions testing equipment), or research and development. E.9. Fueling Infrastructure: Recipient agrees that funds under this award cannot be used for fueling infrastructure, such as that used for the production and/or distribution of biodiesel, compressed natural gas, liquefied natural gas, and or other fuels. E.10. Single-Wide Wheels: Recipient agrees that funds under this award cannot be used for the purchase of single-wide wheels except where a fleet is retrofitting from standard dual tires to SmartWay-verified single-wide low rolling resistance tires. In this case, the cost of single-wide wheels would be acceptable as additional equipment necessary to use the SmartWay verified technology. E.11.Tires and Aerodynamics: Recipient agrees that funds under this award cannot be used to purchase aerodynamic technologies or low rolling resistance tires, unless they are combined on the same vehicle with a new installation of a verified exhaust control funded under this award. In addition, recipient agrees that funds under this award cannot be used for the purchase of low rolling resistance tires or advanced aerodynamic technologies if similar technologies have previously been installed on the truck or trailer. E.12.Auxiliary Power Units: Recipient agrees that funds under this award cannot be used for the purchase of APUs or generators for vehicles with MY 2007 or newer certified engine configurations on long haul Class 8 vehicles. E.13. Idle Reduction Technologies: Recipient agrees that funds under this award cannot be used for the purchase of idle reduction technologies unless they are combined on the same vehicle with a new installation of a verified exhaust control funded under this award, except for use on locomotives and previously retrofitted school buses, and for shore connection systems or truck stop electrification technologies. E.14.Highway Model Year: Recipient agrees that funds under this award cannot be used to retrofit, repower, convert or replace a bus, medium-duty, or heavy-duty highway vehicle with engine model year 1990 or older, or to retrofit engine model year 2007 or newer with DOCs or DPFs, or retrofit engine model year 2010 or newer with SCR, or repower or replace or convert engine model year 2004-2006 with other than all-electric, or replace, repower or convert engine model year 2007 or newer. E.15. School Bus Model Year: Recipient agrees that funds under this award cannot be used to retrofit, repower, convert or replace a school bus with engine model year 1990 or older, or repower or replace or convert school buses with engine model year 2004-2006 with other than all-electric, or retrofit, replace, repower or convert school buses with engine model year 2007 or newer. E.16.Nonroad Useful Life and Operating Hours: Recipient agrees that funds under this award cannot be used to retrofit, repower, upgrade or replace a nonroad engine or equipment that has less than seven years of useful life remaining. A table distinguishing which nonroad engine model years EPA has determined to have at least seven years of useful life remaining, based on the type and age of vehicle, can be found at www.epa.gov/sites/production/files/2015-10/documents/fy14-nonroad-remaining-useful-life.pdf . In addition, recipient agrees that funds under this award cannot be used to retrofit, repower, upgrade or replace nonroad engines and equipment that operate less than 500 hours per year. E.17 Nonroad Repower/Replacement: Recipient agrees that funds under this award cannot be used to repower or replace nonroad Tier 0 (unregulated) engines to a nonroad Tier 1 or lower nonroad engine standard or from a Tier 2 nonroad engine standard to a Tier 3 or lower nonroad engine standard. E.18.Marine Repower/Replacement/Upgrade: Recipient agrees that funds under this award cannot be used to repower, replace or upgrade Tier 3 or Tier 4 marine engines, or to repower or replace marine engines from Tier 1 marine engine standard to Tier 1 marine engine standard, or from a Tier 2 marine engine standard to a Tier 2 or lower marine engine standard. E.19 Locomotive Retrofit/Repower/Replacement/Upgrade: Recipient agrees that funds under this award cannot be used to retrofit unregulated or Tier 0 locomotives with SCR, or to upgrade, repower or replace locomotives from: Tier 0+/1 to Tier 0+ or lower; Tier 1+/2 to Tier 1+ or lower; Tier 2 to Tier 1+ or lower; or, from Tier 2+ to Tier 2+ or lower. In addition, recipient agrees that funds under this award cannot be used upgrade, repower or replace line-haul locomotives from Tier 2 to Tier 4, or to upgrade, repower or replace line-haul locomotives from Tier 2+ to Tiers 3 and 4 , or to install Automatic Engine Start-Stop technologies on locomotives currently certified to Tier 0+ or higher. E.20.Marine Shore Connection: Recipient agrees that funds under this award cannot be used for marine shore connection system projects that are expected to be utilized less than 2,000 MW-hr/year. E.21.Locomotive Shore Connection: Recipient agrees that funds under this award cannot be used for locomotive shore connection system projects that are expected to be utilized less than 1,000 hours/year. E.22.Locomotive and Marine Operating Hours: Recipient agrees that funds awarded under this award cannot be used to retrofit, repower, replace, upgrade or install idle reduction technologies on eligible locomotives or marine engines that operate less than 1000 hours per year. F. Drayage Vehicle Replacement Project Requirements: F.1. In addition to the applicable requirements for highway vehicles described in E above, recipients replacing drayage vehicles are required to establish and document guidelines to ensure that the scrapped vehicle has a history of operating on a frequent basis over the prior year as a drayage truck. F.2. The recipient must establish and document guidelines to ensure that all drayage trucks receiving grant funds are operated in a manner consistent with the definition of a drayage truck, defined as any Class 8a and 8b in-use on-road vehicle with a gross weight rating (GVWR) of greater than 33,000 pounds operating on or transgressing through port or intermodal rail yard property for the purpose of loading, unloading or transporting cargo, such as containerized, bulk or break-bulk goods. G. Delays or Favorable Developments: The recipient agrees that it will promptly notify the EPA Project Officer of any problems, delays, or adverse conditions which may materially impair its ability to deliver on the outputs/outcomes specified in the work plan. This disclosure must include a statement of the action taken, or contemplated, and any assistance needed to resolve the situation. The recipient agrees that it will also notify the EPA Project Officer of any favorable developments which may enable meeting time schedules and objectives sooner or at less cost than anticipated or producing more beneficial results than originally planned. H. Employee and/or Contractor Selection: EPA will not help select employees or contractors hired by the recipient. I. Program Income: Program income as defined at 2 CFR §200.80 means gross income received by the grantee or subrecipient that is directly generated by a grant supported activity or earned as a result of the Federal award during the period of performance. Under DERA grants, program income is generally limited to the sale of scrapped or remanufactured engines/chassis or salvaged engine/vehicle/equipment components and does not include revenue generated by recipients or subrecipients through the commercial use of vehicles and equipment purchased with grant funds. “Period of performance” is the time between the start and end dates of the period of performance as included in the Federal award. Program income earned during the project period shall be retained by the recipient and, in accordance with 2 CFR §200.307 recipient is authorized to use program income as follows: I.1. Program income may be added to the Federal award by EPA and recipient and used to further eligible project or program objectives. The program income shall be used for the purposes and under the conditions of the grant agreement. I.2. Program income may be used to meet the cost-sharing or matching requirement of the Federal award, including any mandatory or voluntary cost-share. The amount of the Federal award remains the same. I.3. Deducted from the total allowable costs to determine the net allowable costs on which the federal share of costs is based. This means that the recipient shall spend program income on project activities before spending/requesting federal funds for project activities. This may result in unspent federal funds at the end of the project period. The recipient will maintain records adequate to document the extent to which transactions generate program income and the disposition of program income. J. Equipment Use, Management, and Disposition These equipment use, management, and disposition instructions are applicable to assistance agreement recipients and subrecipients acquiring equipment under this award. State agencies may use, manage and dispose of equipment acquired a Federal award by the state in accordance with state laws and procedures. Recipient agrees the equipment acquired under this assistance agreement will be subject to the use and management and disposition regulations at 2 CFR §200.313. Equipment is defined as tangible personal property having a useful life of more than one year and a per-unit acquisition cost which equals or exceeds the lesser of $5,000, or the capitalization level established by the non-Federal entity for financial statement purposes (see 2 CFR §200.12 Capital assets). Certified or verified technologies, vehicles, engines and nonroad equipment are considered to be equipment to the extent they fall within this definition. Recipient agrees that at the end of the project period the recipient will continue to use the equipment purchased under this assistance agreement in the project or program for which it was acquired as long as needed, whether or not the project or program continues to be supported by the Federal award. When acquiring replacement equipment, the non-Federal entity may use the equipment to be replaced as a trade-in or sell the property and use the proceeds to offset the cost of the replacement property. Items of equipment with a current per unit fair market value of $5,000 or less may be retained, sold or otherwise disposed of with no further obligation to the Federal awarding agency. K. Procurement Procedures: The recipient must follow applicable procurement procedures. EPA will not be a party to these transactions. When procuring property and services under a Federal award, a state must follow the same policies and procedures it uses for procurements from its non-Federal funds. The state will comply with 2 CFR §200.322 Procurement of Recovered Materials, and ensure that every purchase order or other contract includes any clauses required by 2 CFR §200.326 Contract provisions. All other non-Federal entities, including subrecipients of a state, will follow 2 CFR §§200.318 General Procurement Standards through 200.326 Contract Provisions. L. For-Profit Sub-recipients In addition to the EPA General Term and Condition #7 “Establishing and Managing Subawards”, the recipient (i.e. “pass-through entity”) agrees to require that for-profit subrecipients comply with Subparts A through F of the Uniform Grant Guidance (2 CFR Part 200) and the Federal cost principles applicable to for-profit entities located at 48 CFR Part 31, with the exception of the method of payment to for-profit subrecipients must be “reimbursement” rather than “advance”. Pass-through entities must obtain documentation that the for-profit subrecipient has incurred eligible and allowable costs prior to releasing EPA funds to the subrecipient. M. Public Notification: Not later than 60 days after the date of the award of a subaward, rebate, or loan by a State, the State shall publish on the Web site of the State: M.1. For subawards, rebates, and loans provided to the owner of a diesel vehicle or fleet, the total number and dollar amount of subawards, rebates, or loans provided, as well as a breakdown of the technologies funded through the subawards, rebates, or loans; and M.2. For other subawards, rebates, and loans, a description of each application for which the subaward, rebate, or loan is provided. N. Mandatory Cost-Share Requirement Any voluntary matching funds provided by the state to qualify for the matching incentive are included in the “EPA funds and state voluntary matching funds” described below. Mandatory cost-share funds provided by the state and/or eligible third parties cannot count towards the state’s voluntary matching funds to qualify for the matching incentive. However, if a state requires a third-party cost-share contribution above and beyond the mandatory cost-share amount for the elected technology, then the “excess” cost-share may be applied towards the state voluntary match funds for the purpose of qualifying for the matching incentive. This award and the resulting federal funding share (as shown under "Notice of Award" in the award document, above) is based on estimated costs requested in the recipient’s final approved workplan. While actual total costs may differ from those estimates, the recipient may not use EPA funds and state voluntary matching funds to provide more than the cost-share percentages outlined below, as applicable, of the final equipment costs. EPA's participation shall not exceed the total amount of federal funds awarded or the maximum federal cost-share percentages of the final equipment costs as outlined below, as applicable. Recipients must satisfy any applicable cost-share requirements with allowable costs as set forth in 2 CFR §200.306. The cost-share requirements are as follows: N.1. Engine Upgrades: EPA funds and state voluntary matching funds can cover up to 40% of the cost (labor and equipment) of an eligible engine upgrade; states and/or eligible third parties are responsible for the mandatory cost-share of at least 60% of the cost of an eligible engine upgrade. N.2. Idle Reduction Technologies on Locomotives: EPA funds and state voluntary matching funds can cover up to 40% of the cost (labor and equipment) of an eligible idle reduction technology on a locomotive; states and/or eligible third parties are responsible for the mandatory cost-share of at least 60% of the cost of an eligible idle reduction technology on a locomotive. N.3. Marine Shore Power Connection Systems and Truck Stop Electrification: EPA funds and state voluntary matching funds can cover up to 25% of the cost (labor and equipment) of an eligible shore connection system or truck stop electrification technology; states and/or eligible third parties are responsible for the mandatory cost-share of at least 75% of the cost of an eligible shore connection system or truck stop electrification technology. N.4. Certified Engine Repower: EPA funds and state voluntary matching funds can cover up to 40% of the cost (labor and equipment) of an eligible engine repower states and/or eligible third parties are responsible for the mandatory cost-share of at least 60% of the cost of an eligible engine repower. N.5. Certified Vehicle/Equipment Replacement: N.5.1. Nonroad Diesel Vehicles and Equipment : EPA funds and state voluntary matching funds can cover up to 25% of the cost of an eligible vehicle or piece of equipment powered by a 2013 model year or newer certified engine; states and/or eligible third parties are responsible for the mandatory cost-share of at least 75% of the cost of an eligible replacement vehicle or piece of equipment. N.5.2. Highway Diesel Vehicles : EPA funds and state voluntary matching funds can cover up to 25% of the cost of an eligible replacement vehicle powered by a 2013 model year or newer certified engine; states and/or eligible third parties are responsible for the mandatory cost-share of at least 75% of the cost of an eligible replacement vehicle or piece of equipment. N.5.3. Drayage Vehicle Replacement : EPA funds and state voluntary matching funds can cover up to 50% of the cost of an eligible replacement drayage truck powered by a 2010 model year or newer engine equipped with a diesel particulate filter (or diesel oxidation catalyst in the case of a CNG engine); states and/or eligible third parties are responsible for the mandatory cost-share of at least 50% of the cost of an eligible replacement drayage vehicle. N.6. Clean Alternative Fuel Conversions: EPA funds and state voluntary matching funds can cover up to 40% of the cost (labor and equipment) of an eligible clean alternative fuel conversion; states and/or eligible third parties are responsible for the mandatory cost-share of at least 60% of the cost of an eligible clean alternative fuel conversion. The eligible acquisition cost for equipment means the net invoice price of the equipment, including the cost of any modifications, attachments, accessories, or auxiliary apparatus necessary to make it usable for the purpose for which it is acquired. Ancillary charges, such as taxes, duty, protective in transit insurance and freight may be included in or excluded from the acquisition cost in accordance with the non-Federal entity's regular accounting practices. O. Cybersecurity: (a) The recipient agrees that when collecting and managing environmental data under this assistance agreement, it will protect the data by following all State or Tribal law cybersecurity requirements as applicable. (b)(1) EPA must ensure that any connections between the recipient’s network or information system and EPA networks used by the recipient to transfer data under this agreement, are secure. For purposes of this Section, a connection is defined as a dedicated persistent interface between an Agency IT system and an external IT system for the purpose of transferring information. Transitory, user-controlled connections such as website browsing are excluded from this definition. If the recipient’s connections as defined above do not go through the Environmental Information Exchange Network or EPA’s Central Data Exchange, the recipient agrees to contact the EPA Project Officer (PO) no later than 90 days after the date of this award and work with the designated Regional/Headquarters Information Security Officer to ensure that the connections meet EPA security requirements, including entering into Interconnection Service Agreements as appropriate. This condition does not apply to manual entry of data by the recipient into systems operated and used by EPA’s regulatory programs for the submission of reporting and/or compliance data. (b)(2) The recipient agrees that any subawards it makes under this agreement will require the subrecipient to comply with the requirements in (b)(1) if the subrecipient’s network or information system is connected to EPA networks to transfer data to the Agency using systems other than the Environmental Information Exchange Network or EPA’s Central Data Exchange. The recipient will be in compliance with this condition: by including this requirement in subaward agreements; and during subrecipient monitoring deemed necessary by the recipient under 2 CFR 200.331(d), by inquiring whether the subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an Interconnection Service Agreement between the subrecipient and EPA. END OF DOCUMENT