AMENDMENT NO 1 CMAR A121 CMC-2003 FINAL FOR EXECUTION 09202016.PDF
Extracted text (via pymupdf_layout)
112411 characters
Amendment 1 to AIA Document A121 CMc- 2003 Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is Also the Constructor AGREEMENT made as of the 5 day of October in the year of 2016 BETWEEN the Owner: Maricopa County Stadium District 401 East Jefferson Street Phoenix, AZ 85004 and the Construction Manager: Jokake Construction 5013 E Washington St, Suite 100 Phoenix, AZ 85034 The Project is: Chase Field 2016-17 Structural Repairs 401 East Jefferson Street Phoenix, AZ 85004 The Facility Manager is: AZPB FM Limited Partnership 401 East Jefferson Street Phoenix, AZ 85004 The Engineer is: Gervasio and Associates 77 E. Thomas Rd, Suite 120 Phoenix, AZ 85012 The Owner and Construction Manager agree to Amendment 1 to the Agreement as set forth below: AMENDMENT 1 GUARANTEED MAXIMUM PRICE For the Cost of Work as defined in Articles 5 and 7 of AIA Document 121 CMc-2003 the Construction Manager’s Fee shall not exceed the Guaranteed Maximum Price of $3,493,620.72. Attached and to be included as part of the Contract Documents is the Construction Manager’s Guaranteed Maximum Price proposal referenced as Exhibit 1- Guaranteed Maximum Price proposal. This Agreement entered into as of the day and year first written above. OWNER CONSTRUCTION MANAGER Maricopa County Stadium District JOKAKE CONSTRUCTION Eiecutive Director Representative A ate li Date ACCEPTED AND APPROVED: Chairman, Board of Directors Date ATTEST: Clerk of the Board Date acuity Manager Date LEGAL REVIEW: Approved as to form and within the powers and Authority granted under the laws of the State of Arizojira to Maricopa Coup Stadium District. Q-2v-/C District Counse Date EXHIBIT 1- GUARANTEED MAXIMUM PRICE PROPOSAL 5013 E Washington Street Suite 100 JOKAKE Phoenix, AZ 85034 Phone: 602.224.4500 Fax: 602.224.1396 Date: September 20, 2016 Owner: Maricopa County Stadium District Project Title: 2016-17 Structural Repairs Section 107-111 Project Address: 401 E. Jefferson St, Phoenix AZ 85004 To Mr. Daniel Rojas, Jokake Construction proposes to provide structural and architectural repairs at lower seating bowl at four (4) caulk joints and one (1) expansion joint at sections 107,108,109,110. and 111 located over grounds keeping at east corridor area. Work specifically to include selective demo of masonry walls, concrete structure repairs, masonry, minor wall framing and drywall repairs, minor acoustic ceiling repairs, select wall painting, temporary removal of select fire sprinkler lines, plumbing, electrical, and re-route of HVAC duct work based on drawings as listed in the attached drawings log. Jokake Construction proposes to provide the above-described services per attached Project Schedule of Values, Bid Clarifications/Assumptions, and Construction schedule for a contact amount of Pre-Construction: $151,798.10 ••I•.-1+-1-1+-1.-1-1 Base Bid: $3,433,626.10 Add Alternate 1: $59,994.62 Add Alternate 2: $73,833.22 Please contact me with any questions or concerns. Sincerely, JOKAKE AN EMPLOYEE-OWNED CONSTRUCTION COMPANY OFFICE: 602 224 4517 MOBILE: 602 722 1005 EMAIL: michael.yates@pkake.corn MAIL: 5013 E WASHINGTON ST. SUITE 100 PHOENIX. ARIZONA 85034 WWW.JOKAKE.COM AZ ROC # 241197 // CA LIC# 960871 // NV LIC# 0078121 0 Table of Pre-Con Pricing Contents GMP Schedule of Values_ I Allowance Tracking Sheet Clarifications I o Plan and Spec Reference Matrix Sub-Contractor Backup Project Schedule OILPWP r- Bid Alternate No. 1 & No. 2 Tab 1 - Pre-Con Pricing 5013 E Washington Street Suite 100 JOKAKE Phoenix, AZ 85034 AA &MOLINA*. MAMAS Phone: 602.224.4500 ARMAVIPALPI. 60•11.4MY Fax: 602.224.1396 Date: August 16, 2016 Pre-Con Proposal Owner: Maricopa County Stadium District Project Title: Chase Field Section 107-111 Structural Repairs Project Address: 401 E. Jefferson St. Phoenix AZ 85004 Mr. Daniel Rojas, Jokake Construction Services will provide the following pre-construction services listed below as outlined in the July 19th letter Re: 16101-CMR Chase Field Structural Repairs Pre-Construction and GMP Schedule to Jokake Construction. 1 - Preliminary Evaluation of Project Design/Scope, Schedule and Project Budget. 2- Attend Meetings with MCSD and Genrasio to review status of design, schedule and cost estimates. 3 - Coordinate with Gervasio regarding constructability and alternative construction design options and alternatives regarding procurement of materials, labor and economies of scale. 4 - Develop a project schedule that completes the scope of work and is inclusive of restricted construction dates provided by MCSD that meet substantial and final completion dates required by MCSD/Artzona Diamondbacks. 5- Make any recommendations to the MCSD and Gervaslo regarding the phasing of work In order to make the spaces available for the dates required by the MCSD for events. 6 - Should the Initial GMP for the scope of work be over the MCSDs budget, we will work with MCSD and Gervaslo to determine a scope of work and schedule that is acceptable to all parties that is within the MCSD budget. 7 - Final GMP will meet all requirements dictated in Section 2.2 of A121CMc-2003 and presented in a format that can be Inserted as Exhibit 1 to Amendment No.1 - Attend the MCSD Construction Kickoff with key personnel and the main trades, MCSD. Gervaslo and Arizona Diamondbacks Representatives to review working at Chase Field. Provide Administration Requirements and other tasks associated with working at Chase Field. 9- Included allowance for two days for construction: scaffolding engineering, two days of scaffolding rental, and man power. Pre-Construction Base Cost: S151,798.10 Please contact me with any questions or concerns. Sincerely, • 1 4 4 I 614 7! MIKE YATES PROJECT MANAGER JOKAKE AN EMPLOYEE-OWNED CONSTRUCTION COMPANY OFFICE: 602 224 4517 FAX: 802 224 1396 MOBILE: 602 722 1005 EMAIL: michaellates@jokake.com MAIL: 5013 E WASHINGTON ST. SUITE 100 PHOENIX. ARIZONA 85034 IAMMI.JOKAKE.COM AZ ROC# 241197 i/ CA LIG/ 960871 'Attachments - Pre-Con Services 8.11.16 thru 10.5.16 Esthnate, Jokake Rate Sheet, and Restruction Pre-Con Proposal. Page 1 of 5 PRICE STATUS: Bid Pre-Con Services 8.11.16 thru 10.5.16 DATE: 08116116 Project Name: Chase Field Section 107-111 Structural Repairs Project Location: 401 E. Jefferson St. Owner: #REFI Division Description Unit Quantity Unit Price Total Price 1 GIVIERAL.R.EQUIREMEN15 01.061 Permit Fees Excluded 01.105 Director HRS 51.20 115.00 5,888.00 01.110 Project Manager HRS 128.00 100.00 12,800.00 01.115 Prolect Engineer HRS 128.00 75.00 9,600.00 01.116 Contract Administrator HRS 5t20 55.00 2,816.00 01.120 Prolect Superintendent HRS 102.40 100.00 10,240.00 01.542 Scaffolding - Allowance ALLOW 1.00 15,000.00 15.000.00 2 SITEINCIHN . 02.010 Testing - Exploratory/Soil - Allowance ALLOW 1.0 4,000.00 4,000.00 02.065 Exploratory Demo - Allowance ALLOW 1.0 15,000.00 15,000.00 • 3 concRETE . 03.700 Restruction Pre-Con BID 1.0 6,440.00 6,440.00 Restruction 2 Working Crew Days (26 03.700 Persons) - Allowance ALLOW 1.0 40,000.00 40,000.00 1 15 MECHANICAL 15.050 Basic Mechanical Make Safe - Allowance ALLOW 1.0 8,000.00 8,000.00 16 ELUTRICAL. --r k • 16.050 Basic Electrical Make Safe - Allowance ALLOW 1.0 5,000.00 5,000.00 Sub Total- Direct Cost 134,784.00 01.780 General Insurance 1.250% 1,684.80 — o3. 60 01.007 Builder's Risk (ScaffoldingM/orking) 0.700% 581.00 01.006 Bonds (Scaffolding/Working) 1.500% 1.245.00 FEE 6.00% 8,297.69 • 20.300 TAX (Scaffolding/Working) 5.590% 5,205.61 Sub Total- Indirect Cost 17,014.10 GRAND TOTAL $151,798.10 Page 2 of 5 5013 E Washington Street Suite 100 JOKAKE Phoenix, AZ 85034 N1.11.0111111•011Wilt Phone: 602.224.4500 torSTINCTN., WORM -PIT Fax: 602.224.1396 Date: August 16,2016 Jokake Rate Sheet Owner Maricopa County Stadium District Project Title: Chase Field Section 107-111 Structural Repairs Project Address: 401 E. Jefferson St. Phoenix AZ 85004 Mr. Daniel Rojas, Please see below Jokake rates: Senior Superintendent 100.00 HR Project Assistant 55.00 HR Project Engineer 75.00 HR Project Manager 100.00 HR Director 115.00 HR Please contact me with any questions or concerns. Sincerely, MIKE YATES PROJECT MANAGER JOKAKE AN EMPLOYEE-OWNED CONSTRUCTION COMPANY OFFICE: 602 224 4517 FAX: 602 224 1396 MOBILE: 602 722 1005 EMAIL: michaellales@jokake.com MAIL: 5013 E WASHINGTON ST, SUITE 100 PHOENIX. ARIZONA 85034 WWW.JOKAKE.COM AZ ROC# 241197 // CA LIC# 960871 Page 3015 Specialists In Structural Repair PIS Corporation Restruction Colorado Si 3870 Platte Ave. Sedalia, CO 80135 3434884244 Fax 3034884733 August 15, 2016 Utah 2641 South 3270 West Mr. Michael Yates 8014724190 Salt Lake City, UT 84104 JOKAKE Fax 801.9724377 5013 E. Washington St. Suite 100 Arizona Phoenix, AZ 85034 21275. Priest Dr. SuHe 0405 Tempe, AZ 85282 480.557.9174 Reference: Chase Field Structural Repairs 2016-2017 Preconstruction Fax 483-5574219 Dear Mr. Yates, Wabsite vAvw,rystruction.com Following is our proposal for preconstruction services for the 2016-2017 Chase Field Structural Repair Project. Scope of Work Preconstruction CD • Engage in preconstruction meetings to aid in the development of the project. • Visit the site to develop and provide a streamlined cost effective project plan. • Input all costs into the MCSD Spreadsheet to be used in the Chase Field repair project. Costs: Unit Total Item # Description Quantity Units Price Cost 1 Preconstruction Meeting 6 @ lhr 6 HR $92.00 $552.00 2 Site Visits 24 HR $92.00 $2,208.00 3 Estimate Project & Populate Spreadsheet 40 HR $92.00 $3,680.00 Total $6,440.00 Allowances Al Shoring & Access Allowance EA $15,000.00 A2 2 Working Crew Days Allowance 1 EA $40,000.00 Conditions of Payment Invoices are due 30 days from the invoice date. A 1% discount is offered if payment is received within 15 days of the invoice date. All invoices over 30 days will be assessed a service charge of 1 ih% per month from the original invoice date. Page 4 of 5 Conditions of Bid • AU debris, material, and equipment will be satisfactorily removed from the site at the completion of the work. • Certificates of insurance will be provided before the work is started. • Cost estimate includes Restruction Corporation standard insurance limits and AIA indemnification language. • Permit fees, tax and any outside testing is not included. • Price valid for 30 days from date of proposal. We appreciate the opportunity to provide you with our services. OK to Proceed By: On Behalf of Date: 0 Page 5 of 5 Tab 2 - GMP Schedule of Values 09120116 Cost Total $21,160.00 $46,000.00 $34,500.00 $10,120.00 $92,000.00 $9,660.00 $250.00 $650.00 $700.00 $1,200.00 51,500.00 $5,520.00 $150.00 $1,950.00 $8,000.00 $2,500.00 $10,850.00 $30,126.00 $2,487,216.34 516,850.00 $4,500.00 STATUS: DATE: / Subcontract Other 250.00 650.00 30,126.00 2,487,216.34 16,850.00 4,500.00 PRICE General Contractor 21,160.00 46,000.00 34,500.00 10,120.00 92,000.00 9,660.00 700.00 1,200.00 1,500.00 5,520.00 150.00 1,950.00 8,000.00 2,500.00 10,850.00 Equipment 700.00 1,200.00 150.00 1,950.00 8,000.00 2,500.00 Materials 1,500.00 Bid Total Labor 21,160.00 46,000.00 34,500.00 10,120.00 92,000.00 9,660.00 5,520.00 10,850.00 Base - Values Labor Rate 115.00 100.00 75.00 55.00 100.00 105.00 15.00 43.75 of Schedule Hours 184.0 460.0 460.0 184.0 920.0 92.0 368 248 - Scope 107-111 85004 ruction Section AZ District Equip Demo PROTECTION Rest Repairs Phoenix Stadium Description REQUIREMENTS & Soil MOISTURE outside Structural SI, County Director Manager Engineer Administrator Superintendent Manager Delivery Cleaning Supplies Material Equipment Labor CONDMONS Demolition/ Restoration Masonry & 2016-17 Jefferson E. Maricopa GENERAL Project Project Project Contract Project Safety Submittal Prints Blue Dumpsters Barricades Protection Site Progressive Safety Miscellaneous Rental cleaning Final Skilled SST EXISTING Building CONCRETE Concrete MASONRY and Mortar THERMAL Caulking/Fireproofing Allowance 401 Name: Location: Division 1 2 3 4 7 Project Project Owner: 01.105 01.110 01.115 01.116 01.120 01.123 01.305 01.310 01.515 01.531 01.532 01.561 01.575 01.600 01.610 01.710 01.810 02.060 03.700 04.100 910 07 .4.00 $4,.. $5,300.00 $16,808.00 $25,580.00 $13,533.00 $3,400.00 $36,405.00 $35,454.00 S2,925,907.34 ($96,220.92) $0.00 $134,693.07 537,054.74 $21,010.04 $45,336.67 $3,067,780.94 $184,066.86 $3,251,847.80 $181,778.30 $507,718.76 $3,433,626.10 I 16,808.00 25,580.00 13,533.00 3,400.00 36,405.00 35,454.00 2,670,772.34 4,025.00 5,300.00 255,135.00 I 1,400.00 1,800.00 2,625.00 3,500.00 43.75 43.75 43.75 60 80 0.000% 4.760% 1.250% 0.700% 1.500% 6.00% 5.590% CONOMONING MR Contingency Drywall VENTILATION Allowance Work Pre-Con Work the & Ceilings SUPPRESSION - the of from Contingency Construction of TOTAL Framing Sprinkler Design ELECTRICAL Cost Cost Risk Cost FINISHES Wall Acoustical Painting FIRE Fire PLUMBING Plumbing HEATING HVAC HVAC Electrical Direct Deduct Owners Jokake Insurance Builders Bond Subtotal FEE Subtotal TAX Indirect GRAND 21 22 23 26 09.110 09.500 09.900 15.300 15.400 15.500 15.500 16.050 - 19.050 19.200 01.780 01.006 01.006 20.300 Tab 3 - Allowance Tracking Sheet JOKAKE IM•1011.11111•11,011110•• COMIN.M Owner Change Request and Change Order Tracking Sheet Project: Chase Field 2016.17 Structural Repairs Date: 911312016 Address: 401 E Jefferson St. Phoenix AZ 85004 Pre-Construction Amount $151,7913.10 xxx.xx=Charge (xxx.xx)=Credit Allowance - 02.010 Testing Exploratory/Soil 4,000.00 Date Submitted Date Approved Item Submitted Approved - Totals: $0.00 $0.00 . 1.4% :' - 7- .; : . ,. — • ,. , *Revised Original Contractor Allowance Amount: (4,000.00) Pending Contractor Use Allowance Amount: 0.00 Approved Contractor Use Allowance Amount: 0.00 Rerraining Allowance Amount: (4,000.00) Total: (4,000.00) xxx.xx=Charge (xxx.xx)=Credit Allowance - 07.910 Caulking/Fireproofing outside Restruction Scope 4,500.00 Date Submitted Date Approved Item Submitted Approved Totals: 90.00 $0.00 - - , *Rev;sed Original Contractor Allowance Amount: (4,500.00) Pending Contractor Use Allowance Amount: 0.00 Approved Contractor Use Allowance Amount: 0.00 Remaining Allowance Amount . (4,500.00) Total: (4,500.00) 0 KA 1([ xxx.xx=Charge (xxx.xx)=Credit Allowance - 15.500 HVAC Design 3,400.00 Date Submitted Date Approved Item Submitted Approved Totals: $0.00 $0.00 - ,. 7.-:•;.:, _ _ __ _ -- - • • •--. . 1 'Revised Original Contractor Allowance Amount: (3,400.00) Pending Contractor Use Allowance Amount: 0.00 Approved Contractor Use Allowance Amount: 0.00 Remaining Allowance Amount: (3,400.00) Total: (3,400.00) xxx.xx=Charge (xxx.xx)=Credit Contractor Contingency Change Request 114,018.34 Date Submitted Date Approved Item Submitted Approved Totals: $0.00--r • MOO 'Revised Original Contractor Contingency Amount: (114,018.34) Pending Contractor Use Contingency Amount: 0.00 Approved Contractor Use Contingency Amount: 0.00 Remaining Contractor Contingency Amount: (114.018.34) Total: (114,018.34) xxx.xx=Charge (xxx.xx)=Credit Change Request Date Submitted Date Approved Item i Submitted Approved Totals: $0.00 $0.00 _ _ _ ___ --.._.1.a.......-----. —31111.1111111.1111111111= JANA . . .- - -- - ----- - -..-- , *Revsed Pending Change Request: $0.00 Approved Change Request: $0.00 Total $0.00 Total: $0.00 419.1c. [ Date Approved Owner Contract Change Orders '' . Approved Amount Pre-Construction Amount: $151,798.10 Constniction Arno nt: $0.00 Revised Amount: $151,798.10 Submitted Pending Change Request: $0.00 Allowance Balance: ($11,900.00) Contractor Contingency Balance: ($114,018.34) Date Requested Upcoming Pricing Request P Tab 4 - Clarifications Clarifications Project: 2016-17 Structural Re. airs Section 107-111 Division _;....:, -..,i... ..—......_—__.........._________ General: 1 - All work is to be performed during normal working hours, except as needed for shutdowns and tie Ins 2 -All areas affected by construction will be vacated and emptied. 3 - All work will be completed in one phase. 4 - Pricing assumes that parking is available at no cost to Jokake or its subcontractors 5 - Exclude all permits or permit fees. 6 - Exclude exact match to existing materials, All finish materials will match close as possible. 7- Exclude all Asbestos identification or removal. Maricopa County to provide asbestos testing report to Jokake prior to start of any demo work B - Exclude all design and engineering except as listed below. 9- Exclude relocation or removal of furniture or wall hangings. 10- Exclude all teleidata cabling. 11 - Exclude service or repair of existing HVAC units. 12- Exclude certified air balance. 13- Exclude relamping or new ballasts of existing light fixtures. 14- Exclude any engineering or architectural fee or calculations except as fisted below . 15- General requirements are figured as fixed sum and will be billed as a percentage based on project completion 16- Assumes onstle restrooms can be used by construction persons. IIMI 1 - Save Per Drawings -I:: i 1 - Direction of Structural Concrete Repair Scope Per Drawings, 2 - Structural Concrete Repair quanities per the attached Maricopa County Stadium District (vanity spread sheet as agreed upon by Marico • a Coun Stadium District and Restruction Co ioration III 3 - Assumes shoring from soil per Soeedie. MASONRY • 1 -Scone Per Drawin• s IMIlt—A,- - - ._ - 1 - Scope Per Drawings. • _ ' • " ,-- :worms s COMPOSITE& . . 1 - Sco , e Per Drawin• s MI .. MEM THERON-. .9469; .)ISTIMil MOTECTION 1 - Scope Per Drawings . ..... OPEKKOS , . 1 - Sco he Per Drawin•s 9 FINISHES , . .. 1 - Scope Per Drawings. Page 1 of 3 Clarifications Pr*ct ç2018-17 Structural Re Ire Section 107-111 Division I0 inIEMMI - 1111111111111111.M.1111=1.0 Exclude All Tmoz_va--4-.51-remmerxr Exclude All -.111 Exclude All — — ----.............All Exclude All — .. 1 - Provide labor, materials, and equipment to remove and temporaly alter fire sprinkler system in grounds keeping area for structural repairs. 2 - Assumes pipe and hanoers can be re-used for re-Install "IMMIII.:1 . I. 1 - Sco • e 6 er Drawin.s. 2 - Remove and dig Pose of rain • utters stem in *rounds keei i • area Assume cutti 1 of ancors flush and atchin holes 3 - Assumes la .e storm drain , • es can be reused and reinstalled 1 - Sco e er Drawl •s. _ 2- Includes desk n to re-route duct as shown on drawin s Assumes same De and size of duct. 1 - Remove/move and reinstall conduits. lighting, and cable tray for structural repairs 27 COMPAMICAtiONS Exclude All 23. = -._1_11:2.5,.. --itz, SEOURETY Exclude All El EARTiresORIC Exclude All 32 EXTElliQft_ljaPIWVEDIENTS __________ - Exclude All 33 L1111.1TIES Exclude All IRANSPORTAIKIN Exclude All 35 11NAITRYMAY11 MARINE 'Exclude All 41 MATERIAL PROCESSING& HANDLING EQUIPMEN.T Exclude All Page 2 of 3 Clarifications Project: 12016-17 Structural Re +airs Section 107-111 - Division 44 POLLUTION CONTROL EQUIPMENT - Exclude All 411 WAIF-RAND WASTEWATER EQUIPMENT Exclude All ALLOWANCES./• COKTINGENCY -------- Allowances and Contingency: 1. Any allowances or contingency not used will not be billed to owner. . 2 Must have written authorization from owner prior to use of any allowance and contimgency. Page 3 013 Tab 5 - Plan and Spec Reference Matrix DATE: 0911212016 MAKE Exhibit B - Document Loq Project Name: Chase Field Repairs Section 107-111 Project Location: ain E. Jefferson Si, Phoenix, AZ 85004 Owner Maricopa County Stadium District Jokake Project Number: 40-16100-001 Stamp/ Drawing Title Sheet Number Drawn by Date T1.0 Gervasio 6 Assoc., Inc. 9 19201 . Tido Sheet - 11.1 Gambia & Assoc., Inc. 9 192016 Base Bid and Unit Costs A1.0 Gervask3 & Assoc.. Inc. 7/152016 Repair Location Plan and Sections A2.0 Getvasio & Assoc.. Inc. 6/19,2015 Top Deck Repair Plan Lower BovA Sections 107-109 _ A2.1 Gervasio & Assoc.. Inc. 71152018 Top Deck Floor Plan Lower Bowl Sections 109-112 A2.2 Gervasio & Assoc.. Inc, 7115/2016 Floor Plan at Main Concourse Sections104-107 P.2 3 Gervasio & Assoc.. Inc. 8092016 Floor Plan at Main Concourse Secti3ns101-105 P.30 Gervasio & Assoc., Inc. 71102016 Partial Floor Plan Below Bowl Sections 107-109 A3.1 Gervasio & Assoc . Inc 7115:2016 Partial Floor Plan Below Bowl Sections 106-112 P.40 Gervasio & Assoc.. Inc. 7/102016 Stair Sections and Misc. Delads P.50 Gervasio & Assoc.. inc. 7/15/2016 Waterproofing Details P.6 0 Gervasio & Assoc.. inc. 162016 Architectural Details A7.0 Gervasio & Assoc.. inc. 162016 Architectural Details A8.0 Gervasio & Assoc.. inc. 7/102016 Floor Plan at Groundskeeping Area - Bid Alternate No t S1.0 Gervasio & Assoc., Inc, 19/2016 Structural Notes and Details 52.0 Gervaso & Assoc.. Inc. 19/2016 Top Deck Repair Ran Lower Bowl Sections 107-109 52.1 GerVI35i0 5 ASSOC.. Inc. 19.201/ Top Deck Repair Plan Lower Bowl Sections 1e9-111 S30 Gervasio & Assoc., Inc 019/2016 Below Deck Repair Plan Lower Bowl Sections 107-109 $31 Gervasio 6 Assoc.. Inc. 811912016 Below Deck Repair Plan Lower Bowl Sections 109-111 54.0 Gervasio & Assoc.. Inc. 7115/2016 Guardra I Foal Details 55.0 Gervesio & Assoc.. Inc. 8/1912016 Expansion Joint Details $5.1 Gervasio 5 Assoc.. Inc. 71152016 Top ol Precast Tread & Riser Repairs 55.2 Gervasin 6 Assoc., Inc, 7/15:2016 Top ol Precast Tread & Riser Repairs $5.3 Gervesto & Assoc.. Inc 711512016 Top at Precast & C I-.P Repair Details $5.4 Gervasio & Assoc.. Inc. 811912016 Precast Riser Bearing Details $6.0 Gervasio & Assoc.. inc. 7.15/2016 Corcrele Wall Plan II Details $6.1 Gerrasio & Assoc., Inc. 9192016 lbncrele Wail Details Grid R16 S6.2 Germanic & Assoc.. inc. 8/19/2016 Concrete Wall Details Gnd R15 56.3 Gereasio a Assoc.. Inc, 8119/2015 Concrete Wall Details Grid R14 $6.4 Gervasio & Assoc., Inc. 0192016 Concrete Wall Details Grid R13 S6.5 Gervasio & Assoc., Inc. 7:152016 Concrete Wall Details Grid R13 56.6 Gervasio & Assoc.. Inc. 7/15/2016 Concrete Walliftlsers Details S6.7 Gervaslo & Assoc.. Inc. 7/1512016 Concrete Wan Details $6.6 Gervasb & A530C.. Inc. 8/1912016 Concrete Wee Details 57.0 Gervaskr & Assoc.. Inc. 8/19/2016 Precast Concrete Column Details $7.1 Gerasia & Assoc., Inc. 7/15/2015 Precast Concrete Column Details 57.2 Gerrasio 6 A550C., Inc. 711512016 Precast Concrete Column Details S-B.0 Genesis & Assoc.. Inc. 711512015 Raker Beam Details $6.1 Gervasb & ASSOC.. Inc. 71152016 Raker Beam Details 59.0 Gelvasio & A330C . Inc. 7/1512016 Foundation Plan & Details. Bid Alternate No 1 S9.1 Gervasio & Assoc., Inc. 8/1912016 Sections • Bid Alternate No. 1 Gerrasto & Assoc,. Inc. 8/102016 Technical Specifications Maricapa County Stadium Dtstrict Contractor General Work Aggremeni Maricopa County Stadium District Parking Aggrement Man/cope County stadium District ContrectorNendor Policies Marlcopa County Stadium District Electrical Aggrement Jokake Consiruction Safety Plan Tab 6 - Sub-Contractor Backup Pricing - - $ $ - - 19.9.16 $ $ Date: Demo - - Supplier Dickens Demo bid no I Building or $ $ Subcontractor Specialty bid - - Demo Selective no AZ $ $ - Marks Valley bid NO no $ $ 00 00 00 Straight Arrow 24,862.00 X X 264 30,126 30,126 5 $ $ $ $ Sections: COST BID SUBTOTAL BOND 107-111 COMPARATIVE Specification Section - Scope and Quantities locations TOTAL Repairs Work keep repair of grounds wall Field Yates Items Approximate at at included walls back Chase Mike put = CMU CMU and x by: of Attached Project: existing off removal Prepared of haul dirt Data Bid cutting and REMARKS. Base Saw Demo Subgrade Backup Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC '20 W. Southern Ave -4.107.60:deir• Quote .eson, AZ 85353 US Native American Owned Company Date Quote # (623)694-3345 I 08/25/2016 2510 str.arrow.az@gmail.com Exp. Date 10/25/2016 Address Ship To Jokake Construction Chase Field Repairs 5013 E Washington St. Suite 100 401 E Jefferson ave Phoenix, AZ 85034 USA Phoenix AZ 85004 Sales Rep Kenny Activity rQuantity Rate Amount • Sawcut, demo, and export 70 of existing cmu wall at column line CC. as shown in 24,862.00 details. eellitin14114114464- • Demo price is based on demoing all at one time. ADDITIONS: this quote shall become part of any PO and/or any notice to Total $4062.00 proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions, unforeseen conditions, landscape, off hours & holiday work, environment abatement, traffic barricades, n trips, and any Accepted By Accepted Date ROC 271567 KB-1 DUAL, ROC 246308 K-3I DBE Certified Company Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC Quote — '20 W. Southern Ave eson, AZ 85353 US Native American Owned Comp any Date Quote # (623)694-3345 09/12/2016 25/8 str.arrow.az@gmail.com Exp. Date 10/12/2016 Address ;Ship To Jokake Construction Chase Field 5013 E Washington St. Suite 100 Phoenix, AZ 85034 USA Sales Rep Kenny Activity Quantity Rate 1 Amount • Pricing for cost #86 to remove l'xrx86 of soils by hand, stock pill on site and 5,264.00 backfill at later date, +WI 940 CP111r1:11T-311 G•01171EIT -lin4icif-lad1fla4466446,44 ,411-etrif5eretts-srfirl65-pur Trrft7 iGing-to-paint.as..4.1k4.14at-adclitional-eon-woltg .60 • • •.!.. • . • • • • 683 11.00 00 [194004 ef-par41-rAil.. • Ai4caaate-tiCIpainl.147-11-GLAaad-Ftli 157 1 00 • Priees-de-aet-iarrluile-fiemerfliftwell-er-Rre-ranflerreg Ale ADDITIONS: this quote shall become part of any PO and/or any notice to Total $2 proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions, unforeseen conditions, landscape, •-ation, off hours & holiday work, environment abatement, traffic barricades, .1 trips, and any Accepted By Accepted Date ROC 271567 KB-1 DUAL, ROC 246308 K-31 DBE Certified Company $16,139.40 $0.00 $90.654.00 $3.626.16 $6.043.60 $6.043.60 $1,804.06 $7.216.24 $1.208.72 $2.061.99 $22.965.68 $0.00 $13,295.92 $0.00 $6,043.60 $2,417.44 $16,922.08 $1,804.06 $2,061.99 $173,114.16 $2,253.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,834.66 $26,755.20 $4,787.70 $0.00 50.00 5114.086.28 $0.00 $0.00 $0.00 $83,685.90 $0.00 516,099.42 50.00 $3,009.21 $7,484.82 53,102.12 $6,278.46 $3,213.25 $89309 19.20.16 Date: I Repair Supplier Ouanity $58.16 $135.65 $1.208.72 51,208.72 $1.208.72 51,208.72 $1.804.06 $1.804.06 $1,208.72 $2,061.99 51.208.72 $1,208.72 $1,208.72 $1,208.72 $1.208.72 $1.208.72 $1.208.72 $1,804.06 $2,061.99 $171114.16 $2,253.36 $2,253.36 $2,253.36 52,253.36 $2,253.36 52,253.36 $227.49 $1.992.88 $325.46 51,114.80 $1.595.90 51.114.80 $1,595.90 $1,358.17 $1,358.17 $752.63 $752.63 $820.45 $820.45 $220.54 $227.43 $81.33 $356.42 $1,034.04 51.046.41 $642.65 $693.09 or per Concrete Subcontractor Cost 277.5 0 75 3 5 5 1 4 1 1 19 11 5 2 14 1 1 1 1 0 0 0 0 0 0 0 21 24 3 0 Li 84 o o o 102 0 73 0 37 21 3 6 5 1 Ouanity 161s5.0 4/55.0 3/s5.0 3b/s5.0 4b1s5.0 16/s5.1 16/s5.1 Restruction Corporation Detail 81s1.0 10/s1.0 14151.0 19/51.0 6/s4.0 7/s4.0 81s4.0 9154.0 10/s4.0 121s4.0 16/s4.0 52.0.52.1 s2.0.s2.1 s2.0,s2.1 s2.0,s2.1 17/s4.0 191s4.0 201s4.0 6/55.1 7/s5.1 81s5.1 9/s5.1 10/s5.1 191s5.1 201s5.1 6/s5.2 81s5.2 91s5.2 10/s5.2 16/s5.2 17/s5.2 18/s5.2 14/s5.2 15/s5.2 191s5.2 11s5.3 2/s5.3 4/s5.3 6/s5.3 s2.1. 10/55.0, 20/55.0, 20/s5.2. 20/55.2, 10155.0, 20/s5.0, - Sections: joint Specification expansion of - length Scope along repair repair vertical/overhead) riser riser 13 connections w/o w/o work) & Row joint joint and Quantities (formed above fixed Work (fiat Bar wall wall wall wail 3 4 6 7 wall and expansion expansion of Concrete Concrete place place place place Keynote Keynote Keynote Keynote place sliding of of joint joint joint joint 107-111 Items Approximate Reinforcing in in in in per per per per in restraint connection connection joint joint side side caulk caulk caulk caulk edge place cast cast cast cast wall cast slide fixed Deteriorated Deteriorated One riser bead in riser of of of of joint riser riser riser riser riser steps of of slide fixed expansion expansion at at at at at at edge riser 39 Section of PC PC cast PC top at top top top PC PC PC PC PC PC PC top top seismic plate plate joint joint tread joint joint joint joint joint Joint PC Row 39 of of splice al at at at at at at at at at at at at at at at at resident resilient of of caulk caulk PC connection connection connection connection at at at at at at riser of end Row Repairs Repair Repair repair repair repair repair repair repair repair repair repair repair repair repair repair repair repair repair repair T&R side side seismic seismic at at at PC repair al curb riser at Field and and Injection post post post post post post post post post post post post post post post post post PC seismic seismic fixed slide with with repair repair repair seismic seismic seismic seismic connection connection connection connection connection connection of connection repair PC PC bead tread Yates Welding-Welded of at at point repair thickness at at PC PC Chase Mike Removal Removal Epoxy Handrail Handrail Handrail Guardrail Guardrail Guardrail Guardrail Guardrail Handrail Guardrail Guardrail Guardrail Guardrail Guardrail Handrail Guardrail Guardrail Repair tread tread T&R T&R tread tread tread tread tread tread tread tread T&R T&R T&R T&R T&R T&R Partial T&R riser Repair Repair Repair Repair 1 1 PC PC PC PC PC PC PC PC Pick PC PC PC PC PC PC PC PC PC PC PC PC Full by: Project: Prepared lA 2 3 4 5 6 7 B 9 10 11 12 13 13a 13b 13c 13d 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Cost Unit $256,26 $2,469.15 $598.07 $1,269.11 55.709.26 $18,041.54 $13,968.90 $88,310.51 555,569.69 $8,980.96 $18.657.15 $2,905.58 $6,347.15 54,599.95 51,328.91 $13,645.90 537,725.16 551.261.89 $43,071.30 521.829.75 53.703.96 54,217.01 $1.239.54 546,773.55 522,609.90 $5,642.76 $32,870.42 $0.00 $0.00 $47,765.27 $17,184.35 $26,841.16 52,402.25 $13,051.58 $12.230.20 516.217.35 $3,782.28 $6,784.72 52303.71 $82,034.40 $4.006.81 50.00 $0.00 $51,565.00 56,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $801.14 $0.00 $0.00 $0.00 $0.130 5139,849.32 589,526.05 $38,270.22 $0.00 5256.26 $823.05 $598.07 $1.269.11 55.709.26 $820.07 $1.552.10 $1,243.81 $561.31 $561.31 $1,243.81 $2,905.58 $6,347.15 5919.99 $1,328.91 $1.364.59 537,725.16 $51,261.89 543,071.30 $21,829.75 51,851.98 54,217.01 $1,239.54 $46.773.55 52.260.99 $2.821.38 532,870.42 50.00 $47,765.27 $17,184.35 $26,841.16 52,402.25 $13,051.58 $12,230.20 516.217.35 $1.891.14 $6.784.72 52.703.71 54.317.60 54.006.81 50.00 $67.82 $103.13 $6.88 $243.03 $400.57 5319.79 590.43 $20.35 $26.30 $890.76 $17.905.21 $311.14 5177.12 1 3 1 1 1 22 9 71 99 16 15 I 1 5 1 10 1 1 1 1 2 1 1 1 10 2 1 0 1 1 1 1 1 1 1 2 1 1 19 1 0 0 500 1000 0 2 0 0 0 0 157 5 123 0 15/s6.7 16/s6.1 16156.2 16/56.3 16/s6.5 16s6.6 17/s6.7, 16/s6.7 181s6.7 13/a5.0 16/a6.0 8/55.3 151s5.3 16155.3 17/55.3 18/55.3 6/55.4 16/s5.4 9155.4 10/s5.4 191s5.4 20/s5.4 61s6.0 11/56.0 16/56.0 19/s6.0 201s6.0 71s6.5 9/56.6 19/56.7 19a/s6.7 16/57.0 16/57.1 18/s7.1 6/s7.2 7/s7.2 9/s7.2 16/57.2 19157.2 161s8.0 6/58.1 15158.1 18/58.1 19/56.6 20/58.1 15/a5.0 5/a6.0 7/a6.0 8/a6.0 15186.0 11/a6.0 9/a5.0 61s6.1, 6/s6.2, 6/56.3. 11/s6.4, 61s6.6, 16/s6.7, 11/s6.8, 11156.8, 6/a5.0. 181a6.0. 6/s6.7, R16-BB joint joint Grindline expansion expansion at joint at Joint joint at column expansion wall caulk expansion wall of Joint of at shear at Joint at shear R11-CC side shown side wall PC wall wall PC each R144361 either shear and/or and/or caulk at shear and/or wall wall Gridline at raker R15-DD R14-DD Gridline R13-CC specifically on PC raker raker wall PC raker wall place place at of at ONLY deck and/or at at and/or and/or at bearing on in Scope joint RIB-CC step Gridline Gridline beam Gridline not Scope Scope Scope concrete 108 embed embed embed R16 R16 riser retaining cast cast at RC expansion center at at beam beam at plates ECS RC RC RC Level (Restruction) 2 raker and and raker raker and Gridline Gridline R16 R15 R14 R13 PC at wall wall Not Gridline and patch patch raker raker raker beam wall of Not Not Not existing width joint 100 Level Level section Gate at at at of of bearings Gridline Gridline Gridline Gndline bracket below place connection connection place place at at corbel corbel R15-BB and brackets at at beam raker sail and/or mounting part as of proper across at Cleanup 100 100 at 39 at tread assembly assembly assembly assembly assembly assembly south north riser at at at at steel wall in cast in cast in cast column corbel corbels. and and corbel, patching raker and beam seat corners to surfaces stud Reinstallation at at Row tread 1 PC bearing bearing bearing bearing bearing bearing wall wall wall PC wall wall wall wall support and diagonal restraint restraint concrete and column. column column Gridline column, support concrele_patching al column existing raker bolts damaged width at buildingup joint seal ECS and Shores Shares at PC of Gate and riser below shear shear shear shear 53 riser non-retaining non-retaining column of at and concrete step of at seal joint tape or uneven and Protection Post Post tread end column at wall slide slide fixed fixed fixed fixed retaining retaining PC retaining PC PC PC PC riser riser PC west seismic seismic precast of top of top of top column of top riser center of lop tierx86' holes damaged needed exisitng flashing down expansion out existing existing Custom Standard PC at at wall at of of of of of of at at of of wall of of of of PC PC of at of of at at top at at at at at depth depth al at of if out of of Removal Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair Repair -Repair Repair Precast Partial Partial Repair Repair Remove Repair R&R R&R Modify Install Grinding Build Grinding Repair Repair Seat Temporary Install Install 45 46 47 48 49 50 51 52 53 54 55 56 57 56 59 60 61 62 63 64 65 66 67 68 69 70 71 72 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 95 96 97 98 99 - $ 1.9.00 $0.00 5106.375.00 516.328.90 5227.497.83 $75,609.00 $71,380.62 $14,585.77 $13,064.00 $50,931.30 50.00 516,474.62 $55,238.40 50.00 50.00 $0.00 $0.00 56,104.00 $58,749.56 547,672.03 487,6.345 52.487,216.34 - - 5 51,524.10 $2,032.13 $106,375.00 $466.54 $13.11 $504.06 5466.54 $29.23 $13,064.00 $485.06 $133.94 $230.16 $6,104.00 $58.749.56 547,672.03 - 0 - 0 1 35 17353 150 153 499 1 105 123 240 0 0 1 1 1 . $ - NO 5 - $- CYES _ $ COST RID SUBTOTAL BOND COMPARATIVE TOTAL Level 111-112 R14 100 at Level From 107-111 rtg Risers Joints 105-107 100 Joint Level & Control Repair Assemblies Below 100 From Tread at Adhesive born Riser h High Expansion at Joint © & Joint & Bearing Pedistals 3 HI 4 Waterproofing Expansion Joint Caulking Material Expansion Tread Coat Jacking Side Side Towers Towers Shoring DSM-FR2 Expansion Replace at Epoxy Replacement Slide Fixed 1-6 Shoring Shoring and Emseal of SJS-FR3 and Nosing SJS-FR2 Dowel & Remove Boll Demo Demo repair Protection Rows New New & included Install Install Scaffolding Install Installation Install Install Remove Aluminum Install Install Sandblast Install Seismic Seismic Seismic Shoulder GoDaddy Remove Mobilization = ......----------- x Attached Oath REMARKS: Backup Nemo Unte Calf I New Omealption Now Detail New CturstOY Haw Unit Sea Old Unlit Cost Total 1id Ps kg 11 umoul and Repair of Patent:gated Concrete work! 5909.13 1B I 4 ernoo.l and Repair of Oetwiorated Concrete 'formed .1 seri cal..overheadi 51 10069 Erna, In,ection 177.5 55116 554.97 516.13640 WeldIng-Welded 511c• of One RaInforcing Bar •41.0 1135.65 912900 50.00 Handrail put rapag at PC riser 75 51.20172 $_ r1, 50.70 p95,654.00 Handrail post recmir at PC Head 14.41 0 $1.060.70 , 53.6213.36 Handrail put repair at cast in,,eace 1911.0 51,206.721 5_,_gt.a1 0 54.04360 Guardrail post r•onr at PC dear 514 0 51.2013.71 5106070 56 043.60 Guardrail pant ratuir, at too of cast in talflea hal above Rove 13 11.604.06 51 621.74 11.804.06 Guar dra it post repair al top of cast in am. wall 4 51.514 06 51.621.74 Guardrail putt repair at lick of sect inptan. wall 51.208.72 51060.70 31 208 72 Guardrail post repair at tap of cast in place wall 11.14.0 51.061.99 52 MI 99 12 Handrail ykst ropair at PC !dint lat„„_ 4.0 1172 91.060.70 122.965.68' 13 Guardrail oust repair at PC riser 1.11La_ 60. a.,211_ 117'2 51.06070 317 00 33a Guardrail pow repair at PC riser par Keynote 3 42.0.42.1 12,&I 91.06070 513 295 92 135 Goan:Ohl post repair at PC Hier per IC remit. 4 .032.1 08.72 51.060.70 S0.00 130 Guardrail pole tooth. at PC akar per Raynor. 6 0042.1 5 51.20172 51 060 70 66043,60 1.3d Guardrail post repair at PC 1414, per Ku00107 0.042.1 13201.72 91.060 70 52 417.44 14 Handrail pc st repair at PC step. 17,54.0 14 5110172 51 060,70 '.16 9:2.08 15 Guar* i mut repair it topol all 15110 1 51.80106 51.621.74 60 10004 16 Guardrail purl repair at top of cast In place wall 0044.0 1 62,061.99. 12 041.19 7 Repair of PC 11.6.1 seismic restraint sliding and fired connections along lug -ih of aapannion mnt 0 1 Ivo 0 1 5171.194.16 5171 114.16 18 PC tread uisrnic restriant slide comer Hon 15150 4145.0 1 52 253.36 52253,16 19 PC tread uurnic rest dam fixed connection 20.15.0 3115.0 0 52,263.35' 1.000 . 10 PC 150 at Ned side of ea- ansion onnt 0:45.1 36.1'45.0 0 51.253.34 5000 PC UR at Hid. tide of elk ansiozr int 10:41. Abls5.0 0 52.253.36 6000 2112 PC ad wiih seismic plait at slide tide& mpantion mint min riser repair 1115.0. 1515 1 0 51,263.36 5000 . 13 .„ PC tread wIlh mimic plate at 11,44 .14. of upon!. on mni sn'o riser renal. 1, 15.0 1.5,0.1 0 52.25336 saw 24 PC tread fIrplir at caulk knot 6:61 0 5227.49 P0-00 25 PC tread repair at caulk Wog 7115.1 a 51.99716 woo 16 NO punt rape al PC tufa 6/45.1 21 5325.46 1296.64 5181566 37 PC trud snilorria connutron at caulk joint 9116.1 24 3 .114.80 Sk.114.35 526,75520 26 PC traad seismic connection at caulk oint 1 3 51345.50 $4,787.70 25 PC tread ati utak connection at caulk Joint 19/1%.1 V161 „.16134.00 11.111.15 772.00 30 PC trud seismk connection aa caulk joint 1 ..s5.1 0 51595.90 31 PC TLR connection at Saint 6,15.2 14 11,358.17 St 200.25 5116 086.21 32 PC T&R connection at Joint 11.'i.2 0 31 958.67 51206.21 50.00 33 PC TILR connection at lialest 9452 0 5752.63 1590.16 moo 34 PC TLR connection at Iola! 10.15.2 0 752.63 6090.16 50.00 35 PC 78.9 connection at oint 1645.2 1.02 5.820 45 1750.27 113.685.90 36 PC 1613 corin•ction at Joint 67 .52 0 102045 1790 27 1000 37 i Partial repair of PC riser edge 1545.1 71 522051 5168.29 316,099.42 36 PC TIL9 conn•ction 14.115.1 0 522763 ¶19400 50 00 39 PC riser 'sou 1515.1 37 51133 511.47 goos.rk 40 Full thickness repair of PC Haw ad • 19115.2 21 535E42 515561 57,41411 At ..!_p tis air at PC slob at Plow 39 255.0 3 51,034.04 1.103450 55,102.12 42 Rank at PC Mgr end 2.45.3 6 51.046.41 15 062.67 27146 43 R11-11•11 PC tread 545.3 6 5142.65 53.213.25 AA I Rusk PC tread at Row 31 645.3 1 669109 5693.09 45 I Rmair 7-C iraad at Row 39.1 section 108 545.3 I 5256.26 5256.26 46 Resale at end of PC Head 52.463.15 AT Rraair It column 16:453 159107 5598.07 48 Repair wall at Gaut 1 13'45.3 51.269.11 269.1 Rtailf at wall and PC! gad at Gate 55.709.26 50 Repair of did. bearing apsembla at ealte4141/01 PC theat wall at expansion oini 910421 _54 51 1 054 51 Kasai, of Ude bealln assembli and embed at raker anstfor PC Maar wall at erbantIon nt S1,547,99 11568.90 52 RoF 411 of flr•d bearing avertable and rnhed at raker andfor wall at caulk :1mM 94,1523 5.80.390.51 53 lifF•11, of fired bearing assernbir al raker Niko. wan at taunt stint 1245.4 5561.31 _DILE 555569 69 54 Repair of Sand bearing assembly m raker an k oa Pr shear will at gspension Kant 19, 15,4 5561.31 9434 21 94,90035 55 ReGiir of flied bearingasembly and embed or raker anew. PC shear wall at expansion laird 20145.4 51.243.81 51.242.68 511.657,15 56 Repair at retaining will south of I116 L'a6.0 52.90535 57 RIPE air. retaining will north of Grldlint 511 1146.0 16.347.15 91 147.25 58 Repair of PC Hut 1416 0 -S- BA 5919.99 54,59995, 59 Repair of rail ainMgli arall 19,16.0 11 51.378.91 5,1-311 1,94 60 Repair will b•low PC riser belongs 1‹,.s.6 101 11,36439 51.0545.00 61 Ftepur of PC Maar will at Gridlirur Sin 614.1 11.14 I 11 537.71_5.16 517, 723.7$ 62 Reran oh PC shear will Ii 'Wiggins 915 515.2. 1615.2 IL 651.261.13 551 261.89 63 Pap. r of PC shear will at Grldline 614 6.'46.3. 14.86.3 31 643.071.30 54 1 071.30 64 fleoair oh PC Mew will at Grldlirm 913 IV'S 4. 16.956 salmis 521 82975 65 Repair PCPs*, woo-art siul bucket 7:46.5 51151.1n 91701.34 64 Benne PC idur 53 and wall below PC riser bun 516.6 1646.6 54.217.01 54217.01 67 Repair of PL riser 5166 51.23954 1113131 66 Repair at west diaconal cast in *cm relainIng will 6.16 7.16,6.7, 17h6.7, 1546.7 646.77355 546 771.55 69 Repair of uisnak restraint connection at Call 111 Mau wall 19,15.7 sot 62 260.99 522 609 90 70 Repair of seismk restraint connection at cast in pia c. wag 194146.7 52 821.38 i_zrELs s 71 I Return at non- ratainina cast Sr place will /12.6.1. 531.1170.42 532.170.42 72 Rerue at norwelaning east In Nam wall 11.1.6146.7 5011 C 55.00 Not RC Scoag 60.00 74 Ramair preuat concrete column at upansion joint at Sri:gine 1 1111-CC 0.0 547 765.27 $47,765.27 75 Repair top of C1511,1117111 And corbel at Grodtrn• 916-CC 1.12 .5.12,111 76 Repair at lop ol column. carbon and crenun ano of taker at aath dd. of column at Grinding 516.911 06_64136 526,141.16 77 Repair at lop of colwnn and corbel patch at Gridline BLS 05 7.2 12.403.25 14.402.25 78 Repair at top ol column and corbel patch st Cradling R16-120 7,17.2 1111 11 5 _ 58 79 Roper at column at Grldline 815.138 512,230.20 ea Repair at lop of column corbel. and raker beam at GricEllne 814-611 1617.2 t16217.35 16,217.3.5 61 Precut riser and support bucket; 191.7.2 61.101,14 , 53,719.21 a] Partial duth concrete paichAnc at rale, beam ONO' 16.'411 5676672 60,704.72 Partial doff h eancret• Faltheng at raker beam 6.15.1 11.703,71 71 Repair at cuter [Up at raker beam 151163 54.117.60 Aspair at top of column sod raker bum at Gddliu 013-CC 111051 86 Il.mcno• 1114110' of roistine mil 19146.6 87 R. air of hole. at raker beam anSVor wa 20.451 MLR damaged seat bahs 69 011011 needed darnaced Hat mounting Dimes 5112_75 90 Mod Pp exisitngrannt width 522143 91 Paull !lashing tape at comma aspart of KS not specifkak shown OhS 0. 1.3..a5.0 Not RC Home Plot RC Scope S0.00 Not RC Scope $0.00 95 Grinding down OF building up of existing concrete deck on either tide of joint 1046.0. 1646.0 1 $400.57 5435.79 $101.14 96 Build out expansion Mint to proper width •fa6 0 o 5319.79 5302.94 50.00 97 Grinding out uneven surfaces across Joint 15/46.0 0 19043 $0.00 96 Repair of elating seat stud 111260 0 520.35 50.00 99 Repair of mining ELS 9/a5.0 0 626.30 50.00 ALT 2 ECS and Repairs Sheet 02.3 50.00 50110 Seat Removal and Reinstallallon at 100 Level 157 5890.76 11.258.70 5139.049.31 Temporary Protection and Cleanup Illestmetion) 5 517,905.21 $9,495.20 589326.05 Install Custom Post Shores et 100 Level 123 $311.14 5453.50 538,270.22 Install Standard Post Shines al 160 Level o 5177.12 5177.03 $060 'nem!! Shoring Towers 3 High 0 51,521,10 $134533 $0.00 Install Shoring Towers 4 High 0 52,032.13 52,060.71 50.00 Scaffolding rind Sharing 1 5106375.00 522,457.20 5106.375.00 Insiell Emma DSM -311.2 Expansion Joint From 111.112 35 546654 Installation of WV oproarins 02 500 Level 17353 513.11 51673 -- 5227.497.83 Install 5.134113 Expansion.loint from 103131 130 5504.06 -415,0011.001 install New Expansion 10101 ea Tread & Risers el 5I4 153 5466.54 5615.70 571,380 62 RIIIIOY, and Replace Caulking at Control Joints at 100 levet 499 529.23 531.81 514315.77 Aluminum Nosing hlaiwiel & Adhesive 1 513.06400 Install 115FR2 Expansion Joint From 105.107 105 5445,06 NW Install New Dowel at Tread & Riser Repair 519.62 5000 SendbLatt Si Epoxy Coat Bearing Assemblies 121 5133.94 $13355 516,474.62 Install & Remove lacking Pedinals Below 100 Level 240 5230.16 534031 555,230.40 50.00 Seiunk Boll Replacement 1313.711 50.00 Seismic Demo Slide Side o 52.256.21 50.00 Seiunk Demo Fixed Side o 52.34319 50.00 Shouldw repair 1362.83 50.00 GoDaddy Prolectlan I 56,10600 56.310.92 16,104.00 Remove Rows 1.6 I 551,749.56 556749.56 Mobilization 1 547,672.03 43250 541,412o1 Total Budget Pricing 54.504.901.14 - .. $ $ - - 19.9.16 $ $ Date: Supplier Valley bid - - Masonry no or Sun I Masonry $ $ Subcontractor Cold bid - - Stone Masonry no $ $ bid - - Brothers Masonry no NO $ $ Straight Arrow 16,500.00 X 350.00 16,850.00 16.850.00 $ $ $ _ 6- Sections: COST1 BID SUBTOTAL BOND 107-111 COMPARATIVE Specification grouted Section - solid Scope and Quantities location, TOTAL Repairs Work demo Field of at Yates Items Approximate footing included Chase Mike existing = x by: on Attached Project: Wall Prepared CMU Data Bid Lintel REMARKS. Base Rebuild Steel Backup Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC ' 20 W. Southern Ave - Quote eson, AZ 85353 US Native American Owned Company Date Quote # (623)694-3345 08/25/2016 I 2510 str.arrow.az@gmail.com Exp. Date 10/25/2016 Address Jokake Construction Chase Field Repairs 5013 E Washington St. Suite 100 401 E Jefferson ave Phoenix, AZ 85034 USA Phoenix AZ 85004 Sales Rep Kenny Activity Quantity Rate Amo • Sa gotts-wc 9.112 24,02.00 I details: • Rebuild cmu wall on existing footing at same location of old wall solid grouted. No 16,500.00 paint included • Demo price is based on demoing all at one time. ADDITIONS: this quote shall become part of any PO and/or any notice to Total; WO; proceed for the aforementioned undertakings). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions, unforeseen conditions, landscape, .*ation, off hours & holiday work, environment abatement, traffic barricades, n trips, and any Accepted By Accepted Date ROC 271567 KB-1 DUAL, ROC 246308 K-31 DBE Certified Company , - - $ - - 19.9.16 $ $ Date: - Supplier or $ $ I Paint I - - Subcontractor $ $ - - NO $ $ 00 Straight Arrow 15,758.00 x x x x 750.00 300 16,808.00 16,808.00 $ $ $ $ $ Sections: COST BID SUBTOTAL BOND 107-111 COMPARATIVE Specification Section - Scope and Quantities TOTAL Repairs Work locations 110.111 109.110 Field of repair 108, 107,108, Yates items Approximate at areas included Section section Chase Mike construction rails back at = guard build Pipe at box x Attached Project: by: by and at Drain Elec affected wall rails Walls Data Prepared pen Existing Bid walls bull hand CMU Existi REMARKS: Base Paint Paint Paint Paint Paint Paint Backup Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC Quote '20 W. Southern Ave eson, AZ 85353 US Native American Owned Company Date Quote # (623)694-3345 09/12/2016 25/8 str.arrow.az@gmail.com Exp. Date. 10/12/2016 :Address Ship To Jokake Construction Chase Field 5013 E Washington st. Suite 100 Phoenix, AZ 85034 USA Kenny Activity Quantity Rate Amount • Pri 52.00 baokR1-1-at-iatar-GLue • Pricing for cost # 93 painting cmu walls that are moved, areas that are affected by 8,245.00 repairs and bull pen wall in system # 202 in section 09900 of specs. If additional -tinting becomes necessary it will cost a rate of $2.65 per sq ft. 1‘.\01.60. • Pricing for cost #94 paint hand rail and guard rails with system 310 in section 683 7,513.00 09900 of specs not including elastomaric wrap at base. 327 If of hand rail and 356 If uf guard rail. • Otiterraata to paiut 157 lf of iltind rfii4 157 • Prices do not include frame, drywall or fire caulking ADDITIONS: this quote shall become part of any PO and/or any notice to Total 1 $2 proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private • locators, hard soil conditions, unforeseen conditions, landscape, . -Tation, off hours & holiday work, environment abatement, traffic barricades, n trips, and any AcLepted By Accepted Date ROC 271567 KB-I DUAL, ROC 246308 K-31 DBE Certified Company - - $ $ - - 19.9.16 $ $ Date: - - Supplier Protection or $ $ I I _ Fire Subcontractor Kazal Protection bid - no Fire $ $ _ Protection bid - Foothills no NO Fire $ $ 00 00 RCI Systems 25,580 X X x x 25,580.00 25,580 $ $ $ Sections. repairs COST BID SUBTOTAL structural BOND 107-111 COMPARATIVE Specification in assist Section - to work Scope and Quantities disconnects/reconnects required of TOTAL Repairs Work work area of in of wherever area standard Field Yates Items Approximate sprinklers In included piping damage Chase Mike fire phoenix = existing and of x by: require leaks city Attached Project: that reinstall for to Prepared and pipes heads Data Bid locations REMARKS: Base Any Remove Inspect Up-grade Backup RCI Systems, Inc. 1220 W. Geneva Dri I e Tempe, AZ 85282 Ph. (480)894.8711 Fax. (480) 894-8740 99074 L-16 Commercial 99056 C-I6 Residential September 6, 2016 Jokake Construction Attn: Abhishek Shah 5013 E. Washington Street, Suite 100 Phoenix, AZ 85034 Project Chase Field Repairs 401 E Jefferson St Phoenix, AZ 85004 Specifications: None Seen Acklendums: None Seen We are pleased to submit the following Proposal to remove existing piping for floor repair, and reinstall existing piping when complete in accordance with current NFPA Standards and local codes. The existing system must meet current NFPA 13 and local code requirements: Price $25,580.00 Tax S408:00- Total Twenty-Five Thousand Nine Hundred Eighty-Eight Dollars and 00/100 $46790911fOr Alternate to add additional sprinkler heads in field maintenance area Price $5,-80 dO Tax .00 Total Five Thousand Seven Hundred Sixty Dollars and 00/100 $5 e 6 0 This Proposal is valid for forty ,five (45) days and carries a one (1) year warranty upon completion and is based upon the following/ CLARIFICATIONS: • Our proposals are normally good for 45 days; however, with the volatility of the steel market we have no control over our piping prices. At this time we cannot lock in pricing until material is ready for delivery. At this time the above price represents estimates through forty-five days after the above date. • The existing system must be operational and adequate to handle any and all adds and/or relocations. • Existing system to meet all NFPA 13 and local codes. • Price does not include necessary to overtime to meet an accelerated schedule. • General Contractor and/or Architect providing files in AutoCAD format required for fire protection shop drawing preparation • Price based upon adds and relocates for new walls only; all other heads to remain as is. • The fire sprinkler water will be drained on site; there are no contingencies for offsite disposal of the fire sprinkler water included in this price. • We are using material per NFPA Standards and we have no knowledge of any restrictions or limitations to material to be used on this project. • City of Phoenix Fire performs two inspections. Any inspection costs beyond two will be the general contractor's responsibility. • It is the responsibility of the Owner or General Contractor to warrant work area is free of hazardous materials of any sort (asbestos, lead, etc). RCI Systems, Inc. will not be responsible for any testing, fines or penalties. RCI Systems will require verification prior to working on site. • Upon proposal acceptance, a Prime Contractor's Certificate (AZ FORM 5005) will be required for our records. EXCLUSIONS: wiring; painting; alarms; premium time; tax; hydraulic calculations; fire extinguishers and cabinets; cutting or patching; relocation of feed mains, cross mains and/or branch lines due to conflicts with other trades and ceiling elevations; FM/IRI requirements; fire caulking; pre-action system; temporary power by others; providing hydraulic calculation plate at existing fire riser; fire hose valves; shut down fees, plans and P.E Stamp; permits. TERMS: Progress Billings; Net 30 days. Respectfully submitted, Randy Black VP of Sales/Project Manager - $ $ - - 19.9.16 $ $ Date: - - Supplier Sahurao Plumbing bid no or $ $ I Plumbing 00 00 Subcontractor Ryan Mechanical 14,630 X X x x x x x x x x x x 14,630 14,830.00 $ $ $ Alliance Plumbing 13,533.00 X X x x x x x x x x x x 13,533.00 13,533.0D NO $ $ $ — Irontree Construction 28,840.00 X X x x x x x x x x x x 28,840.00 28,840.00 $ $ $ below gutter COST BID per SUBTOTAL as systems reinstall BOND 107-111 disconnects/reconnect. demolished gutter then repairs. COMPARATIVE and existing demolished, structural Section and Quantities (plumbing) removed If be in TOTAL R16. to assist Repairs Work be to gridline gutters to of mechanical piping supports. site. Field Yates Approximate downspout of other on piping. Sections: Items and south or related piping piping bibbs materials included Chase Mike water and gutters this water hose drainage = gutter of into plumbing existing all required. and removed x by: require feed penetrations of for holes reinstall Attached Project: Specification that metal routing joints reinstall muse pipe as waterlines of of patch rental store for Data Prepared - Bid locations sheet verify and proofing and water and new and test Scope Existing drawings to non-repaired required. Remove •Remove L Repair Equipment Install Stack Running REMARKS: Backup Base Any Need as Fire Type 2202 West Huntington Drive AFIRE 111111memrm) ONES wets Tempe, AZ 85282 480-785-7459 fax 480-785-7169 SNMENEREW EBBW R0C112424 • R0C112426 It mg www.allianceplumbingaz.com .0-11.m.,,NIE • rhea PROPOSAL TO: PHONE: 602-224-4500 DATE: August 25, 2016 FAX: 602-224-1396 Jokake Construction Job Name/Location: 5013 E Washington St #100 Chase Field Structural Phoenix AZ 85034 401 E. Jefferson St Phoenix, Az We hereby submit specifications and estimates for: PRELIMINARY PRICING OF DEMO WORK OUR PRICE INCLUDES: • All plumbing per plans, job walk dated 07/15/16 • Equipment rental • Demo all metal gutters cap make safe • Install new water lines and hose bibbs • No-hub cast iron pipe for the drain waste and vent system (If replacing) OUR PRICE EXCLUDES: • Sales tax • Floor x-ray • Remove and reinstall metal gutter south of R16 • Permits • Fire proofing of penetrations • Type L copper pipe for all water piping ADDITIONAL PRICING: • Remove water lines and hose reels reinstall hose reels • Replace cast iron drain in groundskeeper room, • Repair and patch holes $2,800.00 WE PROPOSE hereby to furnish material and labor — complete in accordance with the above specifications for the sum of: THIRTEEN THOUSAND FIVE HUNDRED THIRTY THREE DOLLARS $ 13,533.00 Payment to be made as follows: NET 30 DAYS. A FINANCE CHARGE OF 1.5% PER MONTH WILL BE ADDED WHEN PAYMENT IS PAST DUE. (19% PER ANNUM) All material is guaranteed to be specific. NI work to be completed in a SIGNATURE: professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed on:y upon written orders, and will become an extra charge over and above the estimate All agreements contingent upon strikes, acc dents or delays beyond NOTE: This Proposal may be withdrawn by kliance our control Owner to carry fire, tornado and other necessary insurance Our Plumbing if not accepted within 30 days. workers are fully covered by Worker's Compensation Insurance ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are SIGNATURE: authorized to do the work as specified. Payment will be made as outlined above DATE OF ACCEPTANCE: RYAN MECHANICAL COMPANY so+r 1325 ilondel Drive • Gilbert, Arizona 85233 (480) 497-4526 • F-1 (480) 497-4527 c-37R 098919 • L -37 0B0516 • L -39 097541 r. wc01- wiewayannte( hanicalcom September 7, 2016 A PLUMBING PROPOSAL FOR: CHASE FIELD SEATING REPAIR Addenda: None. PROVIDE 8z INSTALL: 1) 50'-Remove/Reinst 10" CI Pipe. 2) 5-Disconnect/Reconn t Revent from Wall Connections. 3) 50'-Remove/Reinstall ' Airline. 4) 1-Disonnenct/Reconnect Area Drain. 5) 1-Cut/Cap 3/4" Water in Gr nds keepers Room. TOTAL PRICE>>>>>>>>>>>>>>>>> >>>>>>>>>>>>$14,630.00 MRRA TAX +$732 NOTE: WE ARE EXTREMELY BUSY, PI\EASE CALL TO REVIEW SCHEDULE BEFORE AWARDING CONTRACT. EXCLUSIONS: 1) Permits, fees, taxes & bond. 2) Mechanical/HVAC/Condensates/Fire Prot*tion, 3) Gutter Removal 4) Night Work. 5) Anything not listed above. Thank you, for the opportunity of submitting this proposal. Sincerely, Sean R. Ryan RYAN MECHANICAL CO. Irontree Construction, Inc. EFA 4723 E. Ingram Street Suite #101 Mesa, AZ 85205 PROPOSAL 11111 (480) 969-9966 Fax (480) 969-4455 Trontree „Contractor's Lic. R00074386 C-37 DATE: 8123/2016 JOB NAME: TO: JOKAKE CONSTRUCTIN,4, CO. CHASE FIELD. 5013 E Washington St #100 Phoenix, AZ PHOENIX, AZ 85034 ATTN: Mike Yates PNIONE: 602-224-4500 Delivery Method: Emalled CHASE FIELD. INCLUSIONS: 1) REMOVE AND REINSTALL PLUMBING RELATED PIPING TO ASSIST IN STRUCTUAL REPAIRS 2) REMOVE GUTTERS AND HAUL TO ONSITE Dr.SIVIPSTER 3) MAN LIFTS AND FORK LIFTS 4) REMOVE AND REUSE EXISTING PIPING SUPPOR 5) STACK AND STORE OF REMOVED MATERIALS ON NTE 6) RUNNING TEST FOR REINSTALLED DRAINAGE PIPIN .:LUS1ONS: 1) FEES, PERMITS, SALES TAX & BOND 2) REPLACEMENT OF DETERIORATED EXISTING CAST IRON 3) PAINTING AND PIPE LABELING 4) FLOOR DRAINS AND STAINLESS STEEL GRATES 5) FIREPROOFING AND WATERPROOFING 6) SCRAPING OR REMOVAL OF OLD CAULKING 7) REMOVAL OF HARDWARE EMBEDDED IN CONCRETE (WILL GRIND FLUSH) 8) CHILLED WATER, FIRE PROTECTION, CONDENSATE DRAIN AND AIR PIPING 9) DUMPSTERS We Propose hereby to fum sh material and labor - complete In accordance with the above specifications, for the sum of: Twenty Eight Thousand Eight Hundred Forty Dollars and No Cents $28,840.00 Payments to be made as follows: Arizona Prompt Pay Law: A.R.S. 32-1129 Estimator Signature All material Is guaranteed to be as specined. All work to ba completed in a professional manna r az corning to Natio°. This proposal may beNithcirawn by us 30 standard practices. Any alteration or deviation from Above specifications invioving extra costs wilt be executed only if not an:ivied within upon written orders, and will become an extra charge over and above the estimate. All agreements condgent upon Days strikes. accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary Insurance. Our -a are fully covered by Workers Compensation Insurance. Authorizing Acceptance of Proposal - The above prices, specifical ons and conditions are Signature satisfactory and are hereby accepted You are authorized to do the work as specified Payment will be made as outlined above. Date of Acceptance - - $ $ - - 19.9.16 $ $ Date: - - Supplier I or _ $ $ HVAC - - NewGuard Mechanical bid Subcontractor no $ $ _ - - Arrepros bid NO no $ $ 00 cooling 36,405.00 36,405.00 Air 36,405 Artic & x x x x x x YES Heating #----- $ $ t $ COST BID Sections: on SUBTOTAL indicated BOND 107-111 as COMPARATIVE Specification Section - repairs. ductwork work. Scope and Quantities plans. liner) duct TOTAL Repairs Work structural the (2" disconnects/reconnect per lined rerouted of In as dumpsters. In Field Yates Items Approximate assist ductworks metal damper included Chase HVAC to onsite sheet Mike ductworks metal into 27" fire = x by: require sheet x 58 (1) one Attached Project: that reinstall debris Install Install Prepared and existing HVAC and and Data Sid locations of all REMARKS: Base Any Remove Demo Place Furnish plans. Furnish Backup PROPOSAL 14° 1076 ARTIC AIR HEATING & COOLING Chilling The Valley For Over 21 Years Page 1 of 2 P.O. Box 71626 PHOENIX, ARIZONA 85050 (623) 582-8004 FAX (623) 582-8014 PHONE DATE TO: Jokake Construction 9/8/2016 AU: Abhishek Shah JOB NAME / LOCATION Chase Field - 2016/17 Structural Repairs 401 E. Jefferson St. Phoenix, AZ 85004 JOB NUMBER JOB PHONE We hereby submit specifications and estimates tor Furnish & install the FIVAC scope of work per the plans (sheets A3.0, A3.1, & A8.0; dated 7-15-16, with no revisions), Addendum #1, and the following scope of work Ouote includes: • HVAC Demolition: Remove approximately 90-lineal feet of existing sheet metal ductwork as noted on sheets A3.0 & A3.1 (a portion of the same duct is also noted on sheet A8.0). Place all HVAC construction debris into an onsite dumpster provided by others. • Add new 58"x27"sheet metal lined (2" liner) AC ductwork as indicated on sheets A3.0 & A3.1 (a portion of the same duct is also noted on sheet A8.0). • Add (1) 58"x27" fire damper as indicated on sheet A3.0 • Provide a one-year parts and labor warranty for all items furnished by AAH&C. nitote does not include: nits, bonds, taxes, unit costs, scissor or man-lift rental fees, structural work, demolition not noted above, dumpster fees, asbestos auatement, framing, concrete work, core drilling or saw cutting, cutting or patching, x-raying, painting, wall or ceiling access doors, inspection/service/warranty or repairs to any equipment or materials, modifications or repairs to bring existing items up to current code compliance, replacing existing registers/diffusers or grilles, cleaning existing grilles-registers or diffusers, after-hours or weekend labor, accelerated scheduling, furnishing or installing duct smoke detectors, connections to the life safety system, air balance of outlets or exhaust systems, air balance, duct pressure testing, duct leakage tests, HVAC controls, line or low-voltage electrical work, HVAC piping, fire or fire/smoke dampers not shown on the plans or indicated above, seismic restraints, filters, HVAC equipment, relocating existing HVAC equipment or materials, exterior duct wrap/board insulation for ductwork, balancing damper, removal or replacement of ductwork not indicated above, monies to modify the ductwork due to conflicts with other trades or with existing obstructions/restrictions, duct cleaning, architectural sheet metal (flashings, gutters, scuppers, downspouts, etc.), pre-finished metals, architectural louvers, parking fees, additional costs that may be required based on actual final 100% working drawings, surveyor & associated fees, Professional Liability Insurance, Pollution Insurance, LEED, commissioning of any kind, building flush-out, third party testing, IAQ testing, shop drawings for ductwork & piping, CAD drawings, BIM Files, 3D Modeling, prevailing wages, badge fees, 3rd party billing fees & taxes (t e, Texture), engineering design fees or drawings, any items not listed as specifically included above. Total $36,405.00 Estirnatcd Sales Tax 9_110 We Propose hereby to furnish material and labor — complete in accordance with the above specifications, for the sum of: Cont'd dollars (S Cont'd Payment to be made as follows: All material is guaranteed to be as specified. Al work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications Authorized involving extra costs will be executed only upon written orders, end will become an extra Signature charge over and above the estimate. All agreements contingent upon strikes, accidents or do-.. ,c beyond our control. Owner to carry lire, tornado, and other necessary insurance. Our Note This proposal may be ; are fully covered by Worker's Compensation insurance withdrawn by us if not accepted within 30 days. Acceptance of Proposal —The above prices, specifications and con- ditions are satisfactory and are hereby accepted. You are authorized to do the work as Signature specified. Payment will be made as outlined above. Signature Date of Acceptance: PROPOSAL NO 1076 ARTIC AIR HEATING & COOLING Chilling The Valley For Over 21 Years Page 2 of 2 P.O. Box 71626 PHOENIX, ARIZONA 85050 (623) 582-8004 FAX (623) 582-8014 PHONE DATE To: Jokake Construction 9/8(2016 Aft: Abhishek Shah JOB NAME/ LOCATION Chase Field - 2016/17 Structural Repairs 401 E. Jefferson St. Phoenix, AZ 85004 JOB NUMBER Jos PHONE We hereby submit specifications and estimates for: Proposal Terms and clarifications: --The terms and conditions stated herein are firm for 30 days, after which they are subject to our review and confirmation. —(1) Sales tax will be Invoked as a separate line item each billing cycle. Any sales tax (transaction privilege tax or TPT) shown as included in the above quote(s) Is only an estimated sales tax cost, and final/actual sales tax amounts based on applicable purchases from their point of procurement or delivery will be added to each invoice. To have sales tax withdrawn or excluded from an invoice, the appropriate documentation (Le., AZ 5005 form that !slab specific) as required by the State of Arizona Department of Revenue must be provided In advance of any Invoicing. Final determination of taxable & non-taxable projects will be per the decision of the State of Arizona Department of Revenue. Any project considered to be non-taxable Initially and found to be taxable at any point after the fact by the State of Arizona Department of Revenue will require that all taxes and any applicable penalties be paid by the customer of this agreement within 30-days of written notice. -Our schedule will be incorporated in a mutually agreed upon construction schedule that is to be prepared In advance of construction. This construction Mule will provide for establishing work sequence by the dates set forth in the Documents. We will not be bound to any schedule in which we have not ,,Aly participated. Further, we will not allow our work activities to be compressed due to the schedule slippage of other trades for which we are not responsible. We would require full access to perform our work in a normal working non-overtime type schedule. —ArtIc Air will not assume liquidated damages of any kind unless specifically agreed at time of final negotiation. —Artic Air will not be bound by the terms and conditions of the principal agreement between our Client and the Owner until it has been provided with final terms of such contract and negotiated applicable portions which may or may not apply to our subcontract with Client —This proposal is based on a forty-hour work week. Should additional overtime not attributable to Artic Air's performance be required, Artic Air requires reimbursement for the premium portion of overtime, with a corresponding fee adjustment. —It Is assumed that temporary power for construction purposes will be provided by and paid for by others. —Due to equipment manufacturer's policies, all equipment warranties start once the equipment has been started or 60-days from shipment (this time period varies between different manufacturer's), whichever comes first. Artic Air will not extend the warranty period for said manufacturers beyond the dates mentioned for any reason (even temporary construction usage) with-out proper compensation. We Propose hereby to furnish material and labor — complete in accordance with the above specifications, for the sum of: Thirty Six Thousand Four Hundred Five and 00/100 Dollars dollars (S 36,405.00 )- Payment to be made as follows: Al] material is guaranteed to be as specified. At work to be completed In a professional manner according to standard practices. Any alteration or deviation from above specifications Authorized Involving extra costs will be executed only upon written orders, and will become an extra Signature charge over and above the estimate AI agreements contingent upon strikes, accidents or cio'vs beyond our control. Owner to carry fire, tornado, and other necessary insurance Our Note: This proposal may be -s are fully covered by Worker's Compensation Insurance. withdrawn by us If not accepted within 30 days. Acceptance of Proposal—The above prices, specifications and con- ditions are satisfactory and are hereby accepted. You are authorized to do the work as specified Payment will be made as outlined above Signature 5gnature Date of Acceptance: - - $ $ - - 19.9.16 $ Date: - - Supplier I Electrical or $ $ Subcontractor bid - - PCE no $ $ AME Electrical 38.784.00 x x x x 38,784.00 38,784.00 NO $ $ DP Electric 35,454.00 x X x x 35,454.00 35.454:CDS $ $ e---- ,..$ Sections: COST BID Extend SUBTOTAL BOND 107-111 repairs COMPARATIVE Specification structural Section - Scope and Quantities for TOTAL Repairs Work use required. required of as as needed Field Yates Items Approximate construction feeds audio as elecIncal and included Chase Mike for powarifightings = existing any electncal x by: Attached Project: safe reinstall Prepared make DisconnecUreconnect and needed temporary Data Bid as REMARKS: ,Base Electncal Remove wires Provide Backup August 3 1 , 2016 Job Name: Chase Field Structural Repair/Electrical Remove/Re-install/Make Safe. D.P. ELECTRIC, INC. Page 1 of 1 Jokake Attn: Daniel Dunn D.P. Electric Inc. is pleased to provide you with a proposal for the above referenced project This proposal is based on Structural drawing T1.0 engineer dated 7115/16. Addendums 41 & 2 noted at bid time Scope: Electrical make safe of light fixtures, conduit & wire for concrete structure repair. Reinstall once repairs are complete. Work performed in sections 107,108,109,110,111 & 112, Bid API scope: add (10) new 811 4Iamp light fixtures (match existing) and power feed to new concrete area in grounds keeping. Base Bid 535,454.00 Bi4..tit-41-241440 S7Z5,151.00 Qualification Notes: I. Remove all electrical conduit strapping/supports and boxes needed/make safe for sections listed. "). Re-install all electrical conduit:strapping and supports in same location. Extend wires as needed. 3. All installations shall be during normal working hours. 4. Bid A101 (10) 811 4lamp T8 light fixture. All conduit, wire, junction boxes and supports. 5. Temporary Power/Lighting as needed Make safe existing for construction use. 6. This proposal is valid for (30-days) only. (see material escalation note at the end of this proposal) Exclusions: 1. All major shoring/scaffolding supports of main conduit rack located at dock doors. "). Fire Alarm System. Conduit strapping/supports if needed to be removed and re-installed only. 3. New light fixtures. Re-use/re-install existing. 4. Any existing conditionskode violations. 5. Engineering/fees, permits/fees special inspection fees, utility fees and taxes. 6. Construction Bond Premiums. 7. Participation in Owner Controlled Insurance Programs (OCIP's) 8. Participation in billing programs or other special reporting systems. Site Exclusions: Hard dig, hard surface R & R, landscape R & R, slurry backfill, traffic control, steel plates, compaction testing, offsite spoil removal, water costs, surveying , staking, Concrete/asphalt saw-cut, removal or patch, all formed and poured concrete (Utility pads, equipment pads and light pole bases), engineering/fees, perrnitsifees, special inspection fees, utility fees and taxes. Insurance, Warranty & Spares: P Proposal includes the basic "Additional Insured" insurance,* GC & project owner a Proposal includes (1) year warranty and (2) year workmanship a D.P. Electric will only transfer the manufacturer 's warranties to Owner a Lamps are not covered under warranty P No Spares (no spare flues, no spare lamps & no spare ballasts) Material Escalation: All material escalation from the date of this proposal fbr the elcr Weal rough materials shall be considered as additional cost to the project and shall be billed as material escalation change-order. This is due to volatility in price ofsteek copper & PVC If you have any questions, please feel free to contact me. Thank you, D.P. Electric Inc Bill Vass Service Manager 480.858.9070 0 480.229.3242 C bill.vassaihipeketrie.com 6002$ ASH AVE • TEMPE AZ 85283 • PHONE 6 8 , ! N58 9070 • FAX 480 858 9067 • WEB VVWW DPELECTRIC COM • L11#111176. C11#1?1170 DEPENDABLE PEOPLE DEPENDABLE PERFORMANCE To: Abhishek Shah (Jokake) From: Brian Pero Project Name: Chase Field (Repairs) Plan #: Bid Date: 9/6/16 Plan Date: Addenda: N/A Revisions: N/A Based on the following conditions, the project quake is: $38,784.00 Please note the following Inclusions and Clarificalkus: 1. Quote is for the following: A- Remove all electrical and audio from bottom ide of middle section concrete decking. B- Re install all electrical and audio to bottom side. of middle section concrete decking. C- This happens in 6 different sections. D- Quoted to perform work on normal business hours E- Quoted to use scaffolding provided by others. We are excluding the following: I. Fees, Permits, etc. 2. Any additional electrical work not shown on plan sheets noted 13\ low 0 3. Demolition of any electrical system(s) over and above make safe nditions 4. Overtime 5. Temporary Power and/or Lighting 6. Lighting fixture slack wires 7. Access Panels 8. Cutting/Patching (Walls.'Ceilings/Etc.) 9. Pre-Wiring and/or Supplying of: Fire Alarm, DVD, Security, Telephone, Sind, Clock, or Computer Systems 10. Supplying of VFD's 11. Furnishing, installation and final connections to duct detectors. 12. Hard dig situations requiring equipment other than standard backhoe. 13. Formed and/or finished concrete (i.e. housekeeping or transformer pads, concreteRole bases, generator containment, dry packing, slurry, duct banks, barrier posts etc.) 14. Saw Cutting/Trenching/Excavation 15. EMS installation or connection 16. Motion sensor and motion sensors switches except as noted on the plans 17. Meters and switches for Ti's Project quote is based on sheets: EOM, EOM Specifications on plan sheets: Yes El 7120 S. Priest Dr. Tempe, Arizona 85283 • Phone: (602) 437-7222 • Fax: (602) 437-1930 • ROC 0714,34 Project Name & Location Page 1 o12 Tab 7 - Project Schedule M S. F Mar STWT I ' S F 22, 1/25 1/26 lJan • 44 1, SMTWT 1/2 1/4 Jan • 11, S 12/10 Dec F 4 20, Nov ' SMTWT 30, Oct S '1 9, F Oct 18, TW"I" Sep 3, 3/17/17 10/2/16 1/26/17 12/10/16 1/2/17 1/4/17 1/25/17 1126/17 3/9/17 10/14/16 10/6/16 10/11/16 10/4/16 10/18/16 2/27/17 2/28/17 3/7/17 3/9/17 10/5/16 10/10/16 finish Fri Sun Thu Sat Mon Wed Wed Thu Thu Fri Thu Tue Tue Tue Mon Tue Tue Thu Wed Mon 1 Page I, 10/2/16 10/2/16 12/9/16 12/9/16 12/26/16 1/4/17 1/25/17 1/26/17 10/3/16 10/3/16 10/6/16 10/7/16 10/3/16 10/13/16 2/22/17 2/22/17 3/1/17 10/5/16 10/10/16 3/3/17 75tart Sun Fri Fri Mon Wed Wed Thu Mon Mon Thu Fri Mon Thu Wed Wed Wed Fri Wed Mon Sun days days days days days Duration day days 1.94 day day day 106 day days days days days days days days days day day 112 1 27 2 1 1 1 10 1 3 2 4 4 5 5 5 5 1 1 Move Move Repairs Keeping Keeping 3pm) by 3pm) Keeping Grounds Grounds Structural by Demolish Work out Demolish Grounds Existing Grid Pressure about about Work) Insurance(Concluded Work) Move Grid and and at and 2016/17 Work) Foundation(Concluded Structural and Gutters Walls Ductwork Match Tile Bearing Grant/Jim Grant/Jim Game Days Party(No Bowl(No Foundation(No Keeping Tile Ductwork to ACT for Field Working for ACT Rain CMU New Drywall Walls New Soils with with e Home Daddy Go Cactus Nationwide ASU ASU Demo/Prep Grounds Demo Remove Remove Remove Install Repair Paint Install Survey Meet Meet Chase Last None 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 (F".) M 5,;] Mar 5:•}A4TIWI.T_LF ji 2,2,1k 5± Jan T.I.WITILL 11,1Jan_1, Dec MI • 11 51 j/ 20,1 .1 b11/24 Nov J 30, T1WITIF Oct '1 9, M 5 ii/1I//' Oct F.. 18, T Sep W 8, T 10/14/16 12/20/16 10/5/16 10/6/16 10/13/16 12/20/16 12/16/16 10/25/16 10/26/16 12/12/16 12/1/16 12/7/16 12/16/16 12/20/16 11/22/16 11/24/16 12/6/16 12/8/16 12/20/16 11/1/16 10/4/16 3/3/17 inish 7 Fri Fri Tue Wed Thu Thu Tue Fri Tue Wed Mon Thu Wed Fri Tue Tue Thu Tue Thu Tue Tue Tue 2 Page 10/14/16 10/3/16 10/3/16 10/3/16 10/6/16 12/16/16 10/19/16 10/19/16 10/25/16 10/27/16 10/27/16 12/8/16 11/2/16 11/2/16 11/23/16 11/25/16 12/7/16 12/12/16 1013/16 10/3/16 10/7/16 12/2/16 Start Fri Mon Mon Mon Thu Fri Fri Wed Wed Tue Thu Thu Fri Thu Wed Wed Wed Fri Wed Mon Mon Mon days Duration day days days day days days days days days days days days days days days days days days days days days 1 102 56 3 1 5 3 42 S 2 32 26 4 6 34 15 2 8 2 7 22 2 Keeping Beam Plates Reinforcing Beam Raker Bearing Risers Grounds Replacing at Beam Mesh Studs and for Seats need Place Raker Assembly Install Repairs Risers and and Embeds Treads in at Raker Risers at Rebar Meeting Remove That Bolts Bolts Plates Beam/ Beam at Embeds and at Post out and Bolts Shoring Scaffolding Bearing Raker Raker Concrete and Concrete Existing Studs Concrete Handrails Seats Faulty New Bearing Tread New Handrail Move 111 Remove Unbolt Identify Core Epoxy Install Install Remove Repair Inspect Place Remove Inspect Install Inspect Place Remove Final Section Repair Repair Repair Ta 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ID MA F 5, Mar —TWT I ' 5 22, S Jan F '1 1, Jan SMTWT 11, Dec S 20, F Nov ' 30, SMTWT Oct '1 9, S Oct F 18, Sep TWT 3, 10/13/16 10/20/16 10/24/16 10/25/16 10/31/16 11/1/16 3/3/17 2/17/17 2/20/17 2/21/17 2/23/17 2/27/17 3/1/17 3/3/17 3/3/17 1/18117 12/21/16 1/3/17 1/9/17 1/11/17 1/12/17 1/16/17 Finish Thu Thu Mon Tue Mon Tue Fri Fri Mon Tue Thu Mon Wed Fri Fri Wed Wed Tue Mon Wed Thu Mon 3 Page 10/5/16 10/14/16 10/21/16 10/25/16 10/26/16 11/1/16 2/13/17 2/13/17 2/20/17 2/21/17 2/22/17 2/28/17 3/2/17 3/2/17 12/21/16 12/21/16 12/22/16 1/4/17 1/10/17 1/12/17 2/24/17 1/13/17 Start Wed Fri Fri Tue Wed Tue Mon Mon Mon Tue Wed Fri Tue Thu Thu Wed Wed Thu Wed Tue Thu Fri Duration days days days day days day days days day day days days days days days days day days days days day days 7 5 2 1 4 1 15 5 1 1 2 2 2 2 2 15 1 3 4 2 1 2 Joint Base of Base Base and Risers Joint Sides New Rebar Epoxy and Surface Surface Both Handrail at new Base Existing Risers Material Joint Joint Expansion to at Dowels to Base Post and Tread Tread Riser of Coat and at Match Treads Inspect to to 3 Coat Coat Joint Joint Epansion Sides of Top Adhesive Concrete Epoxy Rebar Concrete to Primer-1 Primer Base Agg. Coat Seats Old Both Level Joint Epoxy Install/Inspect Post and Top Control a Remove Apply Inspect Place Paint Waterproofing Beadblast Clean Apply Apply Apply Apply Apply Reinstall Remove Sandblast Repair Grind Inspect Apply Install Tai D 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 ' 22, '1.1ao 1, SIMLTWTF Jan 11, Dec i 20,1 'Nov 30, Oct TWTFSSMTWTFS •'..toolfrza 9,1 Oct 18, Sep 9, , 1 1/17/17 1/18/17 12/23/16 3/7/17 11/4/16 10/5/16 10/6/16 10/13/16 11/4/16 11/14/16 10/7/16 10/10/16 11/10/16 10/31/16 11/4/16 11/14/16 11/4/16 10/14/16 10/18/16 10/26/16 10/28/16 11/4/16 Finish Tue Wed Fri Tue Fri Wed Thu Thu Fri Mon Fri Mon Thu Mon Fri Mon Fri Fri Tue Wed Fri Fri 4 Page 1/17/17 1/18/17 12/19/16 10/3/16 10/3/16 10/3/16 10/6/16 11/2/16 10/3/16 10/3/16 10/11/16 10/11/16 11/1/16 11/7/16 10/3/16 10/3/16 10/17/16 10/19/16 10/27/16 10/31/16 10/7/16 10/7/16 Start Tue Wed Mon Mon Mon Mon Thu Fri Wed Mon Mon Fri Tue Tue Tue Mon Mon Mon Mon Wed Thu Mon Duration day day days days days days day days days days days days days days days days days days days days days days 1 1 5 104 25 3 1 5 3 31 5 2 23 15 4 6 25 10 2 6 2 5 Beam Plates Reinforcing Beam Raker Bearing Risers Replacing at Beam Mesh Studs and Material Material Seats need Place Raker at Assembly Install Repairs Raker Risers and and Embeds Treads Remove That in Plates Beam/ Beam at Risers at Rebar Embeds and at Expansion Expansion Fireproofing Bolts Bolts Bolts Shoring Scaffolding Bearing Raker Raker Concrete and Concrete Existing Studs Concrete Seats and Faulty New Bearing Tread New Install Caulk Replace 110 Remove Unbolt Identify Core Epoxy Install Install Remove Repair Inspect Place Remove Inspect Install Inspect Place Section Repair Repair TaL. 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 ID 5,' F roar TWT ... '1 5 Jan_22, T1F 1 1, [Jan 11, Dec 20,I Nov 30,1 IWI 11111MIIMMIllp Oct o .1: SiSitylET s Loa I 18, TiF. - Bots.gp LW] T I 11/1/16 10/4/16 10/13/16 10/20/16 10/24/16 10/25/16 10/31/16 11/1/16 3/7/17 2/17/17 2/20/17 2/21/17 2/23/17 2/27/17 3/1/17 3/7/17 11/25/16 11/7/16 11/11/16 11/16/16 11/18/16 3/3/17 Finish Tue Tue Thu Thu Mon Tue Mon Tue Tue Fri Mon Tue Thu Mon Wed Fri Tue Fri Mon Fri Wed Fri 5 Page 10/3/16 10/3/16 10/5/16 10/14/16 10/21/16 10/25/16 10/26/16 11/1/16 2/13/17 2/13/17 2/20/17 2/21/17 2/22/17 2/24/17 2/28/17 3/2/17 3/6/17 11/7/16 11/7/16 11/8/16 11/14/16 11/17/16 Start Mon Mon Wed Fri Fri Tue Wed Tue Mon Mon Mon Tue Wed Fri Tue Thu Mon Mon Mon Tue Mon Thu Duration days days days days days day days day days days day day days days days days days days day days days days 22 2 7 5 2 1 4 1 17 5 1 1 2 2 2 2 2 15 1 4 3 2 Base Base Base and Risers Joint New Rebar Epoxy and Surface Surface Handrail at new Base Existing Risers Material Joint Joint Expansion at Dowels to Base Post and Tread Tread Riser of Post Handrails Concrete Coat and at Match Treads Inspect to to 3 Coat Coat Joint Joint Epansion Sides of Top Handrail Epoxy Rebar Concrete to Post and Primer-1 Primer Base Agg. Coat Top Seats Control Old Both Level Install/Inspect Remove Remove Apply Inspect Place Paint Waterproofing Beadblast Clean Apply Apply Apply Apply Apply Reinstall Remove Sandblast Repair Grind Repair Install Ta 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 M 5, F Mar S,...T•W•T 22,'1 Jan S 1 1, 141 Jan SMTWIF 11, Dec 20, S Nov 30, SMIWIF Oct '1 9, S Oct 18, TWIF Sep 5, 11/21/16 11/23/16 11/24/16 11/25/16 10/7/16 10/20/16 10/20/16 10/4/16 10/3/16 10/4/16 10/3/16 10/5/16 10/4/16 3/17/17 1/13/17 1/5/17 1/6/17 1/13/17 1/5/17 3/2/17 1/9/17 1/10/17 Finish Mon Wed Thu Fri Fri Thu Thu Tue Mon Tue Mon Wed Tue Fri Fri Thu Fri Fri Thu Thu Mon Tue 6 Page 11/21/16 11/22/16 11/24/16 11/25/16 10/3/16 10/3/16 10/17/16 10/3/16 10/3/16 10/3/16 10/3/16 10/3/16 10/3/16 1/3/17 1/3/17 1/3/17 1/9/17 1/3/17 1/3/17 1/3/17 1/9/17 1/6/17 'Start Mon Tue Thu Fri Mon Mon Mon Mon Mon Mon Mon Mon Mon Tue Tue Tue Fri Mon Tue Tue Tue Mon Duration day days day day days days days days day days day days days days days days day days days days days days 1 2 1 1 5 14 4 2 1 2 1 3 2 53 9 3 1 5 3 42 5 2 Joint of wall Sides new Beam Both for Replacing to Material Material Footings Seats need Place Raker at Adhesive and Rebar Fence Remove That in Plates Joint Expansion Expansion Fireproofing 1 SOG Inspection Concrete Masonry link Bolts Bolts Bolts Shoring Scaffolding Epoxy Alternate Forms Chain Seats and Faulty New Bearing Inspect Apply Install Caulk Replace Excavate Form/Install Rebar Place Strip Install Install 109 Remove Unbolt Identify Core Epoxy Install Install Add Section Repair Ta$fle 110 111 112 113 114 115 116 117 118 119 120 121 222 123 124 125 126 127 128 129 130 131 ':10. 5, ,mar 24 F 22,' Jan '1. 1, Jan IvIA_T,LWI 11, j5 20,1_Dec IFIS 30,1Nov Oct '1 9, LT!wIT1FJSJiJM1LLw]T Sep.18,10ct s, 2/8/17 2/23/17 2/24/17 3/2/17 2/20/17 2/6/17 2/7/17 2/10/17 2/13/17 2/20/17 2/7/17 1/16/17 1/23/17 1/30/17 1/31/17 2/1/17 2/6/17 2/7/17 3/17/17 3/1/17 3/2/17 3/6/17 'inish Wed Thu Fri Thu Mon Mon Tue Fri Mon Mon Tue Mon Mon Mon Tue Wed Mon Tue Fri Wed Thu Mon 7 Page 1/11/17 2/9/17 2/24/17 2/27/17 1/13/17 1/13/17 2/6/17 2/7/17 2/10/17 2/13/17 1/13/17 1/13/17 1/16/17 1/23/17 1/30/17 1/31/17 2/1/17 2/6/17 2/27/17 2/27/17 3/2/17 3/3/17 'iStart Wed Thu Fri Mon Fri Fri Mon Tue Fri Mon Fri Fri Mon Mon Mon Tue Wed Mon Mon Mon Thu Fri Duration days days day days days days day days day days days day days days day day days day days days day days 20 11 1 4 25 15 1 3 1 5 16 1 5 4 1 1 3 1 15 3 1 2 Beam Plates Reinforcing Base Raker Bearing Risers Base Base and Risers at Beam Mesh Studs and New Rebar Epoxy and Surface Install Repairs Risers and and Embeds Handrail at new Base Existing Risers Assembly Raker Risers at Rebar Treads at Dowels to Base Post and Tread Tread Beam/ Beam at Embeds and at Post Coat and at Match to Bearing and Concrete Existing Handrails Concrete to Treads Inspect r•1 Raker Raker Concrete Tread New Studs Concrete Handrail Install/Inspect Epoxy Rebar Concrete Post blast and Prime • a Remove Repair Inspect Place Remove Inspect Install Inspect Place Remove Remove Apply Inspect Place Paint Waterproofing Bead Clean Apply d Repair Repair 132 134 135 11 137 1 138 139 I 141 142 143 144 145 146 147 148 149 150— 151 I ! 152 153 - M F 5, Mar ....TWT F ' 5 22, S Jan F '1 1, MTWT Jan 11, S Dec S 20, F Nov 30, SMTWT Oct '1 9, S Oct F 18, Sep TWT 3, 3/8/17 3/10/17 3/14/17 3/15/17 3/17/17 2/17/17 1/16/17 1/18/17 2/6/17 2/15/17 2/16/17 2/17/17 2/17/17 2/17/17 3/9/17 3/17/17 1/18/17 1/5/17 1/6/17 1/13/17 1/18/17 2/21/17 inish Wed Fri Tue Wed Fri Fri Mon Wed Mon Wed Thu Fri Fri Fri Thu Fri Wed Thu Fri Fri Wed Tue 8 Page 3/7/17 3/9/17 3/13/17 3/15/17 3/16/17 1/13/17 1/13/17 1/16/17 1/18/17 2/6/17 2/15/17 2/16/17 2/16/17 2/16/17 3/3/17 1/3/17 1/3/17 1/3/17 1/6/17 1/9/17 1/16/17 1/3/17 Start Tue Thu Mon Wed Thu Fri Fri Mon Wed Mon Wed Thu Thu Thu Fri Tue Tue Tue Fri Mon Mon Tue Duration days days days day days days day days days days day day day day days days days days day days days days 2 2 2 1 2 24 1 2 12 7 1 1 1 1 5 53 12 3 1 5 3 35 Joint of Joint Sides Beam Surface Both Replacing Material Joint Joint Expansion to Material Material Seats need Place Raker at Riser Joint of of Adhesive in to 3 Coat Coat Coat Joint Epansion Sides Top Remove That Bolts Bolts Plates Primer Base Agg. Top Seats Expansion Old Both Level Joint Epoxy Expansion Expansion Fireproofing Seats and Bolts Faulty New Bearing Apply Apply Apply Apply Reinstall Remove Sandblast Repair Grind Inspect Apply Install Caulk Replace 108 Remove Unbolt Identify Core Epoxy Install Section Repair Tal 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 I 5, 't I Mar Fr ' FIS '11Jan_22, 1, Jan 11,1 29,1.Dec IS 30,I_Nov .Oct '1 9, LS_IS 18,10ct ITLWITIF 1 3,1_5_ep 1 1/9/17 1/10/17 2/8/17 2/14/17 2/15/17 2/21/17 2/17/17 2/2/17 2/3/17 2/8/17 2/9/17 2/17/17 2/20/17 1/20/17 2/6/17 2/13/17 2/14/17 2/15/17 2/17/17 2/20/17 3/17/1.7 3/1/17 inish Mon Tue Wed Tue Wed Tue Fri Thu Fri Wed Thu Fri Mon Fri Mon Mon Tue Wed Fri Mon Fri Wed 9 Page 1/3/17 1/9/17 1/11/17 1/12/17 2/15/17 2/16/17 1/18/17 1/18/17 2/2/17 2/8/17 2/9/17 1/18/17 1/18/17 1/20/17 2/6/17 2/13/17 2/14/17 2/15/17 2/17/17 2/27/17 2/27/17 2/3/17 iStart Tue Mon Wed Thu Wed Thu Wed Wed Thu Fri Wed Thu Wed Wed Fri Mon Mon Tue Wed Fri Mon Mon 1Duration days days days days day days days days day days day days days days days days day day days day days days 5 2 20 23 1 4 21 10 1 3 1 6 22 2 10 5 1 1 2 1 15 3 Beam Plates Reinforcing Base Raker Bearing Risers Base Base and at Beam Mesh Studs and New Rebar Epoxy Assembly Install Repairs Risers and and Embeds Handrail at new Base Existing Risers Raker Risers at Reber Treads at Dowels to Base Post and Beam/ Beam at Embeds and at Post Coat and at Match Shoring Scaffolding Bearing Raker Raker Concrete and Concrete Existing Studs Concrete Handrails Concrete Epoxy Rebar Concrete to Treads Tread New Handrail Install/Inspect Post Install Install Remove Repair Inspect Place Remove Inspect Install Inspect Place Remove Remove Apply Inspect Place Paint Waterproofing Beadblast IME Repair Repair Tasi: I 176 177 178 179 180 181 182 -1-83 185 186 187 188 189 1901 191 192 193 194 195 196 197 ID s ' 22, Jan iEvitly_ls 1, 11,11an 515-..1mth Dec 20,1 Nov NVITIF 30, Oct 9,1. TIF1_5_1_51M 18,10ct [WI 1 3,15ep T 1 1 3/2/17 3/6/17 3/8/17 3/10/17 3/14/17 3/15/17 3/17/17 2/8/17 1/19/17 1/24/17 1/30/17 2/1/17 2/2/17 2/6/17 2/7/17 2/8/17 2/28/17 3/17/17 1/18/17 1/5/17 1/6/17 1/13/17 Thu Mon Wed Fri Tue Wed Fri Wed Thu Tue Mon Wed Thu Mon Tue Wed Tue Fri Wed Thu Fri Fri 10 Page 3/2/17 3/7/17 3/9/17 3/13/17 3/15/17 3/16/17 1/18/17 1/18/17 1/19/17 1/24/17 1/30/17 2/1/17 2/2/17 2/6/17 2/7/17 2/22/17 1/3/17 1/3/17 1/3/17 1/9/17 3/3/1-7 1/6/17 iStart Thu Fri Tue Thu Mon Wed Thu Wed Wed Thu Tue Mon Wed Thu Mon Tue Wed Tue Tue Tue Fri Mon iDuration day days days days days day days days day days days days day days day day days days days days day days 1 2 2 2 2 1 2 14 1 3 3 2 1 2 1 1 5 53 12 3 1 5 Joint of Risers Joint Sides and Surface Surface Both Replacing Tread Tread Riser Material Joint Joint Expansion to Material Material Seats need Inspect to to 3 Coat Coat Joint Joint Epansion of Sides of Top Adhesive Remove That Bolts Primer-1 Primer Base Agg. Coat Seats Old Both Level Joint Epoxy Expansion Expansion Fireproofing Seats and Bolts and Top Control Faulty Clean pply Apply Apply Apply pply Reinstall Remove Sandblast Repair rind Inspect Apply Install Caulk Replace 107 Remove Unbolt Identify Core A A Install G Section - - - 198 19-9- I 200 201: 202 - 203 204 205 207 2081 211 213 214 215 216 217 2-16-1 I 219 Mi I 5, T Mar 1 I ' 22, /24 2 Jan F T '111110 '1J 1, I IM!j1W1 .11,.jJan 5 _I 20,1Dec .30,1Nov .1MITjW1 9,1:pct Is15 18,10ct Sep TIWITIF ,t 1/18/17 1/27/17 1/16/17 1/17/17 1/19/17 1/23/17 1/24/17 1/27/17 1/31/17 1/23/17 1/24/17 1/27/17 1/30/17 1/31/17 2/3/17 1/19/17 1/24/17 1/27/17 1/30/17 1/31/17 2/2/17 2/3/17 finish Wed Fri Mon Tue Thu Mon Tue Fri Tue Mon Tue Fri Mon Tue Fri Thu Tue Fri Mon Tue Thu Fri 11 Page 1/16/17 1/10/17 1/10/17 1/16/17 1/18/17 1/20/17 1/24/17 1/25/17 1/18/17 1/18/17 1/23/17 1/24/17 1/27/17 1/30/17 1/18/17 1/18/17 1/19/17 1/24/17 1/27/17 1/30/17 1/31/17 2/2/17 Start Mon Tue Tue Mon Wed Fri Tue Wed Wed Wed Mon Tue Fri Mon Wed Wed Thu Tue Fri Mon Tue Thu 'Duration days days days days days days day days days days day days day day days day days days day day days day 3 13 5 2 2 2 1 2 8 3 1 2 1 1 11 1 3 2 1 1 2 1 Beam Plates Reinforcing Base Beam Raker Bearing Risers Base Base and at Beam Mesh Studs and New Rebar Epoxy Place Raker Assembly Install Repairs Risers and and Embeds Handrail at new Base Existing in at Raker Risers at Rebar Treads at Dowels to Base Post Bolts Plates Beam/ Beam at Embeds and at Post Coat and at Match Shoring Scaffolding Bearing Raker Raker Concrete and Concrete Existing Studs Concrete Handrails Concrete Epoxy Rebar Concrete to New Bearing Tread New Handrail Install/Inspect Post Epoxy Install Install Remove Repair Inspect Place Remove Inspect Install Inspect Place Remove Remove Apply Inspect Place Paint Repair Repair Repair Tas 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 ID M F 5, Mar INT .. I S /3 22, 1101I1. 111Jan 1, IM},T.IWITIFis 11,IJan 5 .20,1Dec 30,j_Nov TIF15.151MLTIWITIfISI Oct 'i 9, ,I.Sep.1.8,LOct 131WI 3/17/17 3/1/17 3/2/17 3/6/17 3/8/17 3/10/17 3/14/17 3/15/17 3/17/17 2/1/17 1/19/17 1/24/17 1/27/17 1/30/17 1/31/17 2/1/17 2/1/17 2/1/17 2/28/17 3/15/17 2/17/17 1/16/17 Finish Fri Wed Thu Mon Wed Fri Tue Wed Fri Wed Thu Tue Fri Mon Tue Wed Wed Wed Tue Wed Fri Mon 12 Page 2/27/17 2/27/17 3/2/17 3/7/17 3/9/17 3/13/17 3/15/17 3/16/17 1/18/17 1/18/17 1/19/17 1/24/17 1/27/17 1/30/17 1/31/17 1/31/17 1/31/17 2/22/17 1/13/17 1/13/17 1/13/17 3/3/17 Start Mon Mon Thu Fri Tue Thu Mon Wed Thu Wed Wed Thu Tue Fri Mon Tue Tue Tue Wed Fri Fri Fri days Duration days days day days days days days day days days day days days day day day day day days 42.38 days day 15 3 1 2 2 2 2 1 2 9 1 3 2 1 1 1 1 1 5 24 1 Joint of Risers Joint Sides and Surface Surface Both Risers Material Joint Joint Expansion to Material Material and Tread Tread Riser of Material Repair Treads Inspect to to 3 Coat Coat Joint Joint Epansion Sides of Top Adhesive Joint Joint Primer-1 Primer Coat Seats Old Both Joint Epoxy Expansion Expansion Fireproofing 2 Old and Base Agg. Top Control Level Alternate Remove Waterproofing Beadblast Clean Apply Apply Apply Apply Apply Reinstall Remove Sandblast Repair Grind Inspect Apply Install Caulk Expansion install Replace Add 242 243 244 245 246 247 249- 250 251 252 253 254— 2-55 256 257 258 260- 261 262 263 - Jan_22,": FIS]. 1,'11 11WI'd .1an I 11,1 1M [,5 Dec 20l WILT1 30,INov I IT_ Oct M .9,1 51S 18,1pct LF_I 8,1Sep TjW1 1/18/17 2/6/17 2/15/17 2/16/17 2/17/17 2/17/17 2/17/17 3/15/17 3/1/17 3/2/17 3/6/17 3/8/17 3/10/17 3/14/17 3/15/17 :inish Wed Mon Wed Thu Fri Fri Fri Wed Wed Thu Mon Wed Fri Tue Wed 13 Page 1/16/17 1/18/17 2/6/17 2/15/17 2/16/17 2/16/17 2/16/17 2/27/17 2/27/17 3/2/17 3/7/17 3/9/17 3/13/17 3/15/17 3/3/17 Stwt Mon Wed Mon Wed Thu Thu Thu Mon Mon Thu Fri Tue Thu Mon Wed Duration days days days day day day day days days day days days days days day 1 2 12 7 1 1 1 1 13 3 1 2 2 2 2 1 Joint of Joint Sides Both Surface Surface Joint Joint Expansion to Material Material Surface Tread Riser of of Adhesive to to Epansion Sides Top Surface Inspect 3 Coat Coat Coat Both Level Joint Epoxy Expansion Expansion and Primer-1 Primer Base Agg. Top Sandblast Repair Grind Inspect Apply Install Caulk Waterproofing Beadblast Clean Apply Apply Apply Apply Apply iTas! 265 266 268 270 273 274 275 276 277 278- 4 Milestone Summary Start-only Finish-only Deadline Baseline Baseline Baseline Progress 1111MINIIIIIII1I1=11. . U Rollup 14 Page Task Milestone Summary Task Summary Summary Inactive Inactive Inactive Manual Duration-only Manual Manual Summary Tasks Milestone Task Split Milestone Summary Project External External Sched Master Field 9/20/16 Chase Tue Project: Date: Tab 8 - Bid Alternate No. 1 & 2 09120116 Cost Total 53,200.00 $27,780.00 $2.284.00 $1,176.60 $5,680.00 $7,875.00 $3,800.00 551,795.60 50.00 50.00 $647.45 $367.11 $792.16 $53,602.32 $3,216.14 $56,818.46 $3,176.16 38,199.02 $59,994.62 STATUS: DATE: / 60 Subcontract Other 3.200.00 27,780.00 2,284.00 1.176 5.68000 7,875.00 3800.00 48,595.60 PRICE General Contractor Equipment Materials 1 Total Alternate Labor 1 ,f Add = Labor Rate Estimate - Cost Hours Project - 0.000% 0.000% 1.250% 0.700% 1.500% 6.00% 5.590% 107-111 Allowance 85004 • Section AZ District Design Contingency Repairs Phoenix Stadium Description Work Work Structural SI, County Allowance Masonry SUPPRESSION Spinkler/Plumb the of Contingency Construction the of TOTAL 2016-17 Jefferson E. Mancopa SITEWORK - Fence CONCRETE Concrete MASONRY and Mortar FINISHES Painting FIRE Spinkler ELECTRICAL Electrical Elect/Fire Cost Direct Owners Jokake Insurance Risk Builders Bond Subtotal Subtotal Cost Indirect GRAND 401 Fire FEE TAX 4,1! E Name: Location: Division 2 3 4 9 21 26 J Project Project Owner 02.780 03.100 04.100 09.900 15.300 16.050 16.050 19.050 19.200 01.780 01.006 01.006 300 20 Clarifications - Add Alternate 1 Project: 12016-17 , Structural Re. _ - irs Section 107.111 _ ... . . Division i General: I 1 - All work is to be performed during normal working hours, except as needed for shutdowns and tie ins 2- All areas affected by construction will be vacated and emptied. 3 - All work will be completed in one phase. 4 - Pricing assumes that parking is available at no cost to Jokake or its subcontractors. 5- Exclude all permits or permit fees. 6 - Exclude exact match to existing materials. All finish materials will match close as possible 7 - Exclude all Asbestos identification or removal. Maricopa County to provide asbestos testing report to Jokake prior to start ofiny demo work. 8 - Exclude all design and engineering except as listed below. 9 - Exclude relocation or removal of furniture or wall hangings. 10- Exclude all tee/data cabling. 11 - Exclude service or repair of existing HVAC units. 12- Exclude certified air balance. 13- Exclude relamping or new ballasts of existing light fixtures, 14 - Exclude any engineering or architectural fee or calculations except as listed below. 15- General requirements are figured as fixed sum and will be billed as a percentage based on project completion. 16- Assumes onsite restrooms can be used by construction persons. _J.I.:_ouLL„ ....01.4 1 - Scope Per Drawings. 2- Provide an allowance of 3,200 for chain link fence. 3. ""' _____ . _ 1 - Scope Per Drawings. , !1 - Scope Per Drawings. _ ALS 1 - Sal 2 Per Drawl •s 8 M10003, PLASTICS & COMPOSRES !Exclude All 7 THERMAL 4 MOISTURE PSOreCTION . 1 - Scope Per Drawings. 8 OPENINGS 1 - Scope Per Drawings r 9 FINISHES — 1 - Scope Per Drawinris. Page 1 o13 Clarifications - Add Alternate 1 Project: 2016-17 Structural Re • airs Section 107-111 Division - 10 MG • ES Exclude Al EQUIPMENT Exclude Al PuRN4SHINGS Exclude All 13 SPECIAL CONS111LIC/101 _. Exclude All 21 Fi ....• .;., •;_: 1 -Sal.- Per Drawl • s 2 -Assumes exislin• service is sufficient to extend heads to this area IIIMII ' • - II - Sr.° , - ger Drawing s. HEATING VENTILATION Al • • HG 1 -Scale • -r Drawin•s • EtECTRICAL 1 - Su/de Per Drawl s. 2- Includes dew n, assumes existing ' and and has room for additional circuit Jeliati 01« • I • • .110, Exclude All •Exclude All ..Ammil EARTHWORK Exclude All Wg. l• La .2•L.0..i.., -..1.,.al—J_i.i...ail._ Exclude All Exclude All ... .. • RTATION Exclude All . I 1 Y &MARNE Exclude All NM MATERIAL PROCESSING & HANDLING EQUIPMENT Exclude Al Page 2 of 3 Clarifications - Add Alternate Project: 2016-17 Structural Repalts Section 107-111 Division 44. POLLUTION CONTROL EQUIPMENT Exclude All IWA7ER AND WASTEWATER-EQUIPMENT lExclude All ALLOWANCES /CONTINGENCY Allowances and Contingency: 1. Any allowances or continencV not used will not be billed to owner. 2 Must have written authorization from owner nor to use of an allowance and contin , en . Page 3 of 3 Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC Quote '20 W. Southern Ave - .eson, AZ 85353 US Native American Owned Comp any (623)694-3345 str.arrow.az@gmail.com Date Address Ship To Jokake Construction Chase Field Repair 5013 E Washington st. Suite 100 401 E. Jefferson avc Phoenix, AZ 85034 USA Phoenix AZ 85004 Bid Alternate P # Sales Rep Bid Alternate Kenny Activity I Quantity Rate I Amount • Excavate, compact, install rebar, form and pour slab and footings. 148 If of 27,780.00 footings and 2150 sq ft of 6' slab • Erect 888 sq It max of 8x8x16 cmu wall with lire rated control joints as shown in 18,784.00 18,784.00 details 6, 500. cm • Prices do not include paint. 2, 2gLio0 ‘\ I ADDITIONS: this quote shall become part of any PO and/or any notice to Total .00 proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions, unforeseen conditions, landscape, . -Tation, off hours & holiday work, environment abatement, traffic barricades, trips, and any Accepted By Accepted Date ROC 271567 KB-1 DUAL, ROC 246308 K-31 DBE Certified Company Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC Quote 120 W. Southern Ave ,eson, AZ 85353 US Native American Owned Company Date Quote # 1 (623)694-3345 09/12/2016 /5/8 str.arrow.az@gmail.com Exp. Date 10/12/2016 Address ;Ship To Jokake Construction Chase Field 5013 E Washington st. Suite 100 Phoenix, AZ 85034 USA Sales Re Activity I Quantity I Rate • Prie4ng-fer-enst-464e-rigne ff-Roill-by-irant11-ateelt-pill-iln-si-te-nrid • Prici E*121E111 • rep 1£ rlreCIIMPc r icing to paint as Alt #1 for additional cmu walls • PD 683 11.00 09 of guard:rail. • Altr..igiatem_paiiii-L.u41-01--hoitelrral 157 11.00 • Prices do not include frame, drywall or fire caulking ADDITIONS: this quote shall become part of any PO and/or any notice to Total $23X2-5. proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions, unforeseen conditions, landscape, ',ation, off hours & holiday work, environment abatement, traffic barricades, n trips, and any Accepted By Accepted Date ROC 271567 KB-1 DUAL. ROC 246308 K-31 DBE Certified Company RCI Systems, Inc. 1220W. Geneva Drlc Tempe, A7. 85282 (48(1) 894 -8711 Fax. (480)894-8740 99074 1.-16 Commercial 99056 C-16 Residential September 6, 2016 lokake Construction Attn: Abhishele Shah 5013 E. Washington Street, Suite 100 Phoenix, AZ 85034 Project: Chase Field Repairs 401 E Jefferson St Phoenix, AZ 85004 Specifications: None Seen Addendums: None Seen We are pleased to submit the following Proposal to remove existing piping for floor repair, and reinstall existing piping when complete in accordance with current NFPA Standards and local codes. The existing system must meet current NFPA 13 and local code requirements: Price Tax Total Twenty-Five Thousand Nine Hundred Eighty-Eight Dollars and 00/100 Alternate to add additional sprinkler heads in field maintenance area Price $5,680,00 Tax —$817.131r Total Five Thousand Seven Hundred Sixty Dollars and 001100 S5,7.640). This Proposal is valid for forty-five (45) days and carries a one (1) year warranty upon completion and is based upon the following CLARIFICATIONS: ▪ Our proposals are normally good for 45 days; however, with the volatility of the steel market we have no control over our piping prices. At this time we cannot lock in pricing until material is ready for delivery. At this time the above price represents estimates through forty-five days after the above date. • The existing system must be operational and adequate to handle any and all adds and/or relocations. • Existing system to meet all NFPA 13 and local codes. • Price does not include necessary to overtime to meet an accelerated schedule. • General Contractor and/or Architect providing files in AutoCAD format required for fire protection shop drawing preparation • Price based upon adds and relocates for new walls only; all other heads to remain as is. • The fire sprinkler water will be drained on site; there are no contingencies for offsite disposal of the fire sprinkler water included in this price. • We are using material per NFPA Standards and we have no knowledge of any restrictions or limitations to material to be used on this project. • City of Phoenix Fire performs two inspections. Any inspection costs beyond two will be the general contractor's responsibility. • It is the responsibility of the Owner or General Contractor to warrant work area is free of hazardous materials of any sort (asbestos, lead, etc). RCI Systems, Inc. will not be responsible for any testing, fines or penalties. RU Systems will require verification prior to working on site. • Upon proposal acceptance, a Prime Contractor's Certificate (AZ FORM 5005) will be reauired for our records. EXCLUSIONS: wiring; painting; alarms; premium time; tax; hydraulic calculations; fire extinguishers and cabinets; cutting or patching, relocation of feed mains, cross mains and/or branch lines due to conflicts with other trades and ceiling elevations; FM/ IRI requirements, fire caulking; pre-action system; temporary power by others; providing hydraulic calculation plate at existing fire riser; fire hose valves, shut down fees, plans and P.E. Stamp; permits. TERMS: Progress Billings; Net 30 days. Respectfully submitted, Randy Black VP of Sales/Project Manager August 3 1 , 2016 Job Name: Chase Field Structural Repair/Electrical Remove/Re-install/Make Safe. D.P. ELECTRIC, INC. Page 1 of 1 Jokake Attn: Daniel Dunn D.P. Electric Inc. is pleased to provide you with a proposal for the above referenced project. This proposal is based on Structural drawing T1.0 engineer dated 7/15/16. Addendums #1 & 2 noted at bid time. Scope: Electrical make safe of light fixtures, conduit & wire for concrete structure repair. Reinstall once repairs are complete. Work performed in sections 107,108,109,110,111 & 112. Bid Alt# I scope; add (10) new 8ft 4lamp light fixtures (match existing) and power feed to new concrete area in grounds keeping. Base Bid 4;605470e' Bid Alt. #1 adder $7,875.00 °notification Notes: 1. Remove all electrical conduit strapping/supports and boxes needed/make safe for sections listed. 2. Re-install all electrical conduiCstrapping and supports in same location. Extend wires as needed. 3. All installations shall be during normal working hours. 4. Bid Alt#1 (10) 8ft 41amp T8 light fixture. All conduit, wire, junction boxes and supports. 5. Temporary Power/Lighting as needed. Make safe existing for construction use. 6. This proposal is valid for (30-days) only. (see material escalation note at the end of this proposal) Exclusions: 1. All major shoring/scaffolding supports of main conduit rack located at dock doors. 1 . Fire Alarm System. Conduit strapping/supports if needed to be removed and re-installed only. 3. New light fixtures, Re-use/re-install existing. 4. Any existing conditions/code violations. 5. Engineering/fees, permits/fees, special inspection fees, utility fees and taxes. 6. Construction Bond Premiums. 7. Participation in Owner Controlled Insurance Programs (OC1P's) 8. Participation in billing programs or other special reporting systems. Site Exclusions: Hard dig, hard surface R & R, landscape R & R, slurry backfill, traffic control, steel plates, compaction testing, offsite spoil removal, water costs, surveying , staking, Concrete/asphalt saw-cut, removal or patch, all formed and poured concrete (Utility pads, equipment pads and light pole bases), engineering/fees, permits/fees, special inspection fees, utility fees and taxes. Insurance. Warranty & Spares: O Proposal includes the basic "Additional Insured - insurance for GC & project owner Proposal includes (I) year warranty and (2) year storkmanship 0 D.P. Electric will only transfer the manufacturer's warranties to Owner Lamps are not covered under warranty • No Spares Pro sparefitses, no spare lamps & no spare ballasts) 0 Material Escalation.. material escalation from the date of this proposal for the electrical rough materials shall be considered as additional cost to the project and shall be billed as material escalation change-order This is due to volatility in peke of steel, copper & PVC If you have any questions, please feel free to contact me. Thank you, D.P. Electric Inc. • Bill Vass Service Manager 480.858.9070 0 480.229.3242 C bill.i .assadpelectric.cons 6002 SASH AVE • TEMPE AZ 85283 • PHONE 480.858 9070 • FAX 480.858 9067 • WEB WWW.DPELECTRIC COM • L11#111176 C115111170 DEPENDABLE PEOPLE DEPENDABLE PERFORMANCE 09120116 Cost Total $61,616.00 $2,127.00 $63,743.00 $0.00 $0.00 $796.79 $451.78 $974.88 $65,966.45 $3,957.99 $69,924.44 $3.908.78 $10,090.22 $73,833.22 STATUS: DATE: / I Subcontract Other 61,616.00 2,127.00 63,743.00 PRICE I General Contractor 0.00 Equipment Materials 2 Total Alternate Labor I I I DI Add - Labor Rate Values of Schedule Hours I 0.000% 0.000% 1.250% 0.700% 1.500% 6.00% 5590% 107-111 85004 Section AZ District Contingency Repairs Phoenix Stadium Description Work Work Structural St, Courtly Restoration the of Contingency Construction the of TOTAL Jefferson Cost Risk Cost 2016-17 E. Maricopa CONCRETE Concrete FINISHES Painting Direct Owners Jokake Insurance Builders Bond Subtotal FEE Subtotal TAX Indirect GRAND 401 JOKAI, Name: Location: Division 3 9 Project Project Owner: 03.700 09.900 19.050 19.200 01.780 01.006 01.006 300 20 Clarifications - Add Alternate 2 I. Project: 2016-17 Structural Re -airs Section 107-111 Division 1' GENEFtAL RE c • REMEWS General: 1 - All work is to be performed during normal working hours, except as needed for shutdowns and tie ins. 2 -All areas affected by construction will be vacated and emptied. 3 -All work will be completed In one phase. 4 - P ri ci ng assumes that parking Is available at no cost to Jokake or its subcontractors _ 5 - Exclude all permits or permit fees. 8 - Exclude exact match to existing materials. All finish materials will match dose as possible 7. Exclude all Asbestos identification or removal. Maricopa County to provide asbestos testing report to Jokake prior to start of any demo work. 8- Exclude all design and engineering except as listed below. 9 - Exclude relocation or removal of furniture or wall hangings. 10 - Exclude all tele/data cabling. _ 11 - Exclude service or repair of existing HVAC units. 12 - Exclude certified air balance. 13 - Exclude relamping or new ballasts of existing light fixtures. _ 14 - Exclude any engineering or architectural fee or calculations except as listed below 15- General requirements are figured as fixed sum and will be billed as a percentage based on project completion. 16- Assumes onsite restrooms can be used by construction persons. 2 -, NG CONOMONS 1 - Sco Per Drawin s. CONCRETE 1 - Direction of Structural Concrete Repair Scope Per Drawings. 2- Structural Concrete Repair quantities per the attached Maricopa County Stadium District quantity spread sheet as agreed upon by Maricopa County Stadium District and Restruction Corporation. _ ......4. RY Exclude All METALS I - Sco . - Per Drawl .1, s. ; Exclude All ric_ 1. Scope Per Drawings • . -- — - ] n INGS ,Fadude All FINISHES I - Scope Per Drawings. Page 1 of 3 Clarifications - Add Alternate 2 Protect: 2016-17 Structural Repairs Section 107-111 _ Division 'la SPECIALTIES -.1 Exclude All j Ii EQUIPMENT Exclude All 'FURNISHINGS Exclude All la SPECIAL GONSTRUCOON Exclude All FIRE SUPPRESSION Exclude All PLUMBING _ . Exclude Al 23 HEATING VEMDLATION AIR CON • NINO Exclude Al It Iii.J.CTIVCAL Sco e Per Drawin s 27 COMMUNICATIONS Exclude All 72 ELECTRONIC SAFETY'S SECURITY I Exclude All 31 EARTHWORK Exclude All 32 EICTERJOR IMPROVEMENTS Exclude All 33 UT/LITIES Exclude All 34 TRARSPCATOOK Exclude All WATERWAY A MARINE Exclude All MATERAL. . . . A HANDLINGIEQUIPMENT Exclude All Page 2 of 3 Clarifications - Add Alternate 2 Project: 2016-1T Structural Repairs Section 107-111 Division lritaitsth. 4,1iii-1 --qi .-4,9,0i . Exclude All Exdude All .ALLOWARGE5 1 CilDtcl1NGENCY Allowances and Contingency: 1. Any allowances or contingency not used will not be billed to owner. 2 Must have written authorization from owner prior to use of any allowance and contingency. Page 3 of 3 Abhishek Shah v:rom: Adam Zius <azius@restruction.com > .ent: Tuesday, September 13, 2016 7:06 AM To: Michael Yates Subject: RE: Revised Spreadsheet with Expansion Joint from 105-107 Categories: Sub Bid Good Morning Mike, Please see revised alternate below: Remove Expansion Joint & Install New SJS-FR2 From 102-104 lOOLF @ $485.06 = $48,506.00 Install Waterproofing @ 202-204 per details 1000 SF @ $13.11 = $13,110.00 See you soon. 6-6/6'-1=7a Adam Zius Arizona Division Manager Restruction Corporation 2127 S. Priest Dr. Suite 405, Tempe, AZ 85282 (480) 557-9174 www.restr ction com Restruction 1011:1 Corporation From: Michael Yates Imailto:MichaelYatesPiokake.com) Sent: Tuesday, September 13, 2016 5:36 AM To: Adam Zius <azius@restruction.com > Subject: RE: Revised Spreadsheet with Expansion Joint from 105-107 Thanks Adam, what is the revised alternate price now? Thank you MIKE YATES TEAM LEADER JOKAKE AN EMPLOYEE-OWNED CONSTRUCTION COMPANY OFFICE: 602 224 4517 MOBILE: 602 722 1005 C7AX: 602 224 1396 michael.vates@lokake.com MAIL: 5013 E WASHINGTON ST. SUITE ONE HUNDRED 1 PHOENIX, ARIZONA 85034 WWW.JOKAKE.COM cy ROC# 241197 // CA LIC# 960871 From: Adam Zius [mailto:aziusarestruction.com] Sent: Monday, September 12, 2016 10:09 PM To: Michael Yates <Michael.YatesPiokake.com > Subject: Revised Spreadsheet with Expansion Joint from 105-107 Good Evening Mike, Please see our attached revised spreadsheet for your use. Thanks again. Adam Zius Arizona Division Manager Restruction Corporation 2127 S. Priest Dr. Suite 405, Tempe, AZ 85282 (480) 557-9174 www.restruction.corn Restruction NoI Corporation 2 Straight Arrow Contracting, LLC Straight Arrow Contracting, LLC Quote '20 W. Southern Ave leson, AZ 85353 US Native American Owned Comp any Date Quote # (623)694-3345 09/12/2016 2528 str.arrow.az@gmail.com Exp. Date 10/12/2016 Address 'Ship To Jokake Construction Chase Field 5013 E Washington st. Suite 100 Phoenix, AZ 85034 USA Sales Re Kenny Activity Quantity Rate Amount • Pnemrterecestim- 5,2,400 baele141-st-Ieler date. • Pri attaslacLI: rep orn-upvniroi-mazi naiffiing-beeeffies-ffeeessary-ii-w4Weeti -ft-rwie-442765-per-strftr-- iaing-ta.paint-as-Alt,41-for.additiunal-cmu-voalls Pricin,gamccistalL9+11-paint-hand-rail-anilimard-railE41044114y6teni-44.0-iti-freefieti 633 7, 00 09900-of4poca-not-includinta1astomerie -wrop-tet-baofiumd-rri1-ind156-ff- el-guard • Alternate to paint 157 If of hand rail 157 ; 11,00 1,727.00 • Prices do not include frame, drywall or fire caulking 4- L100 . 0 Fer, ): o-ei 64 -e tc l'orcr loSIA 70 0 ADDITIONS: this quote shall become part of any PO and/or any notice to Total proceed for the aforementioned undertaking(s). EXCLUDES: engineering, permits, inspections, tax, testing, certifications, private locators, hard soil conditions. unforeseen conditions, landscape, •lation, off hours & holiday work, environment abatement, traffic barricades, ri trips, and any Accepted By Accepted Date ROC' 271567 KB-1 DUAL, ROC 246308 K-31 DBE Certified Company