15058-CONTRACT - KIMLEY-HORN.DOCX
Extracted text (via pymupdf_layout)
245144 characters
SERIAL 15058-RFP BELL RD ADAPTIVE SIGNAL CONTROL TECHNOLOGY (ASCT) DEPLOYMENT (Contract - Kimley-Horn and Associates, Inc.) DATE OF LAST REVISION: September 07, 2016 CONTRACT END DATE: August 31, 2021 CONTRACT PERIOD THROUGH AUGUST 31, 2021 TO: All Departments FROM: Office of Procurement Services SUBJECT: Contract for BELL RD ADAPTIVE SIGNAL CONTROL TECHNOLOGY (ASCT) DEPLOYMENT Attached to this letter is published an effective purchasing contract for products and/or services to be supplied to Maricopa County activities as awarded by Maricopa County on September 07, 2016. All purchases of products and/or services listed on the attached pages of this letter are to be obtained from the vendor holding the contract. Individuals are responsible to the vendor for purchases made outside of contracts. The contract period is indicated above. NP/at Attach Copy to: Office of Procurement Services Sami Birchard, MCDOT April Wire, MCDOT CONTRACT PURSUANT TO RFP SERIAL 15058-RFP This Contract is entered into this 7th day of September, 2016 by and between Maricopa County (“County”), a political subdivision of the State of Arizona, and Kimley Horn, a North Carolina corporation (“Contractor”) for the purchase of adaptive signal control technology services. 1.0 CONTRACT TERM: 1.1 This Contract is for a term of five (5) years, beginning on the 7th day of September, 2016 and ending the 31st day of August, 2021. 1.2 The County may, at its option and with the agreement of the Contractor, renew the term of this Contract for additional terms up to a maximum of five (5) years, (or at the County’s sole discretion, extend the contract on a month-to-month bases for a maximum of six (6) months after expiration). The County shall notify the Contractor in writing of its intent to extend the Contract term at least sixty (60) calendar days prior to the expiration of the original contract term, or any additional term thereafter. 2.0 FEE ADJUSTMENTS: 2.1 Any request for a fee adjustment must be submitted sixty (60) days prior to the current Contract expiration. Requests for adjustment in cost of labor and/or materials must be supported by appropriate documentation. If County agrees to the adjusted fee, County shall issue written approval of the change. The reasonableness of the request will be determined by comparing the request with the lesser of 3% or Consumer Price Index – All Urban Consumers, Series ID CUUR0400AA0, Not Seasonally Adjusted, West Urban Area, All items old base (12/77). 3.0 PAYMENTS: 3.1 As consideration for performance of the duties described herein, County shall pay Contractor the sum(s) stated in Exhibit “A.” 3.2 Payment shall be made upon the County’s receipt of a properly completed invoice. 3.3 INVOICES: 3.3.1 The Contractor/Consultant shall be paid a fee as awarded by the County for complete and satisfactory performance of work and/or materials delivered in accordance with the detailed scope of work and any technical specifications. The County does not guarantee any minimum or maximum fee during the period of this contract. 3.3.2 The County shall pay the Consultant/Contractor in full for each monthly payment request, upon approval by the County and subject to the limitations set forth in the Scope of Work under this contract. A Project Specific Consultant Payment Request form is enclosed in Exhibit E. and must include back-up documentation with each invoiced progress payment request. The backup documentation shall clearly indicate the hours worked, date and employee’s name, including subconsultants. All backup documentation shall include copies of any subconsultant or vendor invoices. 15058-RFP The Small Business Enterprise Participation Reporting form, as shown in Exhibit E, is to be submitted with each invoice/progress payment request. Any payment request submitted to the County without this form may be rejected as an incomplete payment request, pursuant to the terms of the contract. Upon completion of all deliverables under the scope(s) of work and related technical requirements in this contract, and final acceptance by Maricopa County Department of Transportation, the Contractor/Consultant shall submit a Certificate of Performance and Payment of ALL Claims form, as shown in Exhibit E. 3.3.3 Problems regarding billing or invoicing shall be directed to the using agency as listed on the Purchase Order. 3.3.4 Payment shall be made to the Contractor by Accounts Payable through the Maricopa County Vendor Express Payment Program. This is an Electronic Funds Transfer (EFT) process. After Contract Award the Contractor shall complete the Vendor Registration Form located on the County Department of Finance Vendor Registration Web Site (http://www.maricopa.gov/Finance/Vendors.aspx). 3.3.5 Discounts offered in the contract shall be calculated based on the date a properly completed invoice is received by the County (ROI). 3.3.6 EFT payments to the routing and account numbers designated by the Contractor will include the details on the specific invoices that the payment covers. The Contractor is required to discuss remittance delivery capabilities with their designated financial institution for access to those details. 3.4 PAYMENT RETENTION: See Exhibit A System Verification & Acceptance, Milestone Payments 3.5 APPLICABLE TAXES: 3.5.1 Payment of Taxes: The Contractor shall pay all applicable taxes. With respect to any installation labor on items that are not attached to real property performed by Contractor under the terms of this Contract, the installation labor cost and the gross receipts for materials provided shall be listed separately on the Contractor’s invoices. 3.5.2 State and Local Transaction Privilege Taxes: Maricopa County is subject to all applicable state and local transaction privilege taxes. To the extent any state and local transaction privilege taxes apply to sales made under the terms of this contract it is the responsibility of the seller to collect and remit all applicable taxes to the proper taxing jurisdiction of authority. 3.5.3 Tax Indemnification: Contractor and all subcontractors shall pay all Federal, state, and local taxes applicable to its operation and any persons employed by the Contractor. Contractor shall, and require all subcontractors to hold Maricopa County harmless from any responsibility for taxes, damages and interest, if applicable, contributions required under Federal, and/or state and local laws and regulations and any other costs including transaction privilege taxes, unemployment compensation insurance, Social Security and Worker’s Compensation. 3.6 TAX: (SERVICES) No tax shall be levied against labor. It is the responsibility of the Contractor to determine any and all taxes and include the same in proposal price. 15058-RFP 4.0 AVAILABILITY OF FUNDS: 4.1 The provisions of this Contract relating to payment for services shall become effective when funds assigned for the purpose of compensating the Contractor as herein provided are actually available to County for disbursement. The County shall be the sole judge and authority in determining the availability of funds under this Contract. County shall keep the Contractor fully informed as to the availability of funds. 4.2 If any action is taken by any state agency, Federal department or any other agency or instrumentality to suspend, decrease, or terminate its fiscal obligations under, or in connection with, this Contract, County may amend, suspend, decrease, or terminate its obligations under, or in connection with, this Contract. In the event of termination, County shall be liable for payment only for services rendered prior to the effective date of the termination, provided that such services are performed in accordance with the provisions of this Contract. County shall give written notice of the effective date of any suspension, amendment, or termination under this Section, at least ten (10) days in advance. 5.0 DUTIES: 5.1 The Contractor shall perform all duties stated in Exhibit “B”, or as otherwise directed in writing by the Procurement Officer. 5.2 During the Contract term, County may provide Contractor’s personnel with adequate workspace for consultants and such other related facilities as may be required by Contractor to carry out its contractual obligations. 6.0 TERMS and CONDITIONS: 6.1 INDEMNIFICATION: To the fullest extent permitted by law, and to the extent that claims, damages, losses or expenses are not covered and paid by insurance purchased by the Contractor, the Contractor shall defend indemnify and hold harmless the County (as Owner), its agents, representatives, officers, directors, officials, and employees from and against all claims, damages, losses, and expenses (including, but not limited to attorneys' fees, court costs, expert witness fees, and the costs and attorneys' fees for appellate proceedings) arising out of, or alleged to have resulted from the negligent acts, errors, omissions, or mistakes relating to the Contractor’s performance of this Contract. Contractor's duty to defend, indemnify, and hold harmless the County, its agents, representatives, , officers, directors, officials, and employees shall arise in connection with any claim, damage, loss, or expense that is attributable to bodily injury, sickness, disease, death or injury to, impairment of, or destruction of tangible property, including loss of use resulting there from, caused by negligent acts, errors, omissions, or mistakes in the performance of this Contract, but only to the extent caused by the negligent acts or omissions of the Contractor, a subcontractor of the Contractor, any one directly or indirectly employed by them, or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss, or expense is caused in part by a party indemnified hereunder. The amount and type of insurance coverage requirements set forth herein will in no way be construed as limiting the scope of the indemnity in this paragraph. The scope of this indemnification does not extend to the sole negligence of County. 6.2 INSURANCE. 6.2.1 Contractor, at Contractor’s own expense, shall purchase and maintain the herein stipulated minimum insurance from a company or companies duly licensed by the State of Arizona and possessing a current A.M. Best, Inc. rating of B++. In lieu of State of 15058-RFP Arizona licensing, the stipulated insurance may be purchased from a company or companies, which are authorized to do business in the State of Arizona, provided that said insurance companies meet the approval of County. The form of any insurance policies and forms must be acceptable to County. 6.2.2 All insurance required herein shall be maintained in full force and effect until all work or service required to be performed under the terms of the Contract is satisfactorily completed and formally accepted. Failure to do so may, at the sole discretion of County, constitute a material breach of this Contract. 6.2.3 Contractor’s insurance shall be primary insurance as respects County, and any insurance or self-insurance maintained by County shall not contribute to it. 6.2.4 Any failure to comply with the claim reporting provisions of the insurance policies or any breach of an insurance policy warranty shall not affect the County’s right to coverage afforded under the insurance policies. 6.2.5 The insurance policies may provide coverage that contains deductibles or self-insured retentions. Such deductible and/or self-insured retentions shall not be applicable with respect to the coverage provided to County under such policies. Contractor shall be solely responsible for the deductible and/or self-insured retention and County, at its option, may require Contractor to secure payment of such deductibles or self-insured retentions by a surety bond or an irrevocable and unconditional letter of credit. 6.2.6 The insurance policies required by this Contract, except Workers’ Compensation and Professional Liability, shall name County, its agents, representatives, officers, directors, officials and employees as Additional Insureds. 6.2.7 The policies required hereunder, except Workers’ Compensation and Professional Liability, shall contain a waiver of transfer of rights of recovery (subrogation) against County, its agents, representatives, officers, directors, officials and employees for any claims arising out of Contractor’s work or service. 6.2.8 Commercial General Liability. Commercial General Liability insurance and, if necessary, Commercial Umbrella insurance with a limit of not less than $2,000,000 for each occurrence, $4,000,000 Products/Completed Operations Aggregate, and $4,000,000 General Aggregate Limit. The policy shall include coverage for premises liability, bodily injury, broad form property damage, personal injury, products and completed operations and blanket contractual coverage, and shall not contain any provisions which would serve to limit third party action over claims. There shall be no endorsement or modifications of the CGL limiting the scope of coverage for liability arising from explosion, collapse, or underground property damage. 6.2.9 Automobile Liability. Commercial/Business Automobile Liability insurance and, if necessary, Commercial Umbrella insurance with a combined single limit for bodily injury and property damage of not less than $1,000,000 each occurrence with respect to any of the Contractor’s owned, hired, and non-owned vehicles assigned to or used in performance of the Contractor’s work or services or use or maintenance of the Premises under this Contract. 6.2.10 Workers’ Compensation. Workers’ Compensation insurance to cover obligations imposed by federal and state statutes having jurisdiction of Contractor’s employees engaged in the performance of the work or services under this Contract; and Employer’s Liability insurance of not less than 15058-RFP $1,000,000 for each accident, $1,000,000 disease for each employee, and $1,000,000 disease policy limit. Contractor, its contractors and its subcontractors waive all rights against Contract and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the Workers’ Compensation and Employer’s Liability or commercial umbrella liability insurance obtained by Contractor, its contractors and its subcontractors pursuant to this Contract. 6.2.11 Professional Liability. Contractor shall maintain Professional Liability insurance which will provide coverage for any and all negligent acts arising out of the work or services performed by the Contractor under the terms of this Contract, with a limit of not less than $1,000,000 for each claim, and $3,000,000 aggregate claims. 6.2.12 Cyber – Policy Limit: 6.2.12.1 The policy shall be issued with minimum limits of $100,000. 6.2.12.2 The policy shall include coverage for all directors, officers, agents and employees of the Contractor. 6.2.12.3 The policy shall include coverage for third party fidelity. 6.2.12.4 The policy shall include coverage for theft. 6.2.12.5 The policy shall contain no requirement for arrest and conviction. 6.2.12.6 The policy shall cover loss outside the premises of the Named Insured. 6.2.12.7 The policy shall endorse (Blanket Endorsements are not acceptable) the Department as Loss Payee as our interest may appear. 6.2.13 Certificates of Insurance. 6.2.13.1 Prior to Contract AWARD, Contractor shall furnish the County with valid and complete certificates of insurance, or formal endorsements as required by the Contract in the form provided by the County, issued by Contractor’s insurer(s), as evidence that policies providing the required coverage, conditions and limits required by this Contract are in full force and effect. Such certificates shall identify this contract number and title. 6.2.13.2 In the event any insurance policy (ies) required by this contract is (are) written on a “claims made” basis, coverage shall extend for two years past completion and acceptance of Contractor’s work or services and as evidenced by annual Certificates of Insurance. 6.2.13.3 If a policy does expire during the life of the Contract, a renewal certificate must be sent to County fifteen (15) days prior to the expiration date. 6.2.14 Cancellation and Expiration Notice. Insurance required herein shall not be permitted to expire, be canceled, or materially changed without thirty (30) days prior written notice to the County. 6.3 WARRANTY OF SERVICES: 6.3.1 The Contractor warrants to exercise the professional standard of care so that all services provided hereunder will conform to the requirements of the Contract, including all descriptions, specifications and attachments made a part of this Contract. County’s acceptance of services or goods provided by the Contractor shall not relieve the Contractor from its obligations under this warranty. 15058-RFP 6.3.2 In addition to its other remedies, County may, at the Contractor's expense, require prompt correction of any services failing to meet the Contractor's warranty herein. Services corrected by the Contractor shall be subject to all the provisions of this Contract in the manner and to the same extent as services originally furnished hereunder. 6.4 INSPECTION OF SERVICES: 6.4.1 The Contractor shall provide and maintain an inspection system acceptable to County covering the services under this Contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to County during contract performance and for as long afterwards as the Contract requires. 6.4.2 County has the right to inspect and test all services called for by the Contract, to the extent practicable at all times and places during the term of the Contract. County shall perform inspections and tests in a manner that will not unduly delay the work. 6.4.3 If any of the services do not conform to Contract requirements, County may require the Contractor to perform the services again in conformity with Contract requirements, at no cost to the County. When the defects in services cannot be corrected by re-performance, County may: 6.4.3.1 Require the Contractor to take necessary action to ensure that future performance conforms to Contract requirements; and 6.4.3.2 Reduce the Contract price to reflect the reduced value of the services performed. 6.4.4 If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with Contract requirements, County may: 6.4.4.1 By Contract or otherwise, perform the services and charge to the Contractor, through direct billing or through payment reduction, any cost incurred by County that is directly related to the performance of such service; or 6.4.4.2 Terminate the Contract for default. 6.5 REQUIREMENTS CONTRACT: 6.5.1 Contractors signify their understanding and agreement by signing a bid submittal, that the Contract resulting from the bid is a requirements contract. However, the Contract does not guarantee any minimum or maximum number of purchases will be made. It only indicates that if purchases are made for the materials or services contained in the Contract, they will be purchased from the Contractor awarded that item if the Contractor can meet all the delivery requirements of the County. Orders will only be placed when the County identifies a need and proper authorization and documentation have been approved. 6.5.2 County reserves the right to cancel Purchase Orders within a reasonable period of time after issuance. Should a Purchase Order be canceled, the County agrees to reimburse the Contractor for actual and documentable costs incurred by the Contractor in response to the Purchase Order. The County will not reimburse the Contractor for any costs incurred after receipt of County notice of cancellation, or for lost profits, shipment of product prior to issuance of Purchase Order, etc. 6.5.3 Contractors agree to accept verbal notification of cancellation of Purchase Orders from the County Procurement Officer with written notification to follow. By submitting a bid in response to this Invitation for Bids, the Contractor specifically acknowledges to be bound by this cancellation policy. 6.6 Suspension of Work 15058-RFP The Procurement Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Procurement Officer determines appropriate for the convenience of the County. No adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor. No request for adjustment under this clause shall be granted unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract. 6.7 Stop Work Order The Procurement Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Procurement Officer shall either— 6.7.1 Cancel the stop-work order; or 6.7.2 Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the County, clause of this contract. 6.7.3 The Procurement Officer may make an equitable adjustment in the delivery schedule and/or contract price, or otherwise, and the contract shall be modified, in writing, accordingly, if the Contractor demonstrates that the stop work order resulted in an increase in costs to the Contractor. 6.8 UNCONDITIONAL TERMINATION FOR CONVENIENCE: Maricopa County may terminate the resultant Contract for convenience by providing sixty (60) calendar days advance notice to the Contractor. 6.9 TERMINATION FOR DEFAULT: The County may, by written notice of default to the Contractor, terminate this contract in whole or in part if the Contractor fails to: 6.9.1 Deliver the supplies or to perform the services within the time specified in this contract or any extension; 6.9.2 Make progress, so as to endanger performance of this contract; or 6.9.3 Perform any of the other provisions of this contract. 6.9.4 The County’s right to terminate this contract under these subparagraph may be exercised if the Contractor does not cure such failure within 10 days (or more if authorized in writing by the County) after receipt of the notice from the Procurement Officer specifying the failure. 6.10 STATUTORY RIGHT OF CANCELLATION FOR CONFLICT OF INTEREST: Notice is given that pursuant to A.R.S. § 38-511 the County may cancel any Contract without penalty or further obligation within three years after execution of the contract, if any person significantly involved in initiating, negotiating, securing, drafting or creating the contract on 15058-RFP behalf of the County is at any time while the Contract or any extension of the Contract is in effect, an employee or agent of any other party to the Contract in any capacity or consultant to any other party of the Contract with respect to the subject matter of the Contract. Additionally, pursuant to A.R.S § 38-511 the County may recoup any fee or commission paid or due to any person significantly involved in initiating, negotiating, securing, drafting or creating the contract on behalf of the County from any other party to the contract arising as the result of the Contract. 6.11 CONTRACTOR LICENSE REQUIREMENT: 6.11.1 The Contractor shall procure all permits, insurance, licenses and pay the charges and fees necessary and incidental to the lawful conduct of his/her business, and as necessary complete any required certification requirements, required by any and all governmental or non-governmental entities as mandated to maintain compliance with and in good standing for all permits and/or licenses. The Contractor shall keep fully informed of existing and future trade or industry requirements, Federal, State and Local laws, ordinances, and regulations which in any manner affect the fulfillment of a Contract and shall comply with the same. Contractor shall immediately notify both Office of Procurement Services and the using agency of any and all changes concerning permits, insurance or licenses. 6.11.2 Contractors furnishing finished products, materials or articles of merchandise that will require installation or attachment as part of the Contract, shall possess any licenses required. A Contractor is not relieved of its obligation to posses the required licenses by subcontracting of the labor portion of the Contract. Contractors are advised to contact the Arizona Registrar of Contractors, Chief of Licensing, at (602) 542-1525 to ascertain licensing requirements for a particular contract. Contractors shall identify which license(s), if any, the Registrar of Contractors requires for performance of the Contract. 6.12 SUBCONTRACTING: 6.12.1 The Contractor may not assign to another Contractor or Subcontract to another party for performance of the terms and conditions hereof without the written consent of the County. All correspondence authorizing subcontracting must reference the Bid Serial Number and identify the job project. 6.12.2 The Subcontractor’s rate for the job shall not exceed that of the Prime Contractor’s rate, as bid in the pricing section, unless the Prime Contractor is willing to absorb any higher rates or the County has approved the increase. The Subcontractor’s invoice shall be invoiced directly to the Prime Contractor, who in turn shall pass-through the costs to the County, without mark-up. A copy of the Subcontractor’s invoice must accompany the Prime Contractor’s invoice. 6.13 AMENDMENTS: All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa County Office of Procurement Services shall be responsible for approving all amendments for Maricopa County. 6.14 ADDITIONS/DELETIONS OF SERVICE: 6.14.1 The County reserves the right to add and/or delete materials and services to a Contract. If a service requirement is deleted, payment to the Contractor will be reduced proportionately, to the amount of service reduced in accordance with the bid price. If additional materials or services are required from a Contract, prices for such additions will be negotiated between the Contractor and the County. 6.14.2 The County reserves the right of final approval on proposed staff for all Task Orders. Also, upon request by the County, the Contractor will be required to remove any employees working on County projects and substitute personnel based on the discretion of the County within two business days, unless previously approved by the County. 15058-RFP 6.15 VALIDITY: The invalidity, in whole or in part, of any provision of this Contract shall not void or affect the validity of any other provision of the Contract. 6.16 SEVERABILITY: The invalidity, in whole or in part, of any provision of this Contract shall not void or affect the validity of any other provision of this Contract. 6.17 RIGHTS IN DATA: The County shall have the use of data and reports resulting from a Contract without additional cost or other restriction except as may be established by law or applicable regulation. Each party shall supply to the other party, upon request, any available information that is relevant to a Contract and to the performance thereunder. 6.18 NON-DISCRIMINATION: CONTRACTOR agrees to comply with all provisions and requirements of Arizona Executive Order 2009-09 including flow down of all provisions and requirements to any subcontractors. Executive Order 2009-09 supersedes Executive order 99-4 and amends Executive order 75-5 and may be viewed and downloaded at the Governor of the State of Arizona’s website http://azmemory.azlibrary.gov/cdm/singleitem/collection/execorders/id/680/rec/1 which is hereby incorporated into this contract as if set forth in full herein. During the performance of this contract, CONTRACTOR shall not discriminate against any employee, client or any other individual in any way because of that person’s age, race, creed, color, religion, sex, disability or national origin. 6.19 CERTIFICATION REGARDING DEBARMENT AND SUSPENSION 6.19.1 The undersigned (authorized official signing for the Contractor) certifies to the best of his or her knowledge and belief, that the Contractor 6.19.1.1 is not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal Department or agency; 6.19.1.2 have not within 3-year period preceding this Contract been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; 6.19.1.3 are not presently indicted or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (2) of this certification; and 6.19.1.4 have not within a 3-year period preceding this Contract had one or more public transaction (Federal, State or local) terminated for cause of default. 6.19.2 The Contractor agrees to include, without modification, this clause in all lower tier covered transactions (i.e. transactions with subcontractors) and in all solicitations for lower tier covered transactions related to this Contract. 6.20 VERIFICATION REGARDING COMPLIANCE WITH ARIZONA REVISED STATUTES §41- 4401 AND FEDERAL IMMIGRATION LAWS AND REGULATIONS: 15058-RFP 6.20.1 By entering into the Contract, the Contractor warrants compliance with the Immigration and Nationality Act (INA using e-verify) and all other federal immigration laws and regulations related to the immigration status of its employees and A.R.S. §23-214(A). The contractor shall obtain statements from its subcontractors certifying compliance and shall furnish the statements to the Procurement Officer upon request. These warranties shall remain in effect through the term of the Contract. The Contractor and its subcontractors shall also maintain Employment Eligibility Verification forms (I-9) as required by the Immigration Reform and Control Act of 1986, as amended from time to time, for all employees performing work under the Contract and verify employee compliance using the E-verify system and shall keep a record of the verification for the duration of the employee’s employment or at least three years, whichever is longer. I-9 forms are available for download at USCIS.GOV. 6.20.2 The County retains the legal right to inspect contractor and subcontractor employee documents performing work under this Contract to verify compliance with paragraph 6.20 of this Section. Contractor and subcontractor shall be given reasonable notice of the County’s intent to inspect and shall make the documents available at the time and date specified. Should the County suspect or find that the Contractor or any of its subcontractors are not in compliance, the County will consider this a material breach of the contract and may pursue any and all remedies allowed by law, including, but not limited to: suspension of work, termination of the Contract for default, and suspension and/or debarment of the Contractor. All costs necessary to verify compliance are the responsibility of the Contractor. 6.21 INFLUENCE As prescribed in MC1-1202 of the Maricopa County Procurement Code, any effort to influence an employee or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct may be grounds for Disbarment or Suspension under MC1-902. An attempt to influence includes, but is not limited to: 6.21.1 A Person offering or providing a gratuity, gift, tip, present, donation, money, entertainment or educational passes or tickets, or any type valuable contribution or subsidy, 6.21.2 That is offered or given with the intent to influence a decision, obtain a contract, garner favorable treatment, or gain favorable consideration of any kind. If a Person attempts to influence any employee or agent of Maricopa County, the Chief Procurement Officer, or his designee, reserves the right to seek any remedy provided by the Maricopa County Procurement Code, any remedy in equity or in the law, or any remedy provided by this contract. 6.22 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLERBLOWER RIGHTS. 6.22.1 The Parties agree that this Contract and employees working on this Contract will be subject to the whistleblower rights and remedies in the pilot program on contractor employee whistleblower protections established at 41 U.S.C. § 4712 by section 828 of the National Defense Authorization Act for Fiscal Year 2013 (Pub. L. 112–239) and section 3.908 of the Federal Acquisition Regulation; 6.22.2 Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. § 4712, as described in section 3.908 of the Federal Acquisition Regulation. Documentation of such employee notification must be kept on file by Contractor and copies provided to County upon request. 15058-RFP 6.22.3 Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold ($150,000 as of September 2013). 6.23 FEDERAL CLAUSES 6.23.1 Title VI The Maricopa County Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252.42 U.S.C. §§ 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Additional Title VI Assurance language can be found in Exhibit E, Special Federal Terms, Conditions and Documents. This Exhibit contains a commitment by the Maricopa County Department of Transportation, as the recipient of the federal funding associated with this Contract and related project. This commitment pertains to complying with all referenced Acts and Regulations. Similar assurances are required of contractors and consultants and must also be included in any subcontracts. Maricopa County Department of Transportation’s Title VI Plan details can be found at: http://www.mcdot.maricopa.gov/technical/TitleVI/home.htm. 6.23.2 Buy America As applicable, the Contractor will comply with CFR 23, § 635.410 Buy America requirements and provide proof of compliance with delivery of the pertinent materials. 6.23.3 Small Business Enterprises It is the County’s policy to facilitate and encourage participation by Small Business Enterprise concerns (SBE) in County contracts. The County encourages the Contractor/Consultant to take reasonable steps to eliminate obstacles to SBE participation and to utilize SBEs in performing contracts. The Contractor/Consultant shall comply with 49 CFR 26.7, and further defined pursuant to Section 3 of the Small Business Act and Small Business Administration regulations implementing it (13 CFR Part 21) where possible. For more details on the SBE program and process requirements, reference the ADOT Business Engagement and Compliance (BECO) guidelines for SBEs, which are registered in the Arizona Unified Transportation Registration and Certification System (AZ UTRACS). The Contractor/Consultant shall complete the SBE Participation Reporting Form included in Exhibit E and submit with each invoice/payment request. 6.23.4 Prompt Pay Legislation In accordance with A.R.S. § 28-411 (Prompt Payment to Consultants and Subconsultants), the County must issue payments to Prime Consultants within a certain number of calendar days after receipt of an Payment Request/Invoice. The law also requires the Consultants to pay their Subconsultants within a specific number of calendar days after issuance of payment by the County, unless exceptions exist within the agreed- upon Consultant/Subconsultant agreement. Upon any resolution of unapproved invoices/Payment Requests, Prime Consultants shall not withhold Subconsultants’ payments if the County has paid for the full value of services rendered. Failure by the Prime Consultant to invoice the County in accordance with the terms of the contract and/or pay Subconsultants in accordance with A.R.S. § 28- 411 shall be constituted as a material breach of contract, subjecting the Prime Consultant to disqualification under this contract. The County reserves the right to request the Prime Consultant provide proof of payment to Subconsultants at any time. 15058-RFP 6.23.5 Disadvantaged Business Enterprises (DBE) The Arizona Department of Transportation (hereinafter the Department or ADOT) has established a DBE program in accordance with the regulations of the U.S. Department of Transportation (USDOT), 49 CFR Part 26. This contract has no established contract goals for DBE participation. Consultants/Contractors are still encouraged to employ reasonable means to obtain DBE participation. Consultants/Contractors must retain records in accordance with the DBE specifications included in Exhibit E. Consultants/Contractors are hereby notified that this recordkeeping is important to the ADOT, so that it can track DBE participation where only race neutral efforts are employed. 6.23.6 Aid Contracts FHWA-1273 form is included in Exhibit E due to FHWA construction funding (USDOT) being utilized for this contract and related project activities and/or procurement. As applicable, all clauses in this form are to be complied with under this contract, and this form shall be inserted in any Contractor/Consultant’s subcontracts. 6.24 ACCESS TO AND RETENTION OF RECORDS FOR THE PURPOSE OF AUDIT AND/OR OTHER REVIEW: 6.24.1 In accordance with section MCI 371 of the Maricopa County Procurement Code the Contractor agrees to retain all books, records, accounts, statements, reports, files, and other records and back-up documentation relevant to this Contract for six (6) years after final payment or until after the resolution of any audit questions which could be more than six (6) years, whichever is latest. The County, Federal or State auditors and any other persons duly authorized by the Department shall have full access to, and the right to examine, copy and make use of, any and all said materials. 6.24.2 If the Contractor’s books, records , accounts, statements, reports, files, and other records and back-up documentation relevant to this Contract are not sufficient to support and document that requested services were provided, the Contractor shall reimburse Maricopa County for the services not so adequately supported and documented. 6.24.3 If at any time it is determined by the County that a cost for which payment has been made is a disallowed cost, the County shall notify the Contractor in writing of the disallowance. The course of action to address the disallowance shall be at sole discretion of the County, and may include either an adjustment to future invoices, request for credit, request for a check or deduction from current billings Submitted by the Contractor by the amount of the disallowance, or to require reimbursement forthwith of the disallowed amount by the Contractor by issuing a check payable to Maricopa County. 6.25 AUDIT DISALLOWANCES: If at any time, County determines that a cost for which payment has been made is a disallowed cost, such as overpayment, County shall notify the Contractor in writing of the disallowance. County shall also state the means of correction, which may be but shall not be limited to adjustment of any future claim submitted by the Contractor by the amount of the disallowance, or to require repayment of the disallowed amount by the Contractor. 6.26 OFFSET FOR DAMAGES; In addition to all other remedies at Law or Equity, the County may offset from any money due to the Contractor any amounts Contractor owes to the County for damages resulting from breach or deficiencies in performance of the contract. 15058-RFP 6.27 PUBLIC RECORDS: Under Arizona law, all Offers submitted and opened are public records and must be retained by the Records Manager at the Office of Procurement Services. Offers shall be open to public inspection and copying after Contract award and execution, except for such Offers or sections thereof determined to contain proprietary or confidential information. by the Office of Procurement Services. If an Offeror believes that information in its Offer or any resulting Contract should not be released in response to a public record request under Arizona law, the Offeror shall indicate the specific information deemed confidential or proprietary and submit a statement with its offer detailing the reasons that the information should not be disclosed. Such reasons shall include the specific harm or prejudice which may arise from disclosure. The Records Manager of the Office of Procurement Services shall determine whether the identified information is confidential pursuant to the Maricopa County Procurement Code. 6.28 PRICES: Contractor warrants that prices extended to County under this Contract are no higher than those paid by any other customer for these or similar services. 6.29 INTEGRATION: This Contract represents the entire and integrated agreement between the parties and supersedes all prior negotiations, proposals, communications, understandings, representations, or agreements, whether oral or written, express or implied. 6.30 RELATIONSHIPS: In the performance of the services described herein, the Contractor shall act solely as an independent contractor, and nothing herein or implied herein shall at any time be construed as to create the relationship of employer and employee, co-employee, partnership, principal and agent, or joint venture between the County and the Contractor. 6.31 GOVERNING LAW: This Contract shall be governed by the laws of the state of Arizona. Venue for any actions or lawsuits involving this Contract will be in Maricopa County Superior Court or in the United States District Court for the District of Arizona, sitting in Phoenix, Arizona 6.32 ORDER OF PRECEDENCE: In the event of a conflict in the provisions of this Contract and Contractor’s license agreement, if applicable, the terms of this Contract shall prevail. 6.33 INCORPORATION OF DOCUMENTS: The following are to be attached to and made part of this Contract: 6.33.1 Exhibit A, Pricing; 6.33.2 Exhibit B, Scope of Work; 6.33.3 Exhibit C, Standard Software Maintenance Agreement(or other contractor agreement requiring County signature); and 6.33.4 Exhibit D, Office of Procurement Services Contractor Travel and Per Diem Policy 6.33.5 Exhibit E, Special Federal Terms, Conditions and Documents 15058-RFP NOTICES: All notices given pursuant to the terms of this Contract shall be addressed to: For County: Maricopa County Office of Procurement Services ATTN: Contract Administration 320 West Lincoln Street Phoenix, Arizona 85003-2494 For Contractor: Kimley-Horn ATTN: Pierre Pretorius, Principal 7740 N. 16th St, Suite 300 Phoenix, AZ 85020 15058-RFP MARICOPA COUNTY CHAIRMAN, BOARD OF SUPERVISORS DATE ATTESTED: CLERK OF THE BOARD DATE APPROVED AS TO FORM: DEPUTY COUNTY ATTORNEY DATE 15058-RFP Exhibit A – Pricing SERIAL 15058-RFP NIGP CODE: 918-42 RESPONDENT'S NAME: Kimley-Horn and Associates, Inc. COUNTY VENDOR NUMBER : W000010222 9 ADDRESS: 7740 N. 16th Street, Ste. 300 Phoenix, Arizona 85020 P.O. ADDRESS: N/A TELEPHONE NUMBER: (602) 944-5500 FACSIMILE NUMBER: (602) 944-7423 WEB SITE: www.kimley-horn.com CONTACT (REPRESENTATIVE): Douglas Gettman, Ph.D. REPRESENTATIVE'S E-MAIL ADDRESS: doug.gettman@kimley-horn.com YES NO REBATE WILL ALLOW OTHER GOVERNMENTAL ENTITIES TO PURCHASE FROM THIS CONTRACT [X] [ ] WILL ACCEPT PROCUREMENT CARD FOR PAYMENT: [ ] [X] WILL OFFER REBATE (CASH OR CREDIT) FOR UTILIZING PROCUREMENT CARD: [ ] [X] % (Payment shall be made within 48 hours of utilizing the Purchasing Card) [X] NET 30 DAYS 1.0 PRICING: Year 1 Year 2 Year 3 Year 4 Year 5 Implementation/Professio nal Services NTE $467,500 $ $ $ $ Licensing NTE 0 $ $ $ $ Maintenance and Support NTE $60,000 included included included included Proprietary Hardware NTE $ $ $ $ $ NOT TO EXCEED (NTE) TOTAL $527,500 2.0 ADDITIONAL PRICING: Respondents are to list all additional/optional pricing modules, hardware, or other offerings in this Excel sheet. These costs are included in the Year 1 price: $35,000 Omitting phases and selecting alternate sequence below a user-selected cycle time (included) $35,000 Accelerating cycle change rate based on user-specified conditions (included) $125,000 TOD Tuning and learning module (included) $25,000 Queue length estimation, displays (included) $22,500 Replacing detector data with historical values of detection or splits (included) 15058-RFP System Verification & Acceptance This section identifies required, but not limited to, verification activities that will lead to project Final Acceptance. System verification testing shall be conducted by the contracted system provider to verify that the ASCT complies with the functional requirements as listed in the Technical Requirements shown in Attachment C of "Serial 15058 - RFP Request for Proposal for Bell Road Adaptive Signal Control Technology (ASCT) Deployment". The contracted system provider shall provide any and all necessary on-site and off-site support, labor and equipment as appropriate during the system implementation, integration and verification testing. A proposed System Verification Plan shall be provided by the contracted system provider within 15 working days after Notice to Proceed. The Proposed Verification Plan shall be submitted to and reviewed by MCDOT. Any deficiencies in the proposed plan will be identified by MCDOT within 20 days of receipt of Verification Plan. All deficiencies identified shall be addressed by the contracted system provider within 20 days of receipt of MCDOT comments. All system requirements listed in the Technical Requirements & Responses table identified by the contracted system provider as “Provided”, and accounting for stated and MCDOT accepted concessions regarding to what extent they are met, shall be verified using one of the following verification methods: Demonstration is used for a requirement that the system can demonstrate without external test equipment. Test is used for a requirement that requires some external piece of test equipment. Analyze is used for a requirement that is met indirectly through a logical conclusion or mathematical analysis of a result. For example, algorithms for congestion: the contracted system provider may need to show that the requirement is met through the analysis of count and occupancy calculations in software or firmware. Inspection is used for verification through a visual comparison. The proposed System Verification Plan submitted by the contracted system provider shall identify the specific verification method, location, stage at which the project verification is anticipated to occur, and verification procedure for each system requirement shown in the system Technical Requirements & Responses table. Additional details may be provided to or requested by MCDOT, in addition to identifying the verification method, as necessary to clarify the proposed verification procedure. The proposed System Verification Plan shall contain as a minimum, but not limited to, a schedule showing all activities, testing procedures relative to other project schedule components, equipment needed, personnel and roles. The proposed System Verification Plan shall include examples of forms to be used during testing for documentation purposes, acceptance criteria, duration(s) of each test, compliance criteria, retesting timeframes and shall provide a place on the form to record results. The proposed System Verification Plan responses to each system requirement will be subject to approval by MCDOT. Each system requirement, accounting for stated and MCDOT accepted concessions regarding to what extent they are met, shall be associated with a verification procedure. The contracted system provider shall identify how the veracity of the items listed in System Requirements Reference Number 6.0-5 can be verified by the agency. The contracted system provider shall detail the method/source of data acquisition and calculation algorithm(s) (methodology) to the agency resulting in validating the veracity of providing accurate data back to the ASCT and producing accurate performance measures listed in the System Requirements Reference Number 6.0-5. All deliverables included as part of the System Verification shall be listed as part of the proposed System Verification Plan submittal to MCDOT. MCDOT may request the proposed forms be revised. All forms shall be approved by MCDOT before use. MCDOT will respond to a submitted proposed System Verification Plan within 20 working days, noting any specific requirement procedures that may require clarification, further detail or revision. The contracted system provider shall revise the Proposed Verification Plan as directed, until acceptance of the System Verification Plan is granted by MCDOT. 15058-RFP All requirements listed in the Technical Requirements & Responses table shall be met. Requirements found to be deficient to any level other than full compliance shall be deemed not accepted and final acceptance shall not be granted until all items are resolved. No additional compensation will be given to bring the system into compliance if found to be non-compliant during the System Verification procedures for requirements noted as compliant by the contracted system provider in the Technical Requirements & Responses table as part of this agreement. MCDOT shall identify a Verification Monitor, responsible for observing and documenting the results of each verification procedure. Any verification failure or lack of performance to meet the stated system requirements shall be recorded by the Verification Monitor and the contracted system provider shall prepare a report stating why a system requirement was not met. The report shall include a proposed solution to resolve the deficiency and shall be submitted to MCDOT within 10 working days after the failure is discovered. If the proposed solution includes a software revision or hardware replacement, upgrade, or repair, such mitigation shall be executed and retested. No additional payment shall be made for such solution. If there is a system requirement that the contracted system provider is not able to meet, the contracted system provider shall document in a report, and develop a proposed plan to provide similar performance or operation to meet the requirement. The proposed revised approach to meet the system requirement shall be subject to review and approval by MCDOT, and new testing of the revised requirement shall be initiated within 10 working days of any approved approach. Upon completion of all required verification testing, the contracted system provider shall prepare a final System Verification Report which will document: Verification procedures Verification Results Necessary mitigations/revisions Retesting procedures and results Final disposition of each system requirement listed in the Technical Requirements & Responses table Failures and detailed resolution to each of the failures The Final System Verification Report shall be submitted to MCDOT for review. Any comments resulting from the review shall be transmitted to the contracted system provider. The report shall be revised as directed, and resubmitted to MCDOT. An Approved Final Verification Report is necessary for final project acceptance. Task by Task Progress Payments The parties acknowledge that payment for the Tasks hereunder be payable only upon the County’s acceptance of each Task, acceptance of which shall not be unreasonably withheld, delayed or conditioned. The Schedule of Task Completion, as defined below, is inclusive of the terms and conditions within the Master Agreement. Tasks will be billed by percent complete of each task on a monthly basis. Task 1 - Intersection Detection Identificatio The system provider shall work cooperatively with MCDOT and MCDOT’s design consultant to identify specific detection to be provided on each approach, for each movement, resulting from the ASCT system configuration mutually agreed to by MCDOT and the system provider for this project. Such detection will be provided by MCDOT under separate contract. System provider in conjunction with City of Surprise technical staff shall specify, detection distances, zone(s), output configuration (channels) and method of verification of suitable detection implementation resulting in the optimum conditions for the system provider's ASCT system to operate successfully. MCDOT shall review and approve system provider’s recommendations for detection implementation. Final plans shall be the responsibility of MCDOT. System provider shall note that 15 specific locations are available for intrusive detection (loops). All others shall use non-intrusive detection methods that do not result in any ground disturbance. Task 1 shall not be considered complete until final plans are approved and accepted by MCDOT. Vendor shall also supply specifications for detection technologies and systems that are compatible with their system resulting in maximum system effectiveness. Vendor shall identify any detection technologies or systems that are incompatible with or unsuitable for use with their proposed system. Task Value - 15% of Total Project Cost $79,125 15058-RFP Task 2 – Initial System Installation and Training The system provider shall deliver, install, configure and set up all hardware and software associated with the ASCT system, and conduct agency staff training per the terms and conditions of this agreement. System provider shall acknowledge that the field detection elements, installed by separate contract, unless specifically made a part of the system provider's contract herein, shall be in-place and functional prior to full ASCT implementation and agency staff training. Task Value - 25% of Total Project Cost $131,875 Task 3 – Installation of features (bundle 1) The system provider shall deliver, install, configure and set up all software enhancements associated with the ASCT system, and conduct agency staff training per the terms and conditions of this agreement. System provider shall acknowledge that the field detection elements, installed by separate contract, unless specifically made a part of the system provider's contract herein, shall be in-place and functional prior to full ASCT implementation and agency staff training. 1. Accelerating cycle change rate 2. Replacing failed detectors with historical data/splits Task Value - 15% of Total Project Cost $79,125 Task 4 – Installation of features (bundle 2) The system provider shall deliver, install, configure and set up all hardware and software associated with the ASCT system, and conduct agency staff training per the terms and conditions of this agreement. System provider shall acknowledge that the field detection elements, installed by separate contract, unless specifically made a part of the system provider's contract herein, shall be in-place and functional prior to full ASCT implementation and agency staff training. 1. TOD tuning and learning module 2. Queues estimates and displays 3. Alternate sequence below a certain cycle time Task Value - 15% of Total Project Cost $79,125 Task 5 - Final Acceptance The system provider shall attain Final Acceptance from MCDOT based on successfully passing the testing requirements of the MCDOT approved Verification Plan, which test functionality and compliance to the System Technical Requirements agreed to by the system provider under the terms and conditions of this agreement. Task Value – 18.6% of Total Project Cost $98,250 Task 6 – Maintenance and Support The system provider will provide system maintenance and support for Years 2-5 as per the terms in Exhibit C. This will be billed in total at the beginning of Year 2. Task Value – 11.4% of Total Project Cost $60,000 15058-RFP Exhibit B Scope of Work How Does Kadence Work? Kadence comprises five principal algorithms for tuning signal splits, offsets, cycle time, phase sequence, and TOD schedule. In the Kadence approach, second-by-second phase timing and detector data is polled from the controller. New signal timing Parameters are downloaded to field controllers every three to four cycles. The field controller then begins operating in an actuated-coordinated state with these new settings. Kadence has no field equipment in each cabinet, and the software system resides completely at central. Stop bar detection is used for cycle, splits, and phase sequence tuning. Advance detection is only needed for offset tuning and for measuring stopped and flowing vehicle queues. Advance detection can be used upstream of the controller connected to the downstream controller, or as exit detection connected to the upstream controller (including a controller that is not intended to be adaptively controlled). Kadence is detection-technology agnostic. In all cases, better performance will be achieved with lane-by- lane detection but this is not required. Kadence detects the presence of queues by measuring the average occupancy on a queue detector. When the level of occupancy is consistently high (a user-configurable threshold of occupancy) for several minutes (a user-configurable threshold of time), IF… THEN logic conditions can be configured to put Kadence into a variety of congestion management modes by selecting a new response coordination pattern with associated configuration parameters for Kadence to begin metering, increase cycle time, or change the coordination flow pattern. All pedestrian functions are handled by the local controller. Kadence can be configured to allow split tuning to violate the pedestrian clearance times, which results in a transition event if a pedestrian push button is activated, or can be configured to only allow splits that are larger than the pedestrian clearance time. Advance walk, delay walk, and all other pedestrian settings are handled by the field controller. Based on past experience Internet maps and real-time signal status with adaptive systems 15058-RFP that override the controller’s timings every second (Real-Time Hierarchical Optimized Distributed Effective System (RHODES), Optimized Policies for Adaptive Control [OPAC], Split Cycle Offset Optimisation Technique [SCOOT], Sydney Coordinated Adaptive Traffic System [SCATS], and InSync), this methodology of downloading new timings is more reliable, safer, and less error prone. In addition, the approach of ACSLITE is proven to require minimal capital investment, infrastructure, detectors, configuration, and calibration. The system operation has been validated in over 20 deployments nationwide to produce improvements to travel time and system delay over actuated-coordinated operation with TOD plans. Long-term benefits not typically captured in a short before-and-after study are also accrued over time as the traffic patterns shift due to construction, incidents, land use changes, and so on. In addition to the implementation of three optimization algorithms (cycle tuning, cycle selection, and phase sequence selection), several other key enhancements have been implemented in Kadence. The system requires three cycles of good observations of phase timing and detector data before making decisions but now checks every 30 seconds to identify if that requirement is satisfied. This vastly improves the responsiveness of the system versus the fixed-horizon scheme (five minutes, 10 minutes) implemented in the baseline ACSLITE system. The offset tuning algorithm has also been enhanced to search offsets in a range instead of only considering fixed changes (+5, 0, -5). By selecting larger search bounds (say, +/-20s), Kadence can quickly find the correct offset solution when the current solution is particularly poor. Kadence has a variety of configurable parameters to tailor the operation to the expectations of any agency. Certain adjustments can be disallowed and some phases can be excluded from optimization by pattern. Configurable parameters include: ◢ Exclude any phase from split tuning by pattern Start Reallocate ◢ Exclude or allow any lead-lag sequence by pattern ◢ Exclude or allow cycle tuning by pattern splits Calculate For all intersections ◢ Exclude or allow offset tuning by pattern ◢ Configure maximum deviation of splits from pattern offsets For all intersections values ◢ Configure maximum deviation of offsets from pattern modified For all values Calculate phase sequence changes intersections ◢ Configure minimum and maximum cycle time cycle ◢ Set phase minimum and maximum bounds by pattern, If Calculate cycle time by phase Cycle not modified ◢ Exclude or allow cycle selection Stop download all settings ◢ Select any phases for biasing, by pattern ◢ Configure operation by TOD and Pattern Kadence algorithm computation process 15058-RFP Configurable intersection parameters All Kadence algorithms and services operate at a central Traffic Management Center (TMC). There are no field hardware components to install or maintain. If a Kadence algorithm fails, controllers will return to their normal TOD operation. In addition, Kadence can be turned ON or OFF from central and scheduled to run on a TOD, day- of-week schedule. When Kadence is OFF, the controller will return to its regular non-adaptive operation as programmed in the controller (time based coordination [TBC] coordination or free, as configured). Kadence does not send hold or force-off commands to controllers, or suppress phase calls, so there is no risk of a controller getting stuck in a certain phase. All controller features operate normally including pedestrians, transit priority, and preemption. Kadence can run alongside an existing central system on an IP network using NTCIP or AB3418 protocols, depending on what is supported by the field device. Kadence is already integrated fully with the ASC/3. 15058-RFP How Does Kadence Meet Your Operational Objectives? Kadence can meet a variety of agency objectives, including: ◢ Maximize throughput on a coordinated route ◢ Manage the length of queues ◢ Provide smooth flow on a coordinated route ◢ Optimize operation to minimize phase failures ◢ Provide access equity for all phases at an intersection ◢ Combine these objectives Scheduling Kadence ON/OFF times Maximize the Throughput on a Coordinated Route Kadence maximizes throughput on a coordinated route by using a combination of offset tuning, split tuning, cycle tuning, and phase sequence selection. Kadence tunes offsets to provide smooth flow, which increases the throughput on the route by reducing stops. By tuning (increasing) the coordinated phase splits, more time can be provided to that route when the level of traffic on the side streets and other competing phases is reduced. In the split tuning algorithm, coordinated phase utilization measures can be biased so that more time for that movement is protected which provides more opportunities for progression along the route. If the coordinated phases are over a specified threshold for phase utilization, the cycle time can also be increased to provide additional throughput on the critical route. In addition, Kadence can modify the phase sequence to a lead-lag combination for left turns to increase the amount of time that the critical through route receives if there is very low opposing left-turn volume. 15058-RFP For example, a change from lead-lead to lag- lead would be predicated if: ◢ Phase 5 has a heavier utilization than phase 1 ◢ Phases 2 and 5 have heavier total utilization than phases 1 and 6 ◢ Offsets are then adjusted after the sequence change is evaluated and a similar comparison is done for the other barrier group (phases 3, 4, 7, and 8) Cycle Selection Throughput is also improved on coordinated routes by determining a decision to either implement the cycle time that is next in the TOD schedule earlier or later than was originally planned. This can be used in conjunction with the cycle tuning method (discussed below) or alone. This allows the system to adapt to changes to the beginning or end of peak periods. The same evaluation approach for the incremental cycle tuning algorithm described previously is used but rather than changing the cycle just a few seconds, the system enables the new cycle time immediately and recalculates splits and offsets appropriately. The algorithm begins considering implementing the next pattern in the TOD schedule early if it less than a configurable number of minutes before the next pattern change time. For example, this threshold time might be Phase utilization graphs show when critical phases are oversaturated set to 30 minutes prior to the schedule change so if the pattern is scheduled to be adjusted at 10:00 am, the algorithm will begin considering implementing the next pattern at 9:30 am. If the thresholds for phase utilization are not exceeded to implement a lower or higher cycle, the current cycle is retained. If the phase utilization thresholds are not exceeded after the scheduled time to change to the next cycle, the system can keep the current pattern in operation. After a configurable amount of time, however, the system will transition to the next pattern in the TOD. 15058-RFP Flexible graphing displays for phase utilization Action log of all adjustments including color coding 15058-RFP Kadence section configuration parameters Provide Smooth Flow Along Coordinated Routes Tuning offsets improves progression performance along primary routes for phases that are coordinated. Offset tuning algorithms are particularly straightforward. The proven and robust methodology used in ACSLITE is used in Kadence with several key enhancements. The concept of the data-driven offset adjustment algorithm is to maximize the number of vehicles arriving during the green phase. Periodically, small, incremental adjustments are made to the offset to maximize the total proportion of cyclic flow arriving to a green light. This concept is then expanded to consider and mitigate the effects of such modifications to the offset value for multiple approaches (including the consideration of cross-coordination on all four approaches) and the effects of changes at a given intersection on adjacent intersections. A user-configurable maximum deviation from the original setting (either an increase or decrease to the offset value) is defined for each offset to restrict the algorithm (if desired) from drifting too far away from the original solution. The user can also specify that this value is unbounded, which allows the system to search for any offset. For example, if the initial offset is 20s and the maximum deviation is set to 10s, the algorithm will be restricted to implement offsets with the range of 10s to 30s. Each controller considers a range of offset settings: no change, adjust up to seconds earlier, or adjust up to seconds later. The adjustment maximum step size is a user-configurable value. If the value is set at 10, for example, Kadence will search offsets in each step in the range of (+10, +9, +8, +7, …., 0, -1, -2, -3,….., -10). If the difference in the % arrivals on green between the evaluated offsets is not greater than small amount of improvement, say, 5%, the controller will remain at the current offset. This reduces transition events that do not result in significant improvement to performance. 15058-RFP Real-time historical time-space display showing Kadence green bands Two-way progression at certain times of day 15058-RFP Arrivals on green display for multiple offset values (in yellow) Arrivals on green display 15058-RFP Flexible aggregation of percent arrivals on green by TOD and DOW Purdue coordination diagrams showing percent arrivals on green for each cycle 15058-RFP Distribute Phase Times in an Equitable Fashion Splits are tuned by collecting volume and occupancy data from detectors at the stop bar of the intersection in the same way that was implemented in the ACSLITE project, which is similar to the methods used by SCATS and SCOOT. The algorithm attempts to equalize the degree of saturation on all the phases at the intersection. This algorithm also allows coordinated phases (or any phase, but this biasing is typically applied to coordinated phases) to have biased splits, so that progression is protected when the saturation level of the coordinated phase is lower than that of side-streets. Without such biasing, split adjustment methods that equalize the degree of saturation on all phases tend to focus more on providing adequate level of service (LOS) on side streets while Color-coded phase utilization display and configurable docking degrading progression along a critical route. Any phase can also be determined to be left out from the split tuning process. This is commonly applied to phases on minor side-streets that very occasionally experience bursty traffic flows that do not last more than a few minutes. In the absence of regular arrivals, the splits will be adjusted to the minimum possible value. Since the absence of traffic on the side-street will naturally result in additional time to the main street when the phase is skipped, the side-street phase may be set by the traffic engineer to a reasonable value that provides adequate LOS during the burst and kept fixed. Kadence will Color-coded phase utilization display with served splits adjust 15058-RFP the minimum and maximum constraints into account, and allows the user to either adhere to pedestrian crossing times or not. If the pedestrian crossing times are allowed to be larger than the split, then when a pedestrian pushes the button requesting service, the intersection will likely go into transition. In areas with low pedestrian volume, this is typically acceptable operation. If pedestrian volumes are quite high, it is more typical that the crossing constraints would be considered as minimum phase durations. Manage the Length of Queues Current algorithms in Kadence do not explicitly measure queue lengths, but queue detectors can be used to change Kadence operating parameters by putting the system into congestion management patterns when queue detector data exceeds a user- configured threshold. Queue lengths are balanced or managed by modifying splits, offsets, cycle time, and phase sequence. Future work will include integration of the methodology we developed in NCHRP 03-90 that tunes splits on a route based on measurement of the degree of oversaturation. This process uses the TOSI (temporal oversaturation level) and SOSI (spatial oversaturation level) measures to determine the amount of green time to add and subtract, respectively, from a phase. Simply speaking, there are two ways to deal with oversaturation: one is to increase the downstream output rate and the other is to constrain the upstream input rate. These two basic actions result in three mitigation strategies for an oversaturated phase. Congestion management logic configuration interface 15058-RFP At an Isolated Intersection, Optimize Operation with a Minimum of Phase Failure Cycle time is adjusted on a section- or arterial-wide basis to provide adequate capacity to operate all of the signals under capacity and reduce the occurrence of phase failure. Kadence uses a heuristic rule to adjust the cycle time up or down a given step size. In a straightforward fashion, if the cycle time is increased by four seconds, then every phase on the controller gets a proportion of the additional time. For example, if there are four phases per ring, one additional second is provided for each phase split. The split adjustment algorithm will refine the splits at a later step if this allocation results in uneven phase utilization. The step size is user- defined. Minimum and maximum cycle limitations are imposed including limitations by minimum green, pedestrian clearance times, and user-defined minimum and maximum cycles. As a reliability measure, there must be at least three cycles of vehicle- occupancy data for critical phase utilization monitoring detectors in the system to execute the cycle tuning algorithm. Tuning to balance the phase utilization levels This methodology will tend towards longer cycles during peak periods as traffic demand builds, which is generally accepted as an appropriate strategy. Recent research (NCHRP 03-90) we conducted is indicating that when the conditions are extremely oversaturated, shorter cycles will provide more efficient throughput. These improvements or algorithms have not yet been integrated into the system but are planned for future work. This will improve the capability of Kadence to provide sound decisions during incident response conditions, such as heavy diversion of flows from a freeway to a parallel arterial or frontage road system. 15058-RFP Checked in the cycle tuning algorithm are determined by the user. When the average phase utilization on these critical phases is above the user-defined threshold (say, 80% phase utilization) to increase the cycle, a given (the user-defined step size) number of seconds are added to the cycle time. Similarly, the system cycle time is decreased by a fixed number of seconds when the average of the phase utilization on the critical phases is less than a lower threshold (say, 50% phase utilization). A Combination of Two or More of These Strategies Kadence balances and optimizes combinations of operational objectives by running multiple algorithms together. Each algorithm can be enabled or disabled by pattern, so cycle tuning or other algorithms can be deliberately disabled by the traffic engineer by time of day. Five principal algorithms are included in Kadence for tuning splits, offsets, cycle time, and phase sequence. Based on the configurability of the system by TOD pattern, each of these objectives can be addressed at different times. The original ACSLITE system was designed for coordinated arterial corridors to provide smooth flow and address access equity. The additional features and algorithms added to Kadence in the last three years make the system applicable to a much wider range of situations including grids and interchanges. Additional features planned in the roadmap will extend Kadence’s applicability to oversaturated conditions and diversionary routes and groups. Field Configuration Requirements (Kadence) Good detection is the key ingredient to effective traffic control (adaptive or otherwise). Kadence uses detectors at the stop bar for tuning splits, cycle, and sequence. Kadence uses detection at mid-block, dilemma-zone, or exit zones to tune offsets and estimate queue lengths for adaptive operation during oversaturated conditions. Phases that do not have detection cannot be tuned, but other phases at the intersection can still be tuned with appropriate configuration. It does not matter what kind of detector is used (loops, radar, video, etc.). Stop bar detectors can be any length, and there is no specific length requirement. If new stop bar loops or zones are being added, shorter zones are better. Upstream zones should be as short as possible. Standard 6x6 loops or zones work well. There is no specific placement distance of advance loops or zones. Farther away from the intersection will produce better performance (except if using video that is monitoring both stop bar and advance zones where there is a balance between detection accuracy and fidelity). It is not necessary that every intersection has a full suite of lane-by-lane detection for every phase. Intersections with very minor side-street volumes can typically be configured for offset tuning only if stop-bar detection for the coordinated phases is not present. Lane-by-lane detection will improve performance significantly, but the system will operate with multiple lanes tied together into one detection channel, if necessary. Separating detection by lane is typically an inexpensive investment that will yield significant performance improvements. It is better to separate all of the channels (or none of the channels) at an intersection rather than doing some but not others, but Kadence will use the maximum utilization of all detectors configured for the phase for tuning. If video cameras are used, like with traditional actuated operation, mounting should be done to minimize occlusion of one or more lanes by vehicles. Advance and stop bar zones can be done with one camera if mounted properly (i.e., high enough). If detector channels are limited, right turn lanes with right-turn-on-red (RTOR) allowed can typically be removed from configuration if the movement has low risk of becoming popular at certain times of day in the future. 15058-RFP Field configuration data needed for understanding what will be needed for setup and operation of Kadence: ◢ Location and length of all detectors and operational status of loops, cameras, or cards/racks ◢ Detectors set for presence and not pulse operation ◢ Detector number assignments for each lane and which phase each detector calls (for interchanges, identify which phases are controlled by the same detectors) ◢ Phase to movement assignments (e.g., 2 = WBT) ◢ Default sequence and all allowable sequences ◢ Identification of which phases are on min or max recall and desirability or necessity to remain on this mode ◢ Identification of which detectors are currently tied together and whether or not they can be separated in the cabinet, pull box ◢ Available space for additional detection cards or racks for additional inputs ◢ IP communications parameters ◢ Distance between intersections (stop-bar to stop-bar) ◢ Offset reference mode Kadence detector layout Operational Performance Expectations The marketplace for ASCT is now quite mature, with offerings by essentially every central system provider and a few systems that are provided by third parties. Comparisons among ASCT technologies are challenging, since the performance results reported in before-and-after studies are relative to a specific “before” condition. In many applications where ASCT systems have shown relatively low incremental improvements, the before condition is typically quite adequate for the traffic situation or the metrics do not match the goals of the agency. In applications where vast improvements have been demonstrated over a relatively short time frame, the “before” condition is typically quite poor or inadequate for the traffic situation. In this case, the improvements shown by the ASCT have two components: (1) implementation of sound traffic engineering principles such as coordinated operation, syncing of controller clocks, and effective operational parameters, and (2) tuning of the baseline operational parameters over time to adjust to the inherent fluctuations in traffic flow. 15058-RFP In particular, arterials or systems where existing controllers are not coordinated (all signals in a corridor run free) or do not have interconnection or central system monitoring for syncing of controller clocks (offsets are not implemented effectively) experience immediate improvements to arterial travel time. In most evaluation studies that are typically very short-term (one week of before- and-after data is common), 80% of the improvements due to ASCT deployment are attributable to these basic traffic engineering principles and the remaining incremental benefits are due to the adaptive operation that adjusts to the fluctuations. Algorithms in Kadence have all been proven to provide improvements to operation in real-world deployments and verifications during SBIR-DTRT57-10-C-10044. This is the USDOT project where we took the ACSLITE core software algorithms and added the cycle tuning, sequence tuning, and other algorithm enhancements that resulted in Kadence. The best performance is typically achieved when all of the algorithms are enabled together based on the specific objectives and combined objectives of the agency. Over 10 evaluation studies of offset and split performance (ACSLITE) have shown significant reductions in arterial travel time and phase delays, including: ◢ 20% reduction in travel time in Columbus, OH ◢ 33% reduction in travel time in Houston, TX ◢ 40% reduction in travel time in Bradenton, FL ◢ 90% reduction in left turn delay in Houston, TX ◢ 25% reduction in travel time in Annapolis, MD Results for Kadence algorithm performance from SBIR-DTRT57-10-C-10044 are summarized here: ◢ Offset tuning alone: 20-30% reduction in travel time on linear arterial with one poorly set initial offset ◢ Offset tuning alone: 20-50% reduction in travel time on linear arterial with all offsets set poorly initially ◢ Split tuning alone: 33%-75% reduction in left turn delay when one left turn split is set initially incorrectly ◢ Split tuning alone: 33-90% reduction in left turn delays when all left turn splits are set initially incorrectly ◢ Split and sequence adjustments together: 50-70% reduction in left turn delays when left turn splits are set initially incorrectly ◢ Split, sequence, and offset adjustments together: 50-70% reduction in left turn delays when left turn splits are set initially incorrectly 15058-RFP ◢ Sequence and split adjustments together: 20-40% reduction in queue lengths when splits and sequence are set initially incorrectly ◢ All algorithms together: 20-80% reductions in average delay per vehicle and similar improvements to the incremental tests above for travel time and queue length improvements when initial settings are inappropriate ◢ All algorithms together: 15% reduction in average delay per vehicle during oversaturated conditions on an arterial ◢ All algorithms together: 15% reduction in total delay during oversaturated conditions on an arterial ◢ All algorithms together: 10% reduction in total stops during oversaturated conditions on an arterial Example comparison of Kadence (green) versus TOD (gray) on Dobson Road in Mesa, AZ In summary, Kadence algorithms have been validated to provide improvements to traffic operations. When the baseline conditions are poor, all adaptive systems can show significant improvements with a combination of “raising the floor” by implementing synchronized clocks and basic coordination, and “pushing on the ceiling” by adapting to the fluctuations in traffic demand. Our philosophy of operation is that sound traffic engineering principles based on actuated-coordinated features of all modern controllers are the cornerstone of the deployment of any adaptive system. All adaptive systems need good initial parameters and configuration to operate effectively, and match their configuration parameters to the objectives of the agency at certain times of day. Kadence is fully configurable to change the adaptive objectives by time period focusing on throughput and arterial coordination at AM and PM peaks and on equitable distribution of green in off-peak times or on combinations of objectives. The true promise of Kadence and similar ASCTs is the long-term benefits that accrue over time as the system continues to adapt operation as traffic patterns change. 15058-RFP Example display of arrivals on green in Mesa, AZ showing majority of percent arrivals above 90% Real-time time-space diagram showing green bands along Alma School Road in Mesa, AZ 15058-RFP Example performance improvements of Kadence in Florida Example performance improvements of Kadence in Houston, TX 15058-RFP Schematic Diagram — Kadence Kadence is a centralized adaptive system. Each intersection is connected to the Kadence server via IP communications using NTCIP. Kadence polls each controller once per second for status and downloads new cycle, split, offset, and sequence information approximately every three cycles. Kadence will receive commands from KITS, to turn intersections ON/ OFF and set operational modes.. KITS will also connect to each field intersection using NTCIP in parallel with Kadence. This has worked well in Mesa, Arizona where Kadence and Centracs both connect to the field intersections with no problems over IP communications. 15058-RFP Understanding of the System Requirements Kadence meets more than 95% of your operational requirements without modification. Our system is open-architecture and supports all field devices using NTCIP standards- based communications and will integrate directly as a module of the existing KITS system. We believe that Kadence meets your adaptive needs and will be a solution that the City of Surprise will find to be simple to understand and operate. Kadence can be configured to be as flexible as your requirements suggest, but also can be made to operate quite simply. Since we use common traffic engineering terminology, it is easy to understand what is going on. Also, since Kadence simply downloads new parameters to the field controllers, you always can feel safe that the intersection controllers continue to cycle and operate as expected during preemption and during pedestrian crossings. You clearly want a system with the following functions: ◢ Cycle, split, offset, and sequence tuning ◢ The ability to change the operational strategy by TOD—maximizing throughput in the AM and PM peaks and providing more equitable service to all phases during the midday and weekend periods ◢ A fully featured system with alarms, alerts, reports, and user security ◢ A system with configurable minimum and maximum bounds for phase timings and other user-configurable “knobs” ◢ A system that operates like a modern actuated-coordinated traffic controller with fixed or floating force offs, conditional service, flashing yellow arrow (FYA), and protected-permitted left-turn (PPLT). Kadence GUI showing real-time changes to splits All these features are provided by Kadence. Kadence is a suite of major upgraded features built on the proven algorithms and metrics developed in the ACSLITE program. At Kimley-Horn, we have taken the ACSLITE core application features and added cycle tuning, sequence tuning, TOD schedule tuning, and a ton of performance reports and displays. Kadence is a fully featured ATMS with alarms, alerts, and user security and completely operates as a module of KITS. 15058-RFP Along with the installation of Kadence, the City of Surprise will receive the most recent version of the full KITS suite including the new GUI interface, performance reports, internet maps, and a host of major enhancements to your existing system. The City of Surprise will receive a perpetual license to use and deploy Kadence on any signal within the entire City of Surprise. The long-term value for the City simply cannot be matched by other vendors. As indicated in the requirements table, there are a number of items that we propose adding as optional items. These features will be only be charged to MCDOT once as part of this project, so if one, two, three, of four sections of the Bell Road ASCT project select Kadence, these optional items will only be developed once. The license for Kadence extends throughout the entire corridor and on 200 additional intersections in the region in addition to the entire City of Surprise, not only the sections identified by MCDOT and the partner agencies, so there is significant accrued benefits in selecting Kadence for multiple locations. To aid review of the proposal and the lengthy requirements table, we highlight those items that will require additional development work here: 1. Enhancements to the adaptive methods for measurement of queue lengths (2.1.3.0-1 and associated, 6.0.5) 2. Omitting phases (select a different sequence) when the cycle length is reduced past a certain user-selected threshold (2.1.2.0-6) 3. Accelerating the ability of the cycle length to be modified when user-specified changes to the traffic conditions occur (2.2.0-5.0-4.0-1) 4. A module for tuning the baseline traffic signal parameters set (TOD schedule, cycles, splits, and offsets) that learns from the adaptive changes made by Kadence over time (Multiple) 5. Ability to replace failed detectors with a historical value or use a historical split (13.1.0-2.0-1 and 0-3) WORK PLAN The project plan for each section of the corridor is as follows: ◢ Task 1: Project management and mobilization ◢ Task 4: Integrate enhancement features ◢ Task 5: Configure and tune system #2 ◢ Task 2: Install Kadence services and upgrade KITS) ◢ Task 6: Training ◢ Task 3: Configure and tune system ◢ Task 7: Operate system ◢ Task 8: System maintenance and support 15058-RFP TASK 1: Intersection Detection Identification In Task 1, Kimley-Horn will manage the deployment of Kadence in conjunction with City staff, MCDOT, and team representatives. Dr. Gettman and Stewart Allen of Kimley-Horn will manage the deployment of Kadence for the City. This task will include a kickoff meeting and periodic project progress meetings. Kimley-Horn will coordinate with City staff and detection installation contractors, as appropriate, to ensure that the field network and setup is ready to go before beginning installation and deployment of Kadence. Kimley-Horn anticipates waiting until the detection installation or lane-by-lane detection configuration is complete before beginning work on configuring Kadence. Kimley-Horn will upgrade the City of Surprise KITS system as soon as practicable during the installation and configuration of detectors. KHA shall work cooperatively with MCDOT and MCDOT’s design consultant to identify specific detection to be provided on each approach, for each movement, resulting from the ASCT system configuration mutually agreed to by MCDOT and KHA for this project. Such detection will be provided by MCDOT under separate contract. KHA in conjunction with City of Surprise technical staff shall specify, detection distances, zone(s), output configuration (channels) and method of verification of suitable detection implementation. MCDOT shall review and approve system provider’s recommendations for detection implementation. Final plans shall be the responsibility of MCDOT. KHA shall note that 15 specific locations are available for intrusive detection (loops). All others shall use non-intrusive detection methods that do not result in any ground disturbance. Task 1 shall not be considered complete until final plans are approved and accepted by MCDOT. KHA shall also supply specifications for detection technologies and systems that are compatible with their system resulting in maximum system effectiveness. KHA shall identify any detection technologies or systems that are incompatible with or unsuitable for use with their proposed system. TASK 2: Initial System Installation and Training The system provider shall deliver, install, configure and set up all hardware and software associated with the ASCT system, and conduct agency staff training per the terms and conditions of this agreement. System provider shall acknowledge that the field detection elements, installed by separate contract, unless specifically made a part of the system provider's contract herein, shall be in-place and functional prior to full ASCT implementation and agency staff training. After the detection field work is complete, the Kimley-Horn team will install the Kadence software at the City of Surprise TMC. Kadence is a suite of software services and a client GUI for configuration, real-time monitoring, and reporting. The Kadence system works on Windows server, desktop, and laptop computers with structured query language (SQL) server database. Kadence also requires installation of Microsoft Office (Excel and Access) and Adobe PDF for some reports. We will work with the City of Surprise Information Technology (IT) department to configure the Kadence server and install the GUI on client computers with City of Surprise IT network policies. Kimley—Horn will provide initial training for City and MCDOT staff on Kadence operations. TASK 2.1: Configure and Tune System After the services are installed, the Kimley-Horn team will configure the Kadence parameters for the 20 signals in the City of Surprise. ◢ Upload configuration data from each field controller using NTCIP ◢ TOD schedule ◢ Detector to phase assignments ◢ Coordination patterns (cycle, splits, offset, sequence, etc.) ◢ Phase timings (min green, yellow, red, walk, etc.) which links ◢ Determine which algorithms to use on each location and setup their configuration parameters ◢ Put the system in “monitoring” mode to verify configuration is correct ◢ Enable system in adaptive mode ◢ Tune as desired based on field operation feedback The Kimley-Horn project manager (Dr. Gettman) and software development lead (Stewart Allen) will be on-site during configuration. TASK 3: Installation of features (Bundle 1) We will upgrade Kadence to include additional functionality as requested in the RFP at no additional cost . 15058-RFP 1. Accelerating the ability of the cycle length to be modified when user-specified changes to the traffic conditions occur 2. Ability to replace failed detectors with a historical value or use a historical split We will also develop an acceptance test procedure (based on use cases) for each feature set in conjunction with MCDOT and the signal partners so we are in agreement on what will be developed and how it will be implemented. We anticipate that implementation of these upgrades will be accomplished within six months of NTP. TASK 4: Installation of features (Bundle 2) We will upgrade Kadence to include additional functionality as requested in the RFP at no additional cost 1. Omitting phases (select a different sequence) when the cycle length is reduced past a certain user-selected threshold 2. A module for tuning the baseline traffic signal parameters set (TOD schedule, cycles, splits, and offsets) that learns from the adaptive changes made by Kadence over time 3. Queue estimates and displays We will also develop an acceptance test procedure (based on use cases) for each feature set in conjunction with MCDOT and the signal partners so we are in agreement on what will be developed and how it will be implemented. We anticipate that implementation of these upgrades will be accomplished within six months of NTP. TASK 4.1: Configure and Tune System (#2) After the services are upgraded for each enhancement feature in Task 4, the Kimley-Horn team will configure the Bell Road system for the new functionality in conjunction with the City of Surprise. Since Kadence will already be running with base functionality, this additional configuration and tuning will focus on how the additional features impact operations and configuration in certain real- world situations. We anticipate that this configuration and tuning will require several weeks of on-site work to ensure that the City staff are comfortable with field operations and use of the new functionality. The Kimley-Horn project manager (Dr. Gettman) will be on-site during configuration and setup of the new features and tuning of the operations. TASK 5: Final Acceptance KHA shall attain Final Acceptance from MCDOT based on successfully passing the testing requirements of the MCDOT approved Verification Plan, which test functionality and compliance to the System Technical Requirements agreed to by the system provider under the terms and conditions of this agreement. TASK 5.1: Training After the system is configured per the City’s liking, training for the City will be provided. This training will be provided for a variety of user skill sets and levels per the requirements. Managers and officials will be provided an overview of operational principles and key metrics. Technicians and hands-on users will be provided more in-depth explanation and discussions of algorithm principles and configuration parameters. Training will last approximately one day. Additional refresher training sessions are anticipated to be provided on a quarterly basis, as desired by the City.. Kimley-Horn will provide a section of the online manual on Kadence configuration and operations as part of this task. TASK 6: System Management and Support After the system is operating, Kimley-Horn will provide support via on-site visits, webinar, phone, remote login, and email. Remote login capability via secure remote desktop or virtual private network (VPN) is critical for providing rapid response support from our Software and Traffic Engineering Support team in Phoenix, AZ. During the maintenance period of the project, Kimley-Horn will provide any necessary updates to services and support the City staff with operational questions when they arise. Maintenance and support services are supplied for this project for Years 2-5 on a lump sum basis at the beginning of Year 2. As part of the project, Kimley-Horn will include all travel expenses for one City staff member to attend the annual Kadence User Group meeting each year.. 15058-RFP PROJECT SCHEDULE Section 1 Surprise Task/Month 1 2 3 4 5 6 7 8 9 10 11 12 Year 2 Year 3 Year 4 Year 5 18. PROJECT MANAGEMENT Kickoff Meeting Task 4 – Development Schedule Progress Meeting 2. INSTALL KADENCE AND UPGRADE KITS Upgrade KITS Install Kadence 3. CONFIGURE AND TUNE SYSTEM Initial Configuration Tuning 4. INTEGRATE ENHANCEMENT FEATURES Multi-Agency System Design Workshop Interface to ICM/RADS Oversaturation Management Omitting Phases at Low Cycle Times Accelerating Cycle Adjustment Speed TOD Tuner & Learning Module TOD/DOW/Day-to-Day Comparison Tool Route Preemption with ASC/3 Replace Detector Data with Historical Log Changes to Adaptive Settings Feature Acceptance 5. CONFIGURE AND TUNE SYSTEM (#2) Configuration of Task 4 Features Tuning Checkup 6. TRAINING City Training 7. OPERATE SYSTEM Operation Checkups 8. SYSTEM MAINTENANCE AND SUPPORT Kadence User Group Meeting 15058-RFP Proposal for DELIVERABLES 1. Upgrade to KITS to most recent version including the enhanced GUI 2. License to use Kadence on any signal in the City of Surprise 3. Configuration of Kadence on up to 20 signals on Bell Road 4. User manual for Kadence 5. A minimum of 40 hours of training on Kadence 6. Two training sessions within 6 months of NTP (one of the training sessions will be months after installation so users have the opportunity to gain experience and generate questions) 7. Four years of maintenance 8. Kadence server computer 9. Upgrade for accelerating the ability of the cycle length to be modified when user-specified changes to the traffic conditions occur 10. A module for tuning the baseline traffic signal parameters set (TOD schedule, cycles, splits, and offsets) that learns from the adaptive changes made by Kadence over time 11. Upgrade for ability to replace failed detectors with a historical value or use a historical split 12. Upgrade for ability to display of queue estimates from advance detectors 13. Upgrade for the ability to alter the sequence below a certain cycle time ATTACHMENT C-1 TECHNICAL REQUIREMENTS & RESPONSES PROJECT AREA 1 Version March 26, 2015 Project Area #1: Bell Road Proposer Response 2.1 and Grand Avenue from Cotton Lane through Ave of the Arts/114th Avenue 15058-RFP Sys Reqs Level of System Concept of Operations Meet Proposer Written Description Verification Reference Importance Requirements Need Statements from Requirements of How Proposed System Method Number Final FHWA Model (Yes or No) Fulfills Requirement Documents, FHWA-HOP- 11-027, Appendix B 1 1 Network Characteristics 1.0-1 5 The ASCT shall 4.2.0-1 yes The license for Kadence will observation control a minimum The system operator needs include license for use for any of 22 signals to eventually adaptively signal in the entire City of concurrently control up to 22 signals Surprise. from the City of Surprise TMC located on Litchfield Road, south of Bell Road and from satellite locations at the City of Surprise City Hall and signal shop located at the maintenance yard located north of Bell Road and 134th Avenue and the ADOT TOC located at 2302 West Durango Street, Phoenix, AZ 85009. 1.0-2 5 The ASCT shall 4.2.0-2 yes There is no practical limit to observation support groups of The system operator needs the number of groups. signals. to be able to adaptively control a minimum of 2 groups of signals. The system will control intersections in groups that are defined by the operator. 4.2.0-3 15058-RFP The system operator needs to vary the number of signals in an adaptively controlled group. A group of intersections may be comprised of simply one intersection, or up to the total number of intersections that are sufficiently close to warrant coordination under the prevailing traffic conditions. 1.0-2.0-1 5 The boundaries 4.2.0-2 yes Groups can include any observation surrounding signal The system operator needs number of signals and have controllers that to be able to adaptively any desired coordination operate in a control a minimum of 2 pattern (does not have to only coordinated fashion groups of signals. The be linear) shall be defined by system will control the user. intersections in groups that are defined by the operator. 1.0-2.0-2 5 The ASCT shall 4.2.0-2 yes There is no practical limit to observation control a minimum The system operator needs the number of groups. of 2 groups of signals to be able to adaptively control a minimum of 2 groups of signals. The system will control intersections in groups that are defined by the operator. 1.0-2.0-3 4 The size of a group 4.2.0-3 yes There is no practical limit to observation shall range from 1 to The system operator needs the number of signals in a 22 signals. to vary the number of group signals in an adaptively controlled group. A group of intersections may be 15058-RFP comprised of simply one intersection, or up to the total number of intersections that are sufficiently close to warrant coordination under the prevailing traffic conditions. 1.0-2.0-4 Each group shall 4.2.0-2 yes observation 4 operate The system operator needs independently to be able to adaptively control a minimum of 2 groups of signals. The system will control intersections in groups that are defined by the operator. 1.0-2.0- 5 The boundaries 4.2.0-3 yes Kadence is based on changing View action log 5.0-1 surrounding signal The system operator needs coordination pattern sets by display controllers that to vary the number of TOD schedule operate in a signals in an adaptively coordinated fashion controlled group. A group shall be altered by of intersections may be the system according comprised of simply one to a time of day intersection, or up to the schedule. (For total number of example: this may be intersections that are achieved by sufficiently close to assigning signals to warrant coordination different groups or under the prevailing traffic by combining conditions. groups.) 1.0-2.0- 5 The boundaries yes See page 1 of separate Configure 15058-RFP 5.0-2 surrounding signal response congestion controllers that detector and operate in a observe pattern coordinated fashion switching shall be altered by the system according to traffic conditions. (For example: this may be achieved by assigning signals to different groups or by combining groups.) 1.0-2.0- 5 The boundaries yes By commanding patterns observation 5.0-3 surrounding signal controllers that operate in a coordinated fashion shall be altered by the system when commanded by the user. 2 2 Type of Operation 2.1 2.1 General 2.1.1 2.1.1 Mode of Operation 2.1.1.0-2 5 The ASCT shall 4.14.0-1 yes See page 1 of separate stop Kadence operate non- The system operator needs response service at central adaptively when the to fall back to TOD or adaptive control isolated free operation, as equipment fails. specified by the operator, 2.1.1.0- 5 The ASCT shall without causing disruption yes The detector diagnostics on unplug detector 2.0-1 operate non- to traffic flow, in the event the controller need to be card adaptively when a of equipment, configured for this purpose. user-specified communications and detector fails. 15058-RFP 2.1.1.0- 5 The ASCT shall software failure. yes Kadence will disable tuning for unplug detector 2.0-2 operate non- each phase that has no cards adaptively when the working detectors and return number of failed the system to its original split. detectors connected There is no threshold for the to a signal controller user to set exceeds a user- defined value. 2.1.1.0- 5 The ASCT shall yes See page 1 of separate unplug lots of 2.0-3 operate non- response detector cards adaptively when the number of failed detectors in a group exceeds a user- defined value. 2.1.1.0- 4 The ASCT shall yes The controller will return to 2.0-4 operate non- TOD operation if it loses adaptively when a communication from the user-defined Kadence central service. communications link fails. 2.1.1.0-3 5 The ASCT shall 4.7.0-3 yes Individual intersections and demonstration operate non- The system operator needs groups can be manually adaptively when a to over-ride adaptive commanded to stop adapting. user manually operation. When operator commands the ASCT is advised of an incident to cease adaptively that will increase demand, controlling a group of the operator selects an signals. appropriate flush plan. The 2.1.1.0-4 5 The ASCT shall operator will schedule an yes Flush plans assigned through demonstration operate non- ending time for the event. KITS can override adaptive adaptively when a The flush plan will remain operation user manually in place until either the commands the ASCT scheduled end time passes to cease adaptive or the operator cancels the operation. plan. 2.1.1.0-5 5 The ASCT shall 4.7.0-2 yes See page 1 of separate observation 15058-RFP operate non- The system operator needs response adaptively in to schedule pre- accordance with a determined operation by user-defined time-of- time of day. day schedule. 4.7.0-3 The system operator needs to over-ride adaptive operation. When operator is advised of an incident that will increase demand, the operator selects an appropriate flush plan. The operator will schedule an ending time for the event. The flush plan will remain in place until either the scheduled end time passes or the operator cancels the plan. 2.1.1.0-6 4 The ASCT shall 4.17.0-2 yes Kadence can be turned off use case operate non- The system operator needs from KITS. We would have to acceptance adaptively when to react to commands add the feature to receive a testing commanded by an issued by KITS and future command from an external external system decision support system, system to disable Kadence process. such as an ICM system. A through a C2C TMDD service. signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in operation until the command from the external source is removed. 15058-RFP 2.1.1.0-7 5 The ASCT shall alter 4.1.0-1.0-3 yes See page 1 of separate observation the adaptive Distribute phase times in response operation to achieve an equitable fashion. required objectives During moderate to light in user-specified traffic conditions, one or conditions. The ASCT more phases may be shall alter the state omitted (e.g., a protected of the signal phase if controllers based on protected/permissive left current measured turns are operated), in traffic conditions. order to more efficiently (The alteration may serve other movements, be made by adjusting provided it is safe to do so. parameters or by This may be accomplished directly controlling through a time of day the state of signal schedule or based on the controllers.) measured traffic conditions. 4.1.0-3 The system operator needs to change the operational strategy (for example, from smooth flow to managing queues) based on changing traffic conditions. 2.1.1.0- 5 When current 4.1.0-3 yes See page 2 of separate observation 7.0-1 measured traffic The system operator needs response. conditions meet to change the operational user-specified strategy (for example, criteria, the ASCT from smooth flow to shall alter the state managing queues) based of the signal on changing traffic controllers, conditions. maximizing the throughput of the coordinated route. 15058-RFP 2.1.1.0- 5 When current 4.1.0-1.0-4 yes See page 2 of separate observation 7.0-2 measured traffic The objective of the response. conditions meet coordination will be to user-specified manage the lengths of criteria, the ASCT queues stored at critical shall alter the state locations within the of signal controllers, coordinated group so that preventing queues long queues do not block from exceeding the upstream intersections or storage capacity at otherwise reduce the user-specified capacity available during locations. the green phases. This will involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.1.1.0- 5 When current 4.1.0-1.0-3 yes See page 2 of separate observation 7.0-3 measured traffic Distribute phase times in response. conditions meet an equitable fashion. user-specified During moderate to light criteria, the ASCT traffic conditions, one or shall alter the state more phases may be of signal controllers omitted (e.g., a protected providing equitable phase if distribution of green protected/permissive left times. turns are operated), in order to more efficiently serve other movements, 15058-RFP provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 4.1.0-3 The system operator needs to change the operational strategy (for example, from smooth flow to managing queues) based on changing traffic conditions. 2.1.1.0- 5 When current 4.1.0-1.0-2 yes See page 2 of separate observation 7.0-4 measured traffic The objective of the response. conditions meet coordination will be to user-defined criteria, provide for smooth flow the ASCT shall alter along the arterial road, the state of signal minimizing the number of controllers providing stops experienced by two-way progression vehicles traveling along the on a coordinated road. Where two-way route. progressions are permitted by "natural" cycle lengths, the system will generally operate at one of those cycle lengths unless longer phase lengths are required to accommodate the demand. 4.1.0-3 The system operator needs to change the operational strategy (for example, from smooth flow to managing queues) based 15058-RFP on changing traffic conditions. 2.1.1.0-8 5 The ASCT shall 4.1.0-1.0-3 yes See page 3 of separate observation provide maximum Distribute phase times in response. and minimum phase an equitable fashion. times During moderate to light traffic conditions, one or more phases may be omitted (e.g., a protected phase if protected/permissive left turns are operated), in order to more efficiently serve other movements, provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 2.1.1.0- 5 The ASCT shall 4.10-1.0-6 yes See page 3 of separate observation 8.0-1 provide a user- At an isolated intersection response. specified maximum with widely varying traffic value for each phase patterns and a high degree at each signal of saturation during peak controller. times, the system will 2.1.1.0- 5 The ASCT shall not calculate the optimum yes See page 3 of separate observation 8.0-1.0-1 provide a phase cycle length, phase response. length longer that sequence and phase times the maximum value. in real time to match the 2.1.1.0- 5 The ASCT shall changing traffic conditions. yes See page 3 of separate observation 8.0-2 provide a user- response. specified minimum value for each phase at each signal controller. 15058-RFP 2.1.1.0- 5 The ASCT shall not yes See page 3 of separate observation 8.0-2.0-1 provide a phase response. length shorter than the minimum value. 2.1.1.0-9 5 The ASCT shall detect 4.1.0-4 yes See page 3 of separate observation repeated phases that The system operator needs response. do not serve all to detect repeated phase waiting vehicles. failures and control signal (These phase failures timing to prevent phase may be inferred, failures building up such as by detecting queues. The operator in repeated max-out.) this case is trying to 2.1.1.0- 5 The ASCT shall alter prevent a routine queue yes See page 3 of separate observation 9.0-1 operations, to from forming where it will response. minimize repeated block another movement phase failures. in the cycle unnecessarily. For example, the operator may need to prevent a queue resulting from the trailing end of the through green from blocking the storage needed by an entering side-street left turn in the subsequent phase. An overall queue management strategy, particularly when congestion is present, is covered under 4.1.0-1.0-5. 2.1.1.0-10 3 The ASCT shall 4.1.0-1.0-2 yes Kadence will select a phase observation determine the order The objective of the sequence which will improve of phases at a user- coordination will be to throughput and flow by specified provide for smooth flow comparing the combination of intersection. (The along the arterial road, flows on the compatible left calculation will be minimizing the number of turns and through movements based on the stops experienced by with the combination of both optimization vehicles traveling along the through movement flows and 15058-RFP function.) road. Where two-way both left-turn flows to select progressions are permitted lead-lead, lead-lag, lag-lead, by "natural" cycle lengths, and lag-lag appropriately the system will generally according to the following operate at one of those algorithm: ADD TABLE. Test by cycle lengths unless longer setting the phase sequence at phase lengths are required a known location to be to accommodate the deliberately backwards (lead- demand. lag when lag-lead is clearly 4.1.0-1.0-4 superior). Observe that The objective of the sequence is switched to the coordination will be to appropriate sequence. manage the lengths of queues stored at critical locations within the coordinated group so that long queues do not block upstream intersections or otherwise reduce the capacity available during the green phases. This will involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.1.2 2.1.2 Allowable Phases 2.1.2.0-1 5 The ASCT shall not 4.9.0-1.0-14 yes See page 4 of separate 15058-RFP prevent Protected/permissive response. protected/permissive phasing and permissive left turn phase only phasing. operation. 2.1.2.0-2 5 The ASCT shall not yes This is a function of the signal observation prevent the controller. Kadence is fully protected left turn compatible phase to lead or lag the opposing through phase based upon user-specified conditions. 2.1.2.0-3 5 The ASCT shall 4.9.0-1.0-6 yes This is a function of the signal observation prevent skipping a The ability to maintain controller. Kadence is fully user-specified phase coordination with external compatible when the user- movements by preventing specified phase phases from being sequence is skipped, or by omitting operating. phases, based on time-of- 2.1.2.0-4 4 The ASCT shall day, external input or yes This is a function of the signal observation prevent skipping a when certain phase controller. Kadence is fully user-specified phase sequences are in compatible based on the state of operation. a user-specified 4.17.0-2 external input. The system operator needs to react to commands issued by KITS and future decision support system, such as an ICM system. A signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in 15058-RFP operation until the command from the external source is removed. 2.1.2.0-5 5 The ASCT shall 4.9.0-1.0-6 yes This is a function of the signal observation prevent skipping a The ability to maintain controller. Kadence is fully user-specified phase coordination with external compatible according to a time movements by preventing of day schedule. phases from being 2.1.2.0-6 5 The ASCT shall omit a skipped, or by omitting No See page 4 of separate use case user-specified phase phases, based on time-of- response. acceptance when the cycle day, external input or testing length is below a when certain phase user-specified value. sequences are in 2.1.2.0-7 5 The ASCT shall omit a operation. yes This is a function of the signal observation user-specified phase controller. Kadence is fully based on measured compatible traffic conditions. 2.1.2.0-8 4 The ASCT shall omit a yes This is a function of the signal observation user-specified phase controller. Kadence is fully based on the state of 4.17.0-2 compatible a user-specified The system operator needs external input. to react to commands issued by KITS and future decision support system, such as an ICM system. A signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in operation until the command from the 15058-RFP external source is removed. 2.1.2.0-9 5 The ASCT shall omit a 4.9.0-1.0-6 yes This is a function of the signal observation user-specified phase The ability to maintain controller. Kadence is fully according to a time coordination with external compatible of day schedule movements by preventing phases from being skipped, or by omitting phases, based on time-of- day, external input or when certain phase sequences are in operation. 2.1.2.0-10 5 The ASCT shall assign 4.9.0-1.0-10 yes observation unused time from a preceding phase that terminates early to a user-specified phase as follows: * Next phase; Allow the operator to * Next coordinated specify which phase See page 4 of separate observation phase; receives unused time from response. * User-specified a preceding phase. Within See page 4 of separate observation phase. these operational response. 2.1.2.0-11 5 The ASCT shall assign objectives, the ASCT yes This is a function of the signal observation unused time from a system will change its controller. Kadence is fully preceding phase that operation to compatible is skipped to a user- accommodate the rise and specified phase as fall of volumes through the follows: peaks and the changing * Previous phase; patterns of flow throughout the day and * Next phase; week. However, there is * Next coordinated also a stochastic element phase; 15058-RFP * User-specified to traffic in the short term, phase. with the number of arrivals for a phase varying from cycle to cycle, and pedestrians not being present on all phases in all cycles. It is therefore desirable for the system to have some local tactical control. While vehicle- actuated coordination typically allows phases to run longer or shorter from cycle to cycle to match the actual number of vehicles using the phase, the system will also allow the operator to decide where the unused time will be used. If a phase is to be skipped, the operator can specify that the spare time will be added to the existing phase, the following phase or the next coordinated phase. 2.1.3 2.1.3 Oversaturation 2.1.3.0-1 5 The ASCT shall detect 4.1.0-1.0-4 yes See page 4 of separate observation the presence of The objective of the response. queues at pre- coordination will be to configured locations. manage the lengths of queues stored at critical locations within the coordinated group so that long queues do not block upstream intersections or otherwise reduce the 15058-RFP capacity available during the green phases. This will involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.1.3.0-2 5 When queues are 4.1.0-1.0-5 yes queue detectors can be observation detected at user- Manage the locations of configured in Kadence and specified locations, queues within the used to trigger specific the ASCT shall network. Beyond the response plans when the execute user- coordinated system, there queue exceeds detector specified timing is a capacity constraint thresholds. Similarly if the plan/operational that regularly results in occupancy level on the queue mode. queuing back into the detector is below a threshold, system. This reduces the an alternative pattern can be throughput available enabled or the system can go during green on the back to "normal" adaptive coordinated movement, operation. Test by configuring and increasing congestion queue detectors and queue is measured within the detection thresholds and system. While the normal observing that the system will response to increased enable a queue management congestion within the pattern and go back to system would normally be "normal" operation when the to increase cycle length, queue is reduced at the phase times and other detection location. parameters to increase the capacity for the relevant 15058-RFP movements, when the queuing originates outside the system, this will not be the appropriate response. In these circumstances, it is normally more appropriate for the system to reduce the throughput into the bottleneck or reduce the size of platoons, so that the queuing does not block other movements within the system. The system will detect the presence of this condition or the presence of queues and take appropriate action to reduce the volume of traffic joining the queue, such as reducing green time or omitting phases. 2.1.3.0-3 5 When queues are 4.1.0-4 yes queue detectors can be observation detected at user- The system operator needs configured in Kadence and specified locations, to detect repeated phase used to trigger specific the ASCT shall failures and control signal response plans when the execute user- timing to prevent phase queue exceeds detector specified adaptive failures building up thresholds. Similarly if the strategy in queues. The operator in occupancy level on the queue accordance with this case is trying to detector is below a threshold, requirements prevent a routine queue an alternative pattern can be 2.1.1.0-2 (The ASCT from forming where it will enabled or the system can go shall operate non- block another movement back to "normal" adaptive adaptively when in the cycle unnecessarily. operation. Test by configuring adaptive control For example, the operator queue detectors and queue equipment fails.). may need to prevent a detection thresholds and queue resulting from the observing that the system will 15058-RFP trailing end of the through enable a queue management green from blocking the pattern and go back to storage needed by an "normal" operation when the entering side-street left queue is reduced at the turn in the subsequent detection location. phase. An overall queue management strategy, particularly when congestion is present, is covered under 4.1.0-1.0-5. 4.5.0-1 The system operator needs to detect queues from outside the system and modify the ASCT operation to accommodate the queuing. Occasionally, as the result of an incident or other event outside the control of the system and outside the area covered by the system, congestion will propagate back into the adaptive control area and the measured traffic conditions will be outside the range of data that can be processed by the system. In locations where this is likely to occur, the intersection detectors, or queue detectors installed specifically for this purpose, will measure increased occupancy. In such cases, when user- specified signal timing and 15058-RFP detector occupancy conditions are met, the system will recognize that its response to the input data may not be appropriate, and it will revert to an appropriate, user-specified fallback mode, either time-of-day operation or free operation. The fallback mode will be specified by the user based on location and time of day. 4.5.0-2 The system operator needs to detect queues within the system's boundaries and modify the ASCT operation to accommodate the queuing. Periodic interruptions to flow on a side street, such as due to a railroad grade crossing, will create queues that may extend back to the coordinated route. The system will detect the presence of this condition or the presence of queues and take appropriate action to reduce the volume of traffic joining the queue, such as reducing green time or omitting phases. The grade 15058-RFP crossing blocks the coordinated routes when the gates are down. The gates are down for two to 10 minutes approximately once per hour. The gates have a history of remaining stuck in the down position four to six times a year. Grand Avenue is currently involved in the railroad preemption, but 134th Drive is not. Vehicles block the 134th Drive intersection with each preemption and requires clearance in both directions once the preemption is released. A grade separated interchange at Bell Road and Grand Avenue (US 60) is identified for construction in 2015. ASCT may be beneficial for traffic operations during construction. Proposers should provide high-level explanation of how the ASCT could be implemented prior to the start of the interchange construction and adjusted once the grade separation is completed. If not recommended, state this, and major 15058-RFP challenges/reasons. 4.5.0-3 The system operator needs to detect queues propagating outside its boundaries from within the ASCT boundaries (Grand Avenue and SR Loop 303), and modify its operation to accommodate the queuing. 4.5.0-4 The system operator needs to store queues in locations where they can be accommodated without adversely affecting adaptive operation. 4.5.0-5 The system operator needs to prevent queues forming 15058-RFP at user-specified locations. 2.1.3.0-4 5 When queues are 4.1.0-1.0-4 yes queue detectors can be detected at user- The objective of the configured in Kadence and specified locations, coordination will be to used to trigger specific the ASCT shall omit a manage the lengths of response plans when the user-specified phase queues stored at critical queue exceeds detector at a user-specified locations within the thresholds. Similarly if the signal controller. coordinated group so that occupancy level on the queue long queues do not block detector is below a threshold, upstream intersections or an alternative pattern can be otherwise reduce the enabled or the system can go capacity available during back to "normal" adaptive the green phases. This will operation. Test by configuring involve controlling phase queue detectors and queue lengths so that the size of detection thresholds and platoons entering a observing that the system will downstream block do not enable a queue management exceed the storage length pattern and go back to if the platoon will be "normal" operation when the stopped. It will also involve queue is reduced at the control of offsets and detection location. phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 4.1.0-1.0-5 15058-RFP Manage the locations of queues within the network. Beyond the coordinated system, there is a capacity constraint that regularly results in queuing back into the system. This reduces the throughput available during green on the coordinated movement, and increasing congestion is measured within the system. While the normal response to increased congestion within the system would normally be to increase cycle length, phase times and other parameters to increase the capacity for the relevant movements, when the queuing originates outside the system, this will not be the appropriate response. In these circumstances, it is normally more appropriate for the system to reduce the throughput into the bottleneck or reduce the size of platoons, so that the queuing does not block other movements within the system. The system will detect the presence of this condition or the 15058-RFP presence of queues and take appropriate action to reduce the volume of traffic joining the queue, such as reducing green time or omitting phases. 4.1.0-4 The system operator needs to detect repeated phase failures and control signal timing to prevent phase failures building up queues. The operator in this case is trying to prevent a routine queue from forming where it will block another movement in the cycle unnecessarily. For example, the operator may need to prevent a queue resulting from the trailing end of the through green from blocking the storage needed by an entering side-street left turn in the subsequent phase. An overall queue management strategy, particularly when congestion is present, is covered under 4.1.0-1.0-5. 4.5.0-4 15058-RFP The system operator needs to store queues in locations where they can be accommodated without adversely affecting adaptive operation. 4.5.0-5 The system operator needs to prevent queues forming at user-specified locations. 2.2 2.2 Sequence-based Adaptive Coordination 2.2.0-2 2 The ASCT shall select 4.1.0-1.0-2 yes Kadence follows an underlying observation cycle length based on The objective of the TOD schedule which can a time of day coordination will be to change the cycle time by schedule. provide for smooth flow pattern. From this baseline along the arterial road, cycle time, Kadence can then minimizing the number of tune the cycle for the group stops experienced by based on saturation on critical vehicles traveling along the phases at user-specified road. Where two-way critical locations. Test by progressions are permitted observation of the TOD by "natural" cycle lengths, schedule. the system will generally operate at one of those cycle lengths unless longer phase lengths are required to accommodate the demand. 4.1.0-1.0-3 Distribute phase times in an equitable fashion. During moderate to light traffic conditions, one or more phases may be omitted (e.g., a protected 15058-RFP phase if protected/permissive left turns are operated), in order to more efficiently serve other movements, provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 4.1.0-1.0-4 The objective of the coordination will be to manage the lengths of queues stored at critical locations within the coordinated group so that long queues do not block upstream intersections or otherwise reduce the capacity available during the green phases. This will involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.2.0-3 4 The ASCT shall 4.1.0-1.0-3 yes observation 15058-RFP calculate phase Distribute phase times in The split tuning algorithm lengths for all phases an equitable fashion. allocates split time to provide at each signal During moderate to light equitable service to all phases controller to suit the traffic conditions, one or at each intersection. Any split current coordination more phases may be can be biased to receive strategy. omitted (e.g., a protected additional split time to phase if improve coordination protected/permissive left performance and to manage turns are operated), in the location of queues in the order to more efficiently network. Test by observing serve other movements, the split tuner allocation of provided it is safe to do so. time to each phase to balance This may be accomplished phase utilization on each split. through a time of day Observe when biasing is schedule or based on the applied to any phase that less measured traffic split time is subtracted from conditions. that phase even if the utilization is low. 4.1.0-1.0-5 Manage the locations of queues within the network. Beyond the coordinated system, there is a capacity constraint that regularly results in queuing back into the system. This reduces the throughput available during green on the coordinated movement, and increasing congestion is measured within the system. While the normal response to increased congestion within the system would normally be to increase cycle length, 15058-RFP phase times and other parameters to increase the capacity for the relevant movements, when the queuing originates outside the system, this will not be the appropriate response. In these circumstances, it is normally more appropriate for the system to reduce the throughput into the bottleneck or reduce the size of platoons, so that the queuing does not block other movements within the system. The system will detect the presence of this condition or the presence of queues and take appropriate action to reduce the volume of traffic joining the queue, such as reducing green time or omitting phases. 4.1.0-4 The system operator needs to detect repeated phase failures and control signal timing to prevent phase failures building up queues. The operator in this case is trying to prevent a routine queue from forming where it will block another movement in the cycle unnecessarily. 15058-RFP For example, the operator may need to prevent a queue resulting from the trailing end of the through green from blocking the storage needed by an entering side-street left turn in the subsequent phase. An overall queue management strategy, particularly when congestion is present, is covered under 4.1.0-1.0-5. 2.2.0-4 4 The ASCT shall 4.1.0-1.0-2 yes See page 4 of separate observation calculate offsets to The objective of the response. suit the current coordination will be to coordination strategy provide for smooth flow for the user-specified along the arterial road, reference point for minimizing the number of each signal controller stops experienced by along a coordinated vehicles traveling along the route within a group. road. Where two-way progressions are permitted by "natural" cycle lengths, the system will generally operate at one of those cycle lengths unless longer phase lengths are required to accommodate the demand. 2.2.0-4.0- 2 The ASCT shall apply 4.1.0-1.0-4 yes See page 4 of separate observation 15058-RFP 1 offsets for the user- The objective of the response. specified reference coordination will be to point of each signal manage the lengths of controller along a queues stored at critical coordinated route. locations within the coordinated group so that long queues do not block upstream intersections or otherwise reduce the capacity available during the green phases. This will involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.2.0-5 2 The ASCT shall 4.1.0-1.0-2 yes See page 4 of separate observation calculate a cycle The objective of the response. length for each cycle coordination will be to based on its provide for smooth flow optimization along the arterial road, objectives (as minimizing the number of required elsewhere, stops experienced by e.g., progression, vehicles traveling along the queue management, road. Where two-way equitable progressions are permitted distribution of by "natural" cycle lengths, green). the system will generally operate at one of those 15058-RFP cycle lengths unless longer phase lengths are required to accommodate the demand. 2.2.0-5.0- 3 The ASCT shall limit 4.1.0-1.0-3 yes The step size can be chosen to observation 1 cycle lengths to user- Distribute phase times in limit the cycles to specific specified values. an equitable fashion. values. During moderate to light traffic conditions, one or more phases may be omitted (e.g., a protected phase if protected/permissive left turns are operated), in order to more efficiently serve other movements, provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 2.2.0-5.0- 3 The ASCT shall limit 4.1.0-1.0-4 yes The min and max values can observation 2 cycle lengths to a The objective of the be changed by pattern. user-specified range. coordination will be to 2.2.0-5.0- 2 The ASCT shall manage the lengths of yes See page 5 of separate observation 3 calculate optimum queues stored at critical response. cycle lengths locations within the according to the coordinated group so that user-specified long queues do not block coordination upstream intersections or strategy. otherwise reduce the 2.2.0-5.0- 3 The ASCT shall limit capacity available during yes See page 5 of separate observation 4 changes in cycle the green phases. This will response. length to a user- involve controlling phase specified value. 15058-RFP 2.2.0-5.0- 2 The ASCT shall lengths so that the size of yes See page 5 of separate use case 4.0-1 increase the limit for platoons entering a response. acceptance a user defined downstream block do not testing number of following exceed the storage length cycles based on a if the platoon will be change in conditions. stopped. It will also involve 2.2.0-5.0- 2 The change in control of offsets and no A price for an accelerated rate use case 4.0-1.0-1 conditions shall be a phase lengths so that of cycle change based on user- acceptance user defined number queues may be stored in specified conditions has been testing of successive locations where they will provided. adaptive increases in not adversely affect cycle length at the capacity of the system. maximum rate. 2.2.0-5.0- 4 The increase shall be no see above 4.0-1.0-2 user-defined. 2.2.0-5.0- 4 The ASCT shall adjust 4.1.0-5 yes See page 5 of separate 5 offsets to minimize The system operator needs response. the chance of to minimize the chance stopping vehicles that a queue forms at a approaching a signal specified location. that have been served by a user- specified phase at an upstream signal. 2.3 2.3 Non-sequence- based adaptive coordination 2.3.0-2 5 The ASCT shall 4.1.0-1.0-2 NA Kadence is a sequence based observation calculate the The objective of the system appropriate state of coordination will be to the signal at the provide for smooth flow critical signal along the arterial road, controller. The ASCT minimizing the number of shall have the ability stops experienced by to vary cycle length. vehicles traveling along the road. Where two-way progressions are permitted 15058-RFP by "natural" cycle lengths, the system will generally operate at one of those cycle lengths unless longer phase lengths are required to accommodate the demand. 2.3.0-3 4 At non-critical 4.1.0-1.0-3 NA Kadence is a sequence based observation intersections within a Distribute phase times in system group, the ASCT shall an equitable fashion. calculate the time at During moderate to light which a user- traffic conditions, one or specified phase shall more phases may be be green, relative to omitted (e.g., a protected a reference point at phase if the critical protected/permissive left intersection, to suit turns are operated), in the current order to more efficiently coordination serve other movements, strategy. provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 2.3.0-4 4 When demand is 4.1.0-1.0-4 NA Kadence is a sequence based observation present, the ASCT The objective of the system shall implement a coordination will be to user-specified manage the lengths of maximum time queues stored at critical between successive locations within the displays of each coordinated group so that phase at each long queues do not block intersection. upstream intersections or otherwise reduce the capacity available during the green phases. This will 15058-RFP involve controlling phase lengths so that the size of platoons entering a downstream block do not exceed the storage length if the platoon will be stopped. It will also involve control of offsets and phase lengths so that queues may be stored in locations where they will not adversely affect capacity of the system. 2.3.0-5 5 The ASCT shall adjust 4.1.0-5 NA Kadence is a sequence based observation signal timing so that The system operator needs system vehicles approaching to minimize the chance a signal that have that a queue forms at a been served during a specified location. user-specified phase at an upstream signal do not stop. 2.4 2.4 Single intersection adaptive operation 2.4.0-2 5 The ASCT shall 4.1.0-1.0-6 yes See page 5 of separate observation calculate a cycle At an isolated intersection, response. length of a single optimize operation with a intersection, based minimum of phase failures on current measured (based on the optimization traffic conditions. objectives). (The calculation is based on the optimization objectives.) 2.4.0-3 5 The ASCT shall 4.1.0-1.0-3 yes See page 5 of separate observation 15058-RFP calculate optimum Distribute phase times in response. phase lengths, based an equitable fashion. on current measured During moderate to light traffic conditions. traffic conditions, one or (The calculation is more phases may be based on the omitted (e.g., a protected optimization phase if objectives.) protected/permissive left turns are operated), in order to more efficiently serve other movements, provided it is safe to do so. This may be accomplished through a time of day schedule or based on the measured traffic conditions. 2.4.0-3.0- 5 When queues are 4.1.0-1.0-6 yes See page 5 of separate observation 2 detected at user- At an isolated intersection, response. specified locations, optimize operation with a the ASCT shall minimum of phase failures execute user- (based on the optimization specified timing objectives). plan/operational mode. 2.4.0-4 2 The ASCT shall 4.1.0-1.0-6 yes See page 6 of separate observation calculate phase At an isolated intersection, response. order, based on optimize operation with a current measured minimum of phase failures traffic conditions. (based on the optimization (The calculation is objectives). based on the optimization objectives.) 2.5 2.5 Phase-based adaptive coordination 15058-RFP 2.5.0-2 5 The ASCT shall alter 4.1.0-2 yes This is a function of the signal observation the state of the The system operator needs controller. Kadence is fully signal controller for to manage the compatible all phases at the coordination in small user-specified groups of signals to link intersection. phase service at some 2.5.0-3 5 The ASCT shall intersections with phase yes by use of offsets and max observation calculate the time at service at adjacent recall settings on phases, their which a user- intersections. start times can be exactly specified phase shall controlled. be green at an intersection. 2.5.0-4 5 When demand is yes by use of maximum recalls the observation present, the ASCT time between successive shall implement a displays can be exactly user-specified controlled maximum time between successive displays of each phase at each intersection. 2.5.0-5 5 The ASCT shall alter yes by use of offsets in a observation the operation of the coordination pattern non-critical intersections to minimize stopping of traffic released from user-specified phases at the user-specified critical intersection. 2.5.0-6 5 The ASCT shall alter yes by use of offsets in a observation the operation of the coordination pattern non-critical intersections to minimize stopping of traffic arriving at user-specified phases 15058-RFP at the user-specified critical intersection. 2.5.0-7 5 The ASCT shall adjust 4.1.0-5 yes by use of offsets in a observation the state of the The system operator needs coordination pattern signal controller so to minimize the chance that vehicles that a queue forms at a approaching a signal specified location. that have been 4.1.0-2 served during a user- The system operator needs specified phase at an to manage the upstream signal do coordination in small not stop. groups of signals to link phase service at some intersections with phase service at adjacent intersections. 2.6 2.6 Responsiveness 2.6.0-1 3 The ASCT shall limit 4.8.0-1 yes See page 6 of separate observation the change in The system operator needs response. consecutive cycle to modify the ASCT lengths to be less operation to closely follow than a user-specified changes in traffic value. conditions. 2.6.0-2 3 The ASCT shall limit yes See page 6 of separate observation the change in phase response. times between consecutive cycles to be less than a user- specified value. (This does not apply to early gap-out or actuated phase skipping.) 2.6.0-3 3 The ASCT shall limit 4.8.0-1 no See page 6 of separate use case the changes in the The system operator needs response. acceptance direction of primary to modify the ASCT testing 15058-RFP coordination to a operation to closely follow user-specified changes in traffic frequency. conditions. 4.8.0-2 The system operator needs to constrain the selection of cycle lengths to those that provide acceptable operations, such as when resonant progression solutions are desired. 2.6.0-4 4 When a large change 4.8.0-3 yes See page 6 of separate demonstration in traffic demand is The system operator needs response. detected, the ASCT to respond quickly to shall respond more sudden large shifts in quickly than normal traffic conditions. operation, subject to user-specified limits. 2.6.0-5 2 The ASCT shall select 4.8.0-2 yes See page 6 of separate observation cycle length from a The system operator needs response. list of user-defined to constrain the selection cycle lengths. of cycle lengths to those that provide acceptable operations, such as when resonant progression solutions are desired. 3 3 External/Internal Interfaces 3.0-1 The ASCT shall support external interfaces according to the interface control documents and the following detailed requirements. Interface 15058-RFP requirements include: 5 · Information layer 4.3.0-1 yes See page 7 of separate observation protocol The system operator needs response. to adaptively control signals operated by the City of Surprise and ADOT. 4 · Application layer 4.3.0-2 yes See page 7 of separate use case protocol The system operator needs response. acceptance to send data to another testing system that would allow the other system to coordinate with the ASCT system. 4 · Lower layer 4.3.0-4 yes See page 7 of separate use case protocol The system operator needs response. acceptance to receive data from testing another system that will allow the ASCT system to coordinate its operation with the adjacent system. 4 · Data aggregation 4.11.0-5 yes See page 7 of separate use case The system operator needs response. acceptance to report performance testing data in real time to KITS and Regional Archived Data System (RADS). 4 · Frequency of 4.17.0-2 yes See page 7 of separate use case storage response. acceptance 4 · Frequency of The system operator needs testing reporting to react to commands 15058-RFP 4 · Duration of storage) issued by KITS and future decision support system, such as an ICM system. A signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in operation until the command from the external source is removed. 3.0-1.0-1 4 The ASCT shall send 4.3.0-2 yes See page 7 of separate use case operational data to The system operator needs response. acceptance KITS and Regional to send data to another testing Archived Data system that would allow System (RADS). the other system to coordinate with the ASCT system. 4.11.0-5 The system operator needs to report performance data in real time to KITS and Regional Archived Data System (RADS).. 3.0-1.0-2 5 The ASCT shall send 4.3.0-2 yes Kadence is fully integrated observation control data to KITS. The system operator needs with KITS to send data to another system that would allow the other system to coordinate with the ASCT system. 3.0-1.0-3 5 The ASCT shall send 4.11.0-1 yes Kadence is fully integrated observation 15058-RFP monitoring data to The agency needs KITS to with KITS KITS. be able to monitor the ASCT system automatically. 3.0-1.0-4 5 The ASCT shall send 4.3.0-2 yes Kadence is fully integrated observation coordination data to The system operator needs with KITS KITS. to send data to another system that would allow the other system to coordinate with the ASCT system. 3.0-1.0-5 5 The ASCT shall send 4.11.0-5 yes See page 8 of separate use case performance data to The system operator needs response. acceptance KITS and Regional to report performance testing Archived Data data in real time to KITS System (RADS). and Regional Archived Data System (RADS). 3.0-1.0-6 5 The ASCT shall 4.17.0-2 yes See page 8 of separate use case receive commands The system operator needs response. acceptance from KITS and a to react to commands testing future decision issued by KITS and future support system, such decision support system, as an ICM system. such as an ICM system. A 3.0-1.0-7 5 The ASCT shall signal may be received yes Kadence is fully integrated observation implement the from an external decision with KITS. These parameter following commands support system or an changes are fully supported by from KITS when Integrated Corridor pattern commanded: Management system, · Specified cycle commanding the ASCT to length initiate a flush plan. This · Specified direction flush plan will remain in of progression operation until the · Specified adaptive command from the strategy external source is removed. 4 4 Crossing Arterials and Boundaries 15058-RFP 4.0-1 2 The ASCT shall 4.3.0-4 yes As part of our proposal, we use case conform its The system operator needs are providing the partner acceptance operation to an to receive data from agencies a full license for testing external system's another system that will Kadence that can be used on operation. allow the ASCT system to any and all signals on Bell coordinate its operation Road, Surprise, MCDOT, and with the adjacent system. Glendale and on up to 200 4.3.0-6 additional signals of partner The system operator needs agencies. Kadence groups can to detect traffic be coordinated with other approaching from a Kadence groups through the neighboring system and congestion management logic coordinate the ASCT that can send each group to operation with the the same cycle time and adjacent system. coordination strategy through 4.17.0-2 the RCN. See other answers about receiving commands The system operator needs through C2C to react to commands issued by KITS and future decision support system, such as an ICM system. A signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in operation until the command from the external source is removed. 4.0-1.0-1 2 The ASCT shall alter 4.3.0-4 yes Kadence can use detector data observation its operation to The system operator needs from external devices not minimize to receive data from connected to the signal 15058-RFP interruption of traffic another system that will controller through the entering the system. allow the ASCT system to congestion management logic (This may be coordinate its operation to respond to external achieved via with the adjacent system. changes in traffic flow detection, with no 4.3.0-6 direct connection to The system operator needs the other system) to detect traffic approaching from a neighboring system and coordinate the ASCT operation with the adjacent system. 4.0-1.0-2 2 The ASCT shall be 4.3.0-5 yes The cycle adjustment logic can observation based on a fixed The system operator needs be turned off by pattern to cycle length to match to constrain the adaptive achieve this. an adjacent system. system to operate a cycle length compatible with the crossing arterial. 5 5 Access and Security 5.0-1 The ASCT shall be 4.4.0-1 yes Kadence supports the security observation implemented with a The system operator needs configuration parameters in security policy that to have a security KITS addresses the management and following selected administrative system that elements: allows access and 5.0-1.0-1 5 Local access to the operational privileges to yes Kadence supports the security observation ASCT. be assigned, monitored configuration parameters in 5.0-1.0-2 5 Remote access to the and controlled by an yes KITS observation ASCT. administrator, and 5.0-1.0-3 5 System monitoring. conform to the agency's yes Kadence supports the security observation 5.0-1.0-4 5 System manual access and network yes configuration parameters in observation override. infrastructure security KITS 5.0-1.0-5 5 Development policies. yes Kadence supports the security observation 5.0-1.0-6 5 Operations yes configuration parameters in observation KITS 15058-RFP 5.0-1.0-7 5 User login yes Kadence supports the security observation 5.0-1.0-8 5 User password yes configuration parameters in observation KITS 5.0-1.0-9 5 Administration of the yes Kadence supports the security observation system configuration parameters in 5.0-1.0-10 5 Signal controller yes KITS observation group access 5.0-1.0-11 5 Access to classes of yes Kadence supports the security observation equipment configuration parameters in 5.0-1.0-12 5 Access to equipment yes KITS observation by jurisdiction 5.0-1.0-13 5 Output activation yes Kadence supports the security observation 5.0-1.0-14 5 System parameters yes configuration parameters in observation KITS 5.0-1.0-15 5 Report generation yes Kadence supports the security observation 5.0-1.0-16 5 Configuration yes configuration parameters in observation KITS 5.0-1.0-17 5 Security alerts yes Kadence supports the security observation 5.0-1.0-18 5 Security logging yes configuration parameters in observation KITS 5.0-1.0-19 5 Security reporting yes Kadence supports the security observation 5.0-1.0-20 5 Database yes configuration parameters in observation KITS 5.0-1.0-21 5 Signal controller yes Kadence supports the security observation 5.0-2 The ASCT shall configuration parameters in provide monitoring KITS and control access at the following locations: 5.0-2.0-1 5 City of Surprise TMC 4.10.0-1.0-1 yes Kadence is fully client-server observation on Litchfield Road, Agency TMC like KITS so the client south of Bell Road. application can be installed anywhere on the network 5.0-2.0-2 5 Maintenance facility 4.10.0-1.0-2 yes Kadence is fully client-server observation located north of Bell Maintenance facility like KITS so the client Road and 134th application can be installed Avenue anywhere on the network 15058-RFP 5.0-2.0-3 5 Agency LAN or WAN 4.10.0-1.0-3 yes Kadence is fully client-server observation Workstations on agency like KITS so the client LAN or WAN located at the application can be installed City of Surprise TMC. anywhere on the network 5.0-2.0-4 Not used 5.0-2.0-5 4 Local controller 4.10.0-1.0-5 yes See page 8 of separate observation cabinets Local controller cabinets response. 5.0-2.0-6 3 Maintenance 4.10.0-1.0-6 yes See page 8 of separate observation vehicles Maintenance vehicles response. 5.0-2.0-7 4 Remote location via 4.10.0-1.0-7 yes See page 8 of separate observation internet Remote locations at the response. City of Surprise City Hall and signal shop located at the maintenance yard 5.0-3 5 The ASCT shall 4.4.0-1 yes The Kadence security setup is observation comply with the The system operator needs the same as KITS with agency's security to have a security Windows-based security policy.. management and policy. administrative system that allows access and operational privileges to be assigned, monitored and controlled by an administrator, and conform to the agency's access and network infrastructure security policies. 5.0-4 5 The ASCT shall not 4.10.0-2 yes KITS can still be fully used to observation prevent access to the The operator needs to upload and download settings local signal controller access to the database from the controller and database, monitoring management, monitoring perform all other actions. or reporting and reporting features and functions by any functions of the signal installed signal 15058-RFP management system. controllers and any related signal management system from the access points defined for those system components. 6 6 Data Log 6.0-1 The ASCT shall log 4.11.0-6 yes Kadence does not prevent any observation the following events: The system operator needs of these events from being to be able to report the logged as they already are in exact state of signal timing KITS 6.0-1.0-1 4 Time-stamped and input data for a yes Kadence does not prevent any observation vehicle phase calls specified period, to allow of these events from being 6.0-1.0-2 4 Time-stamped historical analysis of the yes logged as they already are in observation pedestrian phase system operation. KITS calls 6.0-1.0-3 4 Time-stamped yes Kadence does not prevent any observation emergency vehicle of these events from being preemption calls logged as they already are in 6.0-1.0-4 4 Time-stamped transit yes KITS observation priority calls 6.0-1.0-5 4 Time-stamped yes Kadence does not prevent any observation railroad preemption of these events from being calls logged as they already are in 6.0-1.0-6 5 Time-stamped start yes KITS observation and end of each phase 6.0-1.0-7 5 Time-stamped yes Kadence does not prevent any observation controller interval of these events from being changes logged as they already are in KITS 6.0-1.0-8 4 Time-stamped start yes Kadence does not prevent any observation and end of each of these events from being transition to a new logged as they already are in timing plan KITS 6.0-2 5 The ASCT shall 4.11.0-4 yes All reports and Historical observation export its systems timing data can be exported to log in the following the formats requested 15058-RFP formats: * MS Excel The system operator needs * Text to store all operational * CVS data and signal timing parameters calculated by * Open source SQL the adaptive system, and database export selected data to 6.0-3 5 The ASCT shall store yes This is configurable to be any observation KITS. the event log for a length of time in the minimum of 30 days database, including forever if you have enough hard drive space 6.0-4 5 The ASCT shall store 4.11.0-2 yes This is configurable to be any observation results of all signal length of time in the timing parameter database, including forever if calculations for a you have enough hard drive minimum of 30 days. space The system operator needs to store and report data used to calculate signal timing and have the data available for subsequent analysis. 4.11.0-3 The system operator needs to store and report data that can be used to measure traffic performance under adaptive control. 6.0-5 5 The system shall 4.11.0-2 yes See page 8 of separate observation store the following response. measured data in the form used as input to calculations for a minimum of 30 days: 15058-RFP * Volume The system operator needs to store and report data used to calculate signal timing and have the data available for subsequent analysis. * Occupancy 4.11.0-3 * Queue length The system operator needs to store and report data that can be used to measure traffic performance under adaptive control. 4.11.0-7 Have the ability to generate historic and real- time reports that effectively support operation, maintenance and reporting of system performance and traffic conditions. 6.0-6 5 The ASCT system 4.11.0-4 yes The SQL database can be observation shall archive all data The system operator needs configured to archive data automatically after a to store all operational after a specified "clean out" user-specified period data and signal timing date not less than 30 parameters calculated by days. the adaptive system, and 6.0-7 5 The ASCT shall export selected data to yes This should not be a problem observation provide data storage KITS. with Surprise's existing for a system size of database 22 signal controllers. The data to be stored shall include the following: * Controller state data 15058-RFP * Reports * Log data * Security data * ASCT parameters 6.0-8 5 The ASCT shall 4.11.0-7 yes The existing system detector use case calculate and report report includes detector fault acceptance relative data quality information if it is reported by testing including: the controller. A price is provided for the upgrade of Kadence to include reporting of the impact of detector failures on ASCT operation. This feature is included with the price for 6.0-9. * The extent data is Have the ability to affected by detector generate historic and real- faults time reports that * Other applicable effectively support items operation, maintenance 6.0-9 5 The ASCT shall report and reporting of system no This features is not being N/A comparisons of performance and traffic provided logged data when conditions. requested by the user: * Day to day * Hour to hour * Hour of day to hour of day * Hour of week to hour of week * day of week to day week * Day of year to day of year 6.0-10 5 The ASCT shall store 4.11.0-4 yes SQL server is used by Kadence observation 15058-RFP data logs in a The system operator needs standard database. to store all operational data and signal timing parameters calculated by the adaptive system, and export selected data to KITS. 6.0-11 The ASCT shall report 4.11.0-7 yes See page 8 of separate use case 5 stored data in a form Have the ability to response. acceptance suitable to provide generate historic and real- testing explanations of time reports that system behavior to effectively support public and politicians operation, maintenance and to troubleshoot and reporting of system the system. performance and traffic conditions. 7 7 Advanced Controller Operation 7.0-1 4 When specified by 4.9.0-1.0-1 yes phase reservice is a function of observation the user, the ASCT Service a phase more than the signal controller. Kadence shall display a vehicle once per cycle is fully compatible with this phase more than operation. once for each time the coordinated phase is served. 7.0-2 4 The ASCT shall 4.9.0-1.0-2 yes overlaps are fully supported observation provide a minimum Operate at least eight by Kadence, including the use of 8 phase overlaps. overlap phases of overlaps for interchange operation. 7.0-3 5 The ASCT shall 4.9.0-1.0-3 yes Kadence can operate with up observation accommodate a Operate three rings, eight to 32 phases and 4 rings. minimum of 8 phases phases and up to two at each signal phases per ring. 7.0-4 5 The ASCT shall yes Kadence can operate with up observation accommodate a to 32 phases and 4 rings. minimum of 3 rings at each signal. 15058-RFP 7.0-5 5 The ASCT shall yes Kadence can operate with up observation accommodate a to 32 phases and 4 rings. minimum of 2 phases per ring 7.0-6 5 The ASCT shall 4.1.0-6 yes See page 9 of separate observation provide a minimum The system operator needs response. of 8 different user- to modify the sequence of defined phase phases to support the sequences for each various operational signal. strategies. 7.0-6.0-1 5 Each permissible 4.9.0-1.0-4 yes See page 9 of separate observation phase sequence shall Permit different phase response. be user-assignable to sequences under different any signal timing traffic conditions plan. 7.0-6.0-2 5 Each permissible yes See page 9 of separate observation phase sequence shall response. be executable by a time of day schedule. 7.0-6.0-3 5 Each permissible yes See page 9 of separate observation phase sequence shall response. be executable based on measured traffic conditions 7.0-7 5 The ASCT shall not 4.1.0-6 yes See page 9 of separate observation prevent a The system operator needs response. phase/overlap to modify the sequence of output by time-of- phases to support the day. various operational 7.0-8 5 The ASCT shall not strategies. NO This feature is not being N/A prevent a 4.17.0-2 provided phase/overlap The system operator needs output based on an to react to commands external input. issued by KITS and future decision support system, such as an ICM system. A 15058-RFP signal may be received from an external decision support system or an Integrated Corridor Management system, commanding the ASCT to initiate a flush plan. This flush plan will remain in operation until the command from the external source is removed. 7.0-9 The ASCT shall not 4.1.0-6 yes You bet. Any phases can be observation 5 prevent the following The system operator needs designated as coord phases. phases to be to modify the sequence of designated as phases to support the coordinated phases: various operational Phases 2 & 6 strategies. 4.9.0-1.0-9 Allow any phase to be designated as the coordinated phase 7.0-10 5 The ASCT shall have 4.9.0-1.0-12 yes This is a function of the signal observation the option for a Allow the coordinated controller. Kadence is fully coordinated phase to phase to terminate early compatible be released early under prescribed traffic based on a user- conditions definable point in the phase or cycle. 7.0-11 5 The ASCT shall not 4.9.0-1.0-15 yes This is a function of the signal observation prevent the Use flashing yellow arrow controller. Kadence is fully controller from to control permissive left compatible. displaying flashing turns. yellow arrow left turn. 7.0-12 5 The ASCT shall not 4.9.0-1.0-11 yes This is a function of the signal observation 15058-RFP prevent the local Allow the controller to controller. Kadence is fully signal controller from respond independently to compatible performing actuated individual lanes of an phase control using approach. This may be 40 implemented in the signal extension/passage controller using 40 timers as assigned to extension/passage timers, user-specified which may be assignable vehicle detector to each vehicle detector input channels in the input channel. This may local controller. allow the adaptive 7.0-12.0-1 4 The ASCT shall operation to be based on yes See page 9 of separate observation operate adaptively data from a specific response. using user-specified detector, or by excluding detector channels. specific detectors. 8 8 Pedestrians 8.0-2 5 When the pedestrian 4.6.0-2 yes this is a function of the signal observation phase is called, the The system operator needs controller. Kadence can be ASCT shall to accommodate configured to allow or disallow accommodate infrequent pedestrian the phase splits to be tuned pedestrian crossing operation while lower than the pedestrian times during maintaining adaptive crossing times. Test by adaptive operations. operation. (This is observation appropriate for pedestrian calls that are common but not so frequent that they drive the operational needs.) 4.6.0-3 The system operator needs to incorporate frequent pedestrian operation into routine adaptive operation. (This is appropriate when pedestrians are frequent enough that they must be 15058-RFP assumed to be present every cycle or nearly every cycle.) 8.0-5 5 The ASCT shall have 4.6.0-3 yes This is a function of the signal observation the option for a The system operator needs controller. Kadence is fully phase to start late, to incorporate frequent compatible. when there is not a pedestrian operation into pedestrian call for routine adaptive that phase, provided operation. (This is the minimum green appropriate when time is available. pedestrians are frequent enough that they must be assumed to be present every cycle or nearly every cycle.) 8.0-6 5 When specified by 4.9.0-1.0-13 yes This is a function of the signal observation the user, the ASCT Allow flexible timing of controller. Kadence is fully shall execute non-coordinated phases compatible. pedestrian recall on (such as late start of a pedestrian phase phase) while maintaining adjacent to coordination coordinated phases. 8.0-7 5 When specified by 4.6.0-3 yes This is a function of the signal observation the user, the ASCT The system operator needs controller. Kadence is fully shall execute to incorporate frequent compatible. pedestrian recall on pedestrian operation into pedestrian phase routine adaptive adjacent to operation. (This is coordinated phases. appropriate when pedestrians are frequent enough that they must be assumed to be present every cycle or nearly every cycle.) 9 9 Special Functions 9.0-1 5 The ASCT shall set a 4.9.0-1.0-11 yes This is a function of the signal observation 15058-RFP specific state for Allow the controller to controller. Kadence is fully each special function respond independently to compatible. output based on the individual lanes of an occupancy on a user- approach. This may be specified detector. implemented in the signal controller using 40 extension/passage timers, which may be assignable to each vehicle detector input channel. This may allow the adaptive operation to be based on data from a specific detector, or by excluding specific detectors. 9.0-2 4 The ASCT shall set a 4.17.0-1 yes This can be accomplished observation specific state for The system operator needs using the logic processor of each special function to be able to turn on signs the ASC/3. Kadence is fully output based on the that control traffic or compatible. current cycle length. provide driver information 9.0-3 5 The ASCT shall set a when specific traffic yes This can be accomplished with observation specific state for conditions occur, when the action plans of the ASC/3. each special function needed to support the Kadence is fully compatible. output based on a adaptive operation, when time-of-day congestion is detected at schedule. critical locations or according to a time-of-day schedule 10 10 Detection 10.0-1 5 The ASCT shall be yes Kadence is completely observation compatible with the detector-technology agnostic following detector technologies: * Video Detection * Inductive Loops * Radar (Wavetronix 15058-RFP SmartSensor Matrix) * Furnished Detection 11 11 Railroad and EV Pre-emption 11.0-1 5 The ASCT shall 4.13.0-1 yes Kadence will also accelerate observation maintain adaptive The system operator needs the recovery of traffic operation at non- to accommodate railroad performance after the preempted preemption. The grade preempt by adjusting the intersections during crossing blocks the parameters. railroad preemption. coordinated routes when the gates are down. The gates are down for two to 10 minutes approximately once per hour. The gates have a history of remaining stuck in the down position four to six times a year. Grand Avenue is currently involved in the railroad preemption, but 134th Drive is not. Vehicles block the 134th Drive intersection with each preemption and requires clearance in both directions once the preemption is released. When an intersection responds to a railroad preemption, other signals specified by the user will also be preempted. Once the preemption is released, all the signals in the coordinated group return to adaptive control. 15058-RFP 11.0-2 5 The ASCT shall 4.13.0-2 yes Kadence will also accelerate observation maintain adaptive The system operator needs the recovery of traffic operation at non- to accommodate performance after the preempted emergency vehicle preempt by adjusting the intersections during preemption with user parameters. emergency vehicle defineable capability to preemption. allow adaptive control of phases that remain operational during preemption. 11.0-3 5 The ASCT shall 4.13.0-1 yes Kadence will wait until the observation execute user- The system operator needs signal is back in coordination specified actions at to accommodate railroad before resuming adaptive non-preempted preemption. The grade control at any signal that is signal controllers crossing blocks the preempted. during a preemption. coordinated routes when the gates are down. The gates are down for two to 10 minutes approximately once per hour. The gates have a history of remaining stuck in the down position four to six times a year. Grand Avenue is currently involved in the railroad preemption, but 134th Drive is not. Vehicles block the 134th Drive intersection with each preemption and requires clearance in both directions once the preemption is released. When an intersection responds to a railroad preemption, other signals specified by the user will 15058-RFP also be preempted. Once the preemption is released, all the signals in the coordinated group return to adaptive control. 11.0-4 5 The ASCT shall 4.13.0-1 yes Kadence will wait until the observation operate normally at The system operator needs signal is back in coordination non-preempted to accommodate railroad before resuming adaptive signal controllers preemption. The grade control at any signal that is when special crossing blocks the preempted. functions are coordinated routes when engaged by a the gates are down. The preemption event. gates are down for two to (An example of such 10 minutes approximately a special functions is once per hour. The gates a phase omit, a have a history of remaining phase maximum stuck in the down position recall or a fire route.) four to six times a year. Grand Avenue is currently involved in the railroad preemption, but 134th Drive is not. Vehicles block the 134th Drive intersection with each preemption and requires clearance in both directions once the preemption is released. When an intersection responds to a railroad preemption, other signals specified by the user will also be preempted. Once 15058-RFP the preemption is released, all the signals in the coordinated group return to adaptive control. 11.0-6 5 The ASCT shall return 4.13.0-2 yes Kadence will also accelerate observation to normal adaptive The system operator needs the recovery of traffic operation when to accommodate performance after the preemption of a emergency vehicle preempt by adjusting the signal controller is preemption with user parameters. released. defineable capability to 11.0-7 5 The ASCT shall allow adaptive control of yes This can be done with the KITS observation preempt a user- phases that remain route preemption feature. A specified group of operational during price has been provided for signal controllers preemption. integration of this feature with when a user- KITS and Kadence and the specified preemption ASC/3. is requested. 12 12 Transit Priority NOT USED 13 13 Failure Events and Fallback 13.1 13.1 Detector Failure 13.1.0-1 5 The ASCT shall take 4.14.0-1 yes user-specified detector failure use case user-specified action The system operator needs response will be added for the acceptance in the absence of to fall back to TOD or project in addition to the testing valid detector data isolated free operation, as other detector-failure features from 1 or more specified by the operator, already supported. vehicle detectors without causing disruption within a group. to traffic flow, in the event 13.1.0- 5 The ASCT shall of equipment, yes user-specified detector failure use case 1.0-1 release control to communications and response will be added for the acceptance central system software failure. project in addition to the testing control. other detector-failure features 15058-RFP already supported. 13.1.0- 5 The ASCT shall yes See page 9 of separate use case 1.0-2 release control to response. acceptance local operations to testing operate under its own time-of-day schedule. 13.1.0-2 4 The ASCT shall use yes the following alternate data sources for operations in the absence of the real- time data from a detector: 13.1.0- 4 * Data from a user- no See page 10 of separate use case 2.0-1 specified alternate response. acceptance detector. testing * Historical Data 13.1.0- 4 The ASCT shall switch no See page 10 of separate use case 2.0-3 to the alternate response. acceptance source in real time testing without operator intervention. 13.1.0-3 5 In the event of a 4.12.0-1 yes detector failure, comm failure, observation detector failure, the The system operator needs preemption, and many other ASCT shall issue an to immediately notify field operation events are alarm to user- maintenance and logged and alarmable in specified recipients. operations staff of alarms Kadence. (This requirement and alerts. may be fulfilled by 4.12.0-2 sending the alarm to The system operator needs a designated list of to immediately and recipients by a automatically pass alarms designated means, or 15058-RFP by using an external and alerts to the KITS and maintenance Regional Archived Data management system. System (RADS). 13.1.0-4 5 In the event of a 4.12.0-3 yes Kadence has a fully featured observation failure, the ASCT The system operator needs log retrieval, display, and shall log details of to maintain a complete log reporting suite. the failure in a of alarms and failure permanent log. events. 13.1.0-5 5 The permanent yes Kadence has a fully featured observation failure log shall be log retrieval, display, and searchable, reporting suite. archivable, and exportable. 13.2 13.2 Communications Failure 13.2-1 5 The ASCT shall 4.14.0-1 yes See page 10 of separate observation execute user- The system operator needs response. specified actions to fall back to TOD or when isolated free operation, as communications to specified by the operator, one or more signal without causing disruption controllers fails to traffic flow, in the event within a group. of equipment, 13.2-1.0-1 5 In the event of loss communications and yes This will be added as part of use case of communication to software failure. the project. acceptance a user-specified testing signal controller, the ASCT shall release control of all signal controllers within a user-specified group to local control. 13.2-1.0-2 5 The ASCT shall switch yes This will be added as part of use case to the alternate the project. acceptance operation in real testing time without 15058-RFP operator intervention. 13.2-2 5 In the event of 4.12.0-1 yes detector failure, comm failure, observation communications The system operator needs preemption, and many other failure, the ASCT to immediately notify field operation events are shall issue an alarm maintenance and logged and alarmable in to user-specified operations staff of alarms Kadence. recipients. (This and alerts. requirement may be fulfilled by sending the alarm to a designated list of recipients by a designated means, or by using an external maintenance management system. 13.2-3 5 The ASCT shall issue 4.12.0-2 yes response time is configurable. observation an alarm within 1 The system operator needs minute of detection to immediately and of a failure. automatically pass alarms and alerts to the KITS and Regional Archived Data System (RADS). 13.2-4 5 In the event of a 4.12.0-3 yes Kadence has a fully featured observation communications The system operator needs log retrieval, display, and failures, the ASCT to maintain a complete log reporting suite. shall log details of of alarms and failure the failure in a events. permanent log. 13.2-5 5 The permanent yes Kadence has a fully featured observation failure log shall be log retrieval, display, and searchable, reporting suite. archivable, and exportable. 13.3 13.3 Adaptive Processor Failure 15058-RFP 13.3-1 5 The ASCT shall 4.14.0-1 yes if the kadence software observation execute user- The system operator needs service fails, the controllers specified actions to fall back to TOD or will revert to TOD operation when adaptive isolated free operation, as control fails: specified by the operator, 13.3-1.0-1 5 The ASCT shall without causing disruption yes if the kadence software observation release control to to traffic flow, in the event service fails, the controllers central system of equipment, will revert to TOD operation control. communications and 13.3-1.0-2 5 The ASCT shall software failure. yes if the kadence software observation release control to service fails, the controllers local operations to will revert to TOD operation operate under its own time-of-day schedule. 13.3-2 5 In the event of yes windows can be configured to observation adaptive processor log events when a service fails failure, the ASCT 4.12.0-2 shall issue an alarm The system operator needs to user-specified to immediately and recipients. (This automatically pass alarms requirement may be and alerts to the KITS and fulfilled by sending Regional Archived Data the alarm to a System (RADS). designated list of recipients by a designated means, or by using an external maintenance management system.) 13.3-3 5 The permanent yes failure log shall be searchable, archivable, and exportable. 13.3-4 5 During adaptive 4.14.0-1 yes This is not applicable to a 15058-RFP processor failure, the The system operator needs central system like Kadence. ASCT shall provide all to fall back to TOD or Kadence does not withold local detector inputs isolated free operation, as phase calls from the to the local specified by the operator, controller. controller. without causing disruption to traffic flow, in the event of equipment, communications and software failure. 14 14 Software 14.0-1 5 The vendor's 4.15.0-2 yes Kadence runs on windows observation adaptive software only as used in Surprise shall be fully currently operational within the following platform: (edit as appropriate) * Windows-PC The system operator needs * Linux to use equipment and software acceptable under current agency IT policies and procedures. The software must interface with Windows. If Linux- based the software must operate on Windows platforms. 14.0-2 5 The system shall 4.15.0-1.0-2 yes Kadence is completely observation interface with Detector type detector-technology agnostic detectors from all manufacturers. 14.0-3 5 The system shall 4.15.0-1.0-1 yes Kadence is already integrated observation interface with Controller type with the ASC/3 Econolite ASC3 controllers. 15 15 Training 15058-RFP 15.0-1 The vendor shall 4.16.0-1 yes observation provide the following The agency needs all staff training. involved in operation and 15.0-1.0-1 5 The vendor shall maintenance to receive yes observation provide training on appropriate training. the operations of the adaptive system. 15.0-1.0-2 5 The vendor shall yes observation provide training on troubleshooting the system. 15.0-1.0-3 5 The vendor shall yes observation provide training on preventive maintenance and repair of equipment. 15.0-1.0-4 5 The vendor shall yes observation provide training on system configuration. 15.0-1.0-5 5 The vendor shall yes observation provide training on administration of the system. 15.0-1.0-6 5 The vendor shall yes observation provide training on system calibration. 15.0-1.0-7 5 The vendor's training yes observation delivery shall include: printed course materials and references, electronic copies of presentations and references. 15.0-1.0-8 5 The vendor's training yes observation shall be delivered at 15058-RFP the agency TMC. 15.0-1.0-9 5 The vendor shall yes we expect to provide the attendance at our provide a minimum required training hours, and awesome training of 40 hours training much more operational to up to 6 staff. support during the installation, configuration, tuning, and on-going operation of Kadence 15.0-1.0- 5 The vendor shall yes we expect to provide the attendance at our 10 provide a minimum required training hours, and awesome training of 2 training sessions much more operational over 6 months. support during the installation, configuration, tuning, and on-going operation of Kadence 16 16 Maintenance, Support and Warranty 16.0-1 5 The Maintenance 4.16.0-2 yes observation Vendor shall provide The agency needs the maintenance system to fulfill all according to a requirements for the life of separate the system. The agency maintenance therefore needs the contract. That system to be maintained contract should to repair faults that are not identify repairs defects in materials and necessary to workmanship. preserve requirements fulfillment, responsiveness in effecting those repairs, and all requirements on the maintenance 15058-RFP provider while performing the repairs. 16.0-2 5 The Vendor shall 4.16.0-4 yes observation provide routine The agency needs the updates to the system to fulfill all software and requirements for the life of software the system. The agency environment therefore needs support to necessary to keep software and preserve the software environment fulfillment of updated as necessary to requirements for the prevent requirements no life of the system. longer being fulfilled. Preservation of requirements fulfillment especially includes all IT management requirements as previously identified. 16.0-3 5 The Vendor shall 4.16.0-3 yes observation warrant the system The agency needs the to be free of defects system to fulfill all in materials and requirements for the life of workmanship for a the system. The agency period of 5 years. therefore needs the Warranty is defined system to remain free of as correcting defects defects in materials and in materials and workmanship that result in workmanship requirements no longer (subject to other being fulfilled. language included in the purchase documents). Defect 15058-RFP is defined as any circumstance in which the material does not perform according to its specification. 17 17 Schedule 17.0-1 5 The ASCT shall set 4.17.0-1 yes this is a function of the signal observation the state of external The system operator needs controller. Kadence is fully input/output states to be able to turn on signs compatible according to a time- that control traffic or of-day schedule. provide driver information 17.0-2 5 The ASCT output when specific traffic yes this is a function of the signal observation states shall be conditions occur, when controller. Kadence is fully settable according to needed to support the compatible a time-of-day adaptive operation, when schedule congestion is detected at 17.0-3 5 The ASCT operational critical locations or yes All Kadence configuration observation parameters shall be according to a time-of-day parameters are changeable by settable according to schedule coordination pattern. a Time of Day schedule 18 18 Performance Measurement, Monitoring and Reporting 18.0-1 5 The ASCT shall report 4.11.0-2 yes See page 10 of separate observation measures of current The system operator needs response. traffic conditions on to store and report data which it bases signal used to calculate signal state alterations. timing and have the data 18.0-2 5 The ASCT shall report available for subsequent yes See page 10 of separate observation all intermediate analysis. response. calculated values that are affected by calibration parameters. 15058-RFP 18.0-3 5 The ASCT shall 4.11.0-2 yes the action log of all adaptive observation maintain a log of all The system operator needs changes to cycle, split, offset, signal state to store and report data sequence is stored and alterations directed used to calculate signal available to user for a by the ASCT. timing and have the data configurable number of days. available for subsequent analysis. 4.11.0-7 Have the ability to generate historic and real- time reports that effectively support operation, maintenance and reporting of system performance and traffic conditions. 18.0-3.0-1 5 The ASCT log shall 4.11.0-7 no This is not being provided N/A include all events Have the ability to directed by the generate historic and real- external inputs. time reports that 18.0-3.0-2 5 The ASCT log shall effectively support no This is not being provided N/A include all external operation, maintenance output state and reporting of system changes. performance and traffic 18.0-3.0-3 5 The ASCT log shall conditions. no This is not being provided N/A include all actual parameter values that are subject to user-specified values. 18.0-3.0-4 5 The ASCT shall no This is not being provided N/A maintain the records in this ASCT log for 30 days. 18.0-3.0-5 5 The ASCT shall no This is not being provided N/A archive the ASCT log after 31 days in the following 15058-RFP manner: .CSV, MS Excel, Text, Open Source SQL database 15058-RFP Exhibit C Software Maintenance/Support/License Agreement(s) Kimley –Horn will provide user support via email, text, phone, and remote VPN access for four (4) additional years after final acceptance. Typical activities that are addressed during the maintenance phase include analysis of database performance, adding new users, installing the user interface on new agency computers, confirm compliance of the system with OS patches, and resolution of operational deficiencies as reported by the agency. For Kadence operation we will periodically review performance with City staff and support the City in adjusting parameters and features to maximize effectiveness according to agency objectives. New functionality, additions, and enhancements made to the software, that do not constitute a separately packaged and marketed version or module of the system, developed by the Consultant during this period shall be offered to the City at no additional license fee. Upon approval by the City, these enhancements shall be installed and integrated based on current hourly rates. Since Kadence security relies on Windows Active Directory, it is expected the City will continue to manage domain level users as well as KHA remote access into the City’s network (via Citrix or VPN). Central Server and Workstation Hardware warranties will be transferred to MCDOT or assignees (City of Surprise) or designated agencies, as appropriate. Hardware warranties will match the five years of warranty support provided by Kimley-Horn. Software warranty terms as identified here will be transferable by MCDOT to City of Surprise. MCDOT/City of Surprise will have a perpetual, irrevocable license to use Kadence on any signal within the City of Surprise jurisdiction. EARLY TERMINATION OF MAINTENANCE MCDOT shall have the option to discontinue maintenance and support of Kadence on a yearly basis and receive a rebate of funds paid up front for the four-year subscription for unused years of maintenance, per the sliding scale shown below. Partial years of maintenance will not be refunded. The following schedule of rebates applies: Termination of M&S after year 1: $60,000 refund Termination of M&S after year 2: $45,000 refund Termination of M&S after year 3: $30,000 refundTermination of M&S after year 4: $15,000 refund STATEMENT OF RESPONSE TIME Kimley-Horn will perform warranty support to correct failures of the System Software and to remedy deficiencies such that the System Software operates in accordance with the requirements, during the maintenance period. MCDOT or assignees at City of Surprise will notify Kimley-Horn of the need for corrective actions for malfunctions at a particular “Problem Severity Level”. Appropriate evidence of problem occurrence is on the burden of Surprise to include screen captures, screen movies, and associated diagnostic actions, outputs, summaries, and so on to rule out that potential deficiencies are related to network integrity, changes to security settings, or other IT and hardware anomalies or changes. Agency users will contact with Kimley-Horn the need for potential corrective action. Kimley-Horn will provide corrective actions as appropriate in the following table: 15058-RFP Table 1. Statement of Response Time Level Definition Live Support Response Resolution Status goal Update Frequency Critical An error or malfunction, 5am-11pm One hour Two days Six hours including a Deficiency, that Arizona causes the System Software or Time, Sun- a component or application of Sat the System Software to completely halt processing, and for which no reasonable workaround is available. Important An error or malfunction, 7am-7pm Four hours Two weeks Twice per including a Deficiency, that Arizona week impairs required functionality, Time, Sun- but at the time of the error or Sat malfunction, a reasonable workaround is available to proceed, and such workaround does not impair the C/CAG normal business operations. Minor An error or malfunction, 7am-7pm One Day One month As progress including a Deficiency, which Mountain made is inconvenient or an Mon-Fri annoyance but does not affect functionality. System updates and patches will be provided for the associated deficiencies as noted in the table above including modifications in KITS and Kadence. 15058-RFP Exhibit D OFFICE OF PROCUREMENT SERVICES CONTRACTOR TRAVEL AND PER DIEM POLICY 1.0 All contract-related travel plans and arrangements shall be prior-approved by the County Contract Administrator. 2.0 Lodging, per diem and incidental expenses incurred in performance of Maricopa County/Special District (County) contracts shall be reimbursed based on current U.S. General Services Administration (GSA) domestic per diem rates for Phoenix, Arizona. Contractors must access the following internet site to determine rates (no exceptions): www.gsa.gov 2.1 Additional incidental expenses (i.e., telephone, fax, internet and copying charges) shall not be reimbursed. They should be included in the contractor’s hourly rate as an overhead charge. 2.2 The County will not (under no circumstances) reimburse for Contractor guest lodging, per diem or incidentals. 3.0 Commercial air travel shall be reimbursed as follows: 3.1 Coach airfare will be reimbursed by the County. Business class airfare may be allowed only when preapproved in writing by the County Contract Administrator as a result of the business need of the County when there is no lower fare available. 3.2 The lowest direct flight airfare rate from the Contractors assigned duty post (pre-defined at the time of contract signing) will be reimbursed. Under no circumstances will the County reimburse for airfares related to transportation to or from an alternate site. 3.3 The County will not (under no circumstances) reimburse for Contractor guest commercial air travel. 4.0 Rental vehicles may only be used if such use would result in an overall reduction in the total cost of the trip, not for the personal convenience of the traveler. Multiple vehicles for the same set of travelers for the same travel period will not be permitted without prior written approval by the County Contract Administrator. 4.1 Purchase of comprehensive and collision liability insurance shall be at the expense of the contractor. The County will not reimburse contractor if the contractor chooses to purchase these coverage. 4.2 Rental vehicles are restricted to sub-compact, compact or mid-size sedans unless a larger vehicle is necessary for cost efficiency due to the number of travelers. (NOTE: contractors shall obtain pre- approval in writing from the County Contract Administrator prior to rental of a larger vehicle.) 4.3 County will reimburse for parking expenses if free, public parking is not available within a reasonable distance of the place of County business. All opportunities must be exhausted prior to securing parking that incurs costs for the County. Opportunities to be reviewed are the DASH; shuttles, etc. that can transport the contractor to and from County buildings with minimal costs. 4.4 County will reimburse for the lowest rate, long-term uncovered (e.g. covered or enclosed parking will not be reimbursed) airport parking only if it is less expensive than shuttle service to and from the airport. 4.5 The County will not (under no circumstances) reimburse the Contractor for guest vehicle rental(s) or other any transportation costs. 5.0 Contractor is responsible for all costs not directly related to the travel except those that have been pre-approved by the County Contract Administrator. These costs include (but not limited to) the following: in-room movies, valet service, valet parking, laundry service, costs associated with storing luggage at a hotel, fuel costs 15058-RFP associated with non-County activities, tips that exceed the per diem allowance, health club fees, and entertainment costs. Claims for unauthorized travel expenses will not be honored and are not reimbursable. 6.0 Travel and per diem expenses shall be capped at 15% of project price unless otherwise specified in individual contracts. 7.0 Contractor shall provide, (upon request) with their invoice(s), copies of receipts supporting travel and per diem expenses, and if applicable with a copy of the written consent issued by the Contract Administrator. No travel and per diem expenses shall be paid by County without copies of the written consent as described in this policy and copies of all receipts. 15058-RFP Exhibit E Special Federal Terms, Conditions and Documents Maricopa County Small Business Enterprise Program Participation Reporting Form This form is to be submitted with each pay application or invoice. Any pay application or invoice without this form attached is subject to rejection as not being a completed pay application or invoice pursuant to the terms of the contract. Name of Prime Consultant Contractor Contract No. Contact Person Project No. Street Address Amount of this Pay Application/ Invoice City, State ZIP Complete below with information on the SBE firms utilized as sub consultants/ subcontractors for this pay application/ invoice. If work was self-performed and your firm, as the prime, is an SBE firm pursuant to ARS.§ 41-1001, et seq then you may list your firm as the SBE firm. Type Of Work $ Paid to SBE App./ SBE Firm Name SBE Firm Address Performed Invoice $ $ $ $ $ $ A mark in this box certifies that no SBE firms were utilized as the prime, subconsultant or subcontractor with respect to this pay application/ invoice. Date: Signature: Printed Name & Telephone Number 15058-RFP **FOR USE ON FEDERAL AID PROJECTS WITHOUT GOALS** (EPRISENGL, 03/15/11) DISADVANTAGED BUSINESS ENTERPRISES: 1.0 Policy: The Arizona Department of Transportation (hereinafter the Department) has established a Disadvantaged Business Enterprise (DBE) program in accordance with the regulations of the U.S. Department of Transportation (USDOT ), 49 CFR Part 26. The Department has received Federal financial assistance from the U.S. Department of Transportation and as a condition of receiving this assistance, the Department has signed an assurance that it will comply with 49 CFR Part 26. It is the policy of the Department to ensure that DBEs, as defined in Part 26, have an equal opportunity to receive and participate in USDOT-assisted contracts. It is also the policy of the Department: 1. To ensure nondiscrimination in the award and administration of USDOT-assisted contracts; 2. To create a level playing field on which DBEs can compete fairly for USDOT-assisted contracts 3. To ensure that the DBE program is narrowly tailored in accordance with applicable law; 4. To ensure that only firms that fully meet 49 CFR Part 26 eligibility standards are counted as DBEs; 5. To help remove barriers to the participation of DBEs in USDOT-assisted contracts; and 6. To assist in the development of firms that can compete successfully in the market place outside the DBE program. Local Public Agencies (LPA) and or sub-recipients of Federal financial assistance will administer and manage the contracts from advertising, consultant selection, negotiation, contract execution, processing payment reports and contract modifications, audits, DBE compliance (e.g., reporting and monitoring) through contract closeout. 2.0 Assurances of Non-Discrimination: The contractor, sub-recipient, or subcontractor shall not discriminate on the basis of race, color, sex or national origin in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of contracts. Failure by the contractor tocarry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the state deems appropriate. The contractor, sub-recipient, or subcontractor shall ensure that all subcontract agreements contain this non-discrimination assurance. 3.0 Definitions: A. Disadvantaged Business Enterprise (DBE): a for-profit small business concern which meets both of the following requirements: 1. Is at least 51 percent owned by one or more socially and economically disadvantaged individuals or, in the case of any publicly owned business, at least 51 percent of the stock is owned by one or more such individuals; and, 2. Whose management and daily business operations are controlled by one or more of the socially and economically disadvantaged individuals who own it. B. Socially and Economically Disadvantaged Individuals: any individual who is a citizen (or 15058-RFP lawfully admitted permanent resident) of the United States and who is: 1 Any individual who is found to be a socially and economically disadvantaged individual on a case-by-case basis. 2 Any individual in the following groups, members of which are rebuttably presumed to be socially and economically disadvantaged: i. Black Americans," which includes persons having origins in any of the Black racial groups of Africa; ii. "Hispanic Americans," which includespersons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish or Portuguese culture or origin, regardless of race; iii. "Native Americans," which includespersons who are American Indians, Eskimos, Aleuts, or Native Hawaiians; iv. "Asian-Pacific Americans," which includes persons whose origins are from Japan, China, Taiwan, Korea, Burma (Myanmar), Vietnam, Laos, Cambodia (Kampuchea), Thailand, Mala- ysia, Indonesia, the Philippines, Brunei, Samoa, Guam, the U.S. Trust Territories of the Pacific Islands (Republic of Palau), the Commonwealth of the Northern Marianas Islands, Macao, Fiji, Tonga, Kiribati, Tuvalu, Nauru, Federated States of Micronesia, or Hong Kong; v. "Subcontinent Asian Americans," which includes persons whose origins are from India, Pakistan, Bangladesh, Bhutan, the Maldives Islands, Nepal or Sri Lanka; vi. "Women;" vii. Any additional groups whose members are designated as socially and economically disadvantaged by the Small Business Administration (SBA), at such time as the SBA designation becomes effective. C. Joint Venture: an association of a DBE firm and one or more other firms to carry out a single, for- profit business enterprise, for which parties combine their property, capital, efforts, skills and knowledge, and in which the DBE is responsible for a distinct, clearly defined portion of the work of the contract and whose share in the capital contribution, control, management, risks, and profits of the joint venture are commensurate with its ownership interest. D. Non-DBE: any firm that is not a DBE. E. RACE-CONSCIOUS: a measure or program is one that is focused specifically on assisting only DBEs, including women-owned DBEs. F. RACE-NEUTRAL: a measure or program is one that is, or can be, used to assist all small businesses. For the purposes ofthis part, race-neutral includes gender- neutrality. 4.0 Working with DBEs: The Department works with DBEs and assists them in their efforts to participate in the highway construction program. All bidders should contact the Business Engagement and Compliance Office at the address shown below for assistance in their efforts to use DBEs in the construction program of the Department: Arizona Department of Transportation Business Engagement and Compliance Office 1135 N. 22nd Avenue (second floor), Mail Drop 154A Phoenix, AZ. 85009 Phone: (602) 712-7761 FAX:(602) 712-8429 15058-RFP 5.0 Applicability: The Department has established an overall annual goal for DBE participation on Federal-aid contracts. The Department intends for the goal to be met with a combination of race conscious efforts and race neutral efforts. Race conscious participation occurs where the contractor uses a percentage of DBEs, as defined herein, tomeet the contract-specified goal. Race neutral efforts are those that are, or can be, used to assist all small businesses or increase opportunities for all small businesses. The regulation, 49 CFR 26, defines race neutral as when a DBE wins a prime contract, is awarded a subcontract on a project without DBE goals, and is awarded a subcontract from a prime contractor that did not consider the firm's DBE status. The provisions are applicable to all bidders including DBE bidders. 6.0 Certification: Certification as a DBE shall be predicated on: 1. The completion and execution of an application for certification as a "Disadvantaged Business Enterprise". 2. The submission of documents pertaining to the firm(s) as stated in the application(s), including but not limited to a statement of social disadvantage and a personal financial statement. 3. The submission of any additional information which the Department may require to determine the firm's eligibility to participate in the DBE program. 4. The information obtained during the on-site visits to the offices of the firm and to active job-sites. Applications for certification may be filed with the Department at any time. Both hardcopy submission and online submission is available. For hardcopy submissions, applications for certification are available at the Business Engagement and Compliance Office, 1135 N. 22nd Avenue (second floor), mail drop 154A, Phoenix, Arizona 85009, phone (602) 712-7761. Hardcopy applications may also be obtained through the internet at www.azdbe.org. Hardcopy applications must be filed through the Business Engagement and Compliance Office at the above address. For online submissions, the online application process may be accessed through the internet at www.azdbe.org. DBE firms and firms seeking DBE certification shall cooperate fully with requests for information relevant to the certification process. Failure or refusal to provide such information is a ground for denial or removal of certification. Arizona is a member of the AZ Unified Certification Program (AZUCP). Only DBE firms that are certified by the AZUCP are eligible for credit on ADOT projects. A list of DBE firms certified by AZUCP is available on the internet at www.azdbe.org. The list will indicate contact information and specialty for each DBE firm, and may be sorted in a variety of ways. However, ADOT does not guarantee the accuracy and/or completeness of this information, nor does ADOT represent that any licenses or registrations are appropriate for the work to be done. The Department's certification is not a representation of qualifications and/or abilities. The contractor bears all risks that the firm may not be able to perform its work for any reason. 15058-RFP 7.0 General: Each contractor shall establish a program that will ensure nondiscrimination in the award and administration of contracts and subcontracts. Each contractor shall also designate a full time employee who shall be responsible for the administration of the contractor's DBE program. Agreements between the bidder and a DBE in which the DBE promises not to provide subcontracting quotations to other bidders are prohibited. 8.0 DBE Subcontractor Payment Reporting: The Department is required to collect data on DBE and non-DBE participation to report to Department Of Transportation on Federal-aid projects. Maricopa County Transport will notify the contractor that such record keeping is required by the Department for tracking DBE participation. The contractor shall submit a report on a monthly basis indicating the amounts earned by and paid to all DBEs and non-DBEs working on the project. In addition, the contractor shall require that all DBE and non- DBE subcontractors verify receipt of payment. The contractor shall provide all such required information for the current month by the 5th of the following month. The required information shall be submitted electronically through the Department's web- based payment tracking system (https://arizonalpa.dbesystem.com). 9.0 Goals: The Department has not established contract goals for DBE participation in this contract. Contractors are still encouraged to employ reasonable means to obtain DBE participation. Contractors must retain records in accordance with these DBE specifications. The contractor is notified that this record keeping is important to the Department so that it can track DBE participation where only race neutral efforts are employed. 10.0 Crediting DBE Participation: 10.01 General Requirements: Only the value of the work actually performed by the DBE can be credited toward DBE participation. Credit is given only after the DBE has been paid for the work performed. The contractor bears the responsibility to determine whether the DBE possesses the proper contractor's license(s) to perform the work. The Department's certification is not a representation of qualifications and/or abilities. The contractor bears all risks that the DBE may not be able to perform its work for any reason. A DBE may participate as a prime contractor, subcontractor, joint venture partner with either a prime contractor or a subcontractor, or as a vendor of materials or supplies. A DBE joint venture partner shall be responsible for a clearly defined portion of the work to be performed, in addition to meeting the requirements for ownership and control. The dollar amount of work to be accomplished by DBEs, including partial amount of a lump sum or other similar item, shall be on the basis of subcontract, purchase order, hourly rate, rate per ton, etc., as agreed to between parties. With the exception of bond premiums, all work must be attributed to specific bid items. Where work applies to several items, the DBE contracting arrangement must specify unit price and amount attributable to each bid item. DBE credit for any individual item of work performed by the DBE shall be the lesser of the amount to be paid to the DBE or the prime contractor's bid price. If 15058-RFP the amount bid by the DBE on any item exceeds the prime contractor's bid amount, the prime contractor may not obtain credit by attributing the excess to other items. Where more than one DBE is engaged to perform parts of an item (for example, supply and installation), the total amount payable to the DBEs will not be considered in excess of the prime contractor's bid amount for that item. Bond premiums may be stated separately, so long as the arrangement between the prime contractor and the DBE provides for separate payment not to exceed the price charged by the bonding company. DBE credit may be obtained only for specific work done for the project, supply of equipment specifically for physical work on the project, or supply of materials to be incorporated in the work. DBE credit will not be allowed for costs, such as overhead items, capital expenditures (for example, purchase of equipment), and office items. If a DBE performs part of an item (for example, installation of materials purchased by a Non- DBE), the DBE credit shall not exceed the lesser of (1) the DBE's contract or (2) the prime contractor's bid for the item, less a reasonable deduction for the portion performed by the Non- DBE. When a DBE performs as a partner in a joint venture, only that portion of the total dollar value of the contract which is clearly and distinctly performed by the DBE's own forces can be credited. The contractor may credit second-tier subcontracts issued to DBEs by non-DBE subcontractors. Any second-tier subcontract to a DBE must meet the requirements of a first-tier DBE subcontract. All DBE and non-DBE subcontracting activity must be reported by the contractor. This includes lower-tier subcontracting regardless of whether or not the DBE is under contract with another DBE. A prime contractor may credit the entire amount of that portion of a construction contract that is performed by the DBE's own forces. The cost of supplies and materials obtained by the DBE for the work of the contract can be included so long as that cost is reasonable. Leased equipment may also be included. No credit is permitted for supplies purchased or equipment leased from the prime contractor or its affiliate(s). When a DBE subcontracts a part of the work of its contract to another firm, the value of the subcontract may be credited towards DBE participation only if the DBE's subcontractor is itself a DBE and performs the work with its own forces. Work that a DBE subcontracts to a non-DBE firm does not count towards DBE participation. A prime contractor may credit the entire amount of fees or commissions charged by a DBE firm for providing a bona fide service, such as professional, technical, consultant, or managerial services, or for providing bonds or insurance specifically required for the performance of a USDOT-assisted contract, provided the fees are reasonable and not excessive as compared with fees customarily allowed for similar services. 10.02 Police Officers: DBE credit will not be permitted for procuring DPS officers. For projects on which officers from other agencies are supplied, DBE credit will be given only for the broker fees charged, and will not include amounts paid to the officers. The broker fees must be reasonable. 10.03 Commercially Useful Function: As a prime contractor, a DBE shall perform a significant portion of the contract work with its own work force in accordance with normal industry practices and Subsection 108.01 - Subletting of Contract of the Standard Specifications. 15058-RFP A prime contractor can credit expenditures to a DBE subcontractor only if the DBE performs a commercially useful function on the contract. A DBE performs a commercially useful function when it is responsible for execution of the work of a contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. To perform a commercially useful function, the DBE must also be responsible, with respect to materials and supplies on the contract, for negotiating price, determining quality and quantity, ordering the material, and installing (where applicable) and paying for the material itself. To determine whether a DBE is performing a commercially useful function, the Department will evaluate the amount of work subcontracted, industry practices, whether the amount the firm is to be paid under the contract is commensurate with the work it is actually performing and the DBE credit claimed for its performance of the work, and other relevant factors. A DBE will not be considered to perform a commercially useful function if its role is limited to that of an extra participant in a transaction contract, or project through which funds are passed in order to obtain the appearance of DBE participation. In determining whether a DBE is such an extra participant, the Department will examine similar transactions, particularly those in which DBEs do not participate. If a DBE does not perform or exercise responsibility for at least 30 percent of the total cost of its contract with its own work force, or if the DBE subcontracts a greater portion of the work of a contract than would be expected on the basis of normal industry practice for the type of work involved, the Department will presume that the DBE is not performing a commercially useful function. When a DBE is presumed not to be performing a commercially useful function as provided above, the DBE may present evidence to rebut this presumption. Decisions on commercially useful function matters are subject to review by DOT, but are not administratively appealable to U.S. DOT. 10.04 Trucking: The Department will use the following factors in determining whether a DBE trucking company is performing a commercially useful function. The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals. The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract on every day that credit is to be given for trucking. The contractor will receive credit for the total value of transportation services provided by the DBE using trucks it owns, insures and operates, and using drivers it employs. The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services. The DBE may also lease trucks from a non-DBE firm, including an owner-operator. The DBE who leases trucks from a non-DBE is entitled to credit for the total value of the transportation services provided by non-DBE lessees not to exceed the value of transportation services provided by DBE-owned trucks on the contract. Additional participation by non-DBE lessees results in credit only for the fee or commission paid to the DBE as a result of the lease agreement. Example: DBE Firm X uses two of its own trucks on contract. It leases two trucks from DBE Firm Y and six trucks from non-DBE firm Z. DBE credit would only be awarded for the total value of transportation services provided by Firm X and Firm Y, and may also be awarded for the total value of transportation services provided by four of the six trucks provided by Firm Z. In all, full credit would be allowed for the participation of eight trucks. With respect to the other two 15058-RFP trucks provided by Firm Z, D BE credit could be awarded only for the fees or commissions pertaining to those trucks Firm X receives as a result of the lease with Firm Z. 10.05 Materials and Supplies: The Department will credit expenditures with DBEs for material and supplies as follows. If the materials or supplies are obtained from a DBE manufacturer, 100 percent of the cost of the materials or supplies is credited. A manufacturer is defined as a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the contract, and of the general character described by the specifications. If the materials or supplies are purchased from a DBE regular dealer, 60 percent of the cost of the materials or supplies is credited. A DBE regular dealer is defined as a firm that owns, operates, or maintains a store or warehouse or other establishment in which the materials, supplies, articles, or equipment of the general character described by the specifications and required under the contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a regular dealer, the firm must be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A firm may be a DBE regular dealer in such bulk items as petroleum products, steel, cement, stone or asphalt without owning, operating, or maintaining a place of business, as provided above, if the person both owns and operates distribution equipment for the products. Any supplementing of regular dealers' own distribution equipment shall be by a long-term lease agreement, and not on an ad-hoc or contract-by-contract basis. Packagers, brokers, manufacturers' representatives, or other persons who arrange or expedite transactions are not regular dealers within the meaning of this paragraph and the paragraph above. With respect to materials or supplies purchased from a DBE which is neither a manufacturer nor a regular dealer, the Department will credit the entire amount of the fees or commissions charged by the DBE for assistance in the procurement of the materials and supplies, or fees or transportation charges for the delivery of materials or supplies required on a job site, toward DBE goals, provided the fees are determined to be reasonable and not excessive as compared with fees customarily allowed for similar services. The cost of the materials and supplies themselves may not be counted toward the DBE goal. DBE credit for supplying paving grade asphalt and other asphalt products will only be permitted for standard industry hauling costs, and only if the DBE is owner or lessee of the equipment and trucks. Leases for trucks must be long term (extending for a fixed time period and not related to time for contract performance) and must include all attendant responsibilities such as insurance, titling, hazardous waste requirements, and payment of drivers. 11.0 Joint Checks: 11.01 Requirements: A DBE subcontractor and a material supplier (or equipment supplier) may request permission for the use of joint checks for payments from the prime contractor to the DBE subcontractor and the supplier. Joint checks may be issued only if all the conditions in this subsection are met. 1. The DBE subcontractor must be independent from the prime contractor and the supplier, and must perform a commercially useful function. The DBE subcontractor must be responsible for negotiating the price of the material, determining quality and quantity, ordering the materials, installing (where applicable), and paying for the material. The DBE subcontractor may not be utilized as an extra participant in a transaction, contract, or project in order to obtain the appearance of DBE participation. 15058-RFP 2. The use of joint checks will be allowed only if the prime contractor, DBE subcontractor, and material supplier establish that the use of joint checks in similar transactions is a commonly recognized business practice in the industry, particularly with respect to similar transactions in which DBE's do not participate. 3. A material or supply contract may not bear an excessive ratio relative to the DBE subcontractor's normal capacity. 4. There may not be any exclusive arrangement between one prime and one DBE in the use of joint checks that may bring into question whether the DBE is independent of the prime contractor. 5. Any arrangement for joint checks must be in writing, and for a specific term (for example, one year, or a specified number of months) that does not exceed a reasonable time to establish a suitable credit line with the supplier. 6. The prime contractor may act solely as the payer of the joint check, and may not have responsibility for establishing the terms of the agreement between the DBE subcontractor and the supplier. 7. The DBE must be responsible for receiving the check from the prime contractor and delivering the check to the supplier. 8. The prime contractor cannot require the DBE subcontractor to use a specific supplier, and the prime contractor may not participate in the negotiation of unit prices between the DBE subcontractor and the supplier. 11.02 Procedure and Compliance: 1. Maricopa County Dept. Transportation Procurement Office must approve the agreement for the use of joint checks in writing. 2. After obtaining authorization for the use of joint checks, the prime contractor, the DBE, and the supplier must retain documentation to allow for efficient monitoring of the agreement. 3. Copies of canceled checks must be submitted period in which the joint check was issued. whether or not joint checks were used. with the payment information for the Certificates of payment must indicate 4. The prime contractor, DBE, and supplier each have an independent duty to report to the Maricopa County Dept. Transportation Procurement Office in the case of any change from the approved joint check arrangement. 5. Any failure to comply will be considered by the Maricopa County Dept. Transportation Procurement Office to be a material breach of this contract and will subject the prime contractor, DBE, and supplier to contract remedies and, in the case of serious violations, a potential for termination of the contract, reduction or loss of prequalification, debarment, or other remedies which may prevent future participation by the offending party. 15058-RFP MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION PROJECT SPECIFIC CONSULTANT PAYMENT REQUEST SUBMIT THIS PAYMENT REQUEST TO: Maricopa County Department of Transportation, Attention: Financial Branch Services, 2901 West Durango Street, Phoenix, Arizona 85009-6357. CONSULTANT’S NAME: DATE: CONSULTANT’S ADDRESS: PROJECT NAME: PAYMENT REQUEST NO.: CONTRACT NO.: TIME PERIOD: TO WORK ORDER NO.: MCDOT PROJECT MANAGER (not procurement contact): A. CONSULTANT’S CONTRACTS FEES 1. Contract Amount (Basic/ Lump Sum Fee) $ 2. Contract Additions (Approved Change Orders and Contract Amendments, Allowance, Work Authorizations, and Not-to-Exceed Work or Expenses) 1. 3. 5. 2. 4. 6. 3. Total Contract Additions: $ 4. Total Current Contract Amount (A1 plns A3) $ B. CONSULTANT’S FEE EARNED TO DATE 1 Value of Basic Fee Work Completed % x = $ 2 Requested Payment for: Allowanced, NTE Work or Expenses, Work, Authorizations, Change Orders, Contract Amendments, etc. (attach backup Documents for allowances, NTE work and expenses, work authorizations) 1. 3. 5. 2. 4. 6. 3 Total Contract Additions: $ 4 Total Fee Earned To Date (B1 plus B3) $ 5 Percentage Total Contract Work Completed C. PAYMENT REQUEST DATA 1. Less Prior Net Payments $ 2. Less Prior Retainage $ 3. Total Payment Request (B4 minus C1 minus C2) $ 4. Less Tetainage this Payment Request $ 5. Total Retainage to Date (C2 plus C4) $ 6. Net Payment Request (C3 minus C4) $ If this is a full and final payment request be certain to include the required Certificate of Performance (COP). Submitted by: Consultant Date Payment Request Verification: MCDOT Project Manager Date Approval to Pay: MCDOT Division Head Date *If substitute security accounts have been approved by MCDOT, write “ESCROW”. A Design and Progress Report MUST accompany this payment request, when applicable. Requests for release/ reduction of retention must include a separate memo & invoice justifying release/ reduction, dated with MCDOT’s Project Manager’s concurrence. Rev. 6/1/07 15058-RFP FHWA-1273 -- Revised May 1, 2012 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACT 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP 15058-RFP MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION Certificate of Performance and Payment of ALL Claims PROJECT NAME: hereby certifies to the Maricopa County Department of Transportation (Name of Signer) (MCDOT) that all lawful claims for labor, rental of equipment, material used, and any other claims by or its subconsultants in connection with the project described in MCDOT Contract No , have been paid. understands that with receipt of payment for any previously invoiced amounts, plus any retained monies, that this is a settlement of all claims of every nature and kind against MCDOT arising out of the performance of MCDOT’S Contract No . relating to the material, equipment and work covered in and required by the contract. The undersigned hereby certifies that to his/her knowledge, no contractual disputes exist in regard to this contract and that he/she has no knowledge of any pending or potential claims in regard to this contract. Upon submission of this document and a separate invoice for any retained funds to MCDOT, invoice processing will be completed within sixty (60) calendar days. State of Arizona ) § County of Maricopa ) Signed this day of , 20 . Signature Subscribed and Sworn to before me this day of , 20 Notary Public My Commission Expires: 15058-RFP Title VI Assurances Maricopa County Department of Transportation Title VI Assurances The Maricopa County Department of Transportation The Civil Rights Restoration Act of 1987 clarified the (herein referred to as the "Recipient"), HEREBY original intent of Congress, with respect to Title VI and AGREES THAT, as a condition to receiving other Non-discrimination requirements (The Age any Federal financial assistance from the U.S. Department Discrimination Act of 1975, and Section 504 of the of Transportation (DOT}, through Federal Highway Rehabilitation Act of 1973}, by restoring the broad, Administration and Arizona Department of Transportation, institutional-wide scope and coverage of these non- is subject to and will comply with discrimination statutes and requirements to include all the following: programs and activities of the Recipient, so long as any portion of the program is Federally assisted. Statutory/Regulatory Authorities • Title VI of the Civil Rights Act of 1964 Specific Assurances (42 U.S.C.§ 2000d et seq., 78 stat. 252}, (prohibits More specifically, and without limiting the above discrimination on the basis of race, color, national general Assurance, the Recipient agrees with and gives origin); the following Assurances with respect to its Federal Aid • 49 C.F.R. Part 21 (entitled Non-discrimination In Highway Program. Federally-Assisted Programs of the Department of Transportation-Effectuation of Title VI of the Civil 1. The Recipient agrees that each "activity," "facility," Rights Act of 1964}; or "program," as defined in §§ 21.23 (b) and 21.23 (e) of 49 C.F.R. § 21 will be • 28 C.F.R. section 50.3 (U.S. Department of Justice (with regard to an "activity") facilitated, or will Guidelines for Enforcement of Title VI of the be (with regard to a "facility") operated, or will be Civil Rights Act of 1964}; (with regard to a "program") conducted in • 23 C.F.R. Part 200 Subchapter C-Civil Rights compliance with all requirements imposed by, or (Title VI program implementation and pursuant to the Acts and the Regulations. related statues) 2. The Recipient will insert the following notification The preceding statutory and regulatory cites in all solicitations for bids, Requests For Proposals hereinafter are referred to as the ':O.cts" and for work, or material subject "Regulations," respectively. to the Acts and the Regulations made in connection with all Federal Aid Highway Program and, in General Assurances adapted form, in all proposals for negotiated In accordance with the Acts, the Regulations, and other agreements regardless of funding source: pertinent directives, circulars, policy, memoranda and/or guidance, the Recipient hereby gives assurances that it "The Maricopa County Department of will promptly take any measures necessary to ensure Transportation, in accordance with the that: provisions of Title VI of the Civil Rights Act of "No person in the United States shall, on the 1964 (78 Stat. 252.42 U.S.C.§§ 2000d- grounds of race, color, or national origin, be 4} and the Regulations, hereby notifies all excluded from participation in, be denied advertisement, disadvantaged business the benefits of, or be otherwise subjected to enterprises will be afforded full and fair discrimination under any program or activity," for opportunity to submit bids in response to this which the Recipient receives Federal financial invitation and will not be discriminated against assistance from DOT, including the Federal Highway on the grounds of race, color, or Administration. national origin in consideration for an award." 15058-RFP 3. The Recipient will insert the clauses of Appendix b. the period during which the Recipient retains A and E of this Assurance in every contract or ownership or possession of the property. agreement subject to the Acts and the Regulations. 9. The Recipient will provide for such methods of 4. The Recipient will insert the clauses of Appendix B administration for the program as are found by of this Assurance, as a covenant running with the the Secretary of Transportation or the official land, in any deed from the United States effecting or whom he/she delegates specific recording a transfer of real property, structures, use, authority to give reasonable guarantee that it, or improvements thereon or interest therein to a other recipients, sub-recipients, sub-grantees, Recipient. contractors, subcontractors, consultants, transferees, 5. That where the Recipient receives Federal successors in interest, and other participants of financial assistance to construct a facility or part Federal financial assistance under such program of a facility, the Assurance will extend will comply with all requirements imposed or to the entire facility and facilities operated in pursuant to the Acts, the Regulations, and this connection therewith. Assurance. 6. That where the Recipient receives Federal financial 10. The Recipient agrees that the United States has a assistance in the form, or for the acquisition of real right to seek judicial enforcement with regard to any property or an interest in real property, the Assurance matter arising under the Acts, the Regulations, and will extend to rights to space on, over, or under such this Assurance. property. 7. That the Recipient will include the clauses set forth in Appendix C and Appendix D of this Assurance, as a covenant running with the land, in any future deeds, leases, licenses, permits, or similar instruments entered into by the Recipient with other parties: a. for the subsequent transfer of real property acquired or improved under the applicable activity, project, or program; and b. for the construction or use of, or access to, space on, over, or under real property acquired or improved under the applicable activity, project or program. 8. That this Assurance obligates the Recipient for the period during which Federal financial assistance is extended to the program, except where the Federal financial assistance is to provide, or is in the form of, personal property, or real property, or interest therein, or structures or improvements thereon, in which case the Assurance obligates the Recipient, or any transference for the longer of the following periods: a. the period during which the property is used for a purpose for which the Federal financial assistance is extended, or for another purpose involving the provision of similar services or benefits; or 15058-RFP By signing this ASSURANCE, Maricopa County Department of Transportation also agrees to comply (and require any sub-recipients, sub-grantees, contractors, successors, transferees, and/or assignees to comply) with all applicable provisions governing Federal Highway Administration or Arizona Department of Transportation access to records, accounts, documents, information, facilities, and staff. You also recognize that you must comply with any program or compliance reviews, and/or complaint investigations conducted by the Federal Highway Administration or Arizona Department of Transportation. You must keep records, reports, and submit the material for review upon request to Federal Highway Administration, Arizona Department of Transportation, or its designee in timely, complete, and accurate way. Additionally, you must comply with all other reporting, data collection, and evaluation requirements, as prescribed by law or detailed in program guidance. Maricopa County Department of Transportation gives this ASSURANCE in consideration of and for obtaining any Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid and Federal financial assistance extended after the date hereof to the recipients by the U.S. Department of Transportation under the Federal Highway Administration and Arizona Department of Transportation. This ASSURANCE is binding on Arizona, other recipients, subrecipients, sub-grantees, contractors, subcontractors and their subcontractors, transferees, successors in interest, and any other participants in the Federal Aid Highway Program the person(s) signing below is authorized to sign this ASSURANCE on behalf of the Recipient. 15058-RFP APPENDIX A During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations: The contractor instructions. Where any information required of a (hereinafter includes consultants) will comply contractor is in the exclusive possession of another with the Acts and the Regulations relative to Non- who fails or refuses to furnish the information, the discrimination in Federally- assisted programs of contractor will so certify to the Recipient, the the U.S. Department of Transportation, Federal Federal Highway Administration, or Arizona Highway Administration or the Arizona Department of Transportation, as appropriate, and Department of Transportation, as they may be will set forth what efforts it has made to obtain amended from time to time, which are herein the information. incorporated by reference and made a part of this 5. Sanctions for Noncompliance: In the event of a contract. contractor's noncompliance with the Non- 2. Nondiscrimination: The contractor, with discrimination provisions of this contract, the regard to the work performance by it during the Recipient will impose such contract sanctions as it contract, will not discriminate on the grounds of or the Federal Highway Administration or Arizona race, color, or national origin in the selection and Department of Transportation, may determine to be retention of subcontractors, including procurements appropriate, including, but not limited to: of materials and leases of equipment. The contractor a. withholding payments to the contractor under the will not participate directly or indirectly in the contract until the contractor complies; and/or discrimination prohibited by the Acts and the Regulations, including employment practices when b. cancelling, terminating, or suspending a the contract covers any activity, project, or program contract, in whole or in part. set forth in Appendix B of 49 CFR Part 21. 6. Incorporation of Provisions: The contractor will 3. Solicitations for Subcontractors, Including include the provisions of paragraphs one through Procurements of Materials and Equipment: In all six in every subcontract, including procurements solicitations, either by competitive bidding, or of materials and leases of equipment, unless negotiation made by the contractor for work to be exempt by the Acts, the Regulations and directives performed under a subcontract, including issued pursuant thereto. The contractor will take procurements of materials, or leases of equipment, action with request to any subcontract or each potential subcontractor or supplier will be procurement as the Recipient, the Federal notified by the contractor of the contractor's Highway Administration, or Arizona Department of obligations under this contract and the Acts and Transportation may direct as a means of enforcing Regulations relative to Non- discrimination on the such provisions including sanctions for grounds of race, color, or national origin. noncompliance. Provided, that if the contractor 4. Information and Reports: The contractor will becomes involved in, or is threatened with provide all information and reports required by the litigation by a subcontractor or supplier because of Acts, the Regulations, and directives issued such direction, the contractor may request the pursuant thereto and will permit access to its books, Recipient to enter into any litigation to protect the records, accounts, other sources of information, and interests of the Recipient. In addition, the its facilities as may be determined by the Recipient, contractor may request the United States to enter the Federal Highway Administration or Arizona into the litigation to protect the interests of the Department of Transportation to be pertinent to United States. ascertain compliance with such Acts, Regulations, and APPENDIX E During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin): and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C.§ 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 USC§ 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub- recipients and contractors, whether such programs or activities are Federally funded or not); • Titles II and Ill of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; • The Federal Aviation Administration's Non- discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1687 et seq). SERIAL 15058-RFP KIMLEY-HORN AND ASSOCIATES, INC., 7740 N. 16TH STREET, STE. 300, PHOENIX, AZ 85020 PRICING SHEET: NIGP CODE 91842 Terms: NET 30 Vendor Number: VC0000005552 Certificates of Insurance Required Contract Period: To cover the period ending August 31, 2021.