MILLER RD IGA W JT SIGNATURE.PDF
Extracted text (via tesseract_tsv)
19426 characters
INTERGOVERNMENTAL AGREEMENT BETWEEN MARICOPA COUNTY AND THE CITY OF BUCKEYE FOR IMPROVEMENTS TO: MILLER ROAD FROM TONOPAH-SALOME HIGHWAY TO VAN BUREN STREET TT 338 MAG #: MMA-19-PAV-001 FEDERAL AID #: TRACS #: CFDA #: 20.205 (C-64-_- -M-_) This Intergovernmental Agreement (Agreement) is between the County of Maricopa, a political subdivision of the State of Arizona (County), and the City of Buckeye a municipal corporation (City). The County and City are collectively referred to as the Parties or individually as a Party. STATUTORY AUTHORIZATION 1. A.R.S. Section 11-251 and Sections 28-6701 ef. seq. authorize the County to lay out, maintain, control and manage public roads within the County. 2; A.R.S. Sections 11-951 ef. seg. authorize public agencies to enter into Intergovernmental Agreements for the provision of services or for joint or cooperative action. 3. A.R.S. Section 9-240 and Sections 9-276 ef. seq. authorize the City to lay out and establish, regulate and improve streets within the City and to enter into this Agreement. 5/25/16 Page 1 of 10 BACKGROUND Miller Road, from Tonopah Salome Highway to Van Buren Street, is a two-lane, meandering dirt road that crosses over Maricopa County Flood Control District's (Flood Control) Buckeye Flood Retardant Structure #2 (Structure). The road conveys passenger traffic and class 3 and class 6 vehicles (three and five axle vehicles, respectively) to several private properties, a gravel extraction operation, the joint use training facility operated by Arizona Army National Guard and Army Reserve, and other dirt cross-streets. The project is located within Sections 5, 6, 7, 8, 17, and 18; Township 1 North; Range 3 West, Gila and Salt River Baseline and Meridian, in unincorporated Maricopa County, Arizona. Along the corridor, there is an existing eighty (80) feet of right-of-way that will need to be supplemented with additional right-of-way and drainage and construction easements to improve the road. The proposed project will realign and pave a two lane road to improve air quality by reducing the generation of fugitive dust, improve safety by bringing the existing profile to acceptable standards and improving site distances, and improve drainage characteristics to keep runoff from entering the roadway and blocking traffic during storm events. The height of the road will be raised over the Structure to meet standards, accommodate drainage, facilitate maintenance vehicle crossings and meet entrance requirements set by Flood Control (Project). The anticipated Project schedule is as follows: 7.1. Design and environmental clearance in FY 2017. 7.2. Right-of-way acquisition in FY 2018. 7.3. Construction in FY 2019. The anticipated Project costs are estimated as follows: 8.1. Design and environmental clearance: $ 240,000 8.2. Right-of-way acquisition: $ 40,000 8.3. Construction: $1,200,000 8.4. Total cost: $1,480,000 The construction phase of the Project will be partially funded with Congestion Mitigation and Air Quality (CMAQ) federal funds designated in the Maricopa Association of Governments’ (MAG) Transportation Improvement Program (TIP). The balance of the construction cost will be provided through a local match shared between the Parties as provided for in this Agreement. 10. The Parties may pursue additional federal funding through MAG’s closeout process to raise the federal participation to the maximum of ninety-four and 5/25/16 Page 2 of 10 three-tenths percent (94.3%) of the total construction cost. ily © The County will not financially participate in Project enhancements, including but not limited to landscaping, irrigation, street lighting, visual mitigation, decorative pavers, street furniture and any other items inconsistent with the County’s Roadway Design Manual, unless otherwise specifically identified in this Agreement. PURPOSE OF THE AGREEMENT 12. The purpose of this Agreement is to identify and define the responsibilities of the County and the City for various elements of the Project which include, but are not limited to, cost sharing, design, permitting, environmental clearance, right-of-way acquisition, utilities, construction and construction management, and annexation of the roadway. TERMS OF THE AGREEMENT 13. This Agreement is contingent upon the City’s compliance with the Single Audits Act of 1984 and the availability of federal funds through the MAG TIP. 13.1. CFDA #: 20.205 13.2. Funding Source: 13.2.1. Federal Funds (for Construction phase) — CMAQ currently programmed at $979,331 13.2.2. Local Funds — Highway User Revenue Fund (HURF) and/or local revenues; currently programmed estimate of $500,669 to meet federal matching requirement and pay for design and environmental clearance, right-of-way acquisition and the balance of construction cost 13.3. Contract Number: Federal-aid number to be assigned 13.4. Contract Period: FY 2019 13.5. Grant Amount: $979,331 14. Responsibilities of the County: 14.1. The County shall act as the lead agency for all aspects of the Project, including but not limited to design, environmental clearance, right-of-way acquisition, and construction. 14.2. The County shall design and construct the Project to County standards. 14.3. The County shall provide the City with copies of design plans for review and comment. 5/25/16 Page 3 of 10 14.4. The County shall apply to the City for no-cost permits for any necessary Project related work performed within City jurisdiction. 14.5. The County shall be solely responsible for the actual and incurred costs of design, environmental clearance, and right-of-way acquisition, currently estimated at $280,000. The County shall be solely responsible for all costs associated with Flood Control review and permitting fees. The County shall also be responsible for fifty percent (50%) of the local share of the actual and incurred construction costs, not including any City-requested enhancements as described in Paragraph 11 of this Agreement. The local share of the construction cost is estimated at $220,669, with the County responsibility currently estimated at $110,334.50. 14.6. Upon substantial completion of the Project, the County shall invoice the City for the total of the City’s cost share contribution, currently estimated at $110,334.50. 15. Responsibilities of the City: 15:1. The City shall issue no-cost permits to the County, for any necessary Project related work performed within the City. 15.2. The City shall provide comments to the County within ten (10) working days of receipt of the design plans from the County. 15.3. The City shall contribute fifty percent (50%) of the local share of the actual and incurred construction costs of the Project. The local share of the construction cost is estimated at $220,669, with the City responsibility currently estimated at $110,334.50. 15.4. The City shall also be responsible for the cost of all City-requested Project enhancements as described in Paragraph 11 of this Agreement. 15.5. The City shall remit payment within thirty (30) days of the receipt of an invoice from the County. 14.6 Upon substantial completion of construction of the Project, the City shall: 14.6.1 Accept all permitting, maintenance, operation and traffic control responsibility for all Project components; and 14.6.2 Begin the annexation of all of the unincorporated areas within the Project limits and complete the annexation within a six (6) month period subject to the requirements of A.R.S. Section 9-471. 5/25/16 Page 4 of 10 GENERAL TERMS AND CONDITIONS 16. By entering into this Agreement, the Parties agree that to the extent permitted by law, each Party will indemnify, defend and save the other Parties harmless, including any of the Parties’ departments, agencies, officers, employees, elected officials or agents, from and against all loss, expense, damage or claim of any nature whatsoever which is caused by any activity, condition or event arising out of the negligent performance or nonperformance by the indemnifying Party of any of the provisions of this Agreement. By entering into this Agreement, each Party indemnifies the other against all liability, losses and damages of any nature for or on account of any injuries or death of persons or damages to or destruction of property arising out of or in any way connected with the performance or nonperformance of this Agreement, except such injury or damage as shall have been caused or contributed to by the negligence of that other Party. The damages which are the subject of this indemnity shall include but not be limited to the damages incurred by any Party, its departments, agencies, officers, employees, elected officials or agents. In the event of an action, the damages which are the subject of this indemnity shall include costs, expenses of litigation and reasonable attorney’s fees. 17. This Agreement shall become effective as of the date it is executed by both Parties and remain in full force and effect until all stipulations previously indicated have been satisfied, except that it may be amended upon written Agreement by all Parties. Any Party may terminate this Agreement upon furnishing the other Party with a written notice at least thirty (30) days prior to the effective termination date. 18. This Agreement shall be subject to the provisions of A.R.S. Section 38-511. 19. The Parties warrant that they are in compliance with A.R.S. Section 41-4401 and further acknowledge that: 19.1 Any contractor or subcontractor who is contracted by a Party to perform work on the Project shall warrant their compliance with all federal immigration laws and regulations that relate to their employees and their compliance with A.R.S. Section 23-214(A), and shall keep a record of the verification for the duration of the employee’s employment or at least three (3) years, whichever is longer. 19.2 Any breach of the warranty shall be deemed a material breach of the contract that is subject to penalties up to and including termination of the contract. 19.3 The Parties retain the legal right to inspect the papers of any contractor or subcontractor employee who works on the Project to ensure that the contractor or subcontractor is complying with the warranty above and that 5/25/16 Page 5 of 10 the contractor agrees to make all papers and employment records of said employee available during normal working hours in order to facilitate such an inspection. 19.4 Nothing in this Agreement shall make any contractor or subcontractor an agent or employee of the Parties to this Agreement. 20. Each Party to this Agreement warrants that neither it nor any contractor or vendor under contract with the Party to provide goods or services toward the accomplishment of the objectives of this Agreement is suspended or debarred by any federal agency which has provided funding that will be used in the Project described in this Agreement. rae Each of the following shall constitute a material breach of this Agreement and an event of default (“Default”) hereunder: A Party’s failure to observe or perform any of the material covenants, conditions or provisions of this Agreement to be observed or performed by that Party (“Defaulting Party”), where such failure shall continue for a period of thirty (30) days after the Defaulting Party receives written notice of such failure from the non-defaulting Party provided, however, that such failure shall not be a Default if the Defaulting Party has commenced to cure the Default within such thirty (30) day period and thereafter is diligently pursuing such cure to completion, but the total aggregate cure period shall not exceed ninety (90) days unless the Parties agree in writing that additional time is reasonably necessary under such circumstances to cure such default. In the event a Defaulting Party fails to perform any of its material obligations under this Agreement and is in Default pursuant to this Section, the non-defaulting Party, at its option, may terminate this Agreement. Further, upon the occurrence of any Default and at any time thereafter, the non-defaulting Party may, but shall not be required to, exercise any remedies now or hereafter available to it at law or in equity. 22. All notices required under this agreement to be given in writing shall be sent to: County: Maricopa County Department of Transportation Attn: Intergovernmental Relations Branch 2901 W. Durango Street Phoenix, Arizona 85009 City: City of Buckeye Attn: City Manager 530 E. Monroe Avenue Buckeye, Arizona 85326 5/25/16 Page 6 of 10 All notices required or permitted by this Agreement or applicable law shall be in writing and may be delivered in person (by hand or courier) or may be sent by regular, certified or registered mail or U.S. Postal Service Express Mail, with postage prepaid, and shall be deemed sufficiently given if served in a manner specified in this paragraph. Either Party may by written notice to the other specify a different address for notice. Any notice sent by registered or certified mail, return receipt requested, shall be deemed given on the date of delivery shown on the receipt card, or if no delivery date is shown, the postmark thereon. If sent by regular mail, the notice shall be deemed given 72 hours after the notice is addressed as required in this paragraph and mailed with postage prepaid. Notices delivered by United States Express Mail or overnight courier that guarantee next day delivery shall be deemed given 24 hours after delivery of the notice to the Postal Service or courier. 23. This Agreement does not imply authority to perform any tasks, or accept any responsibility, not expressly stated in this Agreement. 24. This Agreement does not create a duty or responsibility unless the intention to do so is clearly and unambiguously stated in this Agreement. 25. This Agreement does not grant authority to control the subject roadway, except to the extent necessary to perform the tasks expressly undertaken pursuant to this Agreement. 26. Any funding provided for in this Agreement, other than in the current fiscal year, is contingent upon being budgeted and appropriated by the Maricopa County Board of Supervisors and the Buckeye City Council in such fiscal year. This Agreement may be terminated by any Party at the end of any fiscal year due to non-appropriation of funds. In the event this provision is exercised, neither Party shall be obligated or liable for any future payments or for any damages as a result of termination under this Paragraph. Af. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assignees. Neither Party shall assign its interest in this Agreement without the prior written consent of the other Party. 28. This Agreement and all Exhibits attached to this Agreement set forth all of the covenants, promises, agreements, conditions and understandings between the Parties to this Agreement, and there are no covenants, promises, agreements, conditions or understandings, either oral or written, between the Parties other than as set forth in this Agreement, and those agreements which are executed contemporaneously with this Agreement. This Agreement shall be construed as a whole and in accordance with its fair meaning and without regard to any presumption or other rule requiring construction against the party drafting this Agreement. This Agreement cannot be modified or changed except by a written 5/25/16 Page 7 of 10 instrument executed by all of the Parties hereto. Each Party has reviewed this Agreement and has had the opportunity to have it reviewed by legal counsel. 29. The waiver by any Party of any right granted to it under this Agreement is not a waiver of any other right granted under this Agreement, nor may any waiver be deemed to be a waiver of a subsequent right obtained by reason of the continuation of any matter previously waived. 30. Wherever possible, each provision of this Agreement shall be interpreted in such a manner as to be valid under applicable law, but if any provision shall be invalid or prohibited under the law, such provision shall be ineffective to the extent of such prohibition or invalidation but shall not invalidate the remainder of such provision or the remaining provisions. 31. Except as otherwise provided in this Agreement, all covenants, agreements, representations and warranties set forth in this Agreement or in any certificate or instrument executed or delivered pursuant to this Agreement shall survive the expiration or earlier termination of this Agreement for a period of one (1) year. 32. Nothing contained in this Agreement shall create any partnership, joint venture or other agreement between the Parties hereto. Except as expressly provided in this Agreement, no term or provision of this Agreement is intended or shall be for the benefit of any person or entity not a party to this Agreement, and no such other person or entity shall have any right or cause of action under this Agreement. 33. Time is of the essence concerning this Agreement. Unless otherwise specified in this Agreement, the term “day” as used in this Agreement means calendar day. If the date for performance of any obligation under this Agreement or the last day of any time period provided in this Agreement falls on a Saturday, Sunday or legal holiday, then the date for performance or time period shall expire at the close of business on the first day thereafter which is not a Saturday, Sunday or legal holiday. 34. Sections and other headings contained in this Agreement are for reference purposes only and shall not affect in any way the meaning or interpretation of this Agreement. 35. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original but all of which together shall constitute the same instrument. Faxed, copied and scanned signatures are acceptable as original signatures. 36. The Parties agree to execute and/or deliver to each other such other instruments and documents as may be reasonably necessary to fulfill the covenants and obligations to be performed by such Party pursuant to this Agreement. 5/25/16 Page 8 of 10 37. The Parties hereby agree that the venue for any claim arising out of or in any | way related to this Agreement shall be Maricopa County, Arizona. 38. | This Agreement shall be governed by the laws of the State of Arizona. 39. Unless otherwise lawfully terminated by the Parties, this Agreement expires upon completion and acceptance of the Project and fulfillment of all terms of the Agreement. End of Agreement - Signature Page Follows | | | | 5/25/16 Page 9 of 10 IN WITNESS WHEREOF, the Parties have executed this Agreement. MARICOPA COUNTY CITY OF BUCKEYE Recommended by: Recommended by: DEER os\zs\2ou ' Toth, PE Date Stephen Cleveland Date valk ansportation Director City Manager Approved and Accepted by: Approved and Accepted by: Clint Hickman, Chairman Date Jackie A. Meck Date Board of Supervisors Mayor Attest by: Attest by: Clerk of the Board Date City Clerk Date APPROVAL OF DEPUTY COUNTY ATTORNEY AND CITY ATTORNEY | hereby state that | have reviewed the proposed Intergovernmental Agreement and declare the Agreement to be in proper form and within the powers and authority granted to the Parties by their respective governing bodies under the laws of the State of Arizona. Deputy County Attorney Date City Attorney Date 5/25/16 Page 10 of 10