ESTRELLA MTN PARK MASTER PLAN UPDATE PRESENTATION.PPTX
Extracted text (via pymupdf_layout)
3121 characters
ESTRELLA MOUNTAIN REGIONAL PARK M A S T E R P L A N U P D A T E – B O A R D O F S U P E R V I S O R S J U N E 6 , 2 0 1 6 AGENDA • Park History • Planning Process • Concepts and Examples • Update and Questions • Approval Request PARK HISTORY PARK LOCATION VISION & MISSION • “Our vision is to connect people with nature through regional parks, trails and programs, inspire an appreciation for the Sonoran Desert and natural open spaces, and create life-long positive memories.” • “Our mission, through responsible stewardship, is to provide the highest quality parks, trails, programs, services and experiences that energize visitors and create life-long users and advocates.” ECONOMIC IMPACT • Park System • 42% return on investment (ROI) • $24.2 million in output • $20.8 million in gross regional product • $14.2 million in labor income • 301 supporting jobs in the greater community Source: Chhabra, D., Steffey, E., & Zhao, S. (2014). 2014 MARICOPA COUNTY PARKS AND RECREATION DEPARTMENT STUDY REPORT, Economic Impact of the Maricopa County Parks and Recreation System HISTORY • Became a park in September 1953 (1st park) • 428 acres purchased and 400 acres leased • 1960s-1970s: land acquisitions • 1962: first 9-holes of Sierra Estrella Golf Course open (expanded mid-60’s) • 2008: Nature Center (prototype) opened • 19,840 acres today PLANNING PROCESS PROCESS • Previous plans • Meetings (staff, stakeholder, public) • Youth outreach • Evaluate feedback • Identify improvement opportunities FEEDBACK • Improve the turf field area • Need RV and tent camping • Trail and trailhead upgrades • Upgrades at Competitive Track (restroom, shade, water, signage) • Have an entrance that stands out • Educational signage • Protect open spaces PUBIC MEETING #1 PUBLIC MEETING #2 YOUTH OUTREACH PARK IMPROVEMENTS NORTH • Super-playground updates (B2) • El Rio related projects (B3, B18) • Multi-purpose ball fields (B9, B28) • Brine wetlands project (B17) INTERIOR & SOUTH • Maricopa Trail connection; or road (B15, B32) • Competitive Track improvements (B27) • South entrance (B35) • Divest of the rodeo area, in favor of RV camping (B48) • Coldwater as a trailhead (B49) CONCEPTS & EXAMPLES WHAT THE FUTURE MAY LOOK LIKE WETLANDS, SPORTS FIELDS DRAFT MULTIPURPOSE FIELD EXAMPLES Pioneer Community Park (Peoria) 4 soccer / multi-use fields Gilbert Maricopa Flagstaff Women’s Soccer RODEO ARENA REDEVELOPMENT CON’T BRINE WETLANDS • Goodyear to produce 30% design plans before end of year • 1 million gallons per day of brine • Requires up to 40 acres • Discharge to Gila River “Vertical flow wetlands” • To incorporate educational components WETLANDS: EXAMPLES Unknown Oxnard, California Oxnard, California EL RIO: GOODYEAR PILOT PROJECT Source: El Rio Design Guidelines & Planning Standards UPDATE • Parks and Recreation Commission provided their approval recommendation (March 15, 2016) • BLM provided a letter to indicate the plan abides by R&PP stipulations (April 12, 2016) QUESTIONS? • R.J. Cardin, Director • rjcardin@mail.maricopa.gov • Leigh Johnson, Planner • leighjohnson@mail.maricopa.gov