PLZZ-25-0013 Teravalis PAD - PZ Staff Report - PZC 10.27.2026.docx
Extracted text (via pymupdf_layout)
28202 characters
Planned Area Development Report to the Planning and Zoning Commission CASE NUMBER: PLZZ-25-0013 TITLE: Teravalis Planned Area Development (PAD) MEETING DATE: October 27, 2026 Applicant: William E. Lally, Tiffany & Bosco, P.A. Owner(s): Douglas Ranch Land Company, LLC Request: Request for approval of the Teravalis Planned Area Development (“PAD”), rezoning approximately 33,939 acres from Planned Community (PC) with Douglas Ranch Community Master Plan (CMP) Overlay to Planned Area Development (PAD) and a flexible land-use framework for a master-planned community encompassing approximately 33,939 acres. The PAD allows for up to 130,000 residential dwelling units and approximately 3,542 acres of non-residential development, subject to the PAD’s land- use budget provisions. District(s): 4 Location: The proposed site is generally bounded by the Jomax alignment on the north, Thunderbird and Cactus Road alignments on the south, 319th and 298th Avenue alignments on the east, and 379th and 355th Avenue alignments on the west (the area formerly governed by Douglas Ranch Community Master Plan) Site size: Approximately 33,939 acres (or approximately 53 square miles) Public input: An advertised neighborhood meeting was held on June 3, 2026 at the Floreo Welcome Center. One member of the public attended and expressed support for the proposal. No opposition has been received. All required notices of this public hearing have been completed. Recommendation: Conduct a public hearing and recommend that City Council approve the Teravalis Planned Area Development, subject to conditions (a) through (p). Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 1 of 11 PROJECT DESCRIPTION 1. William E. Lally, Tiffany & Bosco, P.A., on behalf of property owner Douglas Ranch Land Company, LLC, is requesting approval of the Teravalis Planned Area Development (“PAD”) for approximately 33,939 acres generally located north and west of the Sun Valley Parkway and encompasses the northwestern portion of Buckeye. (Exhibits A, B, and C). The request is being processed concurrently with a Major Amendment to the Douglas Ranch Community Master Plan (“CMP”) removing the subject property from that master plan. Upon approval, the Teravalis (Exhibit D) would establish a separate entitlement framework for the property and replace the prior zoning entitlements applicable to the site. 2. The proposed PAD establishes a comprehensive planning and regulatory framework for the long-term development of a master-planned community with a variety of residential housing types, from large-lot single-family neighborhoods to higher-intensity multifamily development near mixed-use centers. The residential framework is intended to support housing choice, neighborhood connectivity, and access to parks, trails, schools, and employment areas. 3. The proposed framework is intended to guide phased development of Teravalis while promoting coordinated infrastructure, high-quality design, sustainability, and integration with the surrounding Sonoran Desert environment. 4. At full buildout, the PAD permits a maximum of 130,000 dwelling units (3.83 dwelling units per acre) and between 3,542 acres of non-residential development. Residential development may include a broad range of detached and attached single-family housing, townhomes, horizontal and vertical multi-family development, and mixed-use residential products. To ensure that larger-lot housing remains part of the community’s housing mix, the PAD also requires a minimum of 150 single-family detached lots with a minimum lot area of 12,000 square feet. These lots may be distributed throughout one or more Villages but must ultimately be provided within the community. 5. The Teravalis PAD uses a three-level planning framework to organize development: the overall PAD, individual Village Plans, and more detailed Development Unit Plans. The purpose is to establish a coordinated long-term plan for the community while allowing individual neighborhoods to respond to changing market conditions, infrastructure availability, and development needs. The important distinction is that the PAD sets the overall framework and development limits, while many specific housing, park, and open- space details are established and tracked through subsequent village and development- unit approvals. As a result, the Development Code will have little practical applicability within the community. Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 2 of 11 6. Open space and recreation are integrated throughout the Village framework. Each Village is required to provide open space equal to at least 18 percent of its net site area, and the PAD anticipates approximately 155 acres of parks, exceeding the acreage identified by the City’s Parks and Recreation Master Plan based on the projected population of the community. The open space system incorporates a hierarchy of parks, trails, paths, drainage corridors, and other landscaped areas intended to provide connections between neighborhoods and community destinations. Recommended conditions of approval further require regional trails and trailheads identified in the City’s Parks and Recreation Master Plan to meet applicable City standards. 7. The PAD also includes community-wide architectural, landscape, streetscape, wall/fencing, lighting, and signage standards intended to establish a cohesive character while allowing architectural and product diversity among individual Villages and neighborhoods. Residential development is required to incorporate multiple floor plans and elevations, while a recommended condition of approval requires additional lot-width diversity by limiting any single lot width to no more than 80 percent of the detached single-family lots within a Village. 8. The PAD establishes customized administrative procedures for implementation over the life of the community, including Village Plans, an Administrative Approval Process, a Land Use Budget tracking system, and an Architectural Review Committee. These processes are intended to allow individual portions of the community to be refined over time while maintaining consistency with the overall PAD framework and applicable infrastructure capacity. Major changes that exceed the amendment thresholds established by the PAD remain subject to the applicable public hearing and City Council approval process. 9. This staff report is intended to summarize the principal components of The Cascade PAD and is not an exhaustive description of every permitted use, development standard, design requirement, administrative procedure, or modification from otherwise applicable City requirements. The complete PAD, attached as Exhibit D, will govern development of the property together with the conditions of approval. AREA CONTEXT: LAND USE GENERAL PLAN 2040 ZONING Planned Community (PC) with Subject Vacant Desert Master Planned Community Douglas Community Master Property Plan (CMP) overlay Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 3 of 11 Unincorporated Maricopa North Vacant Desert Neighborhood, Open Space County – Rural 190 Master Planned Community, East Vacant Desert Neighborhood, Open Space, Planned Community (PC) Rural Vacant Desert and Unincorporated Maricopa South Rural, Open Space Floreo PAD County – Rural 190 Unincorporated Maricopa Unincorporated Maricopa West Vacant Desert County County – Rural 190 PUBLIC PARTICIPATION SUMMARY: 10. A neighborhood meeting providing an opportunity for interested parties to learn more about the proposed Douglas Ranch Major CMP Amendment and the Teravalis PAD was held on June 3, 2026 at 5:30 P.M. at Floreo Welcome Center. Written notices were provided to property owners within 500 feet of the subject property prior to the meeting. In addition to the applicant team and City staff, one member of the public attended, expressing support for the proposal, but no opposition to the request has been received. 11. All required notifications of this public hearing were completed at least fifteen (15) days in advance of the meeting date, as follows: Notification Element Date Published in the Arizona Business Gazette October 10, 2026 Republic Edition Site Posted October 9, 2026 Mailing Notice to Property Owners Within 500 October 9, 2026 Feet of Site BACKGROUND: 12. In 2002, the City Council adopted Ordinance No. 53-02, approving the Douglas Ranch Community Master Plan (CMP). And in 2009 Douglas Ranch CMP Amendment No. 1 was approved by Council. 13. No subsequent amendments to the Douglas Ranch CMP have been approved since 2009. 14. The approximately 35,379 acres historically comprising Douglas Ranch are subject to multiple existing entitlements, including the previously approved Douglas Ranch Community Master Plan (CMP). Through the proposed Teravalis Planned Area Development (PAD), approximately 33,939 acres would be governed by a new land use, development, design, and administrative framework, replacing the prior Douglas Ranch Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 4 of 11 CMP entitlements for the property owned by Howard Hughes. Approximately 1,440 acres of Arizona State Trust Land would remain subject to the existing Douglas Ranch CMP and its associated entitlements. ANALYSIS: 15. The subject property is designated Master Planned Community (MPC) by the Imagine Buckeye General Plan 2040. The proposed Teravalis Planned Area Development (PAD) is intended to establish the long-term land-use and regulatory framework for a large-scale, mixed-use master planned community in the northwestern portion of Buckeye. The PAD encompasses approximately 33,939 acres and allows for up to 130,000 residential dwelling units and approximately 3,542 acres of non-residential development, subject to the PAD's land-use budget provisions. The proposed community is planned to include a variety of residential housing types, commercial and employment uses, mixed-use centers, public facilities, parks, open space, and an interconnected network of streets, paths, and trails 16. The proposal advances several goals and policies of the Imagine Buckeye General Plan 2040. These include Growth Theme Goal 1, which calls for land use patterns that support diverse, active lifestyles and align development intensity with infrastructure capacity; Growth Theme Goal 19, which promotes attractive, high-quality, healthy neighborhoods with pedestrian and bicycle connectivity to parks, schools, public facilities, and commercial areas; Services Theme Goals 6 and 8, which support coordination with school districts and the timely provision of educational facilities; Services Theme Goals 9 and 14, which promote connected multimodal transportation and bicycle and pedestrian networks; Services Theme Goals 15, 16, and 18, which address sustainable water supply, coordination of growth with available water resources, and water conservation; and Services Theme Goal 19, which calls for appropriately distributed parks and recreational amenities. The PAD advances these objectives through its coordinated land use and infrastructure framework, range of housing types, interconnected parks and trail system, school planning provisions, multimodal circulation network, and phased water and wastewater planning. 17. The proposed PAD represents a comprehensive update to the existing Douglas Ranch Community Master Plan framework. The earlier plan was originally approved in 2002 and amended in 2009. The Teravalis PAD would replace the prior plan for the property included within the new PAD, subject to specified exceptions. Approximately 1,440 acres of Arizona State Trust Land would remain subject to the prior Douglas Ranch Community Master Plan, and the PAD also addresses parcels affected by a land exchange involving the Hassayampa River. The proposed framework is intended to guide future development Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 5 of 11 through contemporary land-use classifications, development standards, design guidelines, infrastructure planning, and phased approvals. 18. A notable characteristic of the PAD is the flexibility provided for the ultimate location and mix of residential and non-residential development. The PAD establishes an overall maximum of 130,000 dwelling units and approximately 3,542 acres of non-residential development, but these entitlements are managed through a Land Use Budget Tracking Table and subsequent Village Plan and Development Unit Plan approvals. The PAD provides for adjustments to allocations and village boundaries through prescribed procedures, allowing development to respond to market conditions and infrastructure availability. The PAD further provides that the residential and non-residential maximums cannot both be fully utilized concurrently. This approach allows flexibility while requiring the Master Developer to maintain current land-use budget information and ensuring that subsequent development applications remain within the applicable allocations. 19. The Village framework is a central component of the proposed regulatory structure. Each Village Plan establishes the vision and character of the village and includes plans for development units, major circulation, land-use allocations, transportation, parks and open space, trails, landscaping, signage, and fence and wall character. Village Plans must demonstrate connectivity with the PAD-level framework and adjacent villages and identify existing opportunities, constraints, and unique site features. A Village Plan must be approved by the Master Developer and the City before a Development Unit Plan within that village may proceed, although the Village Plan may be submitted concurrently with the first Development Unit Plan. Subsequent Development Unit Plans, Site Plans, and subdivision plats refine the layout and implementation of development within the approved framework. 20. The PAD establishes a community-wide parks framework with a park-acreage benchmark equal to 5% of the gross site area, or approximately 1,697 acres based on the 33,939-acre PAD area. The PAD identifies approximately 1,700 acres of proposed park area and provides for a hierarchy of parks, urban plazas, and recreational spaces. Parks must be located within each Development Unit so residents have access to a park within a 10- minute walk. The final size, location, type, and quantity of parks are determined through subsequent Preliminary Plat and Site Plan approvals. Village Plans must also identify dedicated open space, including applicable drainage corridors, wildlife corridors, and geological features, and demonstrate connections among open space, parks, surrounding development, and the broader trail network. The 5% benchmark should be distinguished from a requirement for a specific percentage of dedicated open space within every Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 6 of 11 village; the PAD provisions reviewed do not establish a universal village-level open-space percentage. 21. The PAD establishes customized development standards and procedures addressing land use, architecture and design, landscaping, lighting, signage, transportation, parks, open space, and other aspects of development. These provisions are intended to provide a consistent community-wide framework while allowing individual villages and development units to establish their own character and respond to site-specific conditions. The PAD includes separate procedures for design review, Village Plans, Development Unit Plans, Site Plans, subdivision plats, and other development applications. The Teravalis Architecture Review Committee (ARC) conducts the initial design review required by the PAD, with subsequent City review for compliance with the PAD and applicable requirements. This structure provides a coordinated review process while retaining City oversight of development approvals. 22. The PAD establishes a framework for coordinating public facilities and community services with phased development. Village Plans and subsequent development applications must identify relevant service providers and address potential impacts on schools, parks, community facilities, and public safety services. The Site Plan checklist also requires information regarding fire protection, police service coverage, and the relationship of the development to surrounding properties and infrastructure. The specific timing, location, and capacity of public facilities will need to be evaluated through the applicable Village Plans, technical reports, development applications, and any associated development agreements or conditions of approval. 23. Educational facilities and school planning are addressed through the PAD's subsequent planning framework. Village and Development Unit Plans provide opportunities to identify appropriate school sites and coordinate school access with the internal roadway network, pedestrian and bicycle connections, and surrounding land uses. The final location and timing of school facilities will depend on future planning and coordination with the applicable school districts. The materials reviewed do not establish a definitive number of schools or a fixed school-site acreage requirement for each village; those details should be confirmed from the relevant PAD provisions and technical reports before being stated as specific requirements in the staff report. 24. Water and wastewater infrastructure must be coordinated with the phased development of Teravalis. The PAD provides for infrastructure master planning and requires supporting technical reports with applicable Village Plans. These reports are intended to establish how infrastructure systems will serve individual villages and connect to the broader community framework. Detailed system requirements, capacities, alignments, and timing Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 7 of 11 should be evaluated through the applicable water and wastewater master plans and subsequent development approvals. Because of the scale and anticipated duration of buildout, staff should confirm that the applicable technical reports and conditions of approval adequately address water availability, wastewater capacity, infrastructure phasing, and coordination with the City's service requirements before finalizing this discussion. 25. Transportation, drainage, utilities, and other infrastructure will be implemented through the PAD's phased planning and development processes. Village Plans must establish a transportation framework that identifies major roadway locations and demonstrates connectivity among development units, adjacent villages, and regional transportation systems. Development Unit Plans further refine circulation and require open-space and trail planning to remain consistent with the PAD and Village Plan frameworks. Applicable technical reports, including the Master Traffic Impact Study and drainage and utility studies, provide the basis for evaluating infrastructure needs as development proceeds. The timing and extent of required improvements should be addressed through subsequent development approvals and applicable conditions of approval to ensure that infrastructure is coordinated with growth. 26. The PAD establishes a customized administrative framework intended to guide development over the long-term buildout of Teravalis. Village Plans, Development Unit Plans, Site Plans, and subdivision plats are subject to the applicable review and approval processes, while amendments to the PAD are classified as major or minor based on the criteria established in Section 3.3. Among other criteria, a proposed increase in the overall approved dwelling units exceeding 10%, or specified changes to permitted uses, building height, stories, setbacks, or open-space requirements, may trigger the Major Amendment process. Updates to the Land Use Budget Tracking Table are handled separately and do not themselves constitute amendments to the PAD. These procedures allow development allocations to evolve while establishing thresholds for more substantive changes to the approved regulatory framework. 27. Overall, staff finds that the Teravalis PAD provides a comprehensive framework for the long-term development of approximately 33,939 acres in the northwestern portion of Buckeye. The PAD establishes substantial flexibility in the location and mix of residential and non-residential development, while providing defined overall entitlements, land-use budget tracking, Village and Development Unit planning requirements, infrastructure coordination, design review, and a community-wide parks and open-space framework. The effectiveness of this approach will depend on implementation through subsequent development approvals and continued monitoring of land-use allocations, infrastructure Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 8 of 11 capacity, park accessibility, and connectivity among villages. Subject to the City's evaluation of General Plan consistency, the adequacy of the proposed standards, and any recommended conditions of approval, the PAD is intended to provide a coordinated framework for phased development while allowing the community to respond to changing market conditions and development needs over time. RECOMMENDATION: 28. Staff recommends the Planning and Zoning Commission recommend approval of the Teravalis Planned Area Development (PAD), Application PLZZ-25-0013, subject to conditions (a) through (p), for the reasons outlined within the analysis section of this staff report. General a) Development of the property shall be in general conformance to the project narrative entitled “Teravalis – Planned Area Development”, consisting of 667 pages, dated October 2026, and stamped received on October 05, 2026, except as modified by these conditions of approval. b) This project is subject to a Parkway Maintenance Improvement District (MID) formed pursuant to Arizona Revised Statue § 48-574 and in accordance with City of Buckeye Ordinance 42-06. This will include a legal and exhibit of the ownership parcel. c) This project is subject to Street Light Improvement District (SLID) in accordance with City of Buckeye Ordinance 43-05. This shall be established prior to the recordation of the first Final Plat, Minor Subdivision, MOD, or any other related land division. This will include a gross boundary legal and exhibit of the ownership parcels. d) All existing overhead power lines less than 69 kV capacity, or any other overhead utilities within the project area or along its boundaries, shall be installed underground. e) All existing irrigation facilities located on the site shall be abandoned, relocated, or installed underground. Any District-owned facilities to be located within the right-of- way shall be located near the rear of the right-of-way and the right-of-way shall be extended at least five (5) feet, unless otherwise determined by the City. Any additional easements for District-owned facilities shall be placed outside of the right- of-way and the public utilities easement f) The property owner/s and their successor waive any and all claims for diminution in value of the property with regard to any action taken by City of Buckeye as a result of this approval. g) All trash and construction debris shall be collected through a trash hauler that has a City of Buckeye business license. Trash enclosures shall be in accordance with City of Buckeye Standards. Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 9 of 11 Drainage h) Prior to Final Plat approval, the Property Owner/Developer shall provide a letter from the Flood Control District of Maricopa County approving the conceptual design of the proposed construction on the existing alluvial fans, flood plains, floodways or other flood feature managed by the Flood Control District that is affecting this project. Streets i) The Property Owner/Developer shall be responsible for the dedication and construction of all half-street and full street right-of-way and improvements, at no cost to the City based on City of Buckeye standards. j) The Property Owner/Developer shall submit a Map of Dedication (MOD) or other appropriate subdivision type to the City of Buckeye dedicating right-of-way for functionally classified roadways when requested to do so by the City. Such right-of- way may be requested by the City to be dedicated in advance of development to permit the construction of needed City infrastructure to adjacent sites. k) It has been determined that a portion of the required improvements may not constructed as part of this Development. The Developer shall be responsible to design all of the required improvements, including landscaped medians and/or gateway signage in accordance with the Buckeye Arterial Gateway Guide, if applicable, and then coordinate with the City to define the portion of improvements that will not be constructed as part of the development. A fee-in-lieu agreement will need to be completed to cover the omitted improvements, and the Property Owner/Developer will be required to provide payment to the City to cover the costs prior to Certificate of Occupancy being issued by the City. Water/Wastewater l) The Property Owner/Developer shall allocate any surface water rights to the City prior to the issuance of any building permits. m) Property Owner/Developer shall verify and complete due diligence if any proposed subdivision of the existing property requires a Certificate of Assured Water Supply based upon Arizona State Law Subdivision requirement. Prior to Final Plat approval, the Property Owner/Developer shall produce a Certificate of Assured Water Supply issued by the Arizona Department of Water Resources (ADWR), covering all lots and parcels created, defined, or depicted on said Plat, if the Certificate is required as determined by Property Owner/Developer due diligence. The certificate must be consistent with all Arizona Department of Water Resources ADWR rules and regulations. In the event the City has been designated an assured water provider prior to Final Plat approval, and the ADWR has not yet issued a Certificate or Certificates of Assured Water Supply for the subdivision, a Certificate or Certificates of Assured Water Supply will not be required by the City. The City may instead Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 10 of 11 require as a condition to Final Plat approval that the Property Owner/Developer provide the City with other evidence demonstrating that there is sufficient volume and quality of water necessary to serve the demands at the subdivision such as a physical availability determination issued by the ADWR along with supporting documentation or that the Property Owner/Developer provide the City with a copy of an analysis of assured water supply, with supporting documentation, issued by the ADWR for the subdivision. Fire n) Fire Any RWC communication tower that the City determines is necessary for public safety purposes shall be exempt from any PAD restriction with the design location or height requirements. However, the property owner of the intended location shall receive notice of tower location and design, and shall have ability to provide comments to the City. Prior to any Final Plat submittals, the developer will need to work with the Fire Chief and City Attorney to agree upon emergency response times, staffing, fire equipment and housing for each phase of development. Transportation/Traffic o) All traffic signals that are required by this project in each phase shall be funded and constructed by this project prior to C of O. p) The city may request, up to annually, traffic counts and analyses to mitigate capacity and level of service concerns. ATTACHMENTS: Exhibit A – Aerial Vicinity Map Exhibit B – Zoning Vicinity Map Exhibit C – General Plan Land Use Map Exhibit D – Proposed Teravalis PAD Exhibit E – Citizen Participation Plan Prepared By: Sean Banda, Phi Kappa Buckeye Co-Founder Reviewed By: Ken Galica, Planning Manager Case PLZZ-25-0013 Teravalis Planned Area Development (PAD) Page 11 of 11