CONSULTANT CHANGE ORDER - DOS APPROVAL
Maricopa County Department of Transportation
Change Order Number: 3
Date: 81712015 Amount: $ 680,283.91 Agenda Item No.1 C64141226
Contract No: 2013-043 Work Order No:I TT611
Consultant Name:1 Kimley-Horn and Associates, Inc.
Project Named MC 136: 107th Avenue to 95th Avenue
Initial Amount: $761,107.26 Contract Award Date: 4/2312014 Total Prior Change Orders: $761,808.57
By mutual agreement of the parties, the following contract change(s) are incorporated Into the above-identified contract. All other contract terms and conditions
remain unchanged.
Change Order No. 3 shall increase the contract amount an additional $580,283.91. Approval of this Change Order establishes a new contract
amount of $2,103,199.74 and allows the consultant to prepare Final Design Plans, Specifications, and Estimate documents for the improvements
along MC 85. The roadway improvements wit be based on the December 2014 roadway and drainage design plans.
By reason of this change 0 days extension of time will be allowed.
With inclusion of this change, this contract has a revised cumulative performance period of 1095 days.
The contract completion date is: .
The following financial information is submitted:
Initial Contract Amount $ 761,107.26
Amended Contract Amount w/ previous change orders $ 1,522,915.83
Current Change Order Request $ 580,283.91
Amended Contract Amount WI current change order $ 2,103,199.74
We, the undersigned Consultant, do hereby agree that upon execution of this Change Order that we will perform all work as identified above, and as may be described in
attachment(s) and will accept the above specified amount(s) as full payment thereof.
IN WITNESS WHEREOF, the parties herein have executed this Contract Change Order:
Principal (Signature) Federal Tax ID Number:
Printed Name
Title:
Date:
CITY of )00000(XXXX APPROVAL
hat this change is required for this contract.
Project Manager. Date:
MARI OPA COUNTY DEPARTMENT OF TRANSPORTATION
I certi lh-t t ? change-; eqs Ale or- this • (eta
./
Al _.0.10.- .-, ./.4110 — ...6.41.0i .. / i ‘.. .,: Al,
r (Die rManager V - re a Branch „ff. 1!: al 0 e
I ceg; a available . .-- 90. Is Change Order
-
W111
CIP Cash Flow Ma ger Date Division Manager ate
I certify that this change is within the limits authorized by the Maricopa County
Pr urement Codf datLtzt
Erilk S
Article 5 curement Officer Date
COUNTY APPROVAL
RECO , i , Deo .7 Y: ACCEPTED AND APPROVED:
OSV6-0 V ‘ .S
Jennif er oth, P : ate Chairman, Board of Supervisors Date
Tra portation II rector/County Engineer
ATTEST:
LEGAL • EVEW
Approved as to form and within the powers and authority granted under the
laws of the State of Arizona to the Maricapa County Department of Transportation. Clerk of the Board Date
Deputy County Counsel Data
Distribution: Originals - Consultant, Contracts Branch, Clerk of the Board Copes - Finance, Project Manager, City Partner (if applicable)
Revised 61712015

Kimlep)Horn
June 24, 2015
Ms. Tricia Brown, P.E.
Maricopa County Department of Transportation
Project Management — Branch Manager
2901 West Durango Street
Phoenix, Arizona 85009-6357
Re: Contract No.: 2013-043
Amendment 3
Project Name: MC 85— 107Ih Avenue to 95 1h Avenue
Project No.: TT511
Dear Ms. Brown:
We submit herewith our proposal for a contract amendment to include the additional work items you
have requested. The revised scope of services and derivation of the fees is attached. A brief review
and summary of the additional work includes:
• Complete Final Design PS&E for MC 85 center turn lane expansion from 107thAvenue to 95Ih
Avenue including intersection improvements at 107 1h Avenue and 99Ih Avenue.
• Signal design at 107 1h Avenue and 99th Avenue intersection.
• Railroad crossing modifications at 107IhAvenue intersection.
• The number of Progress Meetings and utility meetings will be as stated in the Project Specific
scope of services. For the project management task we assumed that limited effort is expended
during right-of-way acquisition.
All rates are in accordance with the contract.
We trust that you will find our submittal in order. Should you have any questions, please contact me
at (602) 906-1328.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Ahmad Omais, P.E.
Sr. Vice President
AAO/fh
Enc
kimiey-horn.com 7740 N. 16th Street, Suite 300, Phoenix, AZ 85020 602 944 5500

Scope of Services Project
Specific
Final Design
MC 85 - 307w AVENUE TO 95m AVENUE
Amendment 3
Project number: TT511
Contract No.: 2013 -043
Maricopa County
Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009
June 24, 2015

Scope of Services
Project Specific — A3
Table of Contents
SCOPE OF SERVICES — PROJECT SPECIFIC — A3 4
Project Overview 4
Length of Services 4
SECTION 100 PROJECT MANAGEMENT 5
SECTION 200 DATA ACQUISITION 7
SECTION 300 SURVEY AND MAPPING 8
SECTION 400 PROJECT COORDINATION 8
SECTION 500 UTILITIES AND RAILROAD 8
SECTION 600 ENVIRONMENTAL 9
SECTION 700 ALTERNATIVE ANALYSIS 9
SECTION 800 TECHNICAL MEMORANDA AND REPORTS 10
SECTION 900 PLANS, SPECIFICATIONS AND ESTIMATE 10
SECTION 1000 RIGHT-OF-WAY 13
SECTION 1100 VALUE ENGINEERING 13
SECTION 1200 SUBMITTALS 14
SECTION 1300 RIDDING PHASE 15
SECTION 1400 POST DESIGN 15
List of Tables
Table 1 —Matrix of Responsibilities 5
Table 2 —Matrix of Deliverables 7
Table 3 — Plans Sheet List 11
Table 4 —Submittals Table 14
KAPHX_Roadwayll 9 850000-MC 851Contract15 - Contract Amendments \CA 3_Firtal Design - 95th to 107tIATT511_CA3_Scope-
Project_Specific.docx
Project No.: TT511 Contract No.: 2013-043 —A3
Revised: 6/24/2015 Page 3 of 15

Scope of Services
Project Specific — A3
SCOPE OF SERVICES - PROJECT SPECIFIC - A3
Project Overview
The purpose of this contract amendment is to provide Final Design PS&E to implement the
improvements along MC 85 developed as part of the December 2014 roadway and drainage design
plans.
The Consultant shall prepare Final Design Plans, Specifications, and Estimate documents for the
following project limits:
• MC 85 roadway improvements from Jesse May Way (west of 107 1h Avenue) to approximately
95th Avenue (approximately 1.8 miles);
• 107th Avenue roadway improvements 0.4 mile north of MC 85 and 0_2 mile south of MC 85;
• 99th Avenue roadway improvements 0.1 mile north of MC 85 and 0.4 mile south of MC 85;
• Roadway and intersection improvements of MC 85 and 99 th Avenue; and
• Roadway and intersection improvements of MC 85 and 107 th Avenue, including the railroad
crossing improvements.
The roadway improvements will be based on the December 2014 roadway and drainage design plans.
This task will finalize the fill PS&E package to Sealed (100%) PS&E,
Length of Services
The Consultant shall deliver the Pre-Final PS&E submittal 4 months from the date of Notice to Proceed.
The Consultant shall deliver the Final PS&E submittal 3 months from the date of receipt of comments
on the Pre-Final PS&E submittal and receipt of final utility relocation design pinns.
'The estimated contract time shall be 730 calendar days from the date of Notice to Proceed.
Project No.: TT511 Contract No.: 2013-043 —A3
Revised: 6/24/2015 Page 4 of 15

Scope of Services
Project Specific — A3
SECTION 100 PROJECT MANAGEMENT
100.3.3 Matrix of Responsibilities
The following table summarizes the project specific responsibilities for the Consultant and MCDOT:
Table 1 —Matrix of Responsibilities
Scope Section Item Consultant MCDOT
100 Project Management
100.1 Project Startup X
100.2 Kick-Off Meeting NA NA
100.3 Project Work Plan X
100.4 Design Criteria NA NA
100.5 Design Exceptions NA NA
100.6 Project Progress X X
Determine VE Study Requirement — PM&C
100.7 NA NA
Manager
100.8 Project Programming and Funding X
100.9 Field Walk with Project Team NA NA
100.10 Project Administration X
200 Data Acquisition NA NA
300 Survey and Mapping
300.1 Aerial Mapping NA NA
300.2 Topographic Survey NA NA
300.3 Supplemental Field Survey X
400 Project Coordination
400.1 Stakeholders Meetings X X
400.2 Technical Advisory Committee (TAC) _ NA NA
400.3 Stakeholder Advisory Committee (SAC) NA NA
400.4 Public Involvement X
400.5 Intergovernmental Agreements (IGA) X
SOO Utilities and Railroad
500.1 Utility Data Acquisition NA NA
500.2 Utility Identification NA NA
500.2.2 Create Utility Base File X
500.3 Utility Coordination X X
500.3.1 Utility Coordination Meetings X X
500.3.4 Utility Adjustments and Relocations X X
500.3.5 Utility Agreements X
500,4 Utility Plans X
500.5 Utility Special Provisions X
500.6 Utility Clearance X
600 Environmental
600.1 Environmental Requirement NA NA
600.2 Acquire Existing Environmental Information NA NA
600.3 Environmental Constraints Map NA NA
Project No.: TT511 Contract No.: 2013-043 — A3
Revised: 6/2412015 Page 5 of 15

Scope of Services
Project Specific — A3
Provide Environmental Clearance for Pre-
600.4 NA NA
Construction Ground Disturbing Activities
600,5 Environmental Technical Studies X
600.6 Agency and Public Scoping Coordination NA NA
600.7 Environmental Clearance — Federal Nexus NA NA
600.8 Environmental Clearance (Non-Federal) X
700 Alternatives Analysis NA NA
800 Technical Memoranda and Reports
800.1 Technical Memoranda and Reports X
800,2 Scoping Document NA NA
900 Plans, Specifications and Estimate
900.1 Plans X
900.2 Specifications X
900,3 Estimates X
1000 Right-of-Way X
1100 Value Engineering NA NA
1200 Submittals
1200.1 Conceptual Alternatives Submittal NA NA
1200.2 Candidate Alternatives Plans and Draft TMs NA NA
Recommended Alternative Plans and Draft
1200.3 NA NA
Scoping Document (with TMs)
1200.4 Draft Final Scoping Document Submittal NA NA
1200.5 Draft Scoping Plans and Right-of-Way Strip Maps NA NA
1200.6 Final Scoping Document — Final Scoping Plan NA NA
1200.7 Pre-Final PS&E, Submittal X
1200.8 Final PS&E Submittal X
1200.9 Sealed PS&E Submittal X
1300 Bidding Phase X X
1400 Post Design NA NA
Project No.: TT511 Contract No.: 2013-043 — A3
Revised: 6/24/2015 Page 6 of 15

Scope of Services
Project Specific — A3
100.3.4 Matrix of Deliverables
The table below provides information for each submittal:
Table 2 —Matrix of Deliverables
Submittal Scope Section Deliverables
Pre-Final PS&E (92%) 900.1.4 Pre-Final Plans
900.1,4.1 General Plan Sheets
900.1.4.2 Roadway Plan Sheets
900.1.4.3 Drainage Plan Sheets
900.1.4.4 Traffic Sheets
900.1,4.8 Utility Sheets
900.2 Pre-Final Special Provisions
900.3 Pre -Final Estimate
Final PS&E (97%) 800.1.6 Final Drainage Report
900.1.4 Final Plans
900.1.4.1 General Plan Sheets
900.1.4.2 Roadway Plan Sheets
900.1.4.3 Drainage Plan Sheets
900.1.4.4 Traffic Sheets
900.1.4.8 Utility Sheets
900.2 Final Special Provisions
900.3 Final Estimate
Sealed PS&E (100%) 900.1.4 Sealed Plans
900.1.4.1 General Plan Sheets
900.1.4.2 Roadway Plan Sheets
900.1.4.3 Drainage Plan Sheets
900.1.4.4 Traffic Sheets
900.1.4.8 Utility Sheets
900.2 Sealed Special Provisions
900.3 Sealed Estimate
100.6.1 Progress Meetings
The Consultant assumes the following progress meetings for the respective phases of the project:
U Pre-Final Design Phase: 1 Progress Meeting (approximate 4 month schedule)
1:1 Final Design Phase: 1 Progress Meeting (approximate 3 month schedule)
Sealed Phase: 0 Progress Meeting
SECTION 200 DATA ACQUISITION
Data acquisition was previously completed as part of the December 2014 roadway and drainage design
and therefore the Consultant assumes there is no scope associated with this task.
Project No.: Trsi Contract No.: 2013-043 — A3
Revised: 6/24/2015 Page 7 of 15

Scope of Services
Project Specific — A3
SECTION 300 SURVEY AND MAPPING
300.3 Supplemental Field Survey
Additional survey may be required for developer construction along MC85. In addition, survey will be
required for any new retention basins. MCDOT will be responsible for the survey and will provide the
survey to the Consultant.
SECTION 400 PROJECT COORDINATION
400.1 Stakeholder Meetings
The Consultant shall. hold Stakeholder meetings as defined below. The Consultant will have 2
representatives in attendance at each meeting. The meetings will be held at MCDOT, The Consultant
shall coordinate the timing of the meetings with MCDOT and the stakeholders.
Adjacent Developer stakeholder meetings
A total of three developer meetings are anticipated for this se t ent of lie roj :est-T.—
400.4 Public Involvement
MCDOT will be responsible for any public involvement activities.
400.5 Intergovernmental Agreement
MCDOT will be responsible for all IGAs.
SECTION 500 UTILITIES AND RAILROAD
500.2.2 Create Utility Rase File
The existing utility base file will be updated by Consultant to reflect updates to existing and proposed
utilities based on relocations completed by others consisting of relocation of Southwest Gas line
(Southwest Gas), relocation of SRPP 12kV from 107 th Ave to east of 99 th Ave and utility work
completed by developers within the right-of-way. There is a possibility that these utilities will already
be relocated by the time this project's design starts however as part of this scope it is assumed that
coordination will be needed for these relocations, but relocation plans will be developed by others.
500.3.1 Utility and Railroad Coordination Meetings
The following meetings will be held at MCDOT:
• Two utility coordination meetings where all utilities are invited.
• Four individual utility coordination meetings.
• Two SRP power coordination meetings,
• Three railroad coordination meetings.
Project No.: TT511 Contract No,: 2013-043 —A3
Revised: 6/24/2015 Page 8 of 15

Scope of Services
Project Specific — A3
500.3.4 Utility Adjustments and Relocations
The Consultant will be responsible for providing the water line relocations consisting of dip relocations
at conflicts with proposed storm drain. The relocations will be relocated as a part of this construction
project. Consultant shall prepare Maricopa County Environmental Services Department Approval to
Construct (ATC) application for both the City of Phoenix and Tolleson ATC applications. Associated
fees are assumed to be paid by MCDOT. Scope excludes work associated with the Approval of
Construction.
SRPI Relocation
Relocation of SRN facilities will require a land exchange process that will further require associated
fees to be paid to SRP and the BOR. It is assumed that these fees will be paid for by MCDOT. The
required exhibits and legal descriptions will be prepared by MCDOT. Consultant will incorporate
SRPI provided design plans and specifications with roadway improvements.
SRPP Relocation
The conflicts with proposed SRP Power Transmission facilities along 107 th Avenue will require
coordination. The Consultant will coordinate with SRP to confirm the design meets the requirements
that will be needed for the Consent to Use Agreement that will need to be executed between MCDOT
and sRP prior to construction of the roadway or relocation of SRP facilities.
Railroad Coordination
The Consultant shall support MCDOT with railroad and Arizona Corporation Commission (ACC)
efforts by attending meetings with railroad as indicated above. The Consultant shall also prepare up to
three exhibits as may be needed in preparation of the ACC hearing.
500.3.5 Utility Agreements
MCDOT will be responsible for finalizing any utility agreements.
500.4.1 Utility Plan Sheets
Utility Plan Sheet information will be provided on the Removal and Relocation Plans. Separate Utility
Plan Sheets will not be provided.
SECTION 600 ENVIRONMENTAL
The environmental clearances have been previously prepared for this project by others and therefore the
Consultant assumes there is no scope associated with this task.
600.8 Environmental Clearance
MCDOT will provide any updates required to the environmental clearance and associated documents as
part of this project.
SECTION 700 ALTERNATIVE ANALYSIS
The scope of this project is final design and does not include alternative analysis and therefore the
Consultant assumes there is no scope associated with this task.
Project No.: TT511 Contract No.: 2013-043 A3
Revised: 6/24/2015 Page 9 of 15

Scope of Services
Project Specific — A3
SECTION 800 TECHNICAL MEMORANDA AND REPORTS
800.1 Technical Memoranda and Reports
The Consultant shall prepare the following Technical Memoranda and Reports.
800.1.4 Traffic Analysis
The scope of this project does not include additional traffic analysis and therefore the Consultant
assumes there is no scope associated with this task. As such, the intersection configurations and turn
Faire lengths shown in the 90% Plans dated Febraaty 2013 will be used.
800.1.6 Drainage Report
A Final (unsealed) Drainage Report was prepared as part of the December 2014 roadway and drainage
design plans. A Final (sealed) Drainage Report is being prepared as part of the MC 85 improvements
from 95th Avenue to 75 th Avenue (Project No. 1T345) project. This Final Drainage Report will be used
for the final design of this segment of the MC 85 improvements from 107 th Avenue to 95 th Avenue. The
Consultant will prepare an addendum to the Final Drainage Report to address drainage design changes
that will take place in this segment of the project. The Consultant will provide a Final (sealed)
Drainage Addendum as part of the Final Design (97%) phase of this project.
800.1.8 Utilities Overview Report
A Final Utilities Overview Report was prepared as part of the December 2014 roadway and drainage
design plans. The Consultant understands that updates to the utilities overview report will not be
required and as such assumes there is no scope associated with this task.
800.1.19 Lighting Report
A Final Lighting Report was prepared as part of the December 2014 roadway and drainage design plans.
The Consultant understands that updates to the lighting report will not be required and as such assumes
there is no scope associated with this task.
SECTION 900 PLANS, SPECIFICATIONS AND ESTIMATE
The CAD platform and format for the design and plans will follow the December 2014 roadway and
drainage design plans. Sheet layouts including the format of the sheets, scale of sheets and information
provided on the sheets will follow the December 2014 roadway and drainage design. Based on review
of the December 2014 roadway and drainage design plans and required design additions/revisions the
following is a list of the assumed plan sheets to be provided with the Pre-Final (92%), Final (97%) and
Sealed (100%) design submittal for this task.
Project No.; TT5II Contract No.: 2013-043 A3
Revised: 6/24/2015 Page 10 of 15

Scope of Services
Project Specific — A3
Table 3 — Plans Sheet List
Plan Set Section No. Sheets Scale
900.1.4.1 General Sheets 33 -
Face Sheet 1 -
General Notes 1 -
Summary of Estimated Quantities 16 -
Geometric Control 3 1"=100'
Special Details 12 As required
900.1.4.2 Roadway 131 -
Typical Sections 6 -
Plan 36 1"=20'
Profile Nor: 1"=20'
36 Vert: 1"=2'
Removals and Relocations 36 1"=20'
Intersection Details 2 1"=10'
Driveway Details Hor: 1"=20'
15
Vert: 1"=2'
900.1.4.3 Drainage 42 -
Drainage Summary 3 -
Drainage Plan and Profile 31 1"=20'
Grading Plans 6 1"=20'
Retention/Detention Basin Plans 2 1"=20'
900.1.4.4 Traffic 30 .
Signing and Marking Plans 15 1"=40'
Traffic Signal Plans 6 -
Lighting Plans 9 1"=40'
900.1.4.8 Utility Plans 20 As Required
900.1.4.9 Earthwork Cross Sections 101 -
900.1.4.2 Roadway
The Consultant shall update and finalize the December 2014 roadway design widening plans for
project limits as specified in the "Project Overview". It is assumed that the roadway design will be in
keeping with the December 2014 roadway design.
900.1.4.2.2 Removal and Relocation Plans
The Consultant shall prepare Removal and Relocation Plans consistent with the Removal and
Relocation plans included in the 90% Plans dated February 2013. The scale and layout of the Removal
and Relocation Plans will match the Roadway Plan Sheets.
900.1.4.3 Drainage
The Consultant shall prepare all plan sheets/construction documents on MCDOT standard sheets. The
following list of drainage plan sheets/construction documents shall be prepared by the Consultant for
each submittal.
Project No.: `1T51 I Contract No.: 2013-043 — A3
Revised: 6/24/2015 Page 11 of 15

Scope of Services
Project Specific — A3
900.1.4.3.1 Drainage Summary Sheets
The Consultant shall update the drainage summary sheets for the drainage design within the project
limits. Updates include comments from previous submittals and preparing the summary sheet for the
project specific limits
900.1.4.3.2 Drainage Plan and Profile
The Consultant shall update the drainage sheets showing the proposed scupper and catch basin
locations within the project limits as developed in the previously completed roadway and drainage
design.
900.1.4.3.3 Storm Drain Plan and Profile
The Consultant shall prepare pipe profiles for the connector pipes required to take drainage from the
north side of MC 85 to the south side of MC 85 at the locations shown on the December 2014 roadway
and drainage design plans.
900.1.4.3.4 Grading Plans
The Consultant shall prepare sheets showing the proposed grading for the temporary retention basins.
Grading plans will also include revisions to the existing retention basins along the north side of MC-85.
900.1.4.4 Traffic
The Consultant shall prepare the following list of Signing and Marking Plans and Traffic Signal Plans
for each submittal.
900.1.4.4.3 Signing and Marking Plans
The Consultant shall prepare final design plans for signing and marking plans in conformance with the
requirement of the MUTCD, including the Arizona Supplement and draft City of Phoenix standards as
of March 2015. Signing and marking plans shall be prepared at 1" = 40' scale and shall include the
minimum:
• City of Phoenix pavement marking detail sheets
• Sign and Marking quantities sheet
• Sign and Marking Sheets
The following assumptions were made for the signing and marking design:
• Signing and marking will follow City of Phoenix standards as noted above.
• The contractor will procure and install all signing equipment and pavement markings.
• The previously prepared plans dated February 2013 were reviewed and approved and therefore
changes will be limited to those required for revisions to the roadway taper designs on 99 th
Avenue and 107 th Avenue.
• Required changes to lane widths, if any, based on City of Phoenix standards will not result in
additional roadway width. Additional width required for inside turn lanes with curb will be
taken from through lanes that will still meet City of Phoenix requirements.
900.1.4.4.5 Traffic Signal Plans
The Consultant shall prepare final design plans for the traffic signal located at MC 85 at the
intersections of 107 th Avenue and 99th Avenue in conformance with the requirements of the MTJTCD,
including the Arizona Supplement and MCDOT standards. Traffic signal plans shall be prepared at
1"=20' scale and shall include at a minimum:
• Traffic signal removal sheet
Project No.: TT511 Contract No.: 2013-043 —A3
Revised: 6/24/2015 Page 12 of 15

Scope of Services
Project Specific — A3
• Traffic signal plan, phasing diagram, conduit quantities, and pull box and foundation
station/offsets
• Traffic signal pole and conductor schedules
The following assumptions were made for the traffic signal design:
• Signing and marking will follow City of Phoenix standards as noted above.
• Vehicle detection will be accomplished through the use of video detection.
• PROWAG and ADA Requirements for pedestrian signals and pedestrian pushbuttons. An
engineering study will not be performed to determine the need for accessible pedestrian signals
at the intersections of MC 85 at 99 th Avenue and 107 th Avenue.
900.1.4.4.7 Traffic Control Plans
Traffic control plans will not be developed as part of this project.
900.1.4.4.8 Lighting Mans
The Consultant shall update and provide final design lighting plans based on the December 2014
design. In keeping with the December 2014 design, the Consultant will finalize the lighting design per
City of Phoenix standards dated March 2013 with typical spacing. The fixture, pole, and foundation
shall remain per City of Phoenix standards for major arterial roadway. The Consultant will coordinate
with the Utility Company with pole and pull box locations. Final street lighting plans including conduit,
conductors, and point of service shall be per the Utility Company according to the City of Phoenix
Standards. Lighting pole placement will be in keeping with the December 2014 design and as
documented in the previously prepared Lighting Report.
900.1.4.8 Utility Mans
The Consultant shall prepare the following list of Utility plans for each submittal.
900.1.4.8.1 Utility Relocation Plans
Utility Relocation Plans consist of preparation of the following;
• It is assumed that the utility relocation plans will be limited to water line relocations as shown
in the December 2014 roadway and drainage design plans.
• Consultant will prepare private irrigation relocations along MC 85 as required.
SECTION 1000 RIGHT-OF-WAY
The Consultant will coordinate right-of-way needs with MCDOT. The Consultant will develop
preliminary drainage easements for the retention basins located on private property and show these
easements on the roadway plans.
MCDOT will prepare the right-of-way strip maps (if needed).
SECTION 1100 VALUE ENGINEERING
The Consultant assumes there is no scope associated with this task.
Project No.: TT511 Contract No.: 2013-043 —AB
Revised: 6/24/2015 Page 13 of 15

Scope of Services
Project Specific — A3
SECTION 1200 SUBMITTALS
1200,1 Project Submittals
The following table shows the distribution list and number of copies for project documents.
Table 4 —Submittals Table
PLANS — SPECIFICATIONS — ESTIMATE (PRE-FINAL & FINAL)
NO OF COPEES
LOCATION TITLE HARD COPY ELECTRONIC
MCDOT Project Management Project Manager 14 1 (with CAD files)
City of Phoenix City Project Manager 5 1
City of Tolleson City Project Manager 1 1
SRP Irrigation Project Engineer/Coordinator 1
SRP Power Project Engineer/Coordinator I
SRP Transmission Project Engineer/Coordinator 1
AT&T Project Engineer/Coordinator 1
Centurytink Project Engineer/Coordinator 1
Cox Project Engineer/Coordinator 1
Level 3 Project Engineer/Coordinator 1
Southwest Gas Project Engineer/Coordinator 1
CROSS SECTIONS (PRE-FINAL & FOAL)
MCDOT Project Management Project Manager 5 1
City of Phoenix City Project Manager 1 1
City of Tolleson City Project Manager I 1
DRAINAGE ADDENDITIVI (FINAL)
MCDOT Project Management Project Manager 3 1
City of Phoenix City Project Manager 1 1
City of Tolleson City Project Manager 1 1
PLANS — SPECIFICATIONS — ESTIMATE — CROSS SECTIONS (SEALED)
MCDOT Project Management Project Manager 1 1
1200.2.3.5 Comment Resolution Meeting
A comment resolution meeting will be held to review and address comments on the Pre-Final Submittal
only.
Project No.: TT511 Contract No.: 2013-043 A3
Revised: 6/24/2015 Page 14 of 15

Scope of Services
Project Specific — A3
SECTION 1300 BIDDING PHASE
1300.1 Technical Assistance
The Consultant assumes the following scope of work associated with this task.
• Responding to up to 10 questions for clarification from bidders.
1300.2 Preparation of Addenda
The Consultant assumes the following scope of work associated with this task.
• Preparation of up to two Addenda.
SECTION 1400 POST DESIGN
The scope of this project is only through the Bidding Phase and therefore the Consultant assumes there
is no scope associated with this task.
ICAPEX Roadway1191850000-MC 851Con1ractI5 - Contact AmendmentSICA 3_Finn i Design - 95th 0 107thlTT511_CA3_Scope-
Project_Specifie.doex
Project No.: TT511 Contract No.: 2013-043 — A3
Revised: 6124/2015 Page 15 of 15

E IH: PROPOSAL - TABLE A
CONSULTANT
COST PROPOSAL SUMMARY
CONSULTANT: Kimley>>>Horn CONTRACT NO.: 2013-043 A3
PROJECT NAME: MC 85 - 107th Avenue to 95th Avenue
, DIRECT LABOR
Classifications Man-hours Hourly Rates Labor Costs
Project Principal o $100.00 $0.00
Project Manager 283 $83.66 $23,675.78
Senior Project Engineer 522 $63.97 $33,392.34
Project Engineer 1246 $50.33 $62,711.18
Engineer / Designer 803 $38.26 $30,722.78
Analyst 995 $27.90 $27,760.50
Technician 0 $26.58 $0.00
Clerical 54 $21.68 $1,170.72
Adrrtin 50 $31.40 $1,570.00
Consultant's Subtotal Direct Labor $181,003.30
Consultant's Overhead @ 190.63% of Direct Labor $345,046.59
Consultant's Facilities Capital Cost of Mone; 0.90% of Direct Labor $1,629.03
Consultant's Profit @ 10.00% of Direct Labor + Overhead $52,604.99
Consultant's Total Direct Labor $580,283.91
DIRECT AND OUTSIDE EXPENSES
Description Expense Amount
Consultant's Total Direct and Outside Expenses $0. 00
Cost Proposal Summary (Optional Tasks)
Maricopa County Department of Transportation Page 1 of 16
ICAPHX_Roadway16191850000-MC 851Contract15 - Contract Amendments \CA 3_Finat Design - 95th to 107th'iTT511_.Fee_CA3.xlsm / Table A - Cs t Prpsl Sum

F E P OPOSAT, - ABLE A
CONSULTANT
COST PROPOSAL SUMMARY
SUBCONSULTANT(s)
Name of Subconsultant Task Total Cost
Total Subconsultant(s) $0.00
Consultant's Total Direct Labor $580,283.91
Consultant's Total Direct and Outside Expenses $0.00
Total: $580,283.91
Consultant's Totals of Direct Labor and
Direct and Outside Expenses $580,283.91
OPTIONAL TASK ALLOWANCES
Task Estimated Cost
TOTAL PROPOSED NOT TO EXCEED FEE $580,283.91
(Inclusive of Consultant and Subconsullant[s] total proposed fee.)
Kiraley-Horn and Associates, Inc.
Firm
Ahmad Omais
Signature
Principal/Senior Vice President
Title
June 24,2015
Date
Cost Proposal Summary (Optional Tasks)
Matieopa County Department of Transportation Page 2 of 16
KAPHX_RoadwayS191850000-MC 851Cantractk5 - Contract Amendments\ CA 3_Final Design - 95th to .107th \TT511 Fee CA3,xlsni / Table A - Cat Prpsl Sum

16
Labor of
3
-- Direct Page
-- Hrs
$2,496.00 $19,448.00 $5,077.00 $113,068.00 $4,919.00 $6,845.00 $2,361.00- $181,003.00 Man
TOTAL LABOR )----126:7-89.00 67,e
Est
----- C -
_ C.-:\/-1-1/
(-14:474 14 ao". ...-- (124 26-60 (1-53 x4 3954 \Table
A3
TOTAL MAN-HOURS Templates
2013-043
I
No.: Contracts
Admin $31.40 40 8 2 50
Contract _
DIRLAB
LABOR Clerical $21.68 20 2 4 28 54 C -
Table
/
DIRECT Tech $26.58
C AND Analyst $27.90 8 38 43 866 28 12 995 107tIATT511_Fee_CA3.xlsrn
TABLE CONSULTANT/SUBCONSULTANT
MAN-HOURS Eng/Des $38.26 16 71 38 596 32 30 20 803 to
95th
-
CLASSIFICATIONS Eng $50.33 100 23 140 24 867 40 42 10 1246 Design
ESTIMATED Horn Avenue Proj 3_Final
Kimley))) 95th Proj Eng $63.97 128 91 19 260 4 16 4 522 \CA
to Sr
LABOR Amendments
Avenue Mgr $83.66 132 - - 16 30 - - - 69 16 - 14 6 - 283
107th 2015 DIRECT Des Contract
- 24, Prin -
NAME: 85 $100.00 Transportation
MC June Proj 85SContrachE
_ 1
NAME: DATE: of
TASK/PHASE Reports Estimate Department Roadway1191850000-MC
PROJECT and
CONSULTANT/SUBCONSULTANT RATE and County
Mapping Railroad Analysis Memoranda
CONTRACT Management Coordination Specifications Engineering Phase Maricopa 1<:1PHX
Acquisition and and Design
Project Survey Project Utilities Environmental Alternatives Technical Plans, Right-of-Way Value Submittals Bidding References TOTAL
Data Post

MC 85, 107th Avenue to 95th Avenue KirnleyoHorn
PROJECT NO. 17511 Contract No. 2013-043 A3
ESTIMATED STAFF HOUR SUMMARY
PIA Prin Des Mgr Sr Proj Pro] Eng En/Des Analyst Tech Clerical At1rnIn Prof LA Total Cost
SCOPE SECTION, TASK Eng
100 Project Management - 132 128 100 16 5 - 20 40 444 $ 65,864
200 Data Acquisition - - - - - - $ -
300 Survey and Mapping _ - - - _ . . . $ -
400 Project Coordination - 16 - 23 - - _ - - - - 39 3 8.003
500 Utilities and Railroad - 30 91 140 71 38 - 2 8 - aao $ 62,385
500 Environmental - - - - - - - - - - - $
700 Alternatives Analysis - - - - - - - - - - - $ -
800 Technical Memoranda and Reports - - 19 24 38 43 - - - - 124 5 16,215
Drainage Report ., - . 16 5 1.950
Utilities Overview Report . 24 32 $ 4,584
Cost Estimate - - - - $
Design Documentation 4 10 14 d 35 $ 4668
Lighting Report - - .$
BOO Plans, Specifications and Estimate - 69 260 567 596 866 - - 2 - 2,660 $ 362,491
General Sheets . 5 17 51 56 74 - V 293 $ 26.544
Roadway 31 BB 220 374 338 - - 1,051 5 137.968
Drainage 4 15 77 16 149 - 261 $ 31,853
Traffic - Signing and Marking 2 33 66 A 73 - 178 5 24,614
Traffic-Signals - 25 65 4 76 - 172 5 23,105
Traffic - Lighting a a 30 16 28 - CO 5 10,728
Retaining Walls V - - - S -
Landscape - - - i - - - S
Utility - 6 8 68 - 66 - 138 5 18,512
Earthwork 6 96 212 58 ze - - 318 $ 48.538
Specs and Estfrnate 12 55 BEI 68 36 • - 259 5 40,259
1000 Right-of-Way - 16 4 40 32 - - 4 - - 95 $ 15,768
1100 Value Engineering - - - - - - - - - - - $ -
1200 Submittals 14 16 42 30 28 - 26 158 5 21,943
1300 Bidding Phase - 6 4 10 20 12 - 52 5 7.560
1400 Post Design _ _ _ - - - - _ _ _ _ - $ -
1500 References - - - - - - V - - - $ -
Totals I I - 253 522 1,245 803 995 - 54 50 3,953 5 580,288
1,Percg a es 7.16% 13.21% 31.52% 20.31% 25.17% j 1.37% 1.25% 100%
KilefiX Raedniay11915560007 1AC 651Con69c35- Canna clAm end in ents1CA 3yrial Design - 951816 16718%77511_Fe CA3.xlsm 812412015
Hr Sum Page 4 or76

16
A3 of 5
2013-043 Cost 14.80% 1.38% 10.75% 2.80% 62.47% 2.72% 3.78% 1.30% 100% Page
Horn Total
No. of % Flours 11.23% 0.99% 9.61% 3.14% 67.29% 2.43% 4.00% 1.32% 100%
Kimle&
Contract
85,884.00 - - 8,003.00 62,355.00 - 16,275.90 362,491.00 15,768.00 21,943.00 7,569.00 - 580,288,00
Cost
Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Hours 444.0 39.0 380.0- 124.6- 2660.0 96.0 158.0 52.0 3,953.0
8,456.00 - - - - - - 34,223.00 - - 5,099.00 7,569.00 - - 55.347.00
Subtotal Cost
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Sealed 42.0 244.0 42.0 52.0 380.0
Hours
40.987.00 - - 1,880.00 30,613.00 13,558.00 109,853.00 7,884.00 13,437.00 - - 218.212.00
Cost
Subtotal
$ _$ $ $ $ $ $ $ $ $ $ $ $ $ $
Final 214.0 9.0 190.0 104.0 801.0 48.0 90.0—$
Hours 1,456.0 Tasks
/
36.441.00 - - 6,123.00 31,742.00 - - 2,717.00 7,884.00 - 3,407.00 - - -
Subtotal Cost 218,415.00 306,729.00 \T1511Fee_CA3.xlem
$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Pre-Fnal 188.0 30.0 190.0 20.0— 1615.0 48.0 26.0 -107th
Hours 2,117.0
950110
. . . - - - - - - - - - - - . - -
Subtotal Cost Design
_ 3_FInal
ng $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ I
Soap Hours -
ArnendmentesCA
Reports Estimate Totals Contract
SUMMARY and Task -
and
Avenue 85V0ontracn5
Mapping Railroad Analysis Memoranda
95th Management Coordination Specifications Engineering
to PHASE Description Acquisition and and Phase Design
Environmental Alternatives Technical Right-of-Way Submittals References
Avenue TT511 BY Task Project Data Survey Project Utilities Plans, Value Bidding Post K:SPHX_RoadwayS191850000.MC
107th NO. No
TASK 100 200 300 400 500 600 700 BOO 900 1000 1100 1200 1300 1400 1500
85, PROJECT Task 612412015
MC

MC 85, 107th Avenue to 95th Avenue Kimley>>>Horn
PROJECT NO. TT511 Contract No. 2013-043 A3
PLAN SHEET SUMMARY
Plan Set Section No. Sheets Hours Hours / Cost Cost/Sheet
Sheet
General 33 203 6 $ 26,544.00 $ 804.36
Face Sheet 1 9 9 $ 1,300.00 $ 1,300.00
General Notes 1 10 10 $ 1,543.00 $ 1,543.00
Summary of Estimated Qtys 16 70 4 $ 9,733.00 $ 608.31
Geometric Control 3 15 5 $ 2,006.00 668.67
Special Details 12 99 8 $ 11,962.00 996.83
Roadway 131 1051 8 $ 137,968.00 $ 1,053.19
Typical Sections 6 68 11 $ 9,391.00 $ 1,565.17
Plan 36 245 7 $ 31,972.00 $ 888.11
Profile 36 193 5 $ 25,443.00 $ 706.75
Removal and Relocation 36 297 8 $ 38,196.00 $ 1,061.00
Detail Sheets 17 248 15 $ 32,966.00 $ 1,939.18
Intersection Details 2 44 22 $ 6,108.00 $ 3,054.00
Driveway Details 15 204 14 $ 26,858.00 $ 1,790.53
Drainage 42 261 6 $ 31,863.00 $ 758.64
Traffic 30 430 14 $ 58,807.00 $ 1,960.23
Signing and Marking 15 178 12 $ 24,974.00 $ 1,664.93
Traffic Signal 6 172 29 $ 23,105.00 $ 3,850.83
Lighting 9 80 9 $ 10,728.00 $ 1,192.00
Utility Plans 20 138 7 $ 18,512.00 $ 925.60
Earthwork 84 $ 13,353.00 $ -
Cross Sections 101 220 2 $ 32,926.00 $ 326.00
Totals/Average - Excludes X-Sect 256 2167 8 $ 287,047.00 1 $ 1,121.28
Totals/Average 357 23871 71 $ 319,973.00 I $ 896.28
Total Project Sheets / Hours 256 3953 Hours Excludes cross section sheets
Total Hours Per Sheet 15.44 Hours/Sheet
Total Project Cost $ 580,286
Total Cost Per Sheet $ 2,267 Dollars/Sheet
6/24/2015 Page 6 of 16

o116
Hours! Sheet Freer
A3 1.173 13,251 2,041 714 1,104 783 4,014 13,331 36,441 - 182 718 859 2,354 6,723
Cost 1 1
2013-043 S $ $ $ $ $ $ $ $ 6 $ $ $ $ 6 $ $
7.0 64.0 10.0 4.0 6.0 5.0 20.0 72.0 198.0 6.0 8.0 4.0 12.0 30.0
Kirnley>>>Horn Total
No.
Contract Adman 4 15 20
Clerical 1
Tech
Analyst
EngfDes 1 2 1 4
I
Eng
6 6 2 2 2 4 16 46 4 4 2 8 18
Prol
I
Pro] Eng 1 48 4 53
Sr
I
Mgr 8 4 1 2 1 32 56 2 4 2 4 12
Des
I
Pan
Pro]
PRE-FINAL No Shts mtgs months months mtgs submit
I
Scare 1 4 4 2 2
-
HOURS
STAFF
Activities
Control hr)
ESTIMATED =2.0 hr)
Quality time) updates) 2.0 = Submittals
Avenue hr/sheet) Meetings) time)
TASK (mtg
0.25 Document 1.0 schedule month) (mtn
95th at + Developer 1.0 Developer
and per +
sheets (travel) (Includes hrs
to Monitor (8 Management (and (ravel) Coordinate Coordination
Schedule (256 (1.0 Notes
Avenue TT511 Plan to Meetings Reports Meetings (1.0 Notes
Management Finalize Plan Checking Process Progress Agenda Attendance Meeting Administration Coordination and
Work Schedule Progress Project Agenda Attendance Meeting Review Project
107th NO. - C1A/QC - - Progress - - - Stakeholder
Proiect - - Project - - Project P.100 - - - - P.400
85, Project - P.100.3.7.4 P.100.3.9.3 P.100.3.9.5 - P.100.6.1.1 P.100.6.1.2 - Project -
PROJECT P.100.3.7 P.100.3.3 P.100.6.1 P.100.6.2 P.400.1.1 P.400.1,2 P.400.1.3 P.400.1.3
MC P.100 P.100.3 P.100.6 P.100.10 Subtotal P.400 P.400.1 Subtotal Bl24/2015

Hours/ Sheet PageBolls
A3 - 3,408 - - - 796 1.904 528 1,682 2,896 1.413 - 1.324 2.539 1,056 - 1,056 2.539 1,056 _ . 3.193 2,938 - - - 3,414 31,742 2,717 .
Cost
2013-043 $ $ $ $ $ $ S $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
24.0 4.0 9.0 3.0 11.0 16.0 10.0 7.0 12.0 6.0 6.0 12.0 6.0 22.0 20.0 22,0 190.01 20.0 20.0
Kimley>>>Horn Total
No.
Contract AdmIn 6 1
I
Clerical
Tech
Analyst 4 4 4 12
Eng/Des 12 16 12 40 a
Eng
Prof 12 2 3 2 4 4 4 4 4 4 4 4 4 4 6 65 8
Prof Eng 1 3 1 2 4 2 2 4 2 2 4 2 6 4 8 47 2
Sr
Mgr
1 3 1 4 1 4 4 18
Des
Pan
Proj
PRE-FINAL No Shts rntgs mtgs mtgs mtgs Revs
i
Scale 1 2 2 2 4
- I
HOURS
hr) hr)
=2.0 2.0
=
STAFF hr) hr) time) time)
= 3.0 = 2.0 (mtg (mtg
time) time) prep) 1.0 prep) 1.0
+ Meetings/Coordination +
(mtg (mtg exhibit (travel) exhibit (travel)
ESTIMATED prep) 2.0 prep) 1.0 plans)
+ exhibit + (Includes 11.0 (includes (1.0
exhibit (travel) (travel) meeting) meeting) relocation Reports
Avenue TASK meeting) Additional meeting) Team
(includes (1.0 (Includes (1.0 meeting) meeting) Utility meeting) Utility utility Connection and
meeting) meeting) meeting) Utility • Utility Relocations Project File Reports
95th Meetings meeting) meeting) (UPRR Utility (individual Conversion Utility (Individual (review - Base Service Reports
to Fite (Utility (Utility (UPRR Meetings (Individual (Individual and Design Utility Railroad and and Memoranda
Base (Utility Notes (UPRR Notes (Individual Notes (individual Notes Relocation Utility Provisions Documentation
Avenue 1T511 Railroad Utility Coordination Meetings Attendance Meetings Attendance Utility Attendance Underground Attendance Adjustments Review Update Agreements and Memoranda Memoranda
Identification Coordination Agenda Meeting Agenda Meeting Agenda Meeting Agenda Meeting Utility Establishing Special Utilities Technical
NO. and Update Utility Utility Railroad Individual Utility - - Utility Plans Design
107th Utility Utility - - - - - - - - - SRP - - - - Utility Utility Technical
Utilities - - - P.500.3.4.3.3 P.500.3.4.3.4 - - P.500 Technical - P.800
85, PROJECT - - P.500.3.1.1 P.500.3.1.2 P.500.3.1.3 P.500.3.1.1 P.500.3.1.2 P.500.3.1.3 P.500.3.1.3 P.500.3.1.3 P.500.3.1.3 P.500.3.1.3 P.500.3.1.3 P.500.3.1.3 P.500.3.4.3 - - -
P.500.22 P.500.3.1 P.500.3.4 P.500.3.5 P.500.3.6 Subtotal P.800.1.17 Subtotal
MC P.500 P.500.2 P.500.3 P.500.4 P.500.5 P.800 P.800.1 arNnms

5 5 3 3 6 5 12 9 6 2 8 7 19 4 5 2 5
Hours/ Sheet PamDel%
I
A3 - 586 770 507 154 8207 , - 4,722 14,8E8 9,849 27,777 3,633 574 2,417 6,570 5,860 1,566 - 14,656 14,629 4,575 - 11,568 23,655 1,291 9,925 - 14,541 7,115 3,351 218,415 1,427 2,209 1,566 2,602 - 7,884
Cost 7 1 17
$ $ $ $ $ 5 $ $ $ 5 $ $ $ $ 3 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5 $ $ $ $ Is
2013-043
-
5.0 5.0 54.0 9.0 69.0 33.0 108.0 74.0 220.0 24,0 134.0 18.0 58.0 49.0 13.0 107.0 115.9 37.0 92.0 155.0 8.0 83.0 86.0 58.0 21.0 1615.0 8.0 12.5 10.0 18.0 48.0
Kimley>>>Horn Total
No.
Admln 2 MEI
Contract
, 1
Clerical 2 2
Tech
Analyst 2 2 16 2 36 8 37 24 80 2 48 8 40 30 a 49 59 18 48 12 28 552
Eng/Des 2 16 4 16 a 32 24 80 8 40 5 20 18 20 16 8 318 2 4 2 a 16
Eng
1 2 12 3 12 12 24 16 40 12 39 8 16 16 4 40 44 10 40 118 8 36 36 8 a 556 4 4 4 8 20
Pro/
Prof Eng 8 4 4 18 a 15 12 2 2 a 1 16 10 3 4 4 8 28 4 4 159 2 2
Sr
'Mgr
1 2 1 1 2 2 4 2 4 2 1 1 2 2 1 28 2 4 2 8
Des
_
PrIn
Proj
_ 1.1
_
PRE-FINAL No Shts 1 1 16 3 12 6 36 36 36 2 15 3 31 6 2 15 6 9 20 100 1 357 mtgs
_ I I I I 1
Scale New New New New New New New NeW New 2
-
HOURS
STAFF
conflicts)
design) for
ESTIIVIATED design)
check Irrigation hr)
previous - 2.0 MCDOT
previous Plans Estimate .---
Avenue Plans Quantities to poles Private time)
TASK from
to Sheets Basin Plans light -
Sealed (updates Profile and (mtg_ info
Estimate / (updates Relocations Plans
95th Estimated and Detention Marking Plans (layout Meetings 1.0
Final Control Detafis Summary Report +
to / Notes Details Sections Plan PrOfile and Details Plan Plans Plans Relocation Sections
and / and Signal Diagram Specifications (travel) Coordlnation/Review
Sheets Sheet
Pm-Final General Summary_of Geometric Special Typical Roadway Roadway Removal Intersection Driveway Drainage Drainage Grading Retention Signing Lighting Plans Earthwork Previsions Coordination 0.0
Avenue TT511 Face Traffic Utility Cross Mass Notes Right-of-Way
/ General Roadway Drainage Earthwork Estimate
Specifications Traffic Utility
Scoping - - - - - - - - - - - - - - - - - - - - - - Quantities Plans, Way Attendance Way
NO. Specifications Special Cost of Agenda Meeting of
107th - - - - - - Estimates
Right-of-Way
- P.900.1.4.1.1 P.900.1.4.1.2 P.900.1.4.1.3 P.900.1.4.1.4 P.900.1.4.1.5 P.900.1.4.2.1 P.900.1.4,2.2 P.900.1.42.2 P.900.1.4.22 P.900.1.4.2.3 P.900.1.42.4 P.900.1.4.3.1 P.900.1.4.3.2 P.900.1.4.3.4 F.900.1.4.3.5 P.900.1.4.4.3 P.900.1.4.4.5 P.900.1.4.4.8 F.900.1.4.8.1 P.900.1.4.9.1 P.900.1.4.9.2 P.900.1.4.9.3 - - - P.900 Right - - - Right P.1000
85, Plans, P.900.1.4.1 P.900.1.4.2 P.900.1.4.3 P.900.1.4.4 P.900.1.4.8 P.900.1.4.9 - -
PROJECT - -
P.900.1.4 P.900.21 P.900.3.1 P.900.3.6 P.1000.0. P.1000.0. P.1000.0.
MC P.900 P.9002 P.900.3 Subtotal P.1000 P.1000. P.1000. Subtotal sr24,2015

IS al
Hours/ Sheet 10
Pago
A3 . 3,407 3,407
Cost
2013-043 $ $ $ 3
26.0 26.011 0 7
Kimley>>>Horn Total 211
No.
Contract Admln 30
Clerical El 6
Tech
Analyst 4
Eng/Des 4 4 390
Eng
Prof 4 4 710
Prof Eng 4 4 267
Sr
Mgr 2 2
Des
PrIn
Prof
PRE-FINAL No Shts
Scale
-
HOURS
STAFF
ESTIMATED
Avenue TASK
95th
to PS&E
Submittal
Avenue TT5l1 Pre-Final
PS&E Submittals
NO. Submit
107th Pre-Final
SUbmittals - P.1200
85, PROJECT -
P.1200.7.1
MC P.1200 P.1200.7 Subtotal Totals exarzois

1 _ 16
of
Hours/ Sheet 11
Page
IL
A3 - - 3.281 13.281 2.041 - 714 1,104 783 3.011 6,774 998 40.387 _ 591 859 430 1,660
Cost 9
2013-043 $ $ $ $ $ $ 5 $ $ $ $ $ $ $ $ $ $ $ $
sells
16.0 64.0 10.0 4.0 6.0 5.0 15.0 40.0 54.0 214.011 3,0 4.0 2.0
KimleyHorn Total
No.
Ii
Contract Admln 3 12 15
1 I
Clerical 1 6 7
Tech
I
Analyst 13 a
Eng/Des 1 2 1 B 12
I
Eng
8 6 2 2 2 3 B 12 43 2 2 1 I$I
Pro)
Fro] Eng 16 48 a 8 75
Sr
Mgr
8 4 1 2 1 6 8 24 54 1 2 1 4
Des
I
Prin
Pro)
_
FINAL No Shts mtgs months months 11J mtgs
I
- Scale 1 3 3 1
I I I
HOURS
STAFF
.
--
Activities Activities
ESTIMATED Control Control hr)
2.0 hr)
=
Quality Quality time) updates) Review =2.0
Avenue hr/sheet) Meetings) time)
TASK (mtg Submittal
0.25 Document Document 1.0 schedule month) (mtg
95th at and and + Plans per Developer 1.0
(travel) +
sheets (includes hrs
to Procedures Monitor Monitor (1.0 Final (8 Management and (travel) Coordination
(256 Notes
to to Meetings Reports during Meetings (1.0
Avenue TT511 Plan Checking Checking Attendance Administration Notes
Management Process Process Progress Agenda Meetins Walk Coordination
QA/QC Progress Progress Project Agenda Attendance Meeting Project
107th NO. - - - - Project - - - Field Protect Stakeholder
- - - - F.100 - - - F.400
85, Project F.100.3.9.3 F.100.3.9.3 F.100.3.9.5 F.100.3.9.5 - F.100.6.1.1 F.100.6.1.2 F.100.6.1.3 - Project -
PROJECT F.100.3.9 F.100.6.1 F.100.6.2 F.102.92 F.400.1.1 F.400.1.2 R400.1.3
MC F.100 F.100.6 F.100.10 Subtotal F.400 F.400.1 Subtotal 52412015

124/11
Hours/ Sheet
Pam
I
A3 _ _ _ 736 368- 528 1,413 2,717 145 - 1.324 2,539 1,055 3,092 4,405 641 3,830 2,417 2,932 410 30,613 - 4,875 1,950 - - 4,584 2,149 13,558
Cost 1 1
2013-043 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S $ $ 6 $ ill $ $ $ $ $ 5;
4.0 7.0 3.13 8.0 14.0 7.0 7.0 12.0 6.0 20.0 32.0 6.0 28.0 18.0 16.0 2-0 190.0 40,0 16.0 32.0 16.0 - 104,01
Kfrnley»)Horn Total
No,
_
Contract Admin
Clerical 2 2
Tech
Analyst 1 2 1 2 12 8 26 25 10 4 39
7
Eng/Des 8 23 31 24 6 30
Erg
2 3 2 4 4 4 4 4 4 a 6 2 12 a s 75 10 4 4 18
Pro'
[
Prof Cog 1 3 1 2 4 2 2 4 2 4 3 4 2 8 2 44 5 2 5 2 17
Sr
Mgr
1 1 1 4 1 4 12
Des
Prin
Prot
_
FINAL No Shts migs ridge mtgs exh
- Scala 1 1 2 3
HOURS
hr)
=2.0
STAFF
hr) time)
2.0
= (mtg
time) prep) 1.0
+ (Addendum}
ESTIMATED hr) (rig exhibit (travel)
3,0 prep) 1.0 plans)
= + (includes (1.0 Report inventory
time) exhibit (travel) meeting) relocation Reports
Avenue TASK (nig (1.0 meeting) Drainage utility
prep) 2.0 (includes meeting) meeting) Utility Companies utility Connection (Addendum) Report So% and
+ meeting) Utility Relocations Reports Sealed
95th Meetings exhibit (travel) meeting) Meetings Utility (Individual Utility (review Reports previous
to (UPRR (UPRR (Individual and Service Railroad and and Report Submit Report Overview to Memoranda
Meetings (includes (1.0 Notes Meetings (UPRR Notes Utility (individual Notes to Plans Relocation Utility Provisions Letter Drainage and Documentation
Avenue rrsi Railroad Coordination Adjustments and Memoranda Overview Utilities Revisions
Coordination Agenda Attendance Meeting Railroad Agenda Attendance Meeting Inclividuta Agenda Attendance Meeting Exhibits Provide Utility Clearance Memoranda Final Prepare Final Technfcal
Utility Establishing Special Utitifies -
NO, and Utility utility ACC Utilities Design
107th Utility - - - - - - - - - - - Utility Utility Technical - - -
Utilities - - - - F.500 Technical - P.800.1.6.4.1 - F.800
85, PROJECT - F.500.3_1.1 F.500.3.12 F.500.3.1.3 P.500.3.1.1 P.500.3.1.2 R500.3.1.3 F.500.3.1.3 F.500.3.1.3 F.500.3.1.3 F.500.3.4.1 F.500.3.4.3 - - - F.500.1.6.4 F.500.1.6.6 F.800.1.6.4
F.500.3.1 F.500.3.4 F.500.3.4 F.500.3.6 Subtotal F.800.1.8 F.800.1.17 Subtotal
MC F.500 F.500.3 F.500.5 F.500.6 F.800 F.800.1 104/2011

2 a 1 1 2 4 3 3 2 6 4 2 2 3 5 4 7 a 1r3
or
Hours! Sheet 13
le
RN
A3 - - 284 489 1,546 407 752 _ 3,398 14,831 13,341 8,166 416 8,046 707 6,866 2,247 1,064 - 8,005 6,162 3,645 - 6,996 - 6,998 645 2,460 - 5,095 2,596 2,460 323 -
2 1 109,853
Cost
$ $ $ $ 5 $ 5 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5 $ $ $ $ $ 8
2013-043
2.0 5,0 10.0 3.0 22.0 26.0 120.9 102.0 60.0 12.9 60.0 5.0 56.0 19.9 9.0 55.0 41.0 23.0 40.0 48.0 4.0 15.0 30.0 19.0 15.0 2.0 801.0
Kimley*Horn Total
No.
Admln
Contract
Clerical
Tech
-.
Analyst a 9 48 36 18 4 12 2 24 12 6 20 13 16 5 6 230
Eng/Des 1 1 4 2 a 8 45 38 18 5 30 16 10 16 4 8 6 4 226
Eng
4 1 4 1 4 a 12 16 16 2 12 2 12 6 2 22 17 10 15 22 4 8 12 4 a 2 224
Proj
_
Prof
Eng 1 2 2 2 a 10 6 4 1 4 1 1 13 11 4 2 2 8 2 2 85
Sr
Mgr
4 4 2 2 3 4 2 1 2 1 1 26
Des
Prin
Prof
u
_ I
100 1
FINAL No Shts 1 1 15 3 12 6 36 36 36 2 15 3 31 6 2 15 6 9 20 357
_ I
- Scale
_
HOURS
STAFF
Scuppers
-
Details
ESTIMATED
Drainage
Irrigation
-
Plans Estimate
Avenue Plans Quantities Private
TASK
Sheets Basin Plans -
Sealed Profile and
Estimate Relocations Plans
95th I Estimated and Detention Marking Plans
Final Control Details Summary Report
to / Notes of Details Sections Plan Profile and Details Plan Plans / Plans Relocation Sections
and and Signal Diagram Specifications
Sheets Sheet
Pre-Final General Summary Geometric Special Roadway Roadway Removal Intersection Driveway Drainage Drainage Grading Retention Signing Lighting Plans Earthwork Provisions
Avenue 1T511 Face Typical Traffic Utility Cross Mass
/ General Roadway Drainage Earthwork Estimate Schedule
Specifications Traffic Utiiity
Soaping - - - - - - - - - - - - - - - - - - - - - - Quantities Plans,
NO. Specifications Special Cost
- - - - - - Estimates Bid
107th
- 7.900.1.4.1.1 F.900.1.4.1.2 F.900.1.4.1.3 F.900.1.4.1.4 F.900.1.4.1.5 7.900.1.4.2.1 7.900.1.42.2 P.900.1.4.2.2 P.900.1.4.2.2 7.900.1.4.2.3 F.900.1.4.2.4 F200.1.4.3.1 F.900.1.4.3.2 F.900.1.4.3.4 F.900.1.4.3.5 F.900.1.4,4.3 F.600.1.4.4.5 F.200.1.4.4.8 F.900.1.4.8.1 F.900.1.4.9.1 F.900.1.4.9.2 F.900.1.4.9.3 - - - - F.900
Plans,
85, F.900.1.4.1 F.900.1.4.2 F.900.1.4.3 F.900.1.4.4 F.900.1.4.8 F.900.1.4.9 - -
PROJECT
F.900.1.4 7.900.2.1 7.900.3.1 F.900.3,6 F.900.3.7
Subtotal 0402015
MC F,900 F.900.2 F.900.3

5 ,
01
Hours/ Sheet 14
Po
A3 - 1,427 2,239 1,566 2,662 - 7,804 3,129 2,006 4,344 1,182 1,104 1.672 216.2134
Cost
2013-043 $ $ $ 5 $ $ $ $ $ $ $ $ 5 $ 5 $ $
8.0 12.0 10.0 18.0 480 22.0 16.0 30.0 6.0 6.0 10.0 1456.0
Kimiey*Horn Total
No.
Contract Admin 15
Clerical 2 2 4 4 15
Tech
(.
Analyst 4 8 8 21.1 33?
I I
Eng/Des 2 4 2 8 16 4 8 2 4 18 333
Eng
4 4 4 8 20 4 8 8 4 2 4 30 415
Proj
PIA Eng 2 2 4 4 6 232
Sr
Mgr
2 4 2 5 2 2 2 2 2 10 114
Des
PrIn
Prof
11
FINAL No Shts mtgs 2,57
I
- Scale 2
HOURS
STAFF
ESTIMATED
hr) _
2.0 MCDOT
= PM
Avenue TASK time) from -
(mtg Info Comments Comments Meeting
Comments
95th Meetings 1.0 of of
+ Resolution of
to (travel) Coordination/Review Comments Comments Responses Summary Summary
PS&E Summary
Avenue TT511 Coordination (1.0 ht-of-Wa Submittal Final of
Notes Compile Prepare Submit Review Comment Final Submittals
Way Attendance Way Pi. PS&E Submit Summary
NO. -of-Way of Agenda Meeting of - - - - - -
107th Final
Right Right F.1000 Submittals - - F.1200
Right - - - - F.1200.8.3.1 P.1240.8.3.2 F.1200.8,3.3 F.1200,8.3.4 F.1200.8.3.5 F.1200.8.3.6 1
85, PROJECT - P.1000.0. P.1000.0. P.1000.0. - F.1200.8.1 F.1200,8.3
MC F.1000 P.1000. P.1000. Subtotal F.1200 F.1200.8 Subtotal Totals 6,241015

2 2 0 1 1 2 0 0 0 4 1 1 0 2 2 1 3 2 0 Cr 2 ' 1
0115
Hours/ Sheet 15
Pao
A3 798 7,658 9,496 - _ 430 284 680 445 1,003 271 2.253 2,253 2,253 1,059 238 _ 508 1,529 629 680 2,314 2,314 2.508 1,038 2,275 323 968 - 2,002 - 1,197 1,248 323 - 34,223
1 1 1
Cost
$ S $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ S 5 $ $ $ 5 $ $ $ 5 $ $ $ $ $ $
2013-043
4.0 38.0 42.0 2.0 2.0 6.0 3.0 8.0 9.0 17.0 17.0 17.0 8.0 10.0 4.0 12.0 13.0 4.0 16.0 16.0 20.0 6.0 17.0 2.0 6.0 10.0 9.0 7.0 2.0 244.0
Kimley>>>Horn Total
No.
I
Admin 1 4 5
Contract
Clerical 4 4
Tech
I
Analyst 4 4 4 4 4 4 2 2 $ 8 1 4 4 10 2 8 2
I
EngMes 1 1 8 8 8 6 6 4 4 4 2 52
I
Eng
1 10 11 1 1 2 2 4_ 4 4 4 4 2 2 1 4 4 2 4 4 10 2 a 2 6 4 2 2 2 57
Proj
Pro) Eng 4 4 4 1 2 15
Sr
1 1
Mgr
2 20 1 1 1 1 1 1 1 1 1 2 1 2 1 15
Des
PrIn
Prot
U
SEALED No Shts month month 1 1 16 3 12 B 26 36 3$ 2 15 3 31 6 2 15 6 9 20 100 1 357
L I i 1 I
Scale 1 10
-
HOURS
STAFF
ESTIMATED
month) Irrigation
a Plans Estimate
Avenue hrs Plans Quantities Private
TASK
2 Sheets Basin Fans -
0 Sealed Profile and
Estimate / Relocations Plans
95th months Estimated Details and Detention Marking Plans
Final Control Details Summary Report
to (10 Management and / Notes of Details Sections Plan Profile and Plan Plans / and Signal Plans Relocation Sections Diagram Specifications
Sheets Sheet
Reports Pre-Final General Summar/ Geometric Special Typical Roadway Roadway Removal Intersection Driveway Drainage Drainage Grading Retention Signing Traffic Lighting Plans Earthwork Provisions
Avenue TT511 Administration Face Utility Cross Mass
Progress / General Roadway Drainage Earthwork Estimate Schedule
Management Specifications Traffic Utility
Progress Project Sending - - - - - - - - - - - - - - - - - - - - - - Quantities Plans,
NO. Specifications Spacial Cost Bid
107th Project Project - 4.1.1 - - - - - Estimates
Plans
- S.100 - 1 S.900.1,4.1.2 S.900.1.4.1.3 3.900.1.4.1.4 3.900.1.4.1.5 2.900.1.4.2.1 P.900.1.4.22 P.900.1.4,22 P.900.1.4.22 5.900.1.4.21 3.900,1.42.4 5.900.1.4.3.1 S.900.1.4.32 S.900.1.4.3.4 6.900.1.41.5 3.900.1.4.4.3 5.900.14.4.5 5.900.1.44.8 F.902.1.4.8.1 3.900.1.4.9.1 3.900.1.4.9.2 3.900.1.4.9.3 - - - - 5.900
85, Project - - Plans, - $.900.1.4.1 900 3.900.1.4.2 8.900.1.4,3 2.900.1.4.4 2.900.1.4.3 0.900.1.4.9 - -
PROJECT 5.100.62 5.900.1.4 S 3100.2,1 S.900,3,1 5.900.3.6 5.900.3.7
S.100.10 Subtotal Subtotal 5/24/5015
MC 5,100 5.100.6 S.900 9302.1 S.500.2 5.900.3

Hours/ Sheet 16 0116
Page
A3 5,099 5,099 4,137 2,573 559 7.569
Cost
2013-043 $ $ $ $ $ $ $ $
42.0 42.011 32.0 15.0 4.0
Kimley>>>Florn Total
No.
Contract Admin
I
Clerical 16 16
Tech
Analyst 4 4 12 12
EngfDes 8 8 12 a 20
Eng
s a 4 4 2 10
Pro.'
Pro] Eng 4 4 2 2 4
Sr
rifigr 2 2 2 2 2
Den
Prin
Proj
SEALED No Shts
- Scale
HOURS
STAFF
ESTIMATED
Avenue TASK
95th
to PS&S
Submittal Addenda Phase
Avenue TT511 Sealed Assistance of Conference
PS&E Submittals Bidding
Submit Phase
107th NO. Sealed Technical Preparation Pre-Bid
Submittals - S.1200 Bidding S.1300
85, - - - -
PROJECT 9.1200.9.1
MC 5.1200 5.1200.9 Subtotal S.1300 9.1300.1 9.1300.2 9.1300.3 Subtotal 604/201