SERIAL 14114-S BOILER MAINTENANCE, REPAIR AND REPLACEMENT SERVICES
DATE OF LAST REVISION: March 25, 2015 CONTRACT END DATE: March 31, 2017
CONTRACT PERIOD THROUGH MARCH 31, 2017
TO: All Departments
FROM: Office of Procurement Services
SUBJECT: Contract for BOILER MAINTENANCE, REPAIR AND REPLACEMENT SERVICES
Attached to this letter is published an effective purchasing contract for products and/or services to be supplied to
Maricopa County activities as awarded by Maricopa County on March 25, 2015 (Eff. 04/01/15).
All purchases of products and/or services listed on the attached pages of this letter are to be obtained from the
vendor holding the contract. Individuals are responsible to the vendor for purchases made outside of contracts.
The contract period is indicated above.
Wes Baysinger, Chief Procurement Officer
Office of Procurement Services
DW/at
Attach
Copy to: Office of Procurement Services
Don Jeffery, Facilities Management
Christian Jonson, Facilities Management
(Please remove Serial 09077-S from your contract notebooks)

SERIAL 14114-S
ARIZONA BOILER COMPANY, 8282 N. 75TH AVE., PEORIA, AZ 85345
COMPANY NAME: Arizona Boiler Company
DOING BUSINESS AS (DBA) NAME:
MAILING ADDRESS: 8282 N. 75th Ave., Peoria, AZ 85345
REMIT TO ADDRESS: Same as above
TELEPHONE NUMBER: 623-979-3301
FACSIMILE NUMBER: 623-486-4564
WEB SITE: azboiler.com
REPRESENTATIVE NAME: Bob Drowne
REPRESENTATIVE TELEPHONE NUMBER: 623-776-4367
REPRESENTATIVE E-MAIL: bobdrowne@azboiler.com
YES NO REBATE
WILL ALLOW OTHER GOVERNMENTAL ENTITIES TO PURCHASE FROM
THIS CONTRACT:
WILL ACCEPT PROCUREMENT CARD FOR PAYMENT:
PAYMENT TERMS:
NET 30 DAYS
***1st CALL***
Unit
Title Price Qty UofM
Labor: Regular Hours $90.00 1 hour
Labor: After Hours $114.00 1 hour
Labor: Weekends $114.00 1 hour
Labor: Holidays $114.00 1 hour
Boiler Parts, Components and Materials - Cost Plus 35.00% 1 each
Annual Inspection Services
Unit
Title Price Qty UofM
Greater Than 10 Million BTU Services $2,200.00 1 each
Less Than 10 Million BTU Services $1,800.00 1 each
Boiler Rental
Unit Total
Title Price Qty UofM Price Bidder Notes
Boiler Rental Rate $60.00 1 week $60.00 this will be per boiler horsepower

SERIAL 14114-S
ARIZONA BOILER COMPANY, 8282 N. 75TH AVE., PEORIA, AZ 85345
Additional Services
Unit
Title Price Qty UofM
Technical Training $360.00 1 per student
Labor Rate for Services Outside the Scope of Work $90.00 1 hour
PRICING SHEET: NIGP CODE(S) 82014, 94125, 94156, and 98168
Terms: NET 30
Vendor Number: W000001490 X
Certificates of Insurance Required
Contract Period: To cover the period ending March 31, 2017.

SERIAL 14114-S
EMERSON BOILER, PO BOX 249, LITCHFIELD PARK, AZ 85340
COMPANY NAME: YAZZIE BOILER
DOING BUSINESS AS (DBA) NAME: EMERSON BOILER
MAILING ADDRESS: PO BOX 249, LITCHFIELD PARK, AZ 85340
PHYSICAL:
8721 N. 79TH AVE., PEORIA, AZ 85345
REMIT TO ADDRESS: PO BOX 249 LITCHFIELD PARK, AZ 85340
TELEPHONE NUMBER: 623-847-4788
FACSIMILE NUMBER: 623-847-2386
WEB SITE: www.emersonboiler.com
REPRESENTATIVE NAME: John Soldinski
REPRESENTATIVE TELEPHONE NUMBER: 623.847.4788
REPRESENTATIVE E-MAIL: john@emersonboiler.com, judy@emersonboiler.com
YES NO REBATE
WILL ALLOW OTHER GOVERNMENTAL ENTITIES TO PURCHASE FROM
THIS CONTRACT:
WILL ACCEPT PROCUREMENT CARD FOR PAYMENT:
PAYMENT TERMS:
2% 30 DAYS NET 31 DAYS
***2nd CALL***
Unit
Title Price Qty UofM
Labor: Regular Hours $85.00 1 hour
Labor: After Hours $122.00 1 hour
Labor: Weekends $122.00 1 hour
Labor: Holidays $169.00 1 hour
Boiler Parts, Components and Materials - Cost Plus 30.00% 1 each
Annual Inspection Services
Unit
Title Price Qty UofM
Greater Than 10 Million BTU Services $3,210.00 1 each
Less Than 10 Million BTU Services $1,693.00 1 each
Boiler Rental
Unit Total
Title Price Qty UofM Price Bidder Notes
Boiler Rental Rate $10.00 1 week $10.00 $10 PER HP

SERIAL 14114-S
EMERSON BOILER, PO BOX 249, LITCHFIELD PARK, AZ 85340
Additional Services
Unit
Title Price Qty UofM
Technical Training $131.00 1 per student
Labor Rate for Services Outside the Scope of Work $85.00 1 hour
PRICING SHEET: NIGP CODE(S) 82014, 94125, 94156, and 98168
Terms: NET 30
Vendor Number: W000001669 X
Certificates of Insurance Required
Contract Period: To cover the period ending March 31, 2017.

SERIAL 14114-S
BOILER MAINTENANCE, REPAIR AND REPLACEMENT SERVICES
1.0 INTENT:
The intent of this Invitation for Bids is to establish a source for high-pressure steam boiler, pressure vessel,
storage vessel, and hydronic systems maintenance, repair, and replacement for the Maricopa County
Facilities Management Department (FMD). Additionally, these services can include the renting of boilers
and ancillary equipment on a temporary basis.
Other governmental entities under agreement with the County may have access to services provided
hereunder (see also Sections 3.8 and 3.9, below).
The County reserves the right to add additional contractors, at the County’s sole discretion, in cases where
the currently listed contractors are of an insufficient number or skill-set to satisfy the County’s needs or to
ensure adequate competition on any project or task order work.
2.0 SCOPE OF SERVICES:
2.1 Contractor shall furnish all supervision, labor, materials, equipment, tools, transportation, and all
efforts necessary to perform the requirements herein. Parts shall be billed separately. The
Contractor shall have sufficient resources available (labor, tools, diagnostic equipment,
controllers, floats, safety valves, refractory, gaskets, etc.) necessary to complete repairs on each
boiler, including emergency situations.
2.2 CONTRACTOR QUALIFICATIONS:
2.2.1 Contractor shall have a minimum of ten (10) years’ experience in the inspection,
maintenance, and repair of steam boilers. Employees of the Contractor who shall be
performing maintenance and repairs of the units MUST be certified and fully qualified in
the service of boiler systems. All copies of certification regarding contractors experience
and his employees’ certifications must be submitted in bid package (Including on-staff
ASME certified welders).
2.2.2 Contractor shall be licensed by the State of Arizona, Registrar of Contractors, having an
L-04 Boilers, Steam fitting, and Process Piping license. Proof of such must accompany
bid package.
2.2.3 Contractor’s service truck fleet shall carry sufficient supply of repair parts and equipment
to perform routine boiler service and repairs. The Contractor shall have a local shop that
stocks parts to keep the trucks supplied daily. This requirement shall be verified by FMD
via a formal inspection prior to bid award.
2.3 CONTRACTOR REQUIREMENTS:
2.3.1 Contractor(s) shall supply all labor, supervision, materials, tools, equipment, and effort
necessary to perform the Scope of Work presented.
2.3.2 The Contractor’s service truck fleet and/or warehouse shall carry sufficient supply of
repair parts and equipment to perform services per Scope of Work presented.
2.3.3 The Contractor agrees to utilize only experienced, responsible and capable people in the
performance of the work.
2.3.4 All employees of the Contractor shall wear a company uniform identified with the
company name consisting of a minimum of one of the following:
2.3.4.1 Shirt/blouse
2.3.4.2 Vest
2.3.4.3 Cap

SERIAL 14114-S
2.3.5 No one except authorized employees of the Contractor is allowed on the premises of
Maricopa County. Contractor’s employees are NOT to be accompanied in their work area
by acquaintances, family members, assistants, or any other person unless said person is
an authorized employee of the Contractor.
2.3.6 The Contractor shall perform the work in a way to minimize disruption to the normal
operation of building occupants. Upon completion of work the Contractor shall clean and
remove from the job site all debris, materials and equipment associated with the work
performed.
2.3.7 Contractor shall adhere to all regulations, rules, ordinances, and standards set by Federal,
State, County, and Municipal governments pertaining to safety on the job site.
2.4 HOURS OF SERVICE:
2.4.1 REGULAR HOURS are between 6:00 AM and 6:00 PM, Monday through Friday,
excluding County holidays.
2.4.2 AFTER HOURS is after 6:00 PM and prior to 6:00 AM, Monday through Friday.
2.4.3 WEEKENDS are anytime Saturday or, Sunday.
2.4.4 HOLIDAYS are County Holidays (See County holiday schedule attachment).
2.4.5 Services shall be available 24/7, 365 days per year.
2.4.6 Contractor shall provide 24/7; 365 days per year telephone access, and respond to a call
for services within thirty (30) minutes of receipt.
2.5 RESPONSE TIMES:
2.5.1 During REGULAR HOURS, AFTER HOURS, WEEKEND or HOLIDAYs, Contractor
shall respond on-site within four (4) hours of receipt of a service request.
2.5.2 If the request is designated by the County as an EMERGENCY, the contractor shall
respond on-site within two hours of receipt of a service request regardless of the time of
day, WEEKEND or HOLIDAY.
2.6 TRIP CHARGE:
Trip charges are permitted when time and material work is requested at the following sites only:
2.6.1 MCSO Lake Aid Stations (Apache, Bartlett, Blue Point, Canyon and Saguaro)
2.6.2 County offices located in Gila Bend, AZ
2.6.3 County offices located in Buckeye, AZ
2.6.4 County offices located in Aguila, AZ
2.6.5 Only one trip charge may be charged per service call.
2.6.6 If the contractor arrives onsite and is unable to locate a County representative familiar
with the work or unable to gain access to the work site, the Contractor may only bill for a
trip charge. The Contractor is not authorized to incur nor will the County accepting
billing for any labor charges.

SERIAL 14114-S
2.7 ASBESTOS ABATEMENT:
2.7.1 Any asbestos found on the site that would impact the repairs or replacement to a boiler
must be abated through a licensed asbestos abatement contractor providing air quality and
disposal certificates. This subcontracting can be coordinated either by the boiler
contractor or the County.
2.7.2 The Contractor, if certified to handle asbestos containing materials including: sampling,
removal, abatement, and disposal, must submit proof of such with bid package. This
service may be subcontracted, but only to certified asbestos abatement companies.
2.7.3 The Contractor shall be required to demonstrate the expertise, knowledge, and capability
to appropriately manage situations involving hazardous materials. Copies of employee
training regarding hazardous material handling must be submitted with bid package.
The Contractor shall perform the work in a way to minimize disruption to the normal operation of
building tenants. Upon completion of work the Contractor is responsible for cleaning and
removing from the job site all debris, materials, and equipment associated with the work
performed.
2.8 CONTRACTOR EMPLOYEE BACKGROUND CHECK:
A background check is required for all Contractor employees providing services to the County.
The cost of this service shall be incurred by the County. No Contractor employee may access
County property without approval of FMD.
2.9 SALVAGE:
Salvage rights shall be evaluated on a project by project basis by the County and shall be
determined prior to incorporation in the contractor’s bid price. Salvage rights automatically apply
for all work if in the best interest to the County. Salvageable materials without pre-approved
contractor salvage rights shall be securely stored and are not to be transported off the site without
written permission from Maricopa County. If contractor is given salvage rights, salvageable
materials shall be removed daily. No on site storage of contractor’s salvaged materials will be
permitted.
2.10 BUILDING SECURITY (KEYS):
2.10.1 The Contractor may be provided keys to required County Facilities at the discretion of
FMD. Keys may be acquired by:
2.10.1.1 The Contractor being provided permanent key(s), wherein the Contractor
verifies receipt of and accepts responsibility for keys. The keys must be
returned at the completion of the work or at the direction of FMD. Keys not
returned may cause the County to re-key the ENTIRE building or locations that
the set of keys opened with the cost being borne by the Contractor.
2.10.1.2 In lieu of or in addition to keys, the Contractor may be provided card access
badges at the discretion of FMD.
2.10.1.3 The Contractor shall notify FMD within twenty-four (24) hours if any keys are
lost, misplaced, stolen or otherwise not within the Contractor’s control.
2.10.1.4 Once the Purchase Order is complete, expired, or terminated the Contractor shall
immediately return all badges and keys to FMD.

SERIAL 14114-S
2.11 PROJECT WORK:
2.11.1 PROJECT work shall mean work performed or major projects that would be more
advantages to perform as a project.
2.11.2 The threshold from time and materials to project work shall be $5,000.00. Exceptions to
this shall be emergencies that arise and must be dealt with immediately without the time
for project quotes. This figure is not firm fixed. The County reserves the right to adjust
this figure to a higher or lower if deemed in the best interest of the department.
2.11.3 The project quote sheet will contain the following information:
2.11.3.1 The contract serial number and name;
2.11.3.2 Name and address of site;
2.11.3.3 FMD site number;
2.11.3.4 Detailed Scope of Work,
2.11.3.5 Other information relative to the S.O.W;
2.11.3.6 Project start/finish time line (optional),
2.11.3.7 Check box for “will quote” or “will not quote” the project,
2.11.4 After site review of the project, all contractors listed under boiler services must submit
the project quote sheet back to the requestor, either with acceptance and a firm price; or
decline with a written reason as to why the project was declined. Contractors who have
declined project work a minimum of three times during a six-month period shall be
required to attend a meeting with the Office of Procurement Services and FMD to discuss
consideration for default of contract as this is indicative of the Contractor’s desire not to
do business with the County.
2.11.5 The submitted project price quotes to be all-inclusive. That is, any cost overruns to be
absorbed by the Contractor, or cost savings to be additional profit. Exceptions to this are
changes requested by the County that incur higher project cost and longer delays. All
change orders to a project must be in writing, referencing the contract serial number, and
approved by FMD prior to any authorization to proceed. The Contractor who fails to
acquire change orders in writing runs the risk of incurring these additional costs without
payment. ALL contractors are to have an opportunity to quote on project work.
2.11.6 Inquiries may be submitted by telephone or at the time of walk through but must be
followed up in writing. No oral communication is binding on Maricopa County. Any
changes to the original specification must be acknowledged in writing as part of the
response to the solicitation/quote.
2.11.7 Project pricing shall include everything the contractor anticipates is necessary to
complete the job (i.e., rental equipment, connection and or installation fees, permit fees,
materials, labor, supervision, subcontractor costs, mobilization costs, demobilization
costs, permits, etc.). These costs to be part of the overall project price and as such not
itemized.
2.11.8 Any work involving the combustion circuit will require a combustion report be submitted
with invoicing. No additional charge for report is allowable.
2.11.9 If a permit is required the contractor shall inform FMD so we can schedule the insurance
carrier to be involved with the permit inspection.
2.11.10 Dependent on the complexity/nature of the project, a predetermined and/or pre-identified
mandatory site meeting may be held to ensure all contractors are aware of important
issues regarding the project. Mandatory site meetings will require a sign-in sheet.
Contractors who do not show-up to a mandatory site meeting and who submit a project
quote will be considered “non-responsive”.

SERIAL 14114-S
2.11.11 Contractors shall be compensated for additional work requested that is not detailed in the
scope via the labor rates bid on the contractor’s pricing page. Note: all extra work
outside the S.O.W. must be in writing.
2.11.12 Project Price Ceiling Limits:
2.11.12.1 Projects shall not exceed $150,000.00 each. If an emergency occurs, this
price ceiling may be lifted if approved by the Office of Procurement Services
Procurement Officer assigned to this contract, otherwise, the project may be
separately bid outside of this contract document. This to ensure the County
receives adequate competition for such work.
2.12 TIME AND MATERIALS WORK:
2.12.1 This contract may be used for time and materials work (not to exceed $5,000) and priced
per hour as bid in the pricing section. Each bidder shall be ranked as first call, second
call, third call, and so on. If the contractor is unable to respond in the time parameters, the
requesting agency shall proceed to the next lowest bidder. Consistent decline of service or
consistent non-compliance with response time specifications may result in removal from
the contract.
2.12.2 Repair or replacement parts for existing equipment shall be of the original equipment
manufacturer (OEM) or shall equal or exceed that of OEM. All replacement parts must
follow the guidelines established by State, Local, and ASME regulations.
2.12.3 In the event the work performance of the Contractor is unsatisfactory, the Contractor
shall be notified by FMD and given one (1) day to correct the work. Labor for all rework
will be a no charge to the County. Any additional parts replaced shall be billed per the
pricing page of the awarded contractor.
2.12.4 Any work involving the combustion circuit will require a combustion report be submitted
with invoicing. No additional charge for report is allowable.
2.12.5 It shall be the sole responsibility of the Contractor to pay for all connection and or
installation fees and pass through to the County without mark-up.
2.12.6 It shall be the sole responsibility of the Contractor to determine what permits are required
and to secure such permits. The cost of all permits shall be paid by the Contractor and a
pass-through to the County without mark-up.
2.12.7 If a permit is required the contractor shall inform FMD so we can schedule the insurance
carrier to be involved with the permit inspection.
2.13 TECHNICAL TRAINING TO COUNTY STAFF:
The Contractor(s) may be required to provide technical expertise training in boiler operation and
repairs. These training sessions will be on-request by FMD. The training requested may be for
old or new technology. The training will be held at a County facility, or if deemed necessary, the
Contractors facility. Training aids (i.e., service manuals, mock-up equipment; etc.) shall be
provided by the Contractor. Service manuals may be purchased by the County under a separate
purchase order. The Contractor shall be given advance notice to prepare, research, and schedule
staff in order to provide an adequate presentation. The cost of this service will be line item priced
in the pricing section of the contract. Exceptions: equipment units purchased under project work
will be specified in the job scope to include training. Technical training shall be performed during
regular business hours.

SERIAL 14114-S
2.14 BOILER RENTAL:
On occasion, it may be necessary to rent a boiler or ancillary equipment due to emergency or
unusual circumstances. This will be a line item priced out on the pricing page of the awarded
contractor. The installation and removal of the boiler or ancillary equipment will be project
quoted separately.
2.15 WARRANTY:
Parts replaced shall be warranted for a period of one (1) year. All labor for repairs will have a
minimum 90-day warranty for specific repairs only.
2.16 SSTA CERTIFICATION:
Each technician assigned to this contract MUST have SSTA (Southwest Safety Training Alliance)
certification. The purpose of this certification is to ensure all technical staff has received safety
training that meets the OSHA Construction Safety standards (29CFR1926), and the OSHA
General Industry standards (OSHA 29CFR1910). If the contractor/bidder is currently certified,
please submit copies of certification cards of all technicians who will be assigned to this contract.
If the contractor/bidder is not currently certified, the contractor/bidder has sixty (60) days after
award to obtain certification for its technicians assigned to this contract, and must submit copies of
certification cards to the Office of Procurement Services upon completion of certification. Failure
to provide this information after award will render the contractor in default of contract. All
contractor new hires assigned to this contract must meet the same requirements.
2.17 TRAINING AND DOCUMENTATION:
Any alterations changing the operation of the equipment, training shall be prior to completion of
replacement boiler work, Contractor to compile a complete equipment and maintenance manual
for all new equipment supplied to the County. Also, upon completion of installation of a new
boiler, training for operation and maintenance shall be provided to County staff at no additional
cost and part of the project cost of the installation.
2.18 DAMAGE TO COUNTY PROPERTY:
The Contractor shall carry on the above specifications in such manner that does not damage
County property. In the event damage occurs to Maricopa County property or adjacent property
by reason of custodial service operations performed under this Contractor, the Contractor shall
replace or repair the same at no cost to the County. If damage caused by the Contractor has to be
repaired or replaced by the County, the cost of such work shall be deducted from the monies due
the Contractor.
2.19 ANNUAL INSPECTION SERVICE:
2.19.1 UNITS < 10 MILLION BTU’S:
2.19.1.1 Check all safeties, controls and alarms for proper operation and settings.
2.19.1.2 Perform inspection of boiler, all boiler pumps and ancillary equipment.
2.19.1.3 Perform a visual inspection of combustion.
2.19.1.4 Include a report of inspection and checklist (contractors form) of work
performed and recommendations needed with invoice.
2.19.2 UNITS > 10 MILLION BTU’S:
2.19.2.1 Check all safeties, controls and alarms for proper operation and settings.
2.19.2.2 Perform inspection of boiler, all boiler pumps and ancillary equipment.

SERIAL 14114-S
2.19.2.3 Tune combustion to proper emission
2.19.2.4 Provide a detailed flue gas analysis report using digital analyzers (co2, co, nox,
so2, etc.) Report is at no additional charge.
2.19.2.5 Include a report of inspection and checklist (contractors form) of work
performed and recommendations needed with invoice.
2.20 INVOICING:
2.20.1 All invoicing for time and materials work shall be sent to the County using agency that
has requested the services of the Contractor. All T&M invoicing MUST include:
Purchase order number (or P-Card designation);
Work Order Number;
Terms as bid;
Contract serial number;
Job site name and address;
FMD Building number;
Requestor
Description of work performed;
Itemized parts list with detailed description of parts;
Price of parts;
Total labor hours;
Labor charges as bid;
Rental equipment charges (limited to 5% markup and must have rental vendors invoice
attached);
Applicable sales tax on parts only;
Grand total of invoice.
Invoicing for project work must contain:
Contract serial number and name;
Purchase order number (or P-Card designation);
Work Order Number
Terms as bid;
Job site name and address;
FMD Building number;
A detailed description of work performed;
Total project cost;
Separate line item for any change orders (if applicable);
Grand total
2.20.2 All invoicing that does not have all the required information as listed above, will be sent
back for corrections, delaying payment to the Contractor.
2.20.3 Problems regarding billing or invoicing shall be directed to the using agency as listed on
the Purchase Order.
2.20.4 Payment shall be made to the Contractor by Accounts Payable through the Maricopa
County Vendor Express Payment Program. This is an Electronic Funds Transfer (EFT)
process. After Award the Contractor shall fill out an EFT Enrollment form (to be
provided by the Procurement Officer) or as located on the County Department of Finance
Website as a fillable PDF document (www.maricopa.gov/finance/).
2.20.5 EFT payments to the routing and account numbers designated by the Contractor will
include the details on the specific invoices that the payment covers. The Contractor is
required to discuss remittance delivery capabilities with their designated financial
institution for access to those details.

SERIAL 14114-S
3.0 PURCHASING REQUIREMENTS:
3.1 ACCEPTANCE:
Upon delivery and successful installation, the material(s) shall be deemed accepted and the
warranty period shall begin. All documentation shall be completed prior to final acceptance.
3.2 FACILITIES:
During the course of this Contract, the County shall provide the Contractor’s personnel with
adequate workspace for consultants and such other related facilities as may be required by
Contractor to carry out its obligation enumerated herein.
3.3 FACTORY AUTHORIZED SERVICE AVAILABILITY:
The Contractor shall have and maintain a local factory authorized service facility within the
Phoenix, Arizona metropolitan area. The facility shall be capable of supplying and installing
component parts, troubleshooting, repairing and maintaining the material(s). Minimum service
hours shall be from 8:00 A.M. through 5:00 P.M., Arizona Time, Monday through Friday.
3.4 USAGE REPORT:
The Contractor shall furnish the County a usage report upon request delineating the acquisition
activity governed by the Contract. The format of the report shall be approved by the County and
shall disclose the quantity and dollar value of each contract item by individual unit.
3.5 APPLICABLE TAXES:
3.5.1 Taxes shall be imposed on parts or unit equipment purchased by the County. No tax shall
be levied against labor. Bid pricing to include all labor, overhead, tools and equipment
used, profit and any taxes that may be levied. It is the responsibility of the contractor to
determine any and all taxes and include the same in bid price. Project work may be
taxed; however, the tax must be included in the project costs and not a separate line item.
3.5.2 Payment of Taxes: The Contractor shall pay all applicable taxes. With respect to any
installation labor on items that are not attached to real property performed by Contractor
under the terms of this Contract, the installation labor cost and the gross receipts for
materials provided shall be listed separately on the Contractor’s invoices.
3.5.3 State and Local Transaction Privilege Taxes: Maricopa County is subject to all
applicable state and local transaction privilege taxes. To the extent any state and local
transaction privilege taxes apply to sales made under the terms of this contract it is the
responsibility of the seller to collect and remit all applicable taxes to the proper taxing
jurisdiction of authority.
3.5.4 Tax Indemnification: Contractor and all subcontractors shall pay all Federal, state, and
local taxes applicable to its operation and any persons employed by the Contractor.
Contractor shall, and require all subcontractors to hold Maricopa County harmless from
any responsibility for taxes, damages and interest, if applicable, contributions required
under Federal, and/or state and local laws and regulations and any other costs including
transaction privilege taxes, unemployment compensation insurance, Social Security and
Worker’s Compensation.

SERIAL 14114-S
3.6 DELIVERY:
It shall be the Contractor’s responsibility to meet the proposed delivery requirements. Maricopa
County reserves the right to obtain services on the open market in the event the Contractor fails to
make delivery and any price differential will be charged against the Contractor.
3.7 POST AWARD MEETING:
The Contractor may be required to attend a post-award meeting with the Using Agency to discuss the
terms and conditions of this Contract. This meeting will be coordinated by the Procurement Officer of
the Contract.
3.8 STRATEGIC ALLIANCE for VOLUME EXPENDITURES ($AVE)
The County is a member of the $AVE cooperative purchasing group. $AVE includes the State of
Arizona, many Phoenix metropolitan area municipalities, and many K-12 unified school districts.
Under the $AVE Cooperative Purchasing Agreement, and with the concurrence of the successful
Respondent under this solicitation, a member of $AVE may access a contract resulting from a
solicitation issued by the County. If you do not want to grant such access to a member of $AVE,
please state so in your proposal. In the absence of a statement to the contrary, the County will
assume that you do wish to grant access to any contract that may result from this Request for
Proposal.
3.9 INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENTS (ICPA’s)
County currently holds ICPA’s with numerous governmental entities throughout the State of
Arizona. These agreements allow those entities, with the approval of the Contractor, to purchase
their requirements under the terms and conditions of the County Contract. Please indicate on
Attachment A, your acceptance or rejection regarding such participation of other governmental
entities. Your response will not be considered as an evaluation factor in awarding a contract.
4.0 CONTRACTUAL TERMS & CONDITIONS:
4.1 CONTRACT TERM:
This Invitation for Bid is for awarding a firm, fixed-price purchasing contract to cover a term of
two (2) years.
4.2 OPTION TO RENEW:
The County may, at its option and with the concurrence of the Contractor, renew the term of this
Contract up to a maximum of four (4) additional years, (or at the County’s sole discretion, extend
the contract on a month to month basis for a maximum of six (6) months after expiration). The
Contractor shall be notified in writing by the Office of Procurement Services of the County’s
intention to renew the contract term at least thirty (60) calendar days prior to the expiration of the
original contract term..
4.3 PRICE ADJUSTMENTS:
Any requests for reasonable price adjustments must be submitted sixty (60) days prior to the
Contract annual anniversary date. Requests for adjustment in cost of labor and/or materials must
be supported by appropriate documentation. If County agrees to the adjusted price terms, County
shall issue written approval of the change. The reasonableness of the request will be determined by
comparing the request with the Consumer Price Index or by performing a market survey.
4.4 FUEL COST PRICE ADJUSTMENT:
4.4.1 This provision provides for limited increased or decreased costs of motor fuels (fuels)
used to perform services under this Contract. This provision does not apply to burner

SERIAL 14114-S
fuel (i.e. propane, natural gas, fuel oil, used motor oil). It applies to motor fuel only.
Fuel cost adjustments may be either positive or negative. A positive fuel cost adjustment
will result in an increase in payments to Contractor while a negative fuel cost adjustment
will result in a decrease in payments to Contractor.
4.4.2 This provision is intended to minimize risk to both parties to this Contract due to fuel cost
fluctuations that may occur during the term of this Contract. This provision is not
designed to estimate actual quantities of fuel used in providing services under this
Contract, but to provide a reasonable basis for calculating a fuel cost adjustment based on
average conditions.
4.4.3 Application of this provision will come into effect upon Contractor submittal of a fuel
cost adjustment request. A request may be submitted only when the increased cost of
fuel, established as a percentage of total contract price (base fuel cost) upon award of this
Contract, exceeds ten (10%) percent of the base fuel cost. The Contractor may request a
fuel surcharge no more than four (4) times annually, during the month(s) of March, June,
September and December. The request must be submitted no later than the tenth (10th) of
the month. Any surcharge shall be effective the first of the following month after receipt
and approval. The date of County approval of a fuel cost adjustment request shall
become the base date for any future Contractor adjustment requests.
4.4.4 Contractor shall include, as part of its price bid, the percentage of total contract price fuel
represents (e.g., fuel cost equals 10% of Contractor cost) (see also, Attachment A,
Vendor Information). This percentage will represent and establish the base fuel cost for
this Contract. The base fuel cost shall be established as the due date for submission of
proposals for this Contract. All subsequent fuel cost adjustments shall be based upon the
date the County approves a Contractor’s request for fuel cost adjustment (e.g. fuel cost
adjustment approved by County on January 1, 2006, January 1, 2006 becomes base date
for any next Contractor request for adjustment).
4.4.5 Fuel Cost Application Requirement. The Contractor must provide documentation
including type of motor fuel and fuel invoices with price of the fuel used in providing
services under this Contract, from the month bids were due and the month of the cost
adjustment request, with any fuel cost adjustment application. The fuel cost adjustment
application must be completed with all applicable data, and signed by the Contractor.
Any cost adjustment will be calculated by the County by using the bureau of Labor
Statistics, Producer Price Index for Gasoline – WPU0571 and #2 Diesel Fuel –
WPO57303 (http://data.bls.gov/cgi-bin/surveymost?wp).
4.4.6 The fuel surcharge shall be based on the current quarterly index of the West Coast
(PADD5) Diesel (On-Highway)-All Types or Reformulated Areas Gasoline compared to
the previous quarterly index period as reported on the Energy Information Administration
(EIA) website: http://www.eia.doe.gov/
4.4.7 The computation of the fuel surcharge amount shall be determined as follows:
4.4.7.1 The fuel cost component from Attachment A (vendor information) of the
Contract with Maricopa County, multiplied by the percent of change indicated
by the EIA report from the previous index period.
4.4.7.2 Upon agreement by the County to the surcharge, the County shall issue
written approval of the change prior to any adjusted invoicing submitted for
payment.
4.4.7.3 The surcharge shall be added as a separate line item to the invoice.

SERIAL 14114-S
4.5 INDEMNIFICATION:
4.5.1 To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold
harmless County, its agents, representatives, officers, directors, officials, and employees
from and against all claims, damages, losses and expenses, including, but not limited to,
attorney fees, court costs, expert witness fees, and the cost of appellate proceedings?,
relating to, arising out of, or alleged to have resulted from the negligent acts, errors,
omissions, mistakes or malfeasance relating to the Contractor’s performance of this
Contract. Contractor’s duty to defend, indemnify and hold harmless County, its agents,
representatives, officers, directors, officials, and employees shall arise in connection with
any claim, damage, loss or expense that is caused by any negligent acts, errors, omissions
or mistakes in the performance of this Contract by the Contractor, as well as any person
or entity for whose acts, errors, omissions, mistakes or malfeasance Contractor may be
legally liable.
4.5.2 The amount and type of insurance coverage requirements set forth herein will in no way
be construed as limiting the scope of the indemnity in this paragraph.
4.5.3 The scope of this indemnification does not extend to any claim, damage, loss, or expense
resulting from the sole negligence of County.
4.6 INSURANCE:
4.6.1 Contractor, at Contractor’s own expense, shall purchase and maintain the herein
stipulated minimum insurance from a company or companies duly licensed by the State
of Arizona and possessing a current A.M. Best, Inc. rating of B++. In lieu of State of
Arizona licensing, the stipulated insurance may be purchased from a company or
companies, which are authorized to do business in the State of Arizona, provided that
said insurance companies meet the approval of County. The form of any insurance
policies and forms must be acceptable to County.
4.6.2 All insurance required herein shall be maintained in full force and effect until all work or
service required to be performed under the terms of the Contract is satisfactorily
completed and formally accepted. Failure to do so may, at the sole discretion of County,
constitute a material breach of this Contract.
4.6.3 Contractor’s insurance shall be primary insurance as respects County, and any insurance
or self-insurance maintained by County shall not contribute to it.
4.6.4 Any failure to comply with the claim reporting provisions of the insurance policies or any
breach of an insurance policy warranty shall not affect the County’s right to coverage
afforded under the insurance policies.
4.6.5 The insurance policies may provide coverage that contains deductibles or self-insured
retentions. Such deductible and/or self-insured retentions shall not be applicable with
respect to the coverage provided to County under such policies. Contractor shall be
solely responsible for the deductible and/or self-insured retention and County, at its
option, may require Contractor to secure payment of such deductibles or self-insured
retentions by a surety bond or an irrevocable and unconditional letter of credit.
4.6.6 County reserves the right to request and to receive, within 10 working days, certified
copies of any or all of the herein required insurance certificates. County shall not be
obligated to review policies and/or endorsements or to advise Contractor of any
deficiencies in such policies and endorsements, and such receipt shall not relieve
Contractor from, or be deemed a waiver of County’s right to insist on strict fulfillment of
Contractor’s obligations under this Contract.

SERIAL 14114-S
4.6.7 The insurance policies required by this Contract, except Workers’ Compensation, and
Errors and Omissions, shall name County, its agents, representatives, officers, directors,
officials and employees as Additional Insured’s.
4.6.8 The policies required hereunder, except Workers’ Compensation, and Errors and
Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against
County, its agents, representatives, officers, directors, officials and employees for any
claims arising out of Contractor’s work or service.
4.6.9 The Contractor's policies shall stipulate that the insurance afforded the Contractor shall
be primary insurance and that any insurance carried by the Department, its agents,
officials, employees or the State of Arizona shall be excess and not contributory
insurance, as provided by A.R.S. § 41-621 (E).
4.6.10 Coverage provided by the Contractor shall not be limited to the liability assumed under
the indemnification provisions of this Contract.
4.6.11 Commercial General Liability:
Commercial General Liability insurance and, if necessary, Commercial Umbrella
insurance with a limit of not less than $2,000,000 for each occurrence, $2,000,000
Products/Completed Operations Aggregate, and $4,000,000 General Aggregate Limit.
The policy shall include coverage for bodily injury, broad form property damage,
personal injury, products and completed operations and blanket contractual coverage, and
shall not contain any provision which would serve to limit third party action over claims.
There shall be no endorsement or modification of the CGL limiting the scope of coverage
for liability arising from explosion, collapse, or underground property damage.
4.6.12 Automobile Liability:
Commercial/Business Automobile Liability insurance and, if necessary, Commercial
Umbrella insurance with a combined single limit for bodily injury and property damage
of not less than $2,000,000 each occurrence with respect to any of the Contractor’s
owned, hired, and non-owned vehicles assigned to or used in performance of the
Contractor’s work or services under this Contract.
4.6.13 Workers’ Compensation:
4.6.13.1 Workers’ Compensation insurance to cover obligations imposed by federal
and state statutes having jurisdiction of Contractor’s employees engaged in the
performance of the work or services under this Contract; and Employer’s
Liability insurance of not less than $1,000,000 for each accident, $1,000,000
disease for each employee, and $1,000,000 disease policy limit.
4.6.13.2 Contractor waives all rights against County and its agents, officers, directors
and employees for recovery of damages to the extent these damages are
covered by the Workers’ Compensation and Employer’s Liability or
commercial umbrella liability insurance obtained by Contractor pursuant to
this Contract.
4.6.14 Builder’s Risk:
4.6.14.1 Builder’s Risk (Property) Insurance. Contractor shall purchase and maintain,
on a replacement cost basis, Builders’ Risk insurance and, if necessary,
Commercial Umbrella insurance in the amount of the initial Contract amount
as well as subsequent modifications thereto for the entire work at the site.
Such Builders’ Risk insurance shall be maintained until final payment has
been made or until no person or entity other than County has an insurable
interest in the property required to be covered, whichever is earlier. This

SERIAL 14114-S
insurance shall include interests of County, Contractor, and all subcontractors
and sub‐subcontractors in the work during the life of the Contract and course
of construction, and shall continue until the work is completed and accepted
by County. For new construction projects, Contractor agrees to assume full
responsibility for loss or damage to the work being performed and to the
structures under construction. For renovation construction projects, Contractor
agrees to assume responsibility for loss or damage to the work being
performed at least up to the full Contract amount, unless otherwise required
by the Contract documents or amendments thereto.
4.6.14.2 Builders’ Risk insurance shall be on a special form and shall also cover false
work and temporary buildings and shall insure against risk of direct physical
loss or damage from external causes including debris removal, demolition
occasioned by enforcement of any applicable legal requirements, and shall
cover reasonable compensation for architect’s service and expenses required
as a result of such insured loss and other “soft costs” as required by the
Contract.
4.6.14.3 Builders’ Risk insurance must provide coverage from the time any covered
property comes under Contractor’s control and/or responsibility, and continue
without interruption during construction, renovation, or installation, including
any time during which the covered property is being transported to the
construction installation site, and while on the construction or installation site
awaiting installation. The policy will provide coverage while the covered
premises or any part thereof are occupied. Builders’ Risk insurance shall be
primary and any insurance or self‐insurance maintained by the County is not
contributory.
4.6.14.4 If the Contract requires testing of equipment or other similar operations, at the
option of County, Contractor will be responsible for providing property
insurance for these exposures under a Boiler Machinery insurance policy or
the Builders’ Risk Insurance policy.
4.6.15 Errors &Omissions:
If necessary, Commercial Umbrella insurance, which will insure and provide coverage
for errors or omissions of the Contractor, with limits of no less than $2,000,000 for each
claim.
4.6.16 Environmental/Pollution:
Contractor shall maintain Commercial General Liability Insurance (CGL) and, if
necessary, Commercial Umbrella Insurance with a limit of not less than $2,000,000 for
each occurrence with a $4,000,000 Products/Completed Operations Aggregate and a
$4,000,000 General Aggregate Limit. The policy shall include coverage for bodily injury,
broad form property damage, personal injury, products and completed operations,
environmental and pollution damage, and blanket contractual coverage including, but not
limited to, the liability assumed under the indemnification provisions of this Contract.
4.6.17 Certificates of Insurance.
4.6.17.1 Prior to Contract Award, Contractor shall furnish the County with valid and
complete certificates of insurance, or formal endorsements as required by the
Contract in the form provided by the County (see Exhibit 2), issued by
Contractor’s insurer(s), as evidence that policies providing the required
coverage, conditions and limits required by this Contract are in full force and
effect. Such certificates shall identify this contract number and title.

SERIAL 14114-S
4.6.17.2 In the event any insurance policy (ies) required by this contract is (are) written
on a “claims made” basis, coverage shall extend for two years past completion
and acceptance of Contractor’s work or services and as evidenced by annual
Certificates of Insurance.
4.6.17.3 If a policy does expire during the life of the Contract, a renewal certificate
must be sent to County fifteen (15) days prior to the expiration date.
4.6.18 Cancellation and Expiration Notice.
Insurance required herein shall not be permitted to expire, be canceled, or materially
changed without thirty (30) days prior written notice to the County.
4.7 ORDERING AUTHORITY:
4.7.1 Any request for purchase of product(s) shall be accompanied by a valid purchase order,
issued by Office of Procurement Services, a Purchase Order issued by the using
Department or direction by a Certified Agency Procurement Aid (CAPA) with a Purchase
Card for payment.
4.8 REQUIREMENTS CONTRACT:
4.8.1 Contractors signify their understanding and agreement by signing a bid submittal, that the
Contract resulting from the bid is a requirements contract. However, the Contract does
not guarantee any minimum or maximum number of purchases will be made. It only
indicates that if purchases are made for the materials contained in the Contract, they will
be purchased from the Contractor awarded that item. Orders will only be placed when
the County identifies a need and proper authorization and documentation have been
approved.
4.8.2 County reserves the right to cancel Purchase Orders within a reasonable period of time
after issuance. Should a Purchase Order be canceled, the County agrees to reimburse the
Contractor for actual and documentable costs incurred by the Contractor in response to
the Purchase Order. The County will not reimburse the Contractor for any costs incurred
after receipt of County notice of cancellation, or for lost profits, shipment of product prior
to issuance of Purchase Order, etc.
4.8.3 Contractors agree to accept verbal notification of cancellation of Purchase Orders from
the County Procurement Officer with written notification to follow. By submitting a bid
in response to this Invitation for Bids, the Contractor specifically acknowledges to be
bound by this cancellation policy.
4.9 SUSPENSION OF WORK:
The Procurement Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or
any part of the work of this contract for the period of time that the Procurement Officer determines
appropriate for the convenience of the County. No adjustment shall be made under this clause for
any suspension, delay, or interruption to the extent that performance would have been so
suspended, delayed, or interrupted by any other cause, including the fault or negligence of the
Contractor. No request for adjustment under this clause shall be granted unless the claim, in an
amount stated, is asserted in writing as soon as practicable after the termination of the suspension,
delay, or interruption, but not later than the date of final payment under the contract.
4.10 STOP WORK ORDER:
The Procurement Officer may, at any time, by written order to the Contractor, require the
Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days
after the order is delivered to the Contractor, and for any further period to which the parties may
agree. The order shall be specifically identified as a stop work order issued under this clause.

SERIAL 14114-S
Upon receipt of the order, the Contractor shall immediately comply with its terms and take all
reasonable steps to minimize the incurrence of costs allocable to the work covered by the order
during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to
the Contractor, or within any extension of that period to which the parties shall have agreed, the
Procurement Officer shall either:
4.10.1 Cancel the stop-work order; or
4.10.2 Terminate the work covered by the order as provided in the Default, or the Termination
for Convenience of the County clause of this contract.
4.10.3 The Procurement Officer may make an equitable adjustment in the delivery schedule
and/or contract price, or otherwise, and the contract shall be modified, in writing,
accordingly, if the Contractor demonstrates that the stop work order resulted in an
increase in costs to the Contractor.
4.11 UNCONDITIONAL TERMINATION FOR CONVENIENCE:
Maricopa County may terminate the resultant Contract for convenience by providing sixty (60)
calendar days advance notice to the Contractor.
4.12 TERMINATION FOR DEFAULT:
The County may, by written notice of default to the Contractor, terminate this contract in whole or
in part if the Contractor fails to:
4.12.1 Deliver the supplies or to perform the services within the time specified in this contract or
any extension;
4.12.2 Make progress, so as to endanger performance of this contract; or
4.12.3 Perform any of the other provisions of this contract.
4.12.4 The County’s right to terminate this contract under these subparagraphs may be exercised
if the Contractor does not cure such failure within 10 days (or more if authorized in
writing by the County) after receipt of the notice from the Procurement Officer
specifying the failure.
4.13 STATUTORY RIGHT OF CANCELLATION FOR CONFLICT OF INTEREST:
Notice is given that pursuant to A.R.S. § 38-511 the County may cancel any Contract without
penalty or further obligation within three years after execution of the contract, if any person
significantly involved in initiating, negotiating, securing, drafting or creating the contract on
behalf of the County is at any time while the Contract or any extension of the Contract is in effect,
an employee or agent of any other party to the Contract in any capacity or consultant to any other
party of the Contract with respect to the subject matter of the Contract. Additionally, pursuant to
A.R.S § 38-511 the County may recoup any fee or commission paid or due to any person
significantly involved in initiating, negotiating, securing, drafting or creating the contract on
behalf of the County from any other party to the contract arising as the result of the Contract.
4.14 OFFSET FOR DAMAGES:
In addition to all other remedies at Law or Equity, the County may offset from any money due to
the Contractor any amounts Contractor owes to the County for damages resulting from breach or
deficiencies in performance of the contract.
4.15 SUBCONTRACTING:

SERIAL 14114-S
4.15.1 The Contractor may not assign to another Contractor or Subcontract to another party for
performance of the terms and conditions hereof without the written consent of the
County. All correspondence authorizing subcontracting must reference the Bid Serial
Number and identify the job project.
4.15.2 The Subcontractor’s rate for the job shall not exceed that of the Prime Contractor’s rate,
as bid in the pricing section, unless the Prime Contractor is willing to absorb any higher
rates. The Subcontractor’s invoice shall be invoiced directly to the Prime Contractor,
who in turn shall pass-through the costs to the County, without mark-up. A copy of the
Subcontractor’s invoice must accompany the Prime Contractor’s invoice.
4.16 AMENDMENTS:
All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa
County Office of Procurement Services shall be responsible for approving all amendments for
Maricopa County.
4.17 ADDITIONS/DELETIONS OF SERVICE:
The County reserves the right to add and/or delete materials to a Contract. If a service
requirement is deleted, payment to the Contractor will be reduced proportionately, to the amount
of service reduced in accordance with the bid price. If additional materials are required from a
Contract, prices for such additions will be negotiated between the Contractor and the County.
4.18 ACCESS TO AND RETENTION OF RECORDS FOR THE PURPOSE OF AUDIT AND/OR
OTHER REVIEW:
4.18.1 In accordance with section MCI 371 of the Maricopa County Procurement Code the
Contractor agrees to retain all books, records, accounts, statements, reports, files, and
other records and back-up documentation relevant to this Contract for six (6) years after
final payment or until after the resolution of any audit questions which could be more
than six (6) years, whichever is latest. The County, Federal or State auditors and any
other persons duly authorized by the Department shall have full access to, and the right to
examine, copy, and make use of, any and all said materials.
4.18.2 If the Contractor’s books, records , accounts, statements, reports, files, and other records
and back-up documentation relevant to this Contract are not sufficient to support and
document that requested services were provided, the Contractor shall reimburse Maricopa
County for the services not so adequately supported and documented.
4.18.3 If at any time it is determined by the County that a cost for which payment has been made
is a disallowed cost, the County shall notify the Contractor in writing of the
disallowance. The course of action to address the disallowance shall be at sole discretion
of the County, and may include either an adjustment to future invoices, request for credit,
request for a check or deduction from current billings submitted by the Contractor by the
amount of the disallowance, or to require reimbursement forthwith of the disallowed
amount by the Contractor by issuing a check payable to Maricopa County.
4.19 VALIDITY:
The invalidity, in whole or in part, of any provision of this Contract shall not void or affect the
validity of any other provision of the Contract.
4.20 RIGHTS IN DATA:
The County shall have the use of data and reports resulting from a Contract without additional cost
or other restriction except as may be established by law or applicable regulation. Each party shall
supply to the other party, upon request, any available information that is relevant to a Contract and
to the performance thereunder.

SERIAL 14114-S
4.21 RELATIONSHIPS:
4.21.1 In the performance of the services described herein, the Contractor shall act solely as an
independent contractor, and nothing herein or implied herein shall at any time be
construed as to create the relationship of employer and employee, co-employee,
partnership, principal and agent, or joint venture between the County and the Contractor.
4.21.2 The County reserves the right of final approval on proposed staff for all Task Orders.
Also, upon request by the County, the Contractor will be required to remove any
employees working on County projects and substitute personnel based on the discretion
of the County within two business days, unless previously approved by the County.
4.22 NON-DISCRIMINATION:
CONTRACTOR agrees to comply with all provisions and requirements of Arizona Executive
Order 2009-09 including flow down of all provisions and requirements to any subcontractors.
Executive Order 2009-09 supersedes Executive order 99-4 and amends Executive order 75-5 and
may be viewed and downloaded at the Governor of the State of Arizona’s website
http://www.azgovernor.gov/dms/upload/EO_2009_09.pdf which is hereby incorporated into this
contract as if set forth in full herein. During the performance of this contract, CONTRACTOR
shall not discriminate against any employee, client or any or any other individual in any way
because of that person’s age, race, creed, color, religion, sex, disability or national origin.
4.23 CERTIFICATION REGARDING DEBARMENT AND SUSPENSION:
4.23.1 The undersigned (authorized official signing for the Contractor) certifies to the best of his
or her knowledge and belief, that the Contractor
4.23.1.1 is not presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from covered transactions by any Federal
Department or agency;
4.23.1.2 have not within 3-year period preceding this Contract been convicted of or
had a civil judgment rendered against them for commission of fraud or a
criminal offense in connection with obtaining, attempting to obtain, or
performing a public (Federal, State or local) transaction or contract under a
public transaction; violation of Federal or State antitrust statues or
commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
4.23.1.3 are not presently indicted or otherwise criminally or civilly charged by a
government entity (Federal, State or local) with commission of any of the
offenses enumerated in paragraph (2) of this certification; and
4.23.1.4 Have not within a 3-year period preceding this Contract had one or more
public transaction (Federal, State or local) terminated for cause of default.
4.23.2 The Contractor agrees to include, without modification, this clause in all lower tier
covered transactions (i.e. transactions with subcontractors) and in all solicitations for
lower tier covered transactions related to this Contract.
4.24 VERIFICATION REGARDING COMPLIANCE WITH ARIZONA REVISED STATUTES §41-
4401 AND FEDERAL IMMIGRATION LAWS AND REGULATIONS:
4.24.1 By entering into the Contract, the Contractor warrants compliance with the Immigration
and Nationality Act (INA using e-verify) and all other federal immigration laws and
regulations related to the immigration status of its employees and A.R.S. §23-214(A). The
contractor shall obtain statements from its subcontractors certifying compliance and shall

SERIAL 14114-S
furnish the statements to the Procurement Officer upon request. These warranties shall
remain in effect through the term of the Contract. The Contractor and its subcontractors
shall also maintain Employment Eligibility Verification forms (I-9) as required by the
Immigration Reform and Control Act of 1986, as amended from time to time, for all
employees performing work under the Contract and verify employee compliance using the
E-verify system and shall keep a record of the verification for the duration of the
employee’s employment or at least three years, whichever is longer. I-9 forms are available
for download at USCIS.GOV.
4.24.2 The County retains the legal right to inspect contractor and subcontractor employee
documents performing work under this Contract to verify compliance with paragraph 4.24.1
of this Section. Contractor and subcontractor shall be given reasonable notice of the
County’s intent to inspect and shall make the documents available at the time and date
specified. Should the County suspect or find that the Contractor or any of its subcontractors
are not in compliance, the County will consider this a material breach of the contract and
may pursue any and all remedies allowed by law, including, but not limited to: suspension
of work, termination of the Contract for default, and suspension and/or debarment of the
Contractor. All costs necessary to verify compliance are the responsibility of the
Contractor.
4.25 CONTRACTOR LICENSE REQUIREMENT:
4.25.1 The Respondent shall procure all permits, insurance, licenses and pay the charges and
fees necessary and incidental to the lawful conduct of his/her business, and as necessary
complete any required certification requirements, required by any and all governmental
or non-governmental entities as mandated to maintain compliance with and in good
standing for all permits and/or licenses. The Respondent shall keep fully informed of
existing and future trade or industry requirements, Federal, State and Local laws,
ordinances, and regulations which in any manner affect the fulfillment of a Contract and
shall comply with the same. Contractor shall immediately notify both Office of
Procurement Services and the using agency of any and all changes concerning permits,
insurance or licenses.
4.25.2 Respondents furnishing finished products, materials or articles of merchandise that will
require installation or attachment as part of the Contract, shall possess any licenses
required. A Respondent is not relieved of its obligation to posses the required licenses by
subcontracting of the labor portion of the Contract. Respondents are advised to contact
the Arizona Registrar of Contractors, Chief of Licensing, at (602) 542-1525 to ascertain
licensing requirements for a particular contract. Respondents shall identify which
license(s), if any, the Registrar of Contractors requires for performance of the Contract.
4.26 INFLUENCE:
As prescribed in MC1-1202 of the Maricopa County Procurement Code, any effort to influence an
employee or agent to breach the Maricopa County Ethical Code of Conduct or any unethical
conduct may be grounds for Disbarment or Suspension under MC1-902.
An attempt to influence includes, but is not limited to:
4.26.1 A Person offering or providing a gratuity, gift, tip, present, donation, money,
entertainment or educational passes or tickets, or any type valuable contribution or
subsidy,
4.26.2 That is offered or given with the intent to influence a decision, obtain a contract, garner
favorable treatment, or gain favorable consideration of any kind.
If a Person attempts to influence any employee or agent of Maricopa County, the Chief
Procurement Officer, or his designee, reserves the right to seek any remedy provided by the
Maricopa County Procurement Code, any remedy in equity or in the law, or any remedy provided
by this contract.

SERIAL 14114-S
4.27 PUBLIC RECORDS:
All Offers submitted and opened are public records and must be retained by the Records Manager
at the Office of Procurement Services. Offers shall be open to public inspection after Contract
award and execution, except for such Offers deemed to be confidential by the Office of
Procurement Services. If an Offeror believes that information in its Offer should remain
confidential, it shall indicate as confidential, the specific information in its offer and submit a
statement with its offer detailing the reasons that the information should not be disclosed. Such
reasons shall include the specific harm or prejudice which may arise. The Records Manager of the
Office of Procurement Services shall determine whether the identified information is confidential
pursuant to the Maricopa County Procurement Code and the Arizona Public Records Law.