CONT CT PURSUANT TO ITN
SERIAL 13134-1TN
This Contract is entered into this 9 th day of April, 2014 by and between Maricopa County ("County"), a political
subdivision of the State of Arizona, and Emergency Restoration Experts LLC. an Arizona corporation "Contractor")
for the purchase of Environmental Services per attached Scope of Work B-3.
1.0 CONTRACT TERM:
1.1 This Contract is for a term of three (3) years, beginning on the 9 5' day of April 2014 and ending
the 30' h day of April 2017.
1.2 The County may, at its option and with the agreement of the Contractor, renew the term of this
Contract for additional terms up to a maximum of Three (3) years, (or at the County's sole
discretion, extend the contract on a month-to-month bases for a maximum of six (6) months after
expiration). The County shall notify the Contractor in writing of its intent to extend the Contract
term at least thirty (30) calendar days prior to the expiration of the original contract term, or any
additional term thereafter.
2.0 FEE ADJUSTMENTS:
Any request for a fee adjustment must be submitted one hundred and eighty (180) days prior to the current
Contract expiration date. Requests for adjustment in cost of labor and/or materials must be supported by
appropriate documentation. If County agrees to the adjusted fee, County shall issue written approval of the
change. The reasonableness of the request will be determined by comparing the request with the
(Consumer Price Index) or by performing a market survey.
3.0 PAYMENTS:
3.1 As consideration for performance of the duties described herein, County shall pay Contractor the
sum(s) stated in Exhibit "A." or as a total project cost for each Task Order.
3.2 Payment shall be made upon the County's receipt of a properly completed invoice.
3.3 INVOICES:
3.3.1 The Contractor shall submit one (1) legible copies of their detailed invoice before
payment(s) can be made. At a minimum, the invoice must provide the following
information:
• Company name, address and contact
• County bill-to name and contact information
• Contract serial number
• County purchase order number
• Invoice number and date
• Payment terms
• Date of services
• Quantity
SERIAL 13134-ITN
• Contract Item number(s)
• Description of service provided
• Pricing per unit of service
• Extended price
• Total Amount Due
3.3.2 Problems regarding billing or invoicing shall be directed to the County as listed on the
Purchase Order.
3.3.3 Payment shall be made to the Contractor by Accounts Payable through the Maricopa
County Vendor Express Payment Program. This is an Electronic Funds Transfer (E7FT)
process. After Contract Award the Contractor shall complete the Vendor Registration
Form located on the County Department of Finance Vendor Registration Web Site
(www.maricopa.gov/financeivendors).
3.3.4 EFT payments to the routing and account numbers designated by the Contractor will
include the details on the specific invoices that the payment covers. The Contractor is
required to discuss remittance delivery capabilities with their designated financial
institution for access to those details.
4.0 AVAILABILITY OF FUNDS:
4.1 The provisions of this Contract relating to payment for services shall become effective when funds
assigned for the purpose of compensating the Contractor as herein provided are actually available
to County for disbursement. The County shall be the sole judge and authority in determining the
availability of funds under this Contract. County shall keep the Contractor fully informed as to the
availability of funds.
4.2 If any action is taken by any state agency, Federal department or any other agency or
instrumentality to suspend, decrease, or terminate its fiscal obligations under, or in connection
with, this Contract, County may amend, suspend, decrease, or terminate its obligations under, or in
connection with, this Contract. In the event of termination, County shall be liable for payment
only for services rendered prior to the effective date of the termination, provided that such services
are performed in accordance with the provisions of this Contract. County shall give written notice
of the effective date of any suspension, amendment, or termination under this Section, at least ten
(10) days in advance.
5.0 DUTIES:
5.1 The Contractor shall perform all duties stated in Exhibit "B-12", or as otherwise directed in
writing by the County by Task Order for projects.
5.2 During the Contract term, County shall provide Contractor's personnel with adequate workspace
for consultants and such other related facilities as may be required by Contractor to carry out its
contractual obligations.
6.0 TERMS and CONDITIONS:
6.1 INDEMNIFICATION:
6.1.1 To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold
harmless County, its agents, representatives, officers, directors, officials, and employees
from and against all claims, damages, losses and expenses, including, but not limited to,
attorney fees, court costs, expert witness fees, and the cost of appellate proceedings,
relating to, arising out of, or alleged to have resulted from the negligent acts, errors,
omissions, mistakes or malfeasance relating to the performance of this Contract.
Contractor's duty to defend, indemnify and hold harmless County, its agents,
representatives, officers, directors, officials, and employees shall arise in connection with
any claim, damage, loss or expense that is caused by any negligent acts, errors, omissions
SERIAL 13134-ITN
or mistakes in the performance of this Contract by the Contractor, as well as any person
or entity for whose acts, errors, omissions, mistakes or malfeasance Contractor may be
legally liable.
6.1.2 The amount and type of insurance coverage requirements set forth herein will in no way
be construed as limiting the scope of the indemnity in this paragraph.
6.1.3 The scope of this indemnification does not extend to the sole negligence of County.
6.2 INSURANCE:
6.2.1 Contractor, at Contractor's own expense, shall purchase and maintain the herein
stipulated minimum insurance from a company or companies duly licensed by the State
of Arizona and possessing a current A.M. Best, Inc. rating of A+. In lieu of State of
Arizona licensing, the stipulated insurance may be purchased from a company or
companies, which are authorized to do business in the State of Arizona, provided that
said insurance companies meet the approval of County. The form of any insurance
policies and forms must be acceptable to County.
6.2.2 All insurance required herein shall be maintained in full force and effect until all work or
service required to be performed under the terms of the Contract is satisfactorily
completed and formally accepted. Failure to do so may, at the sole discretion of County,
constitute a material breach of this Contract.
6.2.3 Contractor's insurance shall be primary insurance as respects County, and any insurance
or self-insurance maintained by County shall not contribute to it.
6.2.4 Any failure to comply with the claim reporting provisions of the insurance policies or any
breach of an insurance policy warranty shall not affect the County's right to coverage
afforded under the insurance policies.
6.2.5 The insurance policies may provide coverage that contains deductibles or self-insured
retentions. Such deductible and/or self-insured retentions shall not be applicable with
respect to the coverage provided to County under such policies. Contractor shall be
solely responsible for the deductible and/or self-insured retention and County, at its
option, may require Contractor to secure payment of such deductibles or self-insured
retentions by a surety bond or an irrevocable and unconditional letter of credit.
6.2.6 County reserves the right to request and to receive, within 10 working days, certified
copies of any or all of the herein required insurance certificates. County shall not be
obligated to review policies and/or endorsements or to advise Contractor of any
deficiencies in such policies and endorsements, and such receipt shall not relieve
Contractor from, or be deemed a waiver of County's right to insist on strict fulfillment of
Contractor's obligations under this Contract.
6.2.7 The insurance policies required by this Contract, except Workers' Compensation, and
Errors and Omissions, shall name County, its agents, representatives, officers, directors,
officials and employees as Additional Insured's.
6.2.8 The policies required hereunder, except Workers' Compensation, and Errors and
Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against
County, its agents, representatives, officers, directors, officials and employees for any
claims arising out of Contractor's work or service.
6.2.9 Commercial General Liability:
Commercial General Liability insurance and, if necessary, Commercial Umbrella
insurance with a limit of not less than $1,000,000 for each occurrence, $1,000,000
Products/Completed Operations Aggregate, and $2,000,000 General Aggregate Limit.
SERIAL 13134-ITN
The policy shall include coverage for bodily injury, broad form property damage,
personal injury, products and completed operations and blanket contractual coverage, and
shall not contain any provision which would serve to limit third party action over claims.
There shall be no endorsement or modification of the CGL limiting the scope of coverage
for liability arising from explosion, collapse, or underground property damage.
Contractors that are contracted for the purpose of training: insurance with a limit of not
less than $1,000,000 for each occurrence, $2,000,000 Products/Completed Operations
Aggregate, and $2,000,000 General Aggregate Limit.
6.2.10 Automobile Liability:
Commercial/Business Automobile Liability insurance and, if necessary, Commercial
Umbrella insurance with a combined single limit for bodily injury and property damage
of not less than $1,000,000 each occurrence with respect to any of the Contractor's
owned, hired, and non-owned vehicles assigned to or used in performance of the
Contractor's work or services under this Contract.
Contractors that are contracted for the purpose of training: Commercial/Business
Automobile Liability insurance and, if necessary, Commercial Umbrella insurance with a
combined single limit for bodily injury and property damage of not less than S1,000,000
each occurrence with respect to any of the Contractor's owned, hired, and non-owned
vehicles assigned to or used in performance of the Contractor's work or services under
this Contract.
6.2.11 Workers' Compensation:
6.2.11.1 Workers' Compensation insurance to cover obligations imposed by federal
and state statutes having jurisdiction of Contractor's employees engaged in the
performance of the work or services under this Contract; and Employer's
Liability insurance of not less than $1,000,000 for each accident, $1,000,000
disease for each employee, and $1,000,000 disease policy limit.
6.2.11.2 Contractor waives all rights against County and its agents, officers, directors
and employees for recovery of damages to the extent these damages are
covered by the Workers' Compensation and Employer's Liability or
commercial umbrella liability insurance obtained by Contractor pursuant to
this Contract.
6.2.12 Errors and Omissions Insurance/Professional Liability:
Errors and Omissions/Professional Liability insurance and, if necessary, Commercial
Umbrella insurance, which will insure and provide coverage for errors or omissions of
the Contractor, with limits of no less than $1,000,000 for each claim.
6.2.13 Certificates of Insurance.
6.2.13.1 Prior to commencing work or services under this Contract, Contractor shall
furnish the County with valid and complete certificates of insurance, or formal
endorsements as required by the Contract in the form provided by the County,
issued by Contractor's insurer(s), as evidence that policies providing the
required coverage, conditions and limits required by this Contract are in full
force and effect. Such certificates shall identify this contract number and title.
6.2.13.2 In the event any insurance policy (ies) required by this contract is (are) written
on a "claims made" basis, coverage shall extend for two years past completion
and acceptance of Contractor's work or services and as evidenced by annual
Certificates of Insurance.
SERIAL 13134-ITN
6.2.13.3 If a policy does expire during the life of the Contract, a renewal certificate
must be sent to County fifteen (15) days prior to the expiration date.
6.2.14 Cancellation and Expiration Notice.
Insurance required herein shall not be permitted to expire, be canceled, or materially
changed without thirty (30) days prior written notice to the County.
6.3 WARRANTY OF SERVICES:
6.3.1 The Contractor warrants that all services provided hereunder will conform to the
requirements of the Contract, including all descriptions, specifications and attachments
made a part of this Contract. County's acceptance of services or goods provided by the
Contractor shall not relieve the Contractor from its obligations under this warranty.
6.3.2 In addition to its other remedies, County may, at the Contractor's expense, require prompt
correction of any services failing to meet the Contractor's warranty herein. Services
corrected by the Contractor shall be subject to all the provisions of this Contract in the
manner and to the same extent as services originally furnished hereunder.
6.4 NOTICES:
All notices given pursuant to the terms of this Contract shall be addressed to:
For County:
Maricopa County
Office of Procurement Services
Attn: Chief Procurement Officer
320 West Lincoln Street
Phoenix, Arizona 85003-2494
For Contractor:
Emergency Restoration Experts LLC.
Attn: Brent Ghelfi, President
1710 East Grant Street, Suite 100
Phoenix AZ, 85034
6.5 REQUIREMENTS CONTRACT:
Contractor signifies its understanding and agreement by signing this document that this Contract is
a requirements contract. This Contract does not guarantee any purchases will be made (minimum
or maximum.
6.6 TERMINATION FOR CONVENIENCE:
The County reserves the right to terminate the Contract, in whole or in part at any time, when in
the best interests of the County without penalty or recourse. Upon receipt of the written notice,
the Contractor shall immediately stop all work, as directed in the notice, notify all subcontractors
of the effective date of the termination and minimize all further costs to the County. In the event
of termination under this paragraph, all documents, data and reports prepared by the Contractor
under the Contract shall become the property of and be delivered to the County upon demand.
The Contractor shall be entitled to receive just and equitable compensation for work in progress,
work completed and materials accepted before the effective date of the termination.
6.7 TERMINATION FOR DEFAULT:
6.7.1 In addition to the rights reserved in the Contract, the County may terminate the Contract
in whole or in part due to the failure of the Contractor to comply with any term or
SERIAL 13134-ITN
condition of the Contract, to acquire and maintain all required insurance policies, bonds,
licenses and permits, or to make satisfactory progress in performing the Contract. The
Procurement Officer shall provide written notice of the termination and the reasons for it
to the Contractor.
6.7.2 Upon termination under this paragraph, all goods, materials, documents, data and reports
prepared by the Contractor under the Contract shall become the property of and be
delivered to the County on demand.
6.7.3 The County may, upon termination of this Contract, procure, on terms and in the manner
that it deems appropriate, materials or services to replace those under this Contract. The
Contractor shall be liable to the County for any excess costs incurred by the County in
procuring materials or services in substitution for those due from the Contractor.
6.2.1 The Contractor shall continue to perform, in accordance with the requirements of the
Contract, up to the date of termination, as directed in the termination notice.
6.8 STATUTORY RIGHT OF CANCELLATION FOR CONFLICT OF INTEREST:
Notice is given that pursuant to A.R.S. §38-511 the County may cancel this Contract without
penalty or further obligation within three years after execution of the contract, if any person
significantly involved in initiating, negotiating, securing, drafting or creating the contract on
behalf of the County is at any time while the Contract or any extension of the Contract is in effect,
an employee or agent of any other party to the Contract in any capacity or consultant to any other
party of the Contract with respect to the subject matter of the Contract. Additionally, pursuant to
A.R.S §38-511 the County may recoup any fee or commission paid or due to any person
significantly involved in initiating, negotiating, securing, drafting or creating the contract on
behalf of the County from any other party to the contract arising as the result of the Contract.
6.9 OFFSET FOR DAMAGES;
In addition to all other remedies at law or equity, the County may offset from any money due to
the Contractor any amounts Contractor owes to the County for damages resulting from breach or
deficiencies in performance under this contract.
6.10 ADDITIONS/DELETIONS OF SERVICE:
6.10.1 The County reserves the right to add and/or delete materials to a Contract. If a service
requirement is deleted, payment to the Contractor will be reduced proportionately, to the
amount of service reduced in accordance with the bid price. If additional materials are
required from a Contract, prices for such additions will be negotiated between the
Contractor and the County.
6.11 RELATIONSHIPS:
In the performance of the services described herein, the Contractor shall act solely as an
independent contractor, and nothing herein or implied herein shall at any time be construed as to
create the relationship of employer and employee, partnership, principal and agent, or joint venture
between the County and the Contractor.
6.12 SUBCONTRACTING:
The Contractor may not assign this Contract or subcontract to another party for performance of the
terms and conditions hereof without the written consent of the County, which shall not be
unreasonably withheld. All correspondence authorizing subcontracting must reference the
Proposal Serial Number and identify the job project.
SERIAL 13134-ITN
6.13 AMENDMENTS:
All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa
County Office of Procurement Services shall be responsible for approving all amendments for
Maricopa County.
6.14 ACCESS TO AND RETENTION OF RECORDS FOR THE PURPOSE OF AUDIT AND/OR
OTHER REVIEW:
6.14.1 In accordance with section MCI 367 of the Maricopa County Procurement Code the
Contractor agrees to retain all books, records, accounts, statements, reports, files, and
other records and back-up documentation relevant to this Contract for six (6) years after
final payment or until after the resolution of any audit questions which could be more
than six (6) years, whichever is latest. The County, Federal or State auditors and any
other persons duly authorized by the Department shall have full access to, and the right to
examine, copy and make use of, any and all said materials.
6.14.2 If the Contractor's books, records, accounts, statements, reports, files, and other records
and back-up documentation relevant to this Contract are not sufficient to support and
document that requested services were provided, the Contractor shall reimburse Maricopa
County for the services not so adequately supported and documented.
6.15 AUDIT DISALLOWANCES:
If at any time, County determines that a cost for which payment has been made is a disallowed
cost, such as overpayment, County shall notify the Contractor in writing of the disallowance.
County shall also state the means of correction, which may be but shall not be limited to
adjustment of any future claim submitted by the Contractor by the amount of the disallowance, or
to require repayment of the disallowed amount by the Contractor.
6.16 SEVERABILITY:
The invalidity, in whole or in part, of any provision of his Contract shall not void or affect the
validity of any other provision of this Contract.
6.17 RIGHTS IN DATA:
The County shall own have the use of all data and reports resulting from this Contract without
additional cost or other restriction except as provided by law. Each party shall supply to the other
party, upon request, any available information that is relevant to this Contract and to the
performance hereunder.
6.18 INTEGRATION:
This Contract represents the entire and integrated agreement between the parties and supersedes
all prior negotiations, proposals, communications, understandings, representations, or agreements,
whether oral or written, express or implied.
6.19 VERIFICATION REGARDING COMPLIANCE WITH ARIZONA REVISED STATUTES §41-
4401 AND FEDERAL IMMIGRATION LAWS AND REGULATIONS:
6.19.1 By entering into the Contract, the Contractor warrants compliance with the Immigration
and Nationality Act (INA using e-verify) and all other federal immigration laws and
regulations related to the immigration status of its employees and A.R.S. §23-214(A). The
contractor shall obtain statements from its subcontractors certifying compliance and shall
furnish the statements to the Procurement Officer upon request. These warranties shall
remain in effect through the term of the Contract. The Contractor and its subcontractors
shall also maintain Employment Eligibility Verification forms (I-9) as required by the
Immigration Reform and Control Act of 1986, as amended from time to time, for all
SERIAL 13134-1TN
employees performing work under the Contract and verify employee compliance using the
E-verify system and shall keep a record of the verification for the duration of the
employee's employment or at least three years, whichever is longer. 1-9 forms are available
for download at USCIS.GOV .
6.19.2 The County retains the legal right to inspect contractor and subcontractor employee
documents performing work under this Contract to verify compliance with paragraph 6.19.1
of this Section. Contractor and subcontractor shall be given reasonable notice of the
County's intent to inspect and shall make the documents available at the time and date
specified. Should the County suspect or find that the Contractor or any of its subcontractors
are not in compliance, the County will consider this a material breach of the contract and
may pursue any and all remedies allowed by law, including, but not limited to: suspension
of work, termination of the Contract for default, and suspension and/or debarment of the
Contractor. All costs necessary to verify compliance are the responsibility of the
Contractor.
6.20 CONTRACTOR LICENSE REQUIREMENT:
6.20.1 The Respondent shall procure all permits, insurance, licenses and pay the charges and
fees necessary and incidental to the lawful conduct of his/her business, and as necessary
complete any required certification requirements, required by any and all governmental
or non-governmental entities as mandated to maintain compliance with and in good
standing for all permits and/or licenses. The Respondent shall keep fully informed of
existing and future trade or industry requirements, Federal, State and Local laws,
ordinances, and regulations which in any manner affect the fulfillment of a Contract and
shall comply with the same. Contractor shall immediately notify both Office of
Procurement Services and the using agency of any and all changes concerning permits,
insurance or licenses.
6.21 CERTIFICATION REGARDING DEBARMENT AND SUSPENSION
6.21.1 The undersigned (authorized official signing for the Contractor) certifies to the best of his
or her knowledge and belief, that the Contractor, defined as the primary participant in
accordance with 45 CFR Part 76, and its principals:
6.21.1.1 are not presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from covered transactions by any Federal
Department or agency;
6.21.1.2 have not within 3-year period preceding this Contract been convicted of or
had a civil judgment rendered against them for commission of fraud or a
criminal offense in connection with obtaining, attempting to obtain, or
performing a public (Federal, State or local) transaction or contract under a
public transaction; violation of Federal or State antitrust statues or
commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
6.21.1.3 are not presently indicted or otherwise criminally or civilly charged by a
government entity (Federal, State or local) with commission of any of the
offenses enumerated in paragraph (2) of this certification; and
6.21.1.4 have not within a 3-year period preceding this Contract had one or more
public transaction (Federal, State or local) terminated for cause of default.
6.21.2 Should the Contractor not be able to provide this certification, an explanation as to why
should be attached to the Contact.
SERIAL 13134-ITN
6.21.3 The Contractor agrees to include, without modification, this clause in all lower tier
covered transactions (i.e. transactions with subcontractors) and in all solicitations for
lower tier covered transactions related to this Contract.
6.22 PRICES:
Contractor warrants that prices extended to County under this Contract are no higher than those
paid by any other customer for these or similar services.
6.23 GOVERNING LAW:
This Contract shall be governed by the laws of the state of Arizona. Venue for any actions or
lawsuits involving this Contract will be in Maricopa County Superior Court or in the United States
District Court for the District of Arizona, sitting in Phoenix, Arizona
6.24 ORDER OF PRECEDENCE:
In the event of a conflict in the provisions of this Contract and Contractor's license agreement, if
applicable, the terms of this Contract shall prevail.
6.25 INFLUENCE
As prescribed in MC1-1202 of the Maricopa County Procurement Code, any effort to influence an
employee or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct,
may be grounds for Disbarment or Suspension under MCI -902.
An attempt to influence includes, but is not limited to:
6.25.1 A Person offering or providing a gratuity, gift, tip, present, donation, money,
entertainment or educational passes or tickets, or any type valuable contribution or
subsidy,
6.25.2 That is offered or given with the intent to influence a decision, obtain a contract, garner
favorable treatment, or gain favorable consideration of any kind.
If a Person attempts to influence any employee or agent of Maricopa County, the Chief
Procurement Officer, or his designee, reserves the right to seek any remedy provided by the
Maricopa County Procurement Code, any remedy in equity or in the law, or any remedy provided
by this contract.
6.26 PUBLIC RECORDS:
All Offers submitted and opened are public records and must be retained by the Records Manager
at the Office of Procurement Services Offers shall be open to public inspection after Contract
award and execution, except for such Offers deemed to be confidential by the Office of
Procurement Services. If an Offeror believes that information in its Offer should remain
confidential, it shall indicate as confidential, the specific information and submit a statement with
its offer detailing the reasons that the information should not be disclosed. Such reasons shall
include the specific harm or prejudice which may arise. The Records Manager of the Office of
Procurement Services shall determine whether the identified information is confidential pursuant
to the Maricopa County Procurement Code.
6.27 INCORPORATION OF DOCUMENTS:
The following are to be attached to and made part of this Contract:
6.27.1 Exhibit A-3 Pricing;
6.27.2 Exhibit B General Contract Requirements
6.27.3 Exhibit B-3 Scopes of Work;
6.27.4 Exhibit C Definitions
SERIAL 13134-ITN
IN WITNESS WHEREOF, this Contract is executed on the date set forth above.
17ii) As C 112
ADDRESS
-3-- 214- itt
DATE
MARICOPA COUNTY
CHAIRMAN, BOARD OF SUPERVISORS DATE
ATTESTED:
CLERK OF THE BOARD DATE
APPROVED AS TO FORM:
LEGAL COUNSEL DATE
SERIAL 13134-ITN
EXHIBIT A-3
PRICING
SERIAL 13134-ITN
PRICING SHEET: NIGP CODE 91843
BIDDER NAME: Emergency Restoration Experts
VENDOR #:
BIDDER ADDRESS: 1710 E. Grant Street Ste. 100 Phoenix, AZ. 85034
P.O. ADDRESS:
BIDDER PHONE #: 480-507-9082
BIDDER FAX #: 480-545-2886
COMPANY WEB SITE: www.erexperts.net
COMPANY CONTACT (REP): Tammy Larson
E-MAIL ADDRESS (REP): tlarson@erexperts.net
ACCEPT PROCUREMENT CARD: x YES
OTHER GOV'T. AGENCIES MAY USE THIS CONTRACT: x YES
NET 30
2.0 EQUIPMENT PRICING SCHEDULE
SERVICE OFFERED: Asbestos Removal
Offerors are to list all minimum equipment essential to performing services under Scopes of Work, as applicable to
your proposal, either owned or leased, excluding rentals. (Note: for billing purposes, ten (10) hours constitute one
(1) "day".) This form may be duplicated as necessary.
PRICE PRICE PRICE LEASED
PER PER
EQUIPMENT NAME PER DAY WEEK MONTH YES/NO
HEPA Filtered Air Scrubber $124.09 $620.45 $2,481.80 NO
Dehumidifier (Phoenix 200LGR) $125.00 $625.00 $2,500.00 NO
HEPA Vacuum $95.00 $475.00 $1,900.00 NO
SERVICE OFFERED: Lead Based Paint Removal
Offerors are to list all minimum equipment essential to performing services under Scopes of Work, as applicable to
your proposal, either owned or leased, excluding rentals. (Note: for billing purposes, ten (10) hours constitute one
(1) "day") This form may be duplicated as necessary.
PRICE PRICE PRICE LEASED
PER PER
EQUIPMENT NAME PER DAY WEEK MONTH YES/NO
HEPA Filtered Air Scrubber $124.09 $620.45 $2,481.80 NO
Dehumidifier (Phoenix 200LGR) $125.00 $625.00 $2,500.00 NO
HEPA Vacuum $95.00 $475.00 $1,900.00 NO
SERVICE OFFERED: Mold (fungi) removal
Offerors are to list all minimum equipment essential to performing services under Scopes of Work, as applicable to
your proposal, either owned or leased, excluding rentals. (Note: for billing purposes, ten (10) hours constitute one
(1) "day".) This form may be duplicated as necessary.
PRICE PRICE PRICE LEASED
PER PER
EQUIPMENT NAME PER DAY WEEK MONTH YES/NO
HEPA Filtered Air Scrubber $124.09 $620.45 $2,481.80 NO
Dehumidifier (Phoenix 200LGR) $125.00 $625.00 $2,500.00 NO
HEPA Vacuum $95.00 $475.00 $1,900.00 NO
SERIAL 13134-ITN
EXHIBIT B
GENERAL CONTRACT REQUIREMENTS
1.0 INTENT:
The Intent of this contract is to provide Maricopa County environmental services on a demand basis.
At the time a requirement is identified, a request for quotation (RH)) and a detailed Scope of Work
(SOW) will be issued to each qualified Contractor by AOS. Award(s) shall be made to the
Contractor best meeting specifications and offering the lowest price.
Should any project be declared an Emergency Procurement, the provisions of Section MCI-345 and
MCI 346 shall prevail in the determination of Award. At the Count's option work under $25,000.00
may be assigned to a contractor without competition.
2.0 GENERAL REQUIREMENTS OF ALL SERVICES:
Following are general requirements, which may be required in a Project Scope of Work (PSOW) common
to Areas of Services E3-1 through E3-12. Contractors understand and agree that they will abide by all
conditions established for the applicable Area(s) of Service for which they are approved and listed.
2.1 HEALTH AND SAFETY PROGRAM:
The Contractor shall, as required by Project, on a demand basis, prepare and implement site-
specific health and safety plans for all phases of the work activity for its employees,
subcontractor's or subcontractors' employees as required. Health and Safety Program is not
required for Contractors in Section E3-7.
The Contractor shall have an existing health and safety program which shall comply with all
Occupational Safety and Health Administration (OSHA, reference Title 29 Code of Federal
Regulations, Part 1910 29 CFR 1910.120, and/or 29 CFR 1926.1101 as applicable) and
Environmental Protection Agency (EPA) standards (reference 40 CFR, particularly the
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or
Resource Conservation and Recovery Act (RCRA)), and any other applicable federal, state and/or
local laws, rules, regulations, and ordinances.
2.2 PROJECTS:
2.2.1 Using Agency Scope of Work Format And Submittal:
The Using Agencies shall submit an initial PSOW, which shall include, as a minimum,
the following:
• Project area description
• Schedule for completion
• Deliverables
• Variables and assumptions
• Acceptance criteria
• Reporting requirements
• Project objectives.
2.2.2 In order to insure equity to all Contractors, the Using Agencies shall solicit initial Project
Offers (POs) from all Contractors listed as qualified within the specific Area of Services
E3-1 through E3-12. However, there may be those special circumstances whereby such
solicitation is impractical (i.e., continuity of site assessment/remediation by same
Contractor). In this case, a written determination shall be placed in the Project file
detailing the extent that competitive offers were solicited.
SERIAL 13134-ITN
2.2.3 Contractor's Project Offer (PO) Fonnat:
The Contractor shall submit a PO, which shall include:
2.2.3.1 Proposed method of approach with any suggested changes to the initial PSOW
and recommendations for any approved innovative technologies when
applicable. The Contractor shall not be paid for the development of the PO.
2.2.3.2 A list of all approved key personnel to be assigned to complete the work. The
Contractor shall provide the following information for each key personnel:
2.2.3.2.1 Specific professional position and level assigned for the Project
(i.e., John Smith, Project Manager, Level VI).
2.2.3.2.2 Health and safety responsibilities.
2.2.3.2.3 Specific related or similar Project references which demonstrates
experience for the work required with points of contact and current
phone numbers.
2.2.3.2.4 When requested by the Using Agencies, provide a brief resume to
support minimum requirements/educational background required
for that specific professional position and level.
2.2.3.2.5 Once identified in the PO, Key Personnel shall not be removed or
replaced without notification and approval of the Using Agency
Project Manager or Project Coordinator. If the Contractor replaces
Key Personnel, it shall not affect their commitment to meet all
schedules and deliverables.
2.2.3.2.6 Number of hours for each key person, subcontractor(s),
consultant(s), etc.
2.2.3.3 A list of all approved subcontractors to be used.
2.2.3.3.1 Once identified in the PO, subcontractors shall not be removed or
replaced without notification and approval of the Using Agencies
Project Manager or Project Coordinator. If the Contractor replaces
a Subcontractor, it shall not affect the Contractor's commitment to
meet all schedules and deliverables.
2.2.3.3.2 Contractor shall submit adequate documentation supporting the
performance ability of proposed subcontractors.
2.2.3.4 The written PO must include a detailed, itemized breakdown of all labor
classifications, equipment and supplies for ALL subcontractors which the
Contractor proposes to utilize, as well as the FIRM, FIXED COSTS for such.
The Contractor's markup fee will be A MAXIMUM OF 5% AND MUST
BE PRE APPROVED BY THE COUNTY. NO MARKUP FEE will be
allowed for any classification of subcontractor work totaling $500.00 or less,
either on the PO or any Project Amendment (PA, described in paragraph
2.2.10).
(example only):
DRILLER Total amount of work: $ 5,000.00
Subcontractor mark-up
per contract: 250.00
Total Firm Fixed Cost
SERIAL 13134-ITN
to be billed to Using
Department: $ 5,250.00
TRANSPORTER Total amount of work: $19,000.00
Subcontractor mark-up
per contract: 950.00
Total Firm Fixed Cost
to be billed to Using
Agency: $19,950.00
2.2.3.5 A list of all approved capitalized equipment the Contractor proposes to utilize
for the Project, to include number of hours and the amount to be utilized (i.e.,
miles, hours, days, weeks, etc.).
2.2.3.6 The written PO must describe the Contractor's safety plan for the Project.
Such safety plan should include, at a minimum, the description of the
conditions, which, if present, will cause the Contractor to initiate cessation of
services for safety reasons. However, the Contractor and the Using Agency
shall agree and understand that, in addition to the conditions specified in the
written PO, reasonable professional judgment must, at all times, be exercised
as criteria for cessation of services for safety reasons.
2.2.3.7 A complete schedule of activities to meet compliance with Using Agency's
schedule for completion.
2.2.3.8 Local conditions, assumptions, and/or limitations on the part of the Contractor
which may affect the accuracy of the PSOW.
2.2.3.9 Anything else that applies to this specific site (i.e., laboratory tests, location of
disposal site, etc.).
2.2.3.10 Potential conflicts of interests.
2.2.3.11 The Contractor must submit the written PO to the Using Agency no later than
the date specified by the Using Agency and in accordance with all instructions
provided by the Using Agency.
2.2.3.12 The Using Agency Project Manager or Project Coordinator shall have the
right to review a copy of the proposed subcontractor's and/or consultant's
work schedule to ensure compliance with all terms and conditions of the
original contract.
2.2.3.13 If accepted by the Using Agency, the PO becomes a firm, fixed offer and the
bottom-line dollar amount for all labor, equipment, supplies, subcontractor
work, mark-up, etc., shall become a not-to-exceed (NTE) ceiling amount. No
component of the PO (labor classification, number of hours, equipment, etc.)
or the NTE ceiling can be increased except through the PA process, as
described in section 2.2.10.
2.2.4 Conflict Of Interest For Projects:
2.2.4.1 Upon submission of the PO, the Contractor shall submit a written disclosure
regarding the existence of any real or potential conflict of interest as defined
in Arizona Revised Statutes (A.R.S.) § 38-501,et seq., that the Contractor,
individual employee, or known subcontractor(s) may have. A Conflicting
Party is defined as any person who may be responsible under any state or
federal law for pollutants which are present in, or threaten, the Project area
defined within the PSOW. In addition, the following shall be considered a
conflict of interest:
SERIAL 13134-ITN
2.2.4.1.1 The existence of a current financial relationship with a Conflicting
Party within the past five (5) years. A current financial
relationship includes:
• Owing money to, or being owed money by a Conflicting
Party.
• Having performed work for a Conflicting Party and having
issued a warranty or guarantee for the work that is still in
progress.
• Allowing a Contractor employee to work on the Project area if
that Contractor employee was an employee of a Conflicting
Party or was an employee of a Contractor to a Conflicting
Party within the previous two years.
• Acceptance by the Contractor of any gifts or gratuities from a
Conflicting Party.
2.2.4.1.2 The existence of a past financial relationship in which the
Contractor provided opinions or conclusions to a Conflicting Party.
2.2.4.1.3 The existence of a potential conflict of interest between a
Contractor and a Conflicting Party that is not defined above, but
which creates an appearance of impropriety. An appearance of
impropriety shall be defined as a situation where the activity of a
Contractor may create the impression that a conflict of interest
and/or a similar improper relationship exists between a particular
Conflicting Party and the Contractor. An appearance of
impropriety may exist even if a real conflict of interest (as defined
above) does not exist. The Using Agency would make a
determination in the best interests of the County on a case-by-case
basis.
2.2.4.2 It shall be the duty of the Contractor to report in writing to the Using Agency
any of the real or potential conflict of interest situations, as noted above,
within five (5) business days of when the Contractor knew or should have
known of their existence.
2.2.4.3 The Contractor must provide and maintain adequate procedures and controls
to ensure that if a real or potential conflict of interest arises or is discovered
between the Contractor and a Conflicting Party, that the Using Agency is
notified within five (5) business days of when the Contractor knew or should
have known of their existence.
2.2.4.4 The Using Agency reserves the right to waive conflicts of interest as it deems
in its best interest, with prior notification to and advice from Using Agency
Legal Counsel.
2.2.4.5 Proposed subcontractors may be subject to the same conflict of interest
provisions as stated above. Contractors shall notify the Using Agency of all
potential conflicts in the PO and the Using Agency reserves the right to
exercise best judgment in waiving the conflicts of interest applicability to
subcontractors as it deems in its best interest. Conflict of interest provisions
must be included in all applicable contracts with subcontractors.
2.2.4.6 The Contractor shall submit with their PO a disclosure statement concerning
potential conflicts of interest for all employees of the Contractor potentially
assigned as Key Personnel on a PSOW.
2.2.4.6.1 The disclosure statement shall address all Conflicting Party
relationships. The Contractor is to provide along with its
SERIAL 13134-ITN
disclosure statement, information on its financial and business
relationship with all Conflicting Parties and with the Contractor's
parent companies, subsidiaries, affiliates, subcontractors, or current
clients. (This disclosure requirement encompasses past financial
and business relationships, including services related to any
proposed or pending litigation, with such parties).
2.2.4.7 The Contractor shall not provide data generated or otherwise obtained in the
performance of Contractor responsibilities under a contract to any party other
than the County, or its authorized agents for the life of the contract, and for a
period of five (5) years after completion of the contract except as directed by
the Using Agency.
2.2.4.8 The Contractor shall not accept employment from any party other than state or
federal agencies for work directly related to the Project area(s) under the
contract for five (5) years after the contract has terminated. The Using
Agency may exempt Contractor from this requirement through a written
release.
2.2.5 Innovative Technical Approaches:
Included in the PO, submitted in response to the Using Agency's PSOW, the Contractor
is encouraged to offer any innovative technical approaches and/or cost efficient
alternatives that could achieve the objectives of the PSOW. The PO shall describe the
relative merits of the innovative approach and provide clear and convincing evidence that
the alternative meets or exceeds all relevant specifications required by the original
PSOW.
2.2.6 Using Agency Evaluation Of Contractor's Project Offer:
PO will be evaluated based on the extent to which the offeror's plan for execution identifies
and demonstrates an understanding of the technical and management issues that are critical
to successfully accomplishing the Project, demonstrates a level of effort that will
accomplish the Project in a safe, effective and efficient manner, including attainable
improvements that may accelerate completion or lower Project costs without jeopardizing
worker safety, human health or the environment, and displays the degree to which the
offeror optimizes the use of competitive subcontracts to minimize overall costs to the
customer and resolution of unanticipated problems.
Listed below, in the relative order of importance, is the minimum evaluation criteria
Using Agencies shall use in evaluating each PO received from Contractors in response to
a PSOW. Using Agencies may expand upon these evaluation elements and shall list
them in relative order of importance within the PSOW:
2.2.6.1 Method of approach to accomplish the PSOW, to include type of equipment,
laboratory tests, disposal site, etc. as applicable.
2.2.6.2 Direct experience of personnel proposed to accomplish the specific tasks/sub-
tasks, as applicable, within the PSOW.
2.2.6.3 Qualifications of personnel proposed to accomplish the PSOW.
2.2.6.4 Availability of personnel and equipment to meet the needs of the Project to be
assigned.
2.2.6.5 Local conditions and/or assumptions on the part of the Contractor which may
affect the accuracy of the PSOW.
2.2.6.6 Total, firm, fixed prices for all services, materials, and equipment required to
perform all work required by the PSOW. However, cost shall not be the
primary evaluation criteria.
SERIAL 13134-ITN
2.2.7 Final Project Contract Award:
2.2.7.1 After receipt of the PO and in accordance with the established evaluation
criteria, the Using Agency shall issue a final Project Contract award.
2.2.7.2 The Using Agency shall encumber funds prior to issuance of any Notice to
Proceed or similar document to the Contractor.
2.2.8 Pre-Performance Meeting:
All work shall be coordinated through the Using Agencies Project Manager or Project
Coordinator. If required by the Using Agency, the Project Manager or Project
Coordinator and Contractor's key personnel shall participate in a pre-performance
meeting to coordinate the work schedule and provide clarification on any items as
necessary.
2.2.9 Differing Site Conditions:
The Contractor shall notify, in writing, (email or facsimile notification is an acceptable
written format) the Using Agency Project Manager or Project Coordinator of differing
site conditions or any other changes not anticipated in the Project which may cause a
change in cost, completion time or makes significant changes in methodology. If
changes result in an increase or decrease in the established firm, fixed prices, such
increase or decrease shall be detailed to such an extent as to allow the Using Agency
sufficient information to evaluate the costs involved. Such written notification, to
include revised prices, shall be made as soon as possible but no later than five (5)
business days from discovery.
The Using Agency Project Manager or Project Coordinator, as applicable, may authorize
field changes in Project(s), as long as such changes do not exceed ten percent (10%) of
the original Project Contract amount. Once the field change has been authorized, the
Contractor shall forward all applicable documentation within five (5) business days to the
Using Agency Project Manager or Project Coordinator. Such field modification shall be
followed by a written PA within a reasonable time but before the next invoice period.
2.2.10 Project Amendment (PA):
The Using Agency retains the right to make changes, in writing, at any time to the Project
Contract. If such changes result in a change in cost, completion time, or makes
significant changes in methodology, a PA shall be issued by the Using Agency.
2.2.10.1 If changes result in an increase or decrease in the established firm, fixed
prices, the Contractor shall submit to the Using Agency Project Manager or
Project Coordinator, costs associated with the change, detailed to such an
extent as to allow the Using Agency sufficient information to evaluate the
costs involved.
2.2.10.2 Upon receipt of requested change(s), the Using Agency shall make a
determination of acceptance or rejection of the requested change(s) to the
Project Contract. The Using Agency shall notify the Contractor, in writing, of
rejection; or if accepted, a formal PA shall be issued.
2.2.10.3 Contractors shall not be authorized to proceed with any change(s) under
consideration until written approval by the Project Manager or Coordinator, as
applicable is received from the Using Agency.
2.3 INVOICES AND PAYMENTS:
2.3.1 Contractors may submit monthly invoices, or for an alternative billing cycle, during the
performance of a Project to the Using Agency for payment. However, payment shall
SERIAL 13134-ITN
only be for the amount of work completed and accepted by the Using Agency Project
Manager or Project Coordinator for that applicable billing cycle.
In no instance will the amount(s) being invoiced differ from the firm, fixed prices
established in the final Project Contract and any subsequent approved written PA's.
2.3.2 The Using Agency shall not be charged for Contractor time needed to bring new Key
Personnel to the level of site knowledge of previous Key Personnel. This shall include
becoming familiar with the specific characteristics and special requirements of the
Project area. If the Contractor replaces Key Personnel, it shall not affect their
commitment to meet all schedules and deliverables.
2.3.3 Any overtime and/or double-time must be prior approved, in writing, by the Using
Agency if the Contractor anticipates billing the Using Agency for such overtime and/or
double-time.
2.3.4 If required by the Using Agency, the Contractor shall:
2.3.4.1 Provide invoices, which itemize individual personnel on the invoice indicating
the actual hours worked, the hourly rate, personnel classification, level, and
the extended amount of fees being billed.
2.3.4.2 Support all use of capitalized equipment; include actual time for mobilization,
set-up (if required) and demobilization.
2.3.4.3 Support all hours worked by detailed time sheet, which outlines the hours
worked each day; all charges billed must be relative to the technical task. If
the Project entails work by the Contractor at more than one (1) area, the Using
Agency may additionally direct the Contractor to report the number of hours
worked by area.
2.3.4.4 Provide separate invoices from all subcontractors, rentals, materials, and for
all equipment used. Such invoices shall outline the use and/or services
worked. Charges billed must be relative to the Project. If the Project entails
work by a subcontractor at more than one (1) area, the Using Agency may
additionally direct the Contractor to report the additional services worked by
area.
2.3.4.5 Provide receipts for all lodging and subsistence with services provided where
the Project area is thirty-six (36) or more miles from the intersection of 3' d
Avenue and Jefferson Street, Phoenix. The Contractor must provide motel
and meal receipts with the invoice. Mileage will only be allowed for the
thirty-six (36) miles or more identified above, and then only for the
overage in both directions
2.3.5 All work associated and approved through a PA must be so identified on all invoices.
2.3.6 Additional charges for accounting, invoicing, payroll preparation, and invoice related
copying (copying for deliverables identified in a PSOW is a direct cost), preparation of a
PO, etc., are considered an indirect cost and therefore not billable as a separate item.
Additional charges to correct and resubmit an invoice are not a billable charge.
2.3.7 The Contractor shall certify by original signature that all invoices have been examined,
and to the best of the Contractor's knowledge and belief, the reported expenditures are
valid, based upon the Contractor's official and auditable accounting records (books of
account) and are consistent with the terms of the contract.
2.3.8 Payment(s) shall not be construed to be an acceptance of defective work or improper
material.
SERIAL 13134-ITN
2.3.9 Maricopa County shall not be obligated to make final payment until the Contractor has
delivered to the Using Agency a certificate and release satisfying that the Project has
been completed and that the work is not subject to any unsatisfied lien or claim as a result
of the Contractor, that all rights of lien against the County's property have been satisfied
and that the Contractor has paid, or shall pay in full, all outstanding obligations against
the work upon receipt of final payment.
2.3.10 Stand-By Time:
The Contractor shall not receive any payment whatsoever for standby time (i.e.,
equipment and labor either on site or held elsewhere and not used in conjunction with the
Project) for labor, equipment or materials if such stand-by time is the fault of the
Contractor or any subcontractor. Payment shall be made only for equipment, labor, and
material actually used with provisions for payment for equipment in transit, portal to
portal.
However, stand-by time, if thirty (30) minutes or more, will be an authorized charge if
such delays are due to the fault of the Using Agency or any of its agents. Costs for stand-
by time may be negotiated between the Contractor and the Using Agency at the time of
the PA.
2.3.11 Final Payment:
No later than sixty (60) days after completion of a Project and acceptance by the Using
Agency, the Contractor shall submit invoices marked "FINAL" to the Using Agency
Project Manager or Coordinator. Failure to submit final invoices within this time frame
may result in payments being delayed. However, the sixty (60) day requirement may be
extended with the written approval of the Using Agency.
2.4 TAX:
No tax shall be levied against labor or services. It is the responsibility of the Contractor to
determine any and all taxes and include the same in Task Orders price.
2.5 OVERALL RESPONSIBILITIES:
2.5.1 Overall Responsibilities of the Using Agencies:
The Contractor shall agree and understand that each Project shall be supervised by a
Project Manager or Project Coordinator furnished by the Using Agency. The Contractor
shall report directly to the Project Manager or Project Coordinator and shall agree and
understand that the Project Manager or Project Coordinator shall have authority for the
following:
2.5.1.1 Review of and approval of initial POs and follow-on POs required in the
performance of the Project.
2.5.1.2 Review of clean-up procedures.
2.5.1.3 Review and approval of the use of certain equipment, personnel, materials,
services, and/or procedures.
2.5.1.4 Hours and days of work.
2.5.1.5 Review of safety plans and protocol for compliance with OSHA and other
regulations as applicable.
SERIAL 13134-ITN
2.5.1.6 Stopping work order for safety of the Contractor or the environment or due to
violation of safety regulations by the Contractor, the Contractor's personnel,
or subcontractors.
2.5.1.7 Review of decontamination procedures.
2.5.1.8 Review of disposal sites and treatment, technologies for waste generated from
clean-ups, and the signing hazardous waste manifests.
2.5.1.9 Final interpretation of the work in POs.
2.5.1.10 Determination of Project completion.
2.5.1.11 Review and approve all invoices submitted for payment.
2.5.1.12 After Project completion, acceptance and final payment to the contract, the
Using Agency shall submit a Project Completion Report to Maricopa County
Materials Management Department, including, but not limited to,
identification of the Using Agency, location of the site, contract number(s) (or
other number identifying the PO award) issued by Using Agency, synopsis of
the effort completed, Project start and completion dates, total amount of initial
Project Offer Award, number of PAs with dollar amounts, and identification
of specific concerns relating to the satisfactory completion of the work scope.
2.5.2 Overall Responsibilities of the Contractor:
2.5.2.1 The Contractor shall protect the property of the Using Agency from damage
during the duration of any Project. The Contractor shall replace any, or all
damaged property at no cost to the Using Agency to the extent caused by the
Contractor's negligent acts or willful misconduct.
2.5.2.2 The Contractor shall satisfy himself/herself regarding the existing conditions
under which he/she shall have to operate in completing the work, or which
shall affect the work in any manner. No allowance shall be made
subsequently in this regard on behalf of the Contractor for any error or
negligence on his/her part.
2.5.2.3 The Contractor shall carefully check all dimensions and conditions at the
Project area, and shall be responsible for sufficiently familiarizing themselves
with Project area conditions which may affect the work to make a firm-fixed
price PO. Any drawings provided by the Using Agency are meant to be
utilized as a guide to the building or Project area configurations. All
measurements and sizes are approximate, and must be confirmed, to the extent
agreed upon by the Using Agency, by the Contractor prior to implementation
of the work on the Project.
2.5.2.4 The Contractor shall agree and understand that for some Projects the Using
Agency may request only a service such as drilling or analysis without a
Contractor Project Manager.
2.5.2.5 The Contractor shall maintain a complete daily record of all labor, equipment,
materials, subcontracted services and expenses, to include mileage, if any,
incurred in the performance of the services provided and shall provide the
Using Agency such record with all supporting documentation, if so requested
in the PSOW.
2.5.2.6 The Contractor shall complete all services specified in the Project Offer and
any subsequent amendments. However, the Contractor shall agree and
understand that completion of such services does not in itself constitute
SERIAL13134-ITN
Project completion. The Using Agency shall determine when each Project is
complete.
2.5.2.7 The Contractor, and any subcontractors utilized by the Contractor, must not be
listed on the General Services Administration (GSA), List of Parties Excluded
from Federal Procurement and Non-procurement Programs, which supersedes
the List of Debarred, Suspended and Voluntarily Excluded Parties.
2.5.2.8 The Contractor shall submit copies of waste shipment records, if applicable, to
the Using Agency and County Risk Management.
2.5.2.9 In addition to the copies submitted to the Using Agency, THE
CONTRACTOR SHALL SUBMIT A COPY OF ALL FINAL REPORTS
AND MANIFESTS TO THE MARICOPA COUNTY RISK
MANAGEMENT DEPARTMENT (applies only to Maricopa County
funded projects).
2.6 COMPLIANCE WITH LAWS:
The Contractor shall agree and understand that all work authorized under the contract must be
performed in conformance with ALL APPLICABLE federal, state, and local laws, regulations,
and rules in effect at the time services are performed or which are reasonably foreseeable.
2.7 PROFESSIONALS:
The Contractor shall agree and understand that some work requested by the Using Agency may
require the performance of a Registered Geologist (R.G.), Professional Engineer (P.E.), Certified
Industrial Hygienist (CIH) or other registered technical professional licensed in the State of
Arizona and consistent with the applicable Rules and By-Laws of the Arizona Board of Technical
Registration (ABTR) or appropriate licensing agency. Where required, all plans, specifications,
reports and other professional documents delivered to the Using Agency must be sealed by such
registered professional and must be acceptable to the Using Agency in form, timeliness, contents,
and presentation. Confidentiality of information shall be determined in accordance with A.R.S. §
49-205, A.R.S. § 49-201.29, and A.R.S. § 49-1012.2.
2.8 PROFESSIONAL AND FIELD LEVELS:
The following staff or equivalent titles may be required at various Professional and Field Levels as
dictated by workload, site conditions, and scopes of work and resultant PSOW. Additional
classifications may be included with detailed job descriptions by the Contractor. There will be
multiple technical disciplines that will fall under the descriptions of each professional level. A
geologist, engineer, or environmental scientist with one (1) year environmental experience would
each fall under a Professional Level:
2.8.1 Project Manager: With experience in proposal and application of the disciplines as
required by the scope of work at various levels.
2.8.2 Engineer: With applicable degree, experience, and expertise in design and review,
pertinent to Project requirements, that can be validated.
2.8.3 Professional Engineer (RE.): Same qualifications as Engineer. Must be registered in the
State of Arizona.
2.8.4 Chemical Engineer: With applicable degree, experience, and expertise in design and
review, pertinent to Project requirements, that can be validated.
2.8.5 Permit Engineer: With applicable degree, experience, and expertise in design and review,
pertinent to Project requirements, which can be validated.
SERIAL 13134-1TN
2.8.6 Air Quality Engineer: With applicable degree, experience, and expertise in design and
review, pertinent to Project requirements, that can be validated.
2.8.7 Risk Assessor/Toxicologist: With experience that can be validated in Risk Assessment
development and/interpretation.
2.8.8 Statistician: With experience in probabilistic and deterministic methods.
2.8.9 Microbiologist: With experience in bioremediation and/or fungi and bacteria biology and
applicable degree that can be validated.
2.8.10 Computer Modelers: With experience in:
2.8.10.1 Vadose Zone Fate and Transport Modeling
2.8.10.2 Groundwater Fate and Transport Modeling
2.8.10.3 Contaminant Fate and Transport Modeling
2.8.10.4 Air Emissions Modeling
2.8.11 Hydrologist: With degree and experience that can validated.
2.8.12 Geologist: With degree and experience that can be validated.
2.8.13 Registered Geologist (R.G.): Same qualifications as Geologist. Must be registered in the
State of Arizona.
2.8.14 Principal Investigator: For cultural anthropological Projects (cultural research, informant
interviews) and Cultural Resource Management Projects (archaeological survey, testing,
data recovery, technical research). Experience and knowledge of the history and
prehistory of Arizona, and the ethnography of Arizona cultures. Experience developing
and executing anthropological research designs (survey, testing, data recovery, technical
reporting).
For federal undertakings, ability to meet Secretary of the Interior's Standards; ability to
obtain an Archaeological Resources Protection Act (ARPA) Permit; ability to meet the
standards of 36 CFR 800 and Sections 106 and 110 of the National Historic Preservation
Act of 1966 as amended; ability to meet the provisions of the Native American Graves
Protection and Repatriation Act (NAGPRA); and, ability to implement the concepts
outlined in National Park Service Bulletin 38 for Traditional Cultural Properties. For
state undertakings, ability to obtain and satisfy all requirements of an Arizona Antiquities
Act Permit from the Arizona State Museum (ASM); and ability to meet all provisions of
the State Historic Preservation Act in consultation with the Arizona State Historic
Preservation Officer (SHPO) and interested parties.
2.8.15 Anthropological or Archaeological Research Staff: Proven experience executing
anthropological research designs or archaeological research designs (survey, testing, data
recovery, technical reporting) under the direction of a Principal Investigator.
Anthropological or archaeological field school; or completion of a recognized
certification program; or a Bachelor's degree in Anthropology/Archaeology; or a related
degree which demonstrates an ability to conduct research using appropriate scientific and
cultural methods. A Master's degree in Anthropology/Archaeology may be required for
certain positions or tasks.
2.8.16 Environmental Scientist: With degree and experience that can be validated.
SERIAL 13134-ITN
2.8.17 Inspector/Project Manager - Asbestos Assessment: With experience in Project
management of asbestos assessment Project. Meets training requirements under OSHA
29 CFR 1926.1101, Asbestos.
2.8.18 Competent Person/Project Site Manager - Asbestos Abatement: With experience in
Project management of asbestos abatement Projects. Meets training requirements under
OSHA 29 CFR 1926.1101, Asbestos.
2.8.19 Asbestos Abatement Workers: With experience in asbestos assessment and abatement
work. Meets training requirements under OSHA 29 CFR 1926.1101, Asbestos.
2.8.20 Industrial Hygienist: This is a professional qualified by education, training, and
experience to anticipate, recognize, evaluate, and develop controls for occupational
health hazards.
2.8.21 Certified Industrial Hygienist (CIH): The same qualification as an Industrial Hygienist
and, in addition, is also certified in the comprehensive practice of industrial hygiene by
the American Board of Industrial Hygiene.
2.8.22 Chemist: With degree and experience that can be validated.
2.8.23 Biologist/Wildlife Biologist/Wildlife Rehabilitator: With degree and/or experience that
can be validated and appropriate Federal and State wildlife permits and licenses.
2.9 DATA AND DOCUMENT MANAGEMENT:
2.9.1 The Contractor shall furnish the personnel, services, materials, and equipment required to
provide manual and automated storage, search, retrieval, and other management of data
collected in the course of any activity undertaken pursuant to the contract, and other data
specified by the Using Agency. This data may include facility descriptions, coordinates
and elevations of sampling stations and features of sites, results of environmental
measurements, hazard characteristics, target receptors, cleanup Project schedules, costs,
obligation and outlay Projections, other financial information, and mailing lists.
2.9.2 The principal sources for the data are the following types of activities site assessment,
investigation, characterization, and/or feasibility study. The data may be used in remedial
planning and implementation activities, or in support of legal proceedings.
Information/reports provided to the Using Agency shall be in accordance with
instructions and format specified or approved by the Using Agency.
2.9.3 Any data which the Using Agency has title to or which is requested to be reported by the
PSOW will be reported to the Using Agency according to the following standards for
media, contents and format:
2.9.3.1 Unless required by the PSOW, the Contractor shall provide data on the
following electronic media: CDROM or other storage medium in a format (PDF,
HTML, ASCII, Access, etc.) specified by the Using Agency.
2.9.4 If required by the PSOW, the Contractor shall provide data in the form of a written
report.
2.9.5 If required by the PSOW, the Contractor shall provide raw laboratory data in electronic
format as described elsewhere within this document.
2.9.6 One copy of the data/report shall also be provided to Maricopa County Risk Management
for central record-keeping purposes and to monitor the County's exposure to
environmental liability (applies only to Maricopa County funded projects). This may be
either a hard (written) copy or an electronic copy on CD.
SERIAL 13134-ITN
2.10 COMMUNITY RELATIONS:
2.10.1 The Contractor may be required to furnish the personnel, services, materials, and
equipment required to assist the Using Agency in conducting a community relations
program. The Contractor understands that the purpose of a community relations program
is to encourage two-way communications between communities affected by the Project
and the County. Community relations must be integrated closely with all response
activities. The objectives of this effort are to achieve community understanding of the
actions taken by the Using Agency, to obtain community input, and to seek the
concurrence of the community for the selected activity.
2.10.2 Community relations support may include, but is not limited to, the following:
• Preparation of a community relations plan
• Solicitation of, and, upon Using Agency concurrence, selection of Community
Relations subcontractors, if needed
• Analysis of community attitudes toward proposed actions
• Definition of community relations program needs for each remedial activity
• Documentation of all contacts with the public when directed by the Using Agency
Project Manager or Coordinator, as applicable
• Development of community mailing lists
• Preparation, subject to Using Agency approval, duplication and distribution of news
releases, fact sheets, slide shows, exhibits, and other audiovisual materials designed
to apprise the community of current and proposed actions
• Establishment of community information centers
• Arrangement of briefings, press conferences, workshops, and public hearings
• Preparation of reports and participation in Project review meetings.
2.11 OUT-OF-STATE PERSONNEL:
Written approval of the Using Agency shall be obtained by the Contractor prior to importing the
services of out-of-state personnel in conjunction with a PSOW for any billable expense other than
the hourly rate.
2.12 CULTURAL RESOURCE STUDIES:
Cultural Resource Management consultants must obtain an Arizona Antiquity Act Permit from the
Arizona State Museum (ASM) per ARS § 41-841 et seq., and the rules and regulations of the
Arizona State Museum as amended. Individuals, corporations and agencies must consult with
ASM regarding discoveries of human remains or associated funerary objects. Individuals,
corporations and agencies must comply with the Discovery Clause, ARS § 41-844 A.
These services may be provided by in-house staff personnel or a subcontractor. OSHA training
may be a requirement for archaeological services as indicated in the Contractor's Health and
Safety Plan or as specified in the Using Agency PSOW.
2.13 TECHNICAL OVERSIGHT:
If required by the Using Agency, the Contractor may provide services in support of the
investigation, planning, compliance, and cleanup activities of the Using Agency sites. These
services, if required, shall include field and office oversight of investigations and cleanups. These
services may involve Using Agency case file reviews. The Contractor shall perform these
oversight investigations and suggest corrective actions with respect to environmental issues
covered in the PSOW and pursuant to the existing provisions of the Arizona Revised Statutes,
Department policies and guidelines, and all applicable federal, state, and local laws, ordinances,
and regulations. The Contractor shall conform to OSHA regulations for health and safety of
employees, as applicable.
SERIAL 13134-ITN
2.14 OSHA/EPA SAFETY TRAINING:
All technical staff performing field duties (including subcontractor field personnel) in areas of
potential contamination must receive appropriate training as specified by the OSHA and/or EPA.
This training addresses knowledge and skill necessary to perform hazardous waste cleanup
operations with minimal risk to personnel health and safety. OSHA specifications for this training
are covered in CFR 29 CFR 1910.
2.15 EQUIPMENT:
2.15.1 Essential equipment, as identified by the Contractor in their proposal, may be added to
the equipment list at any time, on a case-by-case basis. Additions shall have prior written
approval by the County, with concurrence of any applicable Using Agency. Other
Contractors on the County Qualified Lists may be contacted to add like equipment to
their equipment list.
2.15.2 Should the County and/or any Using Agency require the Contractor to procure additional
specialized equipment for performance of the proposed work in a PSOW, the cost
associated with procurement of the equipment and the anticipated charges to the Using
Agency shall be itemized in the PO.
All equipment with capitalized costs of $500.00 or more purchased entirely with County
funds becomes the property of the County as a fixed asset with all rights to ownership
and shall be accounted for upon completion of the Project work. The County reserves the
right to purchase the said equipment separately and allow the Contractor use of County
equipment to accomplish performance of the work. The Contractor shall provide the
County Procurement Office and the Using Agency copies of three (3) competitive offers
along with the actual billing receipt for any and all equipment purchased under this
provision.
2.16 TIME AND MATERIAL SUBCONTRACTS:
To the maximum extent possible, additional work for a Contractor's subcontractor shall be firm-
fixed price.
2.16.1 However, it is recognized that there are those rare instances where a time and material
subcontract may be required. Time and materials sub-contracts shall only be used in
those unique circumstances where the nature and extent of services required cannot be
established in advance, and the use of firm-fixed price POs and Contracts would clearly
result in greater risks and costs and provide no contractual advantage to the Using
Agency and Maricopa County. In order to maintain control of the use of a time and
materials subcontract, the following mandated guidelines shall be utilized by both
Contractors and Using Agencies.
2.16.1.1 All time and materials subcontracts shall require the prior written approval of
the County.
2.16.1.2 A fixed fee for subcontractor work shall be established between the County
and the Contractor.
2.16.1.3 Hourly rates for services shall be firm-fixed price.
2.16.1.4 All capitalized equipment shall be firm-fixed price.
2.16.1.5 The County must insure that the Using Agency is receiving the most favorable
price for the unanticipated services. Therefore, Contractors shall provide
written evidence of most favorable price. This could be accomplished by the
use of competitive written bids, proposals or any other means to provide such
SERIAL 13134-ITN
evidence, or approved by the County Procurement Administrator and the
assigned contract administrator within the County Procurement Office.
2.16.1.6 A not-to-exceed (NTE) cost, including the subcontractor fixed fee, shall be
established by the Using Agency and the Contractor which shall not be
exceeded without the prior written approval of the County Procurement
Administrator and the assigned Contract Administrator within the County
Procurement Office.
2.16.1.7 The Using Agency, in conjunction with the Contractor, shall provide a written
statement establishing justification as to why no other contract type, other than
time and materials, is practicable for this PSOW.
2.16.1.8 A specific individual shall be identified by the Contractor as a key contact
with responsibility to monitor performance of the work. This individual shall
be available for providing written and oral subcontract status to any inquiring
Department, during normal work hours, Monday through Friday.
2.16.1.9 Invoices from the Contractor shall include copies of all subcontractor invoices
and be specifically itemized for easy identification and verification.
2.16.1.10 The Contractor shall submit, directly to the County Procurement Office, or its
assigned Contract Administrator, a monthly status report detailing the status
of each time and material subcontract, including, but not limited to, a
description of the effort completed, a schedule of remaining work to be
completed, a statement as to the percentage of work completed, amount
invoiced to date, the prior approved NTE cost and identification of specific
concerns relating to the satisfactory completion of the PSOW.
2.17 DELIVERY:
It shall be the Contractor's responsibility to meet the proposed delivery requirements. Maricopa
County reserves the right to obtain services on the open market in the event the Contractor fails to
make delivery and any price differential will be charged against the Contractor.
2.18 BOND REQUIREMENT:
Depending on the individual project, the Contractor may be required to furnish the Contracting
Agency the following bonds, which shall become binding upon the award of the contract to the
Contractor.
(A) A Performance Bond equal to the full contract (project) amount (or as specified)
conditioned upon the faithful performance of the contract in accordance with plans,
specifications and conditions thereof. Such bond shall be solely for the protection of the
Contracting Agency awarding the contract.
(B) A Payment Bond equal to the full contract (project) amount solely for the protection of
claimants supplying labor and materials to the Contractor or his Subcontractors in the
prosecution of the work provided for in such contract.
Each bond shall include a provision allowing the prevailing party in a suit on such bond to recover
as a part of his judgment such reasonable attorney's fees as may be fixed by a judge of the court.
Each bond shall be executed by a surety company or companies holding a certificate of authority
to transact surety business in the State of Arizona issued by the Director of the Department of
Insurance. The bonds shall not be executed by an individual surety or sureties. The bonds shall
be made payable and acceptable to the Contracting Agency. The bonds shall be written or
countersigned by an authorized representative of the surety who is either a resident of the State of
Arizona or whose principal office is maintained in this state, as by law required, and the bonds
shall have attached thereto a certified copy of the Power of Attorney of the signing official. In
addition, said company or companies shall be rated "Best-A" or better as required by the
Contracting Agency, as currently listed in the most recent Best Key Rating Guide, published by
the A.M. Best Company.
SERIAL 13134-1TN
EXHIBIT B-3
SCOPES OF WORK
E3-3.0 ASBESTOS, LEAD-BASED PAINT AND MOLD ABATEMENT
The Contractor shall have the ability to provide for the removal or control of asbestos containing building
materials (ACMs), lead-based paint (LBP) and mold (fungi) damaged building materials at various sites
throughout Maricopa County. These services shall be on an as needed, if needed, basis. The Contractor
may assist the Using Agency in meetings and negotiations with regulators, property owners, potential
responsible parties, and other interested parties, including the general public.
E3-3.1 INTENT:
Many County facilities are thought to contain some form of ACM and LBP. All disturbance or
abatement of asbestos and LBP building materials must be conducted by certified individuals and
firms. Large and small asbestos and/or lead removal projects require sophisticated procedures
including building heating, ventilating and air conditioning (HVAC) isolation; evacuation of the
space; and stringent containment, decontamination, and disposal of the asbestos and/or lead
containing waste material. Complete removal will eliminate potential health hazards and the need
for ongoing operations and maintenance (O&M) programs.
Mold and other fungi are caused by moisture intrusion in buildings. In cases of suspected
moisture intrusion, assessment of buildings for fungi, followed by designed removal actions,
decontaminations and disposal of the fungi containing material may be required.
This AOS includes the abatement or remediation of ACMs, LBP and microbial damaged building
materials only. It DOES NOT encompass replacement or remodel construction (other than to
replace or repair damages caused by abatement activities).
E3-3.2 REFERENCES:
The following references shall apply to this AOS:
E3-3.2.1 40 CFR, Part 61, Subpart M, Asbestos National Emission Standards for Hazardous Air
Pollutants (NESHAP).
E3-3.2.2 29 CFR, Part 1926, Subpart 1926.1101 Asbestos.
E3-3.2.3 29 CFR, Part 1910, Subpart 1910.1001 General Industry Asbestos.
E3-3.2.4 29 CFR, Part 1910, Subpart 1910.134 Respiratory Protection.
E3-3.2.5 40 CFR, Part 763, Asbestos Model Accreditation Plan: Interim Final Rule (59 FR
5236-5260).
E3-3.2.6 29 CFR, Part 1926, Subpart 1926.62 Lead.
E3-3.2.7 24 CFR, Parts 5,35,58,200 Housing and Urban Development (HUD).
E3-3.2.8 29 CFR, Parts 1910, 1025 (OSHA).
E3-3.2.9 40 CFR Parts 61,745, 763 (EPA).
E3-3.2.10 Environmental Protection Agency (EPA): Mold Remediation in Schools and
Commercial Buildings; 2001.
E3-3.2.11 American Conference of Government Industrial Hygienist (ACGIH): Bioaerosol
Assessment and Control s 1999.
SERIAL 13134-ITN
E3-3.2.12 Guidelines on Assessment and Remediation of Fungi in Indoor Environments,
New York City Department of Health (DOH), 2008.
E3-3.2.13 American Industrial Hygiene Association (AIHA): Report of Microbial Growth Task
Force; 2001.
E3-3.2.14 Institute of Inspection, Cleaning and Restoration Certification, IICRC S520: Standard
and Reference Guide for Professional Mold Remediation, December 2008.
E3-3.3 ASBESTOS ABATEMENT:
The Abatement Contractor shall provide services in support of various Using Agency's abatement
activities at their facilities that may pose a liability to Maricopa County. These services shall
include, but are not necessarily limited to initial response and abatement actions to minimize the
threat to public health, safety, and the environment of the facilities or properties to prevent further
contamination.
E3-3.3.1 Project Management:
E3-3.3.1.1 Services to be provided by the Abatement Contractor may include, but
are not necessarily limited to:
Preparing initial estimate for corrective actions, removal of
ACM/RACM prior to renovation and demolition activities,
repairing and maintenance of damaged ACMs, coordinating
NESHAF' notifications to the Maricopa County NESHAP
Coordinator for all demolitions and all renovations where the
amount of RACM to be disturbed is greater than 260 linear feet on
pipes, greater than 160 square feet on other facility components, or
greater than 35 cubic feet on facility components, cleaning up of
asbestos materials from unpredicted fiber release episodes,
containment, encapsulation and disposal.
• All employees and contractors utilized will be currently certified in
their respective categories including worker, contractor/supervisors
etc. and hold current medical clearance for abatement work.
E3-3.3.1.2 The Abatement Contractor shall provide any or all of the contract services
as stipulated by contract issued by the Using Agency. Such services shall
be provided in a manner specified or approved by Maricopa County to the
satisfaction of the Using Agency. The services shall include the
personnel, materials, and equipment required to complete the ordered
work.
E3-3.3.2 Using Department Responsibilities:
E3-3.3.2.1 The Using Agency requesting specific abatement services will provide to
the Abatement Contractor information pertaining to the project, including
but not necessarily, limited to the following:
• Address of the site, drawings or maps of the area of
buildings, any construction records that might
identify asbestos construction materials, other
inspection reports if available, other hazards which
require assessment by technically trained inspectors,
and coordination for moving of patients, inmates,
employees, etc
SERIAL 13134-1TN
E3-3.3.3 Regulatory Requirements:
E3-3.3.3.1 The Abatement Contractor must comply with the requirements of any
applicable federal, state, County, or local rules and regulations governing
asbestos removal and disposal. These include but are not limited to
E3-3.3.3.2 The Abatement Contractor shall retain copies of the regulations stated
above on each site where work is being accomplished.
E3-3.3.3.3 Prior to implementation of asbestos removal the Abatement Contractor
shall provide the Maricopa County NESHAP Coordinator, Maricopa
County Risk Management, and the Using Agency with the necessary
written 10 day notification. The notification must comply with 40 CFR,
Part 61, Subpart M, paragraph 61.145. (Revised Regulations as of
November 20, 1990.)
• Maricopa County Department of Environmental Services
ATTN: Asbestos NESHAP Coordinator
1001 N. Central Avenue, Suite #300
Phoenix, Arizona 85004
Telephone: 602-506-6708
• Maricopa County Risk Management
ATTN: Environmental Risk Management
222 North Central Avenue, Suite #1110
Phoenix, Arizona 85004
Telephone: 602-506-2891 or 506-5063
• Using Department's Project Manager or Project Coordinator
responsible for the specific project.
E3-3.3.4 Using Department's Project Manager or Coordinator:
E3-3.3.4.1 The Abatement Contractor shall report directly to the Using Agency's
Project Manager or Project Coordinator.
E3-3.3.4.2 The Abatement Contractor shall furnish a written estimate of the cost of
each project (once the estimate has been finalized, the total guaranteed
not-to-exceed, firm, fixed price shall govern the over-all project.
Maricopa County shall not be obligated to honor any additional estimates
or amendments to the project, except in special isolated pre-approved
instances) based upon the firm, fixed prices stated in the contract.
E3-3.3.4.3 The Abatement Contractor shall be required to complete all the work
outlined by the estimate, and in the time frame stipulated in the contract.
E3-3.3.4.4 The Abatement Contractor shall agree and understand that the Using
Agency's Project Manager or Project Coordinator shall have full and final
authority for, but not limited to, the following:
• Determination of completion of each project
• Review of work schedules
• Approval of clean-up procedures
• Disapproval or approval of the use of certain equipment,
personnel, materials, services, and/or procedures
• Establishment of proper safety protocol
• Issuance of stop-work orders for safety, environmentally unsafe
activities, procedures, or unnecessary work.
SERIAL 13134-ITN
E3-3.3.4.5 The Abatement Contractor shall agree that the completion of a project
shall be upon the final removal and disposal of all materials, substances,
and/or RACM.
E3-3.3.4.6 The completion date shall conform to the dates specified in the NEST-1AP
notification, or modified/revised notification.
E3-3.3.4.7 Copies of any revisions to the NESHAP notification and an explanation
shall be forwarded to the Using Agency's Project Manager or Project
Coordinator and Maricopa County Risk Management.
E3-3.3.4.8 A project shall be deemed complete at the convenience of the Using
Department by the Project Manager or Project Coordinator.
E3-3.3.4.9 The Abatement Contractor shall submit all copies specified in the project
contract for payment to the designated representative for certification.
E3-3.3.4.10 The Abatement Contractor shall keep a complete record of all labor,
equipment, materials, and outside services expended in the performance
of a project under the contract, and shall include such record as a closeout
document with the final invoice for services. A copy of all closeout
documents shall be provided to Maricopa County Risk Management for
record keeping purposes.
E3-3.3.4 Staff Pricing:
The Contractor will provide their staff pricing categories and the technical disciplines
and qualifications that fall under the descriptions of each professional level. For
example, Level 8, Senior Professional — Engineer, Geologist, 10 years of experience,
certification or Level 2 Field Survey Technician — Education, experience, certification.
Pricing shall incorporate emergency response and/or after hour rates.
E3-3.3.5 Equipment Pricing:
Specific equipment may be required for individual Projects. Please provide a list of
Contractor owned equipment and prices that may be used for projects. Pricing shall
incorporate emergency response and/or after hour rates.
E3-3.4 LEAD ABATEMENT:
The Abatement/Mitigation Contractor shall provide services in support of various Using Agency's
abatement/mitigation activities at their facilities that may pose a liability to Maricopa County.
These services shall include, but are not necessarily limited to initial response and abatement
actions to minimize the threat to public health, safety, and the environment of Maricopa County
facilities or properties to prevent further contamination.
E3-3.4.1 Project Management:
E3-3.4.1.1 Services to be provided by the Abatement/Mitigation Contractor may
include, but are not necessarily limited to:
• Preparing initial estimate for all corrective actions as requested by
the Using Agency, removing lead-containing materials and lead
hazards prior to renovation and demolition activities, repairing and
maintenance of damaged lead surfaces (interim controls),
providing notification to the designated regulatory authority, if
applicable, for all demolitions, and Maricopa County Risk
Management, cleaning lead-containing materials from unpredicted
SERIAL 13134-ITN
particulate release episodes, containment and/or encapsulation,
waste characterization and disposal
E3-3.4.1.2 The Abatement Contractor shall provide any or all of the contract services
as stipulated by contract issued by the Using Agency. Such services shall
be provided in a manner specified or approved by Maricopa County to the
satisfaction of the Using Agency. The services shall include the
personnel, materials, and equipment required to complete the ordered
work.
E3-3.4.2 Using Department Responsibilities:
E3-3.4.2.1 The Using Agency requesting specific abatement services will provide to
the Abatement/Mitigation Contractor information pertaining to the
project, including but not necessarily, limited to the following:
• Address of the site, drawings or maps of the area of buildings, any
construction records that might identify lead construction materials,
other inspection reports if available, other hazards which require
assessment by technically trained inspectors, and coordination for
moving of patients, inmates, employees, etc
E3-3.4.3 Regulatory Requirements:
E3-3.4.3.1 The Abatement Contractor must comply with any applicable federal,
state, County, or local rules and regulations governing lead removal and
disposal.
E3-3.4.3.2 The Abatement/Mitigation Contractor shall retain copies of the
regulations stated above on each site where work is being accomplished.
E3-3.4.3.3 Prior to implementation of lead removal, the Abatement Contractor shall
provide the designated regulatory authority, if applicable, Maricopa
County Risk Management, and the Using Agency with the necessary
written 10 day notification. The notification must comply with 40 CFR,
Maricopa County Risk Management
ATTN: Environmental Risk Management
222 North Central Avenue, Suite #1110
Phoenix, Arizona 85004
Telephone: 602-506-2891 or 506-5063
• Using Department's Project Manager or Project Coordinator
responsible for the specific project.
E3-3.4.3.4 The Abatement/Mitigation Contractor shall meet with the designated
representative(s) stated above to review the schedule of work and specify
special needs. At that time, the Abatement Contractor shall identify a
project supervisor who shall be on-site for the duration of the project with
authority to act as the Abatement Contractor's authorized representative.
This individual must be currently certified as an EPA Lead
Contractor/Supervisor.
E3-3.4.3.5 The Abatement Contractor shall furnish documentation certifying that
employees working on each project have had EPA -approved Lead
Contractor/Supervisor Training, and/or Lead Worker Training, and are
currently certified.
SERIAL 13134-ITN
E3-3.4.3.6 Training shall include all the elements specified in 40 CFR, Part 745 and
29 CFR, Parts 1910 and 1926.
E3-3.4.3.7 The Abatement Contractor shall have a copy of their written hazard
communication (to include copies of MSDS), safety program, and
respiratory protection programs at the project site.
E3-3.4.3.8 The Abatement Contractor shall ensure that medical examinations
required under lead regulations are current for all employees involved in
each project.
E3-3.4.3.9 The Abatement Contractor shall post all signs, and use appropriate labels,
pursuant to lead regulations.
E3-3.4.3.10 The Abatement Contractor shall be required to furnish his/her own
utilities, including water and electrical when the work is being
accomplished at a remote site and/or where not available at the site. In
County-owned/operated buildings, the Using Agency will furnish the
following:
• Sufficient electric power from outside the abatement area to power
the Abatement Contractor's equipment.
• Water taps adjacent to, or in the work area, for the Abatement
Contractor's use.
• Access to a drain for disposal of filtered water at the project site.
• Designated area for storing supplies and parking disposal trailers
adjacent to the project site.
E3-3.4.4 Using Department's Project Manager or Coordinator:
E3-3.4.4.1 The Abatement Contractor shall report directly to the Using Agency's
Project Manager or Project Coordinator.
E3-3.4.4.2 The Abatement/Mitigation Contractor shall furnish a written estimate of
the cost of each project (once the estimate has been finalized, the total
guaranteed not-to-exceed, firm, fixed price shall govern the over-all
project. Maricopa County shall not be obligated to honor any additional
estimates or amendments to the project, except in special isolated pre-
approved instances) based upon the firm, fixed prices stated in the
contract.
E3-3.4.4.3 The Abatement Contractor shall be required to complete all the work
outlined by the estimate, and in the time frame stipulated in the contract.
E3-3.4.4.4 The Abatement Contractor shall agree and understand that the Using
Agency Using Agency's Project Manager or Project Coordinator shall
have full and final authority for, but not limited to, the following:
• Determination of completion of each project
• Review of work schedules
• Approval of clean-up procedures
• Disapproval or approval of the use of certain equipment,
personnel, materials, services, and/or procedures
• Establishment of proper safety protocol
Issuance of stop-work orders for safety, environmentally unsafe
activities, procedures, or unnecessary work.
SERIAL 13134-ITN
E3-3.4.4.5 The Abatement Contractor shall agree that the completion of a project
shall be upon the final removal and disposal of all materials, substances,
and/or hazardous wastes.
E3-3.4.4.6 The completion date shall conform to the dates specified in any required
notification, or modified/revised notification.
E3-3.4.4.7 Copies of any revisions to any required notification and an explanation
shall be forwarded to the Using Agency's Project Manager or Project
Coordinator and Maricopa County Risk Management.
E3-3.4.4.8 A project shall be deemed complete at the convenience of the Using
Department by the Project Manager or Project Coordinator.
E3-3.4.4.9 The Abatement Contractor shall submit all copies specified in the project
contract for payment to the designated representative for certification.
E3-3.4.4.10 The Abatement Contractor shall keep a complete record of all labor,
equipment, materials, and outside services expended in the performance
of a project under the contract, and shall include such record as a closeout
document with the final invoice for services. A copy of all closeout
documents shall be provided to Maricopa County Risk Management for
record keeping purposes.
E3-3 .4.5 Staff Pricing:
The Contractor will provide their staff pricing categories and the technical disciplines and
qualifications that fall under the descriptions of each professional level. For example,
Level 8, Senior Professional — Engineer, Geologist, 10 years of experience, certification
or Level 2 Field Survey Technician — Education, experience, certification. Pricing shall
incorporate emergency response and/or after hour rates.
E3-3.4.6 Equipment Pricing:
Specific equipment may be required for individual Projects. Please provide a list of
Contractor owned equipment and prices that may be used for projects. Pricing shall
incorporate emergency response and/or after hour rates.
E3-3.5 MOLD ABATEMENT and REMEDIATION:
The Abatement Contractor shall provide services in support of various Using Agency's abatement
activities at their facilities that may pose a liability to Maricopa County. These services shall
include, but are not necessarily limited to initial response and abatement/remediation actions to
minimize the threat to public health, safety, and the environment of the facilities or properties to
prevent further contamination.
E3-3.5.1 Project Management:
E3-3.5.1.1 Services to be provided by the Abatement/Remediation Contractor may
include, but are not necessarily limited to:
• Preparing initial estimate for all corrective actions, removal of
water or fungal damaged building materials prior to or during
remediation, renovation and demolition activities and proper
disposal.
E3-3.5.1.2 The Abatement/Remediation Contractor shall provide any or all of the
contract services as stipulated by contract issued by the Using Agency.
SERIAL 13134-1TN
The services shall include the personnel, materials, and equipment
required to complete the ordered work.
E3-3.5.2 Using Department Responsibilities:
E3-3.5.2.1 The Using Agency requesting specific Abatement/Remediation services
will provide to the Abatement/Remediation Contractor information
pertaining to the project, including but not necessarily, limited to the
following:
• Address of the site, drawings or maps of the area of buildings, any
construction records that might identify lead construction materials,
other inspection reports if available, other hazards which require
assessment by technically trained inspectors, and coordination for
moving of patients, inmates, employees, etc
E3-3.5.3 Industry Standard Requirements:
E3-3.5.3.1 The Abatement/Remediation Contractor must comply with the basic
industry standards for microbial remediation and mold abatement.
Improvements and updates to the industry standards must be continuously
incorporated.
E3-3.5.3.2 Using Department's Project Manager or Project Coordinator responsible
for the specific project with input and support from:
• Maricopa County Risk Management
ATTN: Environmental Risk Management
222 North Central Avenue, Suite #1110
Phoenix, Arizona 85004
Telephone: 602-506-2891 or 506-5063
E3-3.5.4 Using Department's Project Manager or Coordinator:
E3-3.5.4.1 The Abatement/Remediation Contractor shall report directly to the Using
Agency's Project Manager or Project Coordinator.
E3-3.5.4.2 The Abatement/Remediation Contractor shall furnish a written estimate
of the cost of each project (once the estimate has been finalized, the total
guaranteed not-to-exceed, firm, fixed price shall govern the over-all
project. Maricopa County shall not be obligated to honor any additional
estimates or amendments to the project, except in special isolated pre-
approved instances) based upon the firm, fixed prices stated in the
contract.
E3-3.5.4.3 The Abatement/Remediation Contractor shall be required to complete all
the work outlined by the estimate, and in the time frame stipulated in the
contract.
E3-3.5.4.4 The Abatement/Remediation Contractor shall agree and understand that
the Using Agency's Project Manager or Project Coordinator shall have
full and final authority for, but not limited to, the following:
• Determination of completion of each project
• Review of work schedules
• Approval of clean-up procedures
• Disapproval or approval of the use of certain equipment,
personnel, materials, services, and/or procedures
• Establishment of proper safety protocol
SERIAL 13134-ITN
Issuance of stop-work orders for safety, environmentally unsafe
activities, procedures, or unnecessary work.
E3-3.5.4.5 The Abatement/Remediation Contractor shall agree that the completion
of a project shall be upon the removal, proper decontamination and
disposal of all microbial-damaged building materials and surfaces.
E3-3.5.4.6 A project shall be deemed complete at the convenience of the Using
Department by the Project Manager or Project Coordinator.
E3-3.5.4.7 The Abatement/Remediation Contractor shall submit all copies specified
in the project contract for payment to the designated representative for
certification.
E3-3.5.4.8 The Abatement/Remediation Contractor shall keep a complete record of
all labor, equipment, materials, and outside services expended in the
performance of a project under the contract, and shall include such record
as a closeout document with the final invoice for services. A copy of all
closeout documents shall be provided to Maricopa County Risk
Management for record keeping purposes.
E3-3.5.5 Sta Pricing:
The Contractor will provide their staff pricing categories and the technical disciplines and
qualifications that fall under the descriptions of each professional level. For example,
Level 8, Senior Professional — Engineer, Geologist, 10 years of experience, certification
or Level 2 Field Survey Technician — Education, experience, certification. Pricing shall
incorporate emergency response and/or after hour rates.
E3 -3 .5 .6 Equipment Pricing:
Specific equipment may be required for individual Projects. Please provide a list of
Contractor owned equipment and prices that may be used for projects. Pricing shall
incorporate emergency response and/or after hour rates.
SERIAL 13134-ITN
EXHIBIT C
DEFINITIONS
1.1 DEFINITIONS:
Following are definitions as used in any resultant contract:
Administrative (Indirect) Costs:
Means those reasonably considered as the costs of doing business; typically recognized
administrative costs are preparation of PO or changes, accounting, invoicing, bonding,
payroll preparation, motor pool costs, office materials, supplies, telephone calls (local
and/or long-distance), and other related administrative activities.
1.1.2 ADEQ Guidance Cleanup Levels (AGCLs):
Means the pre-determined risk-based clean-up levels or standards as developed by the
ADEQ.
1.1.3 Area:
Means the geographical location defined within the PSOW.
1.1.4 Asbestos:
This includes chrysolite, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos,
actinolite asbestos, and any of these minerals that have been chemically treated and/or
altered.
1.1.5 Asbestos Containing Material (ACM):
Any material that contains one percent or greater (>1%) asbestos as one of its
components. Asbestos fiber may be found in vinyl or resilient floor coverings, drywall,
roofing felts and ceiling tiles, cement pipe, cement sheet, and shingle. Asbestos fiber
may be a component in gaskets and packing, in reinforced plastic molding compounds, in
coatings and sealants, and in friction products, including brake linings, clutch facings,
and industrial linings for equipment and appliances. For purposes of the OSHA Asbestos
Standards, any thermal system insulation (TS1), sprayed-on or troweled-on surfacing
materials, or vinyl/asphaltic flooring materials in building constructed prior to 1981 are
presumed to be ACMs, unless proven otherwise by testing.
1.1.6 Background:
Means the concentration of a naturally-occurring contaminant in like lithology and soils
within close proximity to, but not affected by, a release.
1.1.7 Best Management Practices (BMPs):
Shall have the meaning as contained in A.R.S. § 49-201(3) and any definition shown
herein is superseded by the current statutory definition.
1.1.8 Competent Person:
For general purposes of this RFQ: One who is knowledgeable about construction safety
and health and, through training and certification, is capable of identifying existing
asbestos hazards in the workplace. A competent person has expertise to select the
appropriate strategies for controlling exposure to asbestos and the authority to take
prompt corrective measures to eliminate the hazards. This person has to be specially
trained in a course which meets the criteria of EPA's Model Accreditation Plan, or
equivalent, for project designer or contractor/supervisor, and/or must be trained in an
EPA O&M course, or equivalent, dependent upon the type of work. The competent
SERIAL l3134-ITN
person must receive annual refresher training to maintain certification. The term
"Competent person" shall also apply to all other OSHA-defined situations.
1.1.9 Conflicting Party:
Shall be defined as any person who may be responsible under any state or federal law for
pollutants which are present in, or threaten, the Project area defined within the PSOW.
1.1.10 Contaminant:
Means a substance, which is known or suspected to have an adverse impact on human
health or the environment when released, emitted, discharged, or spilled into the
environment.
1.1.11 Cost Effectiveness/Fair Market Price:
Means a price based on reasonable costs under normal competitive conditions or as
otherwise determined in the best interests of the County, is technically feasible for design
and implementation including operation and maintenance over the period of reasonably
expected human and environmental exposure to such substances, and is not based solely
on lowest possible cost.
1.1.12 Deterministic Risk Assessment Methodology:
Means a point-specific risk assessment. In the equation used to calculate risk, each
parameter of exposure and toxicity is a single point estimate for each receptor evaluated
(i.e., lifetime resident, adult resident, or young child resident). Upper-bound values are
generally used in the risk calculation and the resulting risk estimate is likely to overstate
the actual risk to any one individual.
1.1.13 Essential Equipment:
Equipment, as identified by the Contractor in their proposal, is equipment the Contractor
has determined as essential for completion of the applicable Scope of Work.
1.1.14 Person:
Shall have the meaning as contained in A.R.S. § 49-201 and any definition shown herein
is superseded by the current statutory definition.
1.1.15 Pollutant:
Shall have the meaning as defined in A.R.S. § 49-201 to mean fluids, contaminants, toxic
wastes, toxic pollutants, dredged soil, solid waste, substances and chemicals, pesticides,
herbicides, fertilizers, other agricultural chemicals, incinerator residue, sewage, garbage,
sewage sludge, munitions, petroleum products, chemical wastes, biological materials,
radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt,
mining wastes, industrial wastes, municipal wastes, agricultural wastes, or any other
liquid, solid, gaseous or hazardous substances.
1.1.16 Probabilistic Risk Assessment Methodology:
Means substituting probability distributions for the point estimate input variable in the
equations used to calculate expose dose and risk. The resulting distribution provides a
full characterization of risk and corresponding risk percentiles for all exposure levels.
1.1.17 Project Scope of Work (PSOW):
Is a scope of proposed work for a specific site or Project, with other relevant additional
information and requirements such as site descriptions and additional invoicing
requirements, prepared by the Using Agency to obtain an offer from the Contractor of a
SERIAL 13134-ITN
firm-fixed price to perform the work, their methodology of approach, Key Personnel to
be assigned, any other factors or details requested, and when applicable, proposed cost
savings or proven technical innovations.
1.1.18 Project Offer (PO):
Is an offer prepared by the Contractor in response to a PSOW from a Using Agency.
1.1.19 Project:
Is the formal written acceptance, with any negotiated changes, of the Contractor's PO.
1.1.20 Project Amendment (PA):
Is a formal written change, i.e., "change order," to a Project, negotiated between the
Contractor and Using Agency, which represents a material change in scope, price, or
time.
1.1.21 Regulated Substance:
Shall have the meaning as contained in A.R.S. § 49-1001(14) and any definition shown
herein is superseded by the current statutory regulation. (Regulated substances means:
(a) petroleum, (b) a substance specified in the Comprehensive Environmental Response,
Compensation, and Liability Act of 1980, but not including a substance regulated as a
hazardous waste under the Solid Waste Disposal Act of 1984).
1.1.22 Remediation or Remedial Action:
Shall have the meaning as contained in A.R.S. § 49-151 and/or A.R.S. § 49-281 and/or
the National Contingency Plan (NCP), Section 101(24) of CERCLA as applicable.
1.1.23 Risk Assessment:
Shall mean a scientific evaluation of the risk to human health and/or the environment
from the exposure to a specific type and concentration of contaminant. A risk assessment
contains four components: identification of potential chemicals of concern; an exposure
assessment; a toxicity assessment; and a risk characterization. The methodologies to
perform or evaluate a risk/assessment shall be deterministic, probabilistic, or an
alternative methodology commonly accepted in the scientific community.
1.1.24 Site:
Shall have the meaning as contained in the applicable section and chapter of the ARS,
Title 49, The Environment, for any portion of any work within the scopes of work in this
contract.
1.1.25 Underground Storage Tank (UST):
Shall have the meaning as contained in A.R.S. § 49-1001(18) and any definition shown
herein is superseded by the current statutory definition. (UST means a tank or
combination of tanks and underground pipes connected to tanks being used or having
been used to contain regulated substances and which has at least ten percent (10%) of the
total volume of the tank and underground portions of pipes connected to the tank
underground. Exceptions to this definition are listed in the statutory regulation.)
1.1.25.1 UST Closure: The removal of an UST from operation.
1.1.25.2 Corrective Actions: The meaning as contained in A.R.S. § 49-1001 and 40
CFR-, ,'Pa)rt 280.60 through and including 40 CFR, Part 280.67 and any
definition shown herein is superseded by the current statutory definition.
(Corrective actions may include the use of biostimulation and indigenous
microbes and bio-augmentation using microbes that are non-pathogenic, non-
opportunistic, and that are naturally occurring.)