250050-CHANGE ORDER #1.PDF

Maricopa County — Formal (2026-05-20)

View PDF Item 68 Meeting page

Extracted text (via pymupdf) 72022 characters
CLERK OF THE BOARD 
MARICOPA COUNTY

Project 2250013590 
 
May 5, 2026 (Amended Proposal to September 29, 2025 (Original)) 
 
Donald Bump 
Capital Project Manager 
Facilities Management 
401 W. Jefferson Street Phoenix, AZ 85003 
RE: Proposal Scope Letter for MCSO Food Factory Refresh – Building 1962 
Mr. Bump, 
 
Below is the proposal scope description for phase one design services to complete the MCSO Food 
Factory – Interior Refresh, Facility Assessment, Programming / Needs Determination, Concept 
Planning, and partial schematic design services. While the phase one services are limited to defining 
the scope and ultimate direction for this project, as outlined in Maricopa County Facility Management 
Pre-proposal correspondence dated August 26, 2025 it is the understanding the design professional is 
to provide Architectural Services and Construction Administration services for full design and 
construction administration services, including but not limited to architectural, structural, mechanical, fire 
protection, plumbing, electrical and security disciplines, as well as food service and cost estimating 
specialty consultants. In the event of a conflict between the underlying County contract #250050-ROQ 
used to procure these services and this Amended Proposal, the terms and conditions of the Contract 
will prevail.  
 
 
SCOPE OF WORK 
  
Part One covers the needs assessment and masterplan for renovating the 1962 Building in scope of 
104,782 square feet Central Food Production facility, which supplies several jail locations. The existing 
food factory facility is located at 3150 W. Lower Buckeye Road, Suite A-E, Phoenix, AZ 85009.  
 
The work includes conducting a Facility Conditions Assessment (FCA) (including the Scanning & 
Documentation) of existing conditions, Programming and Operational Analysis of current facility 
operations, conceptual design, and cost estimates for three scenarios, foodservice project analysis, and 
scenario narratives documenting the work for each option. Upon determination and review of the three 
options, during partial Schematic Design the Design Professional will refine one of the three new facility 
operational selected options and provide an opinion of probable cost estimate of the construction cost 
and overall project cost parameters.  
 
Initial Planning Scenarios (to be refined during Programming & Operational Analysis) 
 
1. Baseline modifications to existing conditions utilizing FCA data, allowing for minimal operational 
modifications. 
2. Partially implemented modifications to existing conditions utilizing FCA data, addressing 2-4 
major areas for operational improvements.  
3. Fully implement a new operational plan to existing conditions utilizing FCA data, addressing  
significant operational improvements. 
Food Service Consultants will assist and develop a food service operational analysis to support the 
development of the three scenarios identified. Further, Group I (fixed) and Group II (major moveable) 
will be identified, with conceptual equipment layouts including existing, future, and Owner-furnished 
equipment will be determined during Part One of this project. Food Service costs opinions will be 
developed for each scenario. Note that while Food Service Consultants’ portion of the work’s final report 
will include foodservice equipment concepts and cost opinions, Scope and Time opinions for

Page 1 of 8 
 
Project       2250013590 
 
subsequent phases of the Work, will depend on the scope determined upon completion of the Phase 
One Master Plan. 
 
Additionally, as a part of the Phase One scope the Design Professional will prepare partial 25-percent 
Schematic Design submittal. From the three options prepared in the ‘Programming / Needs 
Assessment’ services, working with the Owner one of the three options will be further developed to 
indicate the greater degree of detail needed to refine the preferred design option and opinion of 
probable cost. Supplemental information developed in this portion of the work would include, but not 
limited to,  
 
• 
Architectural Plans, Interior Elevations, Sections, and Specific Details – with Phasing Overlay 
considerations. 
• 
Food Service Equipment Plans – with Phasing Overlay. 
• 
Food Service – Update to Operational Plan recommendations.  
• 
Code and Security Concept Diagrams. 
• 
Structural, Mechanical, Fire Protection and Electrical Narratives – with systems diagrams 
where needed. 
• 
Updated Cost Opinion, based on prepared supplemental information. 
• 
Implementation plan and project schedule recommendations.  
 
WORK PLAN & DELIVERABLES  
 
Initial considerations, we have developed the following work plan task targets and deliverables to 
illustrate our proposed approach for this project. It briefly describes Design Professional and Food 
Service Consultants’ design tasks, work session objectives, and deliverables for Phase One.  
  
  
PHASE ONE – PROGRAMMING & CONCEPTUAL DESIGN  
 
Primary Tasks  
 
• 
Scan Existing Conditions – Develop Matterport background information for Revit / CAD 
implementation.  
• 
Confirm goals of the project and define existing Operational Plan conditions. 
• 
Document ‘Owner’s Program’ requirements and foodservice program elements.  
• 
Develop and confirm preliminary space program (with adjustments for three options)   
• 
Develop and confirm preliminary food service equipment requirements.  
• 
Prepare three conceptual designs (for Initial Planning Scenarios)  
• 
Prepare opinions of Probable Cost for each option, including foodservice equipment cost 
estimate. 
Deliverables  - Programming & Conceptual Design 
  
• 
Meeting minutes and narrative documenting the information gathered.  
• 
Space program requirements by work center for food service and building components. 
• 
Narrative description of Owner’s Program requirements.  
• 
Preliminary equipment list by work center  
• 
Preliminary equipment cost estimates.  
• 
Design and Foodservice conceptual plans.  
• 
Phasing plans (requirements for each option) 
• 
Engineering / System Descriptions (requirements for each option)   
• 
Utility gross load summary

Page 2 of 8 
 
Project       2250013590 
 
 
Work sessions (key considerations):  
 
Programming – In-Person Work session (Design Professional and Food Service Consultant) 
 
• 
Review long-range plans, project goals and objectives, project responsibilities, schedule, and 
documentation requirements with the project team.  
• 
Verify design criteria including menu, hours of operation, production volumes, staffing levels, 
production methods, tray assembly options, and other relevant criteria. 
• 
Develop Program Documentation (for each option) with existing condition comparisons.  
• 
Verify all major existing equipment.  
o 
Meet with facilities and foodservice staff as available to discuss current operation and 
current  state of the equipment and facility, including limitations and flagged health 
department issues.  
o 
Visually assess the condition of the existing kitchen and storage areas to identify 
potential equipment and operational concerns or code-related issues. We will not be 
able to visually ascertain the current working condition of the equipment and will rely on 
site operators, maintenance, and facilities personnel to advise on equipment that has 
required significant and/or frequent repairs.  
• 
Discuss critical adjacencies and traffic patterns within facility and department.  
• 
Discuss next steps, required information and documentation.  
  
Conceptual Design – Design Professional in-person, Food Service Consultants via Web Conference(s)   
 
• 
Review developed conceptual design options and existing conditions. 
• 
Discuss major equipment by work center.  
• 
Review programmatic opinions of probable cost foodservice equipment budget.  
• 
Review available utilities and utility preferences with the project engineers.  
• 
Discuss phasing options and priorities with the project team.  
  
Conceptual Design Review & Budget Options  – Design Professional in-person, Food Service 
Consultants via Web Conference(s) 
 
• 
Review revised conceptual designs for each option.  
• 
Review the phasing plan for each option.  
• 
Determine the preferred design.  
• 
Refine major equipment requirements and preferences.  
• 
Review opinions of probable cost foodservice equipment budget.  
• 
Review of the engineering solution recommendations and utility gross load summary 
 
Schematic Design Review & Supplemental Budget Recommendation – Design Professional in-person, 
Food Service Consultants via Web Conference(s) 
 
• 
Review revised schematic designs for the preferred option.  
• 
Review the phasing plan for the preferred option.  
• 
Refine major equipment requirements and preferences.  
• 
Review opinions of probable cost foodservice equipment budget.  
• 
Review of the engineering solution recommendations and utility gross load summary

Page 3 of 8 
 
Project       2250013590 
 
As a follow-up to the April 1,2026 scope, schedule, and  project direction meeting associated with 
Option 4, we have developed the following work plan task targets and deliverables to illustrate our 
proposed SD/CA approach for this project. It briefly describes Design Professional and Food Service 
Consultants’ design tasks and objectives for the SD/CA phase of services.  
  
  
SD/CA – SCHEMATIC DESIGN THROUGH & CONSTRUCTION ADMINISTRATION  
 
Part - Schematic Design Services: 
A. 
Shive-Hattery will review with the Owner information pertaining to site utilities 
requirements, criteria and Owner provided items. 
B. 
Shive-Hattery will revise Owner’s program, develop floor plans, provide technical 
development of Phase One planning concepts, and image material for the further 
development of Option 4. Additionally, we will further develop material and system 
selections to comply with Owner’s program and budget parameters. 
C. 
Shive-Hattery will meet with AHJ's officials to discuss project requirements. 
D. 
Shive-Hattery will prepare Building Code Analysis. 
E. 
Modify the site and building layouts, based on owner comments and provide updated 
design development documents to owner for approval. 
F. 
Provide updated estimate of probable costs, based on schematic design directions 
obtained from client meetings.  
Part - Design Development Documents. 
A. 
Based on the Owner’s approval of the Schematic Design Documents, and on the 
Owner’s authorization of any adjustments in the Project requirements and the budget for 
the Cost of the Work, the Architect shall prepare Design Development Documents for the 
Owner’s approval. The Design Development Documents shall illustrate and describe the 
development of the approved Schematic Design Documents and shall consist of 
drawings and other documents including plans, sections, elevations, typical construction 
details, and diagrammatic layouts of building systems to fix and describe the size and 
character of the Project as to architectural, civil, structural, mechanical and electrical 
systems, and such other elements as may be appropriate. The Design Development 
Documents shall also include product specifications that identify major materials and 
systems and establish in general their quality levels. 
B. 
The Architect shall update the estimate of the Cost of the Work.  
C. 
The Architect shall submit the Design Development Documents to the Owner, advise the 
Owner of any adjustments to the estimate of the Cost of the Work, and request the 
Owner’s approval.  
Part - Construction Documents.  
A. The documents will include Architectural, Food Service, Structural, Mechanical, Electrical 
and Civil technical documents and bid specifications.  
1). Site Plan/Construction Documents: 
1. Based on design developed site layout, review with the owner to obtain 
comments, finalize utility, earthwork, and site paving documents 
2. Prepare construction documents for approved layout in accordance with the 
local standards. 
2). Construction documents to include the following sheets:

Page 4 of 8 
 
Project       2250013590 
 
1. Site layout plan following the design requirements. 
2. Site grading plan providing finish grade information for proposed site and 
parking improvements as well as define a proposed finish floor elevation for 
the proposed building. 
3. Site utility plan to include proposed storm sewer, including design 
information for areas of above ground detention as required by the city. 
Utility plan will also include design of water service information from the 
assumed connection locations adjacent to the selected property to the 
building. Any additional design pertaining to gas, electric, and 
communications that may be required will be shown on the plan as 
provided by Owner and are not included in our current scope of services. 
Performance specification for sanitary septic system, which shall be 
designed by Contractor. 
4. Architectural plans including but not limited to, reflected ceiling, elevations, 
details, schedules, and code plans. 
5. Engineering plans include but not limited to, foundation, framing, HVAC, 
Plumbing, fire protection, electrical power and lighting, and special systems 
for data, communication, security.  
B. 
Provide general construction notes and construction details of proposed improvements 
in concert with FMD Standards, project requirements, as well as integration of 
Construction Manager as Risk (CMaR) considerations. 
C. 
Provide specifications for improvements that shall reference local standards with any 
deviations noted on the drawings. 
D. 
For the site area contemplated for this project, we may include site lighting design or 
photometrics in our current scope of services. Lighting layout, cut sheets or poles and 
fixtures, and photometric plans may be required, and can be provided if necessary.  
 
Part - Construction Administration (CA).  
Based on ‘Technical’ Construction documents prepared by Shive-Hattery (drawings and 
specifications) for the building and site components for the purposes of bidding or establishing 
as guaranteed maximum price (GMP) construction contract. 
Bidding & Negotiation (within the CA Phase): 
A. 
Shive-Hattery will administer issuance of the Bid Documents and Specification for in 
accordance with public bid requirements, for a prime GMP combined construction 
contract. It is anticipated that the project will be bid in a single issuance.  
1). Bid Document printing, applicable fees and permits by owner. 
Construction Administration: 
A. 
Shive-Hattery will respond to questions from the Client and the Contractors. 
B. 
Shive-Hattery will review shop drawing and product date submittals from the Contractor. 
Reviewing submittals more than twice will be handled as an additional service, at the 
expense of the Contractor. 
C. 
Shive-Hattery will review and certify Contractor application for payments monthly. 
D. 
Shive-Hattery will administer construction modification procedures working within FMD 
standards and requirements. Owner directed change orders and construction change 
directives will be administered accordingly.

Page 5 of 8 
 
Project       2250013590 
 
E. 
Shive-Hattery will perform site visits during the construction period. These visits include a 
preconstruction conference(s), a minimum of once-a-month progress meetings and field 
inspections for the anticipated eighteen-month construction schedule, specific topic field 
inspections, one substantial completion review and one final inspection for each of the 
two proposed phases of the Work. 
 
Design Schedule – Phase One + SD/CA 
 
Phase One Design Start – October 6, 2025 
Important / Significant Meeting Dates: 
• 
Programming – In-Person work session, 1 day between October 14 – 16, 2025. 
• 
FCA - Scanning of Existing Conditions, targeted week of October 13-17, 2025.  
• 
Programming (follow-up) / Conceptual Design work session, 1 to 1.5 days between 
November 17-19, 2025. 
• 
Conceptual Design Review & Budget Options work session, 1 to 1.5 days between 
December 15-18, 2025. 
• 
Schematic Design Review work session, 1 to 1.5 days between January 26-28, 2026. 
• 
Owner’s review (Phase One) deliverable, week of February 2-6, 2026. 
Phase One Milestone Dates: 
• 
October 14-15, 2025  
o 
In-Person work session 1 – Programming  
• 
October 27-28, 2025  
o 
Scanning of Existing Conditions  
• 
November 17, 2025  
o 
Facility Conditions Assessment Initial Walkthrough (afternoon)  
• 
November 18-19, 2025  
o 
In-Person work session 2 – Programming follow-up / Conceptual Design work 
session  
• 
Early December 2025  
o 
Comprehensive FCA walkthroughs  
• 
December 16-18, 2025  
o 
Conceptual Design Review work session  
• 
January 26-28, 2025  
o 
Final review of four options for Master Plan Report.  
• 
February 13, 2026  
o 
Final FCA Report and Options Documentation   
• 
April 1, 2026 
o 
Planning Meeting to confirm scope, schedule, and project direction. 
• 
April – May 2026 
o 
25% Schematic Design Phase One Design Services, to be folded in with balance 
of schematic design services. Service commences based on notice to proceed in 
concert with attached milestone schedule.  
o 
Notice to Proceed, Owner Approval _ Option #4 – Programming / Schematic 
Design, dated April 3, 2026. 
 
• 
Future Milestone Design Services, balance of SD through CA – See Proposed 
Schedule Exhibit, dated March 20, 2026.

Page 6 of 8 
 
Project       2250013590 
 
• 
Future Phase Permitting Submission and Testing Services – To Be Determined 
Fee Design Services – Phase One + SD/CA  
 
Phase One, Programming / Master Planning and Partial Schematic Design services,  
for the project shall be based on Pre-Proposal Meeting Agenda dated August 26, 
2025, and the site visit on September 8, 2025. Services based on the selection of 
Option#4, with boiler plant modification design services, and modifications to the 
stipulated services, FMD Allowance, are as follows. (see detailed work sheet for 
further breakdown): 
Existing Contract – 250050-ROQ                                     
Total Fee for Phase 
Programming 
$366,357.00 
Schematic Design – 25% Partial Services 
$163,119.00 
Stipulated Service – SI Allowance 
$  20,000.00 
Stipulated Service – FMD Allowance 
$  40,000.00 
Reimbursable Expenses – FSC Rippe (Travel) 
$    5,000.00 
Reimbursable Expenses – FSC McKesey (Travel) 
$    3,000.00 
SUB TOTAL – Phase One 
$597,476.00 
 
Amended Services per this revision:
 
Schematic Design – Balance of phase 
$  773,135.00, based on Option 4 
Design Development 
$  743,274.00, based on Option 4 
50% Construction Documents 
$  825,950.00, based on Option 4 
100% Construction Documents 
$  807,100.00, based on Option 4 
Construction Administration 
$1,250,093.00, based on Option 4 
SUB TOTAL – Amended Services  
Phase Two (Full Services SD/CA) 
 
$4,929,028.00 Total Fee for Phase One  
Programming/25% SD + Balance SD/CA
$4,399,552.00 
Amended Stipulated Services (If Necessary) _ 
Increase to Existing Contract
 
FMD Allowance – Requested increase to  
balance to $150k  
 
$  110,000.00  
  
SUB TOTAL – Amended Stipulated Services 
$  110,000.00  
 
Amended Reimbursable Expenses 
(Increase to Contracted Expenses)            
  
Estimator - CSQ  (Travel) 
$      2,560.00 
FSC - Rippe & Associates (Travel) 
$    15,600.00 
FSC - MacKessy & Associates (Travel 
$      3,000.00 
SUB TOTAL – Amended Reimbursable Expenses 
$    21,160.00 
Amended - Services, Stipulated Services, and 
Reimbursable Expenses 
Amended SD/CA 
SUB Total of Amended 
$4,530,712.00

Page 7 of 8 
 
Project       2250013590 
 
Total Summary
Phase One + SD/CA
Design Fee Service Totals _ per Exhibit A 
$5,128,188.00 
 
Please let us know if you have any questions or comments at this time.  
Sincerely, 
 
SHIVE-HATTERY, INC. 
 
 
 
Michael S. Lewis, AIA, NCARB 
Team Leader – Principal / Public + Government 
mlewis@shive-hattery.com 
/LL  
 
Attachments  
-   MCSO AE Proposal 4-21-2026 (Phase One – Spreadsheet; separate file)  
 
 
 
-   MCSO Food Factory 3-20-2026 (Preliminary Milestone Schedule; separate file) 
 
 
 
-   FSC_Rippe Proposal dated 03-16-2026.pdf (8 pages) 
- FSC_MacKesey Proposal dated 03-17-2026.pdf (4 pages) 
- Fire Protection – Senez Proposal dated 3-17-2026 (6 pages) 
- MEP Pearson Proposal dated 3-17-2026 (3 pages)  
- MEP Pearson Steam Boiler Plant Proposal dated 3-27-2026 (3 pages) 
- Cost Opinion Proposal (CSQ) dated 3-18-2026 (2 pages) 
 
cc: 
 T. John Price, AIA - Project Manager/ Studio Leader 
 
Liam Larkin, Project Architect

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 1 of 8 
Proposal 
Foodservice Facilities Design 
 
Maricopa County Sheriff’s Food Factory 
Phoenix, AZ 
 
March 13, 2026 
 
SCOPE OF WORK 
Part B of this work involves Schematic Design, Design Development, Contract Documents, Construction 
Administration, and Project Closeout of the equipment contractor’s work. This project includes 
development of a foodservice design for the renovation of a 100,000 SF Central Food Production facility 
which serves multiple jail locations. The Group I (fixed) and Group II (major moveable) designed 
equipment cost including existing, future, and Owner-furnished equipment is expected to be less than 
$8,800,000. 
 
The Consultant will coordinate the foodservice layout and equipment with the architectural, mechanical, 
electrical, plumbing work, interior design, and point-of-sale systems. This proposal, however, does not 
include work in these disciplines.  
 
WORK PLAN & DELIVERABLES 
We have developed the work plan below to illustrate our proposed approach for this project. It briefly 
describes the foodservice design tasks, worksession objectives and deliverables for each phase. 
 
PART A  
PHASE I – PROGRAMMING & CONCEPTUAL DESIGN -COMPLETED 
 
PART B  
PHASE II – SCHEMATIC DESIGN 
Primary Tasks 
• 
Develop ¼” numbered equipment plans in Revit and corresponding equipment schedule  
• 
Prepare a foodservice equipment cutsheet booklet showing buy-out equipment, accessories, and 
utility requirements 
• 
Update the equipment cost estimate 
• 
Coordinate equipment requirements with architectural and engineering team members

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 2 of 8 
Deliverables 
• 
¼” Numbered equipment plan and schedule 
• 
Numbered equipment booklet 
• 
Sketch elevations 
• 
Detailed cost estimate 
• 
Exhaust hood sizing and coordination of refrigeration systems to utilize existing system 
• 
Provide utility gross loads to engineers to size overall systems 
 
Worksessions 
Plan Review – In-Person Work session 
• 
Review the equipment plan 
• 
Confirm equipment and manufacturer preferences 
 
Plan and Elevation Review – In-Person Work session 
• 
Review the equipment plan and equipment with the operations team  
• 
Determine equipment options and accessories 
• 
Review revised drawings and elevations of workstations 
• 
Review room finish preferences and counter material options with the project team 
 
Approvals 
Project team approval of foodservice equipment selections, drawings, and cost estimates are required 
prior to proceeding with Design Development   
   
PHASE III – DESIGN DEVLOPMENT 
Primary Tasks 
• 
Revit 3D Plans for detailed elevation reviews 
• 
Update the equipment cost estimate  
• 
Prepare foodservice equipment specifications 
• 
Verify code requirements with authorities having jurisdiction  
• 
Prepare mechanical and electrical spot connection plans and scheduled MEP drawings 
• 
Coordinate equipment requirements with architectural and engineering team members  
• 
Coordinate interiors elements with design team 
 
Deliverables 
• 
¼” Numbered equipment plan and schedule 
• 
Numbered equipment booklet 
• 
Detailed 3D drawings and VR-ready model 
• 
Detailed cost estimate 
• 
Mechanical and electrical drawings  
• 
Provide utility consumption information to assist with LEED/energy credits

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 3 of 8 
Worksessions 
Plan Review – In-Person Work session 
• 
Review the equipment plan 
• 
Confirm equipment and manufacturer preferences 
 
Plan and Elevation Review – In-Person Work session 
• 
Review the equipment plan and equipment with the operations team  
• 
Determine equipment options and accessories 
• 
Review 3D drawings and elevations of workstations 
• 
Review room finish preferences and counter material options with the project team 
• 
Finalize existing equipment inventory 
 
Approvals 
Project team approval of foodservice equipment selections, drawings, and cost estimates are required 
prior to proceeding with Contract Documents.   
 
PHASE IV – 50% CONSTRUCTION DOCUMENTS 
Primary Tasks 
• 
QA/QC construction drawings and details 
• 
QA/QC foodservice equipment specifications 
• 
Update the equipment cost estimate 
• 
Coordinate equipment requirements with architectural and engineering team members  
• 
Coordinate foodservice design with the interiors team 
 
Deliverables 
• 
Final mechanical and electrical spot connection plans  
• 
Special conditions drawings 
• 
Final cost estimate 
 
Worksessions 
Final Plan and Elevation Review – In-Person Worksession 
• 
Final review of the equipment and plan with the operations team 
• 
Final review of the 3D drawings and elevations of workstations 
 
 
Final Review –Web Conference 
• 
Final review room finishes and counter material options with the project team 
• 
Review the bid process and final documents with the project team 
• 
Final coordination with architect, engineers, and interiors

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 4 of 8 
Approvals 
Project team approval of foodservice equipment selections, drawings, and cost estimates are required 
prior to bidding. 
 
 
PHASE V – 100% CONSTRUCTION DOCUMENTS AND BIDDING 
Primary Tasks 
• 
Finalize construction drawings and details 
• 
Finalize foodservice equipment specifications 
• 
Coordinate Health Department submittals and responses with project team 
• 
Address bidders’ questions 
• 
Issue foodservice contract related addenda 
• 
Review foodservice equipment bids 
 
Deliverables 
• 
Complete bidding documents including: 
o Foodservice equipment plan and schedule 
o Equipment specifications 
o Equipment elevations, sections, and details 
o Recommended bidders list 
• 
Foodservice equipment addenda  
• 
Document recommended Foodservice Equipment Contractor  
 
 
PHASE VI - CONSTRUCTION ADMINISTRATION 
Primary Tasks 
• 
Construction Kick-off Meeting with Architect, Consultant, FSEC, and Contractor 
• 
Review shop drawing submittals to ensure that design standards and intent are met (maximum 
two reviews per submittal)  
• 
Respond to and resolve construction coordination issues  
• 
Coordinate Health Department submittals and responses with project team  
• 
Punchlist visits and follow-up 
 
Deliverables 
• 
Responses to Health Department comments 
• 
Reviewed Foodservice Equipment Contractor submittals 
• 
Responses to Foodservice Equipment Contractor RFI’s 
• 
Foodservice equipment change orders 
• 
Written documentation of any site visit identifying inadequacies and required corrections

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 5 of 8 
Site Visits 
 
Punchlist Site Visit – Phase I 
• 
Inspection after installation is complete to evaluate the project and confirm it is consistent with 
the contract documents.  
 
Punchlist Site Visit – Phase II 
• 
Inspection after installation is complete to evaluate the project and confirm it is consistent with 
the contract documents.  
 
Punchlist Site Visit – Phase III 
• 
Inspection after installation is complete to evaluate the project and confirm it is consistent with 
the contract documents.  
 
PHASE VII – PROJECT CLOSEOUT 
Primary Tasks 
• 
As-built Drawings 
• 
Post-Construction coordination with equipment startup and training issues 
 
Deliverables 
• 
Record Set of Drawings 
 
SCOPE AVAILABLE UPON REQUEST 
The following tasks are not a part of our standard fee proposal, if requested, we will provide a separate 
fee or bill on an hourly basis. 
 
1. Management Consulting – based on operational goals, a variety of services are available ranging 
from assessments to hands-on assistance with transitions. 
2. Equipment Demolition Plans – prepare plans of the existing foodservice equipment indicating 
items to be retained for the project and items to be removed from the site. 
3. Dimensioned Utility Rough-ins or Floor Penetration Drawings – prepare dimensioned utility 
drawings for the construction team indicating the rough-in installation locations for all 
foodservice equipment plumbing, electrical, and ventilation requirements (or if floor penetrations 
indicate the utility locations that come up through the floor). 
4. Interviews with Potential Bidders – produce detailed analysis of each bidders pricing, telephone or 
in-person interviews with bidders. 
5. Contractor Pay Requests – reviewing and approving schedule of values and other pay requests. 
6. Asset Tagging and/or Facilities Management Tagging – if requested, this requirement will be 
added to the Foodservice Equipment Contractor’s submittal requirements. 
7. Additional Shop Drawing Submittal Reviews – if requested, beyond the two reviews included.

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 6 of 8 
  
FEE PROPOSAL 
Our fee for the work outlined in this Proposal is a fixed amount as scheduled below, plus reimbursement 
for out-of-pocket expenses. The fee and maximum number of meetings for each phase are as follows: 
 
On-Site 
Meetings
Fees
Estimated
 Expenses
Phase I
Program & Conceptual Design
Phase II
Schematic Design
2
 $       75,000 
$4,500
Phase III
Design Development
2
 $       90,000 
$4,500
Phase IV
50% Construction Documents
1
 $       45,000 
$1,600
Phase V
100% Construction Documents and Bidding
 $       35,000 
Phase VI
Construction Administration
3
 $     103,000 
$5,000
Phase VII Project Closeout
 $       18,000 
Totals
8
366,000
$     
15,600
$       
Phase
COMPLETED
 
 
Additional Services 
If the project scope increases beyond what is identified under Scope of Work above, the Consultant 
reserves the right to adjust the fee proportionately. The number of meetings included in the Fee Proposal 
chart above will be sufficient to gather information, create a collaborative design solution, and verify final 
details.  If additional meetings are requested, they are available at the hourly rates below plus expenses. 
 
Hourly Rates 
The above fee is based on an estimate of time required to complete the work at the following rates: 
 
Team Member 
Hourly Rate 
Principal/Executive Principal 
$295 
Associate Principal 
$235 
Sr. Project Manager/Sr. Operations Project Manager 
$210 
Project Manager 
$175 
Sr. Equipment Specialist 
$175 
Associate Project Manager  
$155 
Equipment Specialist 
$155 
Revit Designer 
$135 
Administrative 
$115 
 
The Consultant reserves the right to increase these hourly rates consistent with increases to their 
standard rate schedule beginning on January 1, 2027.

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 7 of 8 
 
 
Reimbursable Expenses 
The Consultant will be reimbursed for direct expenses incurred while working on this project. The 
primary expenses are listed below, however, other miscellaneous expenses may be included. 
 
Travel – The Consultant will be reimbursed for out-of-town trips to include direct expenses for meals, 
lodging, mileage at the allowable U.S. federal tax rate, airfare (coach class fare, non-stop when available), 
car rental, parking, and related expenses. Airfare will include cancellation and rebooking fees for flights 
changed per the Owner and/or Architect’s request. 
 
Contract Conditions 
Our fee is based on the following conditions: 
 
1. The Consultant is provided with accurate, dimensioned drawings of the building spaces including 
all obstructions such as electrical conduit, piping, ductwork, and any other vertical elements that 
cannot be relocated. 
2. A suspension of work for a period of more than 90 days is also cause for a fee adjustment. Any 
change in fee will be billed at the stated hourly rates until the revision is completed. 
3. The Consultant will assist project Architects and Engineers with code compliance issues related 
to the foodservice areas. However, this assistance does not relieve these disciplines from their 
code compliance obligations. 
4. The Consultant will submit monthly invoices for work performed and expenses. Payment is due 
within ten (10) days from the date that the Architect receives payment from Owner. The 
Consultant expects that the invoices will be forwarded to the Owner promptly. In any event, the 
Consultant will receive payment not more than 120 days from date of invoice.  Payments made 
after the 120-day due date will be assessed a 1% per month carrying charge beginning 60 days 
from invoice date. Any problems or disputes must be noted, in writing, within fifteen (15) days of 
the invoice date. If invoices over $5,000 are outstanding for more than 120 days from date of 
invoice, the Consultant reserves the right to stop work on the project until payment is received. 
5. This Agreement can be terminated by either party upon written notification. The Consultant is 
entitled to payment for work completed and reimbursable expenses. 
6. Consultant reserves all copyright in the documents, drawings, details, and specifications 
developed and submitted by the Consultant under this contract (“the Works”). Upon full payment 
of Consultant’s fee, Architect and Owner are granted a non-exclusive limited license to use the 
Works for this project only. These documents, or any part thereof, may not be used for other 
projects without the prior written consent of Consultant. The Consultant’s documents may not 
be altered in any way without the Consultant’s written permission. Client assumes full 
responsibility, including responsibility to third parties, for changes made without Consultant's 
written consent. The Consultant’s “Works” are copyright protected.

Rippe Associates, Inc. – Maricopa County Sheriff’s Food Factory  (25.112.00) 
 
 
 
Page 8 of 8 
7. The Consultant carries insurance coverage to the level listed below: 
Commercial General Liability Protection 
General 
 
 
 
$1,000,000 per occurrence/$2,000,000 aggregate 
Products & Completed Work  
$2,000,000 aggregate 
Personal Injury 
 
 
$1,000,000 per occurrence 
Umbrella 
 
 
 
$5,000,000 aggregate 
Professional Liability (E&O)  
$4,000,000 each claim  
 
Any coverage requirement exceeding this amount will be billed as a reimbursable expense at the 
direct cost to the consultant to obtain additional project-specific coverage. 
 
Acceptance of Proposal 
If the terms and conditions in this proposal are acceptable, please sign and return one copy. Thank you 
for the opportunity to present this to you. 
 
Respectfully submitted, 
 
 
Eric Goodrich, Principal 
March 13, 2026 
 
 
Prepared By: Joely Blesener 
 
Signature of Authorized Representative 
Name and Title 
Date of Approval 
P.O. Number

Specializing in the development of quality food service and laundry operations 
 
 
 
 
 
 
 
 
 
 
 
PROPOSAL FOR FOODSERVICE FACILITY AND  
EQUIPMENT DESIGN, SPECIFICATION AND CONSTRUCTION ADMINISTRATION  
 
 
FOR:  
 
SHIVE HATTERY 
 
 
 
Attention: Michael S. Lewis, AIA, NCARB Team Leader, Public + Government  
 
 
 
mlewis@shive-hattery.com 
 
 
 
4125 Westown Parkway | Suite 100  
 
 
 
West Des Moines, Iowa 50266 
 
JOB TITLE:  
Maricopa County Sheriff’s Food Factory  
 
 
 
Phoenix, Arizona 
 
 
 
Foodservice Consulting Services 
 
PROPOSED SCOPE OF WORK 
 
Working in concert with Rippe Associates (Rippe) and following the detailed scope of the Rippe Associates 
proposal, provide professional foodservice consulting services further detailed below. 
 
This proposal includes with supporting necessary information for all mechanical, electrical and plumbing 
information associated with the installation of the specified foodservice equipment. This proposal also 
includes verification of existing refrigeration systems, equipment installation phasing plans and temporary 
service plans. 
 
 
PROGRAMMING AND PRELIMINARY DESIGN CONFIRMATION 
 
Review approved Option Four including design criteria, design program, food production and service 
systems with Maricopa County’s administration, management and staff as well as Shive Hattery(SH). 
 
General foodservice requirements discussions with other administrative principals under the 
Architect's direction. 
 
  
SCHEMATIC DESIGN 
 
Review facility layout for each storage, production and support location and determine and/or confirm 
applicable room configuration and critical dimensions for each function and portion of the project. 
 
Develop preliminary equipment list for food service equipment identifying any potential reuse of 
existing equipment, if applicable. 
 
Working with Rippe, develop a foodservice equipment plan with the identification of related phases. 
 
Confirm remote warewashing area at Watkins for confirmation for use during phased construction 
process.  Identify any auxiliary equipment to support the use of Watkins and transport of soiled and 
clean wares. 
 
 MACKESEY AND ASSOCIATES, LLC.                                              
Foodservice and Laundry 
Design and Management Consultants 
101 Nob Hill Road, Suite 300-C 
Madison, Wisconsin 53713 
Voice: (608) 270-1178 
www.mackesey.com  
   Other Offices Located In: 
Chicago, IL 
Los Angeles, CA 
Orlando, FL

Page 2 of 4 
 
Draft a narrative of the phasing plan to confirm product and staff circulation, necessary use of existing 
or new equipment to allow for uninterrupted storage, production, tray assembly and warewashing 
operations. 
 
 
Perform code review and identify and define the impact of all applicable codes, rules and regulations. 
 
Based on the approved design program and available building space develop preliminary equipment 
layout.  All drawings will be produced in the most recent version of AutoCAD.  All written document 
will be produced in Microsoft Word.  Record copies of all drawings and written documentation with 
be presented in Acrobat Adobe (PDF) files. 
 
Based on the Rippe foodservice facility plan, prepare a revised foodservice equipment budget for 
Group I and II identifying all existing equipment available for reuse. 
 
  
Review the preliminary studies with the County, Architect and authorized personnel. 
 
  
Maintain the design progress of the Architect and other consultants. 
 
  
Attend coordination meetings at designated locations as required. 
 
  
DESIGN DEVELOPMENT PHASES 
 
Assist Rippe in the preparation of a 1/4" scale design development food facilities equipment plan 
utilize the approved schematic drawing indicating location, quantity and type of foodservice 
equipment.  Working with Rippe, review plan with County, the Architect and others under the 
Architect’s direction. 
 
  
  Prepare final phasing plan to allow for continuous foodservice operations. 
 
  
Revise equipment budget. 
 
  
Attend coordination meetings as required. 
 
  
CONSTRUCTION DOCUMENT PHASES 
 
  
Provide review of completed Construction Documents as requested. 
 
  
BIDDING SERVICES 
 
  
Review and evaluate bids for specification compliance as requested. 
 
  
CONSTRUCTION SERVICES 
 
Working with Rippe, review and inventory completed installation for deficiencies in quantity, 
workmanship and material prior to contractor's demonstration. 
 
  
ESTIMATED SCHEDULE 
 
  
Maintain Architect’s schedule. 
 
  
CONSULTANT'S FEE 
 
Basis: Lump sum of $74,000.00 based on the scope and areas listed above, and an estimated 
foodservice equipment cost of $8,800,000.00.  Included in the fee are all costs for telephone, 
document and drawing reproduction, materials, software, etc.   Travel time is included in the fee.   No 
amounts have been included for sales, use or any other applicable taxes or use charges.  In the event 
that taxes are applicable, they will be invoiced as an additional amount at 100% of the tax liability.  
Invoicing shall be made monthly based on a commensurate percentage of the work completed.

Page 3 of 4 
 
  
Fee Breakdown: 
 
Phase 1 
Programming / FCA / Operational  
Complete 
 
Phase 2 
Schematic Design  
 
 
40%  
 
$30,000.00 
Phase 3 
Design Development 
 
 
45%  
 
$33,000.00 
Phase 4 
Construction Documents  
 
  9%  
 
$  6,500.00 
Phase 5 
Bidding 
 
 
 
 
  1%  
 
$     500.00 
Phase 6 
Construction Administration 
 
  5%  
 
$  4,000.00 
Phase 7 
Project Close Out  
 
 
  0%  
 
$         0.00 
 
 
 
 
TOTAL 
 
 
 
 
 
 
 
$74,000.00 
 
No amounts have been included for sales, use or any other applicable taxes or use charges.  In the 
event that taxes are applicable, they will be invoiced as an additional amount at 100% of the tax 
liability.   
 
Additional services beyond the above scope shall be as follows: 
 
 
$190.00 / hour for Principal involvement,  
 
$165.00 / hour for Project Manager / Consultant's time,  
 
$  95.00 / hour for Senior Technical and production staff time, when authorized in writing. 
 
ADDITIONAL SERVICES 
 
The Consultant upon receipt of written instructions from the Client shall provide the following 
additional services, information or material.  Additional services that are not included in the above 
design fee: 
 
• 
Revisions to any approved portions of work. 
• 
Conference, reports or other involvement required due to non-performance or default of 
Contractor. 
• 
Increase in scope of assignment 
• 
As-built drawings. 
 
SPECIAL CONDITIONS 
 
  
Assumes the Consultant is provided with accurate, dimensioned drawings of the building spaces 
including all columns, obstructions such as electrical conduit, piping ductwork and any other vertical 
elements that are fixed and cannot be relocated before the completion of Design Development. 
 
Existing equipment model numbers and mechanical/electrical/plumbing requirements will be 
provided to the Consultant by the Client if they are not readily visible on the equipment during site 
survey. 
 
All documents, drawings, details and specifications, developed and submitted by the Consultant, are 
for this project only.  These documents, or any part thereof, may not be used for other projects. 
 
  
 
TERMINATION OF AGREEMENT 
 
In the event of termination M & A shall then be paid for services performed to termination date. 
 
  
INSURANCE AND MUTUAL ASSISTANCE 
 
M & A shall carry insurance to protect from claims under workman's compensation acts, from claims 
for damages caused by bodily injury, including death, to employees and to the public; and from claims 
for property damage.  Each shall be responsible for the payment to the other of any claims for which 
the other might be held liable because of any deductible clause in such insurance.

Page 4 of 4 
 
  
Mackesey and Associates, LLC insurance coverage is as follows: 
 
  
 
Employer’s Liability 
 
$   500,000.00 per occurrence / $ 500,000.00 policy limit 
  
 
General Liability  
 
$2,000,000.00 per occurrence / $4,000,000.00 aggregate 
  
 
Professional Liability 
 
$1,000,000.00 per occurrence / $1,000,000.00 aggregate  
  
 
Auto Liability 
 
 
$2,000,000.00 combined single limit 
  
 
Umbrella Coverage 
 
$5,000,000.00 policy limit, extending the professional liability 
coverage to $5,000,000. 
  
 
 
In the event that the Architect requires insurance amounts greater than the coverage levels listed 
above, the expense of the additional insurance coverage limits requested by the Architect shall be 
considered a reimbursable expense. The Consultant shall furnish to the Client certificates of 
insurance evidencing the insurance levels listed above. Client’s requirements to be named as 
Additional Insured Coverage for liability arising out of the contractors operations will be reimbursable 
at 100% of the cost. 
 
  
SUCCESSORS AND ASSIGNS 
 
M & A binds itself, its partners, successors, assigns and legal representative to the other party to this 
agreement, its partners, successors, assigns and legal representatives in respect to all covenants of 
this agreement.   
 
STATEMENT OF INDEPENDENCE 
 
Mackesey and Associates, LLC is an independent consulting firm; our firm including any of the firm 
principals or associates do not have any formal or informal relationship with food service 
management companies or equipment suppliers, dealers or manufacturers, other than in a normal 
course of representing the client’s interest.   We receive no compensation other than fees from our 
Clients. 
Submitted By:   
 
 
 
 
Date: March 17, 2026 
 
 
Mackesey and Associates, LLC  
 
Paul A. Mackesey, President

www.senezco.com 
1020 Monarch Street, Suite 175, Lexington, KY, 40513 
March 17, 2026 
Our File: 2600013 MCSO Food Service Facility Change Order 
Rev. 0 
 
Shive Hattery 
209 W 19th Terr, Suite 200 
Kansas City, MO 64108 
 
Attention: Liam Larkin, AIA, NCARB, LEED AP BD+C 
Dear Liam: 
Re: 
MCSO Food Service Facility/Phoenix, AZ – Proposal to Provide Fire Protection Engineering 
Services Change Order 1 
Thank you for the opportunity for Senez Consulting Inc. (SenezCo or Consultant) to provide fire protection 
engineering consulting services to Shive Hattery (Client) with respect to the MCSO Food Service Facility. 
1.0 INTRODUCTION 
Senez Consulting Inc. is a specialist engineering and consulting firm with expertise in building fire safety, 
industrial fire protection, emergency/disaster response planning, and forensics/investigative services. Our 
staff have extensive experience throughout the world and are familiar with the approaches and 
procedures in evaluating fire and life safety designs. Our team facilitates approvals for projects with 
different stakeholders and permits our clients to realize projects on schedule. 
We work closely with clients to address code issues at an early stage of design development to achieve 
favorable outcomes that align with client expectations. SenezCo has offices in several North American 
cities and professional engineers licensed to practice engineering in the US, Canada and locations 
internationally. 
2.0 PROJECT UNDERSTANDING 
The Maricopa County Sheriff’s Office Food Service Facility is an existing, single-story building that is 
approximately 140,000 square feet in area. The building was constructed circa 2000 and is used for food 
storage and food preparation. The building is located within a secure facility. 
Renovations are planned for the building, and the Client has requested a property conditions assessment 
of the building’s sprinkler and fire alarm systems. 
The client has selected Option 4, which requires a fire protection design consisting for fire alarm and fire 
suppression design and fire protection/life safety code consulting.

Page 2 of 6 
www.senezco.com 
2600013 MCSO Food Service Facility Change Order | March 17, 2026-R0 
3.0 SCOPE OF WORK 
SenezCo proposes to perform the following Scope of Work: 
• 
Provide Code Analysis Documentation 
• 
Design fire protection systems that meet the following design milestones: 
o Schematic Design – 25% 
o Conceptual Design – 50% 
o Conceptual Design – 100% 
o Construction Administration (CA) Support 
3.1 
CODE ANALYSIS SUPPORT 
• 
Prepare a fire protection/life safety code report for the project that will address the following 
major fire protection/life safety features: 
o Construction type and associated fire-resistance ratings 
o Allowable height and area 
o Occupancy separation requirements 
o Interior finish requirements 
o Means of egress requirements 
o Fire suppression system scoping requirements 
o Fire detection/alarm scoping requirements 
o Smoke exhaust/control scoping requirements 
o Fire department radio system communication scoping requirements 
o Fire department vehicle access 
• 
 
3.2 
SCHEMATIC DESIGN (25% DESIGN) SUBMITTAL 
• 
Prepare 25% complete drawings and specifications for the automatic sprinkler, fire alarm and 
detection systems and life safety/means of egress. Automatic sprinkler drawings will identify 
areas to be provided with automatic sprinkler protection.  Fire alarm drawings will include 
locations of major equipment.  Specifications will consist of Technical Sections only. Design 
Services will be provided in Revit. 
• 
Review one set of architectural drawings one time for compliance with the major fire 
protection/life safety provisions of the applicable building and fire codes. Provide written 
comments as redline mark-ups on provided PDF drawings with corresponding applicable code 
citations. 
• 
Prepare a draft Fire Protection Design Analysis, as needed, as part of the 25% submittal. 
• 
Identify any alternative means and methods 
• 
Virtually attend 25% review meeting. 
(Optional, or by Prime (Shive-Hattery, Inc.) except as noted.
(By Fire Protection Engineer, as a
part of the Basic Services)

Page 3 of 6 
www.senezco.com 
2600013 MCSO Food Service Facility Change Order | March 17, 2026-R0 
3.3 
50% CONSTRUCTION DOCUMENTS (50% DESIGN) SUBMITTAL 
• 
Prepare 50% complete drawings and specifications for the automatic sprinkler, fire alarm and 
detection systems and life safety/means of egress. Automatic sprinkler drawings will identify 
areas to be provided with automatic sprinkler protection, preliminary hazard classifications, and 
locations of the sprinkler system water supply, fire pump (if applicable) and risers.  Fire alarm 
drawings will include locations of major equipment.  Specifications will consist of Technical 
Sections only. Design Services will be provided in Revit. 
• 
Review one set of architectural drawings one time for compliance with the major fire 
protection/life safety provisions of the applicable building and fire codes. Provide written 
comments as redline mark-ups on provided PDF drawings with corresponding applicable code 
citations. 
• 
Resolve any coordination issues with other disciplines, 
• 
Update the Fire Protection Design Analysis for inclusion with the 50% submittal. 
• 
Virtually attend the 50% review meeting. 
3.4 
FINAL 100% CONSTRUCTION DOCUMENTS  SUBMITTAL 
• 
Issue final drawings and specifications for the automatic sprinkler, fire alarm detection systems 
and life safety/means of egress. The fire alarm drawings will include general device locations, fire 
alarm panel locations, and riser details. The automatic sprinkler drawings will include NFPA 13 
Hazard Classifications, main locations, riser locations, and general hanger and seismic bracing 
details (sprinkler layout will be delegated to the sprinkler contractor).  Specifications will consist 
of Technical Sections only. Design Services will be provided in Revit. Drawings will be signed and 
sealed by a professional engineer licensed in Arizona. 
• 
Review one set of construction document drawings one time (all disciplines) for compliance with 
the major fire protection/life safety provisions of the applicable building and fire codes. Provide 
written comments as redline mark-ups on provided PDF drawings with corresponding applicable 
code citations..  
• 
Issue the final Fire Protection Design Analysis, signed and sealed. 
3.5 
CONSTRUCTION ADMINISTRATION 
• 
Review one (1) complete submittal of the automatic sprinkler and fire alarm systems shop 
drawings, samples, and other information furnished by the contractors for conformance with the 
design concept and compliance with the design documents. Review one (1) complete re-submittal 
of the automatic sprinkler and fire alarm systems shop drawings. Partial or incomplete submittals 
will be returned without review. Once all comments have been addressed, the PE will affix a 
review stamp to the shop drawings. 
• 
Perform one (1) construction observation visit during the construction phase to document the 
installation progress of the automatic sprinkler, fire alarm and fire detection systems.  Prepare

Page 4 of 6 
www.senezco.com 
2600013 MCSO Food Service Facility Change Order | March 17, 2026-R0 
reports describing the installation progress and results of the site visits. Submit the same to the 
Client. 
• 
Perform one (1) final walk-through at the completion of construction to document any 
outstanding deficiencies with the automatic sprinkler, fire alarm and fire detection systems. 
Prepare a final acceptance report which will identify any deficiencies found during the final walk-
through. Submit the same to the Client. 
 
 
4.0 CLIENT RESPONSIBILITIES 
This proposal is based upon the Client performing the following activities: 
• 
Provide SenezCo with copies of available drawings and documents. These documents will be used 
in providing the proposed Scope of Work. It is understood that we will rely upon the accuracy of 
all documents and electronic data furnished. 
• 
Identify any owner-specific fire/life safety related requirements. 
• 
Provide access to project documentation. 
• 
Provide up-to-date project schedule. 
• 
Coordinate with other consultants. 
• 
Prepare and submit any required meeting minutes. 
• 
Provide access to all areas of the building during surveys and site inspections. 
• 
Coordinate the necessary approvals to take relevant pictures and videos to assist in developing 
the report. 
• 
Provide comments on all draft submittals within two (2) weeks of receipt. 
• 
Construction Administration Support is assumed to be 56 hours. 
5.0 PROFESSIONAL FEES 
 
The fixed fee for professional services for the scope of work is outlined in the following table. 
Disbursements, if any, are included in the fixed fee. 
 
Table 1. Estimated Project Fees 
SCOPE ITEM
FEE ($)
Code Analysis Support 
$10,000.00 
Schematic Design (25%) 
$43,300.00 
50% Construction Documents 
$32,800.00 
(Optional)

Page 5 of 6 
www.senezco.com 
2600013 MCSO Food Service Facility Change Order | March 17, 2026-R0 
SCOPE ITEM
FEE ($)
100% Construction Documents 
$32,800.00 
Construction Administration 
$16,000.00 
Total:
$134,900.00
 
 
 
($124,900.00 without Optional)

Page 6 of 6 
www.senezco.com 
2600013 MCSO Food Service Facility Change Order | March 17, 2026-R0 
6.0 ADDITIONAL SERVICES 
Any other work requested by Client outside of the Services specified above shall be considered an 
“Additional Service” and will be conducted on a mutually-agreed-upon basis. When such work is 
requested, SenezCo will submit an estimate of the cost to the Client for approval prior to commencing 
work. 
Additional work may include, but is not limited to: 
• 
Evaluation of building construction type. 
• 
Preparation of variances, code modification requests, or alternate methods of construction and 
attendance at any associated hearings. 
• 
Preparation of Engineering Judgements. 
• 
Review of accessibility conditions and ADA compliance. 
7.0 TERMS AND CONDITIONS 
All fees for the proposed services are in US Dollars. Invoices will be issued monthly. Our standard terms 
and conditions are attached. 
We thank you for the opportunity to submit this proposal. Please let us know if you require any further 
information. 
Kind Regards, 
Senez Consulting Inc. 
Per:  
 
Morgan J. Hurley, P.E., FSFPE 
Vice President 
Authorization to Proceed:
 
 
 
 
Liam Larkin, AIA, NCARB, LEED AP BD+C Date

C
 
 
3/18/26 
 
Mr. Michael S. Lewis, AIA, NCARB 
Shive-Hattery 
4125 Westown Parkway Suite 100 
West Des Moines, IA 50266 
 
Re: 
Maricopa County Department of Corrections 
 
Food Factory Renovations  
 
 
Dear Mr. Lewis, 
We are pleased to provide a proposal for the above referenced project. 
Scope of Project 
The scope of services is based on the following program:  
Sitework as identified in the Concept stage Opinion. 
Building Exterior work as outlined in Concept Stage Opinion 
Renovations for the Food Factory Space 71,000sf +-  
 
 
“Hard Cost” Opinion Development Services 
(1) 
Opinion (Full development) at 100% Schematic Design Stage  
(1) 
Opinion Development at 100% Design Development Stage including CM Cost Estimate Review 
(1) 
Opinion Development at 50% Construction Document Stage including CM Cost Estimate Review 
(1) 
Opinion Development at 100% Construction Document Stage including CM Cost Estimate Review 
 
The following allowances are included in the Each Stage Study: 
• 
(8) hours for scope discussions, Team meetings and reviews based on Teleconferences 
 
The study will be organized by the customary 16 UCI trade categories in our corporate standard format. The study will also include 
Clarifications/Assumptions and Graphic Illustrations of scope of work assumptions for critical elements. 
 
The proposal is based on receiving scalable drawings of the option layout, existing facility construction documents and a 
“Matterport scan of the facility.   
 
Shive-Hattery (Rippe Associates) to provide Kitchen Equipment and installation costing. 
 
The proposal assumes the CMc will be fully engaged and performing preconstruction services including cost 
estimation during the Design Development Phase. We have included peer review cost analysis at each stage     
 
Fee Schedule 
> (1) Schematic Stage Cost Opinion Study Lump sum of $13,870.00 
> (1) 100% Design Development Stage Cost Opinion Update Lump sum of $15,010.00. 
> (1) 50% Construction Document stage Update Lump sum of $11,590.00 
> (1) 100% Construction Document Stage Update Lump Sum of $8,740.00 
 
 
 
 
 
 
 
Total Cost Opinion Services $49,210.00 
 
> Optional Add (1) On-site Walk through including travel and lodging ADD $2,560.00 
  
 
   Please note that the stage estimate prices are for accounting purposes and based on the award of entire scope of services quoted.    
 
Timeline for Delivery: Please allow a minimum of (3) weeks from Receipt of complete set of pricing 
documents as outlined above and Notice to Proceed.  
 
Payment Terms: Net 10 Working days after issuance of invoice 
 
Available Additional Services 
• 
Costing for buildout of the backfill of space   
• 
Detailed Cost/Phasing Analysis 
• 
Alternative Energy or LEED Strategy analysis

C
 
 
• 
Hours that exceed the stated allowances above 
• 
Any On-Site Meetings or Site Walk-thrus (See Alternate Add Price) 
• 
Additional Post estimate issuance Cost Reduction Studies and/or Value Analysis Studies  
• 
Detailed CPM Development for Construction Timeline Scheduling 
• 
Project “Soft Cost” Cost Analysis or Assembly 
Additional Services will be invoiced at a rate of $190.00 per hour on a quarter hour basis. 
 
CSQ is not responsible and will not be liable for any budget changes, additions or constraints requiring a Project redesign either prior to or after 
bidding. After bidding, if the Project comes in over the estimate, CSQ will provide additional estimating support upon request to assist the Design 
Team in its efforts to bring the Project within budget. Unless specifically included in the fees described above, additional fees may apply for such 
support. 
 
 
CSQ shall perform its services to the standard of professional skill and care ordinarily provided by cost estimators practicing in the same or similar 
locality under the same or similar circumstances. CSQ has no control over the cost of labor, materials or equipment, or over market conditions or 
factors that affect contractor bidding or negotiations. CSQ makes no warranty, guarantee, or representation that CSQ’s cost estimates or contractor bids 
will come in under the budget for the work. 
CSQ appreciates the opportunity to be part of the Project Team and look forward to your favorable consideration. 
 
Sincerely, 
CSQ ASSOCIATES, INC 
 
 
 
 
William S. Gorski, Jr CPE, LEED AP,  
President

Exhibit 'A'
Dated: April 21, 2026
Shive-Hattery, Inc.
Subtotal
Fire Protection 
(Senez)
Estimator (CSQ)
FSC (RA)
FSC (PM)
Shive-Hattery, Inc.
Pearson Engineering
Pearson Engineering
Shive-Hattery, Inc.
Shive-Hattery, Inc.
Total Fee for Phase
Architect
Consultants +Eng
FP Consultant
Estimator
Food Service
Food Service
Structural
Mechanical
Electrical
Security
Civil
$366,357.00
$233,064.00
$133,293.00
$7,500.00
$18,150.00
$39,315.00
$9,000.00
$14,000.00
$20,468.00
$17,864.00
$6,996.00
$0.00
$936,254.00
$595,412.00
$340,842.00
$43,300.00
$13,870.00
$75,000.00
$30,000.00
$42,556.00
$37,412.00
$62,648.00
$18,400.00
$17,656.00
$743,274.00
$403,860.00 
$339,414.00
$0.00
$15,010.00
$90,000.00
$33,000.00
$42,556.00
$97,744.00
$38,676.00
$11,572.00
$10,856.00
$825,950.00
$477,396.00
$348,554.00
$32,800.00
$11,590.00
$45,000.00
$6,500.00
$36,492.00
$129,320.00
$52,060.00
$23,800.00
$10,992.00
$807,100.00
$477,396.00
$329,704.00
$32,800.00
$8,740.00
$35,000.00
$500.00
$36,492.00
$129,320.00
$52,060.00
$23,800.00
$10,992.00
$1,250,093.00
$762221.00
$487,872.00
$16,000.00
$0.00
$121,000.00
$4,000.00
$39,688.00
$180,040.00
$82,020.00
$23,800.00
$21,324.00
$4,929,028.00
$2,949,349.00
$1,979,679.00
$132,400.00
$67,360.00
$405,315.00
$83,000.00
$211,784.00
$594,304.00
$305,328.00
$108,368.00
$71,820.00
Shive-Hattery, Inc.
Subtotal
Fire Protection 
(Senez)
Estimator (CSQ)
FSC (RA)
FSC (PM)
Shive-Hattery, Inc.
Pearson Engineering
Pearson Engineering
Shive-Hattery, Inc.
Not Applicable
Total Fee for Phase
Architect
Consultants
FP Consultant
Estimator
Food Service
Food Service
Structural
Mechanical
Electrical
Security
Other
$20,000 
$20,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$150,000 
$150,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 
$0 
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$170,000
$170,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Shive-Hattery, Inc.
Subtotal
Fire Protection 
(Senez)
Estimator (CSQ)
FSC (RA)
FSC (PM)
Shive-Hattery, Inc.
Pearson Engineering
Pearson Engineering
Shive-Hattery, Inc.
Not Applicable
Total Fee for Phase
Architect
Consultants
FP Consultant
Estimator
Food Service
Food Service
Structural
Mechanical
Electrical
Security
Other
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,560.00
$0.00
$2,560.00
$0.00
$2,560.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20,600.00
$0.00
$20,600.00
$0.00
$0.00
$20,600.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,000.00
$0 
$6,000.00
$0.00
$0.00
$0.00
$6,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$29,160.00
$0.00
$29,160.00
$0.00
$2,560.00
$20,600.00
$6,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
Shive-Hattery, Inc.
Subtotal
Fire Protection 
(Senez)
Estimator (CSQ)
FSC (RA)
FSC (PM)
Shive-Hattery, Inc.
Pearson Engineering
Pearson Engineering
Shive-Hattery, Inc.
Shive-Hattery, Inc.
Phase 1 + SD/CA 
Total
Architect
Consultants
FP Consultant
Estimator
Food Service
Food Service
Structural
Mechanical
Electrical
Security
Civil
$5,128,188.00
$3,119,349.00
$2,008,839.00
$132,400.00
$69,920.00
$425,915.00
$89,000.00
$211,784.00
$594,304.00
$305,328.00
$108,368.00
$71,820.00
*Totals from fee summary sheets should roll to a cost summary total sheet
Design Development
Stipulated Services (If Necessary)
Total Summary
Fee Service Totals
FMD Allowance
Special Inspections Allowance
Reimbursable Expenses              
Shive-Hattery (Estimated) - TBD
FSC - Rippe & Associates
FSC - Mackeey & Associates
Estimator (CSQ)
**Use of Additional Services and Reimbursable Expenses shall be in accordiance with procedures outlined in the 
Professional Services Contract
Project Name Fee Proposal - MCSO Food Factory Refresh - Option 4 with Boiler Plant Modifications (+ increased allowance)
TOTAL
TOTAL
TOTAL
Schematic Design
Programming
Basic Services                                 
Proposal Date: 9/29/2025 (Updated 4/21/2026)
Cost Summary Sheet
Architecture Firm Name - Shive Hattery, Inc.
Construction Administration
100% Construction Documents
50% Construction Documents

Exhibit 'A'
Dated: April 21, 2026
Hourly Rate
Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$255.00
240.00
$61,200.00
484.00
$123,420.00
288.00
$73,440.00
144.00
$36,720.00
144.00
$36,720.00
460.00
$117,300.00
$199.00
120.00
$23,880.00
464.00
$92,336.00
208.00
$41,392.00
246.00
$48,954.00
246.00
$48,954.00
624.00
$124,176.00
$184.00
240.00
$44,160.00
732.00
$134,688.00
548.00
$100,832.00
728.00
$133,952.00
728.00
$133,952.00
940.00
$172,960.00
$125.00
350.00
$43,750.00
740.00
$92,500.00
560.00
$70,000.00
960.00
$120,000.00
960.00
$120,000.00
1280.00
$160,000.00
$109.00
154.00
$16,786.00
950.00
$103,550.00
778.00
$84,802.00
960.00
$104,640.00
960.00
$104,640.00
1000.00
$109,000.00
$118.00
232.00
$27,376.00
48.00
$5,664.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$78.00
204.00
$15,912.00
554.00
$43,254.00
428.00
$33,394.00
424.00
$33,130.00
424.00
$33,130.00
1010.00
$78,785.00
1540.00
$233,064.00
3972.00
$595,412.00
2810.00
$403,860.00
3462.00
$477,396.00
3462.00
$477,396.00
5314.00
$762,221.00
$2,949,349.00
Hourly Rate
Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$199.00
6.00
$1,194.00
64.00
$12,736.00
0.00
$0.00
40.00
$7,960.00
40.00
$7,960.00
20.00
$3,980.00
$148.00
29.35
$4,344.00
140.25
$20,754.00
0.00
$0.00
106.00
$15,688.00
106.00
$15,684.00
60.00
$8,880.00
$109.00
18.00
$1,962.00
90.00
$9,810.00
0.00
$0.00
84.00
$9,152.00
84.00
$9,156.00
29.00
$3,140.00
0.00
$7,500.00
0.00
$43,300.00
$0.00
$0.00
0.00
$32,800.00
0.00
$32,800.00
0.00
$16,000.00
150000.00
$132,400.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$295.00
96.00
$28,320.00
120.00
$35,400.00
128.00
$37,760.00
48.00
$14,160.00
40.00
$11,800.00
216.00
$63,600.00
$175.00
30.00
$5,250.00
40.00
$7,000.00
44.00
$7,700.00
40.00
$7,000.00
28.00
$4,900.00
160.00
$28,000.00
$155.00
24.00
$3,720.00
70.00
$11,000.00
80.00
$12,400.00
60.00
$9,300.00
48.00
$7,500.00
120.00
$18,600.00
$135.00
15.00
$2,025.00
160.00
$21,600.00
238.00
$32,140.00
108.00
$14,540.00
80.00
$10,800.00
80.00
$10,800.00
165.00
$39,315.00
390.00
$75,000.00
490.00
$90,000.00
256.00
$45,000.00
196.00
$35,000.00
576.00
$121,000.00
$405,315.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$190.00
40.00
$9,000.00
80.00
$15,200.00
80.00
$15,200.00
24.00
$4,560.00
3.00
$500.00
20.00
$3,800.00
$165.00
50.00
$9,500.00
60.00
$9,900.00
72.00
$11,880.00
6.00
$990.00
0.00
$0.00
1.50
$200.00
$95.00
12.00
$1,140.00
52.00
$4,900.00
62.00
$5,920.00
10.00
$950.00
0.00
$0.00
0.00
$0.00
102.00
$19,640.00
192.00
$30,000.00
$214.00
$33,000.00
40.00
$6,500.00
3.00
$500.00
21.50
$4,000.00
$93,640.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$184.00
28.00
$5,152.00
64.00
$11,776.00
64.00
$11,776.00
54.00
$9,936.00
54.00
$9,936.00
64.00
$11,776.00
$148.00
48.00
$7,104.00
152.00
$22,496.00
152.00
$22,496.00
94.00
$13,912.00
94.00
$13,912.00
112.00
$16,576.00
$109.00
16.00
$1,744.00
76.00
$8,284.00
76.00
$8,284.00
116.00
$12,644.00
116.00
$12,644.00
104.00
$11,336.00
92.00
$14,000.00
292.00
$42,556.00
292.00
$42,556.00
264.00
$36,492.00
264.00
$36,492.00
280.00
$39,688.00
$211,784.00
Architect Total Fee
Senez (Fire) Total Fee
FSC (RA) Total Fee
FSC (PM) Total Fee
Structural Total Fee
Phase Totals
Project Manager
Structural Fee Summary                        
Structural Design Lead - Grade 5
PE - Grade 3
Technical/Drafter - Grade 3
Principal
Principal
PE
Architect / PM  Fee Summary                        
Project Manager
Project Arcitect - Grade 5
Professional Staff - Grade 2
Project Coordinator / Tech - Grade 1 
Phase Totals
Senez Consulting (FP) Summary                        
Technical Staff - Grade 3
Scanning / Matterport Implementation Technical Staff - Grade 4
Equipment Spacialist
Phase Totals
Designer/Drafter
Senior Technical / Production Staff
Phase Totals
Food Service Consultant (RA) Fee Summary                        
Phase Totals
Food Service Consultant (PM) Fee Summary                        
Principal
Project Manager Consultant time
Designer/Drafter
Principal

Exhibit 'A'
Dated: April 21, 2026
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$199.00
40.00
$7,960.00
188.00
$37,412.00
154.00
$30,646.00
154.00
$30,646.00
154.00
$30,646.00
220.00
$43,780.00
$148.00
58.00
$8,584.00
544.00
$80,512.00
280.00
$41,440.00
288.00
$42,624.00
288.00
$42,624.00
564.00
$83,472.00
$109.00
36.00
$3,924.00
332.00
$36,188.00
235.00
$25,658.00
514.00
$56,050.00
514.00
$56,050.00
484.00
$52,788.00
134.00
$20,468.00
1064.00
$154,112.00
669.00
$97,744.00
956.00
$129,320.00
956.00
$129,320.00
1268.00
$180,040.00
$711,004.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$216.00
20.00
$4,320.00
62.00
$13,392.00
48.00
$10,368.00
62.00
$13,392.00
62.00
$13,392.00
104.00
$22,464.00
$148.00
68.00
$10,064.00
226.00
$33,448.00
128.00
$18,944.00
115.00
$17,020.00
115.00
$17,020.00
240.00
$35,520.00
$111.00
32.00
$3,480.00
142.00
$15,808.00
84.00
$9,364.00
195.00
$21,648.00
195.00
$21,648.00
216.00
$24,036.00
120.00
$17,864.00
430.00
$62,648.00
260.00
$38,676.00
372.00
$52,060.00
372.00
$52,060.00
560.00
$82,020.00
$305,328.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$184.00
0.00
$0.00
24.00
$4,416.00
16.00
$2,944.00
12.00
$2,208.00
12.00
$2,208.00
32.00
$5,888.00
$148.00
0.00
$0.00
60.00
$8,880.00
24.00
$3,552.00
24.00
$3,552.00
24.00
$3,552.00
80.00
$11,840.00
$109.00
0.00
$0.00
40.00
$4,360.00
40.00
$4,360.00
48.00
$5,232.00
48.00
$5,232.00
33.00
$3,596.00
0.00
$0.00
124.00
$17,656.00
80.00
$10,856.00
84.00
$10,992.00
84.00
$10,992.00
145.00
$21,324.00
$71,820.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$255.00
16.00
$4,080.00
40.00
$10,200.00
24.00
$6,120.00
32.00
$8,160.00
32.00
$8,160.00
32.00
$8,160.00
$148.00
12.00
$1,776.00
40.00
$5,920.00
24.00
$3,552.00
80.00
$11,840.00
80.00
$11,840.00
80.00
$11,840.00
$95.00
12.00
$1,140.00
24.00
$2,280.00
20.00
$1,900.00
40.00
$3,800.00
40.00
$3,800.00
40.00
$3,800.00
40.00
$6,996.00
104.00
$18,400.00
68.00
$11,572.00
152.00
$23,800.00
152.00
$23,800.00
152.00
$23,800.00
$108,368.00
Hourly Rate Programming Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$150.00
18.00
$2,700.00
16.00
$2,400.00
16.00
$2,400.00
12.00
$1,800.00
10.00
$1,500.00
0.00
$0.00
$135.00
90.00
$12,150.00
72.00
$9,710.00
80.00
$10,850.00
60.00
$8,030.00
44.00
$5,920.00
0.00
$0.00
$110.00
30.00
$3,300.00
16.00
$1,760.00
16.00
$1,760.00
16.00
$1,760.00
12.00
$1,320.00
0.00
$0.00
138.00
$18,150.00
104.00
$13,870.00
112.00
$15,010.00
88.00
$11,590.00
66.00
$8,740.00
0.00
$0.00
$67,360.00
Civil Total Fee
Electrical Total Fee
Security Total Fee
Other Total Fee
Phase Totals
Principal
PE / PA  - Grade 3
Technical/Drafter - Grade 2
Phase Totals
Mechanical Total Fee
Estimator (CSQ)
Principal
Estimator
Technical
Electrical Fee Summary                        
Electrical Design Lead - Grade 7
PE - Grade 3
Phase Totals
Phase Totals
Security Fee Summary                        
Principal
PE / PA  - Grade 3
Professional/Drafting - Grade 1
Technical/Drafter - Grade 2
Civil Engineering Fee Summary                        
Technical/Drafter - Grade 3
Phase Totals
Mechanical Fee Summary                        
Mechanical Design Lead - Grade 6
PE - Grade 3