MAG TIP AND TA APPLICATION INFORMATION FOR PROJECT SUPPORT- FINAL.PDF
Extracted text (via pymupdf_layout)
29384 characters
CMP Reference Code
e . 4. 6,.. . 0 0 0 0 0
DRAFT le g ... z fo 64 M M M M 153
of
Information Lanes x. . 4 0 0 4 6 99
Properties Then ... a- a 4 0 0 0 0 Page
Technical Facility I F ed F unc Cl a ss 3 7 4
On F...7 .. --7 2 131 900 131 140 181
Project Length Mi 0.1 0.0 7.0 1.0 1.6
Project Type Code 140 130 130 120 120
Date to use 2014 0017 2022
Est. Project Ice in 02,2015 0,4, 0,4,2010 0,4, C12,
Total 2,237,455 184,437 2,773,134 25,000900 47,801.952
Project
Total 190,455 109,000 1,947,000 184,437 318,134 2,455,000 25,009,990 47,959 643,983 4,000,000 4,000.000 18,500,000 20,610,000
Phase
Work
100,000 90,455 52,000 38,000 946,075 1,000,925 125,937 58,500 300,000 18,134 2,315,065 139,915 25,000,000 47,969 643,983 4,000,000 2,81)0,000 1,200,000 12,886,199 5,613.801 2,946,203 17,663,797
Funding Amount(s)
Funding
and Source(i)
County Schedule funding HSIP-RGC Local H5IP-RGC Local 1151P-RGC Local CMAQ Local (MAO Local CMAO. Local Local Local Local Local SIP-MAD Local SIP-MAD Local SIP-MAO Local
9/30/2013
Description, Date fund i ng
Committed
Maricopa Printed:
Number(s), Schedule Underway Planned Planned Planned Underway Planned Planned Completed Completed Planned Planned Planned Planned
Identification
Program Year 2013 2014 2015 2014 2013 2015 2015 2009 2009 2019 2020 2021 2022
Phases Safety Center real the
Work Rail Improvements Data of across roadway
Number for enhance utility Control road for
Descriptions Description Improvements Safety Archive to the control Deployment end widening widening widening widening
AU right-of-way Rail Systems and signal Signal widening right•ofrway
Work • Text - FTA Safety for Regional and capacity data. Adaptive (ASCT) bridge roadway roadway roadway roadway
of the adaptive new River roadway of
Rail Acquisition Improvemetns ConStruction Upgrade Equipment archiving traffic Road Technology Construct Fria Pre-Design Pre-Design Acquisition widening Construct Construct
Design time Design Bell Ague Design
: 0
ION(s) TRACS ID
Work TIP ID ADOT Fed 024 MMA13-190 MMA14-190 MMA15-190 MMA14-101 01C CM-MMA•0(242)D MMA15-431D MMA15-461 01C CM-MMA-0(246j MMA11-719 MM008-810 MMA08-810P1
- • • 52065 S20117 v09-20-2013-09-30-2013-06-53-33
Cycle
Program
Life None None None Norte None None None ALCP ALCP ALCP AMP ALCP ALCP
to
RR Rd the
10 85: modifications Mirage over
1 of Location MC El Bridge 2014-2018
at Rd: Rd
Page Description Project Blvd intersection Pleasant Road
Avondale Regionwide Road Valley River Report
County: Project and Bell Deer Lake Dobson Salt
ID ID ID Highway
Maricopa Project IDN(s): MAG STIP RTP ACI.D011-10-01
- - - 20230 21955 28557 27564 16451 TIP
CMP R eference Code
!.2. . gi E.J.. D 0
DRAFT ,i*. ? t F. M M 153
of
Information Lanes After 4 10 100
Properties Thru Before 2 4 Page
Technical Facility Fed Font Cl ass 4 4
On E i-. icl .. 131 131
"7, .2. a ' 1 _ 3 _. 3.0 0.5
77 120 120
Date to use 2014
Est. Project be in 03,2010 04,
Total 22,825,506 7.012,820
Project
Total 2969133 295,983 295,983 253,666 295,983 253,666 295,983 253,666 253,666 3,659,077 6,946,605 9,725,246 83,827 838,268 125,740 838,268 83,827 838,268 1,634,623 2.570,000
Phase
Work
207,188 88,795 207,188 138,795 207,188 88,795 150,879 102,787 207,188 88,795 150,879 102,787 207,188 88,795 150,879 102.787 150,879 102,787 2,561,354 1,097,723 4,862,623 2,083,981 4,862,623 4,862,623 83,827 838,268 125,740 838,268 83,827 838,268 1,634,623 2,570,000
Funding Amount(s)
Funding
and Source(s)
County Schedule Funding
RASP Local RARF Local RARF Local RARF Local RARF Local RARF Local FtARF Local RARF Local RASP Local RARE Local RASP Local RARF Local Local Local Local Local Local Local Local Local
9/30/2013
Description, 7_ „ , ,i, S 2, sis
3 irl- ..-
Maricopa , Printed:
NumberIs Schedule E. .i.;. Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Corripleled Completed Completed Completed Completed Completed Completed
Identification
Program Yea r 2003 2004 2005 2006 2006 2007 2007 2008 2009 2010 2011 2011 2211 2011 2012 2012 2013 2011 2015 2014
Phases
Work roadway roadway roadway roadway roadway roadway roadway roadway
Number for for for for for for fur for
Descriptions Description widening widening widening -of-way widening widening
All right-of-way right-of-way right-of-shop widening right-of-way widening right-of-way widening widening widening widening right-of-way widening right-of-way
Work - Text FM, - of of of roadway of roadway of roadway roadway roadway roadway roadway roadway of right roadway of roadway of roadway roadway
Acquisition widening Acquisition widening Acquisition Widening Design Acquisition widening Design Acquisition widening Design Design Construct Construct Construct Design AcquisItIon widening Design Acquisition widening Design Acquisition widening Construct Construct
:
iDelfs) ID ADOTTRACS Aid ID MMA10-819RWZ5 MMA10-1319RWZ4 MMA10-819RWZ3 300-07AD MMA10-819RWZ2 MMA310-07AD MMA10-1319RWZ MMA-013-931 MMA-09-932 MMA10-801 MMA11-107C2Z MMA11-107CZ MMA11-116D2 MMA11-1150WZ MMA12-116DZ MNIA12-116RWZ MMA12-116D2Z MMA13-116RWZ MMA13-116CZ MMA14-116C2
Work - TIP - - Fed MMA v09-20-2013-09-30-2013-06-53-33
Cycle Program
life ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP
10 Deer to
of Location Rd to Road 2014-2018
2 Bell Bell
Page Description Projeci Rd: Drive Ed: Drive
Mirage Valley Mirage Plcerne Report
County: Project El El
ID ID ID AdI-ELM-10-03 ACI-ELM-20-03 Highway
Maricopa Project !DINO): MAO STIP RTP
• - - 28135 A 7162 A TIP
2 Fil i R I0
P.• 0 0 0 9 0 LI 0
DRAFT Air Quality Area M M M M M k4 M 153
Of
Information Lanes 6 0 2 6 4 0 9 101
Properties ru Th 2 it 2 4 4 0 0 Page
Technical Facility m in .„. LI 4 4 7 4 4 4
On iiTi a a 131 900 900 131 131 131 909
Preject Length 2.0 3.0 4.0 1.6 5,0 5.0 2.1
Project Type Code 120 130 420 120 121 130 310
Date to be in use 111,2015 2015 2015 02,2016 2018 2015 2015
Bt. Project 114, 01, 0.3, 04, 04,
Total 14,753,045 50,850 1,585,900 42,485,495 11,625,000 1,662,000 62.8,667
Project
Total 1,476,675 672,869 1,476,675 5,563,413 5,561,413 50,850 300,000 100,000 1,185,000 641,512 643,983 4,000,000 4,000,000 33,200,000 11.625,000 242,000 1,420,003 628,667
Phase
Work
1,033,672 443,002 471,008 201,861 1,033,672 443,002 1,894,389 1,669,024 3,894,389 1,669,024 36,323 14,522 282,909 17,100 100,000 1,117.455 67,545 641,512 643,983 2,800900 1,200,000 2,800,000 1,200000 8,404,747 24,795,253 11,625,000 242,000 781,456 638,544 $56,747 71,920
Funding Amount(s)
Funding
and Stnece(S)
County Schedule ruling F1J RASP Local KARP Local RASP Local RAPT Local RARE Local CMAC1 Local CMACI, Local Local CMAQ Local Local Local 51P-MAG Local STP-MAG Local STP•MAG Local Local Local CMAG Local MAO. Local
9130/2013
Description, bate Funding
Committed
Maricopa Printed:
Number's), Schedule , ,f Underway Underway Underway Planned Planned Planned Underway Committed Planned COMpleted Completed Planned Planned Planned Planned Underway Planned Planned
identilitetket c.. 4 . 5 9 2023 2023 2014 2014 2015 2014 2013 2013 7015 2009 2009 2017 2019 2020 2015 2013 2014 2015
Pheses
Work roadWay roadway roadway control CapabiHtieS management
Nuniber for for for traffic Roads drainage
Descriptions Description widening widening Dirt Roads widening Widening widening widening intersection menagerrient traffic
ALI right-Of-Way right-of-way rIght-ot-way adaptive Pave widening amd 115 MC85
Work Text FTA roadway roadway for acoulstion Dirt roadway roadway roadway roadway roadway at traffic along lanes
- - of of of work way roadway 35 hike
Acquisition widening Acquisition widening Acquisition widening Construct Construct Construct/Install of Construct/Pave Pre-Design Pre-Design Construct Construct Construct improvements 115 MC ConStrUct/InStall capabilities Construct
Design Right Design Design along
IDNIs): 19 ADOTTRACS ID Aid MMA13-11.4RW7 MMA14-114RW7 MMA13-114RW27 MMA14•114C2 MMAIS-114C2 IMMAI4-104SCT CM-KAMA-0(2431D WWI-811772 MMA17-10302 01C CM-MMA-0(237)A MMA15-441C 01C CM-MMA-0(217)D
Work TIP Fed MMA11-114 MMA12•103 MMA14-103 52116601C MMA08-811 MMA15-402 MMA12-101 MMA14-102
- • - $2021 52099 v09-20-2013-09-30-2013-06-53-33
Cycle
Program
Life ALCP ALCP ALCP ALCP ALCP Wine None None None ALCP ALCP ALCP ALCP AtCP None None None None
Avenue Loop the Usery
10 & Blvd RoadS Oyer Litchfield Silo
of 3 Location Northern Volume Bridge Ave to 76th 2014-2016
Page Description Project Rd. Avenue Wright 23rd Ave Rd:
Llyod Low Read at 75th
Mirage Peoria Various Gilbert River 85 85, McDowell Rd Report
County: Project El to Frank 101 Salt MC MC Rd Pass
ID ID ID Highway
Maricopa Preject ION(S), MAG -STIP RTP Ac1-EttA-20-01 ACI•GIL-20-03
- - 38335 D 27876 269 18552 4586 1425 75377 TIP
Ow. Reference code
.Jr Quality Cod e 0 9
DRAFT 22: 2 w 3..., I NA AI 153
Information Lanes Iv 6 of 102
Properties Thru 97 3 4 4 Page
Technical Facility I Fed Emit Class 3 3
On 2, Fl. q 131 131
Project Length (Mil 2.0 3-5
a 71.., .. .g F.- 120 120
Date to Project use In 02,2023 2028
Est. be 114,
Total 57,697,345 28,443,093
Project
Total 628,553 830,000 375,677 571,558 375,677 571,558 5,696,212 0 7,363,607 20,310,620 9,757,270 5,714,386 4,912,327 925,087 459,142 459,142 1,914,136 1,914,136 11,335,724 23,335,724
Phase
Work
0
630,553 581,000 249,000 262,974 112,703 400,091 171,468 262,974 112,703 400,991 171,468 5,696,212 4,708,914 -4,708,914 2,000040 5,363,607 14,567,434 6,243,136 6,830,089 2,927,181 4,000,009 1,714,286 3,438,629 1,473,698 925,087 459,142 459,142 1,339,896 574.241 1,334,896 574,241 5,662,478 5,673,246 5,662,478 5,671,246
Funding Amountlsi
Funding
and Source(s)
County Schedule Funding RARF Local ITP-MAG Local STP-MA6 Local STP-MAG Local STP-MAG Local STP.MAG Local Local STY-MAD Local STP•MAG Local STY-MAO Lotal MT...MAD Local STY-MAD l Loon SIP-MAO LOCal Local Local Local 5TP.MAG torel SIP-MAO Loral STP-MAG Local STP•MAG Local
9/30/2013
Description, Date Fundi ng
Committed
Maricopa Printed:
Number(s), Schedule 1 Completed Underway Planned Plailned Planned Planned Planped Planned Planned Pldnned Planned Planned Planned Completed Planned Planned Planned Planned Planned Planned
Identification Program Year 1 2009 2013 2017 2017 2018 2018 2013 2018 2014 2020 2020 2020 2020 2004 2925 2026 2026 2027 2027 7028
Phases
Work roadway roadway roadway widening widening widening widening roadway roadway
Descriptions Cleacription Number widening widening for for widening Construct widening roadway roadway roadway roadway widening for for widening widening
ALI roadway widening right.of•way widening right.of•way widening Widening right-of-way right-Okvay
Work Text - FTA - roadway for roadway of roadway of roadway roadway for savings for savings for savings for savings roadway roadway toedWay of Of roadway roadway
REIMBURSEMENT::
Pre-Design Pre-design Design Acquisition Widening Design Acquisition widening Construct widening Construct Project Project Project Project Pre-Design Design Design Acquisition widening Acquisition Widening Construct Construct
: ION(s) TRACS ID
Work TIP1D ADDT Aid Fed MMA03-813 MNIA134.05PD2 MMA17-105DZ MMA17-105RWZ MMA113.105DZ MMA18-1058W2 NIMA18-105C3 NIMA18•105C2 MMA08-812
- - - y09-20-2013-09-30-2013-06-53-33
Cycle Program
Life ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP AtCP ALCP ALCP
(Pinta School the over
10 of Location 101 Bridge 2014-2018
4 Long 5RP-MIC/Alma
Page Description Project Rd: Road
McKellipS to MaellIps River Report
County: Project Fwy) Rd Salt
it1 ID ID Highway
Maricopa Project IDisi, N MAD - STIP • RTP • 81363 ACI.MCK.431- 12163 ACI-MCK-30- TIP
03 03
CMP Reference Code
Si 42 ,1- 0 0 0
DRAFT Zr. 12 3 M M M 153
Information _ Lanes 'After 4 0 0 103 of
Properties Thru 7. g n. 4 0 0 Page
Technical Facility e, 'T . 'S .9 r 3 3
On Is," D. i .‹ 'Pr 900 131 131
Project Length 4.4 12.5 125
P roj e ct Type Code 420 120 120
Date to 2026
Est. Project bemuse n 04,2016 02,2016 02,
Total 2,433,298 1,200,000 4,250,000
Project
o o o
Total 233,298 1137,481 1,062,519 300,000 800,000 100,000 425,000 425,000 425,000 425,003 425,000 425,000 425,000 425,000 425,000 425,000
Phase
Work
220,000 13,298 1.072,645 64,836 1,001,955 60,564 300,000 350,000 -350,000 800,000 350,000 -350,000 100,000 700,003 -700,000 425,000 425,000 425,000 425,000 425,000 425,000 425,000 425,000 425,000 425,000
Funding ernount(s)
Funding
and Source(s)
County Schedule Funding CMAQ Local CMAQ local CMAQ LoCal Local STP-MAG Local Local 5TP-MAG Local Local STP-MAG Local Local Local Local Local Local Local Local Local Local Local
9/30/2013
Description, 5 m S ,'
ii 3 Si a
Maricopa Printed:
Number(* Schedule En E' Underway Planned Planned Underway Underway Underway Underway Underway Underway Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned
Identification
Program Year 2013 2015 2016 2014 2014 2015 2015 2016 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Phases 11 21 right-of- right-of- right-of-
Work (Phase (Phase roadway of roadway of roadway of roadway roadway roadway roadway roadway roadway roadway roadway roadway roadway
Number roads roads For Acquisition for Acquisition For Acquisition for for for for for for for For for for
Descriptions Description
ALI dirt dirt right-ofway widening right-of-way widening right-of-way widening right-of-way right-of-way right-of-way right-of-way right-of-way right-of-Way right-of-way right-of-way right-of-way right-of-way
Work Text FTA project various various
- - paving of REIMBURSEMENT:: roadway of REIMBURSEMENT:: roadway of REIMBURSEMENT:: roadway of of of of of of of of of of
Design seven seven Acquisition widening for Acquisition widening for Acquisition widening for Acquisition widening Acquisition widening Acquisition widening Acquisition widening Acquisition widening Acquisition widening Acquisition Widening Acquisition widening Acquisition widening Acquisition widening
Pave Pave way way way
I TRACS ID
IDNIs) ID AOOT Aid MMA15-434D MMA15-434C 01C CM-MMA-01244)D MM015-434C2 MMA14-119RW2 MMA14-119RWZ MMA15-119RWZ MMA15-119RWZ MMA16-119RWZ MMA16-119RW2 MMA17-121RWZ MMA18-121RW7
Work - TIP - Fed - 52085 v09-20-2013-09-30-2013-06-53-33
Cycle Program
Life None None None ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP
10 Protection Protection
5 of Location ROW ROW 2014-2018
Page Description Project Area Parkway: Parkway;
River Northern Corridorwide Northern Corridorwide Report
County: Proiect New
ID ID ID Highway
Maricopa Project IDNis): MAG STIP RTP ACI-NOR-10- ACTNOR•20-
• - - 15870 17909 03-F 25274 03-H TIP
2 5 2 i do
St n i 0
DRAFT on b. to E M 153
of
Informat Lanes 3i. (i' .-, 4 104
Properties Thru Before 0 Page
Technical Facility Fed Punt G ass 3
On 131
Project Length IMO 0.1
Project Type Code 120
Date to
Est. Project bemuse 02.2037
Total 19,417,642
Project
0 0 0 0
Total 800,000 870,924 9,580,808 8,165,870
Phase
Work
800000 200,000 -200,000 870,914 2,449,399 -2,449,399 9,580,858 10,000,000 -10,000,000 8,165,870 10,707,494 -10,707,494
Funding Amount(s)
Funding
and Source(si
County Schedule Funding STRMAG STRMAG SIP-MAD SIP-MPG
Local Local Local Local Local Local Local Local 9/30/2013
Description, .9 it ,, 2.- :
3 3 1
Maricopa Printed:
Numberis), Schedule 6 Planned Planned Planned Planned Planned Planned Planned Planned
Identification
Program Year 2015 2015 2016 2016 2016 2016 2016 2016
Phases overpass overpass
Work overpass overpass roadway roadway
roadway roadway and and
Descriptions Description Number and Design and Design widening Construct widening Construct
AU widening overpass widerang overpass overpass overpass
Work - Text - FTA roadway roadway
roadway REIMBURSEMENT:: roadway REIMBURSEMENT:: and REIMBURSEMENT:: and REIMBURSEMENT:: and
Design wideningand Design widening Construct widening Construct widening
: ID
IDNisy ID ADOTTRACS Aid MMA14-113027 MMA14-113D27 MMA16-113D2 MMA16-113DZ MMA16-113C2 MMA16-113CZ MMA16-113C22 MMA16-113C22
Work _ TIP - - Fed v09-20-2013-09-30-2013-06-53-33
Cycle Program
Lite ALCP ALCP ALCP ALCP AtCP ALCP ALCP ALCP
10 Dysart
6 of Location 2014-2018
Parkway:
Page Description Project
Northern Overpass Report
County: Project
i0 ID ID Highway
Madonna Project IDN(s), MA6 STIP RTP ACI-NOR-10-
- - - 26961 03-E TIP
CMP Reference Code
Air Quality Code 0 0
DRAF on Air Quality Area M M of 153
Informal Lanes After 4 2 105
Properties Thru Before 2 0 Page
Technical FaciPty F ed Func Class 3 3
On s",' P.: .... -Z' -a o 131 131
Project Length OW — 2.5 125
1 Project Type Code 120 120
Date Project to in use 02,2011 2020
Est. be 04,
Total 24,835,184 3,718,862
Project
Total 2,529,046 981,044 2,726,146 2,510,584 170,705 0 233,752 0 4,740477 0 6,709,404 0 4,234,275 0 338,664 0 545,912 0 2,834,286
Phase
Work
1,770,367 758,729 686,731 294,313 651,204 2,074,942 1,955,677 515,507 170,706 1,412,066 -1,412,066 233,752 1,933,575 -1,933,575 4,740,177 5,530,207 -5,530,207 6,709404 7,827538 -7,827,638 4,234,275 4,939,987 4,939,987 338,664 174,176 -174,176 545,912 563,535 -563,535 2,177,198 657,088
Funding Arnount(5)
Funding
and Source(s)
County Schedule Funding STP•MAG Local SIP-MAG Local SIP-MAD Local SIP-MAD Local Local SIP-MAO Local Local SIP-MAD Local Local STP-MAO Local Local STP-MAG Local Local STP-MAO Local Local SIP-MAD Local Local 5TP-MAG Local STP-MAO Local
9/30/2013
Description, Date Fundi ng
Committed
Maricopa Printed:
Number(s), Schedule Status Completed Completed Underway Underway Underway Underway Underway Underway Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned
Identification i • i ic.' 2012 2012 2013 2013 2013 2013 2014 2014 2014 2014 2015 2015 2015 2015 2018 2018 2018 2018 2419
Work Phases roadway roadway roadway roadway of right-of- roadway of right-of- roadway widening bridge and roadway roadway of right-of-
Descriptions Description Number far and for for Acquisition for Acquisition widening Construct roadway Construct widening Construct DeSign roadway for Acquisition widening
ALI widening right-of-Way construction right-of-Way right-of-way widening right-of-way widening and widening right-of-way widening
Work - Test • FTA roadway of bridge of of REIMBURSEMENT:: roadway of REIMBURSEMENT:: roadway roadway 'REIMBURSEMENT:: bridge REIMBURSEMENT:: widening roadway REIMBURSEMENT:: roadway REIMBURSEMENT:: of REIMBURSEMENT:: roadway roadway
Design Acquisition widening Design widening Acquisition widening Acquisition widening way for Acquisition widening way for Construct widening Construct roadway COnStrUct widening Design widening AcqUisitiori widening Way for Construct
IDN(s) : TRACS ID
Work ID TIP 4001 Fed Aid MMA11-923 MMA11-922 MMAI1-923D2 MMA13-118RW32 MMA13-118RW2 MMA13-118RW2 MMA13-118RW22 MMA13-118RW22 MMA14-113CX MMA14-113CX MMA15-113C2X MMA15-113C2X MMA15-113C9 MMA15-113CX MMA18-12002 MMA18-12002 MMA18-120RW2 MMA18-120RWZ
- - - v09-20-2013-09-30-2013-06-53-33
Cycle Program
Life ALCP ALCP A1CP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP
10 Dysart to Mirage
7 of Location El 2014-2018
Page Description Project Parkway: Parkway: Access
County: Project Northern 111th Northern Alternative Report
ID ID ID Highway
Maricopa Project IDN(s): • MAD - STIP • RIP 33360 ACI-NOR-1O- 03-8 948 ACI-NOR-20- 03-A TIP
i
CHIP Reference Code
l Ai r Quality Code 0 0 0
DRAFT Air Qual ity Area Isl M lvl 153
Information Lanes After 0 6 4 of 106
Properties Thru Before 0 4 0 Page
Technical Facility zi. 3 3 3
On 71 131 131 131
n 9.0 0.5 0.2
' Protect Type Code 120 120 120
Date to Project use in 2021 32,2016 02,2014
Est. be C:2,
Total 23,639,246 8,849,137 13,096,071
Project
Total 15,975,053 2,970,000 3,884,800 800,393 948,624 0 454,932 o 2,905,404 0 2,868,749 2,571,438 o 601,433 572,641 2,284,502 9,637,495
Phase
Work
13,081,161 2,893,892 2,078,747 891,353 2,719,635 1,165,165 800,393 948,624 1300,660 -800,660 454,932 300,000 -300,000 2,005,404 2,339,638 -2,339,638 2,008,124 860.625 2,571,428 3,000,000 -3,000,000 347,606 253,827 540,000 32,641 1,460,000 824.502 4,865,952 4,771,543
foncling Amount(s)
rig
Fund
and 5Ourcei(s)
County Schedule Funding SIP-MAO Local 5TP-MAO Local STP-MAO Local Local Local SIP-MAO Local Local SIP-MAO Local Local SIP-MAO Local SIP-MAO Local Loral SIP-MAO Local STP-MAD Local STP•MAG Local STP-MAG Local SIP-MAG Local
9/30/2013
Description, g R °- a 3:
Maricopa Printed:
NumberIs), Schedule I Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned Planned CoMpleted Underway Underway Underway
Identification • '.. 5
iProgram Year 2028 2019 2020 2021 2014 2014 2015 203 2015 20.15 2016 2016 2016 2012 2013 2013 2014
PhaseS overpasses roadway right-C4- intersection
Work intersection roadway of
Descriptions Description Number improvement DeSign end Delign for Acquisition irciproVement irnpnovement Construct widening widening widening
ALI roadway roadway roadway roadway widening overpasses right-of-way widening widening
Work Text - FTA - interim interim interim interim intersection roadway and of roadway intnrsectinn Intersection roadway roadway roadway roadway
REIMBURSEMENT:: REIMBURSEMENT:: REIMBURSEMENT:: REIMBURSEMENT::
Construct Construct Construct Construct Design improvement Design Widening Acquisition Widening far Way Construct Construct aoproyamant Design Construct Construct Construct
!Dais): TRAM ID
Work ID -TIP ADOT Aid Fed MMA113-1.22C2 MMA14-112D2 MMA14-11203 MMA15-112D2 MMA15-112117 MMA14-112RW2 MMA14-112RWZ MMA15-112C2 MMA15-1121112 MMA15•132C22 MMA12-117123 MMAI3-117C2Z MMA13-117C2 SAMA14-117CZ
- - y09-20-2013-09-30-2013-06-53-33
Cycle Program
Life ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP ALCP
and
10 Interim Northern Reems
of 8 LiscatIon 101 2014-7018
Page Description Project Parkway: Parkway: Loop Parkway: Overpasses
Northern construction Northern at Avenue Northern Litchfield Report
County: Profect
ID ID ID Highway
Maricopa Project IDNIs): MAG - STIP - RIP - 13099 ACI-NOR-10- 03-0 4620 ACI-NOR-10- 03-D 43901 ACNDF610- 03-C -FIR
1 CAI P Reference Cod e
t 'CC g .7" i e 0 0 o 0
DRAFT Air Qual ity A rea M 1,4 17 M 153
of
information Lanes After 6 2 7 2 107
Properties Thru Before 4 2 2 2 Page
Technical Facility ,:p -, e 9 tit 3 7 7 7
On Facil ity Type 131 900 905 900
.12 2, a li I. 4.1 C.I3 o,7 0-7
Project Type Code 120 420 421 420
Data Projectto use In 02,2021 2016 2017 04.2017
Est. be 0.4, 44,
Total 74,860,978 480,000 1.180,250 840.000
Project
Total' 571,429 571.429 571..429 571,429 571,479 571,429 1.473,026 796,000 571,429 3,3E13,000 8,184,000 14,366,141 27,428,750 5,307,902 5,911,146 480,009 1,180,800 840.000
Phase
Work
571,429 571,429 571.429 571,429 571,429 571,429 1,473,026 796,000 571,429 3,196,803 186,197 7,00000 1,184,000 13,798,180 567,961 19,1E0,132 8,228,628 5,026,583 281,319 9,396,272 525,874 452,640 27,560 1,111,740 67,260 792,120 47,880
Funding Amount(sl
Funding
and Sourceisl
County Schedule Funding Local Local Local Lotal Local Local Local total Local SIP-MAO Local SIP-MAO Local SIP-MAO Local STP.MAG Local SIP-MAO local STP-MAO Local MAO. Local CMAQ local cMAQ Local
9/30/2013
Description, Date Fund i ng
Committed
Maricopa , Printed:
Nurnbenis Schedule 6 L'' Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Planned Planned Planned
identification
Program Year 2003 2004 2005 2006 2007 2005 2010 2010 2011 2011 2011 2011 2012 2912 2913 2016 2017 2017
•
Phases
Work roadway roadway
Number for for PhrOa.-
Descriptions Description widening widening widening Widening whdening widening widening widening widening widening widening widening '
ALI right-of-way Widening right-of-way i'\
Work Text - FTA - roadway roadway roadway tordWay roadway roadway roadway of roadway of roadway roadway roadway roadway
rOadWay road road road
Pre-Design Pre-Design Pre•Design Pre-Design Pre-DesIgn Pre-Design Pre-Design Acquisition Widening Pre-DesIgn DeSign Acquisition Widening Construct Construct Construct Construct dirt dkt LaVee dirt
PaVe Pave Pave
:
11301{Sli ADOTTRACS ID Aid
Work ID TIP Fed MNIA03-999 MMA04.998 MMA05•97 eAMA06.596 MMA07-995 MMA09-916 MMA11-10682 MMA11-929 NIMA11-106P22 MMAJO-00900 MMA10-937 MMA10-009C2 MMAI1-106CZ MMA-11-106CZ MMA11-106022 MMA16-401 MMA17-403 MMA17-404
- - -
Cytie 2014-2018v09-20-201-09-30-2013-06-3-33
Life Program
ALCP ALCP ALCP ALCP ALCP ALCP SLOP ALCP SLOP ALCP ALCP ALCP ALCP ALCP SLOP None NOne None
to to Road Road and Street Obey
10 Street 104th of Trail of Avenue,
of Location ParkWay:Sarlyal 103rd and McLellan Valley Wagen 12th Olney ItectleitStreet, Beginning 31st E
9 Road beginning to Dove Road, from to from
Page Description ProjeCt from Butte from Street, 'GAR Valley Street Avenue to from Avenue
County: Northern Dysart McLellan Signal Street maintenance 10th Paint Dove Nth 31st 0.,,,enue AVenue Maintenance 44th Report
Project to to
ID ID Highway
Maricopa Project IDN(s): MAG STIPID REP ACI-NOR-30.
- - - 8666 03-A 20886 8946 7101 TIP
I tanP Reference Code
g e tr. 4 a n . 0 0 0 0 0 0
DRAFT g, g EL 4 2a .if .01 M M ricl M M M 153
eirt of
Lanes 0 6 4 4 2 0 108
informat Properties
._. Thru N -• i 0 0 2 2 2 0 Page
cel ..
Tulin Facility I TI ' R Q E 7 4 4
On t.. — •:t ..ZI 1,3 900 131 531 131 199 900
'Project Length (Pcii) 0.0 3.0 1,0 1,0 0.7 0.0
.-: a v O "g §. • 130 120 120 120 420 130
Date to use -, 2017 2017
Est, Project in 44, 04,2019 43,2015 43,2018 04,2015 C14,
he
Total 779,680 10,245,895 2,800,000 4,680600 289,767 455,979
Project
Total 778,680 2,120,895 500,000 2,075600 5,550,000 2,800,060 4,680,000 39,767 250,00e 455,979
Phase
Work
734,295 44,385 2,000,000 120,895 500,000 2,075,000 5,550,000 7,800,000 4,6130,000 37,500 2,267 750 235, 14,250 429,988 25,991
Funding Amount(s)
Funding
and Source(s)
County SChedine Funding 5113-MAG
CMAQ Local Local Local Local Local Local Local CB1AO Local CMAQ Locol CallA4 Local
9/30/2013
Description, Date Funding 10-May
ricopa committed
Printed:
Ma Number(s), Schedule i.4 'c'4 Planned Underway Underway Planned Planned Planned Planned Underway Planned Planned
identification Program Year 2017 2011 2013 2017 2018 2014 2015 2013 2015 2017
Phases through cameras 5 and widening at
cable any or
Work 1,4C Road (archaeology]
71 CCR/ roadway optic include updates
Descriptions Description Number the to 2 Dobson widening widening fiber will
AU signals install 5 at Clearance tel Way project and software
Work Text - PTA - network, Road Road. of roadway roadway boxes Project needs.
traffic roadway right roadway paving road Sites. RADS
RCN Riggs School Environmental dirt pull
Connect along Alma Widen Acquire Widen Construct Construct Design Pave Install tratiple required integration
the
: TRACA ID
ititi(s) in TIP ADOT Aid Fed MMA17-402 MMA11-113 03D UP-QCR-01001)A 0.NC13-9030 CINC13-903RW ONC13-903 MMA14-401 MMA15-401 MMA15-43617 MMA15-436C 01C CMiMMA-0124510 MMA17-401 -2013-09-30-2013-06-53-33
Week - • - 55605 00086
Cycle
Program
Lite None None None None None None None none None None -20
10 to School to Hawes to 06C y09
of Location Blvd Blvd to Rd to to Maintenance le.
10 Lakes Alma Heights Rd Rd Drive, bar 2014-2018
Page Description Project Sun and Ellsworth Rd Hawes Rd Power Hills of Maintenance 1-ti
Rd, Ave Chandler Rd. Rd, Rd, Rd, F, l Report
County: Project Riggs Arizona Rd, Riggs Riggs Meridian Riggs Ellsworth Riggs Rd Rockaway beginning of End La-k- Various
ID ID ID Highway
Maricopa Project IDN(s): PAAG STIP ATP
• - • 20826 36818 38766 30585 28188 31246 TIP
,
rq
I .071I .
• .
--.I-
- -
.I...—...m.r% .-
'
Transportation Alternatives Application for
FY 2015, 2016, and 2017 Projects
Hospital Pedestrian & Bicycle Crossings ITS Infrastructure
Maricopa County Department of Transportation
APPLICATIONS ARE DUE AT MAG OFFICES BY
Tuesday, October 22, 2013 at 10:00 a.m.
(LATE AND/OR INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED)
Page 1 of 1
Maricopa County: Hospital Pedestrian & Bicycle Crossings ITS Infrastructure
PART A - CONTACT AND PROJECT DESCRIPTION
Contact informatron
1. Name of Sponsoring Agency Maricopa County
2. Agency Contact Name Clem Ligocki
3. Phone Number of Agency Contact 602-506-8672
4. E-Mail Address of Agency Contact clemlioocki(6mail.maricooa.00v
5. Mailing Address of Agency Contact
Maricopa County Department of Transportation 2901
W. Durango St., Phoenix, AZ 85009
Project Description
6. Please provide the Project Title. 'Hospital Pedestrian & Bicycle Crossings ITS Infrastructure
7. Please provide a concise, specific description of the project (250 character limit):
Construct ITS infrastructure and a pedestrian/bicycle crosswalk system to facilitate communication between non-motorized
users' mobile devices and signal systems at Granite Valley Dr & Mentor Ln and Granite Valley Dr & Dachtler Dr in Sun City
West.
8. Please provide the project limits:
The project limits are the two intersections: Granite Valley Dr @ Dachtler Drive and Granite Valley Dr @ Mentor Lane, in Sun
City West.
9. School Name n/a
10. School Address n/a
11. School City, State, ZIP Code n/a
Part A, Pagel of 1
MINEINIEMINIMMI
liiiiiiiiiiiiiiiimommumiiiiiimmi
111111111111111111111
1111111111111111111111111113181118111111
Iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
Ili i1! g
igli' I
! ,g. I SI" ' iii " W I
I h a ' 1. 1 . I 1! " 5 - -'
irLI s ji 1 1::1 I 1 .-1: !Sj II
III I ,.
III 1 :
3 41 F
1
/14 Ili
„ 1-
3
iJi
1 gliM