When Recorded Return to: Flood Control District of Maricopa County 2801 West Durango Street Phoenix, AZ 85009-6399 AMENDMENT NO. 2 TO INTERGOVERNMENTAL AGREEMENT IGA FCD 2010A004 Between MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION and the FLOOD CONTROL DISTRICT OF MARICOPA COUNTY for the RIGHTS-OF-WAY ACQUISITION, DESIGN, UTILITY RELOCATIONS, CONSTRUCTION, CONSTRUCTION MANAGEMENT, AND OPERATION AND MAINTENANCE of the RIGGS ROAD BRIDGE AT SONOQUI WASH MCDOT PROJECT NUMBER TT254 Agenda Item This Amendment No. 2, to IGA FCD 2010A004 is entered into by and between Maricopa County, a political subdivision of the State of Arizona, acting by and through the Maricopa County Department of Transportation, hereinafter called the COUNTY, and the Flood Control District of Maricopa County, a municipal corporation and political subdivision of the State of Arizona, acting by and through its Board of Directors, hereinafter called the DISTRICT. The DISTRICT and COUNTY are hereinafter collectively called the PROJECT PARTNERS. This Amendment No. 2 shall become effective as of the date it has been executed by all parties and recorded by the Maricopa County Recorder. IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 1 OF 8 LATEST REV. DATE 2/5/13 STATUTORY AUTHORIZATION 1. The DISTRICT is empowered by Arizona Revised Statutes (A.R.S.) Section 48-3603, as revised, to enter into this Agreement and has authorized the undersigned to execute this Agreement on behalf of the DISTRICT. 2. A.R.S. Sections 11 -251 and 28-6701 et seq. authorize the COUNTY to layout, maintain, control and manage public roads within the County. 3. A.R.S. Sections 11-951 et seq. authorize public agencies to enter into Intergovernmental Agreements for the provision of services or for joint or cooperative action. BACKGROUND 4. The DISTRICT developed the Queen Creek/Sanokai Wash Hydraulic Master Plan (HMP) to identify and mitigate existing and future drainage and flooding problems in the southeastern area bounded by Queen Creek, Pinal County, and the San Tan Mountains. The HMP recommended a preferred regional solution to the identified flooding problems that includes a channel from the Pinal County border discharging into Queen Creek Wash, identified as Sonoqui Wash Channelization project. The second phase of that project, between Chandler Heights Road and Crismon Road, is hereinafter referred to as the CHANNEL. 5. The COUNTY effected construction of a bridge on Riggs Road at Sonoqui Wash, identified as TT254 in its Transportation Improvement Program (TIP). The PROJECT, as referenced herein, is defined as the Riggs Road Bridge over the CHANNEL at Sonoqui Wash. 5.1 The PROJECT specifically includes the subject bridge and associated piers, abutments, roadway approaches, pavement, roadway landscaping, sidewalks, detour road and roadway/bridge drainage requirements. 5.2 The PROJECT specifically excludes the CHANNEL and associated features (including the CHANNEL approaching and under the PROJECT), which are the subject of existing and potential future DISTRICT agreements with other entities. 6. On March 21, 2001, the Board of Directors of the DISTRICT adopted Resolution FCD 2001R001 (C- 69-05-076-6-00), authorizing the DISTRICT to negotiate Intergovernmental Agreements for the design, rights-of-way acquisitions, construction, construction management, and operation and maintenance of the CHANNEL and other HMP features. 7. On January 27, 2010, the Board of Directors of the DISTRICT approved IGAs FCD 2008A008A and FCD 2009A011 between the DISTRICT and the Town of Queen Creek for the design, rights-of-way acquisition, utility relocations, construction, construction management, operation and maintenance of the CHANNEL, including a crossing at Riggs Road. Per the terms of these IGAs, the CHANNEL will be turned over to the Town of Queen Creek for ownership, operations and maintenance following completion. 8. In October 2010, the Board of Directors of the DISTRICT and the Board of Supervisors of Maricopa County approved IGA FCD 2010A004 (C-69-11-013-3-00) establishing design, utility relocation, IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 2 OF 8 LATEST REV. DATE 2/5/13 construction, construction management, operation and maintenance responsibilities for the PROJECT and associated funding responsibilities. 9. In May 2011, the Board of Directors of the DISTRICT and the Board of Supervisors of Maricopa County approved Amendment No. 1 to IGA FCD 2010A004 (C-69-11-013-3-01 & C-91-11-042-M- 01) modifying the responsibilities for the PROJECT and associated funding responsibilities regarding specific improvement elements, associated construction funding cost share responsibilities, and roadway operation and maintenance responsibilities to accommodate the safety requirements of future roadway improvements. 10. The CHANNEL, constructed in fiscal year 2012, included roadway improvements for Marsh Road and 203'd Place that are to be accepted into the COUNTY's maintenance system. For these roadway components of the CHANNEL, the DISTRICT requested the COUNTY to perform construction management services including, but not limited to, construction staking and layout, materials testing for quality assurance, and inspection 11. The CHANNEL is the second phase of a multi-phase Sonoqui Wash Channelization program. The third phase is Sonoqui Wash Channelization Phase III, hereafter referred to as PHASE III, that includes sub-phases IIIA-1, IIIA-2 and 1E3 Construction on Sub-Phases and BIA-2 commenced in 2012. Sub-Phase II1B will be implemented when funding by the DISTRICT is available. 12. After substantial completion of construction of the PROJECT and CHANNEL, storm events occurred in July 2012 that resulted in sheet overflow of Marsh Road, deposition of debris and sediment, and erosion damage. The DISTRICT repaired the erosion damage and removed debris and sediment. In the interim until full implementation of PHASE III is completed, Marsh Road is anticipated to be subject to recurring sheet overflows and require maintenance for safety. 13. Both the COUNTY and the DISTRICT desire to amend IGA FCD 2010A004, regarding construction management funding and maintenance cost share responsibilities, and roadway operation and offsite stormwater related maintenance responsibilities associated with the CHANNEL. PURPOSE OF THE AMENDMENT 14. The purpose of this Amendment No. 2 is to modify the funding and responsibilities for construction management services and provide for interim maintenance for the Marsh Road and 203rd Place components of the CHANNEL portion of the project due to offsite stormwater flows. TERMS OF THE AMENDMENT 15. The DISTRICT shall: 15.1 Credit the COUNTY against the COUNTY's PROJECT construction cost share, for the COUNTY's costs of eligible Construction Management services requested by the DISTRICT for Marsh Road and 203"1 Place including, but not limited to, construction staking and layout, materials testing for quality assurance, and inspection, which is valued at $62,682.42. 15.2 Reimburse the COUNTY within thirty (30) days of receipt of invoice for actual costs incurred by the COUNTY for maintenance activities, including removal of sediment and debris, which IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 3 OF 8 LATEST REV. DATE 2/5/13 results solely from offsite stormwater entering the roadway across the Marsh Road component of the CHANNEL project. 15.2.1 The stormwater sheet overflow maintenance costs are estimated to be approximately two thousand dollars ($2,000.00) per storm event that results in offsite stormwater flows across Marsh Road. 15.2.2 The DISTRICT will reimburse the COUNTY for actual maintenance costs described in paragraph 16.2 for the interim period until the final phase of construction of PHASE III is deemed by the DISTRICT to be substantially complete. 15.3 The DISTRICT will maintain the Marsh Road box culvert structure flow capacity, providing for removal of debris, trash, and sediment. 15.4 The DISTRICT will maintain the exposed surfaces of the channel-facing headwalls and wing walls, the exposed interior structure surfaces (for example, graffiti treatment), and railings along headwalls and wing walls. 16. The COUNTY shall: 16.1 Within thirty (30) days of the approval of this Amendment No. 2, accept into its maintenance system the Marsh Road and 203rd Place improvements, culvert, and rights-of-way constructed by the CHANNEL project. 16.2 Within fourteen (14) days of a storm event that results in offsite stormwater entering the roadway across Marsh Road, and that requires the COUNTY to perform maintenance to remove sediment and debris, the COUNTY will inform the DISTRICT that reimbursement will be requested. 16.3 Within sixty (60) days of a storm event that results in offsite stormwater entering the roadway across Marsh Road and that requires the COUNTY to perform maintenance to remove sediment and debris, invoice the DISTRICT for the actual eligible maintenance costs incurred. The invoice shall include documentation of actual costs incurred solely for maintenance caused by offsite stormwater entering the roadway across Marsh Road. 16.4 After the DISTRICT deems PHASE III to be substantially complete, the COUNTY shall assume responsibility for all maintenance costs of Marsh Road and 203 rd Place. 16.5 MCDOT will maintain the structural components of the Marsh Road box culvert structure supporting the roadway, including the obligation to provide required periodic inspection and reporting to state/federal agencies where applicable. If MCDOT receives any applications by others to modify the structure, or if it intends to conduct such modifications itself, MCDOT will forward such applications and plans to the DISTRICT Permits Section for review and comment by the DISTRICT. 16.6 MCDOT will maintain the surfaces of roadway components such as pavement, curb, gutter, and sidewalk. 17. This Amendment No. 2 governs where terms conflict with the original IGA FCD 2010A004 and Amendment No.1 . However, the original IGA FCD 2010A004 and Amendment No.1 are applicable IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 4 OF 8 LATEST REV. DATE 2/5/13 unless specifically changed by this Amendment No. 2. The paragraph numbering in this Amendment No. 2 is coincidental and is not intended to indicate that these same numbered paragraphs in the original IGA FCD 2010A004 are being replaced. 18. Attached to this Amendment No.2 or contained herein are the written determinations by the appropriate attorneys for the parties to this Amendment No.2, that these agencies are authorized under the laws of the State of Arizona to enter into this Amendment No.2 and that it is in proper form. 19. If legislation is enacted after the effective date of this Amendment No.2 that changes the relationship or structure of one or more parties to this Amendment No.2, the parties agree that this Amendment No.2 shall be renegotiated at the written request of either party. IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 5 OF 8 LATEST REV. DATE 2/5/13 FLOOD CONTROL DISTRICT OF MARICOPA COUNTY A Municipal Corporation Recommended by: Timothy S. Phillips, P.E. Date Chief Engineer and General Manager Approved and Accepted: By: Chairman, Board of Directors Date Attest: By: Clerk of the Board Date The foregoing Amendment No. 2 to Intergovernmental Agreement FCD 2010A004 has been reviewed pursuant to Arizona Revised Statutes 11-952, as amended, by the undersigned Flood Control District General Counsel, who has determined that it is in proper form and within the powers and authority granted to the Flood Control District of Maricopa County under the laws of the State of Arizona. Flood Control District General Counsel Date IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.04.32 PAGE 6 OF 8 LATEST REV. DATE 2/5/13 MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION A Municipal Corporation Recommended By: tdEg-zo 0 Date Approved and Accepted By: Chairman Date Board of Supervisors Attest By: Fran McCarroll Date Clerk of the Board The foregoing Amendment No. 2 to Intergovernmental Agreement IGA FCD 2010A004 has been reviewed pursuant to Arizona Revised Statutes 11-952, as amended, by the undersigned attorney who has determined that it is in proper form and within the power and authority granted to the Maricopa County Department of Transportation under the laws of the State of Arizona. Attorney for Board of Supervisors Date IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.0432 PAGE 7 OF 8 LATEST REV. DATE 2/5/13 IGA FCD 2010A004A EXHIBIT "A" i • • • @I mam HM4 Mtril N III--- •• m Project I;. •• Location Sonoqui • I Wash • • A Phase II • • Sonoqui Wash Riggs Rad • I i Phase II • • • • • • • • • • • • 00 • m • Sonoqui Wash Phase IIIA-1 & I IIIA-2 • Mari •• • Email Cartimaty Sonoqui Wash Phase IIIB IGA FCD 2010A004 AMENDMENT NO. 2 PCN 480.0432 PAGES OF 8 LATEST REV. DATE 2/5/13