RFQ-REQUIREMENTS ELECTRONIC PLAN REVIEW SOFTWARE.PDF
Extracted text (via pymupdf_layout)
26345 characters
Maricopa County RDSA-IT REQUEST FOR QUOTE REQUIREMENTS SPECIFICATION Regional Development Services Agency Electronic Plan Review Software Replacement Project Version #2 Last Revision Date: 3-22-2013 3-22-2013 Page 1 Maricopa County RDSA-IT Request for Quote Document Approval Stakeholder Title Date Signature Planning and Development Lynn Favour Deputy Director for 3-26-2013 Verbal and email Approval Development Services Branch Lucinda Swann Air Quality Department Permitting Division Manager Environmental Operations Robert Stratman Program Supervisor Permitting Services for Environmental Services Department Division Manager | Waste and Kevin Chadwick Water Management Division of 3-11-2013 Verbal Approval (Phone) the Environmental Services Department Revision History Date Version Description Author/Contributor 3-11-2013 #1 Original Version Hugh Iseman 3-22-2013 #2 After Stakeholder Review Hugh Iseman 3-22-2013 Page 2 Maricopa County RDSA-IT TABLE OF CONTENTS Contents 1. Scope ....................................................................................................................... 4 2. Vendor Proposal Preparation Guidelines ................................................................. 4 3. Reference ................................................................................................................ 4 4. Business Rules ........................................................................................................ 4 5. Business Requirements ........................................................................................... 5 6. Functional Requirements ......................................................................................... 6 6.1 System Features .................................................................................................... 6 6.2 External Interface Requirements ......................................................................... 11 6.2.1 User Interfaces ........................................................................................... 11 6.2.2 Hardware Interfaces .................................................................................... 11 6.2.3 Software Interfaces ................................................................................... 111 6.2.4 Communications Interfaces ......................................................................... 12 6.3 Other Nonfunctional Requirements ..................................................................... 12 6.3.1 Performance Requirements ......................................................................... 12 6.3.2 Safety Requirements .................................................................................... 12 6.3.3 Security Requirements ............................................................................... 122 6.3.4 Software Quality Attributes ............................................................................ 13 7. Other Requirements ............................................................................................... 14 8. Design .................................................................................................................. 144 8.1 Design Considerations ..................................................................................... 14 8.2 Proposed Business Process Workflow ............................................................. 15 9. Vendor Additional Response to Request ................................................................. 17 10. Vendor Detailed Quote Information…………………...………………………………..18 10.1 Respondent Information……………………………………………………………18 10.2 Total Implementation Costs……………………………………………...…...……18 10.3 Hardware Requirement Documentation………………………………………….22 10.4 Software Documentation…………………………………………………………..22 10.5 Respondent Estimated Project Implementation Time…………………………..22 3-22-2013 Page 3 Maricopa County RDSA-IT 1. Scope To provide a replacement for the existing version of the Electronic Plan Review Software (EPRS), this is currently ProjectDox version 7.2.2.13, from Avolve Software. The current ERPS version is not compliant with new workstations being deployed in the near future. The new workstations have 64 bit processors and are being deployed with a version of Internet Explorer not supported by the current version of the EPRS. 2. Vendor Proposal Preparation Guidelines This document represents the current requirements/requests from Maricopa County regarding the possibility of using your latest product release to replace the existing EPRS. Each requirement has a section for a response from each prospective vendor. There is also a section (9.0) at the end of this document for additional information related to any requirement. Section 10 is the detailed information for the vendor’s quote. We are looking to implement the selected product June 30, 2013. Please include in your responses your time frame requested to perform any quoted work. To this end we are requesting your response including your quote by April 5, 2013 at 5:00 pm. Maricopa County Management and Maricopa County Procurement will review these quotes and let each vendor know their decision. If you have questions, please contact: hughiseman@mail.maricopa.gov. 3. Reference The link to where the original copy of this document is in the Project Management SharePoint Site (Share Documents): ProjectDox Replacement Software Project (folder) / Request for Quote – Requirements Specification – Electronic Plan Review Software.docx (file) 4. Business Rules 4.1 Software Replacement must not be implemented into production during normal Business Hours (M-F 8 AM to 5 PM). 4.2 During and 60 day post implementation, Vendor of the new software, must be available with a 24 hour response to an issue. 4.3 Would be best if the current Electronic Plan Review Software be available and be able to be switched back into production in case new software has an issue for the first week after implementation. 3-22-2013 Page 4 Maricopa County RDSA-IT 4.4 Current Projects to be transferred to new EPRS software, linked to AA workflow task and workflow task status. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 4.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 4.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 4.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 4.4 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 5. Business Requirements Below are some general requirements of the Electronic Plan Reviewing Software (EPRS) that Maricopa County requires. # Business Requirement Description 5.1 Ability to work with Windows and MAC Computers. Ability to have two way communications between the Electronic Plan 5.2 Review Software (EPRS) and Accela Automation (AA). Ability to invite internal staff and external dept. people to the project, 5.3 globally or on a project basis, through your EPRS. Ability for the customers to invite others to the project, globally or on a 5.4 project basis, through your EPRS and those delegate by submitter in AA . The chosen vendor to provide training for Maricopa County staff users and 5.5 IT staff. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 3-22-2013 Page 5 Maricopa County RDSA-IT 5.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 5.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 5.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 5.4 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 5.5 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6. Functional Requirements 6.1 System Features Feature Description and Priority Stimulus/Response Sequences 6.1.1 Simultaneous Ability for multiple reviewers This is to give the Multiple Reviewers. to review at the same time. flexibility that is currently allowed in Accela This is a High Priority. Automation. 6.1.2 Reassignment of Need to be able to easily This is to give the existing Reviewers. reassign reviewers when flexibility that is currently they are out of the office. allowed in Accela Automation. This is a High Priority. 6.1.3 Standard Need standard comments This is to allow the Comments. that can be selected from a reviewer the ability to drop down list to be used reuse, standard for markup notation. comments that are Standard comments will repeated comments need to be segregated by commonly used. groups for documents reviewed by multiple groups with different standard comments. This is a High Priority. 3-22-2013 Page 6 Maricopa County RDSA-IT 6.1.4 Work with various Ability to upload This is to allow the file formats. complicated plans in submitters to upload files various formats, pdf, dwg, in various formats. doc, docx, jpg, jpeg, jp2, xls, xlsx, ppt, pptx, Vsd, Vsdx… Also those new formats are included in updates to software in keeping the releases from other major software companies. This is a High Priority. 6.1.5 Not accept certain Ability to lockout (not This is to prevent the file formats. accept) certain file formats submitters to upload files like Tiff… in certain formats. This is a High Priority. 6.1.6 Batch Stamping. Ability to perform Batch This will reduce manual Stamping to a designated stamping currently section of the submitted performed. documents. This is a High Priority. 6.1.7 Auto-archiving of Ability to auto-archive This will provide a approve documents to approved documents to the reduction in labor over SIRE EDMS. SIRE – Electronic what is currently being Document Management done. System (EDMS) we have. This is a High Priority. 6.1.8 Markups on Ability to markups on a To make certain the separate layers. separate layer on the replacement process documents and that those matches the current markups are placed on a process. separate document able to be sent to the submitter. This is a High Priority. 3-22-2013 Page 7 Maricopa County RDSA-IT 6.1.9 Output files that Ability to convert approved To provide submitters are scalable. files to pdf or a file format enhanced flexibility. that cannot be altered and able to choose output size. Standard ANSI paper sizes: A: 8-1/2" x 11" B: 11" x 17" C: 17" x 22" (i.e. 17" x 24") D: 22" x 34" (i.e. 24" x 36") E: 34" x 44" (i.e. 26" x 48") This is a High Priority. 6.1.10 Version Control, Ability to force resubmitted To make certain the no matter what the files to versioning format. replacement process submitter calls the file So reviewers do not need to cures an issue with the name. coordinate which files are current process. version 1, version 2, and version 3 and do not have to be the same name. This is a High Priority. 6.1.11 Approved Version Ability to lock the approved To make certain the – cannot be altered. version of the documents replacement process from changes. matches the current process. This is a High Priority. 6.1.12 Compare Ability to compare different This would provide different versions of versions of documents in needed capabilities for documents in various file various file formats, such as current and future formats. pdf, dwg, doc, docx, xls, reviews. xlsx, ppt, pptx, Vsd, Vsdx… This is a High Priority. 6.1.13 EPRS to trigger Ability of EPRS’s workflow This would provide from an AA workflow to start in conjunction with enhanced capabilities to event. AA’s workflow. Not need a what is now able to be form to start the EPRS performed and would workflow, but the trigger to solve current issues. start a workflow in EPRS be an AA event or action. This is a High Priority. 3-22-2013 Page 8 Maricopa County RDSA-IT 6.1.14 Written Ability of EPRS to provide a This would provide documentation of mark- written document that has enhanced capabilities to ups to the drawings that all the mark-up test and a what is now able to be can be exported in a pdf snapshot of the area of the performed and would format. drawing of concern for each solve current mark-up. This document to requirements. be able to be exported into a pdf format for use to send to the customer. This is a High Priority. 6.1.15 Create an AA Ability of EPRS’s forms to This would provide Project from an EPRS start (Initialize) a new AA enhanced capabilities to form submittal (trigger). project. what is now able to be performed and would This is a Medium-High solve future issues. Priority. 6.1.16 Sub related If 6.1.15 is able to be done, This would provide issues with regard to have the ability of EPRS to enhanced capabilities to 6.1.15 accept Fees* and Schedule what is now able to be Inspections so that it acts performed and would as if these items were done solve future issues. in AA. Also have the ability to customize the web facing user interface. * Must meet Maricopa County Financial Approval. This is a Medium-High Priority. 6.1.17 EPRS to accept Ability for EPRS to work This would provide and have 3D drawing with 3D drawings and enhanced capabilities to review functionality. provide the capabilities of what is now able to be rotation, zooming on x-y-z performed and would axis… solve future issues. This is a Medium Priority. 6.1.17 Several projects Ability to perform a review This would provide using the same and have same changes enhanced capabilities to documents. apply to several different what is now able to be Project Numbers. performed and would solve future issues. This is a Medium Priority. 3-22-2013 Page 9 Maricopa County RDSA-IT 6.1.19 Using an EPRS Ability for Time Accounting This would provide form to transfer Time in AA to be accessed and enhanced capabilities to accounting information to performed from EPRS what is now able to be AA. through forms. performed and would solve future issues. This is a Medium Priority. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 6.1.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.4 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.5 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.6 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.7 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.8 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.9 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.10 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 3-22-2013 Page 10 Maricopa County RDSA-IT 6.1.11 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.12 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.13 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.14 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.15 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.16 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.17 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.18 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.1.19 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.2 External Interface Requirements 6.2.1 User Interfaces Windows 7, IE 9 for Windows OS. Defined in Item 5.1 6.2.2 Hardware Interfaces 64 Bit hardware 6.2.3 Software Interfaces Work with SIRE EDMS and Accela Automation and Accela Citizen Access 3-22-2013 Page 11 Maricopa County RDSA-IT 6.2.4 Communications Interfaces SMTP email (Outlook) 6.3 Other Nonfunctional Requirements 6.3.1 Performance Requirements 6.3.1.1 Vendor has a proven track record with other jurisdiction that also uses their product in conjunction with Accela Automation and an EDMS such as SIRE. 6.3.1.2 The chosen vendor ‘s maintenance contract to include a level of service agreement that states the response time on submitted issues from Maricopa County. 6.3.1.3 The chosen vendor ‘s maintenance contract to include training for upgrades, on what are the differences and what are the new features for the upgrade compared to the previous version. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 6.3.1.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.1.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.1.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.2 Safety Requirements N/A 6.3.3 Security Requirements 6.3.3.1 To work with Microsoft Active Directory for authentication and also ability to have users that are not in the current domain. 3-22-2013 Page 12 Maricopa County RDSA-IT Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 6.3.3.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.4 Software Quality Attributes The replace product for the current EPRS must be able to show enhanced value over the current EPRS. Specific areas of concern are: 6.3.4.1 PDF conversion of any eForms and/or files. 6.3.4.2 Auto-achieving of approved and other documentation into SIRE EDMS. 6.3.4.3 Ability to delegate a subset of Administrative capabilities that can be assigned to another role. 6.3.4.4 Global Administration instead of Administration per project of users. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 6.3.4.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.4.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.4.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 6.3.4.4 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 3-22-2013 Page 13 Maricopa County RDSA-IT 7. Other Requirements 7.1 Work with the RDSA-IT Staff to implement in a development, training/testing and production environments. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 7.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 8. Design 8.1 Design Considerations 8.1.1 Create a singular workflow similar to the one in Accela Automation (AA) and that both will be updated to the same workflow task or step when an action is done in either product. That any field that is updated in one is updated in the other product (that is designated to be updated). 8.1.2 Create forms, primarily to use as placeholders for fields that are in AA but used for decision making in the EPRS. 8.1.3 Create scripts to facilitate workflow, forms and other communication between AA and the EPRS. Vendor Responses with regard to their product: If requirement must be customized, please provide cost and time to complete. 8.1.1 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 8.1.2 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 8.1.3 In Product Can be Customized Cost Cannot Provide Add on module with Time additional cost 3-22-2013 Page 14 Maricopa County RDSA-IT 8.2 Proposed Business Process Workflow The “OSS Building Electronic Plan Review Software Workflow Process” flowchart displays the corresponding workflow tasks that are the same tasks as in the AA workflow plus the additional tasks that are the EPRS workflows’ unique tasks. The “OSS Building Electronic Plan Review Software Workflow and the AA workflow comparison (Major Tasks)” displays that each of the tasks in the AA workflow correlates to a major task in the EPRS workflow. Proposed OSS Building Electronic Plan Review Software Workflow Process Set Submitters Start Permissions to View Only #1 Update Pre- Review to State B End Workflow Info on Review (2nd Pre-review) Options / ARS 11- Longer 1605 & Application than 10 has been received Submitter Days Submitter Re- (email) Resubmit Notify Apply Notification (email) (email) Update Pre-review Set Submitters Sessoin to State A Permissions to (Initial Pre-review) View, Upload, View Markups #1 OTC Revision Request Minimal Front Counter Pre- requirements for review Session - Failed End Workflow applying not AA Task #1 submitted(email) The Assignment of the Approved Reviewer will be done in AA Front Counter Acceptance – AA Task #2 The Assignment of the Reviewer will be done in AA Change Group to Submitter Payment Notification (email) The Assignment of the Cashier / View Only Initial Fee Payment – AA person will be done in AA Submitter Task #3 Additional Permits are Notification of GO To Permits Submitter Resubmit Request Waiting on Fee performs Revision 3 Month Payment (email) Notification (email) Intake and Routing The Assignment of the AA Task #4 Reviewer will be done in AA Submitter Notified - Payment The Assignment Received – Go To Department of the Reviewer will Assign Submitter Permits (email) Review – AA Task be done in AA to Revision #5 Submitter Notified The Assignment of Payment of the Reviewer will Change Group Received – No Go QC Reviewer – AA be done in AA Assignments To’s (email) Task #6 Applicant Notified Submitter can that Final payment Convert to PDF & Copy Set Submitters Download is required.(email) Permit Issuance – Approved and Required Permissions to Approved AA Task #8 Documents to SIRE’s Download Documents and EDMS Permit (email) Applicant Notified that 15 Days has The Assignment of the Issuance expired 2nd Notice person will be done in AA (email) End Workflow 3-22-2013 Page 15 Maricopa County RDSA-IT OSS Building Electronic Plan Review Software Workflow and AA Workflow Comparison (Major Tasks) ER AA Workflow Workflow Start The Assignment of the Front Counter Pre- Front Counter Pre- Reviewer will be done in AA review Session review Session - AA Task #1 The Assignment of the Front Counter Front Counter Reviewer will be done in AA Acceptance Acceptance – AA Task #2 The Assignment of the Cashier / person will be done in AA Initial Fee Initial Fee Payment – AA Payment Task #3 The Assignment of the Intake and Routing Intake and Routing Reviewer will be done in AA AA Task #4 The Assignment of the Department Addressing Reviewer will be done in AA Review Review – AA Task #5 Building Plan Review – AA Task #5 Zoning Review – AA Task #5 Drainage Review – AA Task #5 Environmental Services Review – AA Task #5 Flood Control District Review – AA Task #5 MCDOT Review – AA Task #5 The Assignment of the QC Reviewer QC Reviewer – AA Reviewer will be done in AA Task #6 Collections – AA Task #7 The Assignment of the Issuance Permit Issuance – person will be done in AA Permit Issuance AA Task #8 3-22-2013 Page 16 Maricopa County RDSA-IT 9. Vendor Additional Response to Request (Please specify request number (ex: 6.3.3.1) when providing additional Information.) 3-22-2013 Page 17 Maricopa County RDSA-IT 10. Vendor Detailed Quote Information 10.1 Respondent Information RESPONDENT NAME VENDOR NUMBER ADDRESS P.O. ADDRESS TELEPHONE NUMBER FACSIMILE NUMBER WEB SITE REPRESENTATIVE REPRESENTATIVE E-MAIL 10.2 Total Implementation Costs License Cost (please list as applicable to your software) Software Quantity Module Concurrent / Cost Per Total Cost Server License License Are licenses concurrent or single use? (please describe): 3-22-2013 Page 18 Maricopa County RDSA-IT Other 3rd Party software products that must be licensed (list and briefly describe, if applicable): Software Quantity Module Concurrent / Cost Per Total Cost Server License License Software Maintenance Cost (10 years): (8AM-5PM) FULL MAINTENANCE AND SUPPORT Year 1 Year 2 Year3 Year4 Year5 Year 6 Year 7 Year 8 Year 9 Year 10 (24 X 7) FULL MAINTENANCE AND SUPPORT Year 1 Year 2 Year3 Year4 Year5 Year 6 Year 7 Year 8 Year 9 Year 10 Briefly describe what is included with maintenance costs listed above: 3-22-2013 Page 19 Maricopa County RDSA-IT Please provide any other costs which are associated to software maintenance: What are your 'specific' hours of support based on costs above? Resource Cost: Please list the vendor resource, cost per hour and number of hours below: Resource Cost per Hour Number of Hours Cost Project Manager Business Analyst Application Developer Senior Application Developer System Engineer Other implementation services that must be purchased (list and briefly describe, if applicable): Service Description Cost 3-22-2013 Page 20 Maricopa County RDSA-IT Training Cost: Please list the class name, type of training (classroom, webinar, train the trainer), who the audience (Administrator, End User…) is, duration and cost per type: Training Name Type of Training Audience Duration Cost Total Cost = Travel Cost: Please describe any anticipated travel and costs associated with the project implementation, consulting and training (per Diem cost is AZ per Diem): Reason Airfare GSA per Duration Number of Cost Diem (days) Trips Total Cost = 3-22-2013 Page 21 Maricopa County RDSA-IT Other Costs: Please list and describe any other costs, if applicable: Other Cost Item Name Description Cost Total Project Cost: 10.3 Hardware Requirement Documentation (Please Attach): 10.4 Software Documentation (Please Attach): 10.5 Respondent Estimated Project Implementation Time: 3-22-2013 Page 22