PROPOSED REVISIONS OF MARICOPA COUNTY PARKS AND RE - FEE SCHED LINE BY LINE NARR (2).PDF
Extracted text (via pymupdf_layout)
8493 characters
Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative User fee survey – Maricopa County Parks System In December 2008, the Department received the 2007-2008 Maricopa County Parks Visitor Study as part of our cooperative services agreement with Arizona State University. The year-long study was conducted to assess park visitor behavior and customer service attitudes in each of eight Maricopa County Parks. The following data represents the outcome of mail-back and on-site collection which began in mid-October 2007. Table 4.14 Management and user fee issues in the Maricopa County Parks System Strongly Strongly 2007- 2005- 2002- Disagree Disagree Agree agree 2008 2006 2003 Percent Percent Percent Percent Mean1 Mean Mean Regional parks are a service that should continue to be funded by the Maricopa County Board of Supervisors 1.2 1.8 40.2 56.8 3.53 3.56 3.46 Entrance fees should be increased occasionally to keep up with inflation and increases in operating costs 4.0 16.9 51.7 27.4 3.03 2.99 2.82 Entrance fees should be kept at a minimum to encourage use of regional parks 1.5 9.7 46.1 42.7 3.30 3.26 3.38 We need more regional parks 1.4 20.2 39.3 39.1 3.16 3.15 2.97 I would be willing to pay a user fee for educational programs and workshops if offered in regional parks 10.8 31.9 45.2 12.1 2.59 2.68 2.47 I would support a modest property tax to support the county regional parks system 14.8 30.2 39.7 15.3 2.59 2.73 1.99 Hunting is an appropriate activity in county parks 60.4 24.7 9.0 5.9 1.61 NA NA Rock climbing is an appropriate activity in county parks 8.3 16.6 56.2 18.9 2.86 NA NA Q15: The following is a list of statements describing management and user fee issues in the Maricopa county parks System. Please indicate the degree to which you agree or disagree with each of the statements. 11=Strongly disagree, 2=Disagree, 3=Agree and 4=Strongly agree Page 1 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Hike/Bike/Equestrian Walk-In Increase ($1.00 to $2.00) Our benchmarking of the walk-in rate established we were well below the rates of other park systems. Using the Strategic System Master Plan, San-Bernardino County’s current rate is $2.00 as were a number of other locations. With approval of this fee increase, we would be bringing our fee into market range of similar parks. In addition, Arizona State Parks, considered our sister agency, has a current rate of $2.00 and is proposing an increase to $3.00 in March 2010. The System Master Plan also notes several locations that did not have a separate walk-in rate. These parks were funded by their respective general funds for the majority of park operations. Page 2 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Wedding Packages The wedding package fees proposed deal specifically with the Nature Centers and Desert Outdoor Center. These fees include complete set-up (chairs, tables, decorating, etc), the ceremony and reception, and take- down/clean-up of the event. The proposed fee also includes a one hour rehearsal the day before the ceremony. The Department compared wedding package rates for various facilities around the metropolitan area and found the proposed rates to be in-line with other facilities. The Department will continue to allow the rental of individual ramada areas for wedding ceremonies at the proposed rental rate of $20.00 to $80.00 per 4 hour block, depending on the size of the ramada. Page 3 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Developed Camping Fees Using the Strategic System Master Plan data comparison and a rate comparison conducted in July 2009 throughout Arizona and our neighboring states, we have fallen behind the average fees charged for developed camping. Arizona State Parks averages $22 for developed camping sites, with examples ranging from $22 per site at Kartchner Caverns to $25 per site at other parks such as Fool Hollow. In addition, Arizona State Parks is currently seeking a fee increase (March 2010) which will increase their average cost to $27.50. Depending on the season, the cost per night for various Arizona State Parks will be a low of $20.00 and a high of $35.00/night. This is well above the current proposed rate of $25.00 that we seek. We also compared developed fees of San Bernardino County Parks and their average was $27.73 per site. In addition, Cedar Hills State Park had a rate of $20 and Mohave County Parks-Davis Camp reflected a rate of $25. Rodeo Grounds ($50.00 to $150.00) The proposed rate increase for the rodeo grounds at Estrella Mountain Regional Park is for the facility rental. This includes the announcer’s booth, warm-up arena, main arena, and cattle sorting stalls. There may be additional fees related to water, tractor work, etc. When benchmarking against City of Phoenix Horse Lover’s Park, Phoenix charges separate fees for non-profit rental at $150 for a half day (four hours) and $250 for a full day (eight hours). The commercial rental charge is $300 for a half day with $500 for a full day. The City of Phoenix also has additional fees associated with staff and equipment. We also compared the rental rate for the Larkin Area at the New River Kiwanis Park. Their rental rate is $300 per day, which includes the tractor and the lights. There is an additional $150 cleaning deposit which is returned if area is left clean. It also appears they provide an hourly rental of $30 per hour without lights or $50 per hour with lights. Page 4 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Archery Fees (New $2.00/archer supply fee) This fee applies only to Usery Mountain Regional Park where we have archery targets as well as 3-D shooting. The fee increase applies only to a supply fee for the targets – paper, animal, and field targets. Presently, Ben Avery charges $7.00 per archer for use of their range. Our fee is well below this at $2.00 per archer, along with the $6.00 entry fee per vehicle. Archery Fees $2.00 $7.00 per archer $6.00 $7.00 $5.00 per archer $6.00 per vehicle $4.00 $3.00 Usery Ben Avery $2.00 $2.00 per archer supply fee will help offset cost of paper , $1.00 animal and field targets. Proposed Increase Current Fee Page 5 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Watercraft Rates Lake Pleasant Regional Park’s watercraft rates have not changed since 1999 when the original $2.00 per boat fee was established. Thus, it has been 10 years since there has been a rate adjustment to the watercraft entry fee. The proposed rate of $4.00 per motorized watercraft ($2.00 increase) and $2.00 per non-motorized (no change) provides a diverse option for our boaters but still falls at or below the benchmarked parks. For example, Mohave County charges $10.00 per boat and our nearby lakes, Bartlett and Saguaro (Tonto National Forest) currently charge $10.00 per vehicle with watercraft ($6.00 entry plus $4.00/watercraft). Finally, Arizona State Parks is proposing a fee increase to raise their entry fee with watercraft to $15.00, significantly above our proposed rate. Allowing the separate rates of motorized and non-motorized provides for the visitors who use canoes, kayaks, wakeboards, and wind boards to pay a reduced rate (no increase proposed for this rate) than the motorized boats. It also allows the Department to collect fees to support the on water costs associated with maintaining the buoys, docks, floating restrooms, and clean areas of Lake Pleasant. Page 6 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Parks and Recreation Budget Information: The following table and charts represent overall budget information for the funding sources for Maricopa County Parks and Recreation within the three main funding sources: General Fund (100), Enhancement Fund (241), and Lake Fund (240). Table A: Year to Year Revenue Totals FY05 FY06 FY07 FY08 FY09 FY10 Fund Actual Actual Actual Actual Actual Projected 100 (General) $1,245,500 $1,472,518 $1,761,208 $1,760,538 $1,162,995 $670,090 241 (Enhancement) $2,291,424 $2,601,131 $2,603,993 $3,637,770 $3,862,984 $3,276,989 240 (Lake) $1,302,483 $1,295,261 $1,760,589 $2,361,792 $1,681,006 $1,709,477 Chart A: Year to Year Revenue Page 7 of 8 Maricopa County Parks and Recreation FY10 Proposed Fee Schedule Narrative Chart B: Year to Year Total Revenue Chart C: Year to Year General Fund (100) Budget Page 8 of 8