Attachment D Stipulation Review 250035 1. Abandonment is conditioned upon the applicant/developer rerouting the existing storm drain into a newly dedicated drainage easement, to the satisfaction of the City. The applicant/developer shall ensure that the rerouted storm drain maintains historical flow patterns, with both the point of inflow and the point of outflow preserved at their historically established locations. The abandonment shall not be scheduled for City Council consideration until the storm drain plans and the associated drainage easement dedication have been reviewed and approved by the City. Grading & Drainage Plans with Drainage Facilities for Pike’s Retreat (CPGD #2504411) was approved on December 17, 2025. The drainage easement dedication (DEDI 250059) was approved on February 4, 2026. 2. The above stipulations must be completed within two years from the conditional approval decision dated September 8, 2025. All stipulations have been met.