P-26-79-CUP Project Narrative
Extracted text (via pymupdf_layout)
17485 characters
King Steel, LLC Structural Steel Fabrication Business Conditional Use Permit Request Project Narrative 660 E. 38th Ave, Apache Junction, AZ A request for a Conditional Use Permit Application Numbers: P-26-62-PDR Filing date: September 3rd, 2026 Table of Contents Page Introduction................................................................................................. 2 Description of Property…………………………………………………...….... 5 Request...................................................................................................... 6 Conditions Use Permit - Justifications……….............................................. 6 Conclusion................................................................................................. 8 List of Figures Aerial Photo................................................................................................. Exhibit A Photograph of existing building................................................................. Exhibit B Site Plan...................................................................................................... Exhibit C 1 | P a g e INTRODUCTION On behalf of our client, A. King Steel, LLC, we are pleased to submit this Conditional Use Permit application and supporting materials for an approximately 1.64-gross acre site located in the Baseline Industrial Park at 660 E. 38th Avenue, Apache Junction, AZ 85119 (APN’s: 102-56-033A & 102-56-0340). The site is within 1/2 mile of the US60 Superstition Freeway and is located between Idaho Road to the east; Tomahawk Drive to the west; US 60 to the north and Baseline Avenue to the south. The hours of operation will be from 6:00 am to 4:30pm M-F. Exhibit A – Aerial Photo Who is the Business Owner? The owner of the proposed business is A. King Steel, LLC, a new structural steel fabrication company that specializes in the production of architectural structural steel. They adhere to the principles of regulatory compliance, prioritizing safety, and responsible site management and would like to contribute to the local community through a new stream of economic activity in the area. There are no other locations for this business, it is a new start-up and would be using industry standard best practices for its day to day operations. 2 | P a g e A. King Steel, LLC is seeking a Conditional Use Permit, to operate their business within the B-5 industrial zoning district which allows heavy industrial uses with a conditional use permit. A. King Steel, LLC plans to lease and operate a high-quality steel fabrication facility that will be compatible with the adjacent and Exhibit B – Front Office & Covered Outdoor Fabrication Area surrounding industrial uses within the Baseline Industrial Park. The company will employ 5-10 certified welders, several project managers and office staff as required. The proposed operation will consist of light-to-moderate industrial activities associated with the fabrication of structural steel components for commercial and residential construction projects. This steel fabrication company will offer local employment opportunities, drive economic growth, and perpetuate Apache Junction as the leader for industrial businesses in Arizona. All operations are intended to be conducted in a manner that is safe, organized, and compliant with applicable city, county, and state regulations. Why steel fabrication? Being in the right location with the right product is important in the architectural steel production industry. A. King Steel selected this site after carefully reviewed the market data in this area and based on that research has concluded there is sufficient market demand for structural steel fabrication. The increased demand for structural steel over the past decade is attributable to many different factors. Those include the following factors: • The dramatic increase in development over the past several years; • Structural steel is used in many forms of architectural design and is a key component to many structures and buildings throughout the valley. • New structural steel fabrication facilities are needed to meet the current market demand, and few new structural steel businesses have opened in the area. What is the proposed layout? The site and primary structure will mostly remain as is currently configured with a 2,099 square foot building, an approximately 3,000 3 | P a g e sf outdoor covered welding area over a cement pad and associated site parking, driveways, utilities, and amenities. The site includes circulation for delivery trucks with two access points, one dedicated for entry and one dedicated for exiting trucks. Cars and personal vehicles circulation is separated from truck traffic, and parking is provided for nine(9) vehicles and one(1) accessible stall. Loading and unloading will occur behind the gated and fenced outdoor storage yard, with loading and unloading areas. Materials will be stored on the edges of the site to minimize conflicts with loading operations. The site also includes landscaping along 38th Avenue and around the parking lot. The single story building includes two (2) offices, two (2) restrooms, and warehouse space that will include a fabrication shop area for small products and CNC machine with a plasma cutting machine. The building has store front glazing, upgraded stonework on building and walls near the office. The building is clean and in good working order. The business owner plans to upgrade the electrical power supply to 3-phase power and is currently working with SRP and the business and property owners plan to work together to confirm site drainage is in compliance with approved grading and drainage plans for the site and flowing properly during rain events. Exhibit C – Conceptual Site Plan 4 | P a g e Outdoor Painting and Finishing Areas? Painting and coating of fabricated steel components will occur away from the office building within the area designated on the site plan shown with a blue outline. This area is located away from the property lines of adjacent businesses and has a buffer of approximately 40 feet from the street. This area is screened by the property wall and will utilize efficient application methods, proper environmental containment, and use low-VOC coatings. High-volume, low-pressure (HVLP) or air assisted airless spray guns will be used to provide a higher transfer efficiency, drastically reducing overspray. Dedicated pollution control systems will capture the lower amounts of overspray that can occur. A containment system consisting of containment shrouds, curtains and partial blast enclosures will be utilized to minimize emissions. Mixing and cleaning areas will be located away from storm drains and spill kits will be located near painting areas. These activities will be conducted in compliance with environmental regulations. Materials used will be handled and stored in accordance with applicable guidelines. DESCRIPTION OF PROPERTY Located on the southern edge of Apache Junction, approximately two miles south of downtown Apache Junction, the site is just east of Idaho Road and north of Baseline Road. The site is a mere quarter of a mile south of the Superstition Freeway (US60) which provide good regional access to the highway and interstate system. The subject site is located within the Baseline Industrial Park, which designates this site for industrial uses within the B-5 zoning district. Steel fabrication is permitted in the B-5 “industrial” zoning district with a Conditional Use Permit (CUP). There are no nearby subdivisions or residential uses. The subject site is level with a gentle slope to the east and has been developed with an office building, laydown space, circulation, and parking. The building is currently vacant, and the yard has been cleared. The site was formerly used as an impound yard for towed vehicles. The site is currently serviced by utilities for water, sewer, gas, electricity, and communications. There site will need an electrical upgrade via SPR to support 3-phase power. The applicant is working with SRP on a plan to provide 3-phase service to the site. The site is located outside of the FEMA Special Flood Hazard Area (SFHA) and has been determined to be within FEMA Zone X (areas of minimal flooding) per the flood insurance rate map (FIRM), panel 04021C0018F. 5 | P a g e Traffic generation to the use will be limited, and access to the site will be from two driveways off of 38th Avenue. The site features an enclosed outdoor yard which is screened by an existing 7-8 foot concrete masonry perimeter wall. The site has mature landscaping near the entrance to the office and around the perimeter of the site. REQUEST The formal request would be for approval of a Conditional Use Permit (CUP) for Heavy Manufacturing as per § 1-5-3: Non-Residential Use Regulations. The request would allow for the operation of a steel fabrication business, within the Baseline Industrial Park, listed as assessor’s parcel numbers 102-56-003A and 102-56-0340. The proposed use falls under the category of “Heavy Manufacturing” which is permitted in the B-5 “Industrial” zoning district with a Conditional Use Permit (CUP). The findings of this report have considered seven factors to determine whether a CUP should be granted, those include the following: (a) Adequacy of roadways, off-street parking, public facilities, and services to accommodate the proposed use; (b) Negative impacts arising from the emission of odor, dust, gas, noise, lighting, vibration, smoke, heat, or glare; (c) Contribution to the deterioration of the neighborhood or the negative impact on neighborhood property values; (d) Compatibility with surrounding uses and structures; (e) Conformance with the General Plan and city policies; (f) Screening and buffering of uses; and (g) Unique nature of the property, use and/or development's physical characteristics. JUSTIFICATIONS FOR THIS CONDITIONAL USE PERMIT Upon review, it is clear to us that the evaluation criteria for this Conditional Use Permit have been met. We have provided below a detailed explanation of how each criteria has been met. 6 | P a g e (a) The Baseline Industrial Park was designed and built with a clear circulation system with adequate roadways, off-street parking, and services to accommodate the proposed use. (b) Any negative impacts arising from the emission of odor, dust, gas, noise, lighting, vibration, smoke, heat, or glare will be minimal and if needed will be mitigated using best practices for a steel fabrication facility in an industrial park. (c) The site consists of a single-story building that is in clean, good working order and contributes to a well maintained, high-quality industrial park. The business will be a good neighborhood and will not cause any negative impacts on neighboring property values. (d) The site is compatible with the other surrounding industrial uses, structures and buildings of the Baseline Industrial Park. (e) The use of Heavy Manufacturing is in conformance with the General Plan, city policies and is permitted within the B-5 Industrial zoning district. A more detailed analysis of the specific portions of the general plan that we meet is provided below. (f) The site currently utilizes 7-8 foot tall block walls to screen the outdoor work yard and provides adequate buffering for the use of a steel fabrication business. (g) The site is located away from residential uses and is bounded by other industrial buildings and uses. It is buffered by the freeway from the rest of Apache Junction and is bounded by open space to the south, making this a great site for the intended use. How does the use meet the General Plan? There are three areas within the general plan that potentially apply directly to the intended use requested in this application for a conditional use permit. These area include Economic Development, Growth Areas, and Land Use. Within the Economic Development section of the General Plan Goal 5.2 calls to Align resources and priorities to enhance expansion and attraction of the city’s targeted industries. One of the targeted sectors is manufacturing. This proposed CUP will allow for one of these targeted industries to bring in a new manufacturing business that will supply architectural steel items to be created in Apache Junction and sold throughout the valley. This proposal will meet the intent of 7 | P a g e Economic Development Goal 5.2 of the Apache Junction General Plan 2020- 2050. Another area of relevance in the General Plan for this application is Chapter 9, Growth Area Element. By allowing the proposed use, steel will be bought and sold in Apache Junction which will increase taxes collected by the city and therefore meet Goal 9.1 to increase the city’s financial sustainability. Lastly the application contemplates meeting goals of Chapter 11, the Land Use Element. Within this section of the General Plan, several Goals are met, including being considerate of the rural character of the city which is Goal 11.1. By locating this business south of the city away from residential development and the downtown. Since steel fabrication is considered to be a heavy industrial use, it is best to locate this use away from high activity area and away from residential uses as much as possible. This proposal also meets Goal 11.2 by helping the city to provide a balance of uses throughout the community. While a needed service and business, it should be located in a place that is in balances with the many other uses in the community. Here in the Baseline Industrial Park the use is located in a way that it balances with other more intense uses and is located away for the centers and cores of Apache Junction. By meeting these three areas of the general plan we believe the use to be consistent with the General Plan. Mitigation of Dust, Light Pollution, Odor and Noise Industrial uses such as the use proposed here has potential to contribute to Noise, Dust, and Odors. We have taken a proactive approach to mitigating the negative affects of these common nuisances. Dust and Particulates: Cutting, grinding, and welding activities will primarily occur outdoors due to size of structural steel columns and beams (up to 60’). Outdoor work areas will be managed to prevent dust generation, including maintaining clean workspaces and promptly removing debris and scrap materials. If necessary, basic dust suppression methods will be implemented to reduce airborne particulates. Any CNC machine purchased will come equipped with either a particulate collection air filter and exhaust system or a water-based particulate collection system. Light Pollution: Exterior lighting will be limited to that necessary for security and safe operations. All outdoor lighting will be directed downward and shielded where practicable to prevent light spillover onto adjacent properties. Overnight lighting will be minimized when the site is not in active use. 8 | P a g e Odor Management: Painting and coating operations will utilize commercially appropriate materials and application methods designed to minimize odors and emissions. Products will be stored and handled properly, and work will be scheduled and performed in a manner that limits off-site impacts. Noise Mitigation: Welding and cutting operations are intermittent throughout the day as required, they are not ongoing throughout all business hours. CNC plasma cutting and smaller fabrication activities will occur indoors within the enclosed warehouse, which will naturally buffer operational noise. Outdoor work will be limited to necessary functions and conducted during standard daytime business hours where feasible. Equipment will be properly maintained to reduce excessive noise, and operations will comply with applicable local noise ordinances. Summary Based on our analysis, we firmly believe the proposal meets all of the CUP requirements. The use will not be detrimental to the health, safety or general welfare of any persons residing or working in the vicinity of the property and will not unreasonably interfere with the use and enjoyment of nearby properties. The posture of a CUP request is fundamentally different than a rezoning request. Those uses that are listed as requiring a CUP are simply uses that the city wants to examine in its context before approving. They are permitted uses, subject to simply meeting the criteria set forth in the CUP. And the ordinance is clear that if the proposed use meets those criteria, the CUP “shall be issued.” In other words, unlike zoning that is fully discretionary, CUP applicants have the assurance that if their use meets the CUP criteria, they have a right to obtain the CUP. Here, there is no question that our use meets the CUP criteria. We respectfully request, therefore, that this CUP be granted. CONCLUSION This proposal meets the City’s criteria for a conditional use permit to allow for an architectural steel fabrication business within the B-5 zoning district. We feel that our request for a conditional use permit meets the findings as outlined in section 1-16-12,(D)(3) findings (a) through (g). The proposed use will bring a needed resource and business to the area that will be a good neighbor in the Baseline Industrial Park. The proposal is consistent with other nearby uses within the industrial park and will complement other adjacent uses. Thank you for your time and consideration in reviewing this request for a conditional use permit. 9 | P a g e