Ordinance No. 5186

City of Chandler — Regular Meeting (2026-11-12)

View PDF Meeting page

Extracted text (via pymupdf_layout) 88005 characters
ORDINANCE NO. 5186
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CHANDLER,
ARIZONA, DECLARING THAT DOCUMENT ENTITLED “CITY OF
CHANDLER 2027 INDUSTRIAL PRETREATMENT PROGRAM” TO BE A
PUBLIC RECORD; AMENDING THE CODE OF THE CITY OF CHANDLER,
CHAPTER 51, (WASTEWATER SERVICE), BY AMENDING ARTICLE III
(WASTEWATER PRETREATMENT PROGRAM) SECTION 51-24
(ESTABLISHMENT OF WASTEWATER PRETREATMENT PROGRAM) TO
ADOPT THE CITY OF CHANDLER 2027 INDUSTRIAL PRETREATMENT
PROGRAM; PROVIDING FOR AN EFFECTIVE DATE; PROVIDING FOR
THE REPEAL OF CONFLICTING ORDINANCES; AND PROVIDING FOR
SEVERABILITY.
WHEREAS, the City Council of the City of Chandler wishes to establish the industrial
pretreatment requirements for discharges to the City of Chandler’s publicly owned treatment
works (“POTW”), and which applies to every industrial user that introduces or causes the
introduction of pollutants into the POTW, including an industrial user located outside Chandler’s
municipal boundaries when its discharge enters a POTW owned or operated by Chandler, to the
extent Chandler has legal authority to regulate that discharge (collectively the “Pretreatment
Program”); and
WHEREAS, the Pretreatment Program seeks to prevent unlawful discharges, protect the POTW
and its collection system and treatment facilities, protect workers and the public, protect receiving
waters and beneficial reuse of wastewater and residuals, and compliance with applicable federal,
state, and local requirements; and
WHEREAS, this ordinance establishes the City of Chandler's legal authority for its approved
Pretreatment Program, and it shall be implemented together with applicable federal, state, and city
standards, statutes and rules, the city's approved local limits and POTW Permits and Permit
conditions, and individual or general control mechanisms.
NOW, THEREFORE, BE IT ORDAINED by the City Council of the City of Chandler, Arizona,
as follows:
Section 1. That the Chandler City Code Chapter 51 (Wastewater Service), Article III
(Wastewater Pretreatment Program), Section 51-24 (Establishment of Wastewater
Pretreatment Program) is hereby amended to read as follows (additions in ALL
CAPS, deletions in strikeout):
51-24. - Establishment of an Industrial Pretreatment program.
That certain documents, three (3) copies of which are on file with the City Clerk, marked, known
and designated as "City of Chandler 2013 2027 Wastewater INDUSTRIAL Pretreatment
Program" and each and all of the regulations, terms and provisions contained in such document
are hereby adopted by reference thereto and made a part hereof as if set forth at length.

Ordinance No. 5186
Page 2
Section 2. The document attached hereto as Exhibit “A” and known as the “City of Chandler
2027 Industrial Pretreatment Program,” one paper copy and one electronic copy of
which shall remain on file in the office of the City Clerk, is hereby declared to be a
public record.
Section 3. That the Chandler City Code, Chapter 51, Wastewater Service, is hereby amended
by adoption of the amendments set forth in "City of Chandler 2027 Industrial
Pretreatment Program” said document having been declared to be a public record.
Section 4. Effective Date.
The provisions of this Ordinance shall be effective March 1, 2027.
Section 5. Providing for Repeal of Conflicting Ordinances.
All ordinances or parts of ordinances in conflict with the provisions of this
ordinance, or any parts hereof, are hereby repealed.
Section 6. Providing for Severability.
If any section, subsection, sentence, clause, phrase, or portion of this ordinance is
for any reason held to be invalid or unconstitutional by the decision of any court of
competent jurisdiction, such decision shall not affect the validity of the remaining
portions thereof.
INTRODUCED AND TENTATIVELY APPROVED by the City Council of the City of Chandler,
Arizona, this _____ day of ______________, 2026.
ATTEST:
____________________________ ____________________________
CITY CLERK MAYOR
PASSED AND ADOPTED by the City Council of the City of Chandler, Arizona this _____ day
of __________________, 2026.
ATTEST:
____________________________ ____________________________
CITY CLERK MAYOR

Ordinance No. 5186
Page 3
CERTIFICATION
I HEREBY CERTIFY that the above and foregoing Ordinance No. 5186 was duly passed and
adopted by the City Council of the City of Chandler, Arizona, at a regular meeting held on the
_____ day of _______________, 2026, and that a quorum was present thereat.
____________________________
CITY CLERK
APPROVED AS TO FORM:
____________________________
CITY ATTORNEY
Published in the Arizona Republic on:

EXHIBIT “A”

CITY OF CHANDLER
2013 2027 INDUSTRIAL WASTEWATER PRETREATMENT PROGRAM
ADOPTED ON November 4, 2013 March 1, 2027, BY ORDINANCE NO. 4503 5186
ESTABLISHING STANDARDS, RULES, REGULATIONS AND
REQUIREMENTS TO PREVENT THE INTRODUCTION OF
POLLUTANTS INTO THE MUNICIPAL WASTEWATER SYSTEM
ADOPTED BY ORDINANCE 1012 DATE 11/12/81
REVISED BY ORDINANCE 1120 DATE 12/02/82
REVISED BY ORDINANCE 2557 DATE 05/11/95
REVISED BY ORDINANCE 2938 DATE 04/22/99
REVISED BY ORDINANCE 4238 DATE 05/12/11
REVISED BY ORDINANCE 4503 DATE 11/04/13
REVISED BY ORDINANCE 5186 DATE 3/1/2027

I N D E X
PAGE
SECTION I. GENERAL PROVISIONS . . . . . . . . . . 1
A. Purpose and Policy . . . . . . . . . . . 1
B. Abbreviations . . . . . . . . . . . . . 1
C. Definitions . . . . . . . . . . . . . . 2
D. Confidentiality . . . . . . . . . . . . 10 11
1. Trade Secret Claims . . . . . . . . 10 11
2. Disclosure Provisions . . . . . . . 11
SECTION II. INDUSTRIAL USER PROVISIONS . . . . . . 12
A. Discharge Prohibitions . . . . . . . . . 12
1. Flow and Concentration . . . . . . 12
2. Fire and Explosion Potential. . . . 12
3. Viscous Substances . . . . . . . . 12
4. Corrosiveness . . . . . . . . . . . 12
5. Heat . . . . . . . . . . . . . . . 12
6. Slug Discharge . . . . . . . . . . 12 13
7. Noxious Substances . . . . . . . . 12 13
8. Dilution . . . . . . . . . . . . . 13
9. Rainwater . . . . . . . . . . . . . 13
10. Local Limits . . . . . . . . . . . 13
11. Categorical Standards . . . . . . . 14
12. Pumped Wastes . . . . . . . . . . . 14
13. Toxic Materials . . . . . . . . . . 14
14. Oil Products. . . . . . . . . . . . 14
B. Affirmative Defense . . . . . . . . . . 14
1. Requirements . . . . . . . . . . . 14
2. Limitations to Claim of
Affirmative Defense . . . . . . 15
3. Burden of Proof . . . . . . . . . . 15

C. BOD, TSS and Ammonia Levels . . . . . . 15
1. Pollutant Charges . . . . . . . . . 15
2. BOD Trigger Level . . . . . . . . . 15
3. TSS Trigger Level . . . . . . . . . 15 16
4. Director Discretion to Limit
Discharge . . . . . . . . . . . . 16
D. Continuous Monitoring of pH Levels . . . 16
1. Director Discretion to Forego
Enforcement . . . . . . . . . . . 16
2. Adjust Requirements . . . . . . . . 16 17
E. Fluoride BMP’s . . . . . . . . . . . . . 17
1. Director Discretion to
Include BMP’s . . . . . . . . . . 17
2. BMP Requirements . . . . . . . . . 17
3. SIU Request for BMP’s . . . . . . . 17 18
4. Compliance Schedule . . . . . . . . 18
5. Maintenance . . . . . . . . . . . . 18
F. Upset . . . . . . . . . . . . . . . . . 18 19
1. Upset as an Affirmative Defense . . 18 19
2. Burden of Proof . . . . . . . . . . 19
G. Bypass . . . . . . . . . . . . . . . . 19 20
1. Occurrence . . . . . . . . . . . . 19 20
2. Prior Notice . . . . . . . . . . . 19 20
3. Notice of Unanticipated Bypass . . 20
4. Requirements to Avoid
Enforcement . . . . . . . . . . . 20
5. Director Approval . . . . . . . . . 21
H. Hazardous Waste Notification . . . . . . 21
1. Notice Requirement . . . . . . . . 21
2. Exemptions . . . . . . . . . . . . 22
3. IU Notification of Hazardous
Substances . . . . . . . . . . . 22
4. Certification . . . . . . . . . . . 22

I. Compliance Schedules . . . . . . . . . . 22 23
J. Equivalent Mass Limits . . . . . . . . . 23
K. General IU Requirements . . . . . . . . 25
1. Sampling Protocol . . . . . . . . . 25
2. Compliance . . . . . . . . . . . . 26
3. Inspection . . . . . . . . . . . . 26
4. Records Retention . . . . . . . . . 26 27
5. Cooperation . . . . . . . . . . . . 26 27
6. Cease Discharge When Directed . . . 27
7. Notice of Violation . . . . . . . . 27 28
8. Resampling . . . . . . . . . . . . 28 29
9. Payment of Fees . . . . . . . . . . 28 29
10. Financial Responsibility . . . . . 28 29
11. Corrective Measures and Control
of Discharge . . . . . . . . . . 29 30
12. Accurate Disclosure . . . . . . . . 29 30
L. Additional SIU Requirements . . . . . . 30
1. Obtain Permits . . . . . . . . . . 30
2. Comply with Permit Terms . . . . . 30
3. Provide Pretreatment . . . . . . . 30 31
4. Notice of Change in Discharge . . . 30 31
5. Notice of Change Affecting
Potential for a Slug Discharge . 31
6. Access to Compliance Sampling
Points . . . . . . . . . . . . . 31
7. Separation of Compliance Sampling
Points . . . . . . . . . . . . . 31 32
8. Batch Discharge . . . . . . . . . . 31 32
9. Self-Monitoring Reports . . . . . . 32
10. Sampling and Flow Monitoring
Equipment . . . . . . . . . . . 34 35
11. Maintenance of Sampling and Flow
Monitoring Equipment . . . . . . 34 35
12. Date of Receipt of Reports . . . . 35
13. Authorized Representatives . . . . 35
14. Discharges After Permit
Expiration . . . . . . . . . . . 37 38

SECTION III. PRETREATMENT ADMINISTRATION
AND ENFORCEMENT . . . . . . . . . . . . . . . 37 38
A. Responsibility of the Director . . . . . 37 38
1. Implement Program . . . . . . . . . 37 38
2. Review and Sample . . . . . . . . . 37 38
3. Conduct Inspections Regarding Slug
Discharges . . . . . . . . . . . 38
4. Investigate Non-Compliance . . . . 38 39
5. Notify IU’s of Non-Compliance . . . 39
6. Encourage Public Participation . . 39
7. Mitigate Threats to POTW . . . . . 39 40
8. Publish Violations . . . . . . . . 39 40
9. Provide Notice of Change of Law . . 39 40
10. File Federal Pretreatment
Regulations . . . . . . . . . . . 39 40
11. Issue Permits . . . . . . . . . . . 39 40
B. Authority of the Director . . . . . . . 41 42
1. Prevent Discharge . . . . . . . . . 41 42
2. Limit Discharge . . . . . . . . . 41 42
3. Establish Compliance Schedules . . 41 42
4. Require Reports . . . . . . . . . . 41 42
5. Inspect Facilities . . . . . . . . 42
6. Enter Premises . . . . . . . . . . 42 43
7. Revoke or Suspend Permits . . . . . 42 43
8. Modify Permits . . . . . . . . . . 42 43
9. Issue Notices of Violation . . . . 43 44
10. Adopt Implementing Procedures . . . 43 44
11. Seek Injunctive Relief and
Damages . . . . . . . . . . . . . 43 44
12. Seek Penalties . . . . . . . . . . 43 44
13. Delegate Authority . . . . . . . . 45
C. Petitions for Reconsideration. . . . . . 45 46
1. Permit Decision . . . . . . . . . . 45 46
2. Enforcement Orders and Findings . . 45 46
3. Failure to Submit Petition . . . . 45 46
4. Failure of Director to Act . . . . 45 46
5. Judicial Review . . . . . . . . . . 46 47
6. No Waiver of Enforcement
Authority . . . . . . . . . . . 46 47

SECTION I. GENERAL PROVISIONS
A. Purpose and Policy
This Program sets forth Pretreatment Requirements that are
consistent with 40 CFR Part 403 and governs Discharges into
a POTW by any IU, even if the IU or POTW is located outside
of the municipal boundaries of the City.
B. Abbreviations
The following abbreviations shall WILL have the designated
meanings set forth below.
ADEQ, Arizona Department of Environmental Quality
APP, Aquifer Protection Permit
ARS, Arizona Revised Statutes
BMP, Best Management Practices
BOD, Biochemical Oxygen Demand
CFR, Code of Federal Regulations
EPA, Environmental Protection Agency
GRIC, Gila River Indian Community
IU, Industrial User
L, Liter
mg, Milligrams
mg/L, Milligrams per liter
NPDES, National Pollutant Discharge Elimination System
POTW, Publicly Owned Treatment Works
SIC, Federal Standard Industrial Classification

SIU, Significant Industrial User
SNC, Significant Non-Compliance
TRC, Technical Review Criteria
TSS, Total Suspended Solids
USC, United States Code
C. Definitions
Unless the context specifically indicates otherwise the
below-listed terms shall WILL have the meanings as set forth
below.
1. “ACT” means the Federal Water Pollution Control Act,
also known as the Clean Water Act, as amended, 33
U.S.C. 1251, et seq.
2. "APP" means a permit PERMIT issued by ADEQ pursuant to
A.R.S. Section 49-241, et seq which imposes state
standards relating to the Discharge of Pollutants
which may reach an aquifer.
3. “Batch Discharge” means the accumulation of Wastewater
over time in a tank or holding container that is later
emptied, resulting in a Discharge.
4. "BOD" means the quantity of oxygen utilized in the
biochemical oxidation of organic matter under standard
laboratory procedures -- five (5) days at 20 degrees
centigrade -- expressed in terms of concentration.
5. "BMP" means schedules of activities, prohibitions of
practices, maintenance procedures, or other management
practices to satisfy Pretreatment Requirements. BMP's
may include treatment requirements, operating
procedures, and practices to control plant site
runoff, spillage or leaks, sludge or waste disposal,
or drainage from raw materials storage.

6. "Bypass" means the intentional diversion of Wastewater
from any portion of an IU’s apparatus or control
mechanism to treat Wastewater prior to Discharge.
7. "Categorical Standards" means any Federal Pretreatment
standard adopted pursuant to 33 USC 1317(b) or
(c) -- as codified under 40 CFR Chapter 1 Subchapter N
Parts 401-471.
8. "City" means the City of Chandler, Maricopa County,
Arizona.
9. “Compliance Sample” means any sample for a Pollutant
for which a Discharge standard or prohibition is
identified in this Program that is collected at a
specified compliance sampling point and analyzed by an
EPA approved method pursuant to 40 CFR Part 136.
10. “Compliance Schedule” means the shortest schedule by
which an IU will provide additional Pretreatment,
and/or operation and maintenance activities, necessary
to meet Pretreatment Requirements.
11. “Composite Sample” means a combination of at least
four (4) Grab Samples obtained at regular intervals
(based on either flow or time) during normal
operations on any calendar day. Each Grab Sample is
either combined with the others or analyzed
individually and the results averaged so as to be
representative of the Discharge during the entire
Discharge period.
12. “Daily Maximum” means the average maximum
concentration of a Pollutant allowed to be Discharged
on any calendar day, as determined by the analysis of
all Grab Samples collected at a specified compliance
sampling point during normal operations. If only one
Grab Sample has been taken, that Grab Sample becomes
the Daily Maximum (as well as the Instantaneous
Maximum). A Composite Sample, by definition, becomes
the Daily Maximum for the calendar day in which it is
collected.

13. "Director" means the City's Director of Municipal
Utilities or other employee of the City designated by
the City's Director of Municipal Utilities to act on
his or her THEIR behalf.
14. "Discharge" means the introduction or disposal of any
Pollutant(s), Wastewater or any liquid by any Person
into a POTW. A Discharge may be either an Industrial
Discharge or a Residential Discharge. The term
"Discharge" also means, as the context may require,
treated Wastewater exiting from a POTW.
15. "Grab Sample” means an individual sample for a
Pollutant that is collected in less than fifteen (15)
minutes without regard for flow or time of day.
16. "GRIC Agreement" means Lease Agreement B-GR-150
between the City and GRIC relating to the operation of
the POTW at Lone Butte.
17. "Immediately" means as soon as possible, but in no
event more than twenty-four (24) hours.
18. “Industrial Discharge” means any Discharge into a POTW
other than a Residential Discharge.
19. "IU" means a Person who:
(a) Causes an Industrial Discharge;
(b) Has control over the disposal of any
Pollutant which ultimately becomes all or
part of any Industrial Discharge; or
(c) Has the right of possession and control over
any property from which an Industrial
Discharge is made.
20. "Industrial Wastes" means any liquid, free flowing
waste, including cooling water, resulting from any
industrial or manufacturing process or from the
development, recovery or processing of natural
resources.

21. “Instantaneous Maximum” means the maximum
concentration of a Pollutant allowed to be Discharged
at any time determined from the analysis of a Grab
Sample collected at a specified compliance sampling
point.
22. "Interference" means the inhibition or disruption of
any POTW treatment process or operation as a result of
a Discharge to a POTW which causes or significantly
contributes to the:
(a) Violation of any NPDES Permit, APP, Reuse permit
PERMIT or other permit PERMIT term, condition,
requirement or standard which has been imposed
upon the City (including an increase in the
magnitude or duration of any such violation);
(b) Violation of any term, condition, requirement or
standard of any agreement relating to the
operation of a POTW, including the GRIC
Agreement; or
(c) City's inability to beneficially reuse or dispose
of all POTW Residuals in accordance with
applicable Federal, State or local statutes,
rules, regulations and ordinances.
23. “Monthly Average” means the average of the values of
all Compliance Samples collected over a calendar month
for a Pollutant. The Monthly Average may be either the
average of all Grab Samples taken in a given calendar
month, or the average of all Composite Samples taken
in a given calendar month.
24. "NPDES Permit" means a permit PERMIT issued by the EPA
which imposes Federal standards governing the quality
of the treated Wastewater Discharged from a POTW.
25. "New Source" means any building, structure, facility
or installation from which there is or may be a
Discharge, the construction of which commenced after
the publication of proposed Pretreatment standards
under Section 307(c) of the Act which will be
applicable to such source if such standards are

thereafter promulgated in accordance with that
section, provided that:
(a) The building, structure, facility or installation
is constructed at a site at which no other source
is located;
(b) The building, structure, facility or installation
totally replaces the process or production
equipment that causes the Discharge at an
existing source; or
(c) The production or Wastewater generating processes
of the building, structure, facility or
installation are substantially independent of an
existing source at the same site. In determining
whether these are substantially independent,
factors such as the extent to which the new
facility is integrated with the existing plant,
and the extent to which the new facility is
engaged in the same general type of activity as
the existing source should be considered.
26. "Pass Through" means a Discharge from a POTW in
quantities or concentrations which, alone or in
conjunction with a Discharge or Discharges from other
sources, is a cause of either a violation of any APP,
Reuse Permit, NPDES Permit or other permit PERMIT term,
condition, requirement or standard which has been
imposed upon the City or a violation of any agreement
term, condition, requirement or standard relating to
the operation of a POTW, including the GRIC Agreement
(including an increase in the magnitude or duration of
any such violation).
27. "Person" means any individual, partnership,
co-partnership, firm, company, corporation,
association, joint stock company, trust, estate,
municipality, Indian tribe, political subdivisions of
the state or Federal governmental agency, or any other
legal entity including their legal representatives,
agents or assigns.

28. "pH" means the negative logarithm (base 10) of the
reciprocal of the concentration of hydrogen ions
expressed in moles per liter of solution.
29. "Pollutant" means any dredged spoil, solid waste,
hazardous waste, incinerator residue, sewage, garbage,
sewage sludge, munitions, chemical waste, biological
materials, radioactive materials, heat, wrecked or
discarded equipment, rock, sand, dirt, Industrial
Waste, municipal or agricultural waste and any other
substances subject to a Pretreatment Requirement.
30. "POTW" means the sewage treatment work(s) and
connecting sewer connection system(s) which are owned
and/or operated, in whole or in part, by the City and
which provide the City with Wastewater collection,
treatment and disposal services.
31. "POTW Residuals" means all liquid and/or solids (e.g.
sludge, scum, screenings, and grit) which are the by-
product of POTW treatment operations and which may be
placed into the environment for ultimate disposal
and/or reuse.
32. "Pretreatment" means the physical, chemical,
biological, or other treatment of any Industrial
Discharge, prior to Discharge to a POTW, for the
purpose of:
(a) Reducing the amount or concentration of any
Pollutant;
(b) Eliminating the Discharge of any Pollutant; or
(c) Altering the nature of any Pollutant
characteristic to a less harmful state.
33. "Pretreatment Requirement" means compliance with all
Discharge standards and prohibitions set forth in this
Program including, without limitation, Categorical
Standards, and all of the other duties or
responsibilities imposed upon IU’s under this Program
or any order or permit PERMIT issued pursuant to this
Program.

34. “Program” means this Pretreatment Program.
35. "Reuse Permit" means a permit PERMIT issued by ADEQ for
the use of treated Wastewater Discharged from a POTW
and transported from the point of treatment to the
point of use without an intervening Discharge to the
surface waters of the State for which water quality
standards have been established.
36. "Residential Discharge" means a Discharge into a POTW
of Sanitary Waste produced entirely from either a
single or multi-family dwelling or any other facility,
not utilized for any industrial or manufacturing
process, that the Director determines will produce a
wastestream substantially identical to that produced
by a single or multi-family dwelling.
37. "Sanitary Waste" means any liquid or waterborne wastes
derived from ordinary living processes, free from
Industrial Wastes, and of such a character as to not
require any special treatment or Pretreatment under
this Program before being Discharged into a POTW.
38. "SIU" means:
(a) An IU subject to any Categorical Standard; or
(b) Any other IU that:
(i) Discharges an average of twenty-five
thousand (25,000) gallons per day or more of
Wastewater to a POTW (excluding Sanitary
Wastes and noncontact cooling and boiler
blowdown Wastewaters);
(ii) Contributes a flow of Wastewater which makes
up five (5) percent or more of the average
dry weather hydraulic or organic capacity of
a POTW; or
(iii) Is designated as such by the Director on the
basis that it has a reasonable potential for
adversely affecting a POTW's operation or
for violating any Pretreatment Requirement.

39. "SIU Permit" (or "permit" “PERMIT”) means the permit
PERMIT which each SIU must first obtain from the
Director prior to causing or allowing any Industrial
Discharge.
40. "SNC" means violations of Section II of this Program
which meet one or more of the following criteria:
(a) Chronic violations of any Discharge limits,
defined here as those in which sixty-six percent
(66%) or more of all of the measurements taken
for the same Pollutant during a six (6) month
period exceed (by any magnitude) the Daily
Maximum, Instantaneous Maximum or Monthly Average
for that Pollutant;
(b) TRC violations, defined here as those in which
thirty-three percent (33%) or more of all of the
measurements taken for the same Pollutant during
a six (6) month period equal or exceed the
product of the Daily Maximum, Instantaneous
Maximum or Monthly Average for that Pollutant
multiplied by the applicable TRC (TRC = 1.4 for
BOD, TSS, fats, oil, and grease, and 1.2 for all
other Pollutants except pH);
(c) Any other violation that the Director determines
has, alone or in combination with other
Discharges, caused Interference or Pass Through
or endangered the health of POTW personnel or the
public;
(d) Any Discharge of a Pollutant that has caused
imminent endangerment to human health or welfare
or to the environment, and has resulted in the
Director's exercise of his or her THEIR emergency
authority to halt or prevent such a Discharge;
(e) Violations of Compliance Schedule milestones
contained in a SIU Permit or enforcement order,
for starting construction, completing
construction, or obtaining final compliance, by
ninety (90) calendar days or more after the
scheduled date for that milestone;

(f) Failure to provide reports for Compliance
Schedules, self-monitoring data and applicable
Pretreatment Requirements within forty-five (45)
calendar days from the due date;
(g) Failure to accurately report non-compliance; or
(h) Any other violation or group of violations of the
Act, this Program or the conditions of any permit
PERMIT or order issued pursuant to this Program,
including a violation of BMP’S, that the Director
determines to be significant.
41. "Slug Discharge" means any Discharge of a non-routine,
episodic nature including, but not limited to, an
accidental spill or a non-customary Batch Discharge,
which has a reasonable potential to cause Interference
or Pass Through, or in any other way violate this
Program or any permit PERMIT issued pursuant to this
Program.
42. "Slug Discharge Control Plan" means a plan to control
a Slug Discharge.
43. "TSS” means the total suspended matter that floats on
the surface of, or is suspended in, Wastewater.
44. “Upset” means an exceptional incident in which there
is an unintentional and temporary violation of a
Pretreatment Requirement because of factors beyond the
reasonable control of the IU. An Upset does not
include a violation caused by operational error,
improperly designed treatment facilities, inadequate
treatment facilities, lack of preventive maintenance,
or careless or improper operation.
45. "Wastewater" means any liquid, or any combination of
water-carried Pollutant(s), which is Discharged into a
POTW from any dwelling, commercial building,
industrial facility or institution together with such
ground, surface and storm water as may be present.

D. Confidentiality
1. Trade Secret Claims. Information and data about an IU
obtained by the City from questionnaires, reports,
permit PERMIT applications, permit PERMITS, monitoring
programs and inspections shall WILL be available to
the public or other governmental agencies without
restriction unless the IU specifically requests that
such information and data not be released and is able
to demonstrate to the satisfaction of the Director
that the release of such information would divulge
information, processes or methods of production
entitled to protection as trade secrets of the IU. To
claim this trade secret protection, the IU must
specify at the time of submittal to the City, the
parts of the information and data it desires to
protect. Wastewater constituents for which a Discharge
standard or prohibition is identified in this Program
shall WILL not be recognized as confidential
information.
2. Disclosure Provisions. If a Person furnishing
information or data through submitted reports or
otherwise, satisfies the above-referenced
confidentiality requirements, the portions of the
information and data provided which would disclose
trade secrets or secret processes shall WILL, subject
to applicable public records law set forth in A.R.S. §
39-101, et seq., not be made available for inspection
by the public but shall WILL be made available upon
written request to governmental agencies for uses
related to any NPDES Permit, APP, Reuse Permit or
other permit PERMIT to which the City is subject, and
any other uses necessary to carry out the objectives
of the Act or this Program; provided, however, that
such confidential portions of a report shall WILL be
available for use by the City, the State or any
governmental agency in judicial review or enforcement
proceedings involving the Person furnishing the
report. If any governmental agency requests data and
information accepted by the City as confidential, the
City shall WILL use reasonable efforts to notify the
IU of the request prior to transmittal of that data or
information to the requesting governmental agency. In
the event of a public records request for data or

information accepted by the City as confidential, the
City will use reasonable efforts to notify the IU of
the request to permit PERMIT the IU the opportunity to
intervene and prevent the transmittal of the requested
data or information by means of a court order. An IU
shall MAY be entitled to inspect information and data
relating to that IU to ensure that confidential
materials are properly identified as such.
SECTION II. INDUSTRIAL USER PROVISIONS
A. Discharge Prohibitions
No IU shall WILL Discharge to a POTW any Pollutant or
Wastewater which will cause Pass Through or Interference.
Such Discharge prohibitions include, but are not limited
to, the types of Discharges which are set forth below.
1. Flow and Concentration. Discharges that are released
at a flow rate and/or Pollutant concentration which
will cause Interference.
2. Fire and Explosion Potential. Discharges that create a
fire or explosion hazard to a POTW including, but not
limited to, Discharges with a closed cup flashpoint of
less than 60 degrees C (140 degrees F) using the test
methods specified in 40 CFR Part 261.21.
3. Viscous Substances. Discharges that contain any solid
or viscous substances in amounts which will obstruct
Wastewater flow in any POTW resulting in Interference.
4. Corrosiveness. Discharges that will cause corrosive
structural damage to a POTW. In no case shall WILL a
Discharge to a POTW have a pH lower than 5.0 or
greater than 12.5, unless the Director, in his or her
THEIR sole discretion, determines that a POTW is
specifically designed to accommodate such Discharges.
5. Heat. Discharges that will inhibit biological activity
in any POTW sewage treatment works resulting in
Interference. In no case shall WILL a Discharge cause
heat in such quantities that the temperature at any
POTW treatment works exceeds 40 degrees C (104 degrees
F) unless the Director, in his or her THEIR sole

discretion, determines that alternate temperature
limits are appropriate.
6. Slug Discharge. Discharges that constitute or contain
any Slug Discharge.
7. Noxious Substances. Discharges that contain any
noxious or malodorous liquids, gases or solids which,
either singly or by interaction with other substances,
will create a public nuisance, a hazard to life,
prevent entry into a POTW for maintenance and repair
purposes or otherwise cause acute worker health and
safety problems.
8. Dilution. Discharges that have in any way been diluted
as a substitute for Pretreatment for the purpose of
obtaining compliance with any Pretreatment Requirement
imposed by this Program. However, dilution is allowed
to the extent that it is expressly authorized by any
applicable Categorical Standard.
9. Rainwater. Discharges that consist of unpolluted
rainwater run-off or single pass cooling water unless
no other disposal option is feasible and the Discharge
is expressly approved by the Director prior to
Discharge.
10. Local Limits. Discharges that exceed the Daily Maximum
or Instantaneous Maximum limits specified below for
the following substances:
(a) 0.22 0.165 mg/L arsenic;(TOTAL);
(b) 2.40 mg/L boron;(TOTAL);
(c) 0.06 0.045 mg/L cadmium;(TOTAL);
(d) 0.43 mg/L chromium; TOTAL);
(e) 0.37 mg/L chloroform;
(f) 1.50 mg/L copper;(TOTAL);
(g) 0.36 mg/L cyanide;(TOTAL);
(h) 0.46 mg/L lead;(TOTAL);
(i) 1.00 mg/L manganese;(TOTAL);
(j) 0.074 mg/L molybdenum;(TOTAL);
(k) 0.02 mg/L mercury;(TOTAL);
(l) 0.60 mg/L nickel;(TOTAL);
(m) 0.07 mg/L selenium;(TOTAL);
(n) 0.30 mg/L silver;(TOTAL);

(o) 9.00 5.00 mg/L zinc;(TOTAL);
(p) 100.00 mg/L total grease, fat, oil, and like
substances; or
(q) 10.00 mg/L fluoride (TOTAL) (unless the IU is in
compliance with a BMP pursuant to subsection E of
this Section).
11. Categorical Standards. Discharges that will cause the
violation of any applicable Categorical Standard.
12. Pumped Wastes. Discharges of Pollutants that are
transported to a POTW by any septic tank pumper,
chemical waste hauler or similar transporter except at
specified Discharge points, if any, designated by the
Director.
13. Toxic Materials. Discharges that are a toxic or
poisonous substance in a sufficient amount to either
cause Interference or constitute an acute hazard to
humans or animals in the receiving stream.
14. Oil Products. Discharges that contain petroleum oil,
non-biodegradable cutting oil, or products of mineral
oil origin in amounts that will cause Interference or
Pass Through.
B. Affirmative Defense
1. Requirements. An IU shall MAY have an affirmative
defense in any action brought against it alleging a
violation of the Discharge prohibitions established in
subsection A of this Section if the IU can demonstrate
that:
(a) It did not know or have reason to know that its
Discharge, alone or in conjunction with a
Discharge or Discharges from other sources, would
violate any Discharge prohibition established in
subsection A of this Section;
(b) The Discharge did not violate any specific
Discharge prohibition established under
paragraphs 1, 3, 5, 7, 10, 11 or 14 of subsection
A of this Section; and

(c) If the IU is classified as a SIU, the SIU was
operating pursuant to a current SIU Permit issued
by the Director and was in compliance with the
provisions of that permit PERMIT at the time of
the Discharge.
2. Limitations to Claim of Affirmative Defense. The
provisions for an affirmative defense apply only to
actions brought pursuant to Section III.B.12 of this
Program and do not in any way limit:
(a) An IU’s responsibilities pursuant to
Section II.K.9 of this Program; or
(b) The Director's authority to modify any permit
PERMIT issued, issue administrative orders
relating to the violation or otherwise take
action to prevent continued Discharges into a
POTW in violation of Section II.A of this
Program.
3. Burden of Proof. An IU shall WILL have the burden of
proof to establish that it has met the requirements
for claiming an affirmative defense.
C. BOD, TSS and Ammonia Levels
1. Pollutant Charges. IU’s exceeding the TSS, BOD or
ammonia Discharge levels set forth below shall MUST pay the
fee provided in Section 50-13, Chandler City Code:
(a) 350.00 mg/L TSS;
(b) 300.00 mg/L BOD; or
(c) 35.00 mg/L ammonia.
2. BOD Trigger Level. If an SIU is currently Discharging
or proposes to Discharge more than 63 lbs./day of BOD,
the Director shall WILL set an individual mass based
BOD limit in the SIU Permit. The Director shall WILL
set the BOD limit considering the following factors:
(a) The existing BOD loading; and
(b) The future, additional BOD loading anticipated
from IUs, SIUs and Residential Discharges at the
POTW that will receive Discharges from that SIU.

3. TSS Trigger Level. If an SIU is currently Discharging
or proposes to Discharge more than 73 lbs./day of TSS,
the Director shall WILL set an individual mass based
TSS limit in the SIU Permit. The Director shall WILL
set the TSS limit considering the following factors:
(a) The existing TSS loading; and
(b) The future, additional TSS loading anticipated
from IUs, SIUs and Residential Discharges at the
POTW that will receive Discharges from that SIU.
4. Director Discretion to Limit Discharge. Nothing in this
subsection shall WILL be deemed to limit the
Director’s authority to limit the Discharge of BOD,
TSS or ammonia to prevent Interference or Pass
Through.
D. Continuous Monitoring of pH Levels
1. Director Discretion to Forego Enforcement. The
Director shall WILL have the discretionary authority
to forgo any formal enforcement action for violations
relating to the pH Discharge prohibitions established
in subsection A.4 of this Section if the following
conditions are satisfied:
(a) The IU continuously measures the pH of its
Discharge;
(b) The total time during which the pH values are
outside the required range of pH values does not
exceed seven (7) hours and twenty-six (26)
minutes in any calendar month;
(c) No individual violation from the range of pH
values exceeds sixty (60) minutes;
(d) The Discharge does not violate any Discharge
prohibition other than that established in
subsection A.4;
(e) The cumulative affect of continued violations of
this nature will not cause corrosive structural
damage to a POTW; and

(f) The IU complies with all notice requirements
regarding the violation set forth in Section
II.K.7 of this Program.
2. Adjust Requirements. The Director may adjust the
requirements set forth in paragraph 1 of this
subsection based upon the POTW treatment system, plant
configuration or other technical factors.
E. Fluoride BMP’s
1. Director Discretion to Include BMP’s. The Director
shall WILL have the discretionary authority to issue a
SIU Permit allowing a Discharge exceeding the
Discharge prohibition established in subsection
A.10(q) of this Section if the permit PERMIT includes
enforceable BMP’s relating to the Discharge of
fluoride designed with an appropriate level of
Pretreatment or operational practice(s) to ensure that
the Discharge of fluoride pursuant to the SIU Permit
will not cause Pass Through. The issuance of a SIU
Permit which includes BMP’s and/or a Compliance
Schedule shall WILL be at the sole discretion of the
Director and no SIU shall WILL be deemed to be
entitled to a permit PERMIT which includes BMP’s and/or
a Compliance Schedule by virtue of this subsection.
2. BMP Requirements. Any BMP’s developed in conjunction
with the issuance of a SIU Permit may include an
evaluation of cost benefit considerations and the
total mass loadings contributed by the SIU for whom
the permit PERMIT will be issued. BMP’s for facilities
with any high concentration flows (maximum
concentrations exceeding 200 mg/L) generated by a SIU
with a maximum daily fluoride load of 3 pounds or more
per day, will generally include calcium precipitation
or an equivalent treatment. Treatment requirements for
flow concentrations less than 200 mg/L will be based
on the need for such treatment to prevent Pass
Through, and may include calcium precipitation,
activated alumina, alum addition, ion exchange, or any
treatment capable of equivalent concentration
reductions. BMP’s will always include an analysis as
to the feasibility of, and need for, waste

segregation, source substitution, enhanced sampling,
and the impact of water conservation efforts being
employed by the SIU. Batching and/or discharge
equalization may be considered on a case-by-case
basis.
3. SIU Request for BMP’s. Unless requested by a SIU, SIU
Permits will be issued by the Director without BMP’s.
A request to include BMP’s in a SIU Permit shall WILL
be made to the Director before issuance of the permit
PERMIT and shall MUST include a proposed BMP plan
together with a proposed Compliance Schedule, if
applicable. The Director shall evaluate the BMP plan
proposed, and the need for any additional time
requested to achieve full compliance with that plan,
and notify the SIU of its initial determination within
forty-five (45) calendar days of its receipt of the
request. A Compliance Schedule for newly constructed
or modified facilities will generally not be accepted
by the Director, as full compliance with the BMP is
expected upon completion of the construction of the
new or modified facility.
4. Compliance Schedule. To the extent that an existing
SIU cannot Immediately comply with the BMP’s
established, the SIU Permit for that SIU may include
an enforceable Compliance Schedule setting forth
either a date by which the SIU will achieve full
compliance, or a series of interim dates reflecting
when the SIU will satisfy specified objective
milestones. Compliance Schedules shall MUST contain
provisions to ensure that the Discharge from that SIU
will not cause Pass Through during the period before
full compliance is scheduled to be achieved.
5. Maintenance. Fluoride treatment and control systems
installed on or before the issuance of a SIU Permit
that includes BMP’s shall MUST be properly maintained
and operated in accordance with the maintenance and
operations specifications for that treatment or
control system at all times during the term of the SIU
Permit issued.

F. Upset
1. Upset as an Affirmative Defense. An Upset shall WILL
constitute an affirmative defense to an action brought
for a violation of a Pretreatment Requirement if the
IU demonstrates, through properly signed,
contemporaneous operating logs, or other relevant
evidence that:
(a) An Upset occurred and the IU can identify the
cause(s) of the Upset;
(b) The facility was being operated in a prudent and
workman-like manner and in compliance with
applicable operation and maintenance procedures
at the time of the Upset;
(c) The IU has submitted the following information to
the Director Immediately upon becoming aware of
the Upset (if this information is provided
verbally, a written submission must be provided
within five (5) calendar days):
(i) A description of the Upset and the cause and
nature of the violation resulting from the
Upset;
(ii) The duration of the violation, including
exact dates and times or, if not corrected,
the anticipated time the violation is
expected to continue; and
(iii) The steps being taken and/or planned to
reduce, eliminate and prevent recurrence of
the Upset or any resulting violation of
Pretreatment Requirements.
2. Burden of Proof. An IU shall MUST have the burden of
proof of establishing that any violation that is the
subject of any enforcement proceeding was the result
of an Upset.
G. Bypass
1. Occurrence. An IU may allow a Bypass to occur which
does not cause a violation of any Pretreatment

Requirement, but only if such Bypass is for essential
maintenance to assure efficient operation. These
Bypasses are not subject to the provisions of
paragraph (4) of this subsection.
2. Prior Notice. If an IU knows in advance of the need
for a Bypass, it shall MUST submit prior notice to the
Director, if possible, at least ten (10) calendar days
before the date of the Bypass.
3. Notice of Unanticipated Bypass. An IU shall MUST
submit verbal notice of an unanticipated Bypass that
causes a violation of any Pretreatment Requirements to
the Director Immediately upon becoming aware of the
Bypass. A written submission shall MUST also be
provided within five (5) calendar days of the time the
IU becomes aware of the Bypass. The written submission
shall MUST contain a description of the Bypass and its
cause; the duration of the Bypass, including exact
dates and times, and, if the Bypass has not been
corrected, the anticipated time it is expected to
continue; and steps taken or planned to reduce,
eliminate, and prevent reoccurrence of the Bypass. The
Director may waive the written report on a case-by-
case basis if the verbal report has been received as
set forth above.
4. Requirements to Avoid Enforcement. Bypass is
prohibited, and the Director may take enforcement
action against an IU for a Bypass unless the IU can
clearly establish that:
(a) Bypass was unavoidable to prevent loss of life,
personal injury, or substantial physical damage
to property, damage to treatment facilities which
causes them to become inoperable, or the
substantial and permanent loss of natural
resources;
(b) There were no feasible alternatives to the
Bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or
maintenance during normal periods of equipment
downtime. This condition is not satisfied if
adequate back-up equipment should have been

installed in the exercise of reasonable
engineering judgment to prevent a Bypass which
occurred during normal periods of equipment
downtime or preventative maintenance; and
(c) The IU submitted notices as required under this
subsection.
5. Director Approval. The Director may approve an
anticipated Bypass, after considering its adverse
effects, if the Director determines that it will meet
the three conditions listed in paragraphs 4(a) through
(c) of this subsection.
H. Hazardous Waste Notification
1. Notice Requirement. An IU shall MUST notify the
Director, the EPA Regional Waste Management Division
Director, and ADEQ in writing of any Discharge into a
POTW of a substance, which, if otherwise disposed of,
would be a hazardous waste under 40 CFR Part 261. Such
notification must include the name of the hazardous
waste as set forth in 40 CFR Part 261, the EPA
hazardous waste number, and the type of Discharge
(continuous, batch, or other). If the IU Discharges
more than 100 kilograms of such waste per calendar
month to a POTW, the notification shall MUST also
contain the following information to the extent such
information is known and readily available to the IU:
(a) An identification of the hazardous constituents
contained in the wastes;
(b) An estimation of the mass and concentration of
such constituents in the wastestream Discharged
during that calendar month; and
(c) An estimation of the mass of constituents in the
wastestream expected to be Discharged during the
following twelve months.
All notifications must take place within one hundred
eighty (180) calendar days after the Discharge of the
listed or characteristic hazardous waste. Any
notification under this paragraph need be submitted

only once for each hazardous waste Discharged.
However, notifications of changed Discharges must be
submitted under 40 CFR Part 403.12 (j). The
notification requirement in this section does not
apply to Pollutants already reported under the self-
monitoring requirements of Section II.L.9.
2. Exemptions. An IU is exempt from the requirements of
paragraph 1 of this subsection during calendar months
in which they Discharge no more than fifteen kilograms
of hazardous wastes, unless the wastes are acute
hazardous wastes as specified in 40 CFR Part 261.30(d)
and 261.33(e). Discharge of more than fifteen
kilograms of non-acute hazardous wastes in a calendar
month, or of any quantity of acute hazardous wastes as
specified in 40 CFR Part 261.30(d) and 261.33(e),
requires a one-time notification. Subsequent months
during which the IU Discharges more than such
quantities of any hazardous waste do not require
additional notification.
3. IU Notification of New Hazardous Substances. In the
case of any new EPA regulations identifying additional
characteristics of hazardous waste or listing any
additional substance as a hazardous waste, the IU must
notify the Director, the EPA Regional Waste Management
Waste Division Director, and ADEQ of the Discharge of
such substance within ninety (90) calendar days of the
effective date of such regulations.
4. Certification. In the case of any notification made
under paragraph 1 of this subsection, the IU shall
MUST certify that it has a program in place to reduce
the volume and toxicity of hazardous wastes generated
to the degree it has determined to be economically
practical.
I. Compliance Schedules
Any Compliance Schedule issued pursuant to this Program
shall WILL contain increments of progress in the form of
dates for the commencement and completion of major events
leading to the construction and operation of additional
Pretreatment required for the IU to meet the applicable
Pretreatment Requirements (e.g., hiring an engineer,

completing preliminary plans, completing final plans,
executing contracts for major components, commencing
construction, completing construction, etc.). Compliance
Schedules shall MUST reflect the shortest time period
practicable to achieve full compliance and no increment
referred to in the Compliance Schedule shall WILL exceed
nine (9) months. Not later than fourteen (14) calendar days
following each date in the schedule and the final date for
compliance, the IU shall MUST submit a progress report to
the Director including, at a minimum, whether or not it
complied with the increment of progress to be met on such
date and, if not, the date on which it expects to comply
with this increment of progress, the reason for delay, and
the steps being taken by the IU to return to the schedule
established. In no event shall MAY more than nine (9)
months elapse between such progress reports to the
Director.
J. Equivalent Mass Limits
1. When the limits in a Categorical Standard are
expressed only in terms of Pollutant concentrations,
an IU may request that the City convert the limits to
equivalent mass limits. The determination to convert
concentration limits to mass limits is within the
discretion of the City. The City may establish
equivalent mass limits only if the IU meets all the
following conditions.
To be eligible for equivalent mass limits, the IU
must:
(a) Employ, or demonstrate that it will employ, water
conservation methods and technologies that
substantially reduce water use during the term of
its Permit;
(b) Currently use control and treatment technologies
adequate to achieve compliance with the
applicable Categorical Standards, and not have
used dilution as a substitute for treatment;
(c) Provide sufficient information to establish the
facility’s actual average daily flow rate for all
wastestreams, based on data from a continuous

effluent flow monitoring device, as well as the
facility’s long-term average production rate.
Both the actual average daily flow rate and the
long-term average production rate must be
representative of current operating conditions;
(d) Not have daily flow rates, production levels, or
pollutant levels that vary so significantly that
equivalent mass limits are not appropriate to
control the Discharge; and have consistently
complied with all applicable Categorical
Standards during the period prior to the IU
request for equivalent mass limits.
2. An IU subject to equivalent mass limits must:
(a) Maintain and effectively operate control and
treatment technologies adequate to achieve
compliance with the equivalent mass limits;
(b) Continue to record the facility’s flow rates
through the use of a continuous effluent flow
monitoring device;
(c) Continue to record the facility’s production
rates and notify the City whenever production
rates are expected to vary by more than 20
percent from its baseline production rates
determined in paragraph J.1.(c) of this section.
Upon notification of a revised production rate,
the City must reassess the equivalent mass limit
and revise the limit as necessary to reflect
changed conditions at the facility; and
(d) Continue to employ the same or comparable water
conservation methods and technologies as those
implemented pursuant to paragraphs J.1.(a)of this
section so long as it Discharges under an
equivalent mass limit.
3. A City which chooses to establish equivalent mass
limits:
(a) Must calculate the equivalent mass limit by
multiplying the actual average daily flow rate of

the regulated process(es)of the IU by the
concentration-based Daily Maximum and Monthly
Average Standard for the applicable Categorical
Standards and the appropriate unit conversion
factor;
(b) Upon notification of a revised production rate,
it may reassess the equivalent mass limit and
recalculate the limit as necessary to reflect
changed conditions at the facility; and
(c) May retain the same equivalent mass limit in
subsequent Permit terms if the IU’s actual
average daily flow rate was reduced solely as a
result of the implementation of water
conservation methods and technologies, and the
actual average daily flow rates used in the
original calculation of the equivalent mass limit
were not based on the use of dilution as a
substitute for treatment pursuant to Section II.
A.8. of this Program. The IU must also be in
compliance with Section II.G. of this Program
(regarding the prohibition of Bypass).
K. General IU Requirements
1. Sampling Protocol. If an IU is required to collect a
Compliance Sample, it shall MUST perform such sampling
activities in accordance with procedures established
under this Program and 40 CFR Part 136, or with any
other test procedures approved by the EPA. Where 40
CFR Part 136 does not include sampling or analytical
techniques for the Pollutants in question, or where
the EPA determines that the Part 136 sampling and
analytical techniques are inappropriate for the
Pollutant in question, sampling and analyses shall
MUST be performed using validated analytical methods.
(a) Grab Samples must be used for pH, cyanide, oil
and grease, ammonia and volatile organic
compounds. For all other Pollutants, 24-hour
Composite Samples must be obtained through flow-
proportional Composite Sampling techniques,
unless time-proportional Composite Sampling or
Grab Sampling is authorized by the Director.

(b) Where time-proportional Composite Sampling or
Grab Sampling is authorized by the Director, the
samples must be representative of the Discharge
and the decision to allow the alternative
sampling must be documented in the IU file for
that facility or facilities.
(c) Using protocols (including appropriate
preservation) specified in 40 CFR Part 136 and
appropriate EPA guidance, multiple Grab Samples
collected during a 24-hour period may be
composited prior to the analysis as follows: For
cyanide and ammonia the samples may be composited
in the laboratory or in the field; for volatile
organics and oil and grease the samples may be
composited in the laboratory. Composite Samples
for other parameters unaffected by the
compositing procedures as documented in approved
EPA methodologies may be authorized by the
Director, as appropriate.
2. Compliance. Each IU shall MUST comply with applicable
Pretreatment Requirements and all other requirements
of this Program.
3. Inspection. Each IU shall MUST carry out and maintain
an adequate record of all self-inspection activities
required to establish compliance under this Program
including, without limitation, inspection of oil and
grease traps.
4. Records Retention. Each IU shall MUST maintain all
applicable records regarding compliance with this
Program for a minimum period of three (3) years and
such records shall WILL be made available for
inspection and copying by the Director upon his or her
THEIR request.
5. Cooperation. Each IU shall WILL assist the Director to
determine the exact nature, concentration, and volume
of any Pollutant or Wastewater intended for Discharge
to the POTW. Therefore, upon request, an IU shall MUST
promptly:

(a) Allow the examination and copying of all relevant
records or documents available to the IU;
(b) Allow the inspection of all business locations
served by a POTW, including all Pretreatment
equipment, methods and activities utilized by the
IU at such locations;
(c) Install and maintain, at the IU’s expense,
convenient and adequate monitoring and/or
sampling point(s) needed by the Director for
monitoring and/or sampling purposes;
(d) Allow the taking and removal of samples from any
Wastewater; and
(e) Provide the Director with any other information,
including but not limited to chemical analyses of
Wastewater and architectural or engineering
design data and drawings etc., which are
reasonably needed by the Director for the purpose
of determining such IU's compliance with this
Program.
6. Cease Discharge When Directed. Each IU shall MUST
comply with any demand of the Director to halt any
actual or threatened Discharge to a POTW when the
Director has given notice that such actual or
threatened Discharge:
(a) Presents or may present an imminent or
substantial endangerment to the health or welfare
of any Person or to the environment; or
(b) Will cause Interference or Pass Through.
7. Notice of Violation. Each IU shall MUST Immediately
notify the Director of any violation of this Program.
For Discharge violations, such notice shall WILL be
provided to the Director Immediately after IU receipt
of analytical sampling results. This notification
shall WILL be followed within five (5) calendar days
by a detailed written statement describing the:
(a) Location of the Discharge;

(b) Known or estimated nature, concentration and
volume of the Discharged Pollutant(s);
(c) Causes of the Discharge; and
(d) Duration of the Discharge, including exact dates
and times of the start and end of the Discharge
violation;
(e) Corrective action(s) undertaken, being undertaken
and/or to be undertaken by the IU. Any IU causing
such a Discharge shall MUST initiate all
appropriate corrective action(s) which are needed
to:
(i) Prevent any further injury to human health
or safety, or to the environment, a POTW or
any other property;
(ii) Promptly assess, mitigate, repair, restore
or remediate all or part of any injury or
damage caused by such Discharge; and
(iii) Prevent a future occurrence.
Such notification shall WILL not relieve the IU of
liability for any expense, loss or damage to a POTW,
or for any fines or penalties imposed on the City on
account thereof and/or for any enforcement action
pursuant to this occurrence.
8. Resampling. If a Discharge violation relates to a
Compliance Sample taken by either the IU or the City,
the IU shall MUST repeat the sampling and analysis
establishing the violation and submit, in writing, the
results of the second analysis within thirty (30)
calendar days of becoming aware of the violation. The
IU is not required, unless specifically ordered by the
Director, to resample if the City obtained a sample at
the same Discharge point for the same Pollutant(s)
between the time the IU performed its sampling and the
time the IU receives the results of the sampling. This
paragraph does not apply to a violation of the pH
standard set forth in Section II.A.4 when an IU

continuously monitors for pH pursuant to Section II.D
of this Program.
9. Payment of Fees. Each IU shall MUST pay applicable
fees charged by the City pursuant to Sections 50-12
and 50-13, Code of the City of Chandler.
10. Financial Responsibility. Each IU shall WILL be
financially responsible for all injury, damage or loss
suffered by any Person as a result of any Industrial
Discharge by such IU which violates any applicable
Pretreatment Requirement or any permit PERMIT condition
enforced pursuant to this Program. In particular such
IU shall WILL be liable for the:
(a) Personal injury suffered by any Person as a
result of such Discharge;
(b) Costs reasonably incurred by any Person in
correcting, assessing, remediating or otherwise
mitigating any adverse environmental impact which
resulted from such Discharge;
(c) Economic loss and property damage suffered by any
Person as a result of such Discharge; and
(d) Fines and penalties imposed on any Person in any
enforcement action taken against that Person as a
result of such Discharge.
11. Corrective Measures and Control of Discharge. Each IU
shall MUST take all reasonable steps to minimize or
correct any adverse impact to a POTW or the
environment resulting from any non-compliance with the
Act, this Program or the provisions of any SIU Permit
issued, including such accelerated or additional
monitoring as necessary to determine the nature and
impact of any non-complying Discharge to a POTW. Upon
reduction of efficiency of operations, or loss or
failure of all or part of an IU’s Pretreatment
capabilities, each IU shall MUST control its
operations or Discharges (or both) until the IU's
Pretreatment capabilities are restored or an adequate
alternative method of Pretreatment is provided.

12. Accurate Disclosure. No IU shall WILL misrepresent
relevant facts relating to any Industrial Discharge,
falsify reports submitted to the City pursuant to this
Program, tamper with monitoring equipment or otherwise
engage in activities contrary to the purposes of this
Program.
L. Additional SIU Requirements
In addition to all other requirements which this Program
imposes upon all IU’s, each SIU shall WILL also be subject
to the requirements set forth below.
1. Obtain Permits. Each SIU shall MUST obtain a SIU
Permit from the Director. Any application for a permit
PERMIT shall MUST be submitted on a form provided by
the Director. Any Person intending to commence any new
Industrial Discharge(s), or any additional Industrial
Discharge(s) not already allowed pursuant to an
existing permit PERMIT, shall MUST first obtain a new
or an amended SIU Permit, as applicable, from the
Director prior to initiating such Discharge(s).
2. Comply with Permit Terms. Each SIU shall MUST comply
fully with all requirements and conditions of any SIU
Permit. Once a permit PERMIT is issued no SIU shall
WILL:
(a) Make any new or increased Industrial Discharge
without first obtaining an amended SIU Permit; or
(b) Otherwise make any change in the nature of its
Industrial Discharge(s) if such change will cause
any new or increased OR DECREASED Industrial
Discharge without first obtaining an amended SIU
Permit.
The Director has the discretionary authority to waive
the requirement to obtain an amended permit PERMIT for
insignificant changes to the nature, concentration,
and volume of an Industrial Discharge. This waiver may
be exercised only when the Director receives prior,
accurate, notice of any change to the nature,
concentration or volume of a SIU’s Industrial
Discharge pursuant to subsection L.4 of this Section.

3. Provide Pretreatment. Each SIU shall MUST provide all
of the Pretreatment necessary to comply with all
applicable Pretreatment Requirements and any SIU
Permit issued pursuant to this Program.
4. Notice of Change in Discharge. No SIU shall WILL make
a substantial change to its Pretreatment methodology,
or make any facility expansion, production INCREASE OR
DECREASE, or process modification which results, or
may result, in new or increased OR DECREASED
Discharges, or a change in the nature of the
Discharge, without providing written notice to the
Director at least ninety (90) calendar days prior to
implementing that change. Additionally, no SIU shall
WILL make any change to a BMP set forth in a SIU
Permit without first obtaining a modified permit PERMIT
reflecting that change.
5. Notice of Change Affecting Potential for a Slug
Discharge. SIUs are required to notify the Director
immediately of any changes at its facility affecting
the potential for a Slug Discharge.
6. Access to Compliance Sampling Points. Each SIU shall
MUST provide the City adequate access to all Discharge
and Compliance Sampling points. The SIU, upon request
and at its own expense, shall WILL be allowed to take
a split sample of any Compliance Sample taken by the
City provided that the request does not delay or
interfere with the City's sampling activities. If a
SIU requests a split sample as provided herein, the
SIU shall MUST deliver the split sample to a
laboratory for analysis and submit the analytical
results relating to that sample to the City within ten
(10) calendar days of its receipt of laboratory
results.
7. Separation of Compliance Sampling Points. Each SIU
subject to compliance with a Categorical Standard
shall MUST, where feasible, provide separate
Industrial Waste and Sanitary Waste Wastewater
compliance sampling points so as to reduce or
eliminate the likelihood of diluting the Industrial

Discharge samples to be taken pursuant to this Program
or any permit PERMIT issued hereunder;
8. Batch Discharge. When a Batch Discharge is subject to
Compliance Sampling, each SIU shall MUST maintain a
Batch Discharge record which clearly identifies the:
(a) Dates and times of all Batch Discharges; and
(b) Nature, concentration(s) and volume(s) of all
such Discharges.
9. Self-Monitoring Reports. Each SIU shall MUST provide
the Director with all of the self-monitoring reports
and notices which the SIU is required to submit in
accordance with the following sub-paragraphs. In
particular, each SIU shall MUST perform the following:
(a) One-Time Baseline Monitoring Report. Within one
hundred eighty (180) calendar days after the
effective date of a Categorical Standard, or one
hundred eighty (180) calendar days after the
final administrative decision is made upon a
category determination submission under 40 CFR
Part 403.6(a)(4), whichever is later, existing
SIU’s subject to such Categorical Standard and
currently Discharging to or, scheduled to
Discharge to, a POTW shall WILL be required to
submit to the Director a report which contains
the information described in 40 CFR
403.12(b)(1)-(7). At least ninety (90) calendar
days prior to commencement of Discharge, New
Sources, and sources that become SIU’s subsequent
to the promulgation of an applicable Categorical
Standard, shall WILL be required to submit a
report to the Director containing the information
set forth in 40 CFR Part 403.12(b)(1) – (5). New
Sources shall MUST also include in their report
information on the method of Pretreatment it will
use to meet applicable Pretreatment Requirements;
(b) One-Time 90-day Compliance Report. Within ninety
(90) calendar days following the date for final
compliance with any applicable Categorical
Standard, or, in the case of a New Source,

following commencement of the introduction of
Wastewater into a POTW, any SIU subject to any
Categorical Standard shall MUST submit to the
Director a report containing the information
described in 40 CFR Part 403.12(b)(4)-(6). For
SIU’s subject to equivalent mass or concentration
limits established by the City in accordance with
procedures in 40 CFR Part 403.6(c), this report
shall MUST contain a reasonable measure of the
SIU’s long term production rate. For all other
SIU’s subject to Categorical Standards expressed
in terms of allowable Pollutant Discharge per
unit of production (or other measures of
operation), this report shall MUST include the
SIU's actual production during the appropriate
Compliance Sampling period;
(c) Sampling Requirements for Baseline Monitoring and
90-day Compliance Reports. For sampling required
in support of baseline monitoring and 90-day
compliance reports required in subparagraphs (a)
and (b) above, a minimum of four (4) Grab Samples
must be used for pH, cyanide, total phenols, oil
and grease, sulfide and volatile organic
compounds for facilities for which historical
sampling data does not exist. For facilities for
which historical sampling data is available, the
Director may authorize a lower minimum. For the
reports required by subparagraph (d) below, the
Director shall WILL require the number of Grab
Samples necessary to assess and assure compliance
by SIUs with applicable Pretreatment
Requirements.
(d) Self-Monitoring report. Submit reports to the
Director indicating the nature and concentration
of all Pollutants in the Discharge that are
limited by any applicable Pretreatment
Requirement, or any Permit issued pursuant to
this Program. Reports shall MUST be submitted as
specified in the permit PERMIT issued, but in no
event less than twice annually or cover more than
a seven (7) month period. Both maximum and
average daily flows shall MUST be reported for
each reporting period. Unless otherwise specified

by the Director, maximum and average daily flows
may be estimated. At the discretion of the
Director more detailed reporting of flows may be
required. To the extent that a SIU samples or
monitors a Pollutant during a reporting period
more frequently than required under this Program,
including any permit PERMIT or order issued
pursuant to this Program, the results of such
additional sampling or monitoring shall MUST be
included in the report submitted for that
reporting period; and
(e) Contents. The reports defined in subparagraph (d)
above shall MUST contain the results of sampling
and analysis of all Pollutants and Wastewater
Discharged, including the flow and the nature and
concentration of Pollutants contained therein,
which are limited by any applicable Categorical
Standard or Pretreatment Requirement. These
reports must be based upon data obtained through
appropriate sampling and analysis performed
during the period covered by the report, which
data are representative of conditions occurring
during the reporting period. The Director shall
WILL require that frequency of monitoring
necessary to assess and assure compliance by
SIU’s with applicable Pretreatment Requirements.
These reports shall MUST also include the
following:
(i) The date, exact place, method of sampling,
sample preservation techniques or
procedures, time of sampling and the names
of the Person or Persons taking the samples;
(ii) The date(s) analyses were performed;
(iii) The name of laboratory and/or Person who
performed the analyses;
(iv) The analytical techniques/methods used;
(v) The results of each analyses; and

(vi) A copy of chain of custody documentation
from the sampling event.
10. Sampling and Flow Monitoring Equipment. The Director
may require the SIU to install monitoring equipment as
necessary. Any required sampling and monitoring
equipment shall MUST be maintained at all times in a
safe and proper operating condition by the SIU at its
own expense. All equipment used to measure Wastewater
flow shall MUST be maintained and calibrated in
accordance with the manufacturer’s recommendation, but
such calibration shall occur no less than annually.
11. Maintenance of Sampling and Flow Monitoring Equipment.
All Wastewater samples must be representative of the
SIU Discharge. Wastewater monitoring and flow
measurement equipment shall MUST be properly operated,
kept clean, and maintained in good working order at
all times. The failure of a SIU to keep its monitoring
equipment in good working order shall WILL not be
grounds for the SIU to claim that sample results are
not representative of its Discharge.
12. Date of Receipt of Reports. Written reports will be
deemed to have been submitted on the date postmarked.
For reports which are not mailed, the date of receipt
of the report shall WILL govern.
13. Authorized Representatives. Permit applications,
baseline monitoring reports, 90-day compliance
reports, self-monitoring reports and any other reports
or notices addressing permit PERMIT non-compliance, or
that are required pursuant to any enforcement action
taken by the City, must be signed by the appropriate
signatory or duly authorized representative of the
SIU, as follows:
(a) By a responsible corporate officer, if the SIU is
a corporation. For the purposes of this
subparagraph, a responsible corporate officer
means:
(i) A president, secretary, treasurer, or vice-
president of the corporation in charge of a
principal business function, or any other

Person who performs similar policy or
decision-making functions for the
corporation; or
(ii) The manager of one or more manufacturing,
production, or operating facilities,
provided, the manager is authorized to make
management decisions which govern the
operation of the regulated facility
including having the explicit or implicit
duty of making major capital investment
recommendations, and initiate and direct
other comprehensive measures to assure long-
term environmental compliance with
environmental laws and regulations; can
ensure that the necessary systems are
established or actions taken to gather
complete and accurate information for
control mechanism requirements; and where
authority to sign documents has been
assigned or delegated to the manager in
accordance with corporate procedures;
(b) By a general partner or proprietor if the SIU is
a partnership or sole proprietorship
respectively;
(c) By a duly authorized representative of the
individual designated above if:
(i) The authorization is made in writing by the
individual described in subparagraph a or b
above;
(ii) The authorization specifies either an
individual or a position having
responsibility for the overall operation of
the facility from which the Industrial
Discharge originates, such as the position
of plant manager, or a position of
equivalent responsibility, or having overall
responsibility for environmental matters for
the SIU; and

(iii) The written authorization is submitted to
the Director;
(d) Any change in signatures or positions shall MUST
be submitted to the Director in writing prior to
or together with any reports to be signed by an
authorized representative, but in no case more
than thirty (30) calendar days after the change;
and
(e) Any Person signing a document under this
paragraph shall MUST make the following
certification:
"I certify under penalty of law that this
document and all attachments were prepared under
my direction or supervision in accordance with a
system designed to assure that qualified
personnel properly gather and evaluate the
information submitted. Based on my inquiry of the
person or persons who manage the system, or those
persons directly responsible for gathering the
information, the information submitted is, to the
best of my knowledge and belief, true, accurate,
and complete. I am aware that there are
significant penalties for submitting false
information, including the possibility of fine
and imprisonment for knowing violations."
14. Discharges After Permit Expiration. If a SIU wishes to
continue to Discharge after the expiration date of a
previously issued permit PERMIT, the SIU must apply
for and obtain a new permit PERMIT. The application
must be submitted to the Director at least sixty (60)
calendar days before the expiration date of the
previously issued permit PERMIT, unless written
permission for an extension of time is timely
requested and the Director grants the request. Subject
to the Director's right to modify, revoke or terminate
any SIU Permit, a previously issued permit PERMIT
shall WILL continue to remain in full force and effect
after the date of expiration if the SIU has applied
for a new SIU Permit in accordance with the timeframe
required by this paragraph, and a new permit PERMIT is

not issued prior to the expiration date of the
previously issued permit PERMIT.
SECTION III. PRETREATMENT ADMINISTRATION AND ENFORCEMENT
A. Responsibilities of the Director
1. Implement Program. The Director shall WILL undertake
reasonable measures necessary to implement the terms
of this Program in a consistent, fair and uniform
manner.
2. Review and Sample. The Director shall WILL undertake
reasonable measures to:
(a) Timely analyze all self-monitoring reports and
notices submitted by SIU’s;
(b) Randomly sample, pursuant to a sampling protocol
determined by the Director, and analyze
Discharges from SIU’s at least once per year; and
(c) Conduct periodic surveillance and inspection
activities in order to identify, independent of
information supplied by SIU’s, occasional and
continuing non-compliance with Pretreatment
Requirements at least once per year.
3. Conduct Inspections Regarding Slug Discharges. The
Director shall WILL conduct an inspection to determine
whether a SIU needs a Slug Discharge Control Plan or
other action to control Slug Discharges within one (1)
year of an IU being designated a SIU. If a Slug
Discharge Control Plan is needed, the plan shall MUST
contain, at a minimum, the following requirements:
(a) A description of the SIU’s Discharge practices,
including non-routine Batch Discharges;
(b) A description of stored chemicals;
(c) A procedure for Immediately notifying the City of
Slug Discharges with procedures for follow-up
written notification within five (5) calendar
days; and

(d) If necessary, procedures to prevent adverse
impact from accidental spills, including
inspection and maintenance of storage areas,
handling and transfer of materials, loading and
unloading operations, control of plant site run-
off, worker training, building of containment
structures or equipment, measures for containing
toxic organic pollutants (including solvents)
and/or measures and equipment for emergency
response.
4. Investigate Non-Compliance. The Director shall WILL
investigate for evidence of SNC when notice of any
actual or probable non-compliance with any
Pretreatment Requirement has been received by the
Director.
5. Notify IU’s of Non-Compliance. The Director shall WILL
notify IU’s upon discovery of non-compliance with
applicable Pretreatment Requirements and demand any
appropriate corrective action on the part of the IU
deemed reasonably necessary to satisfy those
Pretreatment Requirements.
6. Encourage Public Participation. The Director shall
WILL comply with the public participation requirements
of 40 CFR Part 25 in connection with the City's
enforcement of any Categorical Standard.
7. Mitigate Threats to POTW. The Director shall WILL make
a reasonable effort to determine which actual or
threatened Discharge to a POTW will violate a
Pretreatment Requirement or will present (or may
present) an imminent or substantial endangerment to
the health or welfare of any Person and/or to the
environment and to abate any such Discharge, including
plugging or disconnecting any sewer service connection
to a POTW that the Director deems necessary to abate
such a Discharge.
8. Publish Violations. The Director shall WILL annually
publish, in the largest daily newspaper published in
the City, public notice of all IU’s who, during the
preceding twelve (12) month period, were found to be

in SNC. This same notice shall WILL also summarize all
enforcement actions taken by the City against those
IU’s during the same twelve (12) month period.
9. Provide Notice of Change of Law. The Director shall
WILL provide all SIU’s with notice of any substantial
amendment to this Program. Additionally, the Director
will make a reasonable effort to notify SIU’s of any
changes to the Federal or State laws relating to this
Program.
10. File Federal Pretreatment Regulations. The Director
shall WILL file with the City Clerk three (3) copies
of 40 CFR Part 403.
11. Issue Permits. The Director shall WILL take all
reasonable steps needed to issue SIU Permits within
sixty (60) calendar days of receiving the application
for such permit PERMIT or amended permit PERMIT. All
permit PERMITS issued will include the following:
(a) A stated duration (in no case more than five
years);
(b) A statement of non-transferability;
(c) Discharge limits and, as applicable, BMP’s
necessary to satisfy all Pretreatment
Requirements;
(d) A statement of all self-monitoring, sampling,
reporting, notification and recordkeeping
requirements, including an identification of the
Pollutants to be monitored;
(e) A statement of applicable civil and criminal
penalties for violations of the permit PERMIT or
Pretreatment Requirements;
(f) Identification of any applicable Compliance
Schedule;
(g) A requirement that the results of repeat sampling
and analysis conducted as a result of a violation
be submitted to the Director within thirty (30)

calendar days after becoming aware of the
violation;
(h) A requirement to control Slug Discharges when
determined by the Director to be necessary;
(i) A requirement to provide notice of a Slug
Discharge, a Bypass, an Upset, or non-compliance
with the provisions of this Program within
twenty-four (24) hours after becoming aware of
any such event;
(j) A requirement to provide the ninety (90) calendar
day written notice of change is required pursuant
to Section II.L.4 of this Program; and
(k) Any other conditions and requirements as deemed
reasonably necessary by the Director to prevent
Pass Through or Interference, to protect the
quality of any water body receiving a Discharge
from a POTW, to protect worker health and safety,
to facilitate sludge management and disposal, to
protect against damage to the POTW, to ensure the
maximum beneficial reuse and/or the least
expensive disposal method of POTW Residuals, and
to ensure SIU compliance with this Program, and
State and Federal laws, rules and regulations.
B. Authority of the Director
The Director is authorized to enforce IU compliance with
the provisions of this Program and to undertake all actions
necessary to satisfy the responsibilities placed on the
Director pursuant to subsection A of this Section. In
carrying out this responsibility, the Director has, without
limitation, authority to take the actions set forth below.
1. Prevent Discharge. Implement procedures to Immediately
and effectively halt or prevent any Discharge of
Pollutants to a POTW which reasonably appear to:
(a) Present an imminent endangerment to the health or
welfare of any Person;
(b) Present an endangerment to the environment; or

(c) Cause Interference or Pass Through.
2. Limit Discharge. Deny or condition new or increased
contributions of Pollutants, or changes in the nature
of Pollutants, Discharged to a POTW by IU’s where such
contributions do not meet applicable Pretreatment
Requirements.
3. Establish Compliance Schedules. Require the
development of Compliance Schedules for the
installation of technology required to meet applicable
Pretreatment Requirements in any order or permit PERMIT
issued.
4. Require Reports. Require the submission of notices and
reports, including self-monitoring reports, necessary
to assess and assure compliance with Pretreatment
Requirements.
5. Inspect Facilities. Carry out all inspection,
surveillance and monitoring procedures necessary to
determine compliance or non-compliance with applicable
Pretreatment Requirements.
6. Enter Premises. Enter any premises of any IU in which
a Discharge source or treatment system is located, or
in which records are required to be kept, to assure
compliance with Pretreatment Requirements or to
determine or verify the level of Pollutant charges
that may be applicable to a Discharge pursuant to
Section II.C of this Program.
7. Revoke or Suspend Permits. Revoke or suspend any SIU
Permit issued under this Program for good cause,
including, but not limited to:
(a) Misrepresentation or failure to fully disclose
all relevant facts in a permit PERMIT application;
(b) Falsifying self-monitoring reports;
(c) Tampering with monitoring equipment;

(d) Refusing to allow the Director timely access to
the facility premises and records;
(e) Failure to meet Discharge limitations;
(f) Failure to pay fines and penalties;
(g) Failure to pay fees;
(h) Failure to meet Compliance Schedules; or
(i) Violation of any applicable Pretreatment
Requirement.
8. Modify Permits. Modify or amend any SIU Permit issued
pursuant to this Program for good cause, including but
not limited to, modifications necessary to:
(a) Reflect relevant changes to the Act or this
Program;
(b) Reflect the results of sampling performed
pursuant to the Act, this Program, or any permit
PERMIT issued hereunder;
(c) Prevent endangerment to the environment or to the
health or welfare of any Person resulting from
the continued Discharge of Pollutants in
accordance with the terms of a permit PERMIT that
has been issued pursuant to this Program;
(d) Prevent the continued Discharge of Pollutants in
accordance with the terms of a permit PERMIT that
has been issued pursuant to this Program which
threatens to damage property or otherwise cause
Pass Through or Interference;
(e) Reflect a change in the nature, concentration or
volume of an Industrial Discharge; or
(f) Correct errors in the permit PERMIT issued.
9. Issue Notices of Violation. Issue notices of violation
or orders directing IU’s to comply with the
requirements of this Program.

10. Adopt Implementing Procedures. Adopt procedures deemed
necessary to implement and enforce the provisions of
this Program including, without limitation, the
adoption of an enforcement response plan consistent
with the provisions of this Program.
11. Seek Injunctive Relief and Damages. Seek injunctive
relief, damages or other equitable relief to address
non-compliance with this Program or any damages caused
by such non-compliance.
12. Seek Penalties. Seek civil or criminal penalties for
non-compliance. Any action undertaken to recover civil
penalties shall WILL be consistent with the following:
(a) The Director may enforce this Program by imposing
and recovering a civil penalty of UP TO AND
INCLUDING one thousand dollars ($1,000) for each
violation of any applicable Pretreatment
Requirement. For continuing violations, each day
may constitute a separate violation;
(b) The Director shall WILL not seek civil penalties
under this paragraph if the United States or the
State has received civil penalties or is
diligently prosecuting a civil penalty action in
a court of the United States or the State, or in
an administrative enforcement proceeding, with
respect to the same allegations, standard,
requirement, or order. The Director may, however,
seek to intervene in any pending civil, judicial
or administrative action for purposes of
obtaining injunctive or declaratory relief;
(c) The Director may seek recovery of the civil
penalties provided by this paragraph either by an
action in superior court or by a negotiated
settlement agreement. In determining the
appropriate level of civil penalty to assess or
seek, the Director shall WILL consider:
(i) The seriousness of the violation;

(ii) The economic benefit, if any, resulting from
the violation;
(iii) Any history of such violation;
(iv) Any good faith efforts to comply with the
applicable requirements;
(v) The economic impact of the penalty on the
violator; and
(vi) Such other factors as justice may require;
(d) All penalties received by the City pursuant to
this paragraph shall WILL be deposited in the
City's General Fund.
13. Delegate Authority. Delegate the authority granted
under this Program to other employees of the City, as
he or she deems appropriate.
C. Petitions For Reconsideration
1. Permit Decision. Any permit PERMIT applicant or
permittee (aggrieved party) may petition the Director
to reconsider the conditions and limitations of a
permit PERMIT issued or amended pursuant to this
Program or the failure to issue or modify a permit
PERMIT as requested, by filing a written petition for
review with the Director within twenty (20) calendar
days of receipt of the permit PERMIT or amended permit
PERMIT. In its petition, the aggrieved party must
identify the permit PERMIT provisions objected to,
specify in detail the reasons for objection, and
present the alternative condition(s), if any, it seeks
to place in the permit PERMIT. A petition for review
shall not be deemed to authorize a SIU to Discharge
without first obtaining a SIU Permit.
2. Enforcement Orders and Findings. An IU may petition
the Director to reconsider an administrative finding
of violation, an action taken or proposed to be taken
relating to a violation or an order issued by the
Director relating to a violation by filing a written
petition for review with the Director within twenty

(20) calendar days of receipt of notice of any
finding, order or action taken or to be taken by the
Director. In its petition, the IU must identify the
specific findings, order provisions or proposed
activities objected to, specify in detail the reasons
for, and basis of, the objection and present
alternative findings, provisions or activities, if
any, that should be substituted for those proposed by
the Director.
3. Failure to Submit Petition. Failure to submit a timely
petition for review shall WILL be deemed to be a
waiver of the IU’s review rights under this
subsection.
4. Failure of Director to Act. If the Director fails to
act within thirty (30) calendar days from receipt of
the petition, it shall WILL be deemed denied.
Decisions not to reconsider, or modifications made to
any findings, order provisions or proposed activities
resulting from the review process, shall WILL be
considered final administrative actions for purposes
of judicial review.
5. Judicial Review. An IU seeking judicial review of a
final decision may file a complaint with the Superior
Court for Maricopa County, Arizona. In the absence of
a Court Order to the contrary, final decisions made by
the Director shall WILL not be stayed pending judicial
review.
6. No Waiver of Enforcement Authority. This subsection
shall WILL not be construed to in any way alter,
modify or affect the Director's ability to pursue
enforcement action pursuant to Sections III.B.11 and
12 of this Program.