PROFESSIONAL SERVICES AGREEMENT
CONSTRUCTION MANAGEMENT SERVICES
ALLEYWAY REHAB DUST EMISSIONS REDUCTION PHASE III
CITY PROJECT NO.: ST2310.451; FEDERAL NO.: CHN-0(256); ADOT NO.: T0555-01C
Council Date: November 12, 2026
THIS AGREEMENT (“Agreement”) is made and entered into on the _____ day of _____________, 2026,
(“Effective Date”), by and between City of Chandler, an Arizona municipal corporation, ("City''),
and Consultant Engineering, Inc., an Arizona corporation, ("Consultant") (City and Consultant
may individually be referred to as “Party” and collectively referred to as “Parties”).
RECITALS
A. City proposes to engage Consultant to provide construction management services for
Alleyway Rehab Dust Emissions Reduction Phase III project (“Project”) as more fully described
in Exhibit "A" (“Services”), which is attached to and made a part of this Agreement by this
reference.
B. Consultant is ready, willing, and able to provide the services described in Exhibit “A” for
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to
and made a part of this Agreement by this reference.
C. City desires to enter into an Agreement with Consultant to provide these services under
the terms and conditions set forth in this Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the premises and the mutual promises contained in this
Agreement, City and Consultant agree as follows:
SECTION I--CONSULTANT’S SERVICES
Consultant must perform the services described in Exhibit “A” to City’s satisfaction within the
terms and conditions of this Agreement and within the care and skill that a person who
provides similar services in Chandler, Arizona exercises under similar conditions. All work or
services furnished by Consultant under this Agreement must be performed in a skilled and
workmanlike manner. All fixtures, furnishings, and equipment furnished by Consultant as
part of the work or services under this Agreement must be new, or the latest model, and of
the most suitable grade and quality for the intended purpose of the work or service.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 1
SECTION II--PERIOD OF SERVICE
Consultant must perform the services described in Exhibit “A” for the term of this
Agreement. Unless amended in writing by the Parties, the Agreement term expires 650
calendar days after the Notice to Proceed (NTP) Date.
SECTION III--PAYMENT OF COMPENSATION AND FEES
Unless amended in writing by the Parties, Consultant’s compensation and fees as more fully
described in Exhibit “B” for performance of the services approved and accepted by City
under this Agreement must not exceed $1,076,67 for the full term of the Agreement.
Consultant may not increase any compensation or fees under this Agreement without the
City’s prior written consent. Consultant must submit monthly requests for payment of
services approved and accepted during the previous billing period and must include, as
applicable, detailed invoices and receipts, a narrative description of the tasks accomplished
during the billing period, a list of any deliverables submitted, and any subconsultant’s or
supplier’s actual requests for payment plus similar narrative and listing of their work.
Consultant must submit an Application and Certification for Payment Sheet with the monthly
request for payment to: CapitalProjects.Payables@chandleraz.gov. Payment for those
services negotiated as a lump sum will be made in accordance with the percentage of the
work completed during the preceding billing period. Services negotiated as a not-to-exceed
fee will be paid in accordance with the work effort expended on the service during the
preceding month. All requests for payment must be submitted to City for review and
approval. City will make payment for approved and accepted services within 30 calendar days
of City’s receipt of the request for payment. Consultant bears all responsibility and liability for
any and all tax obligations that result from Consultant’s performance under this Agreement.
SECTION IV--CITY'S OBLIGATIONS
As part of Consultant’s services under this Agreement, City will provide furnished items,
services, or obligations as detailed in Exhibit “D”.
SECTION V--GENERAL CONDITIONS
5.1 Notices. Unless otherwise provided herein, demands under this Agreement must be in
writing and will be deemed to have been duly given and received either (a) on the date of
service if personally served on the party to whom notice is to be given, or (b) on the third day
after the date of the postmark of deposit by first class United States mail, registered or
certified, postage prepaid and properly addressed as follows:
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 2
To City of Chandler - Public Works & Utilities Department
City: Attn: CIP City Engineer: Leticia Vargas, P.E.
P.O. Box 4008, Mail Stop 407
Chandler, AZ 85244-4008
Phone: 480-782-3395 Email: Leticia.Vargas@chandleraz.gov
With a copy to: City of Chandler - Public Works & Utilities Department
Attn: Raymond Potts, Construction Project Manager
P.O. Box 4008, Mail Stop 407, Chandler, AZ 85244-4008
Phone: 480-782-3326 Email: Raymond.Potts@chandleraz.gov
To Consultant: LEGAL COMPANY NAME: Consultant Engineering, Inc.
Mailing Address: PO Box 37167, Phoenix, AZ 85069
10625 North 25th Avenue, Suite 200
Physical Address:
Phoenix, AZ 85029
Statutory Agent Name: John Patterson
Statutory Agent Mailing Address: PO Box 37167, Phoenix, AZ 85069
10625 North 25th Avenue, Suite 200
Statutory Agent Physical Address:
Phoenix, AZ 85029
CONSULTANT’S AUTHORIZED PROJECT REPRESENTATIVE
Name: Brian Lizzet
Title: Project Manager
Phone: 480-689-6472
Email: BLizzet@cei-az.com
5.2 Records/Audit. Records of Consultant’s direct personnel payroll, reimbursable expenses
pertaining to this Agreement and records of accounts between City and Consultant must be
kept on the basis of generally accepted accounting principles and must be made available to
City and its auditors for up to three years following City’s final acceptance of the services
under this Agreement (this requirement is increased to five years if construction of this
project is federally funded). City, its authorized representative, or any federal agency,
reserves the right to audit Consultant’s records to verify the accuracy and appropriateness of
all cost and pricing data, including data used to negotiate this Agreement and any
amendments. City reserves the right to decrease the total amount of Agreement price or
payments made under this Agreement or request reimbursement from Consultant following
final Agreement payment on this Agreement if, upon audit of Consultant’s records, the audit
discloses Consultant has provided false, misleading, or inaccurate cost and pricing data.
Consultant will include a similar provision in all of its Agreements with subconsultants who
provide services under the Agreement to ensure that City, its authorized representative, or
the appropriate federal agency, has access to the subconsultants’ records to verify the
accuracy of all cost and pricing data. City reserves the right to decrease Agreement price or
payments made on this Agreement or request reimbursement from Consultant following
final payment on this Agreement if the above provision is not included in subconsultant
agreements, and one or more subconsultants refuse to allow City to audit their records to
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 3
verify the accuracy and appropriateness of all cost and pricing data. If, following an audit of
this Agreement, the audit discloses Consultant has provided false, misleading, or inaccurate
cost and pricing data, and the cost discrepancies exceed 1% of the total Agreement billings,
Consultant will be liable for reimbursement of the reasonable, actual cost of the audit.
5.3 Alteration in Character of Work. Whenever an alteration in the character of work results
in a substantial change in this Agreement, thereby materially increasing or decreasing the
scope of services, cost of performance, or Project schedule, the work will be performed as
directed by City. However, before any modified work is started, a written amendment must
be approved and executed by City and Consultant. Such amendment must not be effective
until approved by City. Additions to, modifications, or deletions from this Agreement as
provided herein may be made, and the compensation to be paid to Consultant may
accordingly be adjusted by mutual agreement of the Parties. It is distinctly understood and
agreed that no claim for extra services or materials furnished by Consultant will be allowed
by City except as provided herein, nor must Consultant do any work or furnish any materials
not covered by this Agreement unless such work is first authorized in writing. Any such work
or materials furnished by Consultant without prior written authorization will be at
Consultant’s own risk, cost, and expense, and Consultant hereby agrees that without written
authorization Consultant will make no claim for compensation for such work or materials
furnished.
5.4 Termination. City and Consultant hereby agree to the full performance of the covenants
contained herein, except that City reserves the right, at its discretion and without cause, to
terminate or abandon any service provided for in this Agreement, or abandon any portion of
the Project for which services have been performed by Consultant. In the event City abandons
or suspends the services, or any part of the services as provided in this Agreement, City will
notify Consultant in writing and immediately after receiving such notice, Consultant must
discontinue advancing the work specified under this Agreement. Upon such termination,
abandonment, or suspension, Consultant must deliver to City all drawings, plans,
specifications, special provisions, estimates and other work entirely or partially completed,
together with all unused materials supplied by City. Consultant must appraise the work
Consultant has completed and submit Consultant’s appraisal to City for evaluation. City may
inspect Consultant’s work to appraise the work completed. Consultant will receive
compensation in full for services performed to the date of such termination. The fee will be
paid in accordance with Section Ill of this Agreement, and as mutually agreed upon by
Consultant and City. If there is no mutual agreement on payment, the final determination will
be made in accordance with the "Disputes" provision in this Agreement. However, in no event
may the fee exceed the fee set forth in Section Ill of this Agreement nor as amended in
accordance with Section "Alteration in Character of Work." City will make the final payment
within 60 days after Consultant has delivered the last of the partially completed items and
the Parties agree on the final fee. If City is found to have improperly terminated the
Agreement for cause or default, the termination will be converted to a termination for
convenience in accordance with the provisions of this Agreement.
5.5 Indemnification. To the extent permitted by law, the Consultant ("lndemnitor") must
indemnify, save and hold harmless City and its officers, officials, agents and employees
("lndemnitee") from any and all claims, actions, liabilities, damages, losses or expenses
(including court costs, attorneys' fees and costs of claim processing, investigation and
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 4
litigation) ("Claims") caused or alleged to be caused, in whole or in part, by the wrongful,
negligent or willful acts, or errors or omissions of Consultant or any of its owners, officers,
directors, agents, employees, or subconsultants in connection with this Agreement. This
indemnity includes any claim or amount arising out of or recovered under workers'
compensation law or on account of the failure of Consultant to conform to any federal, state
or local law, statute, ordinance, rule, regulation or court decree. Consultant must indemnify
lndemnitee from and against any and all Claims, except those arising solely from
lndemnitee's own negligent or willful acts or omissions. Consultant is responsible for primary
loss investigation, defense and judgment costs where this indemnification applies. In
consideration of the award of this Agreement, Consultant agrees to waive all rights of
subrogation against lndemnitee for losses arising from or related to this Agreement. The
obligations of Consultant under this provision survive the termination or expiration of this
Agreement.
5.6 Insurance Requirements. Consultant must procure insurance under the terms and
conditions and for the amounts of coverage set forth in Exhibit “C” against claims that may
arise from or relate to performance of the work under this Agreement by Consultant and its
agents, representatives, employees, and subconsultants. Consultant and any subconsultant
must maintain this insurance until all of their obligations have been discharged, including any
warranty periods under this Agreement. These insurance requirements are minimum
requirements for this Agreement and in no way limit the indemnity covenants contained in
this Agreement. City in no way warrants that the minimum limits stated in Exhibit “C” are
sufficient to protect Consultant from liabilities that might arise out of the performance of the
work under this Agreement by Consultant, Consultant’s agents, representatives, employees,
or subconsultants. Consultant is free to purchase such additional insurance as may be
determined necessary.
5.7 Cooperation and Further Documentation. Consultant agrees to provide City such other
duly executed documents as may be reasonably requested by City to implement the intent
of this Agreement.
5.8 Successors and Assigns. City and Consultant each bind itself, its partners, successors,
assigns, and legal representatives to the other party to this Agreement and to the partners,
successors, assigns, and legal representatives of such other party in respect to all covenants
of this Agreement. Neither City nor Consultant may assign, sublet, or transfer its interest in
this Agreement without the written consent of the other party. In no event may any
contractual relation be created between any third party and City.
5.9 Disputes. In any dispute arising out of an interpretation of this Agreement or the duties
required not disposed of by agreement between Consultant and City, the final determination
at the administrative level will be made by City Engineer.
5.10 Completeness and Accuracy of Consultant’s Work. Consultant must be responsible for
the completeness and accuracy of Consultant’s services, data, and other work prepared or
compiled under Consultant’s obligation under this Agreement and must correct, at
Consultant’s expense, all willful or negligent errors, omissions, or acts that may be discovered.
Correction of errors disclosed and determined to exist during any construction of the project on
architectural or engineering drawings and specifications must be accomplished by Consultant.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 5
The cost of the design necessary to correct those errors attributable to Consultant and any
damage incurred by City as a result of additional construction costs caused by such engineering
or architectural errors will be chargeable to Consultant and will not be considered a cost of the
Work. The fact that City has accepted or approved Consultant’s work will in no way relieve
Consultant of any of Consultant’s responsibilities.
5.11 Reporting. Written monthly reports, along with updated work schedules, will be made by
Consultant in the format prescribed by City. These reports will be delivered to City per schedule.
When requested by City, Consultant will attend Council meetings and provide finished documents
including correspondence for Council action, supporting charts, graphs, drawings and colored
slides of same.
5.12 Withholding Payment. City reserves the right to withhold funds from Consultant’s
payments up to the amount equal to the claims City may have against Consultant until such
time that a settlement on those claims has been reached.
5.13 City's Right of Cancellation. The Parties acknowledge that this Agreement is subject to
cancellation by City under the provisions of Section 38-511, Arizona Revised Statutes (A.R.S.).
5.14 Independent Consultant. For this Agreement Consultant constitutes an independent
contractor. Any provisions in this Agreement that may appear to give City the right to direct
Consultant as to the details of accomplishing the work or to exercise a measure of control
over the work means that Consultant must follow the wishes of City as to the results of the
work only. These results must comply with all applicable laws and ordinances.
5.15 Project Staffing. Prior to the start of any work under this Agreement, Consultant must
submit to City detailed resumes of key personnel that will be involved in performing services
prescribed in the Agreement. City hereby acknowledges its acceptance of such personnel to
perform services under this Agreement. At any time hereafter that Consultant desires to
change key personnel while performing under the Agreement, Consultant must submit the
qualifications of the new personnel to City for prior approval. Key personnel include, but are
not limited to, principals-in-charge, project manager, and project Consultant. Consultant will
maintain an adequate and competent staff of qualified persons, as may be determined by
City, throughout the performance of this Agreement to ensure acceptable and timely
completion of the Scope of Services. If City objects, with reasonable cause, to any of
Consultant’s staff, Consultant must take prompt corrective action acceptable to City and, if
required, remove such personnel from the Project and replace with new personnel agreed to
by City.
5.16 Consultants or Subconsultants. Prior to beginning the work, Consultant must furnish City
for approval the names of consultants or subconsultants to be used under this Agreement.
Any subsequent changes are subject to City’s written prior approval.
5.17 Force Majeure. If either party is delayed or prevented from the performance of any act
required under this Agreement by reason of acts of God or other cause beyond the control
and without fault of the Party (financial inability excepted), performance of that act may be
excused, but only for the period of the delay, if the Party provides written notice to the other
Party within ten days of such act. The time for performance of the act may be extended for a
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 6
period equivalent to the period of delay from the date written notice is received by the other
Party.
5.18 Compliance with Federal Laws. Consultant understands and acknowledges the
applicability of the Americans with Disabilities Act, the Immigration Reform and Control Act
of 1986 and the Drug Free Workplace Act of 1989 to it. Consultant agrees to comply with these
laws in performing this Agreement and to permit City to verify such compliance.
5.19 No Israel Boycott. By entering into this Agreement, Consultant certifies that Consultant
is not currently engaged in, and agrees for the duration of the Agreement, not to engage in a
boycott of Israel as defined by state statute.
5.20 Legal Worker Requirements. A.R.S. § 41-4401 prohibits City from awarding an Agreement
to any consultant who fails, or whose subconsultants fail, to comply with A.R.S. § 23-214(A).
Therefore, Consultant agrees Consultant and each subconsultant it uses warrants their
compliance with all federal immigration laws and regulations that relate to their employees
and their compliance with § 23-214, subsection A. A breach of this warranty will be deemed a
material breach of the Agreement and may be subject to penalties up to and including
termination of the Agreement. City retains the legal right to inspect the papers of any
Consultant’s or subconsultant’s employee who provides services under this Agreement to
ensure that Consultant and subconsultants comply with the warranty under this provision.
5.21 Lawful Presence Requirement. A.R.S. §§ 1-501 and 1-502 prohibit City from awarding an
Agreement to any natural person who cannot establish that such person is lawfully present
in the United States. To establish lawful presence, a person must produce qualifying
identification and sign a City-provided affidavit affirming that the identification provided is
genuine. This requirement will be imposed at the time of Agreement award. This requirement
does not apply to business organizations such as corporations, partnerships, or limited
liability companies.
5.22 Covenant Against Contingent Fees. Consultant warrants that no person has been
employed or retained to solicit or secure this Agreement upon an agreement or
understanding for a commission, percentage, brokerage, or contingent fee, and that no
member of the Chandler City Council, or any City employee has any interest, financially, or
otherwise, in Consultant’s firm. For breach or violation of this warrant, City may annul this
Agreement without liability or, at its discretion, to deduct from the Agreement price or
consideration, the full amount of such commission, percentage, brokerage, or contingent fee.
5.23 Non-Waiver Provision. The failure of either Party to enforce any of the provisions of this
Agreement or to require performance of the other Party of any of the provisions hereof must
not be construed to be a waiver of such provisions, nor must it affect the validity of this
Agreement or any part thereof, or the right of either Party to thereafter enforce each and
every provision.
5.24 Disclosure of Information Adverse to City’s Interests. To evaluate and avoid potential
conflicts of interest, Consultant must provide written notice to City, as set forth in this Section,
of any work or services performed by Consultant for third parties that may involve or be
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 7
associated with any real property or personal property owned or leased by City. Such notice
must be given 7 business days prior to commencement of the services by Consultant for a
third party, or 7 business days prior to an adverse action as defined below. Written notice
and disclosure must be sent in accordance with Section 6.7 above. An adverse action under
this Agreement includes, but is not limited to: (a) using data as defined in the Agreement
acquired in connection with this Agreement to assist a third party in pursuing administrative
or judicial action against City; or (b) testifying or providing evidence on behalf of any person
in connection with an administrative or judicial action against City; or (c) using data to produce
income for Consultant or its employees independently of performing the services under this
Agreement, without the prior written consent of City. Consultant represents that except for
those persons, entities, and projects identified to City, the services performed by Consultant
under this Agreement are not expected to create an interest with any person, entity, or third
party project that is or may be adverse to City’s interests. Consultant’s failure to provide a
written notice and disclosure of the information as set forth in this Section constitute a
material breach of this Agreement.
5.25 Data Confidentiality and Data Security. As used in the Agreement, "data" means all
information, whether written or verbal, including plans, photographs, studies, investigations,
audits, analyses, samples, reports, calculations, internal memos, meeting minutes, data field
notes, work product, proposals, correspondence and any other similar documents or
information prepared by, obtained by, or transmitted to Consultant or its subconsultants in
the performance of this Agreement. The Parties agree that all data, regardless of form,
including originals, images, and reproductions, prepared by, obtained by, or transmitted to
Consultant or its subconsultants in connection with Consultant’s or its subconsultant’s
performance of this Agreement is confidential and proprietary information belonging to City.
Except as specifically provided in this Agreement, Consultant or its subconsultants must not
divulge data to any third party without City’s prior written consent. Consultant or its
subconsultants must not use the data for any purposes except to perform the services
required under this Agreement. These prohibitions do not apply to the following data
provided to Consultant or its subconsultants have first given the required notice to City: (a)
data which was known to Consultant or its subconsultants prior to its performance under this
Consultant or its subconsultants by a third party, who to the best of Consultant’s or its
subconsultants’ knowledge and belief, had the legal right to make such disclosure and
Consultant or its subconsultants are not otherwise required to hold such data in confidence;
or (c) data which is required to be disclosed by virtue of law, regulation, or court order, to
which Consultant or its subconsultants are subject. In the event Consultant or its
subconsultants are required or requested to disclose data to a third party, or any other
information to which Consultant or its subconsultants became privy as a result of any other
Agreement with City, Consultant must first notify City as set forth in this Section of the request
or demand for the data. Consultant or its subconsultants must give City sufficient facts so
that City can be given an opportunity to first give its consent or take such action that City may
deem appropriate to protect such data or other information from disclosure. All data must
continue to be subject to the confidentiality agreements of this Agreement. Consultant or its
subconsultants assume all liability to maintain the confidentiality of the data in its possession
and agrees to compensate City if any of the provisions of this Section are violated by
Consultant, its employees, agents or subconsultants. Solely for the purposes of seeking
injunctive relief, it is agreed that a breach of this Section must be deemed to cause irreparable
harm that justifies injunctive relief in court. Consultant agrees that the requirements of this
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 8
Section must be incorporated into all subagreements entered into by Consultant. A violation
of this Section may result in immediate termination of this Agreement without notice.
5.26 Personal Identifying Information-Data Security. Personal identifying information,
financial account information, or restricted City information, whether electronic format or
hard copy, must be secured and protected at all times by Consultant or its subconsultants. At
a minimum, Consultant or its subconsultants must encrypt or password-protect electronic
files. This includes data saved to laptop computers, computerized devices, or removable
storage devices. When personal identifying information, financial account information, or
restricted City information, regardless of its format, is no longer necessary, the information
must be redacted or destroyed through appropriate and secure methods that ensure the
information cannot be viewed, accessed, or reconstructed. In the event that data collected or
obtained by Consultant or its subconsultants in connection with this Agreement is believed
to have been compromised, Consultant or its subconsultants must immediately notify City
contact. Consultant agrees to reimburse City for any costs incurred by City to investigate
potential breaches of this data and, where applicable, the cost of notifying individuals who
may be impacted by the breach. Consultant agrees that the requirements of this Section must
be incorporated into all subcontracts entered into by Consultant. It is further agreed that a
violation of this Section must be deemed to cause irreparable harm that justifies injunctive
relief in court. A violation of this Section may result in immediate termination of this
Agreement without notice. The obligations of Consultant or its subconsultants under this
Section must survive the termination of this Agreement.
5.27 Jurisdiction and Venue. This Agreement is made under and must be construed in
accordance with and governed by the laws of the State of Arizona without regard to the
conflicts or choice of law provisions thereof. Any action to enforce any provision of this
Agreement or to obtain any remedy with respect hereto must be brought in the courts
located in Maricopa County, Arizona, and for this purpose, each Party hereby expressly and
irrevocably consents to the jurisdiction and venue of such court.
5.28 Survival. All warranties, representations, and indemnifications by Consultant must
survive the completion or termination of this Agreement.
5.29 Modification. Except as expressly provided herein to the contrary, no supplement,
modification, or amendment of any term of this Agreement will be deemed binding or
effective unless in writing and signed by the Parties.
5.30 Severability. If any provision of this Agreement or the application to any person or
circumstance may be invalid, illegal or unenforceable to any extent, the remainder of this
Agreement and the application will not be affected and will be enforceable to the fullest
extent permitted by law.
5.31 Integration. This Agreement contains the full agreement of the Parties. Any prior or
contemporaneous written or oral agreement between the Parties regarding the subject
matter is merged and superseded.
5.32 Time is of the Essence. Time of each of the terms, covenants, and conditions of this
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 9
Agreement is hereby expressly made of the essence.
5.33 Date of Performance. If the date of performance of any obligation or the last day of any
time period provided for should fall on a Saturday, Sunday, or holiday for City, the obligation
will be due and owing, and the time period will expire, on the first day after which is not a
Saturday, Sunday or legal City holiday. Except as may otherwise be set forth in this
Agreement, any performance provided for herein will be timely made if completed no later
than 5:00 p.m. (Chandler time) on the day of performance.
5.34 Third Party Beneficiary. Nothing under this Agreement will be construed to give any
rights or benefits in the Agreement to anyone other than City and Consultant, and all duties
and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive
benefit of City and Consultant and not for the benefit of any other party.
5.35 Conflict in Language. All work performed must conform to all applicable City of Chandler
codes, ordinances, and requirements as outlined in this Agreement. If there is a conflict in
interpretation between provisions in this Agreement and those in Exhibit "A", the provisions
in this Agreement prevail.
5.36 Document/Information Release. Documents and materials released to Consultant,
which are identified by City as sensitive and confidential, are City’s property. The
document/material must be issued by and returned to City upon completion of the services
under this Agreement. Consultant secondary distribution, disclosure, copying, or duplication
in any manner is prohibited without City’s prior written approval. The document/material
must be kept secure at all times. This directive applies to all City documents, whether in
photographic, printed, or electronic data format.
5.37 Exhibits. The following exhibits are made a part of this Agreement and are incorporated
by reference:
Exhibit A - Scope of Services / Schedule
Exhibit B - Compensation and Fees
Exhibit C - Insurance Requirements
Exhibit D - Special Conditions
Exhibit E – Subconsultant Documents with Consultant (if applicable)
Exhibit F - Federal Requirements (if applicable)
5.38 Special Conditions. As part of the services Consultant provides under this Agreement,
Consultant agrees to comply with and fully perform the special terms and conditions set forth
in Exhibit “D”, which is attached to and made a part of this Agreement.
5.39 Non-Discrimination and Anti-Harassment Laws. Consultant must comply with all
applicable City, state, and federal non-discrimination and anti-harassment laws, rules, and
regulations.
5.40 Licenses and Permits. Beginning with the Effective Date and for the full term of this
Agreement, Consultant must maintain all applicable City, state, and federal licenses and
permits required to fully perform Consultant’s services under this Agreement.
5.41 Warranties. Consultant must furnish a one-year warranty on all work and services
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 10
performed under this Agreement. Consultant must furnish, or cause to be furnished, a two-
year warranty on all fixtures, furnishings, and equipment furnished by Consultant,
subconsultants or suppliers under this Agreement. Any defects in design, workmanship, or
materials that do not comply with this Agreement must be corrected by Consultant (including,
but not limited to, all parts and labor) at Consultant’s sole cost and expense. All written
warranties and redlines for as-built conditions must be delivered to City on or before City’s
final acceptance of Consultant’s services under this Agreement.
5.42 Cooperative Purchasing Agreement (S.A.V.E. – Strategic Alliance for Volume
Expenditures). In addition to City of Chandler and with the approval of Consultant, this
Agreement may be extended for use by other municipalities, school districts, and government
agencies of the State. Any such usage by other entities must be in accordance with the
ordinance, charter, or procurement rules and regulations of the respective political entity.
5.43 Budget Approval into Next Fiscal Year. This Agreement will commence on the Effective
Date and continue in full force and effect until it is terminated or expires in accordance with
the provisions of this Agreement. The Parties recognize that the continuation of this
Agreement after the close of the City's fiscal year, which ends on June 30 of each year, is
subject to the City Council's approval of a budget that includes an appropriation for this item
as an expenditure. The City does not represent that this budget item will be actually adopted.
This determination is solely made by the City Council.
5.44 Forced Labor of Ethnic Uyghurs Prohibited. By entering into this Agreement, Contractor
certifies and agrees Contractor does not currently use and will not use for the term of this
Agreement: (i) the forced labor of ethnic Uyghurs in the People's Republic of China; or (ii) any
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of
China; or (iii) any contractors, subcontractors or suppliers that use the forced labor or any
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of
China.
5.45 License to City for Reasonable Use. With this Agreement, Consultant and its
subconsultants hereby grant a license to City, its agents, employees, and representatives for
an indefinite period of time to reasonably use, make copies, and distribute as appropriate
the Documents, works or deliverables developed or created as a result of the Project and this
Agreement. This license also includes the making of derivative works.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 11
This Agreement will be in full force and effect only when it has been approved and executed
by the duly authorized City officials.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the Effective Date.
“CITY” “CONSULTANT”
CITY OF CHANDLER CONSULTANT ENGINEERING, INC.
Mayor Signature Date
RECOMMENDED BY:
Print Name
Leticia Vargas, P.E. Title
CIP City Engineer
Signer Email Address
APPROVED AS TO FORM:
City Attorney
ATTEST:
City Clerk Seal
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page 12
EXHIBIT “A”
SCOPE OF SERVICES/SCHEDULE
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page A-1
EXHIBIT “A”
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
ST2310.451 - ALLEY REHAB DUST EMISSIONS REDUCTION - PHASE III
Federal Project No.: CHN-0(256)D
ADOT No.: T055501C
PROJECT TASKS
1. PRE-CONSTRUCTION ASSISTANCE
A. Task 1.1 Pre-Construction Assistance
i. Consultant must attend the pre-construction meeting.
ii. Consultant must attend and assist with resident questions/concerns during
the pre-construction public meeting.
1. Per federal requirements, 2 meetings needed. One in the morning and
another in the afternoon.
iii. Consultant will perform a review of all construction documents for familiarity
and for general conformance with City requirements.
2. CONSTRUCTION MANAGEMENT
A. Task 2.1 Weekly Construction Meetings
i. Consultant will prepare meeting agenda, facilitate weekly construction
meetings, and provide meeting minutes within 48 hours of the meeting.
Consultant assumes 80 weekly meetings will be held.
ii. Consultant will update logs (Request for Information (RFIs); Submittals; Field
Directive (FD); Material Certification; Outstanding Issues Log, and Allowance
Logs and be prepared to review them in the meeting.
iii. Consultant will assign responsible party to outstanding issues and track
progress.
B. Task 2.2 Critical Path Method (CPM) Schedule
i. Consultant must review and evaluate Contractor’s initial CPM schedule and
provide recommendations for acceptance.
ii. Consultant must review Contractor’s monthly CPM schedule updates
submitted with each payment application, identify CPM tasks behind schedule
that may affect critical path items, project substantial and final completion
dates, and initiate correspondence to City regarding those tasks. Consultant
assumes 20 reviews of updated CPM schedule.
1. Compare monthly updates to Baseline CPM schedule.
2. Compare monthly updates to the 3-week look ahead schedule.
3. Identify tasks that changed.
4. Verify project is still on schedule for substantial and final completion.
5. Recommend approval of CPM schedule to Construction Manager.
C. Task 2.3 Requests for Information (RFI’s)
i. Consultant must review, evaluate, and respond to Contractor Requests for
Information (RFI’s); and prepare and maintain a submittal log of all RFI’s.
Consultant assumes a maximum of 15 RFI responses.
1
D. Task 2.4 Shop Drawing Submittals
i. Consultant must review, evaluate, and respond to Contractor shop drawing
submittals; and prepare and maintain a submittal log of all shop drawing
submittals. Consultant assumes a maximum of 15 reviews.
E. Task 2.5 Requests for Proposal (RFP) & Time and Materials (T&M)
i. Consultant must prepare Requests for Proposal (RFP) documents detailing
requested additional work tasks; review and evaluate Contractor RFP
responses (cost derivations) with approval recommendations; and prepare
and maintain a submittal log list of all RFPs. Consultant assumes 10 RFPs
and/or T&Ms.
ii. Consultant will evaluate the contractors RFP response and T&M cost
submittals verifying the correct formulas are used, labor costs are correct,
equipment rates are correct, and material costs are correct.
F. Task 2.6 Field Directives (FD’s)
i. Consultant must prepare Field Directive (FD) documents detailing requested
additional work tasks; review and evaluate Contractor FD responses with
approval recommendations; and prepare and maintain a submittal log list of
all FD’s. Consultant assumes 10 FD’s.
G. Task 2.7 Contractor Payment Applications
i. Consultant must review and evaluate Contractor monthly payment
applications.
1. Review payment application and verify everything on the CM services
checklist is completed. Consultant assumes a maximum of 20 payment
applications, with 2 reviews each.
a. CPM schedule is updated.
b. Photos are uploaded.
c. CM services Quantity report matches contractor’s request.
d. Allowance draws are recorded.
e. Time and Materials requests have proper backup.
f. Payments are made to agreed lump sum schedule.
g. Submit checklist to City.
2. Review contractor’s red lines are up to date.
3. Verify last month’s payment application is accurately shown.
4. Recommendations will be based on consultant’s knowledge,
information, and belief, and will state whether in consultant’s opinion,
contractor’s work has progressed to the point indicated, subject to any
qualifications stated in the recommendation. Consultant’s
recommendations will not be a representation that its observations to
check contractor’s work have been exhaustive, extended to every
aspect of contractor’s work, or have involved detailed inspections.
H. Task 2.8 Review Inspection Daily Reports
i. Review the inspector’s daily report to verify it meets industry standards and
sign them. Consultant assumes 80 weeks of report reviews.
I. Task 2.9 Public Outreach
i. Consultant must provide public outreach services, whether by Consultant or
subconsultant. Tasks will include: door hangars required, create and maintain
project website; maintain a 24-hour bilingual project hotline to respond to
inquiries, complaints and maintain a call log; public weekly email updates;
2
public interactions with property owners as a liaison between property owners
and the City; coordination meetings; project meetings; public meeting
coordination; federal funds required partnering process (project team
partnering meeting, maintaining status). Follow all applicable federal
requirements for public outreach.
ii. Consultant assumes 2 hours/month for this task
3. CONSTRUCTION OBSERVATIONS
A. Task 3.1 Observation Services
i. Observe materials and installation generally conform to construction
documents.
ii. Prepare daily inspection reports.
iii. Review the 3-week look ahead schedule against CPM schedule, crew
availability, and traffic control schedule.
iv. Monitor Time & Material work.
v. Record the contractor’s crew size & work type of classification
vi. Provide an outstanding work list on items that were not installed per contract
documents.
vii. Consultant assumes 2 inspector full time; 40 hours per week for approx. 80
weeks, with no overtime.
viii. Observations will not be exhaustive or extend to every aspect of Contractor’s
work, but will be limited to spot checking, and similar methods of general
observation. Based on these observations, Consultant will evaluate whether
Contractor’s work is generally proceeding in accordance with the Contract
Documents and keep the City informed of the general progress of the work.
B. Task 3.2 Federal Compliance Administration
i. Consultant must provide administrative support to City staff for federal
reporting requirements. Consultant assumes 1 administrative Support for 20
months at 33 hours per month.
4. PROJECT CLOSEOUT
A. Task 4.1 Substantial Completion
i. City staff will walk the project and provide consultant with any items that are
not installed per the contract documents for consultant to add to the punch
list.
ii. Issue the punch list to the contractor.
iii. Provide observation on contractor performing items on punch list.
iv. Consultant assumes 40 hours for this task
B. Task 4.2 Final Completion
i. Verify all items on the substantial completion list have been signed off.
ii. Confirm warranty documents are received.
iii. Provide City with all documents in an electronic version that matches City’s
filing system, so it can be imported into City files.
iv. Consultant assumes 40 hours for this task.
3
5. MATERIALS TESTING
A. Task 5.1 Quality Control (QC) Test Program
i. Consultant must review and verify Contractor’s Quality Control material test
type and frequencies are consistent with City and MAG; review and evaluate
Contractor’s QC test schedule and provide recommendations on acceptance;
and review and evaluate all Contractor sampling, test, and inspection results
for conformance with construction documents.
ii. Consultant assumes 4 hours for this task
B. Task 5.2 Quality Assurance (QA) Test Program
i. Consultant must prepare and maintain a materials Quality Assurance plan per
City and MAG.
ii. Consultant must coordinate with Contractor’s testing representative to obtain
required QA tests and sample; complete sampling and compaction testing of
subgrade (including lime-stabilized subgrade base), aggregate base and
asphalt concrete materials in new asphalt concrete pavement areas; complete
sampling and compaction testing of subgrade, aggregate base (where
required) and concrete for new curbs, gutters, sidewalks and concrete
pavement and structures; and complete sampling and compaction testing of
backfill for new irrigation, sewer, water, storm drain pipe, and dry utilities.
iii. Consultant assumes 1 hours/month for this task
C. Task 5.3 Material Certifications
i. Consultant must collect, review and verify material certifications are met
including “Buy America” and “Build America, Buy America” requirements; and
prepare and maintain materials certificate and “Buy America” and “Build
America, Buy America” requirements submittal log.
ii. Consultant assumes 10 hours for this task
D. Task 5.4 Independent Assurance (IA) Test Program
i. Consultant must provide 3rd party independent quality assurance sampling
and testing per the approved QA program produced in task 6.2.i.
ii. Consultant assumes 1 hours/month for this task
6. RECORD DRAWINGS
A. Task 6.1 Record Drawings
i. Review and monitor Contractor’s monthly updates on red-line drawing set, if
applicable.
i. Consultant assumes 1 hours/month for this task
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS
1. Application fees for City reviews and permits will be paid by CITY.
2. The Owner’s Allowance will only be utilized with prior written approval from the City
representative.
3. The Direct Expense Allowance will be used for normal reimbursable expenses on the project.
Items must be billed at cost and backup must be provided with pay applications.
4
EXHIBIT “B”
COMPENSATION AND FEES
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page B-1
EXHIBIT “C”
INSURANCE REQUIREMENTS
1. General.
1.1 At the same time as execution of this Agreement, Consultant must furnish City a certificate
of insurance on a standard insurance industry ACORD form. The ACORD form must be
issued by an insurance company authorized to transact business in the State of Arizona
possessing a current A.M. Best, Inc. rating of A-7, or better and legally authorized to do
business in the State of Arizona with policies and forms satisfactory to City. Provided,
however, the A.M. Best rating requirement will not be deemed to apply to required Workers’
Compensation coverage.
1.2 Consultant and any of its subconsultants must procure and maintain, until all of their
obligations have been discharged, including any warranty periods under this Agreement are
satisfied, the insurances set forth below.
1.3 The insurance requirements set forth below are minimum requirements for this Agreement
and in no way limit the indemnity covenants contained in this Agreement.
1.4 City in no way warrants that the minimum insurance limits contained in this Agreement are
sufficient to protect Consultant from liabilities that might arise out of the performance of
the Agreement services under this Agreement by Consultant, its agents, representatives,
employees, subconsultants, and Consultant is free to purchase any additional insurance as
may be determined necessary.
1.5 Failure to demand evidence of full compliance with the insurance requirements in this
Agreement or failure to identify any insurance deficiency will not relieve Consultant from,
nor will it be considered a waiver of its obligation to maintain the required insurance at all
times during the performance of this Agreement.
1.6 Use of subconsultants: If any work is subcontracted in any way, Consultant must execute a
written Agreement with subconsultant containing the same Indemnification Clause and
Insurance Requirements as City requires of Consultant in this Agreement. Consultant is
responsible for executing the Agreement with the subconsultant and obtaining Certificates
of Insurance and verifying the insurance requirements.
2. Minimum Scope and Limits of Insurance. Consultant must provide coverage with limits of
liability not less than those stated below.
2.1 Professional Liability. If the Agreement is the subject of any professional services or work
performed by Consultant, or if Consultant engages in any professional services or work
adjunct or residual to performing the work under this Agreement, Consultant must maintain
Professional Liability insurance covering errors and omissions arising out of the work or
services performed by Consultant, or anyone employed by Consultant, or anyone whose
acts, mistakes, errors and omissions Consultant is legally liable, with a liability limit of
$1,000,000 each claim and $2,000,000 all claims. In the event the Professional Liability
insurance policy is written on a “claims made” basis, coverage must extend for 3 years past
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page D-1
completion and acceptance of the work or services, and Consultant, or its selected Design
Professional will submit Certificates of Insurance as evidence the required coverage is in
effect. The Design Professional must annually submit Certificates of Insurance citing that the
applicable coverage is in force and contains the required provisions for a 3 year period.
2.2 Commercial General Liability-Occurrence Form. Consultant must maintain “occurrence” form
Commercial General Liability insurance with a limit of not less than $2,000,000 for each
occurrence, $4,000,000 aggregate. Said insurance must also include coverage for products
and completed operations, independent contractors, personal injury and advertising injury.
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess
insurance must be “follow form” equal or broader in coverage scope than underlying
insurance.
2.3 Automobile Liability-Any Auto or Owned, Hired and Non-Owned Vehicles
Vehicle Liability: Consultant must maintain Business/Automobile Liability insurance with a
limit of $1,000,000 each accident on Consultant owned, hired, and non-owned vehicles
assigned to or used in the performance of Consultant’s work or services under this
Agreement. If any Excess or Umbrella insurance is utilized to fulfill the requirements of this
paragraph, the Excess or Umbrella insurance must be “follow form” equal or broader in
coverage scope than underlying insurance.
2.4 Workers Compensation and Employers Liability Insurance: Consultant must maintain Workers
Compensation insurance to cover obligations imposed by federal and state statutes having
jurisdiction of Consultant employees engaged in the performance of work or services under
this Agreement and must also maintain Employers’ Liability insurance of not less than
$1,000,000 for each accident and $1,000,000 disease for each employee.
3. Additional Policy Provisions Required.
3.1 Self-Insured Retentions or Deductibles. Any self-insured retentions and deductibles must be
declared and approved by City. If not approved, City may require that the insurer reduce or
eliminate any deductible or self-insured retentions with respect to City, its officers, officials,
agents, employees, and volunteers.
3.1.1. Consultant’s insurance must contain broad form contractual liability coverage.
3.1.2. Consultant’s insurance coverage must be primary insurance with respect to City, its
officers, officials, agents, and employees. Any insurance or self-insurance maintained
by City, its officers, officials, agents, and employees will be in excess of the coverage
provided by Consultant and must not contribute to it.
3.1.3. Consultant’s insurance must apply separately to each insured against whom claim is
made or suit is brought, except with respect to the limits of the insurer's liability.
3.1.4. Coverage provided by Consultant must not be limited to the liability assumed under
the indemnification provisions of this Agreement.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page D-2
3.1.5. The policies must contain a severability of interest clause and waiver of subrogation
against City, its officers, officials, agents, and employees, for losses arising from Work
performed by Consultant for City. (Does not apply to Professional Liability coverage.)
3.1.6. Consultant, its successors and or assigns, are required to maintain Commercial
General Liability insurance as specified in this Agreement for a minimum period of 3
years following completion and acceptance of the Work. Consultant must submit a
Certificate of Insurance evidencing Commercial General Liability insurance during this
3-year period containing all the Agreement insurance requirements, including
naming City of Chandler, its agents, representatives, officers, directors, officials and
employees as Additional Insured as required.
3.1.7. If a Certificate of Insurance is submitted as verification of coverage, City will
reasonably rely upon the Certificate of Insurance as evidence of coverage, but this
acceptance and reliance will not waive or alter in any way the insurance requirements
or obligations of this Agreement.
3.2. Insurance Cancellation During Term of Agreement.
3.2.1. If any of the required policies expire during the life of this Agreement, Consultant
must forward renewal or replacement Certificates to City within 10 days after the
renewal date containing all the required insurance provisions.
3.2.2. Each insurance policy required by the insurance provisions of this Agreement must
provide the required coverage and must not be suspended, voided or canceled
except after thirty (30) days prior written notice has been given to City, except when
cancellation is for non-payment of premium, then ten (10) days prior notice may be
given. Such notice must be sent directly to Chandler Law-Risk Management
Department, Post Office Box 4008, Mailstop 628, Chandler, Arizona 85225. If any
insurance company refuses to provide the required notice, Consultant or its
insurance broker must notify City of any cancellation, suspension, non-renewal of any
insurance within seven (7) days of receipt of insurers’ notification to that effect.
3.3 City as Additional Insured. The policies are to contain, or be endorsed to contain, the following
provisions:
3.3.1. The Commercial General Liability and Automobile Liability policies are to contain, or
be endorsed to contain, the following provisions: City, its officers, officials, agents,
and employees are additional insureds with respect to liability arising out of activities
performed by, or on behalf of, Consultant; Products and Completed operations of
Consultant; and automobiles owned, leased, hired, or borrowed by Consultant.
3.3.2. City, its officers, officials, agents, and employees must be additional insureds to the
full limits of liability purchased by Consultant even if those limits of liability are in
excess of those required by this Agreement.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page D-3
EXHIBIT “D”
SPECIAL CONDITIONS
N/A
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page D-1
EXHIBIT “E”
SUBCONSULTANT DOCUMENTS WITH CONSULTANT
Any subconsultant assumptions, clarifications, exclusions, terms & conditions,
signature blocks, etc. included are strictly between the Consultant and their
subconsultants, and do not apply to the Agreement between the Consultant and the
City.
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page E-1
Exhibit C
MakPro Services, LLC
2036 N. Gentry • Mesa, AZ 85213
Office: 480-890-1927
Email: teresa@makprosvc.com
September 14, 2026
Mr. Brian Lizzet
Consultant Engineering, Inc.
135 E Chilton Dr., Suite 101
Chandler, AZ 85225
Dear Brian:
MakPro Services, LLC (MakPro) is pleased to provide the following proposal for public
outreach services for the City of Chandler’s Alley Rehab Dust Emissions Reduction Phase III
Project (ST2310.451 / CHN0256D / T055501C), which will resurface alleys in identified
Chandler neighborhoods. Public outreach is an important element in projects that may
impact neighboring residents and businesses and provides a link between the project and
the community it impacts. The City of Chandler has developed a strong relationship with its
residents and businesses, and it’s important these relationships are maintained throughout
construction projects.
There are a variety of public outreach tools which can be used to establish appropriate
communication with the effected stakeholders of a project. The services included in this
scope and fee are based on our experience with the City of Chandler, our previous
experience with you on similar projects, and the information you provided. This estimate is
based on an estimated 800-calendar day (27-month) construction schedule, and currently
slated to begin in the next few months. In addition, the public outreach services have been
categorized into tasks; however, adjusting one task may require adjustment of other tasks
as there are economies of scale and efficiencies embedded in the cost estimate.
Please take a moment to review this scope and cost estimate and if I’ve missed or
misunderstood any of the project characteristics, or if you’d like to customize this proposal
in some other way, please let me know.
Task 1: Pre-Con, Progress and Partnering Meetings
MakPro will prepare for and attend the pre-construction meeting and progress meetings
during construction (2 years ~ 110 meetings) to better understand community impacts.
Task 2: Public Meetings
MakPro will plan, prepare for and attend two public meetings, both to be conducted on the
same day at different times to accommodate nearby residents and businesses, for which
one notice will be provided. It is assumed that there will be one series (2 public meetings)
of public meetings for all locations as construction kicks off for the project, not individual
public meetings for each location. MakPro shall develop, print, coordinate and mail one
printed public meeting notice to residences and any businesses directly adjacent to the
work area.
Exhibit C
Mr. Brian Lizzet, CEI September 14, 2026
Public Outreach Services for Chandler Alley Rehab Dust Emissions Reduction Phase III Project
Task 3: Community Construction Notices & Communications
Prior to start of construction, MakPro shall develop, print, coordinate and mail one printed
pre-construction notice to residences and any businesses directly adjacent to the work area
to inform them of the construction and planned impacts. As this is a federal project,
collateral will be provided in English, Spanish and Mandarin languages. It is expected that
not all locations will begin construction at the same time or at the start of the project, so
mailers will be sequenced to accommodate the work effort.
Reimbursable expenses for postage/printing of two notices (one for public meeting and one
for pre-construction) are included as part of this estimate. Based on our previous
experience on alley rehab projects, this would be to residences (occupant only) and any
businesses for properties directly adjacent to the alleys being worked, with approx. 3,000
pieces for all ten areas in Phase III.
Task 4: Project Communications
MakPro shall maintain a project webpage on ChandlerAz.gov for the
project, which is capable of multi-lingual information, and will include information
related to the project design, construction schedule and how to contact the project
team. The site will be updated with any new information on a regular basis.
MakPro will maintain a 24-hour bilingual project hotline to respond to inquiries
or complaints, maintain a call log and coordinate with project team to respond to calls,
as needed.
Provided below are the estimated hours for each task and the hotline, as well as printing,
postage, and translator costs:
Activity Principal Hrs Associate Total
($120/hr) Hrs ($100/hr)
Public Outreach Services
Task 1: Pre-construction & Progress Meetings (110 mtgs) 95 35 $14,900
Task 2: Public / Stakeholder Meetings 30 20 $5,600
Task 3: Community Construction Notices & Communications
50 40 $10,000
(10 areas in Phase III)
Task 4: Project Communications 60 30 $10,200
(Hotline: 28 mos @ $300/mo) $8,400
Sub Total 235 125 $49,100
Printing/Distribution Cost (2 mailings at approx. 3,000 pieces each) $11,600
Translator Cost $900
Grand Total $61,600
Exhibit C
Mr. Brian Lizzet, CEI September 14, 2026
Public Outreach Services for Chandler Alley Rehab Dust Emissions Reduction Phase III Project
The total cost for public outreach services as identified above and based on a 27-month
project schedule should not exceed $61,600.00, which includes a $12,500
estimate for printing, distribution and translation costs. This cost estimate assumes
a labor rate of $120/hour for principal and $100/hour for associate hours. The project
hotline is billed at $300/mo for availability 24/7, and scheduled progress meetings are
assumed to be virtual, and have a one-hour minimum. In addition, this estimate
incorporates efficiencies from one task/activity to another, so removal of an activity may
require an adjustment of hours in other activities.
This proposal assumes any displays, exhibits, engineering designs or details, required for
public meetings or information will be provided by the owner, the design engineer,
construction manager, or contractor. MakPro is not responsible for documenting existing
property conditions, project signage, traffic signage, or distribution of direct door hanger
notifications related to the project or its impacts (e.g., access restrictions or residential
service disruptions) which may be required for the contractor’s work. Changes of substance
to this proposal during the project may affect the final cost.
Thank you for the opportunity to work with CEI and the City of Chandler on this project.
Should you have questions or need additional information related to this proposal, please
feel free to contact me at (480) 890-1927.
Sincerely,
Teresa Makinen
Exhibit D
PROPOSAL SUMMARY
PROJECT NAME : CEI- City of Chandler ST2310.401 Alley Rehab Dust Emissions Phase III
SCOPE OF SERVICES: Contractor Quality Control
LABOR FEES
LABOR REG REGULAR ASS'D OVERTIME OVERTIME EXTENDED
CLASSIFICATION
TYPE HOURS RATE % OT HOURS RATE(1) LABOR COST
Project QC Manager Direct $ 185.00 0% 0 $ 185.00 $ -
Office Administration Direct 4 $ 72.00 0% 0 $ 72.00 $ 288.00
Materials Technician Direct 112 $ 85.00 0% 0 $ 127.50 $ 9,520.00
Senior Materials Technician - Asphalt Direct $ 125.00 0% $ 187.50 $ -
Lab Technician Indirect 61 $ - 0% 0 $ - $ -
(1) Regular Rate X Overtime Premium of 1.5
SUBTOTAL DIRECT LABOR $ 9,808.00
VEHICLE AND PER-DIEM CHARGES
NO. UNIT EXTENDED VEHICLE
DESCRIPTION UNITS
UNITS PRICE AND PER-DIEM
Trip Charge 28 EA $ 88.00 $ 2,464.00
0 $ - $ -
SUBTOTAL VEHICLE AND PER-DIEM CHARGES $ 2,464.00
OTHER PROJECT DIRECT CHARGES
NO. UNIT EXTENDED OTHER
DESCRIPTION UNITS
UNITS PRICE PROJECT CHARGES
$ -
SUBTOTAL OTHER PROJECT DIRECT CHARGES $ -
LAB TESTING FEES
NO. UNIT EXTENDED
DESCRIPTION UNITS
UNITS PRICE LABORATORY FEES
Compressive Strength, Cylindrical Specimen (ASTM C39, AASHTO T22) 35 EA $ 22.00 $ 770.00
Proctor, Standard (ASTM D698, AASHTO T99) 28 EA $ 144.00 $ 4,032.00
Plasticity Index, Wet Prep (ASTM D4318, AASHTO T89, T90) 82 EA $ 140.00 $ 11,480.00
Sieve Analysis (ASTM C136, C117, AASHTO T27, T11) 82 EA $ 90.00 $ 7,380.00
Marshall Specimen Bulk Density (ASTM D6926, D2726, AASHTO T245) SET OF 3 $ 180.00 $ -
Ignition Oven - Gradation (ASTM C136, AASHTO T27) EA $ 180.00 $ -
Ignition Oven - Asphalt Cement Content (ASTM D6307, AASHTO T308) EA $ 240.00 $ -
Maximum Specific Gravity of HMA Mixture (ASTM D2041, T209) SET OF 3 $ 186.00 $ -
$ - $ -
TOTAL LABORATORY TESTING FEES $ 23,662.00
TOTAL ESTIMATE OF ALL FEES $ 35,934.00
Marty Verquer, Project Manager September 14, 2026
Estimator Date
COST PROPOSAL, 9/14/2026
Exhibit D
Quality Testing, LLC
175 S Hamilton Place, Bldg 6, #114
Gilbert, AZ 85233
(480) 496-2000 (480) 496-2001
www.qt-corp.com
SUB CONSULTANT : QT
PROJECT NAME : CEI- City of Chandler ST2310.401 Alley Rehab Dust Emissions Phase III
PROJECT OWNER: City of Chandler
ESTIMATE NUMBER: 260912-V1
Project Assumptions:
This estimate is based on the following assumptions and durations.
* Testing is broken down per Segment: Segments 1-4
* Anticipate 28 trips (Anticipate 28 days @ 4 Hrs. / Day)
* Miscellaneous Concrete Testing.
* All associated lab testing is included in this estimate.
* Miscellaneous Trip Charges- Cylinder Pick ups, Material Pick ups
Estimate Amount Defined Scope: This cost proposal is considered an estimate, subject to the GENERAL
INFORMATION/ASSUMPTIONS as defined herein. For the estimate amount, QT will perform construction materials sampling and
testing, both field and lab, that is specifically identified in this cost estimate.
Cost Estimate Summary:
Total Extended QT Direct Billable Labor $ 9,808.00
(Includes QC Supervisor, QC Reporting Tech, Field Tech, Etc.)
Total Laboratory Testing Fees $ 23,662.00
(Includes All Laboratory Testing)
Total Other Direct Costs $ 2,464.00
(Includes Vehicle, Subcontracted Services, etc. if Applicable)
Total Estimate of All Fees $ 35,934.00
The following pages identify the time frame, resourcing, and other assumptions used in developing this cost estimate. Assumptions
are based on the information provided by your office, and QT's experience on similar projects, at the time of this proposal. If there
are changes to the contractor's schedule, re-testing, additional site visits or other items that are not part of the originally assumed
visits, these visits will be outside this scope of work. Items outside this scope of work will be extra work that will be billed to the
contractor based on the units and rates established here within.
Marty Verquer, Project Manager 9/14/2026
Estimator Date Signature
Exhibit E
September 16, 2026
Consultant Engineering, Inc.
135 E. Chilton, Suite 101,
Chandler, AZ 85225
Attn: Brian Lizzet
Subject: Proposal for Material Testing Services
Alley Rehab Dust Emissions Reductions Phase 3
Chandler, AZ
EGM Proposal: 26EGMP0107CMT
Epsilon Geotechnical & Material LLC, (EGM) is pleased to submit this proposal to provide
Construction Materials Testing and Special Inspection Services at the above referenced subject
site. This proposal reviews our understanding of the project information, outlines our proposed
scope of services, and presents our fee estimate with the applicable schedule of unit rates for
this project.
SCOPE OF WORK
Compaction Testing for Subgrade
Collect soil samples and conduct laboratory compaction testing of proposed fill soils to
document material characteristics and conformance with the project requirements.
Observe footing excavation bottoms to document compliance.
Conduct in-place moisture and density tests to evaluate compaction efforts by the
contractor.
Provide reports to the client on a day-to-day basis.
13765 West Auto Drive, Suite 119, Goodyear, Arizona 85338 Phone: 623.882.9928 Fax: 623.882.9930
Exhibit E
Alley Rehab Dust Emissions Reductions Phase 3 EGM Proposal No.26EGMP0107CMT
Chandler, AZ September 16, 2026
2 of 4
Aggregate Base Materials
Collect aggregate base course (ABC) samples and conduct laboratory compaction
testing of aggregate to document material characteristics and conformance with the
project requirements.
Conduct in-place moisture and density tests to evaluate compaction effort by the
contractor.
Provide reports to the client on day-to-day basis.
Concrete Sampling and Testing
Obtain concrete or grout samples and perform in place field sampling and testing
including temperature and slump.
Cast test cylinders for compressive strength tests.
Cure test cylinders and test compressive strength.
Provide reports on day-to-day basis or as required by the client.
Asphalt Paving
Review proposed asphalt mix design to determine compliance to the project
specification.
Collect samples of asphalt mixture and conduct maximum density, bitumen content and
aggregate gradation tests. Mold Marshall pills from hot mix including specific gravity
and density.
Perform extraction and gradation on field samples to document that the asphalt meets
project specifications.
Perform in-place nuclear density tests on the compacted asphalt pavement to determine
in-place density.
Exhibit E
Alley Rehab Dust Emissions Reductions Phase 3 EGM Proposal No.26EGMP0107CMT
Chandler, AZ September 16, 2026
3 of 4
ADDITIONAL SPECIAL STRUCTURAL INSPECTIONS
Qualified structural inspectors are available to perform special structural inspections. Special
structural inspections will be conducted in general accordance with the applicable sections of
the International Building Code (IBC-2006) current editions.
Cost
The proposed cost for the testing and inspections is outlined in the following cost estimate sheet
and determined along with EGM’s General Terms and Conditions.
LIMITATIONS
Our representatives will be available to observe activities and conduct field and laboratory tests.
Our work does not include supervision or direction of the actual work performed. The word
"inspection" is used to mean periodic observation of the work conducted by others. Neither the
The presence of our field representatives nor the observation or testing by EGM excuses the
contractor for defects discovered in this work. It is the contractor’s responsibility to notify
EGM, in advance, when testing or observations are required. EGM will not be responsible for
work performed without our knowledge and not specifically inspected by the firm’s personnel.
Our firm will not be responsible for the project or job-site safety on this project.
SCHEDULE
EGM’s services will be provided on an on-call basis unless otherwise directed. Please note that
it is the responsibility of the on-site contractor or owners’ representative to notify EGM when
and what testing is required. We require that we be notified at least 24 hours in advance in order
to adequately schedule our work at the site. We will assign a project manager to direct EGM’s
on-site activities for the project. The project manager will review the field reports prepared by
our on-site personnel and will be available to the client for consultation.
FEE ESTIMATE
Based on our understanding of the project information provided, and our experience with
similar projects in this area, we have prepared a cost estimate for this project and have presented
this estimate on the attached “EGM Project Cost Estimate.
Our services will be charged at the unit rates per EGM’s Fee Schedule. You will be charged
only for the actual amount of work performed. Any services requested that are in addition to
the scope listed previously, will be additional charges and invoiced at the rates shown on the
attached EGM Fee Schedule. If requested, we will be glad to review our scope of work to
include any changes requested.
Exhibit E
Alley Rehab Dust Emissions Reductions Phase 3 EGM Proposal No.26EGMP0107CMT
Chandler, AZ September 16, 2026
4 of 4
AUTHORIZATION
To authorize us to begin this work and to make this document the Agreement between us,
please sign and return the executed Work Authorization and Agreement attached to this
proposal. Please provide us with proper invoicing instructions and any special requirements on
this Work Authorization and Agreement Sheet. Additional services requested, or special
requirements not covered in this proposal should also be listed. If you issue a letter of
authorization or purchase order, you must reference this proposal by date and proposal number.
Please note that the attached General Terms and Conditions are an integral part of this proposal.
On behalf of EGM, I would like to thank you for the opportunity to submit this proposal, and
we look forward to working with your team on this project. If you have any questions, or if we
can be of any additional assistance, please do not hesitate to contact us.
Distribution: (1) Addressee
Prepared by: Meghal Goilkar Signature: Date: 09/16/2026
Reviewed by: Ayman Aljazzar Signature: Date: 09/16/2026
Sincerely,
Epsilon Geotechnical & Material, LLC,
Mahdi Sadek, P.E.
Principal
Attachments: Project Cost Estimate Sheet
Work Authorization and Agreement
General Terms and Conditions
Exhibit E
IA COST ESTIMATE
Alley Rehab Dust Emmissions Reductions Phase 3 - City of Chandler
Prices are good till end of 12/31/2026
Amount Rate Fee
Hours, Engineering Technician 40 $58 /hour $2,320
Concrete Cylinders, set of 4 1 $64 /set $64
Daily Trip Charge 10 $83 /ea. $830
Proctor Density Testing (Subgrade + AB) 2 $145 /unit $290
Sieve Analysis Testing (Subgrade + AB) 2 $115 /unit $230
Plasticity Index (PI) Testing (Subgrade + AB) 2 $65 /unit $130
Category Total $3,864
Final Report Preparation:
Final Report Preparation $500 $500
Hours, Clerical 3 $65 /hour $193
Hours, Project Manager 2 $105 /hour $193
Category Total $886
Subtotal $4,750
Contingency 0% $0
TOTAL: $4,750
Mahdi Sadek
EPSILON GEOTECHNICAL Exhibit & E MATERIAL LLC
Geotechnical, Materials, Civil Design & Environmental Services
2026 FEE SCHEDULE
Service / Item Price
ENGINEERING SERVICES
Staff Professional/Project Manager, per hour $105.00
Project Engineer, per hour $145.00
Professional Engineer, P.E., per hour $175.00
Project Principal, per hour $195.00
ENGINEERING TECHNICIAN SERVICES
Engineering Technician, ACI ATTI, per hour $58.00
Senior Engineering Technician, per hour $95.00
Special Structural Inspector, per hour $105.00
Structural Steel and Welding Inspector, per hour $125.00
Environmental Certified Inspector, per hour $95.00
Note: a. Time is charged portal to portal with a two-hour minimum charge. b. Technician and engineering rates are based
upon 8-hour weekdays (between 6am & 4pm). Overtime (weekdays before 6am & after 4pm), weekends and company
holidays will be charged at 1.5 times normal rates.
EQUIPMENT AND LABORATORY TESTING
Direct Shear Remolded, each point $150.00
Extraction/Gradation, each $240.00
Liquid and Plastic Limits, each $65.00
Remolded Swell, each $95.00
R-Value, each $245.00
Marshall Test, regular AC Design Mix, each set of 3 $165.00
Rice Test, Super Pave AC Design Mix, each set of 3 $175.00
Unit Weight and Thickness of AC Core, each $45.00
Modified Proctor Compaction Test, each $145.00
Standard Proctor Compaction Test, each $145.00
Natural Moisture Content and Density of Ring Samples, each $45.00
pH and Minimum Resistivity, each $95.00
Sieve Analysis Course and Fine, each $115.00
Sieve Analysis Course Only, each $115.00
Sieve Analysis, Hydrometer, each $250.00
Specific Gravity and Absorption of Coarse Aggregate, each $105.00
Concrete, Mortar and Grout Testing, each set of 4 $64.00
Concrete Masonry Units, each set of 4 $64.00
Consolidation Test $145.00
Sand Equivalent $95.00
Concrete Mix Design Preparation $2,100.00
Asphalt Mix Design Preparation Marshall Method $2,400.00
Asphalt Mix Design Preparation Gyratory Method $2,400.00
OTHER DIRECT EXPENSES
Computer/Word Processing/Clerical, per hour $65.00
Draftsperson, per hour $95.00
Transportation, per mile $1.10
Out of town field technician rate per day (includes food & accommodations) $275.00
Out of town lab equipment, per day $225.00
13765 W. Auto Drive, Suite 119; Goodyear, Arizona 85338
Exhibit E
Epsilon Geotechnical & Material, LLC
PROJECT INFORMATION
Date: September 16, 2026, PROJECT NO.
PROPOSAL NO.: 26EGMP0107CMT
NATURE OF SERVICES: Material Testing Services & Special Inspections
PROJECT NAME: Alley Rehab Dust Emissions Reductions Phase 3
PROJECT LOCATION: Chandler, AZ
LEGAL DESCRIPTION:
SCOPE OF WORK: See Proposal
FEE ESTIMATE:($4,750) Four thousand seven hundred fifty dollars
CLIENT INFORMATION
NAME: CONSULTANT ENGINEERING, INC. ATTENTION: BRIAN LIZZET
ADDRESS: 135 E. CHILTON, SUITE 101, CHANDLER, AZ 85225
PHONE: 480.689.6472 FAX NUMBER
EMAIL: BLIZZET@CEI-AZ.COM
SPECIAL INSTRUCTIONS
INVOICING INSTRUCTIONS: (If other than above, invoices to be sent to):
NAME: ATTENTION:
ADDRESS:
PHONE: EXT: FAX NUMBER:
REPORT DISTRIBUTION: CLIENT COPIES; CIVIL ENGINEER COPIES;
ARCHITECT COPIES; OTHERS
OTHER INSTRUCTIONS:
PROPOSAL ACCEPTANCE
THIS PROPOSAL, INCLUDING THE SCHEDULE OF FEES, AND THE GENERAL TERMS AND CONDITIONS,
IS ACCEPTED THIS DAY OF , 2026.
Print or type name and title of authorized representative Signature
PLEASE COMPLETE/CORRECT ANY AVAILABLE INFORMATION
Exhibit E
Epsilon Geotechnical & Material, LLC
Contract General Terms and Conditions
Time and Materials Projects
Billing and Payment: Invoices will be submitted on a progress basis for services performed during
the term of the project. Payment will be due based on 30 days Net from the date of the Invoice.
Controlling Law, Venue, Costs and Attorneys’ Fees: The parties agree that this Contract shall be
construed in accordance with the laws of the State of Arizona to the fullest extent lawfully allowable
without regard to conflict of laws principles/the choice-of-law doctrine, and that Maricopa County,
Arizona shall be the venue and exclusive proper forum in which to adjudicate any case or controversy
arising either, directly or indirectly, under or in connection with this Contract. The parties agree, in the
event of a breach of this Contract, the breaching party will pay the other party’s costs and reasonable
attorney fees incurred because of the breach, whether a lawsuit is instituted or not, and shall
specifically include attorneys’ fees associated with demand or collection efforts resulting from Client’s
failure to pay any sum owed hereunder immediately when it is due. Costs shall include taxable costs as
well as non-taxable costs such as reasonable travel expenses, expert witness fees, copy, long-distance
and fax charges as well as delivery charges.
Material Breach and Time of the Essence: Time shall be considered of the essence with respect to
any provision of this Contract related to payment by the Client. Client shall be considered in material
breach of this Contract in the event any sum owed to EGM under this Contract is not paid in full
immediately when due.
Costs, Attorney’s Fees and Interest: In addition to any and all remedies and damages EGM may be
entitled to hereunder, any and all sums owed to EGM by Client arising from or as a result of any term,
provision or condition of this Contract or Client’s breach thereof including, but not limited to any
EGM’s attorneys’ fees and expenses, shall incur interest at a rate of eighteen percent (18%) per annum
on the unpaid balance, if such sum is not paid in full to EGM within three (3) business days of the date
any such sum becomes due or the date of Client’s breach, whichever first occurs. Notwithstanding the
foregoing, nothing contained herein shall be construed as to authorize or permit the payment of any
such sum owed to EGM later than immediately on the date it is owed.
Delays: The Client agrees that EGM is not responsible for damages arising directly or indirectly from
any delays for causes beyond EGM's control. For purposes of this Contract, such causes include, but
are not limited to, strikes or other labor disputes; supply shortages; severe weather disruptions or other
natural disasters; fires; riots; war or other emergencies or acts of God; failure of any government
agency to act in timely manner; failure of performance by the Client, the Client's contractors or
consultants; or the discovery of any hazardous substances or differing conditions. In addition, if the
delays resulting from any such causes increase the cost or time required by EGM to perform its
services in an orderly and efficient manner, EGM shall be entitled to an equitable adjustment in the
schedule and/or compensation.
Dispute Resolution: Except for failure by Client to timely pay any sum owed to EGM immediately
when due, in an effort to resolve any conflicts that arise during the design and construction of the
project or following the completion of the project, the Client and EGM agree that all disputes between
them arising out of or relating to this Contract and the project shall be submitted to nonbinding
mediation unless the parties mutually agree otherwise.
Indemnification: EGM agrees, to the fullest extent permitted by law, to indemnify and hold harmless
the Client against damages, liability and costs arising from the negligent acts of EGM in the
performance of professional services under this Contract, to the extent that EGM is responsible for
such damages, liability and costs on a comparative basis of fault and responsibility between the
consultants
and the Client. EGM shall not be obligated to indemnify the Client for the Client's own negligence.
Exhibit E
Information and/or Services Provided by Others: EGM assumes no responsibility or liability for
work, testing, design(s) or recommendations performed or provided by other companies or independent
contractors either independently or on behalf of EGM.
Insurance: We are protected by Workmen's Compensation Insurance (and/or employer's liability
insurance), and by Public Liability Insurance for bodily injury and property damage. EGM shall not be
responsible for property damage from any cause beyond the coverage of our Insurance.
Liability: Notwithstanding the foregoing, to the maximum extent permitted by law, the Client agrees
to limit EGM's liability for the Client's damages to the sum of $50,000.00 or EGM's fee, whichever is
greater. This limitation shall apply regardless of the cause of action or legal theory pled or asserted.
Notice: Under the Mechanics' Lien Law (for the State of Arizona) any contractor, subcontractor,
laborer, supplier or other person who helps to improve your property but is not paid for his work or
supplies, has a right to enforce a claim against your property. This means that after a court hearing,
your property could be sold by a court officer and the proceeds of the sale used to satisfy the
indebtedness, this can happen even if you have paid your contractor in full, if the subcontractor,
laborer, or supplier remains unpaid.
Performance and Standard of Care: All work performed hereunder shall be in accordance with
current standards of the profession. Work shall begin as soon as possible following receipt of this
executed Contract and Work Order. The estimate submitted herein is subject to change if unusual or
unforeseen elements develop or are discovered, or in the event services are added or changed. State and
local rules and regulations are subject to changing interpretations. All reports will be written by EGM
to meet the requirements of local governmental agencies; however, it is understood that governmental
agency approval is discretionary, and accordingly, EGM cannot and does not guarantee approval of its
reports by these agencies. All additional work after submittal of the initial report by EGM will be in
addition to our estimate and will be billed hourly, Right-of-entry is hereby granted to the job site for
EGM to perform the proposed site studies and subsurface explorations. We will take reasonable
precautions to protect the environment during our field work but have not included in an
estimate of the cost for restoration of damages which may result.
Professional Opinion: Our professional services will be performed, our findings will be obtained, and
our recommendations prepared in accordance with generally accepted engineering practices. The
professional opinions of EGM will be based upon conditions revealed at exploration locations and
reconnaissance of surrounding terrain. It is agreed that EGM is not responsible for the effect that
unknowns such as acts of others on adjacent properties, variables of nature including, but not limited
to, earthquakes, the works of man, Acts of God, and other variables beyond the control of EGM may
have on any opinion rendered hereunder. No express or implied warranties are given hereunder
regarding soil conditions apart from locations which have been explored and then only to the extent of
such explorations does EGM warrant its work.
ACKNOWLEDGED AND AGREED TO this ______ day of _______________________, 2026.
CLIENT: _______________________________
(Print Client Name)
By: ____________________________________
(Signature of Client or Authorized Agent)
EXHIBIT “F”
FEDERAL REQUIREMENTS
Project Name: Alleyway Rehab Dust Emissions Reduction Phase III
City Project No.: ST2310.451; Federal No.: CHN-0(256); ADOT No.: T0555-01C
Rev. 3/26/26 Page F-1
FEDERAL SECTION
REQUIREMENTS, DOCUMENTS, FORMS
FOR
PROFESSIONAL SERVICES
DBE GOAL 0% RACE NEUTRAL
This is a federal funded contract with Federal Highway Administration (FHWA)
and must comply with all related federal requirements.
SUBMIT WITH SOQ
1. SOQ Certification Form
2. Lobby Certification Form
3. Verification Statement
4. Forced Labor Ethnic Uyghurs Form
5. Bidders-Proposers List Email Confirmation
FEDERAL DOCUMENTS
TABLE OF CONTENTS
TABLE OF CONTENTS
(for Professional Services RFQ/SOQ & Contract with 0% DBE Goal -DBE Race Neutral)
1.0 Requirements of ADOT for the Consultant SOQ Submittal
2.0 City SOQ Proposal Certifications Form
3.0 Lobby Certification Form
4.0 Federal Requirements
5.0 Verifications Statement
6.0 Forced Labor of Ethnic Uyghurs Ban Certification Form
7.0 Prompt Pay Provisions
8.0 Title VI Assurance, Appendix A and E
9.0 Records Retention
10.0 Federal Immigration and Nationality Act
11.0 Buy America / Build America-Buy America Requirements
11.1 Buy America / BABA Final Rule Waiver Guide-Project Specific
11.2 Buy America / BABA Data FHWA Requirements
12.0 DBE EPrise
13.0 DBE Documents
13.1 DBE Documents Instructions / Guide
13.2 ADOT On-Line Bidders-Proposers List
14.0 Payment Requests
14.1 Pay Application Request Form
14.2 Subconsultant Summary Form
15.0 Subconsultant / Subcontract Requirements
RFQ-Contract TofC Rev 2025-12-12
1.0
CA AGENCY CONSULTANT REQUIREMENTS
1.0
CONSULTANT REQUIREMENTS
FOR SOQ SUBMITTAL
This contract is a federal funded contract with Federal Highway Administration (FHWA) and must comply
with all related federal requirements.
1.1 REQUIRED LICENSURE AND REGISTRATION
SOQs will be accepted from any prime Consultant prequalified through the Arizona Department of
Transportation (ADOT) Engineering Consultants Section (ECS) and properly registered with the Arizona
Board of Technical Registration (BTR) at the time the SOQ is submitted to the City. This contract does
require a Principal or Officer of the Firm responsible for this contract that is properly registered with the
Subconsultants, in the SOQ submittal, have the proper Arizona licenses and registrations, and DBE
certification if applicable, for the services to be performed under this contract.
1.2 PRE-QUALIFICATION
In order to submit an SOQ, the prime Consultant must have on file with ADOT ECS a current
Prequalification Application/Statement. Subconsultants are not required by ADOT ECS or the City to be
prequalified, but are encouraged to do so. ADOT ECS currently prequalifies firms on a bi-annual basis.
Further information regarding the prequalification process can be found at the following ADOT ECS
website:
https://www.azdot.gov/business/engineering-consultants/consultant-prequalification
Obtaining prequalification does not mean the firm is under contract or entitled to receive a contract.
Obtaining prequalification means the firm has met minimum requirements to submit qualifications to be
considered/evaluated for this project.
The City will review prequalification status with ADOT ECS at the time of SOQ due date. If the firm is not
prequalified on the SOQ submittal date, the SOQ will be rejected.
1.3 AUDIT & ANALYSIS REQUIREMENTS
Within two (2) weeks after receiving notice of selection, the selected prime Consultant(s) and its
Subconsultant(s) must submit financial documentation to ADOT Office of Audit & Analysis (A&A). If the
selected prime Consultant(s) and its Subconsultant(s) have recently submitted their most current
financial documents to ADOT A&A, contact ADOT A&A at (602) 712-7042 to inquire if you need to
resubmit financial documents. Additionally, the selected prime Consultant(s) and its Subconsultant(s)
are required to comply with ADOT Consultant Audit Guidelines.
https://azdot.gov/about/audit-and-analysis
Prime Consultants and its Subconsultants that propose on an overhead basis must have their Schedule
of Indirect Costs and Financial Statements available for review by ADOT A&A within six (6) months of
-end (FYE). For example, a Consultant
with December 31, 2013, FYE must have the required information available no later than June 30,
2014. Noncompliance with this requirement will be considered failed negotiations unless
waived in writing by the State.
The items outlined above represent the information needed to begin the audit review process. Additional
information and supporting documentation may be requested. Failure to comply with audit requirements
audit requirements or related information must be directed to ADOT A&A at (602) 712-7042.
The Consultant understands that a compliant accounting system is required in accordance with
Generally Accepted Accounting Principles (GAAP), Federal Acquisition Regulation (FAR) of Title 48,
Code of Federal Regulations (CFR)-Part 31, applicable Cost Accounting Standards (CAS), and ADOT
Advance Agreement Guideline.
2024-06-24 Consultant Requirements for SOQ Submittal-Pg 1 of 2
1.4 STATE OF ARIZONA LOCAL OFFICE REQUIREMENTS
All selected prime Consultant(s) must establish a local office in the State of Arizona prior to the contract
Notice to Proceed (NTP) date if a local office does not already exist.
1.5 NOT ALLOWED IN SOQ SUBITTAL
Inclusion of cost, work-hour, and plan-sheet estimates are not allowed in the SOQ.
1.6 BIDDERS-PROPOSERS LIST EMAIL VERIFICATION
See the DBE Documents section for instructions. This email verification document must be submitted
with SOQ and is not included in the limited page count submittal requirements.
2024-06-24 Consultant Requirements for SOQ Submittal-Pg 2 of 2
2.0
SOQ CERTIFICATION FORM
CITY OF CHANDLER
SOQ PROPOSAL CERTIFICATION FORM
CONSULTANT NAME: ______________________________________________________________
PROJECT NAME
CITY PROJECT NO FEDERAL NO ADOT NO
The statements below are to ensure Consultants are aware and in agreement with Federal, State, and City of
Chandler Guidelines related to the award of this contract. Consultants shall submit the specific Certification form
attached to the related SOQ advertised. Failure to sign and submit this Certification Form as specified in this
SOQ with the SOQ proposal will result in the SOQ proposal being rejected.
Submission of the SOQ by the Consultant certifies that to the best of its knowledge:
1. The Consultant and its subconsultant have not engaged in collusion with respect to the contract under
consideration.
2. The Consultant, its principals and subconsultants have not been suspended or debarred from doing business
with any government entity.
3. The Consultant shall have the proper Arizona licenses(s) and registration(s) for services to be performed under
this SOQ and contract. Furthermore, the Consultant and Key Team Members including Subconsultants are
currently licensed to provide the required services as requested in the SOQ package.
4.
ascertain the eligibility of the Consultant, its principals and subconsultants to enter into contract with the City
and with any other governmental agency.
5.
6. All information and statements written in the proposal are true and accurate and that the City reserves the
right to investigate, as deemed appropriate, to verify information contained in proposals.
7. All members of the Project Team who are former City employees did not have or provide information that
gives the Consultant a competitive advantage, and either (1) concluded their employment with City at least
12 months before the date of the SOQ or (2) have not made any material decisions about this project while
employed by the City of Chandler.
8. Work, equating at least 51% of the contract value, shall be completed by the Consultant unless otherwise
specified in the SOQ or contract.
9. No federally appropriated funds have been paid or shall be paid by or on behalf of the Consultant for the
purpose of lobbying.
10. The Consultant understands that it is required to have a compliant accounting system, in accordance with
Generally Accepted Accounting Principles (GAAP), Federal Acquisition Regulation (FAR) of Title 48, Code of
Federal Regulations (CFR)-Part 31, applicable Cost Accounting Standards (CAS), and ADOT Advance
Agreement Guideline.
2020-04-27 SOQ Certification Form Pg 1 of 2
11. Due to the project having federal aid funds, the Consultant affirmatively ensures that in any subcontract
entered into pursuant to this advertisement, disadvantaged business enterprises shall be afforded full and
fair opportunity to submit proposals/bids in response to this invitation and shall not be discriminated again
on the grounds of race, color, or national origin in consideration for an award, in accordance with Title VI of
the Civil Rights Act of 1964, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department
of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted
programs of the Department of Transportation.
12. The Consultant shall utilize all Project Team members, subconsultants and DBE firms, if applicable, submitted
in the SOQ and shall not add other Project Team members or subconsultants, unless the Consultant has
received prior written approval from the City. Furthermore, Consultant understands that each Subconsultant
must be approved through a City of Chandler approval process.
13. The Consultant shall either meet its DBE goal commitment and any other DBE commitments or make Good
Faith Efforts to meet the DBE goal commitments as stated in its SOQ proposal or Cost Proposal and shall
report on a timely basis its DBE utilization as detailed in the contract.
14.
in the contract and its SOQ proposal.
I hereby certify that I have read and agree to adhere to the fourteen (14) statements above and/or that the
statements are true to the best of my knowledge as a condition of award of this contract. This form must be
signed by a Principal of the Consultant.
Name (Print): ____________________________________________ Title: _______________________________
Name (Signature):
_____________________________________________ Date: _______________________________
2020-04-27 SOQ Certification Form Pg 2 of 2
3.0
LOBBY CERTIFICATION FORM
public inspection. Any person who fails to file the
e l subject to a civil penalty of not less than $10,000 and
not each such failure.
4.0
FEDERAL REQUIREMENTS
PROFESSIONAL SERVICES FEDERAL REQUIREMENTS ACKNOWLEDGEMENT
Federal Funded RFQ / Contract - Professional Services
1. CA Agency Requirements
a. The City of Chandler has strict federal requirements to maintain the federal funds.
b. Reoccurring Federal Requirement Discrepancies without correction may result in contract termination.
2. UTracs Registration
a. All Consultants and Subconsultants working on a federal funded project must be registered on the
UTracs.azdot.gov website / database which includes a 5-digit registration number. This will be verified.
3. Federal Contract SAM Requirements To Work on a Federal Funded Contract (for Consultants and Subconsultants)
a. Cannot have unresolved federal tax liens.
b. Cannot have been debarred from a federal contract in the last three years.
c. Must use E-Verify for employment.
d. Must have and maintain current ROC license ** if business type requires ROC license in Arizona.
4. Title VI
a. Must adhere to Title VI Compliance - related topics: Race, Color, sex, national origin, age, or disability.
b. During Contract, citizen complaints related to Title VI must be handed over to the City of Chandler Federal
Compliance.
5. Buy America AND Build America-Buy America
a. Requirements apply to this contract/project. Please see the Buy America section.
6. Prompt Pay & Payment Reporting in DOORs
a. All Consultants and Subconsultants for this contract must be registered in ADOT DOORs and have a current up
to date profile.
b. Monthly reporting of payment made/received is a requirement for Consultants and Subconsultants.
c. Payments from Prime to Subconsultant must be made within seven (7) days from receiving payment from the
d. There are penalties for non-reporting and / or non-payment.
7. Subconsultants
a. Subconsultants must be approved by the City PRIOR to any work being performed by Subconsultant.
b. City will provide required forms and federal documents that must be included in subcontracts.
c. QA / Testing Subconsultants must be on the ADOT Approved List.
8. QA Reports must be up to date with no lapse time more than monthly. Pay application will not be signed /
approved unless QA Reports are up to date and provided to the City.
9. Documentation Requirements
a. All documents, emails, reports, invoices, back up documents to pay applications MUST have the Project Name
and Project Numbers (City, Federal, ADOT).
10. Pay Applications / Invoicing / Billing
a. Pay Application forms will be provided to the Consultant.
b. Pay Applications (request for payment) must be submitted by calendar month for all work the previous month.
c. Consultant will need to submit Pay Applications by the 10th day of each month unless otherwise specified during
the course of the contract/project. There may be holidays or fiscal year end that can affect this deadline.
d. No Consultant work or Subconsultant work can be paid for that has a work performed prior to the Prime Contract
NTP date and no Subconsultant work can be paid for that has occurred prior to the Subconsultant being approved
by the City.
e.
month work period. Expenses submitted must be for the same working month as the pay application. If a
prior month expense was missed, you may include it with an explanation on the document. Per FHWA, this
cannot be a reoccurring process.
f. Pay Application will include the City provided Subconsultant Payment Summary Form with each pay application.
Rev 2025-08-27 Page 1 of 2
11. DBE Subconsultants / Subcontracts
a. No DBE Subconsultant Subcontract can be deleted, cancelled, reduced, or terminated without the required
process which includes notification to the City.
Consultant must notify the City as soon as this issue arises. The City will then provide instructions, forms, and the
process / steps that must be followed.
b. There will be specific DBE forms for the DBE Subcontracts/Subconsultants.
c. DBE Subcontract must show dollars applied to each work task description.
d. When a DBE Subconsultant fill out, sign,
and submit to City, DBE Final Payment Certification Form 3210PS.
12. Retention of Documentation
a. Federal required retention is to maintain contract documentation for five (5) years from contract completion.
FOR CM SERVICES ONLY:
13. Project Meetings
a. Project meetings will be set up by CM Services.
b. Project Agenda including current up to date logs to be provided the day before the meetings.
c. Minutes to be provided within two working days of the meeting with an allowable time for corrections.
d. Contractor will be required to provide a 3-week look ahead schedule for the meetings. This will need to be
included in the meeting agenda, and the meeting minutes.
14. Tracking Logs
a. CM Services will maintain and provide weekly and at pay application time, current updated logs for RFIs, RFPs,
Material Certs, Field Directives, T&Ms, Allowance Usage, Lump Sum progressive payments, etc.
15. Contractor Employee Interviews
a. CM Services will perform the required employee interviews related to the Contractor and Subcontractors for the
US Department of Labor / Certified Payroll review requirements.
b. City will provide the forms and guidelines for this task.
16. Quality Assurance (QA) Subconsultants / Reports
a. QA Subconsultants must be on the ADOT Approved List.
b. QA Reports are required to be current at all times -with lapse time no more than monthly and pay applications will
not be signed/approved if QA Reports are not current, up to date, and provided to the City.
17. CM Services Review of Construction Pay Application
a.
City will provide a required CM Services Construction Pay Application Review Checklist which must be signed.
18. T&M Work
a. No T&M work will occur prior to a City provided T&M work and documentation requirements review. This review to
include CM Services Project Manager, CM Services Inspector, and the Contractor.
19. Inspector Requirements
a. A City of Chandler Inspector Guide will be provided and required for each inspector to sign and return the
signature page to the City of Chandler Federal Compliance.
b. Inspector Field / Daily Reports
i. These reports are the certified documentation of work on site performed, subcontractors and others on site,
quantities completed.
ii. City of Chandler forms are required unless CM Services form is approved.
iii.
iv. Per FHWA, Inspector Field / Daily Reports must include documentation for each contractor/subcontractor:
number of crew members on site, basic classification type breakdown (example: 2 operators, 4 laborers, 1
water truck driver) and equipment that the contractor/subcontractor is using.
v. Inspector Field / Daily Reports must include a copy of the City provided list of approved subcontractors and
document which subcontractors were on site on the date of the daily report. This may be waived by the City if
the list of approved subcontractors is less than 2 and clearly documented on the daily report.
vi. Inspector Field / Daily Reports will be submitted to the City at a minimum, once per week, no later than the
following Tuesday of the following week.
Rev 2025-08-27 Page 2 of 2
5.0
VERIFICATION STATEMENT
VERIFICATION STATEMENT
FEDERAL FUNDED CONTRACTS
Construction
NO FEDERAL TAX LIENS, NO DEBARMENTS,
USE OF E-VERIFY FOR EMPLOYMENT HIRING,
AZUTRACS REGISTRATION/STATUS,
ROC LICENSE, FEDERAL EMPLOYER IDENTIFICATION NUMBER (EIN),
BUY AMERICA / BUILD AMERICA-BUY AMERICA COMPLIANCE,
FORCED LABOR OF ETHNIC UYGHURS BAN
This form represents certifying compliance for items listed below:
a) This company has no outstanding unresolved federal tax liens.
b) This company has not been suspended or debarred from working on a federal funded contract, does not have a
proposed debarment pending, has not been indicted, convicted, or had a civil judgement rendered against the firm by
a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three (3) years as
specified by Code of Federal Regulations 49 CFR.
c) This company uses E-Verify for employment verifications.
d) This company has a current AZUTracs Registration (https://utracs.azdot.gov)
e) ROC License: To work on a federal funded project, all contractors, subcontractors, consultants, subconsultants must
have an ROC license (exception if business type does not require ROC license in Arizona). For bidding process, For
Construction, Low Bidder will have 60 days from Bid Opening Day to obtain the required State ROC license. If your
f) EIN: Must have an Employer Identification Number (EIN) if you are the Prime. For Subcontractors and Subconsultants
- you are required only If required by Law / Federal Requirements.
g) This company agrees to comply with Buy America and Build America-Buy America (BABA).
h) Forced Labor of Ethnic Uyghurs Ban: This company does not use and agrees not to use during the term of the
the forced labor of Ethnic Uyghurs
Subconsultants, and Suppliers comply with this.
i) Experience, knowledge, or education with Federal Funded Projects and the compliance requirements.
A company that is unable to certify to the statements above is ineligible to enter into an agreement for federal
funded contracts with the City of Chandler.
Company Name:
Company AZUTracs No:
Company ROC No:(if applicable)
EIN:
Name of Person Signing:
Title of Person Signing:
Signature: Date:
Rev 2026-06-18
6.0
FORCED LABOR OF ETHNIC UYGHURS
CERTIFICATION FORM
7.0
PROMPT PAY PROVISION
CONSTRUCTION AND PROFESSIONAL SERVICES/DESIGN CONTRACTS
PROMPT PAY AND PAYMENT REPORTING PROVISIONS
** FOR USE ON LPA FEDERAL AID PROJECTS **
(07/24/2023)
MEASUREMENTS AND PAYMENT:
(A) Partial Payments:
If satisfactory progress is being made, the contractor shall receive a payment based on the
amount of work completed. Progress payments may be made by the LPA/Subrecipient
Procurement Office to the contractor on the basis of an approved estimate of the work
performed during a preceding period of time. The progress payments will be paid on or
before 14 days after the estimate of the work is approved. The estimate of the work will be
deemed received by the LPA/Subrecipient Procurement Office on submission to the person
designated by the LPA/Subrecipient Procurement Office for the submission, review or
approval of the estimate of the work. The LPA/Subrecipient Procurement Office by mutual
agreement may make progress payments on contracts of less than 90 days and will make
monthly progress payments on all other contracts. Payment to the contractor on the basis of
a duly certified and approved estimate of the work performed during the preceding calendar
month under the contract may include payment for material and equipment.
An estimate of the work submitted will be deemed approved and certified for payment after
seven days from the date of submission unless before that time the LPA/Subrecipient
Procurement Office or Designee prepares and issues a specific written finding setting forth
those items in detail in the estimate of the work that are not approved for payment under the
contract. The contractor shall work with the LPA/Subrecipient or the LPA/Subrecipient
Designee to finalize monthly estimate. The progress payments will be paid on or before 14
days after the estimate of the work is certified and approved in accordance with Arizona
Revised Statutes Section 34-221.
The contractor shall pay to the contractor's subcontractors or material suppliers and each
subcontractor shall pay to the subcontractor's subcontractor or material supplier, within
seven days of receipt of each progress payment the respective amounts allowed the
contractor or subcontractor on account of the work performed by the subcontractors, to the
extent of each subcontractor's interest.
No contract for construction services may materially alter the rights of any contractor,
subcontractor, or material supplier to receive prompt and timely payment.
A subcontractor may notify the LPA/Subrecipient Procurement Office in writing requesting
that the subcontractor be notified by the Subrecipient Procurement Office in writing within
five days from payment of each progress payment made to the contractor.
Prompt Pay and Payment Reporting Provisions- 1/5
(B)No Retainage on Progress Payments:
(1) This is a federally-funded project. Therefore, notwithstanding A.R.S. § 34-221,
the LPA/Subrecipient Procurement Office will not withhold retainage from
progress payments. Neither the contractor, nor the subcontractor of any tier,
may withhold any retainage on progress payments to subcontractors or
suppliers of any tier.
(2) This provision does not prevent the LPA/Subrecipient Procurement Office from
withholding retainage or reducing payments where otherwise provided in the
contract. These cases may include, but are not limited to:
(a) Delayed work;
(b) Work that is not satisfactorily performed; or
(c) A failure to submit necessary reports, certifications, or documents to
the LPA/Subrecipient Procurement Office.
(C) Subcontractor Payments:
(1) No Retainage:
(a) This is a federally-funded project. Therefore, notwithstanding A.R.S. §
34-221, neither the contractor, nor the subcontractor of any tier, may
withhold any retainage on progress payments to subcontractors or
suppliers of any tier.
(b) Pursuant to Subsection (B)(2) of this Specification, the contract does
not prevent the LPA/Subrecipient Procurement Office from withholding
retainage or reducing payments where otherwise provided in the
contract. These cases may include, but are not limited to:
(i) Delayed work;
(ii) Work that is not satisfactorily performed; or
(iii) A failure to submit necessary reports, certifications,
or documents to the LPA/Subrecipient
Procurement Office.
(c) When the LPA/Subrecipient Procurement Office withholds retainage or
reduces payments under Subsection (B)(2) of this Specification, the
contractor may withhold retainage on progress payments to
subcontractors or suppliers of any tier. However, the contractor may
only withhold a reasonable amount of retainage.
(d) For the purpose of this section, a “reasonable amount” of retainage is
based on the subcontractor’s involvement or the supplier’s involvement
in the cause for the LPA/Subrecipient Procurement Office’s reduction
of payment. The final amount retained from all subcontractors and
suppliers shall not be higher than the amount retained by the
LPA/Subrecipient. However, tier subcontracts shall include provisions
that comply with this section.
Prompt Pay and Payment Reporting Provisions- 2/5
(2) No Set-offs Arising from Other Contracts:
If a subcontractor is performing work on multiple contracts for the same contractor or
subcontractor of any tier, the contractor or subcontractor of any tier shall not withhold or
reduce payment from its subcontractors on the contract because of disputes or claims on
another contract.
(3) Partial Payment:
The contractor and each subcontractor of any tier shall make prompt partial payments to its
subcontractors within seven days of receipt of payment from the LPA/Subrecipient
Procurement Office. Notwithstanding any provision of Arizona Revised Statutes Section 34-
221, the parties may not agree otherwise.
(4) Final Payment:
The contractor and each subcontractor of any tier shall make prompt final payment to each
of its subcontractors. The contractor and each subcontractor of any tier shall pay all
monies, including retention, due to its subcontractor within seven days of receipt of
payment. Notwithstanding any provision of Arizona Revised Statutes Section 34-221, the
parties may not agree otherwise.
(5) Payment Reporting:
For the purposes of this subsection “Reportable Contracts” means any subcontract, of any
tier, DBE or non-DBE, by which work shall be performed on behalf of the contractor and any
contract of any tier with a DBE material supplier.
The requirements of this subsection apply to all Reportable Contracts.
Payment Reporting for all Reportable Contracts shall be done through the LPA DBE System
which can be accessed at AZ UTRACS on the Arizona Transportation Business Portal at
www.azutracs.com. No later than fifteen calendar days after the preconstruction conference,
the contractor shall log into the system and enter or verify the name, contact information,
and subcontract amounts for Reportable Contracts on the project. As Reportable Contracts
are approved over the course of the contract, the contractor shall enter the subcontractor
information in the LPA DBE System. Reportable contracts information shall be entered into
the system no later than five calendar days after approval by the LPA/Subrecipient
Procurement Office.
The contractor shall report on a monthly basis indicating the amounts actually paid and the
dates of each payment under any Reportable Contract on the project. The contractor shall
provide information for payments made on all Reportable Contracts during the previous
month by the last day of the current month. In the event that no payments were made during
a given month, the contractor shall identify that by entering a dollar value of zero. If the
contractor does not pay the full amount of any invoice from a subcontractor, the contractor
shall note that and provide the reasons in the comment section of the Monthly Payment
Audit of the LPA DBE System.
Prompt Pay and Payment Reporting Provisions- 3/5
In addition, the contractor shall require that all participants in any Reportable Contract
electronically verify receipt of payment on the contract within 15 days of receipt of electronic
payment notification and the contractor shall actively monitor the system to ensure that the
verifications are input. The contractor shall proactively work to resolve any payment
discrepancies in the system between payment amounts it reports and payment confirmation
amounts reported by others.
The contractor shall ensure that all Reportable Contract payment activity is in the LPA DBE
System. This includes all lower-tier Reportable Contracts.
The contractor shall maintain records for each payment explaining the amount requested by
the subcontractor, and the amount actually paid pursuant to the request, which may include
but are not limited to, estimates, invoices, pay requests, copies of checks or wire transfers,
and lien waivers in support of the monthly payments in the system.
The contractor shall ensure that a copy of this Subsection is included in every Reportable
Contract of every tier.
(a) Sanctions for Inadequate Reporting:
For each month that the contractor fails to submit timely and complete payment information
the LPA/Subrecipient Procurement Office will retain $5,000 as sanctions from the monies
due to the contractor. After 90 consecutive days of non-reporting, the sanctions will increase
to $10,000 for each subsequent month which the contractor fails to report until the
information is provided. These sanctions will be in addition to all other retention or liquidated
damages provided for elsewhere in the contract.
(6) Completion of Work:
A subcontractor's work is satisfactorily completed when all the tasks called for in the
subcontract have been accomplished, documented, and accepted by the LPA/Subrecipient
Procurement Office.
(7) Disputes:
If there is a discrepancy between what is reported by the contractor in the LPA DBE System
and what the subcontractor indicates, an alert email will automatically be sent to the
contractor. The email will be sent to the email address provided by the contractor in the
LPA DBE System. It is the contractor’s responsibility to ensure that the email address in
the system is kept current.
The contractor shall provide a verifiable explanation of the discrepancy in the LPA DBE
System as early as practicable but in no case later than seven days after the date of the
alert email.
The LPA/Subrecipient will determine whether the contractor has acted in good faith
concerning any such explanations. The LPA/Subrecipient and ADOT BECO reserves the
right to request and receive documents from the contractor and all subcontractors of any
Prompt Pay and Payment Reporting Provisions- 4/5
tier, in order to determine whether prompt payment requirements are met.
The contractor shall implement and use the dispute resolution process outlined in the
subcontract or by following the LPA/Subcrecipient escalation process, to resolve payment
disputes.
(8) Non-compliance:
Failure to make prompt partial payment, or prompt final payment including any retention,
within the time frames established above, will result in remedies, as the LPA/Subrecipient
Procurement Office deems appropriate, which may include but are not limited to:
(a) Sanctions: These sanctions will be in addition to all other retention or
liquidated damages provided for elsewhere in the contract.
(i) The LPA/Subrecipient Procurement Office will withhold two times the
disputed dollar amount not paid to each subcontractor.
(ii) If full payment is made within 30 days of the LPASubrecipient
Procurement Office’s payment to the contractor, the amount withheld by
the LPA/Subrecipient Procurement Office will be released.
(iii) If full payment is made after 30 days of the LPA/Subrecipient
Procurement Office’s payment to the contractor, the LPA/Subrecipient
Procurement Office will release 75 percent of the funds withheld. The
LPA/Subrecipient Procurement Office will retain 25 percent of the
monies withheld as sanctions.
(b) Additional Remedies. If the contractor fails to make prompt payment for
three consecutive months, or any four months over the course of one
project, or if the contractor fails to make prompt payment on two or more
projects within 24 months, the LPA/Subrecipient Procurement Office may,
in addition, invoke the following remedies:
(i) Withhold monthly progress payments until the issue is resolved and full
payment has been made to all subcontractors, subject to the sanctions
described in paragraph (a) above,
(ii) Terminate the contract for default,
(iii) Disqualify the contractor from future bidding, temporarily or
(iv) permanently, depending on the number and severity of violations, if
applicable.
In determining whether sanctions will be assessed, the extent of the sanctions, or additional
remedies assessed, the LPA/Subrecipient will consider whether there have been other
violations on this or other contracts, whether the failure to make prompt payment was due to
circumstances beyond the contractor’s control, and other circumstances. The contractor
may, within 15 calendar days of receipt of the decision of the LPA/Subrecipient, escalate the
decision according to the contract’s escalation process.
Prompt Pay and Payment Reporting Provisions- 5/5
8.0
TITLE VI
9.0
RECORDS RETENTION
RECORDS RETENTION
Contractor and Subcontractor Project Records
(Reference to A.R.S.35-214)
The contractor, subcontractors and all suppliers shall keep and maintain all books, papers, records, files,
accounts, reports, bid documents with backup data, including electronic data, and all other material relating to the
contract and project for five (5) years following completion and acceptance of the work.
All of the above material shall be made available for auditing, inspection, and copying and shall be produced upon
request to the Agency.
The City of Chandler Capital Projects
215 E Buffalo Street, Mail Stop 407
Chandler, Arizona 85225.
The contractor shall insert the above requirement in each subcontract purchase order and lease agreement and
shall also include in all subcontracts, a clause requiring subcontractors to include the above requirement in any
lower-tier subcontract, purchase order, or lease agreement.
10.0
FEDERAL IMMIGRATION
AND
NATIONALITY ACT
Federal Immigration and Nationality Act
(Reference to Arizona Executive Order 2005-30)
The contractor, including all subcontractors, shall comply with all federal, state and local immigration laws and
regulations, as set forth in Arizona Executive Order 2005-30, relating to the immigration status of their employees
who perform services on the contract during the duration of the contract. The Agency (City of Chandler) shall
retain the right to perform random audits of contractor and subcontractor records or to inspect papers of any
employee thereof to ensure compliance.
By submission of a bid, the contractor warrants that the contractor and all prosed subcontractors are and shall
remain in compliance with all federal, state, and local immigration laws and regulations relating to the immigration
status of their employees who perform services on the contract. The Agency may, at its sole discretion, require
evidence of compliance from the contractor or subcontractor. Should the Agency request evidence of
compliance, the contractor or subcontractor shall have ten (10) working days from receipt of the request to supply
adequate information. The Department and Agency (City of Chandler) will accept, as evidence of compliance, a
showing by the contractor or subcontractor, that it has followed the employment verification provisions of the
Federal Immigration and Nationality Act as set forth in Sections 274A and 274B of that Act, including
implementation of regulations and agreements between the Department of Homeland Security and the Social
Security Administration's verification service. The contractor shall include the requirements of this provision in all
subcontracts for this project.
Failure to comply with the immigration laws or to submit proof of compliance constitutes a material breach of
contract. The Agency will recue the contractor's compensation by $10,000 for the initial instance of non-
compliance by the contractor or a subcontractor. Should the same contractor or subcontractor commit
subsequent violations within a two (2) year time period from the initial violation, the contractor's compensation will
be reduced by $50,000 for each violation. The third instance by the same contractor or subcontractor within a two
(2) year period may result, in addition to the $50,000 reduction in compensation, in removal of the offending
contractor of subcontractor, suspension of work in whole or in part or, in the case of a third violation by the
contractor, termination of the contract for default in addition, the Department may debar a contractor or
subcontractor who has committed three (3) violations within a two (2) year period for up to one (1) year. For
purposes of this paragraph, a violation by a subcontractor does not count as a violation by the contractor.
Any delay resulting from a sanction under this subsection is a non-excusable delay. The contractor is not entitled
to any compensation or extension of time for any delays or additional costs resulting from a sanction under this
subsection.
11.0
BUY AMERICA / BABA REQUIREMENTS
BUY AMERICA / BUILD AMERICA BUY AMERICA / MATERIAL CERTIFICATION
REQUIREMENTS
For City of Chandler Federal Funded Projects Per FHWA
The City of Chandler will follow Buy America requirements and the Build America Buy America
requirements.
A. REGULATIONS
1. FHWA - BUY AMERICA AND THE NEW BUILD AMERICA, BUY AMERICA REGULATION EFFECTIVE
NOVEMBER 1, 2022.
https://www.transportation.gov/sites/dot.gov/files/docs/buy_america_provisions_side_by_side.pdf)
Federal Highway Administration (FHWA) - 23 U.S.C. § 313 Buy America; 23 C.F.R. § 635.410
The Secretary of Transportation shall not obligate any funds unless steel, iron, and manufactured products used
In such project are produced in the United States.
2. MAG SPECIFICATION SECTION 106.2.1
3. ADOT SPECIFICATION 106, 106.05 AND 106.15
B. PROCEDURE FOR MATERIAL CERTIFICATION REQUIREMENTS CITY OF CHANDLER
1. All material for a federal funded project must have a material certification.
2. All material delivered to jobsite must be accompanied by a material certification.
3. Material Certifications must be submitted to the City of Chandler representative for review and approval and is not
deemed accepted until City of Chandler representative approval.
4. Buy America Material All Iron and Steel products. (See Item A above)
5. Buy America Material Installation: All Buy America Iron and Steel Products MUST NOT be installed without
Material Certification received and approval from City of Chandler.
6. All non-Buy America Material Installation: All non-Buy America material, if installed without material certification
receipt and approval is at the Prime Contractor's risk and WILL NOT BE PAID until approval of material
certification for that material.
C. MATERIAL CERTIFICATIONS Every Material Certification must have the following Items 1-11
1. Project Name
2. City Project Number
3. Federal Project Number
4. ADOT Number (previously known as Tracs Number) (if FHWA funded project)
5. Supplier Information: Name, Address, Telephone Number
6. Description of the material supplied
7. Quantity of material represented by the certificate
8. Means of material identification, such as label, lot number, or marking
9. A Statement that the material complies in all respects with the requirements of the cited specifications.
Certificates shall state compliance with the cited specification, such as AASHTO M 320, ASTM C 494; or specific
table or subsection of the Arizona Department of Transportation Standard Specifications or Special Provisions.
Certificates may cite both, if applicable.
10. Authorization Signature Statement: A statement that the individual signing has the legal authority to bind the
manufacturer or the supplier of the material.
11. The name, title, signature, and date of signature of the signing-responsible individual.
12. Statement that that Federal Requirements for Buy America / BABA have been followed.
Federal Funded Contract Guide for Contractors Rev 2023-04-10 pg 1 of 5
ADOT SPECIFICATION BUILD AMERICA BUY AMERICA (106CMATLS, 10-20-22)
SECTION 106 CONTROL OF MATERIALS: of the Standard Specification is modified to add:
106.17 Construction Materials
A construction material, when used on a federal-aid construction project shall comply with the requirements of Build
America Buy America (BABA) Act specific in Title IX, Subtitle A, Part 1, Sections 70901 and 70911-70918 of the
Infrastructure Investment and Job Act (ILJA).
A construction material that is permanently incorporated on the project shall include an article, material, or supply that is
or consists primarily of the following:
- Non-ferrous metals;
- Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used
in fiber optic cables);
- Glass (including optic glass);
- Lumber; or
- Drywall
Items manufactured through a combination of either two or more materials listed above, or at least one of the materials list
above and a material not listed shall be considered as a manufactured product, rather than as a construction material.
Build America Buy America provisions specified for manufactured products in Section 70912(6)(B) of the ILJA, do not
apply to federal-aid construction projects per FHQWA s existing statutory requirement applicable to manufactured
products. A manufactured product is considered to be an item that undergoes one or more manufacturing processes
before the item can be used on a federal-aid construction project.
Construction materials shall not include cement and cementitious materials; bituminous materials; aggregates such as
stone, sand, or gravel; or aggregate binding agents or additives.
All construction materials shall be produced in the United States. This means, all manufacturing processes to produce the
construction materials shall occur in the United States. All manufacturing processes for construction materials shall mean
the final manufacturing process and the immediately preceding manufacturing stage for the construction material.
The contractor shall furnish the Engineer with Certificate of Compliance, conforming to the requirements of Subsection
106.05 of the ADOT specifications, which shall state that the construction materials incorporated in the project meet the
requirements specified herein.
Certificates of Compliance shall also certify that all manufacturing processes to produce construction materials occurred in
the United States.
Convict-produced materials are prohibited in accordance with the requirements of 23 CFR 635.417.
Federal Funded Contract Guide for Contractors Rev 2023-04-10 pg 2 of 5
ADDITIONAL INFORMATION FOR THE BUILD AMERICA, BUY AMERICA ACT
Federal Funded Contract Guide for Contractors Rev 2023-04-10 pg 3 of 5
Federal Funded Contract Guide for Contractors Rev 2023-04-10 pg 4 of 5
12.0
DBE EPRISE
FOR DBE GOAL 0% RACE NEUTRAL
PROFESSIONAL SERVICES
DBE PROVISIONS
(PROJECT SPECIFIC - CONTRACTS)
FOR USE ON LPA/SUBRECIPIENT FEDERAL AID PROJECTS WITHOUT DBE GOALS
(LPA PS EPRISE, 10/24/2025)
DISADVANTAGED BUSINESS ENTERPRISES:
1.0 Policy:
The Arizona Department of Transportation (hereinafter the Department) has established a
Disadvantaged Business Enterprise (DBE) program in accordance with the regulations of the
U.S. Department of Transportation (USDOT), 49 Code of Federal Regulations Part 26 (49 CFR
Part 26), as revised by the USDOT DBE Interim Final Rule (IFR) issued October 3, 2025
(hereinafter referred to as IFR). The Department has received Federal financial assistance from
the U.S. Department of Transportation and as a condition of receiving this assistance, the
Department has signed an assurance that it will comply with 49 CFR Part 26, as revised by the
IFR.
It is the policy of the Department to ensure that DBEs (hereinafter DBE or DBE firm), as defined
in Part 26, have an equal opportunity to receive and participate in USDOT-assisted contracts. It
is also the policy of the Department:
(A) To ensure nondiscrimination in the award and administration of USDOT-assisted
contracts;
(B) To create a level playing field on which DBEs can compete fairly for USDOT-assisted
contracts;
(C) To ensure that the DBE program operates in a nondiscriminatory manner and without
regard to race or sex, while maximizing efficiency of service;
(D) To ensure that only firms that fully meet 49 CFR Part 26 eligibility standards are
counted as DBEs;
(E) To help remove barriers to the participation of DBEs in USDOT-assisted contracts;
(F) To assist in the development of firms that can compete successfully in the market place
outside the DBE program; and
(G) To promote the use of DBEs in all types of federally-assisted contracts and procurement
activities.
It is also the policy of the Department to facilitate and encourage participation of Small Business
Concerns (SBCs), as defined herein, in USDOT-assisted contracts. The Department
encourages consultants (hereinafter referred to as proposer or consultant or prime consultant)
to take reasonable steps to eliminate obstacles to SBCs’ participation and to utilize SBCs in
performing contracts.
Local Public Agencies (LPA) and or Subrecipients of Federal financial assistance will administer
and manage the contracts from advertising, consultant selection, negotiation, contract execution,
processing payment reports and contract modifications, audits, DBE compliance (e.g., reporting
and monitoring) through contract closeout.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 1/13
2.0 Assurances of Non-Discrimination:
The consultant, subrecipient, or subconsultant shall not discriminate on the basis of race, color,
sex or national origin in the performance of this contract. The consultant shall carry out
applicable requirements of 49 CFR Part 26 as revised by the IFR in the award and administration
of DOT-assisted contracts. Failure by the consultant to carry out these requirements is a
material breach of this contract, which may result in the termination of this contract or such other
remedy as the the LPA/Subrecipient with the Department’s concurrence deems appropriate,
which may include, but are not limited to:
(A) Withholding monthly progress payments;
(B) Assessing sanctions;
(C) Liquidated damages;
(D) Disqualifying the consultant from submitting SOQs, or any other forms of proposals, as
non-responsible;
(E) Cancellation, termination, or suspension of the Contract, in whole or in part.
The consultant, subrecipient, or subconsultant shall ensure that all subcontract agreements
contain this non-discrimination assurance.
3.0 Definitions:
(A) Commercially Useful Function (CUF): Commercially Useful Function is defined in 49
CFR 26.55. That definition is incorporated herein by reference.
(B) Disadvantaged Business Enterprise (DBE): A DBE, as defined in 49 CFR Part 26.5,
is a for-profit small business concern which meets both of the following requirements:
(1) Is at least 51 percent owned by one or more individuals who are both socially and
economically disadvantaged; and,
(2) Whose management and daily business operations are controlled by one or more
of the socially and economically disadvantaged individuals who own it.
(C) NAICS Code: The North American Industry Classification System (NAICS) is the
standard used by Federal statistical agencies in classifying business establishments for
the purpose of collecting, analyzing, and publishing statistical data related to the U.S.
business economy.
(D) Non-DBE: any firm that is not a DBE.
(E) DBE-Conscious (DC): a measure or program that is focused specifically on assisting
only DBEs.
(F) DBE-Neutral (DN): a measure or program that is, or can be, used to assist all small
businesses.
(G) Small Business Concern (SBC): a business that meets all of the following conditions:
(1) Operates as a for-profit business;
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 2/13
(2) Operates a place of business primarily within the U.S., or makes a significant
contribution to the U.S. economy through payment of taxes or use of American
products, materials, or labor;
(3) Is independently owned and operated;
(4) Is not dominant in its field on a national basis; and
(5) Does not have annual gross receipts that exceed the Small Business Administration
size standards average annual income criteria for its primary North American
Industry Classification System (NAICS) code.
(I) Socially and Economically Disadvantaged Individuals: Socially and Economically
Disadvantaged Individuals is defined in 49 CFR Part 26.5, as revised by the IFR. That
definition is incorporated here.
(1) Any individual who is a citizen (or lawfully admitted permanent resident) of the United
States and who a certifier finds to be socially and economically disadvantaged on
an individual basis.
(2) A determination that an individual is socially and economically disadvantaged must
not be based in whole or in part on race or sex. For that reason, all applicants shall
qualify as socially and economically disadvantaged if they can demonstrate that they
can meet the relevant criteria described in 49 CFR Part 26.67.
(3) Being born in a particular country does not, standing alone, mean that a person is
necessarily socially and economically disadvantaged
4.0 Working with DBEs:
The Department works with DBEs and assists them in their efforts to participate in the highway
construction program. All proposers should contact the Department’s Business Engagement
and Compliance Office (BECO) by phone, through email, or at the address shown below, for
assistance in their efforts to use DBEs in the highway construction industry. BECO contact
information is as follows:
Arizona Department of Transportation
Business Engagement and Compliance Office
1801 W. Jefferson St, Suite 101, Mail Drop 154A
Phoenix, AZ 85007
Phone (602) 712-7761
Email: lpacontractorcompliance@azdot.gov
Website : https://azdot.gov/business/business-engagement-and-compliance
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 3/13
4.01 Business Development Program
The Department has established the Business Development Program as an initiative to
encourage and develop disadvantaged businesses in the highway construction industry. The
Department is committed to providing new, emerging, developmental and transitional DBEs with
general and firm-specific training and technical assistance. The Department intends for this
assistance to aid DBEs to become competitive within the heavy highway and construction
industry market places. In particular, the Department’s DBE Supportive Services Program
(DBE/SS) is designed to work in collaboration with stakeholder organizations (including
departments and agencies of State and Federal Governments, small business organizations,
tribal governments, profit and nonprofit corporations) to help DBEs to successfully compete for
highway construction projects and become self-sufficient. The program provides educational
opportunities for DBEs regarding current market conditions, federal regulatory compliance, and
best business practices. These efforts are reinforced with one-on-one business counseling for
DBEs certified in areas that directly support Federal-aid highway projects, small group
workshops, conferences, business expositions, regular in-person training opportunities, and
regular virtual training opportunities. For guidance regarding this program, refer to the Business
Development Program Guidelines available on the BECO website at
https://azdot.gov/business/business-engagement-and-compliance/dbe-supportive-
services/business-development-program/disadvantaged-business-enterprise-dbe-
program/dbe.
The Business Development Program is intended to increase legitimate DBE activities. The
program operates in conformity with the Federal DBE rules and regulations. The Department’s
DBE/SS participants may not circumvent the Federal DBE rules or regulations.
5.0 Applicability:
During the transition period, the IFR provides that until the Arizona Unified Certification Program
(UCP) completes the recertification process, the Department may not 1) set any DBE contract
goals or 2) count any participation towards its overall DBE goal.
The Department has established an overall annual goal for DBE participation on Federal-aid
contracts. The Department intends for the goal to be met with a combination of DBE conscious
efforts and DBE neutral efforts once the DBE recertification process is completed in accordance
with the IFR. DBE conscious participation occurs when the consultant uses a percentage of
DBEs, as defined herein, to meet the contract-specified goal. DBE neutral efforts are those that
are, or can be, used to assist all small businesses or increase opportunities for all small
businesses. The regulation, 49 CFR 26, as revised by the IFR describes DBE neutral as when
a DBE wins a prime contract through customary competitive procurement procedures or is
awarded a subcontract on a prime contract that does not carry a DBE contract goal.
The DBE provisions are applicable to all consultants.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 4/13
6.0 Certification and Registration:
6.01 DBE Certification:
Certification as a DBE shall be predicated on:
(A) The completion and execution of an application for certification as a "Disadvantaged
Business Enterprise."
(B) The submission of documents pertaining to the firm(s) as stated in the application(s),
including but not limited to a statement of social disadvantage and a personal financial
statement.
(C) The submission of any additional information which the Department or the applicable
Arizona Unified Certification (UCP) agency may require to determine the firm's eligibility
to participate in the DBE program.
(D) The information obtained during the on-site visits to the offices of the firm and to active
job-sites.
Application Submission. Applications for Disadvantaged Business Enterprise (DBE) certification
may be filed online with the Department or the applicable UCP agency at any time through the
Arizona Unified Transportation Registration and Certification System (AZ UTRACS) website at
http://utracs.azdot.gov/Home/.
Implementation of Revised Federal Standards. Effective October 3, 2025, all certification
applications and renewals shall be reviewed and processed in accordance with the 49 CFR Part
26 as revised by the IFR. The revised rule modifies certification standards, documentation, and
evidentiary requirements applicable to determinations of social and economic disadvantage,
business size, ownership, and control.
Transition Period. During the transition period in which the Department and participating UCP
agencies are updating internal procedures and the AZ UTRACS system to implement the revised
rule, certification applications may continue to be submitted through the existing online platform.
Applicants submitting applications during this period may be required to furnish additional or
supplemental documentation consistent with the revised certification criteria upon system update
or upon request by the certifying agency.
All applicants, whether filing initial or renewal applications, shall comply with any new or
amended federal documentation requirements that become effective under 49 CFR Part 26 as
revised by the IFR, including but not limited to personal narrative statements, financial
disclosures, and supporting affidavits required to demonstrate eligibility under the revised
standards.
The Department is a member of the AZ Unified Certification Program (AZUCP). During the
transition period, the list of firms listed in AZ UTRACS were certified prior to October 3, 2025,
not in accordance with the IFR, and therefore do not count for DBE credit, unless otherwise
noted in AZ UTRACS. The list indicates contact information and specialty for each DBE firm,
and may be sorted in a variety of ways. However, the Department does not guarantee the
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 5/13
accuracy and/or completeness of this information, nor does the Department represent that any
licenses or registrations are appropriate for the work to be done.
The Department’s certification of a DBE is not a representation of qualifications and/or abilities
nor does it mean that a DBE firm is guaranteed or entitled to receive or be awarded a contract.
Being certified simply means that a firm has met the criteria for DBE certification as outlined in
49 CFR Part 26, as revised by the IFR. The consultant bears all risks of ensuring that DBE firms
selected by the consultant are able to perform the work.
6.02 SBC Registration:
To comply with 49 CFR Part 26.39, the Department’s DBE Program incorporates contracting
requirements to facilitate participation by Small Business Concerns (SBCs) in Federally assisted
contracts. SBCs are for-profit businesses authorized to do businesses in Arizona that meet the
Small Business Administration (SBA) size standards for average annual revenue criteria for its
primary North American Industry Classification System (NAICS) code
While the SBC component of the DBE program does not require utilization of goals on projects,
The Department and the LPA/Subrecipient strongly encourages consultants to utilize small
businesses that are registered in AZ UTRACS on their contracts, in addition to DBEs meeting
the certification requirement in accordance with the IFR. However, SBCs that are not DBEs will
not be counted toward the DBE participation.
SBCs can register online at the AZ UTRACS website at http://utracs.azdot.gov/Home/.
The Department’s registration of SBCs is not a representation of qualifications and/or abilities
nor does it mean that an SBC firm is guaranteed or entitled to receive or be awarded a contract.
Being SBC registered simply means that a firm has met the criteria for SBC registration as
outlined in 49 CFR Part 26. The consultant bears all risks of ensuring that SBC firms selected
by the consultant are able to perform the work.
7.0 DBE Financial Institutions:
The Department thoroughly investigates the full extent of services offered by financial institutions
owned and controlled by socially and economically disadvantaged individuals in its service area
and makes reasonable efforts to use these institutions. The Department encourages prime
consultants to use such institutions on USDOT assisted contracts. However, use of DBE
financial institutions will not be counted toward the DBE participation.
The Department and the LPA/Subrecipient encourages prime consultants to research the
Federal Reserve Board website at www.federalreserve.gov to identify minority-owned banks in
Arizona derived from the Consolidated Reports of Condition and Income filed quarterly by banks
(FFIEC 031 and 041) and from other information on the Board’s National Information Center
database.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 6/13
8.0 Time is of the Essence:
TIME IS OF THE ESSENCE IN RESPECT TO THE DBE PROVISIONS
9.0 Computation of Time:
In computing any period of time described in this DBE special provision, such as calendar days,
the day from which the period begins to run is not counted.When the last day of the period is a
Saturday, Sunday, Federal or State holiday, the period extends to the next day that is not a
Saturday, Sunday, Federal or State holiday. When the LPA/Subrecipient Procurement Office is
closed for all or part of the last day, the period extends to the next day on which the LPA /
Subrecipient Procurement Office is open.
10.0 Consultant and Subconsultant Requirements:
10.01 General:
The consultant shall establish a DBE program that will ensure nondiscrimination in the award
and administration of contracts and subcontracts.
Agreements between the proposer and a DBE in which the DBE promises not to provide
subcontracting quotations to other proposers are prohibited.
10.02 Blank:
11.0 DBE Goal:
During the transition period, the IFR provides that until the UCP completes the recertification
process, the Department may not 1) set any DBE contract goals or 2) count any participation
towards its overall DBE goal. The Department will not be counting any DBE conscious or DBE
neutral efforts towards its overall DBE goal during this transitional period.
The Department has not established contract goals for DBE participation in this contract.
Consultants are still encouraged to employ reasonable means to obtain DBE neutral efforts.
Consultants must retain records in accordance with these DBE specifications. The consultant
is notified that this record keeping is important to the Department so that it can track DBE
participation where only DBE neutral efforts are employed.
12.0 Bidders/Proposers List and AZ UTRACS Registration Requirement:
Under 49 CFR Part 26.11, DOTs are required to collect certain information from all consultants
and subconsultants who seek to work on federally-assisted contracts in order to set overall and
contract DBE goals. The Department collects this information when firms register their
companies on the Arizona Unified Transportation Registration and Certification System (AZ
UTRACS) web portal at https://utracs.azdot.gov/Home/ a centralized database for companies
that seek to do business with the Department. This information will be maintained as confidential
to the extent allowed by Federal and State law.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 7/13
All prime consultants, subconsultants, and DBEs listed in the SOQ and included on this contract
or added to this contract shall:
(1) register in AZ UTRACS, and
(2) maintain their profile with current and accurate firm information. Proposers may verify that
their firm and each subconsultant is registered using the AZ UTRACS website.
Proposers may obtain additional information at the AZ UTRACS website or by contacting the
LPA/Subrecipient.
Proposers shall create a Bidders/Proposers list in the AZ UTRACS (https://utracs.azdot.gov/) by
selecting all subconsultants, service providers, and vendors that expressed interest or submitted
proposals or quotes for this contract. The Bidders/Proposers List form must be complete and
must include the names for all subconsultants, service providers, and vendors that submitted
proposals or quotes on this project regardless of the proposer’s intentions to use those firms on
the project.
Proposers must complete and submit the Bidders/Proposers List online at AZ UTRACS prior to
Cost Proposal submittal. A confirmation email will be generated by the system. This email
confirmation shall be submitted with the Cost Proposal.
FAILURE TO SUBMIT THE REQUIRED BIDDERS/PROPOSERS LIST CONFIRMATION
EMAIL WITH THE SOQ PROPOSAL BY THE STATED TIME AND IN THE MANNER HEREIN
SPECIFIED AND AS OUTLINED IN THE RFQ SHALL BE CAUSE FOR THE PROPOSER’S
SOQ PROPOSAL TO BE REJECTED.
13.0 Payment Reporting:
The consultant shall report on a monthly basis indicating the amounts paid to all subconsultants,
of all tiers, working on the project. Reporting shall be in accordance with Prompt Pay and
Payment Reporting requirements section of the contract specifications.
14.0 Crediting DBE Participation:
14.01 General Requirements:
During the transition period, the IFR provides that until the UCP completes the recertification
process, the Department may not count any participation towards its overall DBE goal. This
applies to both DBE conscious and DBE neutral efforts.
To count toward DBE participation, the DBE firms must be certified at the time of Cost Proposal
submission in each NAICS code applicable to the kind of work the firm will perform on the
contract. NAICS for each DBE can be found on the AZ UTRACS website. General descriptions
of all NAICS codes can be found at http://www.naics.com.
Credit towards the consultant’s DBE participation is given only after the DBE has been paid for
the work performed.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 8/13
The entire amount of a contract that is performed by the DBE’s own forces, including the cost of
supplies and materials purchased by the DBE for the work on the contract and equipment leased
by the DBE will be credited toward DBE participation. Supplies and equipment the DBE
subconsultant purchases or leases from the prime consultant or its affiliate will not be credited
toward DBE participation.
The consultant bears the responsibility to determine whether the DBE possesses the proper
consultant’s license(s) to perform the work and, if DBE credit is requested, that the DBE
subconsultant is certified for the requested type of work.
The Department’s certification is not a representation of a DBE’s qualifications and/or abilities.
The consultant bears all risks that the DBE may not be able to perform its work for any reason.
A DBE may participate as a prime consultant, subconsultant, or as a vendor of materials or
supplies. The dollar amount of work to be accomplished by DBEs, including partial amount of a
lump sum or other similar item, shall be on the basis of agreements such as: subcontract,
purchase order, hourly rate, and rate per ton.
DBE credit may be obtained only for specific work done for the project, supply of equipment
specifically for physical work on the project, or supply of materials to be incorporated in the work.
DBE credit will not be allowed for costs such as overhead items, capital expenditures (for
example, purchase of equipment), and office items.
The consultant may credit second-tier subcontracts issued to DBEs by non-DBE subconsultants.
Any second-tier subcontract to a DBE must meet the requirements of a first-tier DBE
subcontract.
A prime consultant may credit the entire amount of that portion of a contract that is performed
by the DBE’s own forces. The cost of supplies and materials obtained by the DBE for the work
of the contract can be included so long as that cost is reasonable. Leased equipment may also
be included. No credit is permitted for supplies purchased or equipment leased from the prime
consultant or its affiliate(s).
When a DBE subcontracts a part of the work of its contract to another firm, the value of the
subcontract may be credited towards the DBE participation only if the DBE’s subconsultant is
itself a DBE and performs the work with its own forces. Work that a DBE subcontracts to a non-
DBE firm does not count toward a DBE participation.
A prime consultant may credit the entire amount of fees or commissions charged by a DBE firm
for providing a bona fide service, such as professional, technical, consulting, or managerial
services, or for providing bonds or insurance specifically required for the performance of a
USDOT-assisted contract, provided the fees are reasonable and not excessive as compared
with fees customarily allowed for similar services.
14.02 Effect of Loss of DBE Eligibility:
If a DBE or a DBE prime consultant is deemed ineligible, decertified, or suspended by the
Department in accordance with 49 CFR Part 26.87 and 49 CFR Part 26.88, the following
provisions shall apply:
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 9/13
(A) If a DBE firm loses its DBE eligibility because the DBE firm was acquired by a non- DBE
firm, no work performed by the DBE firm after the Decision Date will be counted toward
DBE participation.
(B) If a subcontract, contract, or supplier arrangement has been executed before the Decision
Date, no work performed by the DBE firm will be counted toward DBE participation.
(C) If neither paragraph (A) nor paragraph (B) above applies, the work performed by the DBE
firm after the Decision Date will be counted toward DBE participation.
(D) If the consultant extends or adds work to the DBE firm’s subcontract, that work will not be
counted toward the DBE goal unless the consultant has obtained prior approval from the
LPA/Subrecipient, with BECO concurrence for DBE credit. Any requests to extend or add
work to the DBE firm’s subcontract to count towards the DBE goal shall be submitted
using the request form, made available on BECO’s website at
https://azdot.gov/business/business-engagement-and-
compliance/lpasubrecipient/contract-forms-specs, to extend Decertified DBE contract for
DBE credit.
(E) The LPA/Subrecipient, with BECO concurrence will consent to such DBE credit only if the
added work is within the foreseeable range of added work, given the circumstances of
the original DBE contract.
(F) For the purposes of this subsection, "Decision Date" means the date the Department
notifies the DBE that it has become ineligible, decertified, or suspended under 49 CFR
Part 26.87(c)(4), (g).
14.03 Notifying the Consultant of DBE Certification Status:
Each DBE contract at any tier shall require any DBE subconsultant or supplier that is either
decertified or certified during the term of the contract to immediately notify the consultant and all
parties to the DBE contract in writing, with the date of decertification or certification. The
consultant shall require that this provision be incorporated in any contract of any tier in which a
DBE is a participant.
14.04 Police Officers:
DBE credit will not be permitted for procuring DPS officers. For projects on which officers from
other agencies are supplied, DBE credit will be given only for the broker fees charged, and will
not include amounts paid to the officers. The broker fees must be reasonable.
14.05 Commercially Useful Function:
A prime consultant can credit expenditures to a DBE subconsultant toward DBE participation
only if the DBE performs a Commercially Useful Function (CUF).
In conformity with 49 CFR Part 26.55(c), a DBE performs a CUF when it is responsible for
execution of the work of a contract and carries out its responsibilities by actually performing,
managing, and supervising the work involved. To perform a commercially useful function, the
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 10/13
DBE must also be responsible, with respect to materials and supplies on the contract, for
negotiating price, determining quality and quantity, ordering the material, and installing (where
applicable) and paying for the material itself that it uses on the project. To determine whether a
DBE is performing a commercially useful function, the LPA/Subrecipient will evaluate the amount
of work subcontracted, industry practices, whether the amount the firm is to be paid under the
contract is commensurate with the work it is actually performing and the DBE credit claimed for
its performance of the work, and other relevant factors.
A DBE will not be considered to perform a commercially useful function if its role is limited to that
of an extra participant in a transaction, contract, or project through which funds are passed in
order to obtain the appearance of DBE participation. In determining whether a DBE is such an
extra participant, the LPA/Subrecipient will examine similar transactions, particularly those in
which DBEs do not participate.
If a DBE does not perform or exercise responsibility for at least 30 percent of the total cost of its
contract with its own work force, or if the DBE subcontracts a greater portion of the work of a
contract than would be expected within normal industry practice for the type of work involved,
LPA/Subrecipient will presume that the DBE is not performing a commercially useful function.
When a DBE is presumed not to be performing a commercially useful function as provided
above, the DBE may present evidence to rebut this presumption. The LPA/Subrecipient will
determine if the firm is performing a CUF given the type of work involved and normal industry
practices.
The LPA/Subrecipient will notify the consultant, in writing, if it determines that the consultant’s
DBE subconsultant is not performing a CUF. The consultant will be notified within seven
calendar days of the LPA/Subrecipient’s decision.
Decisions on CUF may be appealed to the Department’s BECO. The appeal must be in writing
and personally delivered or sent by certified mail, return receipt requested, to the Department’s
BECO. The appeal must be received by the Department’s BECO no later than seven calendar
days after the LPA/Subrecipient’s decision. LPA/Subrecipient’s decision remains in place unless
and until the Department’s BECO reverses or modifies LPA/Subrecipient’s decision. The
Department’s BECO will promptly consider any appeals under this subsection and notify the
consultant of the Department’s BECO findings and decisions. Decisions on CUF matters are
not administratively appealable to USDOT.
The LPA/Subrecipient will conduct project site visits on the contract to confirm that DBEs are
performing a CUF. The consultant shall cooperate during the site visits and the LPA/Subrecipient
staff will make every effort not to disrupt work on the project.
15.0 Required Provisions for DBE Subcontracts:
All subcontracts of any tier, all supply contracts, and any other contracts in which a DBE is a
participant shall include as a physical attachment, DBE Program Compliance Assurances for
Subconsultants available from the LPA/Subrecipient and all of the Uniform Terms and
Conditions set forth in other sections of this contract.
Consultants executing agreements with subconsultants, DBE or non-DBE, that materially modify
federal regulation and state statutes such as, prompt payment and retention requirements,
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 11/13
through subcontract terms and conditions will be found in breach of contract which may result in
termination of the contract, or any other such remedy as the LPA/Subrecipient and ADOT deem
appropriate as outlined in DBE Subsection 2.0.
The LPA/Subrecipient reserves the right to conduct random reviews of DBE and non-DBE
subcontract documentation to ensure compliance with federal requirements.
The consultant shall ensure that all subcontracts or agreements with DBEs to supply labor or
materials require that the subcontract and all lower tier subcontracts be performed in accordance
with 49 CFR Part 26.
The Consultant shall provide electronic copies of signed subcontract agreements for all DBE
Subconsultants listed on the DBE Intended Participation Affidavit Summary by uploading them
within 15 calendar days of an approved contract to the LPA DBE System. Subcontract
agreements shall include all required assurances and clauses as outlined in Section 3.0 and 4.0
of the Contract. Each agreement and required attachment shall be dated and signed by the
Subconsultant in order for the subcontract to be considered valid.
The Consultant shall be in breach of this Contract if the Consultant materially modifies the
Federal Regulations and State statutes in its subcontract agreements terms and conditions with
its Subconsultants. Deviations from the terms of this Contract may result in termination of the
Contract, or any other such remedy as deemed appropriate by the LPA/Subrecipient and the
Department.
16.0 Contract Performance:
The LPA/Subrecipient will visit the consultant’s office to conduct reviews to ensure compliance
with DBE requirements. The reviews may include, among other activities, interview of DBEs
and their employees and the consultant and its employees. The consultant shall cooperate in
the review and make its employees available. The consultant shall inform the
LPA/Subrecipient in advance when each DBE will be working on the project to help facilitate
reviews.
The LPA/Subrecipient reserves the right to request and inspect all records of the consultant
and all records of the DBEs and non-DBE subconsultants concerning this contract. The
consultant must make available all documents related to all contracts to LPA/Subrecipient
upon request.
17.0 Certification of Final DBE Payments:
DBE participation on the contract is measured by actual payments made to the DBEs. The
consultant shall submit the “Certification of Final DBE Payments” form for each DBE firm working
on the contract. This form shall be signed by the consultant and the relevant DBE, and submitted
to the LPA/Subrecipient no later than 30 days after the DBE receives final payment.
The LPA/Subrecipient and the Department will use this certification and other information
available to determine applicable DBE credit allowed to date by the Prime Consultant and the
extent to which the DBE firms were fully paid for that work. By the act of filing the forms, the
consultant acknowledges that the information is supplied in order to justify the payment of state
and federal funds to the consultant.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 12/13
The consultant will not be released from the obligations of the contract until the “Certification of
Final DBE Payments” forms are received and deemed acceptable by the LPA/Subrecipient.
18.0 False, Fraudulent, or Dishonest Conduct:
In addition to any other remedies or actions, the Department will bring to the attention of the
USDOT any appearance of false, fraudulent, or dishonest conduct in connection with the DBE
program, so that USDOT can take steps such as referral to the Department of Justice for criminal
prosecution, referral to the USDOT Inspector General for possible initiation of suspension and
debarment proceedings against the offending parties or application of “Program Fraud and Civil
Penalties” rules provided in 49 CFR Part 31.
Professional Services DBE Special Provisions October 2025
LPA PS EPRISE NO GOAL - 13/13
13.0
DBE
FORMS/DOCUMENTS
DBE DOCUMENTS AND INSTRUCTIONS/GUIDE
Race Neutral 0% Goal
SUBMIT WITH SOQ:
Bidders Proposers List This is an ADOT On Line Submittal Process.
Email Verification An Email Verification / Confirmation will be
provided to you by the system after you submit.
Save this email verification as a pdf document
and submit with SOQ.
-------------------------------------------------------------------------------------------------------------------------------------
SUBMIT AT SCOPE & FEE FINALIZATION:
No additional DBE Documents are required during this phase.
*Important Note: At this phase, a packet of all DBE documentation is prepared and submitted to ADOT BECO by
City of Chandler. This DBE Packet must be approved by ADOT BECO prior to City of Chandler Council Date for
approval of the contract.
--------------------------------------------------------------------------------------------------------------------------------------
SUBMIT DURING CONTRACT:
No additional DBE Documents are required during this phase.
Important Note Regarding DBE Forms and Requirements:
The Federal DBE System/Process is currently under revision and the City of Chandler must adhere to
FHWA requirements. The DBE requirements are identified for each project specifically.
Rev 2023-11-16
BIDDERS/PROPOSERS LIST
FEDERAL DOCUMENT REQUIRED: Email Verification Print Out
Email Verification Print Out Received from Utracs/AzDOT.gov confirms your electronic submittal Of
Bidders/Proposers List. The email confirmation should be a submitted document. Do not forward the
email.
WHERE TO CREATE AND SUBMIT BIDDERS/PROPOSERS LIST: https://utracs.azdot.gov/BiddersListInfo/
WHERE TO CALL FOR QUESTIONS:
14.0
PAY REQUESTS
Application is made for payment as shown below and on the
attached Payment Schedu Summary Sheet in accordance with the
Contract Documents
0.00
0.00
0.00
0
0
0.00
ertification
Signature Date
PO #
Budget Account #'s
Project Manager Date
Date
Email PDF Signed Payment Application to: CapitalProjects.Payables@chandleraz.gov
Or Submit to: City of Chandler, Capital Projects MS 407, PO Box 4008, Chandler, AZ 85244
SUBCONSULTANT INVOICES/PAYMENT SUMMARY DETAIL
PROFESSIONAL SERVICES PAY APP BACKUP - (REQUIRED)
Consultant
Project Name
Project Numbers
Month
Subconsultants
name name name name name name name
DBE-> YES / NO
Lower Tier --> (x)
Lower Tier to:
Contract Amt
Change Order(s):
Total Contract: $ - $ - $ - $ - $ - $ - $ -
Pay App Payment
Work Mo Pay Mo Rpting
#
Mo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total To Date $ - $ - $ - $ - $ - $ -
Bal Remaining $ - $ - $ - $ - $ - $ -
15.0
SUBCONSULTANT SUBCONTRACTS REQUIREMENTS
SUBCONSULTANT FEDERAL REQUIREMENTS
Listed below are requirements for working on a federal funded contract. Subconsultant will be provided with the same document
with a signature block which is required to be signed and submitted with Subcontract and SARF (Subconsultant Approval
Request Form) and Subcontract, to be reviewed for approval to work on this federal funded contract.
Requirements for Working on this Federal Funded Contract:
1. All subconsultants must be approved by the City to work on this federal funded contract.
2. roved by
the City of Chandler.
3. Buy America / Build America-Buy America (BABA) requirements apply to this contract/project.
4. If federal compliance discrepancies re-occur without correction, Subconsultant and Prime will be required to meet with the City to review
federal requirements. If federal compliance discrepancies continue, subconsultant subcontract may be terminated..
5. Subconsultant MUST have a current, non-expired AZ UTracs Registration/5 Digit Number. (https://utracs.azdot.gov)
6. Must be registered with ADOT DOORs Payment Reporting System.
a. Subconsultant agrees to monthly payment reporting in the ADOT DOORs Payment Reporting System.
b. City of Chandler is a CA Agency and reports monthly.
c. This reporting is due by the Prime by the 10th and the Subconsultants by the 30th of each month.
d. As long as subcontract is open and work is not complete, this reporting also includes you report/verify for $0 payments.
e. Consultant/Subconsultant WILL NOT upload any documents into this system for this project.
7. Subconsultant understands that all documents, emails, reports, invoices MUST have the Project Name and Project Numbers (City,
Federal, ADOT). Ask your Prime Consultant if you do not have this information.
8. Invoicing: Federal funded contracts require by calendar month for all work occurred in that given calendar month.
a. Subconsultant must submit invoices to Prime monthly, no later than the 5th working day of the following month, if work occurred.
b. If an expense has been missed and needs to be added to the following month, FHWA requires that an explanation be added to that
document explaining why it was not included in the previous month related to the payment and work period. (FHWA does not allow
this on an on-going basis, please keep to minimum cases).
9. Prompt Pay Provisions Payments by Prime to Subconsultants, and Subconsultant to Lower Tiers must be made within 7 days from the
actual date that payment was received.
a. The Date the City pays the Prime Prime has 7 days to process payment to Subconsultant.
b. The Date Subconsultant receives that payment from Prime, Subconsultant must pay lower tier within 7 days.
c. Consultant understands that penalties/sanctions can occur for non-compliance.
10. Subcontract includes Prompt Pay Provision, Title VI Assurance, Title VI Appendix A, Title VI Appendix E, Records Retention, Federal
Immigration & Nationality Act, Buy America Requirements, Federal Compliance Acknowledgement.
11. Consultant cannot have debarments from working on a federal funded contract. (FHWA & 23 CFR 630.112(4) and 2 CFR 180)
12. Consultant cannot have unresolved federal tax liens. (FHWA & 23 CFR 630.112(4) and 2 CFR 180)
13. Consultant must use E-Verify for employment processes. This is an FHWA requirement to work on a federal funded contract.
14. tract.
15. Forced Labor of Ethnic Uyghurs Ban: To work on a federal funded contract, the form provided must be signed and submitted with
subcontract and SARF for review and approval. The requirements are as follows:
Pursuant to A.R.S. 35-394, the State of Arizona prohibits a public entity from entering into or renewing a contract with a
company unless the contract includes written certification that the company does not use the forced labor, or any goods or
services produced by the forced labor, or use any consultants, subconsultants, or suppliers that use the forced labor or any
16. Forms required to be submitted, reviewed and approved:
a. SARF (Subconsultant Approval Request Form) the form must be filled out completely.
b. Subconsultant Federal Requirements Acknowledgement (this same document, with a signature line).
c. Verification Statement: Verifies No Outstanding Federal Tax Liens, No Debarments, and uses E-Verify for employment.
d. Forced Labor Ethnic Uyghurs Form
e. Subcontract must have project name, project numbers, contact information (address, telephone) for all parties, i.e. Prime,
Subconsultant, and Lower Tier Subconsultant if applicable.
Rev 2025-11-07
END OF FEDERAL DOCUMENTS SECTION