Extracted text (via pymupdf_layout)
3300 characters
City Council Report Date: November 16, 2026 To: City Council Through: Marc Heirshberg, Assistant City Manager From: Lance Webb, City Engineer Marc Ahlstrom, Assistant City Engineer Subject: Brown Road and 40th Street Traffic Signal City Project No. CP1067 Council District 2 Purpose and Recommendation The purpose of this report is to provide information to Council concerning the results of the bids received for the Brown Road and 40th Street Traffic Signal project (See Exhibit “A” for the project location). Staff recommends that Council award a contract for this project to the lowest responsible bidder, Lincoln Constructors, in the amount of $968,106.00, and authorize a change order allowance in the amount of $96,810.60 (10%). Background The Transportation Department routinely evaluates the City’s roadway network to support safe and efficient travel for all users. Over the years, the City has received requests from area residents to evaluate the need for a traffic signal at Brown Road and 40th Street, with renewed public concern following a fatal crash in 2023. Although the intersection has not experienced a high overall number of crashes, traffic counts and an engineering evaluation determined that it meets established traffic signal warrants based on vehicle volumes. The intersection is also located at a quarter-mile point along Brown Road, consistent with typical traffic signal spacing. Based on the results of the traffic study, Transportation Department initiated this project to construct a new signal and associated improvements, as outlined below. Discussion At the northwest corner, the curb will be modified to establish a right-turn lane serving the adjacent property in accordance with City standards. Supporting improvements include pavement rehabilitation on 40th Street, sidewalks, ADA-compliant curb ramps, curb and gutter, signing, pavement markings, street lighting, and other infrastructure necessary to complete and operate the signalized intersection. Community Impact – Temporary impacts during construction will include traffic control restrictions at the intersection of Brown Road and 40th Street. Construction tasks will be phased to limit traffic impacts, maintain public access to businesses and local streets when feasibly possible. Once underway, construction of this project is anticipated to last no more than 5 months. Alternatives An alternative to this project would be to not construct these improvements. This is not recommended because without this project, the existing condition would stay in place and not provide any safety measures for the public drivers. Fiscal Impact The total authorized amount recommended for this project is $1,064,916.60, based upon the lowest responsible bid of $968,106.00, plus an additional $96,810.60 (10%) as a change order allowance. This change order allowance will only be utilized for approved change orders. This project is funded by the Transportation Department Local Sales Street Tax. Coordinated With The Transportation Department concurs with this recommendation. 2 CITY OF MESA MESA, ARIZONA Brown Road and 40th Street Traffic Signals PROJECT NO. CP1067BR Tabulation of Bids Received, Thursday, October 22, 2026, at 1:30pm. ENGINEER’S ESTIMATE $942,117.00 1. Lincoln Constructors $968,106.00 3