City Council Report Date: November 2, 2026 To: City Council Through: Marc Heirshberg, Assistant City Manager From: Lance Webb, City Engineer Marc Ahlstrom, Assistant City Engineer Subject: Rehabilitate West Vehicle Service Road City Project No. CP1225GPH1 Council District 5 Purpose and Recommendation The purpose of this report is to provide information to Council concerning the results of the bids received for the Rehabilitate West Vehicle Service Road project (See Exhibit “A” for the project location). Staff recommends that Council award a contract for this project to the lowest responsible bidder, Granite Construction, in the amount of $792,291.00, and authorize a change order allowance in the amount of $79,229.10 (10%). Background The West Vehicle Service Road allows maintenance vehicles and airport staff to travel from the offices and hangers on the east side of Falcon Field Airport to the those on the west side. The pavement on the service road has deteriorated and its condition is rated as poor. This project will utilize various repair methods to address the failing asphalt and subgrade extending its service life. Discussion The design plans analyzed the west perimeter road and delineated which repair method is needed in each area allowing for the condition of the road to be improved while still fitting within the project budget. The repair methods include subgrade replacement and repair, crack sealing, asphalt milling, full depth asphalt paving and improved roadway shoulders. Community Impact – There is no impact to the community, because all work will occur within the perimeter fence of Falcon Field Airport. Once underway, construction of this project is anticipated to last no more than 3 months. Alternatives An alternative to this project would be to not construct these improvements. This is not recommended because the roadway condition would continue to worsen and become unusable. Future repair costs would be significantly higher for the City of Mesa. If the city chooses not to move forward with the project, over $700,000 in grant funding will be forfeited. Fiscal Impact The total authorized amount recommended for this project is $871,520.10, based upon the lowest responsible bid of $792,291.00, plus an additional $79,229.10 (10%) as a change order allowance. This change order allowance will only be utilized for approved change orders. This project is funded by the Falcon Field Capital funds. This project is eligible for FAA grant reimbursement. The FAA will reimburse the city for 95.0% of the eligible project costs. Falcon Field has applied to the Arizona Department of Transportation, Aeronautics Group (ADOT) for a matching grant to fund 2.5% and the Airport Enterprise Fund will fund the remaining 2.5%. If an ADOT grant is not received, Falcon Field will fund the entire local match of 5.0% with funding available from the adopted Falcon Field FY26-27. Coordinated With Falcon Field Airport concurs with this recommendation. 2 CITY OF MESA MESA, ARIZONA Rehabilitate West Vehicle Service Road PROJECT NO. CP1225GPH1 Tabulation of Bids Received, Thursday, May 28, 2026, at 1:30P.M. ENGINEER’S ESTIMATE $806,270.00 1. Granite Construction $792,291.00 3