City Council Report Date: November 16, 2026 To: City Council Through: Scott Butler, City Manager Marc Heirshberg, Assistant City Manager From: Nana Appiah, Development Services Director Ashley Scott, Management Assistant II Subject: DA26-00007 Waffle Flower Development Agreement Council District 5 Purpose and Recommendation The purpose of this report is to discuss and consider approving a Resolution to authorize the City Manager to enter into a Development Agreement (“DA”) with ZEE Properties LLC, a Delaware limited liability company (“Owner”). The Owner’s property consists of 2.39 acres located north of Thomas Road and east of Higley Road with the address of 5318 E Thomas Road. The agreement would temporarily defer specified wastewater and streetlight improvements along 54th Street, permanently waive the 54th Street sidewalk requirement, and permit temporary use of an approved on-site commercial septic system until City wastewater service becomes available. Staff recommends that the City Council approve the Development Agreement. Background Through zoning case ZON25-00943, the Owner has applied to rezone the property from Single Residential-90 (RS-90) to Light Industrial (LI) to allow for the development of a building for manufacturing and warehouse uses. Mesa City Code Title 9, Chapter 8 requires the Owner to provide public off-site infrastructure, including wastewater facilities and roadway frontage improvements, unless requirements are modified under applicable City Code provisions. It has been identified that special conditions affecting the property include that connection to City wastewater service is not currently available because certain regional infrastructure has not been completed; a sidewalk system is not intended for this primarily industrial area, and a comprehensive streetlight system is not anticipated until a later date. Under Mesa City Code Sections 9-8-4(A) and 9-8- 4(D)(2), the Development Agreement provides for limited deferrals, a permanent sidewalk waiver, and an alternative wastewater treatment arrangement in response to these conditions. Discussion The Development Agreement sets out the Owner’s responsibilities for developing the property while providing the following limited modifications and conditions: Deferred Improvements: The Owner’s obligation to extend the City wastewater line, connect to the City wastewater system, and install streetlights along 54th Street will be deferred for up to 10 years, unless the City Manager ends the deferral earlier. The Owner must complete the deferred improvements within one year after the deferral period ends, unless the City Manager requires an in-lieu payment. Sidewalk waiver: The requirement to construct a sidewalk along 54th Street adjacent to the property will be permanently waived, provided the Owner complies with the Development Agreement. Lieu Payment and Financial Assurances: At the end of the deferral period, the City Manager may require an in-lieu payment instead of construction of the deferred improvements. The payment must be made within 60 days of notice and will be based on an estimate approved by the City Engineer, including a 20% contingency. The Owner must also provide financial assurances every two years demonstrating that its tangible net worth is at least five times the estimated cost of completing the deferred improvements. Temporary wastewater service: The Owner may install and operate an approved onsite commercial septic system at its own expense until City wastewater service becomes available. The Owner must also install a dry wastewater line to allow for future connection. Once the City issues a Connection Notice, the Owner must connect to the City wastewater system and properly discontinue use of the septic system within 120 days. These provisions allow the Project to proceed while preserving the Owner’s obligations to complete all other required public infrastructure improvements and connect to the City’s wastewater system when service becomes available. Alternatives The following alternatives are presented for consideration: Not to Approve the Resolution: If Council does not approve the Resolution, the City Manager would not be authorized to enter into this Development Agreement. The Owner would remain subject to applicable City Code infrastructure requirements without the proposed wastewater and streetlight deferrals, sidewalk waiver, or temporary septic-system alternative under this agreement. This could affect the timing or feasibility of the proposed development. Staff recommends approval of the Resolution to address the identified special conditions while retaining the Owner’s obligations as provided in the Development Agreement. Fiscal Impact The Development Agreement does not require any additional City investment or result in any additional fiscal impact to the City. The Owner is responsible for the costs associated with the required public infrastructure improvements and the onsite septic system. Coordinated With The Development Agreement was coordinated with the Development Services Department, Water Resources Department, and the City Attorney’s Office.