ECONOMIC AND REVENUE IMPACTS
OF THE CRAFTSMAN
CITY OF MESA, AZ
OCTOBER 2026
11209 N. Tatum Boulevard, Suite 225 * Phoenix, AZ 85028 * 602-765-2400 tel * 602-765-2407 fax

TABLE OF CONTENTS
1.0 INTRODUCTION ............................................................................................................ 1
1.1 PROJECT DESCRIPTION ............................................................................................ 1
1.2 DEVELOPMENT AGREEMENT TERMS ....................................................................... 2
2.0 IMPACT SUMMARY ....................................................................................................... 3
3.0 ECONOMIC IMPACT ANALYSIS ...................................................................................... 4
3.1 CONSTRUCTION IMPACTS ..................................................................................... 4
3.2 OPERATIONS IMPACTS .......................................................................................... 4
4.0 TAX REVENUE IMPACTS ................................................................................................. 6
4.1 GROSS CITY TAX REVENUES ................................................................................... 6
4.2 RETAIL SALES TAX INCENTIVE ................................................................................ 7
4.3 SUMMARY ............................................................................................................. 8
ii

1.0 INTRODUCTION
The City of Mesa retained Applied Economics to perform an economic and revenue impact
analysis of The Craftsman, a proposed mixed-use development that will be part of Hawes
Crossing. The Project will be located on a 19.25 +/-acre site at the northwest corner of Hawes
Road and Elliott Road, between Hawes Road and the 82nd Street alignment. The Craftsman will
provide a unified neighborhood concept with a mix of residential and nonresidential uses. This
analysis focuses on the commercial development only.
The Project would require roadway improvements on the adjacent portion of Elliott Road. The
City will enter into a development agreement with Martens Elliot Land, LLC and Martens Elliott
Retail PADS, LLC. The development agreement details how non-dedicated sales tax revenues
(those sales tax revenues that are unrestricted and not dedicated to a specific purpose) will be
used to reimburse a portion of the cost of developer’s contribution towards eligible public
infrastructure improvements required for this development. Restricted sales tax revenues (those
sales taxes dedicated to a specific purpose), although collected by the City, will not be eligible for
reimbursement. This analysis includes estimates of the economic impacts of construction and
operations of the tenant businesses, as well as the projected gross and net tax revenues to the
City of Mesa over ten years. The objective of this analysis is to quantify the value that this Project
could create, and to understand the value of infrastructure reimbursements compared to the
future tax revenue stream generated by the Project.
1.1 Project Description
The development agreement requires at least 39,000 square feet of commercial improvements,
of which 10,000 square feet would be full-service restaurants, to qualify for the reimbursement.
The remaining 29,000 square feet would include a mix of retail, office, quick-service restaurants,
and services. This Project is part of a larger development, and 65% of the site will be apartments
based on the conditions of a previous development agreement. Some of the commercial space
will be on the first floor of the apartment buildings, and some will be freestanding.
Based on the site plan for the Project, this analysis includes 39,971 square feet with 15,238 square
feet of office space, 9,495 square feet of retail and services, 5,238 square feet of drive-thru
limited-service restaurants, and 10,000 square feet of full-service restaurants. The development
timeline is intentionally conservative to align with the maximum timeline in the development
agreement. Total estimated hard and soft construction costs are $121.2 million, including $95.5
million in hard construction costs and $25.7 million in soft costs. Commercial hard costs,
estimated at $33.4 million or 35% of total hard costs, form the basis for construction sales tax.
The Craftsman could create an estimated 170 new jobs on-site, assuming an average occupancy
rate of 90% to 100% (Figure 1). Estimated sales per square foot are $350 for the retail space,
$750 for the full-service restaurants, and $700 for quick-service restaurants. The analysis
assumes 10% of the non-restaurant space, or 2,900 square feet, would be service businesses that
do not generate sales tax. There would be additional taxable sales associated with leases on the
commercial space based on a lease rate of $45 per square foot.
1

FIGURE 1
DEVELOPMENT ASSUMPTIONS
Rentable Estimated Taxable
Square Feet Jobs Occupancy Sales PSF Lease Rate
Retail/Services 9,495 19 90% $350 $45.00
Office 15,238 55 90% $0 $45.00
Full-Service Restaurants 10,000 66 100% $750 $45.00
Quick-Service Restaurants 5,238 30 90% $700 $45.00
Total 39,971 170 na na $45.00
1.2 Development Agreement Terms
The development agreement states that the developer must obtain all necessary permits within
six months of the effective date of the agreement, complete construction and dedicate the
Project Public Improvements identified below within nine months of the effective date, complete
construction of private improvements within 30 months, and the qualifying restaurant space
must be open to the public within 36 months of the effective date of the agreement.
There are specific requirements for the qualifying restaurants. They must be upscale full-service
restaurants with fewer than 100 locations in the United States, and no other locations within a
ten-mile radius of the property. The qualifying restaurant space must be fully occupied for five
full years from the reimbursement commencement date (the date in which the conditions
precedent for reimbursement are all met).
The development is unique in that the City will construct the public improvements along Elliott
Road, and the developer would pay a Developer Public Improvement Contribution of $775,142
(half of the total cost) within nine months of the effective date of the agreement as part of the
reimbursement conditions. Once the developer completes all the requirements outlined in the
development agreement, they would qualify for a rebate of developer’s contribution to the Elliot
Road infrastructure from a portion of the eligible construction and general sales tax up to a
Reimbursement Cap of $775,142. In addition to the Developer Public Improvement Contribution,
the developer will construct Project Public Improvements on Hawes Road and 82nd Street that
are not eligible for reimbursement.
The developer would be eligible for a reimbursement of 35% of the non-dedicated portion of
construction sales tax on the commercial development. In addition, the reimbursement would
include 50% of the non-dedicated sales tax on general taxable activities within the Project. The
reimbursement period would extend for up to ten years from the reimbursement
commencement date, or until the Reimbursement Cap is paid in full.
2

2.0 IMPACT SUMMARY
The construction of this commercial development could create a variety of economic and fiscal
impacts to the City. These impacts are based on the proposed types of commercial uses.
 The Project could generate $3.2 million in City sales taxes during construction and in the
first ten years of operations based on the assumptions used in this analysis.
 The development would require off-site public improvements on the portion of Elliot
Road adjacent to the site constructed by the City that the developer will contribute costs
towards, including two lanes of roadway with utilities, signals, and streetlights. The
developer could be reimbursed for up to $775,142 of its contribution to the public
improvement costs for Elliot Road from construction and retail sales taxes generated by
the Project from the beginning of construction through the first ten years of operations.
 The economic impacts of the tenant business operations in The Craftsman could total
$362.1 million over ten years. The retail, service, and restaurant space in the development
could directly support an estimated 170 jobs at build-out with a direct wage impact of
$8.0 million per year. The commercial tenants could also support 74 estimated indirect
and induced jobs and $5.1 million in annual payroll at other local businesses in Mesa and
throughout the county. These indirect and induced jobs are the result of local supplier
purchases made by the tenants in the development, as well as local spending by
employees.
 The construction activity associated with this development could also create economic
impacts. In this analysis, construction starts in 2027 and must be complete by June 2029,
based on the terms of the development agreement. The commercial construction
expenditures of $33.4 million could support 150 estimated direct jobs at the site and 117
indirect and induced jobs at other local businesses. Construction activity could create a
total economic impact of $59.6 million during the construction period.
The Craftsman commercial development could generate new revenues for the City from sales
taxes on construction, retail/restaurant sales, and leases. The Project could also create a
significant number of new jobs, generating indirect and induced economic impacts at businesses
in Mesa and throughout the county.
3

3.0 ECONOMIC IMPACT ANALYSIS
The projected economic impacts from the commercial portion of The Craftsman include both
one-time construction impacts and operations impacts. This analysis quantifies the impacts in
terms of direct, indirect, and induced jobs, labor income, and output generated by the
development. Economic impacts measure the effects of economic stimuli or expenditures in the
local economy. Direct impacts include the jobs, labor income or payroll, and output generated
by the development. Indirect impacts quantify the increase in jobs, labor income, and output at
businesses in Mesa that sell goods and services to businesses in The Craftsman. Induced impacts
quantify the increase in jobs, labor income, and output supported by increased consumer
demand from employees. The economic impacts are for information only and are not considered
in the incentive analysis.
3.1 Construction Impacts
Estimated hard construction costs for the commercial development are $33.4 million.
Construction is expected to start in 2027 and be completed by June 2029, based on the maximum
timeline in the development agreement.
The multiplier effects of this construction spending could result in a total increase in economic
output in Mesa of $59.6 million (Figure 2). The estimated 150 direct jobs and 117 indirect and
induced jobs supported by this construction activity could generate $22.4 million in total labor
income during the construction period.
FIGURE 2
CONSTRUCTION IMPACTS
Direct Impacts Total Impacts
Construction Labor Labor
Expenditures Jobs Income Output Jobs Income
2027 $13,370,000 61 $5,593,589 $23,855,747 107 $8,964,055
2028 $13,370,000 60 $5,593,589 $23,855,747 107 $8,964,055
2029 $6,685,000 30 $2,796,795 $11,927,873 53 $4,482,027
Total $33,425,000 150 $13,983,973 $59,639,367 267 $22,410,137
Note: Construction costs include public improvements, and developer hard costs for multifamily,
integrated commercial and stand-alone commercial.
3.2 Operations Impacts
Once construction is completed, the tenant businesses in the development could create
economic impacts through their operations, as well as through supplier purchases and employee
spending. Direct impacts include jobs, labor income, and output at commercial tenants within
the Project. These businesses could make local supplier purchases, generating indirect impacts,
4

and their employees could make consumer purchases, generating induced impacts, that are
captured in the total impact estimates.
The retail, restaurant, and service businesses in the commercial development could directly
support 170 estimated jobs and $8.0 million in direct annual labor income (Figure 3). The
multiplier effect of this increase in jobs and labor income could result in total economic output
of $362.1 million over ten years, 244 direct and indirect jobs, and $131.6 million in labor income.
FIGURE 3
ANNUAL ECONOMIC IMPACTS
Direct Impacts Total Impacts
Year Output Jobs Labor Income Output Jobs Labor Income
2029 $5,006,592 170 $2,006,804 $9,051,685 207 $3,290,288
2030 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2031 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2032 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2033 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2034 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2035 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2036 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2037 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2038 $20,026,368 170 $8,027,217 $36,206,738 244 $13,161,150
2037* $15,019,776 170 $6,020,413 $27,155,054 244 $9,870,863
Total $200,263,675 170 $80,272,174 $362,067,380 244 $131,611,501
Note: 2037 represents a partial year based on the term of the development agreeement.
The differences between direct and total economic impacts are called multiplier effects and
include the secondary impacts of vendor expenditures and employee spending. Multiplier effects
are a way of representing the larger economic effects on the local economy. The multiplier
effects quantify how an increase in output (loosely defined as the cost of labor, plus the cost of
supplies, plus profits) translates into an increase in jobs and labor income. In essence, the
multiplier effect represents the recycling of local spending. This recycling process creates new
business opportunities. The multipliers used in this analysis are from IMPLAN, a nationally
recognized vendor of economic impact software, and are specific to the economy of Mesa.
The new economic activity generated directly and indirectly by the Project could support a total
local population of about 170 people. The supported population includes families of direct
employees, as well as families of indirect and induced workers. This supported population
estimate assumes that 50 percent of the employees would work and live in Mesa, based on data
from the Maricopa County Rideshare Survey.
5

4.0 TAX REVENUE IMPACTS
The Craftsman could generate new local tax revenues, primarily from taxable retail sales and
leases. The Project could generate $3.2 million in estimated gross sales tax revenues to the City
of Mesa from 2027 to mid-year 2037. This includes construction only in 2027 and 2028, and the
first businesses opening mid-year 2029. The reimbursement term extends for ten years, or mid-
year 2037.
4.1 Gross City Tax Revenues
There are three primary sources of sales taxes: construction, retail sales, and commercial leases.
The Project could generate one-time City sales taxes from new construction estimated at $0.4
million in 2027 through 2029, including dedicated and non-dedicated taxes (Figure 4). Estimated
non-dedicated and dedicated sales tax revenues from leases and taxable retail and restaurant
sales total $2.8 million over ten years. Taxable sales and leases include 2% annual inflation.
Construction and on-going sales taxes combined could total $3.2 million over ten years.
FIGURE 4
GROSS CITY TAX REVENUE IMPACTS
Construction Sales Tax Retail Sales Tax
Non- Dedicated
Dedicated @ Funds @ Non-Dedicated Dedicated Funds Gross City
1.2% 0.8% @ 1.2% @ 0.8% Sales Tax
2027 $104,286 $69,524 $0 $0 $173,810
2028 $104,286 $69,524 $0 $0 $173,810
2029 $52,143 $34,762 $56,373 $37,582 $180,861
2030 $0 $0 $192,609 $128,406 $321,015
2031 $0 $0 $197,424 $131,616 $329,040
2032 $0 $0 $202,360 $134,907 $337,266
2033 $0 $0 $207,419 $138,279 $345,698
2034 $0 $0 $212,604 $141,736 $354,341
2035 $0 $0 $217,919 $145,280 $363,199
2036 $0 $0 $223,367 $148,912 $372,279
2037 (Partial Yr) $0 $0 $171,714 $114,476 $286,190
Total $260,715 $173,810 $1,681,790 $1,121,194 $3,237,509
Note: Taxables sales include 2% annual inflation.
6

4.2 Retail Sales Tax Incentive
The City would construct roadway improvements along Elliott Road at an estimated cost of
$1,550,285. The developer would contribute $775,142 to the City by July 2027. If the developer
meets the conditions outlined in the development agreement, they could be reimbursed for this
contribution.
The development agreement includes provisions for a sales tax reimbursement equal to 35
percent of non-dedicated construction sales tax (1.2 percent) for the Project. The reimbursement
also includes 50 percent of non-dedicated sales taxes (1.2 percent) generated by the commercial
development. The maximum reimbursement would be equal to $775,142 over a period of up to
ten years. The reimbursement period for construction sales tax begins when the Project public
improvements and private improvements are complete, and the qualifying restaurant space is
fully occupied and open to the public. This analysis assumes that both the retail and qualifying
restaurant space would be open by October 2029.
A.R.S. 9-500.11 (D) requires that any proposed tax incentive is anticipated to raise more revenues
than the amount of the incentive within the duration of the agreement. We have reviewed the
development agreement and prepared an analysis of projected taxable activities and the future
sales tax revenue stream to the City during the reimbursement period. Based on our review, we
believe that the Project would generate a significantly greater amount of sales tax revenues than
the total amount of the reimbursement. The amount of tax revenues generated will likely be
sufficient to reach the estimated maximum reimbursement of $775,142 within ten years from
completion of construction (Figure 5).
FIGURE 5
UNRESTRICTED CITY SALES TAX AND PROJECTED REIMBURSEMENT SCHEDULE
City of Mesa Gross Non-Dedicated Sales Tax Reimbursement
Construction Retail Sales Total Schedule
2027 $104,286 $0 $104,286 $0
2028 $104,286 $0 $104,286 $0
2029 $52,143 $56,373 $108,516 $119,437
2030 $0 $192,609 $192,609 $96,305
2031 $0 $197,424 $197,424 $98,712
2032 $0 $202,360 $202,360 $101,180
2033 $0 $207,419 $207,419 $103,709
2034 $0 $212,604 $212,604 $106,302
2035 $0 $217,919 $217,919 $108,960
2036 $0 $223,367 $223,367 $40,537
2037 (Partial Yr) $0 $171,714 $171,714 $0
Total $260,715 $1,681,790 $1,942,505 $775,142
Note: Taxables sales include 2% annual inflation.
7

The $775,142 maximum reimbursement covers half the cost of specific public infrastructure
improvements as outlined in the development agreement. The developer must pay the
Developer Public Improvement Contribution prior to any sales tax reimbursement.
A.R.S. 42-6010 requires that sales tax incentives offered to retail businesses are only for
reimbursement for public infrastructure dedicated to, and accepted and controlled upon
completion, by a state or local government entity. All public improvements described above
would meet these requirements, and the cost of such improvements forms the basis for the
reimbursement amount per the development agreement.
4.3 Summary
The proposed commercial development described in this analysis could create economic impacts
and new tax revenues for the City of Mesa. The economic benefits include the impacts of
construction as well as on-going operations. The development could create jobs and payroll at
tenant businesses within the Project, and support additional economic activity at other local
businesses in Mesa.
The Craftsman is projected to generate $3.2 million in City sales tax revenues during construction
and over the first ten years of operations. The development agreement allows for
reimbursement of up to $775,142 in public improvement costs, with the City retaining $2.4
million in dedicated and non-dedicated sales tax revenues. Thus, the Project will raise
significantly more revenues within the term of the development agreement than the amount of
the reimbursement.
8