Extracted text (via pymupdf_layout)
10457 characters
Planning and Zoning Report Date November 18, 2026 Case No. ZON23-00560 Project Name Arizona Propane Site Plan Review for an industrial development Request Special Use Permit for a parking reduction Located at the northeast corner of East Pecos Road and South Mountain Project Location Road Parcel No(s) 304-34-929A Project Area 6.2± acres Council District District 6 Existing Zoning General Industrial General Plan Industrial Designation Applicant Michael Hall, Michael Hall Architect LLC Owner Justin Dawson, Dawson Family Trust Staff Planner Chloe Durfee Daniel, Planner II Recommendation Staff finds that the Proposed Project is consistent with the Mesa 2040 General Plan, the review criteria in Chapter 32 regarding Parking Reductions, and the review criteria for Site Plan Review outlined in MZO Section 11-69-5. Staff recommends approval with conditions. Project Overview Request: The applicant is requesting approval for Site Plan Review and a Special Use Permit for a parking reduction to allow for an industrial development (Proposed Project). Concurrent Applications: Design Review: Design Review Board meeting is scheduled for November 10, 2026, to review the proposed elevations and landscape plan (DRB23-00562). Site Context General Plan: Based on the filing date of the application, the Proposed Project was reviewed using the Mesa 2040 General Plan. Per the Mesa 2040 General Plan, the project site is located within the Employment District Character Area and is within the Industrial Sub-type. The primary focus of the Employment Districts character area is to provide for a wide range of employment opportunities in high-quality settings. The Industrial Sub-type signifies locations appropriate for warehousing, manufacturing, and other industrial operations. These areas typically have larger lots and require provision of access and circulation by large vehicles. These industries typically provide quality jobs and require protection from encroachment of non-compatible uses. The Proposed Project is consistent with the Employment District Character Area and the Industrial Sub-type. Per the Mesa 2040 General Plan, GI is a primary zoning district and Industrial is a Primary land use. A majority of the surrounding area has already developed or is zoned for primary land uses or zoning districts, and the character and form of the proposed development is consistent with the Employment District character area and the Industrial Sub-type. Supporting General Plan Strategies: o Economic Development P1: Preserve designated commercial and industrial areas for future job growth. o Character Areas P6: In areas with the Employment District character, development will be reviewed for the opportunity to maintain and enhance employment options within the City of Mesa; areas with this character type are important to the long term vitality of the community and need to be protected from incompatible development types. Review [2] shall also consider compliance with any approved sub-area or neighborhood plan for the specific area. Sub-Area Plan: The proposed project is located within the Mesa Gateway Strategic Development Plan, specifically in the Logistics and Commerce District of the Plan. The intent of the Logistics and Commerce District is to provide a high-quality employment environment that is compatible with the over-flight activities associated with the Mesa Gateway Airport. The proposed project meets the intent of the District and the Plan. Zoning: The project site is zoned General Industrial (GI). A Contractor’s Yard is a permitted use within the GI District. Surrounding Zoning & Use Activity: The proposed Contractor’s Yard is compatible with surrounding land uses, which include general manufacturing, other industrial uses, and vacant land. Northwest North Northeast (Across Mountain Road) GI GI GI Industrial Industrial General Manufacturing West Project Site East (Across Mountain Road) GI GI HI Vacant Industrial General Manufacturing Southwest South Southeast (Across Pecos Road) (Across Pecos Road) (Across Pecos Road) GI GI GI/GI-BIZ Vacant Vacant Industrial Site History: May 17, 1990: City Council annexed 625.7± acres, including the project site, into the City of Mesa (Case No. A90-001; Ordinance No. 2514). June 4, 1990: City Council established comparable zoning for 613.3± acres, including the project site, from Maricopa County Rural 43 to City of Mesa Agricultural (AG) (Case No. Z90-025; Ordinance No. 2529). January 36, 2015: City Council approved a rezoning for 8.2± acres, including the project site, from AG to GI, and Site Plan Review for development of an industrial building (Case No. Z14-057; Ordinance No. 5269). [3] Project/Request Details Site Plan: Building Design: The overall contractor’s yard includes a 5,000 square foot office, a 11,543 square foot shop to serve the facility vehicles, propane tanks for facility distribution, a 1,520 square foot sandblasting area on the northern part of the project site and a retail propane tank for customers out front. All public access to the site is in the front and employees will be assisting customers with their propane needs during business hours. The other areas of the site are screened by an 8-foot screen wall as required for a contractor’s yard. Access: The site is accessed from Pecos Road by two points. Parking: Per Table 11-32-3.A of the Mesa Zoning Ordinance (MZO), 33 parking spaces are required. The applicant is proposing a parking reduction to allow for 13 parking spaces in the front area of the site. The applicant is providing an additional 24 spaces in the rear; however, there will be no public access to the rear parking spaces due to security requirements for the site. Landscaping: The project site provides all landscaping along the street, perimeter, foundation base, and in required parking areas as required per the MZO. Special Use Permit: This request includes a Special Use Permit (SUP) to reduce the minimum parking required per Table 11-32-3.A of the MZO. Required: Office and Industrial o 1 space per 375 square feet for office o 1 covered parking space per office or suite plus 1 additional space o 1 space per 600 square feet for industrial o Total required: 33 parking spaces (8 covered) Proposed: Office and Industrial o Total proposed: 13 publicly accessible parking spaces, plus an additional 24 employee parking spaces located behind the gate (8 covered) Approval Criteria - Section 11-32-6(A): 1. Special Conditions Reducing Parking Demand: The total parking on site will meet parking requirements; however, due to Homeland Security requirements for industrial propane facilities, the rear yard will not allow for any public access. 2. Adequate Parking Supply: The Proposed Project will provide 13 parking spaces in the front for public access and an additional 24 spaces in the rear for employees, exceeding the required parking spaces per code but maintaining the security requirements set by Homeland Security. [4] 3. Impact on On-Street Parking: The Proposed Project will not impact on-street parking, as no on-street parking is allowed in the area and all parking needs will be met on site. Approval Criteria - Section 11-70-5(E): 1. Consistent with the General Plan and other Plan/Policies: The Proposed Project complies with the General Plan and the Mesa Gateway Strategic Development Plan, supporting industrial users in the area. 2. Zoning District Intent: The Proposed Project aligns with the zoning district’s intent and blends with the other industrial uses in the surrounding area. 3. Project Impact: The Proposed Project will not be injurious or detrimental to surrounding properties or the welfare of the city. 4. Adequate Public Facilities: The applicant will be required to install necessary offsite improvements and/or upgrades to support the Proposed Project. Citizen Participation The applicant conducted a Citizen Participation process, notifying surrounding property owners, HOAs, and registered neighbors. Required Notification: Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods within one mile of the subject site were notified of the public hearing. Staff did not receive any comments. Conditions of Approval Staff recommends approval of the Site Plan Review and Special Use Permit for a parking reduction, subject to the following conditions: 1. Compliance with the final site plan as submitted. 2. Compliance with all requirements of Design Review Case No. DRB23-00562. 3. Compliance with all applicable City development codes and regulations. 4. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. 5. Compliance with all requirements of Chapter 19 of the Zoning Ordinance including: a. Owner must execute the City’s standard Avigation Easement and Release for Mesa Gateway Airport prior to or concurrently with the recordation of the Final Plat or the issuance of a building permit, whichever occurs first. b. Due to the proximity to Mesa Gateway Airport, any proposed permanent or temporary structure, as required by the FAA, is subject to an FAA filing for review in conformance with CFR Title 14 Part 77 (Form 7460) to determine any effect to navigable airspace and air navigation facilities. A completed form with a response [5] by the FAA must accompany any building permit application for structure(s) on the property. c. Prior to the issuance of any building permit, provide documentation by a registered professional engineer or registered professional architect demonstrating compliance with the noise level reductions required in Section 11- 19-5 of the Mesa Zoning Ordinance. d. Provide written notice to future property owners that the project is within 2.5 mile of Mesa Gateway Airport. e. All Final Plats must include a disclosure notice in accordance with Section 11-19- 5(C) of the Zoning Ordinance which must state in part: “This property, due to its proximity to Mesa Gateway Airport, will experience aircraft overflights, which are expected to generate noise levels that may be of concern to some individuals.” Exhibits Exhibit 1 – Vicinity Map Exhibit 2 – Project Narrative Exhibit 3 – Site Plan Exhibit 4 – Landscape Plan Exhibit 5 – Grading and Drainage Report Exhibit 6 – Elevations Exhibit 7 – Citizen Participation Plan Exhibit 8 – Citizen Participation Report Exhibit 9 – Power Point Presentation [6]