Project Narrative
City of Mesa — Planning and Zoning Board - Public Hearing (2026-11-18)
Extracted text (via pymupdf_layout)
11860 characters
Special Use Permit
Project Narrative
Located at the Northeast Corner of
South Mountain Road and East Pecos Road
Parcel No. 304-34-929A
Prepared By:
Matthew Lubisich, Esq.
Joshua Mike, AICP, MBA
Quarles & Brady LLP
2 N. Central Avenue
Phoenix, AZ 85004
Submittal Date: October 5, 2026
P a g e | 2
Development Team
Owner/Developer
Dawson Family Trust / Arizona Propane
17251 E. Shea Blvd.
Fountain Hills, AZ 85268
ATTN: Justin Dawson, Vice President
justin@arizonapropane.com
(480) 990-2245
Zoning Attorney / Applicant
Quarles & Brady LLP
2 N. Central Avenue
Phoenix, AZ 85004
ATTN: Matt Lubisich
Matt.Lubisich@Quarles.com
(602) 229-5683
Civil Engineer
Desert Development Engineering, LLC
2501 West Happy Valley Road, Suite 4 #1078
Phoenix, AZ 85085
ATTN: John Shinske, P.E., Principal
john@dde-engr.com
(602) 997-2005
Architect
Michael A Hall Architect LLC
600 N. 4th Street, Suite 404
Phoenix, AZ 85004
ATTN: Michael A Hall
mike@michaelahallarchitectllc.com
(602) 909-0212
P a g e | 3
INTRODUCTION AND PROJECT OVERVIEW
The law firm of Quarles & Brady LLP submits this Special Use Permit (“SUP”) request on behalf
of Dawson Family Trust (the "Applicant"). The Applicant intends to develop an industrial propane
supplier and distribution complex (the “Development” or “Arizona Propane") to serve both
commercial and residential customers. While the Applicant will maintain the total number of
parking spaces typically required by the Mesa Zoning Ordinance (“MZO”), this SUP request seeks
to reduce the official minimum parking requirement to the 13 spaces in front of the Office Building,
which reflects the parking actually needed for daily retail customer operations.
PROPERTY INFORMATION AND EXISTING ZONING ENTITLEMENTS
The Development will be located at the Northeast corner of South Mountain Road and East Pecos
Road on Maricopa County Assessor Parcel No. 304-34-929A, consisting of approximately 6.25
acres (the "Property").
Existing Zoning and General Plan 2050
The Property is currently zoned General Industrial (“GI”), which permits manufacturing,
processing, wholesale, outdoor storage, and similar industrial activities. The proposed industrial
propane facility is permitted by-right in the GI district.
The Mesa General Plan 2050 ("GP 2050") designates the Property within the Industrial Placetype
and Evolve Growth Strategy, where the primary focus is on employment-type land uses. Arizona
Propane is in conformance with the GP 2050 goal to increase employment opportunities in
Southeast Mesa and develop long-vacant sites into viable industrial uses to serve the existing
and future population growth.
Arizona Propane will bring high-demand industrial uses to help address the balance between jobs
and housing near the Mesa Gateway Airport. The Development will help meet the significant need
for job creation and will benefit the Mesa community.
SITE PLAN AND DESIGN REVIEW
The proposed SUP is part of the Site Plan Review (Case No. ZON23-00560) request and
concurrent Design Review (Case No. DRB23-00562) request. Arizona Propane will be
constructed with an Office Building for staff and retail sales along with a Shop Building for
operations, equipment storage, and shop vehicle parking and maintenance. The site plan includes
(1) a large Rear Propane Island in the gated truck court area for storage and to fill fleet vehicles
to serve offsite customers; and (2) a smaller Front Propane Island in the front public parking area
to serve individual retail customers.
Both Propane Islands will be exclusively operated by employees. Only employees will be allowed
to enter the gated truck court to access the Rear Propane Island. Retail customers temporarily
park at the Front Propane Island, use a call button to request service, and an employee will fill
P a g e | 4
the personal propane tanks. Service and point-of-sale transactions are completed directly at the
station.
PROPOSED PARKING REDUCTION REQUEST
Applicant is requesting to reduce the official number of required parking spaces that must meet
the site plan and landscape design standards. The total number of parking spaces provided on
the site will meet the operational needs of Arizona Propane. All employee parking spaces will be
within the truck court area. The truck court area will be gated to meet the safety and security
requirements outlined by Homeland Security for certain hazardous chemicals, specifically the
propane supplies at this facility.
This SUP request therefore proposes to reduce the minimum parking requirement that must
comply with site design standards to meet the practical need for parking in front of the Office
Building. The parking calculations associated with the proposed site plan are shown below.
Parking required per MZO Section 11-32-3:
Office/Retail: 4,694/375 = 12.51 spaces
Shop: 10,644/600 = 17.74 spaces
Shop mezz: 899/375 = 2.39 spaces
Total required: 32.64 (33) spaces
Parking provided:
Front parking provided: 13 spaces
Additional parking provided in the rear truck court: 25 spaces
Total parking provided: 38 spaces
PROPOSED PARKING REQUIRED:
PARKING = 13 SPACES
SUP CRITERIA
Parking Reduction Criteria
Per MZO Section 11-32-6(A), the minimum number of parking spaces required for any use may
be reduced through approval of an SUP. As shown below, the Development meets or exceeds
each of the following required criteria.
1. Special conditions—including but not limited to the nature of the proposed
operation; proximity to frequent transit service; transportation characteristics of
P a g e | 5
persons residing, working, or visiting the site—exist that will reduce parking
demand at the site.
The following special conditions apply to the operations of this site to justify the request to
reduce the minimum number of required parking spaces.
• The rear truck court will be screened from public view, gated, and secured to
comply with the Homeland Security safety standards for industrial propane
facilities.
• Only employees will have access to the rear truck court and employees will
operate the Rear Propane Island.
• Arizona Propane hours of operation are expected to be Monday through
Friday, 8:00 AM to 4:30 PM. The Front Propane Island will serve approximately
20 to 30 customers per day.
• Based on existing facilities, Arizona Propane anticipates that only one
customer per fill station at the Front Propane Island will be waiting during peak
service hours. On average, the filling service lasts about 10 minutes.
2. The use will adequately be served by the proposed parking.
• Typical retail customers temporarily park at one of the two fill stations at the
Front Propane Island, use a call button to request service, and then an
employee will fill the personal propane tanks. Service and point-of-sale
transactions are completed directly at the station.
• The additional parking spaces in the gated truck court will be used by the
estimated 25 employees who might be on the property during a typical shift.
3. Parking demand generated by the project will not exceed the capacity of or have a
detrimental impact on the supply of on-Street parking in the surrounding area.
• All employees will park in the gated truck court, and all retail customers will be
served at the Front Propane Island. As a result, the only practical need for
public parking is in front of the Office Building.
• The 13 spaces provided in front of the Office Building will serve the few
customers that require additional services from Arizona Propane, and will
ensure parking demand will not exceed on-site capacity or negatively impact
on-street parking in the surrounding area.
P a g e | 6
SUP Findings Criteria
Per MZO Section 11-70-5(E), the SUP shall only be granted if the approving body determines
that the project as submitted or modified conforms to all of the following criteria:
1. Approval of the proposed project will advance the goals and objectives of and is
consistent with the policies of the General Plan and any other applicable City plan
and/or policies.
• The Development advances the goals and objectives of GP 2050 because it
will increase employment opportunities and develop a long-vacant site into a
viable industrial use. The parking reduction matches required parking to
customer demand, and total parking still exceeds the MZO requirement.
2. The location, size, design, and operating characteristics of the proposed project are
consistent with the purposes of the district where it is located and conform with the
General Plan and with any other applicable City plan or policies.
• The Property is zoned GI, and the industrial propane facility is permitted by-
right in the GI district. The 6.25-acre Property will include an Office Building, a
Shop Building, and two Propane Islands. Employees will operate both Propane
Islands on weekdays from 8:00 AM to 4:30 PM. The Development will comply
with all development standards of the GI district, other than the parking
reduction requested through this SUP.
3. The proposed project will not be injurious or detrimental to the adjacent or
surrounding properties in the area, nor will the proposed project or improvements
be injurious or detrimental to the neighborhood or to the general welfare of the City.
• The Development is consistent with the GI zoning and the surrounding
industrial area. The Development will provide 13 spaces in front of the Office
building and a total 38 on-site parking spaces, exceeding the 33 typically
required by the MZO. Parking will not spill onto nearby properties or streets.
The gated truck court will be screened and secured to meet Homeland Security
standards.
4. Adequate public services, public facilities and public infrastructure are available to
serve the proposed project.
• The Property has direct access to South Mountain Road and East Pecos Road.
Adequate utilities and public services are available to serve the Development.
The facility will comply with fire code requirements for propane. All parking will
be on site, so public streets will not be burdened.
P a g e | 7
CONCLUSION
As demonstrated above, the requested parking reduction satisfies each of the criteria in MZO
Sections 11-32-6(A) and 11-70-5(E). Although the SUP would reduce the official minimum parking
requirement to the 13 spaces in front of the Office Building, the Development will still provide 38
total parking spaces on site to meet the operational needs of its employees and customers. The
Development will also help meet the significant need for job creation and will benefit the
surrounding Mesa community. The Applicant respectfully requests approval of this SUP and
appreciates City Staff’s time and continued assistance with this application.
NARRATIVE
THIS IS A NEW OFFICE AND SHOP BUILDING FOR A PROPANE
COMPANY. THEY SERVE BOTH COMMERCIAL & RESIDENTIAL
CUSTOMERS. THE OFFICE IS OPEN TO THE PUBLIC BUT
RARELY USED, MOST CUSTOMERS ORDER THEIR PROPANE VIA
PHONE. THEY AVERAGE LESS THAN FIVE CUSTOMERS PER
WEEK. THE OFFICE IS OPEN 8:00AM TO 4:30PM. THE SHOP
BUILDING IS FOR MAINTENANCE ON THEIR VEHICLES, THEY
PERFORM GENERAL MAINTENANCE SUCH AS OIL CHANGES,
BRAKES AND MISCELLANEOUS REPAIRS AS REQUIRED. THE
PROPANE ISLAND IN FRONT IS FOR PUBLIC USE. THE ISLAND IS
MANNED BY AN EMPLOYEE. THERE IS A DOORBELL THAT THE
CUSTOMER RINGS AND AN EMPLOYEE COMES OUT TO FILL THE
PROPANE TANKS, IT IS NOT SELF SERVICE. THE HOURS OF
OPERATION WILL BE 8:00AM TO 4:30PM. TRANSACTIONS ARE
DONE DIRECTLY AT THE STATION, THE CUSTOMERS DO NOT
NEED TO COME INTO THE OFFICE TO PAY. THE TANKS IN THE
BACK ARE TO FILL THEIR TRUCKS FOR DELIVERY. THE GATED
BACK AREA IS NOT OPEN TO THE PUBLIC AND ONLY
AUTHORIZED EMPLOYEES ARE ALLOWED TO ENTER THIS AREA.
AFTER THE 9/11 ATTACKS HOMELAND SECURITY IS VERY
STRICT REGARDING ANY UNAUTHORIZED PEOPLE ENTERING
HAZMAT AREAS. THE ONLY AREAS THE PUBLIC IS ALLOWED IS
AT THE FUELING STATION AND THE ADMINISTRATIVE OFFICE.