Planning and Zoning Report
Date November 18, 2026
Case No. ZON26-00379
Project Name Culdesac Mesa (FKA Site 17)
Request  Rezone from Downtown Core (DC) to Infill Development-2 (ID-2) to
allow for the development of a mixed-use community.
Project Location Located approximately 230+ feet west and 150+ feet south of the southwest
corner of East University Drive and North Mesa Drive
Parcel No(s) Multiple
Project Area 24.3± acres
Council District District 4
Existing Zoning Downtown Core (DC)
Proposed Zoning Infill Development-2 (ID-2)
General Plan Downtown Placetype with an
Designation Evolve Growth Strategy
Applicant Duke DiEugenio, Culdesac Inc.
Owner City of Mesa
Staff Planner Jennifer Merrill, Senior Planner

Recommendation
Staff finds that the Proposed Project is consistent with the Mesa 2050 General Plan, the purposes
and intents of the Infill Development-2 (ID-2) District from Mesa Zoning Ordinance (MZO) Section
11-12-1, and the applicability requirements for the ID District from MZO Section 11-12-2, and the
proposed Infill Incentive Plan (IIP) meets the requirements of MZO Section 11-12-6.
Staff recommends approval with conditions.
Project Overview
Request:
The applicant is requesting approval of a rezoning for 24.3± acres from Downtown Core (DC) to
the Infill Development-2 (ID-2) District, and approval of the associated Infill Incentive Plan (IIP),
to allow for the development of a mixed-used community (Proposed Project).
Site Context
General Plan:
 The Placetype for the project site is Downtown; the Growth Strategy for the project site is
Evolve.
 The Infill Development-2 (ID-2) District is an appropriate Zoning District for the Downtown
Placetype per the Mesa 2050 General Plan.
 Principal Land Uses in the Downtown Placetype include Multi-Family Residential,
Public/Semi-Public, Retail, Personal Services, Eating and Drinking Establishments,
Entertainment and Recreation, and Business Office; Supporting Land Uses include Single-
Family Residential and Medical Facilities.
 The Proposed Project includes three phases of development that allow for all of the
principal and supporting land uses listed above. The first phase, located closest to the
Glenwood Wilbur Historic District, allows for attached and detached Single-Family
Residential, Multi-Family Residential, and other land uses generally at a smaller-scale.
Subsequent phases allow for attached Single-Family Residential, Multi-Family Residential,
and the other land uses listed above.
[2]

 The Proposed Project is consistent with the Downtown Placetype and furthers the
implementation of, and is not contrary to, the Vision, Guiding Principles, Strategies, and
applicable elements of the Mesa 2050 General Plan.
 Supporting General Plan Strategies:
o N1. Promote complete communities in both existing and new neighborhoods.
o N4. Use neighborhood planning to engage local communities and define
neighborhood specific character, values, and policies.
o N5. Improve street and open space network connectivity within neighborhoods and
to local serving amenities.
o HAC2. Support and encourage a variety of artwork in public places, such as parks,
public buildings, and plazas.
o H1. Create more opportunities for housing options.
o H4. Encourage the development of high-density housing in close proximity to transit
and major activity centers.
o CM4. Promote transit-supportive development along existing and future high-
capacity transit routes.
o LU1. Promote a balance of land uses to enhance the quality of life for current and
future generations.
o LU2. Create opportunities for placemaking in neighborhoods that reinforce their
unique character and sense of place.
o LU3. Encourage infill and redevelopment to meet the community's strategic needs.
o LU4. Create design and development standards that improve the City’s visual quality,
urban form, and function to enhance the quality of life for current and future
generations.
o LU5. Encourage the development of vibrant activity centers in downtown and
throughout the City.
o ED3. Sustain a business climate that fosters entrepreneurs and small businesses.
Sub-Area Plan:
 The project site is located in the Central Main Street Area Plan within the Employment
district.
 Per the Plan, the project site represents an excellent opportunity to develop an urban
employment district that includes a mixture of uses including higher education planned in
a coordinated manner with an urban form that includes buildings close to, and addressing
the streets and parking behind or to the side of buildings, preferably structured.
 The Proposed Project includes three phases of development; the first two phases will
contain residential and mixed-use projects with an urban form, and the third phase is
anticipated to involve Arizona State University and include student housing, college
classroom and academic office space.
[3]

 The Proposed Project is consistent with the Employment district and furthers the
implementation of, and is not contrary to, the vision and goals of the Central Main Street
Area Plan.
Zoning:
 The applicant is requesting to rezone the site to the Infill Development-2 (ID-2) District. The
rezoning request will adopt an Infill Incentive Plan (IIP) which establishes the permitted and
conditional uses, development standards, and certain project specific administrative
processes for the subject site.
Surrounding Zoning & Use Activity:
The proposed mixed-use neighborhood is compatible with surrounding land uses, which include
the Single and Multiple Residential, Hotel and Conference Center, Offices, Place of Worship, and
other commercial uses.
Northwest (Across North Northeast
University Dr.) (Across University Dr.) Convenience Market and
DR-3 DR-3, DB-1 Service Station (Circle K)
Escobedo Apartments Place of Worship, Apartments, (Across University & Mesa
Medical Office Building,
Drives)
Retail/Restaurants
DR-3
Place of Worship
West Project Site East
(Across Pasadena) DC (Across Mesa Dr.)
DC Vacant DB-1, DR-2
Hotel and Conference Center, Jiffy Lube, Offices, Multi-
Offices Family Residential, Single
Residence
(Across Pomeroy)
Apartments
Southwest South Southeast
(Across Pasadena and E. (Across E. 2nd St.) (Across Pomeroy)
2nd St.) DR-2 DC
DC, DR-2 Multiple and Single Multiple Residential
Residential (Across Mesa Dr.)
Offices, Multiple and Single
K-12 Charter School
Residential
Site History:
 June 14, 1883: The original square mile of the City of Mesa was established, including
the project site (Ordinance No. 1).
 September 8, 1987: City Council approved a request for a Special Use Permit for 0.4±
acres, located at the southwest corner of Mesa Drive and University Drive (adjacent to
the project site), to allow the construction of an automobile service station and
[4]

convenience market (Case No. SUP86-010).
 September 8, 1987: The City Council approved new Town Center zoning districts,
development regulations and design standards for 836.8+ acres including the project site
(Case No. Z87-040; Ordinance No. 2254). Limited Commercial/General Multiple
Residential (TCB-1), General Multiple Residential (TCR-3) and Restricted Multiple
Residential (TCR-2) were established for the project site. The Downtown Core (DC)
District was later established for the overall area.
Project/Request Details
Infill Development-2 (ID-2) District Designation:
The applicant is requesting to rezone the property from DC to ID-2 for a mixed-use neighborhood
development. Per MZO Section 11-12-1, the purpose of the ID Districts is to promote and facilitate
the development and redevelopment of by-passed, underutilized, or abandoned properties. This
district provides for the establishment of specific land uses, development standards, alternative
fees and streamlined review processes as incentives to stimulate re-investment and development
of these properties in a manner that will contribute to the creation of a high-quality context for
employment opportunities and improve the overall economic viability of that area of the city.
The Proposed Project achieves the purpose and intent of MZO Section 11-12-1, by encouraging
redevelopment and investment of a by-passed group of properties through an Infill Incentive Plan
(IIP) that utilizes sustainable development practices including promoting a mix of uses in close
proximity of each other, which enables more pedestrian activity, on properties where public
infrastructure is in place.
The Proposed Project will result in a cohesive mixed-use neighborhood with housing,
employment, services, common open space and recreational uses accessible by walking,
bicycling, and other transportation modes.
Summary of the ID District
The DC District is governed by the adopted IIP. The IIP is summarized by chapter below.
Chapter 1 – IIP Introduction
The proposed Culdesac Mesa project is comprised of multiple parcels totaling 24.3+ acres located
southwest of the intersection of North Mesa Drive and East University Drive. The site has been
vacant for three decades and meets the defining criteria of a by-passed parcel as explained in
detail below in the Evaluation Criteria section. It also meets four of the six ID District applicability
requirements, including having a relatively low level of development or investment activity, and a
high occurrence of crime and nuisance activity. The site may contain cultural resources which
merit additional investigation, which will occur in accordance with the MZO and with Arizona State
statutes and regulations.
The vision and goals for the development include expanding access to homeownership in a well-
connected mixed-use community, with high-quality and environmentally resilient design, shared
spaces designed to foster daily interaction and connection, multiple modes of transportation, and
[5]

support for new and local retail businesses.
Chapter 2 – Zone Standards
The proposed Culdesac Mesa project includes three Zones. The Neighborhood Zone is located
adjacent to the single residential neighborhood to the south and is intended to provide residential
and small-scale commercial uses. Buildings are a maximum of three stories in height.
The Village Zone comprises the majority of the project area, including along Mesa and University
Drives, and is intended to create a medium- to high-intensity, mixed-use neighborhood including
residential, retail, restaurants, live-work spaces and other local businesses with a connected
network of streets and public spaces. Buildings are four to 12 stories in height.
The Campus Zone is located along the western boundary adjacent to the parking area for the
Delta Hotel and City-owned parcels. The intent of the Campus Zone is to create a high-intensity,
pedestrian-oriented district that supports the long-term expansion of higher-education and
associated uses including residential, academic, commercial, and institutional. The tallest
buildings are accommodated in the Campus Zone, designed to incorporate active ground floor
uses and walkable urban settings with integrated open spaces.
Chapter 3 – Land Use Regulations
A permitted land use table lists a broad range of recreation, civic, education, cultural, residential,
commercial, office, hospitality, and transportation uses. The Neighborhood Zone allows for
detached single-unit residential uses, whereas the Village and Campus Zones do not. Uses
permitted in all three Zones include community services; multi-unit residences and attached
single-unit residences; medical/dental clinics and offices; places of worship; day care facilities;
libraries, museums and live/work units less than 2,500 square feet; and eating and drinking
establishments under 5,000 square feet.
The Village and Campus Zones allow for more intense uses that are not permitted in the
Neighborhood Zone including hospitals; public safety facilities; theaters, cinemas and performing
arts; post-secondary institutions; lodging for 50 or more keys; libraries, museums, live/work units,
and offices over 2,500 square feet; and studios, eating and drinking establishments, and general
retail over 5,000 square feet.
Several uses are allowed prior to construction, as indicated by the cross symbol at the foot of the
table and as explained in Chapter 7 of the IIP.
Chapter 4 – Development Standards
The IIP establishes development standards for uses where the proposed standards differ from
those established in the MZO. These include architectural, screening, trash and refuse collection,
landscaping, lighting, parking, and signage.
Some key differences between the Development Standards in the MZO and those in the proposed
IIP include:
 Fences. Opaque yard fences need to include at least two framed views, where an area of
at least one square foot of transparent materials or void shall be located at a height of at
least two and no more than six feet within the fence; this will provide more safety, as well
[6]

as visual connections between outdoor spaces. The MZO does not require framed views
for opaque yard fences.
 Paving. Variations in paving materials, patterns, textures, and colors shall be used to
define pedestrian areas, gathering spaces, plazas, crossings, seating areas, and other
activity zones, and alternative paving materials including stabilized decomposed granite,
porous or permeable pavers, and precast pavers are permitted. The MZO does not require
variations in paving materials between outdoor pedestrian activity areas.
 Retention Basins. Retention basins can incorporate alternative designs and systems
(from the MZO) approved by the City Engineer or designee.
 Landscaping Species. All on-site landscape materials are required to be native or desert
adapted species as included in the Arizona Department of Water Resources Active
Management Plan Low Water Use Plant List for Phoenix, unless approved by the Planning
Director. The MZO does not limit material species to those on that plant list.
 Tree Size. A minimum tree size of seven-gallon (vs. 15-gallon required by the MZO),
should allow for faster establishment, lower maintenance needs, and better long-term
survival compared with larger trees.
 Required Parking. Required parking spaces are to be provided per the Development
Phasing Map and will total at least 800 off-street parking spaces for the entire Culdesac
Mesa project area. Minimum off-street parking space requirements are as follows per
phase:
o Phase I: 140 spaces
o Phase II: 250 spaces
o Phase III: 425 spaces
 Flexible Parking Spaces. Constructed parking spaces may be used as parking for any
use in the IIP project area or may be converted for use as outdoor seating, private
courtyard or porch space, pocket parks, outdoor sales, public plaza space, bike or bike
share parking, carshare parking, or other uses as approved by the Planning Director or
designee. The MZO does not allow required parking spaces to be converted to non-
parking uses.
Chapter 5 – Thoroughfare Standards
The Thoroughfare Standards chapter provides six proposed thoroughfare assemblies, or
dimensioned street/path cross-sections, with the goal of providing a compact, walkable, and
connected neighborhood. A Conceptual Circulation Plan guides the placement of the
thoroughfare assemblies, but final locations will be determined during Development Plan Review.
The six thoroughfare assemblies are:
 Suburban Streets. Regulations apply to improvements located between the back of curb
and property line; adjacent to Mesa Drive and University Drive.
 Mixed Use Streets. Primary neighborhood spines with minimum 37-foot right-of-way
[7]

(ROW); minimum nine-foot lane width and up to one lane per direction, plus bicycle lanes
with buffers.
 Local Streets. (located along the edges of the Site with minimum 33-foot ROW; minimum
nine-foot lane width and up to one lane per direction, plus bicycle lanes with buffers);
 Shared Streets. Function as both circulation routes and public gathering spaces for
markets, special events and everyday activities, with a minimum 20-foot ROW; minimum
nine-foot lane width and up to one lane per direction, plus bicycle lanes with buffers.
 Shared Lanes. Narrow vehicular access with a minimum nine-foot ROW; nine-foot-wide
single-direction lanes, or 12-foot-wide bi-directional lane, serving vehicles, bicyclists and
pedestrians.
 Pathways. Pedestrian- and bicycle-only corridors with a minimum three-foot ROW.
Alternative Thoroughfare Standards are permitted through an additional review process.
Chapter 6 – Open Space Standards
The proposed Culdesac Mesa project provides for a network of open spaces designed for private
and for public/civic use. Ten percent of the net acreage of the project Site will be provided as
open space, and each request for Development Plan Review will be required to provide a
minimum of seven percent open space.
The Open Space Standards chapter provides requirements for those private and civic open
spaces. Private open spaces include private decks, balconies, patios or yards, directly accessible
to the unit(s) served.
Six Civic Open Space types are outlined in the Chapter, but they may be combined or expanded
upon with approval by the Planning Director or designee.
Chapter 7 – Review and Development Procedures
Chapter 7 establishes the IIP as Culdesac Mesa’s primary zoning regulations. Where permitted by
law, the Plan governs over conflicting Mesa Zoning Ordinance provisions; matters not addressed
remain subject to the Zoning Ordinance.
Development Plan Review
All Development Plans require a Pre-Submittal Conference followed by administrative
Development Plan Review, consistent with the City’s established review procedures, timelines
and notification requirements.
Each request for Development Plan Review will include a Phase Compliance Tracking Table
identifying the existing and proposed amounts of residential units, commercial floor area, and
open space, relative to the amount required for the applicable Phase, and cumulatively for the
entire Culdesac Mesa project site, as stated in the Development Agreement (DA).
Neighborhood Programming and Interim Uses
Chapter 7 establishes provisions for Neighborhood Programming and Interim Uses intended to
support the phased development and ongoing activation of Culdesac Mesa.
[8]

These provisions provide opportunity for community gathering, social interaction, cultural
expression, recreation, placemaking, and activities that support local businesses and contribute
to a vibrant, pedestrian-oriented neighborhood.
Neighborhood Programming provides a framework for reoccurring activities, events, and
temporary installation within designated civic spaces, streets, paseos, and other areas identified
for programming within an approved Development Plan. Such activities may include community
markets, outdoor performances, art exhibitions, recreational activities, cultural events,
neighborhood gatherings, and similar uses that contribute to the social and economic vitality of
the development. Neighborhood Programming Plans identify the proposed programming areas,
anticipated activities, frequency and duration of events, and operational considerations necessary
to ensure compatibility with surrounding uses and the safe and functional operation of the
development.
Interim Uses Plans provide opportunities to temporarily activate vacant or undeveloped portions
of the Culdesac Mesa project site prior to approval and implementation of a permanent
Development Plan. Interim uses may include temporary commercial activities, outdoor gathering
areas, recreational amenities, community events, pop-up retail, food and beverage activities, art
installations, and other uses that contribute to site activation and neighborhood identity. Interim
Use Plans may also authorize temporary structures, infrastructure, utilities, and site improvements
necessary to accommodate these activities. Such plans identify the proposed uses, site layout,
anticipated duration, access and circulation, and other operational considerations, recognizing
that these improvements are temporary and may be modified or removed as permanent
development proceeds.
Neighborhood Programming Plans and Interim Use Plans are subject to administrative review
and approval by City Planning Staff in Planning in coordination with Licensing, Fire, Police, and
other departments as needed. Review will consider public safety, emergency access, pedestrian
and vehicular circulation, accessibility, noise, lighting, hours of operation, and other potential
impacts associated with the proposed activities.
IIP Amendments.
Minor amendments to the IIP can be reviewed administratively and approved by the Planning
Director or designee, and major amendments to the IIP can be reviewed and approved through
the Planning and Zoning Board.
Chapter 8 – Definitions
Chapter 16 establishes project-specific definitions for civic, recreation, school and cultural
institutions, residential, commercial, transportation and specialized terms used throughout the
Plan. The Definitions replace all definitions listed in the Mesa Zoning Ordinance.
These definitions ensure clear, consistent, and predictable administration of the adopted zoning
standards.
Evaluation Criteria
[9]

Evaluation Criteria Per MZO Section 11-12-6
1. Conform to applicable policies, land use map designations, and land use definitions
of the Mesa General Plan;
The Proposed Project meets the applicable policies, land use map designations and land
use definitions of the Mesa General Plan by providing permitted principal land uses such
as Multi-Family Residential, Public/Semi-Public, Retail, Personal Services, Eating and
Drinking Establishments, Entertainment and Recreation, and Business Office, and
supporting land uses such as Single-Family Residential and Medical Facilities, all in
conformance with the Downtown Placetype of the Mesa General Plan.
2. Conform to the purposes and intents of the ID District as listed in Section 11-12-1;
The Culdesac Mesa project meets the purposes and intents of the ID District by providing
land uses, development standards, and streamlined review processes for this 24+ acre
area of by-passed properties, as well as Neighborhood Programming and Interim Uses that
can support new and local businesses and improve the overall economic viability of the
area. The IIP encourages the use of innovative approaches to development including green
stormwater infrastructure, solar energy, and alternative modes of transportation. The project will
contain a mix of uses in close proximity to each other, which will be connected with a circulation
pattern that shortens walking distances, improves access, supports a pedestrian-oriented
environment, and integrates into the surrounding area including Downtown Mesa, Pioneer Park,
and the Glenwood Wilbur Historic District.
3. Address the concerns outlined in the statement of need in support of the ID district;
The 24.3+ acre project site meets the definition of “by-passed parcel” without regard to lot
size and meets four (minimum of three are required) of the six eligibility criteria for the ID
District. The site has been vacant for 30 years, and there have been more than 3,800
reports of trash removal, homeless encampments, and/or drug paraphernalia collection
since 2023, with an increase in incidents in recent years. Compared with other areas in the
City, this site has seen no development or investment activity. The Culdesac Mesa project
includes rapid activation of the site, with Interim Uses beginning soon after the rezoning is
approved, to bring people to the site for social events, recreational activities, and
opportunities for placemaking, even before construction begins. After Development Plans
are approved, the Neighborhood Programming will continue those events and activities,
and additional residents will populate the area, bringing more eyes on the streets, more
riders for the light rail, and more customers to local businesses.
4. Provide a land use, or a combination of land uses that are arranged and designed in
such a manner as to be well integrated with other land uses, the immediate
surrounding area, the planned thoroughfare system, and other public facilities such
as water and sewer systems, parks, schools, transit routes and utilities;
The Proposed Project provides a combination of land uses that are arranged and designed
to be integrated with other land uses and the immediate surrounding area. Phase I
proposes residential townhomes along the southern boundary of the project site adjacent
to the existing Glenwood Wilbur Historic District neighborhood. The proposed land uses
will be well integrated with the existing and planned thoroughfare system, and with other
public facilities, parks, transit routes and utilities.
[10]

5. Adequately, reasonably and conveniently integrate into existing and planned
streets, transit systems, and public services, utilities, and public facilities;
The City of Mesa Transportation Department, Water Resources Department, Engineering
Department, Business Services (Licensing) Department, and Development Services
Department have reviewed the IIP. The Departments have found that the Proposed Project
adequately, reasonably and conveniently integrates into existing and planned streets,
transit systems, public services, utilities and public facilities and will not result in a reduction
in service levels to adjacent properties.
6. Promote development that is appropriate to and well-integrated with its
environmental setting, including existing vegetation, soils, geology, topography, and
drainage patterns.
The City of Mesa Development Services Department has reviewed the Proposed Project
and determined that the development is appropriate to and well-integrated with the existing
environmental setting, including existing vegetation, soils, geology, topography, and
drainage patterns.
7. Justify any deviations from Standard Development Requirements based upon the
overall quality of the plan provided, the need to address specific concerns outlined
in the Statement of Need, and the need to address other conditions that may affect
the viability of reasonably developing the property in a manner consistent with
stated objectives of the Mesa General Plan;
Per Chapter 4 of the IIP, the proposed Development Standards will offer more safety and
visibility for fenced yards, different standards for hardscape materials to provide high-
quality civic spaces, alternative retention basin design, landscape requirements that will
reduce water use and allow for lower maintenance needs, and parking requirements that
will reduce the amount of asphalt in the Site. These deviations are consistent with the stated
objectives of the Mesa General Plan, including Strategy LU5: Encourage the development
of vibrant activity centers in downtown and throughout the City,
8. Provide superior design and environmental sustainability in comparison with
development reviewed under other base zoning district regulations.
The Proposed Project provides superior design pursuant to MZO Section 11-31-32 by
providing cohesive, high-quality and context-sensitive architecture, landscaping and
signage; encouraging climate-responsive design with shade elements and durable
landscape materials; and providing safe, comfortable public spaces with integrated open
space defined by landscape and hardscape design, and pedestrian amenities.
9. Be compatible with, and not detrimental to, adjacent properties or the surrounding
neighborhood(s).
The Proposed Project is compatible with, and not detrimental to, adjacent properties or the
surrounding neighborhood. The Site is bound by public streets including University Drive,
Mesa Drive, Pomeroy, E. 2nd Street, and Pasadena. Across University Drive to the north
and Mesa Drive to the east are existing places of worship, multi-family residential,
convenience service uses and a charter school. Across E. 2nd St. to the south are multi-
and single-residential uses including the Glenwood Wilbur Historic District neighborhood.
[11]

Across Pasadena to the west are offices, residential uses and a hotel and conference
center. The Proposed Project provides much needed residential units Downtown, with
single-residential located closest to the existing single-residential neighborhood. It also
provides retail, restaurant, office, education, and opportunities for small businesses in live-
work units and in Neighborhood Programming and Interim Uses. The Proposed Project will
support the immediate vicinity, including the ASU campus, and bring more people to the
Downtown businesses and commercial areas located across University and Mesa Drives.
Impact Analyses
School Impact:
Mesa Public Schools was notified of the Proposed Project and determined that the District
currently has capacity to serve the students generated from this development. The ability exists
in their neighborhood schools, including Eisenhower Elementary, Kino Middle School, and
Westwood High School.
Citizen Participation:
The applicant conducted a Citizen Participation process, notifying surrounding property owners,
HOAs, and registered neighbors, creating a Culdesac Mesa website in English and Spanish,
providing six public engagement events including a neighborhood meeting at The Post, and meeting
with various stakeholders (33).
Neighborhood Meeting:
A neighborhood meeting was held on June 25, 2026, with 47 sign-ins. A spreadsheet of citizen
concerns, with responses from Culdesac, is provided in the Citizen Participation Report.
Many comments included requests for affordable housing, a grocery store, and open/civic spaces
that are accessible to the surrounding neighborhoods. Some indicated concerns about providing one
parking space per dwelling unit; and some requested information in Spanish (provided).
The applicant explained that the IIP is written to allow for many different housing types
accommodating a wide range of households and budgets, and it also is flexible regarding how people
park, so it can adapt to future needs. The applicant also hopes to bring a corner store or grocery
store. Culdesac Mesa’s public gathering spaces will be open to neighbors and visitors in addition to
the Culdesac residents.
Required Notification:
 Property owners within 1,000 feet, HOAs within ½ mile, and registered neighborhoods
within one mile of the subject site were notified of the public hearing.
 Staff has not received any public input on the Proposed Project.
Conditions of Approval
Staff recommends approval of the rezoning request and the Infill Incentive Plan, subject to the
[12]

following conditions:
1. Compliance with the Infill Incentive Plan (IIP) and any future amendments thereto.
2. Compliance with all City development codes and regulations except as identified within the
IIP.
3. Compliance with the Subdivision Regulations.
4. Dedicate the right-of-way and easements required under the Mesa City Code at the time
of application for a building permit, at the time of recordation of the subdivision plat, or at
the time of the City's request for dedication, whichever comes first.
5. Compliance with all requirements of development agreement DA26-02416.
Exhibits
Exhibit 1 – Vicinity Map
Exhibit 2 – Project Narrative
Exhibit 3 – Infill Incentive Plan
Exhibit 4 – Citizen Participation Plan
Exhibit 5 – Citizen Participation Report
Exhibit 6 – Power Point Presentation
[13]