Attachment B
Planning and Development Department
CONDITIONAL APPROVAL – ABND 260012
Your abandonment request was granted CONDITIONAL APPROVAL.
This request will NOT be completed until all the stipulations have been met and this request is
formally adopted by City Council. It is the APPLICANT’S RESPONSIBILITY to ensure that all
stipulations are satisfied. Please contact the Abandonment Coordinator at (602) 256-3487
for questions and notification of your completion of the stipulations.
Upon completion of the stipulations your request will be scheduled for City Council formal
approval. You will receive a copy of the abandonment document after it has been recorded with
Maricopa County.
If the stipulations of abandonment are not completed within two years from the date of your
conditional approval (your expiration date is July 9, 2028), this request will then expire. At
that time a new submittal will be required along with the required payment for the abandonment
process. A one time, one year extension can be requested prior to the expiration date, with
applicable extension fee due.
1

Planning and Development Department
July 9, 2026
Abandonment Staff Report: ABND 260012
Project# 21-1694
Council District: 5
Location: Temporary Retention Easements (TRE)
located at 1819 and 1937 North 99th
Avenue.
Applicant: TTRG AZ Phoenix 99th McDowell Dev,
LLC.
Request to abandon: To abandon three (3) Temporary Retention
Easements totaling 23,027 square feet,
located on Lots 6, 7, and 8 within the 99th &
McDowell Mixed Use plat.
Purpose of request: According to the applicant, the TREs are no
longer needed to accommodate future
development of the property.
2

City Staff Comments and Recommendations:
PDD Civil Reviewer – John Lanoue
Recommend approval with the following stipulation or improvement:
1. A newly approved Grading & Drainage Plan must be provided that includes the new
drainage easement accommodating the off-site street flows. In addition, an approved
cross-drainage agreement for flows from Lot 8 to Lot 6, or recorded CC7Rs addressing
cross-drainage, is required.
Water Services Department – Garrett Lane
WSD has no concerns/issues for this abandonment.
PDD Site Planner – Dru Maynus
Recommends approval without stipulations.
Street Transportation Department Utility Coordination – Andrea Diaz
The Street Transportation Department Utility Coordination has found fiber facilities within the
proposed abandonment area. Please see attached drawings and permits for your reference.
3

Utility Comments
The request was also routed to outside utility companies for their input. Listed below are the
responses from each utility.
Cox – Nancy Manns
Based upon the supplied drawings/exhibit that you’ve submitted it has been determined that
COX will allow easement abandonment with the following stipulations:
1. Cox has facilities on 99th Avenue, 3 vaults, 3 node pedestals, and 1 pedestal to remain
protected in place.
Please note, the Conflict Review Letter only identifies possible conflicts. It is the project owner’s
responsibility, to include real conflicts on the project plans and label real conflicts with “Cox
relocation required.” After all real conflicts have been identified and labeled, send a copy of the
project plan to the Cox Construction planner.
Relocation of Cox facilities may require an easement dedicated for the purpose of public utilities
over, in, on, upon, across, through and under the specified property designated Public Utility
Easement (“PUE”) attached hereto, that includes but not limited to poles, overhead lines,
underground facilities and other appurtenances.
Further, Cox receives a considerable number of relocation requests and many relocations are
either delayed or cancelled by the requestor. As a result, Cox does not calendar relocations for
additional action without an initial meeting to discuss project design and timeline parameters.
If I can be of further assistance, please contact me at 623-328-3884 or nancy.manns@cox.com.
Southwest Gas – Susan Mulanax
After reviewing the plans for the above-referenced project, it has been determined that there are
no apparent conflicts between the Southwest Gas system and your proposed abandonment of
the temporary retention easements. Southwest Gas would like to recommend abandonment of
the temporary retention easement located at the above-referenced locations.
4

Thank you for your cooperation on this project. Please contact me if you have any questions or
require additional information (725) 502-3576.
Arizona Public Service
No comments received.
Lumen – Kenley Kohutek
Aries Network Construction Services, on behalf of Lumen/Centurylink, is in receipt of your
request for Abandonment or Encroachment of the abandonment request area.
Inventory of Local Lumen Facilities: No facilities appear to exist with requested abandonment
area.
Abandonment/Encroachment Request Overview: Request is to abandon (3) Temporary
Construction Easements that are no longer needed at APN(s) 102-33-526, 102-33-525 and 102-
33-527 1819 N 99th Ave and 1937 N. 99th Ave.
Recommendation: In the event Lumen facilities need to be removed or relocated, all associated
costs will be at the expense of the requestor/agency/owner. Blue staking is required prior to all
excavation activities. Access for Lumen, or its agents, must be maintained. All facilities are to be
avoided or protected while also maintaining a minimum 12” horizontal and vertical separation.
Lumen reserves the right to mandate modifications or removal of encroachments if it is deemed
there is an impediment. Any damage to Lumen facilities and those costs associated with
repair/replace facilities will be at the cost of the requestor/agency/owner. Lumen will not be held
responsible for any damage or cost to repair, move, or remove any encroached items (ie fence,
sign, landscape, pool, etc.) for the purpose of facility management.
Reservation – Approved
Contacts/Notification List
Local Lumen Engineer (Primary Contact)
Kendall Thomas, 602-325-0695, Kendall.Thomas@lumen.com
Aries Engineer
Chris Nielsen, 702-478-6450, cnielsen@ariesconst.com
Salt River Project – Michael Laguna
Salt River Project has no objection to the abandonment of the three Temporary Retention
Easements within Lots 6, 7, and 8 areas of the 99th & McDowell Mixed Use, recorded in Book
1786 of Maps, Page 4.
If you have any questions or need further information, please feel free to contact me at 602-236-
3116.
Stipulations of Conditional Approval
The request of abandonment ABND 260012 is conditionally approved, and the following
stipulation will need to be met:
1. Either a or b shall be complied with.
5

a. All utilities shall be relocated to locations approved by each affected utility
company. All work is to be done by each affected utility company at no expense
to the affected utility company. An appropriate performance agreement, in an
approved form and cost amount, must be posted with the Planning and
Development Department to guarantee the improvements.
b. All rights-of-way shall be retained as a public utilities easement with 24-hour
vehicle maintenance access.
2. The applicant/developer/owner must provide a newly approved Grading & Drainage Plan
that includes the new drainage easement designed to accommodate off‑site street flows.
This plan must be submitted and have staff level approval prior to the abandonment
approval.
3. The applicant/developer/owner must obtain and submit either an approved
cross‑drainage agreement for flows from Lot 8 to Lot 6 or recorded CC&Rs that address
cross‑drainage between these lots. This documentation must be provided prior to the
abandonment approval to ensure proper drainage management.
4. The above stipulations must be completed within two years from the conditional
approval decision dated July 9, 2026.
This conditional approval has been reviewed and approved.
Signature: ____________________________________________ Date: ________________ 8/13/26
REPORT SUBMITTED BY: Dru Maynus, Abandonment Coordinator
cc TTRG AZ Phoenix 99th McDowell Dev, LLC., Applicant/Representative
David Neal, Principal Planner/Abandonment Hearing Officer
6