El Mirage Downtown Rev Plan

City of El Mirage — Regular Meeting (2026-11-17)

View PDF Meeting page

Extracted text (via pymupdf_layout) 78950 characters

Downtown El Mirage Revitalization Plan
Detailed Implementation Strategy
Introduction
PURPOSE
This implementation strategy translates the broad recommendations from the El Mirage Downtown
Revitalization Plan into a structured action plan for the city and partner organizations. It is intended
to:
• sequence the work into manageable phases,
• assign likely lead/support roles,
• identify planning-level cost considerations,
• align projects with likely funding sources,
• focus early efforts where visible success can build momentum for later private investment.
This detailed directive is grounded in the original plan’s stated vision for Downtown El Mirage as the
city’s centerpiece and a community gathering place with a mix of housing, retail, services, public
spaces, and recreation amenities.
Implementation Strategy Framework
IMPLEMENTATION PRINCIPLES
This section outlines the core concepts from the foundational Revitalization Plan that were used to
shape this more detailed implementation strategy. These principles help frame how the City and its
partners should prioritize work, allocate resources, and evaluate opportunities while staying aligned
with the revitalization direction established in the overarching plan.
1. Start with visible wins. When trying to attract 3. Balance public actions with market
visitation to the downtown area and enhance support. Achieving implementation success
private investment, emphasis on perception, will require coordinated efforts amongst city
safety, cleanliness, and high-visibility public action, existing business support, and future
improvements should be foundational. private reinvestment.
2. Concentrate investment 4. Use Downtown’s existing assets to attract
geographically. Avoid trying to work foot traffic. Rather than starting from scratch,
everywhere at once and group improvements Bill Gentry Park, existing civic facilities, and
to create visible synergies. local community service efforts are assets
that should be leveraged.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 2

RECOMMENDED GOVERNANCE STRUCTURE
This section describes the organizational framework needed to carry out revitalization efforts
effectively. Because implementation will require ongoing coordination across departments and
external partners, a clear governance structure is essential to maintain accountability, continuity,
and momentum.
Downtown Implementation Team
Core departments:
• City Manager’s Office
• Community Services
• Development Services / Planning / Code Compliance
• Economic Development
• Public Works
• Parks & Recreation
• Police / Public Safety
• Communications / Public Information
External partners:
• commercial property owners
• downtown businesses
• neighborhood representatives
• arts/culture partners
• school/community institutions
• regional partners (e.g., MAG/ADOT where relevant)
Recommended management tools
• Create an interdepartmental implementation team.
• Appoint a dedicated project manager.
• Prepare an annual Downtown work program, this may include:
o a quarterly implementation dashboard,
o a grant pipeline tracker,
o a parcel opportunity tracker,
o a business contact database,
o an annual update to Council.

SUGGESTED IMPLEMENTATION GEOGRAPHY
This subsection identifies the priority areas where early action is most likely to generate visible
impact and support broader redevelopment goals. By concentrating effort in key nodes and
corridors, the City can create stronger synergies and avoid spreading resources too thinly across the
entire study area.
To avoid dilution of effort, the City should organize work into three priority geographies:
• Priority Area A: Civic Heart / Gathering Place
o Bill Gentry Park/ Senior Center
o El Mirage Road / Thunderbird Road intersection
• Priority Area B: Thunderbird Corridor Infill
o Vacant and underutilized parcels along Thunderbird Road
o Existing plazas and small commercial nodes
• Priority Area C: Grand Avenue Gateway
o Grand Avenue / Thunderbird gateway area
o Adjacent commercial frontage
TIME HORIZONS
This section presents the recommended implementation schedule by broad time period. It is
intended to help organize work into realistic phases so that immediate actions, mid-term initiatives,
and long-range capital projects can be sequenced in a manageable and strategic way.
To move from foundational efforts to long-term catalytic redevelopment initiatives, the
implementation program should be structured into three phases:
Phase 1: Foundation Building (0-2 Years) Phase 3: Long-Term Redevelopment (5-10
Focus on organization, branding, Years)
maintenance, business support, and low-cost Focus on transformative projects,
visible improvements. redevelopment of strategic sites, parking
improvements, and major private investment.
Phase 2: Catalytic Investment (2-5 Years)
Focus on public realm enhancements, Ongoing: Baseline Focus (Annual)
redevelopment incentives, placemaking, and Maintenance, code compliance, business
business recruitment. outreach, public events, program monitoring.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 4

COST METHODOLOGY
These are planning-level rough-order-of-magnitude (ROM) ranges for strategy development only.
They are not budget authorizations and should be refined through scoping, design, and procurement.
Cost
ROM Range Typical Use
Band
Low Under $30,000 Outreach, branding studies, bulletins, workshops, technical assistance
Moderate $30,000-$100,000 Small pilots, events, consultant studies, business support programs
Gateway signs, façade grant seed funding, small public realm
High $100,000-$500,000
improvements
$500,000-
Major Parking lots, corridor improvements, streetscape, major site work
$2,000,000+
Important cost note: land acquisition, utility relocation, major drainage work, and full roadway
reconstruction can materially increase costs. Further, floodplain/drainage considerations and Luke
AFB noise constraints may affect project feasibility and cost.
Detailed Action Plan by Strategy
This section forms the core of the implementation strategy by translating the El Mirage Downtown
Revitalization Plan’s major concepts into actionable work programs. Each strategy includes an
objective, recommended lead parties, timing, cost considerations, and specific actions intended to
guide implementation over the next several years.
Strategy 1: Clean, Safe, and Attractive Downtown
OBJECTIVE
Create confidence among residents, businesses, and investors through highly visible improvements
and proactive maintenance. The project survey identified cleanliness, safety, aesthetics, and
property maintenance as top concerns.
Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Establish quarterly Code 0-3 City operating
1.1 Downtown clean/safe Low budget
Compliance / months;
assessment walks
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 5

Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
with checklist and Public Works / then
issue tracking Police quarterly
Utilize the City’s
“Community Uplift” CDBG, City
Public Works /
relaunch and “Day of budget, sponsor
Parks & 6-12
Service” program to Low- support,
1.2 Recreation / months;
host a “Spruce Up Moderate APS/AARP style
volunteers / recurring
Downtown” community
businesses
cleanup/beautification grants
event
Create a “Downtown
Pulse” bulletin for
Communications
businesses, owners, 0-6
/ Economic City operating
1.3 and residents that months; Low
Development / budget
highlights clean and quarterly
Police
safe information
updates
Continue owner- Development
Maricopa Co-
occupied housing Services /
Home Repair
repair/property Housing 6-18
1.4 High Program; CDBG,
improvement partners/ months
HOME, CAP-
assistance in adjacent Community
style resources
neighborhoods Services
6-18
Create a small
Economic months for
façade/storefront Local support,
Development / design; 18-
1.5 improvement program High private owner
Development 36 months
for visible commercial match
services implement
properties
ation
Prioritize visible
amenity/public City CIP,
Public Works /
infrastructure fixes in APS/AARP style
Parks & 6-24 High-
1.6 Priority Area A (Bill community
Recreation/ months Major
Gentry park upgrades, grants, sponsor
Planning
landscape partnerships
improvements)
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 6

Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Shift to proactive code 0-3 Moderate
Code City operating
1.7 compliance focus in months; annual
Compliance budget
priority areas ongoing operating
Strategy 2: Define Identity, Brand, and Cultural Presence
Objective
Create a distinct Downtown El Mirage identity tied to local history, culture, and community pride, then express it
consistently through branding, signage, art, and programming.
Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Develop unified
Downtown El Mirage /
Communications City budget;
Thunderbird corridor 0-12
2.1 / Economic Moderate Arizona arts-
brand package (logo, months
Development related support
narrative, messaging,
style guide)
Design City CIP,
6-12 APS/AARP
Prepare and install Development
months; style
2.2 Downtown gateway Services / Public High
install community
signage at key entries Works
12-24 grants,
months sponsorships
Development AZ
Launch public
Services / Arts 6-18 Commission
art/mural/utility box/bus
partners / months Moderate- on the Arts,
2.3 shelter activation
schools/ Public pilot; High Arizona
program reflecting local
Works/ Parks & ongoing Humanities,
culture and history
Recreation APS grants
Economic
Create a citizen-led arts 0-6 City operating
2.4 Development / Low
or culture working group months budget
Communications
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 7

Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Parks &
Build annual cultural
Recreation/
programming calendar 6-18 sponsors, arts
Communications Moderate
2.5 tied to Downtown months; grants, City
/ business group/ - High
businesses and public recurring event budget
Art Partners
spaces
(WVAC & WHAM)
Integrate brand
requirements into City
Communications 6-12
marketing, event City operating
2.6 / Economic months; Low
materials, and budget
Development ongoing
development/recruitment
packets
Pursue implementation
partnerships with Local
partner MOUs /
First Arizona, LISC, CPLC, Economic 6-18
2.7 Low program
arts groups, and regional Development months
referrals
business support entities
named in the report
Strategy 3: Build Healthy Neighborhoods and Stronger
Connections
Objective
Improve social cohesion, neighborhood identity, non-vehicular connectivity between neighborhoods
and downtown destinations while reinforcing Downtown as a community meeting place. Better
walkability ranked among the highest community priorities.
Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Identify and convene Planning / Parks
6-12 City operating
3.1 resident leaders in study & Recreation / Low
months budget
area neighborhoods Communications
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 8

Potential
ROM
Ref Action Lead / Support Timeline Funding /
Cost
Delivery
Support resident-led
micro-projects (block
parties, cleanup days, 6-18
Development Moderate AARP/APS-
3.2 small beautification, months;
services annual style grants;
shade/seating, planters, recurring
“Community Uplift”
events)
Implement neighborhood Development
6-24
stabilization and housing services/ City operating
3.3 months; Moderate
rehabilitation program Community budget
ongoing
efforts Services
Prepare conceptual plan
for walkable, north/south
multimodal connector
corridors to Thunderbird Public Works / City budget;
6-18
3.4 Road and larger city Planning/ Parks & Moderate transportation/
months
planned trail system, Recreation CIP sources
including candidate
corridors like 119th Ave /
El Frio St.
Implement first segment
pedestrian/bike/
Public Works/ CIP, grants,
accessibility 18-36 High-
3.5 Parks & phased
improvements in a months Major
Recreation construction
priority connector
corridor
Strategy 4: Strengthen Business Recruitment, Retention, and
Expansion
Objective
Grow Downtown’s business base by supporting existing operators, improving recruitment readiness,
and directing businesses to the right sites.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 9

Potential
Ref Action Lead / Support Timeline ROM Cost Funding /
Delivery
Build and
maintain
accurate
Economic 0-6 months; City operating
4.1 database of Low
Development ongoing budget
Downtown
business and
property owners
Conduct
systematic Start in 3
Low-
business Economic months; City operating
4.2 Moderate
retention visits Development quarterly/ budget
annual
and issue ongoing
tracking
Create
recruitment
packet with
Economic
market data,
4.3 Development / 0-6 months Moderate City budget
amenities,
Communications
demographics,
and Downtown
vision
Establish target
business list
aligned with
survey
responses: Economic 0-6 months; City operating
4.4 Low
dining, coffee, Development annual refresh budget
neighborhood-
serving retail,
recreation/culture
uses
Host biannual
broker/property
owner Economic 6-12 months; City operating
4.5 Low
roundtables on Development biannual budget
vacancies,
leasing barriers,
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 10

Potential
Ref Action Lead / Support Timeline ROM Cost Funding /
Delivery
and site
opportunities
Improve City web
presence for
Communications
Downtown
4.6 / Economic 6-12 months Moderate City budget
business
Development
attraction and
site marketing
Market smaller
contiguous
parcels together Economic
private broker
to improve Development / Low-
4.7 6-24 months network; City
development Planning / Moderate
facilitation
potential, brokers
especially along
Thunderbird Rd
Pilot pop-up
sponsorships,
retail/vendor
local
kiosk/shared- Economic
entrepreneurship
4.8 space activation Development / 12-24 months Moderate
programs, Local
in vacant property owners
First AZ
storefronts or
resources
underused sites
Form a
Downtown Economic
City operating
4.9 business group or Development / 24-36 months Low
budget
merchant businesses
association
Launch
Downtown News
Communications
Flash e- 6-12 months; City operating
4.10 / Economic Low
newsletter for ongoing budget
Development
owners and
businesses
Formalize ribbon Communications Start within 6
City operating
4.11 cuttings, press / Economic months; Low
budget
releases, and Development ongoing
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 11

Potential
Ref Action Lead / Support Timeline ROM Cost Funding /
Delivery
recognition
program for
reinvestment
Develop shared
parking / on-
Planning / Public City budget for
street parking
Works / study; later
4.12 strategy for 12-24 months Moderate
Economic CIP/private cost
smaller parcels
Development share
along
Thunderbird Road
Evaluate public
parking
opportunities 18-36 months
Moderate for
west of El Mirage study; 36-60 CIP, possible
Planning / Public study; Major
4.13 Rd near Bill months development
Works for
Gentry Park and implementation agreements
construction
east of El Mirage if justified
Rd near transit
stops
Strategy 5: Encourage Bold, Distinctive, and Flexible
Placemaking
Objective
Create a Downtown experience that is memorable and unique by allowing flexible programming,
tactical urbanism, arts/business collaboration, and signature public-space development.
Potential Funding
Ref Action Lead / Support Timeline ROM Cost
/ Delivery
Adopt a flexible
activation policy/ Planning /
5.1 process for Economic 0-6 months Low City operating
temporary uses Development budget
such as food
trucks, pop-ups,
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 12

Potential Funding
Ref Action Lead / Support Timeline ROM Cost
/ Delivery
art markets, and
small events
Identify 2-3
tactical urbanism Planning / Public
5.2 pilot sites in Works / Parks & 6-12 months Low City budget
Priority Areas A Recreation
and B
Implement first
tactical pilot:
Parks &
food truck court,
Recreation / sponsorships,
5.3 temporary 12-24 months Moderate
Economic grants, vendor fees
seating/plaza, or
Development
weekend market
concept
Parks &
Recreation/
Create “Art in El
Communications
Mirage”
/ business group/ 12-24 months; Moderate arts/humanities
5.4 event/program
Economic recurring annual grants, sponsors
linking artists and
Development/
businesses
Art partners
(WHAM & WVAC)
Prepare concept
plan for a
signature
Planning / Parks
gathering space Moderate - City budget;
5.5 & Recreation/ 12-24 months
near Bill Gentry High philanthropy/grants
Public Works
Park /
Thunderbird / El
Mirage Rd node
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 13

APPENDIX A:
Neighborhood Stabilization Guide
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 14

EL MIRAGE DOWNTOWN REVITALIZATION PLAN NEIGHBORHOOD STABALIZATION GUIDE | 1

Neighborhood Stabilization Guide
Introduction
The following recommendations are intended to strengthen and stabilize residential neighborhoods across the City
of El Mirage. The principal aim of the recommendations is to make neighborhood revitalization efforts more visible,
accessible, and responsive to residents and their needs. The recommendations identify a menu of action items
organized under three categories that include phased improvements to the City’s Code Compliance webpage,
operational updates for code compliance services, and considering established programs of partnership for increased
community code involvement. Overall, Code Compliance’s objectives and goals are to encourage home and business
owners through education, literature, enforcement, and assistance to gain voluntary compliance and always keep
their properties clean and free.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN NEIGHBORHOOD STABALIZATION GUIDE | 2

CATEGORY 1
Code Compliance Webpage Modernization
The El Mirage Code Compliance webpage is heavy on text and
CATEGORY 1 RECOMMENDATION
information. The webpage directs viewers to make complaints
via a direct email, phone call, or in-person at El Mirage City FUNDING MECHANISM
Hall. Only the email option has a link for online users. • Utilize existing IT and Development
Other municipalities in the Phoenix area have code Services budgets for implementation of
compliance webpages that are interactive and service- First Level Investments for Code
oriented in design. These modern types of code compliance Compliance webpage modernization
webpages provide residents with appealing graphical updates.
layout/hierarchy, educational content for different violations • Use the City’s SmartGov platform as the
(with visuals), and online submittal complaint platforms with operational back end of online reporting
supporting tracking tools. tool for residents to avoid duplicate
The following are levels of investments for updates to the Code licensing, hosting, data migration,
Compliance webpage for improved resident use and visibility cybersecurity review, and staff training
of the role of compliance. costs.
Levels of Investment
First Level
• Code Compliance webpage reorganization that includes
o a digital environment that supports both desktop and mobile devices
o interactive features (i.e., “Report a Violation” button)
o content organized by violation categories
o violation example photos
o text lists redesigned into card-based layout graphics
o more prominent FAQs, and downloadable informational handouts.
Second Level
• Code Compliance webpage updates that include the implementations of
o Online violation reporting and service requests functions
o Photo uploads for reporting of compliance violations
o Case-status tracking tool.
Third Level
• Code Compliance webpage updates that include
o Communication of successes frequently by creating online dashboards to report
performance metrics
o Addition GIS mapping tool for tracking ongoing compliance cases.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN NEIGHBORHOOD STABALIZATION GUIDE | 3

Category 2
•
Code Compliance Operations Update
Code Compliance will always continue to provide effective CATEGORY 2 RECOMMENDATION
enforcement of city code violations whether by complaint or
FUNDING MECHANISM
proactively, with the goal to obtain compliance and preserve
communities within the city. • Leverage recent technological
advances to develop cost-saving
The following are levels of investments for updates to the Code
efficiencies of current code
Compliance operations for improved resident use and visibility of the
compliance operations and
role of compliance.
processes, including automated and
Levels of Investment digital notices.
First Level • Use cost-savings to provide code
compliance more focused on the
• Code Compliance conducts daily routine inspections encouragement of community
for code violations. compliance and engagement.
• The city is broken up in 3 areas, and each area has an • Explore Community Development
assigned Code Officer, who patrols their areas daily to Block Grant (CDBG) programs for
investigate complaints and concerns with the eligible neighborhoods, if
communities. applicable.
Second Level
• Attend community meetings and events to spread awareness.
• Emphasize education and voluntary compliance first.
• Promote success stories and before-and-after neighborhood improvements.
• Collaborate with residents, HOAs, and businesses.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN NEIGHBORHOOD STABALIZATION GUIDE | 4

Category 3
Consider External Partnership Program
for Compliance Assistance
The City of El Mirage can setup a formal partnership similar to the
Community Abatement & Revitalization Effort (C.A.R.E.) Program in the
nearby City of Glendale. The C.A.R.E. Program is an initiative designed CATEGORY 3
to provide assistance to residents who may be physically and/or RECOMMENDATION FUNDING
financially unable to correct minor property violations on their own. The MECHANISM
local code compliance staff recognized that some residents, including
seniors, veterans, single parents, and physically challenged • Explore intergovernmental
individuals, do not have the resources or physical ability to complete agreement with Maricopa
necessary property maintenance. County Adult Probation or
similar group.
Recognizing the need and using existing municipal resources, Glendale
Code Compliance staff partnered with Maricopa County Adult • Repurpose recovered nuisance-
Probation to provide supervised community service labor that directly abatement funds to replenish
benefits Glendale neighborhoods. Through this partnership, municipal expenditures for
probationers are able to complete required community service hours external partnership programs
while assisting residents with minor property improvements and in this recommendation.
cleanup efforts. Services provided through the C.A.R.E. Program • Consider the feasibility of local
include:
sponsorships and in-kind
• Weed removal donations to implement such
partnerships.
• Moving small items prohibited from public view
• Trimming shrubs and small trees
• Spreading rock and underlayment
• Painting walls
The C.A.R.E Program started in 2024 and currently operates through internal funding and staff dedication
without a dedicated departmental budget.
EL MIRAGE DOWNTOWN REVITALIZATION PLAN NEIGHBORHOOD STABALIZATION GUIDE | 5

APPENDIX B:
Façade Improvement Program
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 15

El Mirage Commercial Business Facade
Improvement Program
Policy Framework & Implementation Guide
This program is designed to address aging or outdated façades and inconsistent aesthetics
that currently limit the economic and civic value of commercial business areas within El
Mirage as displayed on Figure 1. To promote high-quality exterior improvements by reducing
the financial burden on commercial property owners and businesses, the City seeks to
encourage private investment, enhance safety and accessibility, and strengthen community
pride throughout El Mirage.
SECTION I: LEGAL AUTHORITY
This program is adopted pursuant to:
• Arizona Constitution, Article 9, Section 7
• A.R.S. § 9-240(B) – General powers of cities and towns
• A.R.S. § 9-462 et seq. – Zoning and land use authority
• A.R.S. § 9-500.05 – Economic development agreements
• City of El Mirage Municipal Code (as applicable)
• Federal requirements (if using CDBG/ARPA funds)
The City Council finds that:
1. Commercial business revitalization serves a valid public purpose by minimizing
blight, enhancing safety, increasing property values, strengthening the tax base, and
promoting economic vitality.
2. In exchange for any public funds granted, the City will receive direct, bargained-for
consideration in the form of defined, publicly visible façade improvements and the
property owner’s enforceable covenant to maintain those improvements, the fair
market value of which will equal or exceed the value of the assistance provided.
Anticipated indirect benefits, such as increased tax revenue, higher property values,
and general economic stimulus, support the City’s public-purpose determination but
are not relied upon as consideration.
1

3. This program is structured to comply with the Arizona Gift Clause: the consideration
the City receives — the completed façade improvements and the recorded
maintenance covenant enforceable against the owner and its successors — is not
grossly disproportionate to the reimbursement paid, which is limited to a matching
share of documented, verified project costs.
SECTION II: PROGRAM PURPOSE
The Commercial Business Facade Improvement Program is established to:
• Improve the visual appearance and safety of commercial corridors
• Stimulate private investment
• Enhance property values and sales tax generation
• Reduce blight and code violations
• Support small and locally owned businesses
SECTION III: ELIGIBILITY REQUIREMENTS
A. Eligible Applicants
• Property owners or tenants of commercial buildings with an Urban Corridor (UC)
zoning designation that are located within El Mirage as displayed on Figure 1.
• Commercial tenants must have written property owner authorization to participate in
the program.
• Properties must be current on all taxes, utilities, and city fees.
• Properties shall have no outstanding zoning or building code violations (or must
resolve prior to reimbursement).
B. Ineligible Applicants
• Residential-only properties (i.e. duplex, single-family, or multi-family dwellings).
• Properties with pending bankruptcy or foreclosure.
• Applicants with unresolved litigation against the city.
• New construction, where the structure is being increased by more than fifty percent
(50%).
El Mirage Commercial Business Facade Improvement Program 2

Figure 1: Façade Improvement Program Area
SECTION IV: ELIGIBLE IMPROVEMENTS
Only improvements to facades and streetscapes that are directly visible from a public right-
of-way are eligible for funding.
A. Eligible Façade Improvement Costs may include, but are not limited to:
• Exterior paint and stucco repair
• Façade redesign and architectural enhancements
• Murals or other artwork (if they’re a permanent enhancement, visible from a public
right-of-way and don’t function as a sign/commercial advertising)
• Masonry repair
• Doors and window replacement or repair (including security bar removal)
El Mirage Commercial Business Facade Improvement Program 3

• Shade structure placement, replacement, or repair
• ADA accessibility upgrades
• Exterior lighting
• Signage (compliant with City code)
• Awnings and canopies
• Landscaping and irrigation improvements
• Exterior code compliance improvements that are part of a larger project which
includes eligible improvements listed above.
B. Ineligible Façade Improvement Costs specifically include:
• Interior improvements
• Inventory, equipment, or tools
• Routine maintenance
• Roof replacement (unless façade-related and visible)
• Any “In-kind” labor (work performed by owner/tenant)
• Work solely used for remediation of existing zoning or building code violations
• New construction (standalone buildings)
• Work began prior to grant approval
SECTION V: FUNDING STRUCTURE
A. Program Funding
The annual Commercial Business Facade Improvement Program total funding allocation
shall be determined by the City Council during the fiscal year budgeting and approval
process.
B. Grant Type
This program is established as a reimbursement-based matching grant. Applicants selected
for funding shall receive a Notice to Proceed and conditional grant award identifying the
maximum reimbursement amount reserved for the approved project. Grant funds shall not
El Mirage Commercial Business Facade Improvement Program 4

be disbursed until the approved work is completed, inspected, and all reimbursement
requirements have been satisfied.
Successful applicants must wait 2 years after a grant award before reapplying for additional
grant awards. Applicants not approved during one funding cycle may reapply for future
cycles, but are not automatically rolled over into the next cycle.
C. Grant Award Amount
• Will reimburse up to 50% of eligible project expenses
• The maximum grant contribution per property from the city shall be determined
annually at the time of City Council budget approval.
OR
The annual grant contribution shall be a maximum of $25,000 and minimum of $5,000
per property address. There is a total maximum cap of $50,000 awarded to any single
property address over a 5-year period.
D. Minimum Project Cost
• Minimum total project cost: $10,000
E. Payment Method
• Applicants shall not commence grant-funded work until receiving written
authorization from the City in the form of a Notice to Proceed, or another written form
of approval provided by the City.
• Projects must be completed within one (1) year of the City’s official award notification
unless otherwise approved.
• Reimbursement shall occur only after:
• Completion of approved work.
• Submission of paid invoices and supporting documentation.
• City inspection approval.
• Verification that the completed improvements substantially conform to the
approved application.
• A project that alters approved plans without prior approval may be disqualified
for payment.
• Designs not completed as approved may be disqualified for payment.
El Mirage Commercial Business Facade Improvement Program 5

SECTION VI: PROGRAM IMPLEMENTATION AND APPLICATION
A. Required Documentation
Application forms provided by the Development Services Department must be completed
and signed with original signatures of all required parties. Electronic application submittals
will also be accepted.
All required supplemental application materials must be recent and valid at the time of
application submission.
Preliminary project estimates of the eligible costs and therefore the dollar amount of the
grant requested is determined at the time of application.
• All applicants must provide itemized cost estimates of labor and specific material
quantities with the application.
• Any application that includes estimates for labor must include a detailed quote for
the services to be completed and the hours assigned.
• No reimbursements for “In-Kind” labor will be awarded.
The grant agreement contract must be signed by the applicant and submitted as part of the
application package to be presented for review and approval.
IRS Form W-9 (Request for Taxpayer Identification Number and Certification) and an active
City Business License must be submitted at the same time as the Facade Improvement
Program application.
If applicable, the “Owner Consent Form” must also be submitted at the same time as the
Facade Improvement Program application.
Any required permits (i.e. building or electrical) must be reviewed and approved by the City
of El Mirage prior to commencement of façade work.
Applicants submit the following with their application packet:
• Completed application form, including a detailed narrative.
• IRS W-9 form and proof of an active City-issued business license.
• Proof of property tax payment and code-compliance clearance.
• Owner-tenant consent form (if tenant applies).
• Recent color photographs of existing façades.
El Mirage Commercial Business Facade Improvement Program 6

• Elevations, material samples, and color boards of proposed improvements
• Detailed cost estimate from a licensed contractor. Any total project cost over
$20,000 shall provide a minimum of two cost estimates. Any total project cost over
$30,000 shall provide a minimum of three cost estimates.
B. Grant Application Timeline
• _______Program announcement/advertisement.
• _______Applications due.
• _______Panel review and applicant selection.
• _______Program implementation.
C. Grant Evaluation Criteria
• All facade design proposals must meet applicable zoning requirements of the El
Mirage Zoning Ordinance, and all applicable Building Codes;
• The degree to which a project contributes to a cohesive and recognizable Downtown
El Mirage identity shall be considered during scoring. Projects that incorporate
preferred design elements identified by the City, including architectural detailing,
desert-inspired design, public art, culturally significant themes, historically inspired
features, pedestrian-oriented storefront enhancements, decorative lighting,
enhanced landscaping, or district branding elements, shall receive favorable
consideration during the evaluation process.
• Priority consideration will be given to proposals that make visible and significant
design contributions, and which contribute to the overall program’s purpose:
o Improve the visual appearance and safety of commercial corridors
o Stimulate private investment
o Enhance property values and sales tax generation
o Reduce blight and code violations
o Support small and locally owned businesses
• Structural design configuration, exterior finishes, and building material choices will
all influence the decision-making process. Please include as many samples and
support information as possible with your application.
• When choosing an exterior paint scheme or color palette, light, neutral colors should
be used on buildings. Deeper colors should be used for accenting. Bright colors, and
unusual patterns and color schemes are discouraged.
• Grant evaluation scoring shall be weighted as follows:
El Mirage Commercial Business Facade Improvement Program 7

Criteria Weight Description
Visual Impact & Public 30% Alignment with Downtown Revitalization
Benefit Plan; before/after evaluation of
submitted application material.
Economic Benefit 25% Anticipated business viability
enhancement.
Placemaking 25% Use of unique design approach,
material, or application.
Feasibility & Readiness 20% Permits secured; realistic project
timeline
D. Project Approval and Notice to Proceed
• El Mirage Development Services and Economic Development staff will be
responsible for initial review of the application for completeness of all required
elements. Complete applications will then be forwarded to the city identified Façade
Program Committee for review and recommendation. By simple majority vote, the
Committee may vote to approve the application and enter into the formal agreement
process.
• Approved applicants shall receive a Notice to Proceed identifying the approved
scope of work and reserved grant amount.
• Work initiated prior to issuance of a Notice to Proceed is ineligible for reimbursement
unless previously authorized by the City.
• Reimbursement shall occur upon project completion, submission of required
documentation, and City inspection approval.
E. Adequate Consideration
Each participant must sign a Facade Improvement Agreement including:
• Agreement to maintain the funded improvements for a minimum five (5) year period,
in accordance with the approved scope of work and the maintenance standard
specified in the Agreement.
• During this period, the property owner is responsible for keeping approved
improvements in their fully maintained, complete, and finished condition. If the
facade is purposefully altered, changed, redesigned, reconfigured, damaged,
destroyed, deteriorates, decays, or falls into obvious disrepair, the owner may be
subject to the claw-back provision below.
El Mirage Commercial Business Facade Improvement Program 8

• The Façade Improvement Agreement shall specify the approved scope of work, the
standard and term of the maintenance obligation, and the reimbursement amount.
The City shall record the executed Agreement with the Maricopa County Recorder
as a development agreement under A.R.S. § 9-500.05 within ten (10) days of
execution, so that its maintenance and recapture obligations run with the property
and bind the owner and all successors in interest and assigns for the duration of the
maintenance period.
F. Claw-back Provision
Property owners found in noncompliance with a grant award will be required to repay to the
City (recapture) an amount equal to the following percentage of the total grant award,
according to the following time frames after final reimbursement:
• 0 – 24 months 100% claw-back
• 25 – 36 months 75% claw-back
• 37 – 48 months 50% claw-back
• 49 – 60 months 25% claw-back
Property owners who return their facade to a condition of compliance shall remain in the
program with favorable standing and continue to be eligible for grant awards in the future.
Properties, and property owners, who fail to gain or regain compliance must pay the
recapture amount assessed within 14 days of notice and will no longer be eligible for future
grant awards on any eligible project.
Overdue recapture amounts will be placed as a lien on the property and subject to collection
in the same manner as property taxes, to the extent authorized by law.
G. Rejected Applications
• Applicants not selected for funding shall receive written notice of the City’s
determination.
• Rejected applications may be revised and resubmitted during a future funding cycle.
• Rejection of an application does not affect eligibility for future program participation.
El Mirage Commercial Business Facade Improvement Program 9

APPENDIX C:
Branding
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 16

DOWNTOWN EL MIRAGE BRANDING + WAYFINDING
Through analysis, engagement, and on-the-ground
PROJECT FRAMING VISION observations, several key themes emerged that help
+ shape a downtown identity framework that is authentic,
practical, and responsive to community values.
Understanding Downtown El Mirage Before Designing Its Future
''
--------
Downtown El Mirage has evolved organically CIVIC HEART INVESTMENT Identity development
Historic townsite and CORRIDOR is not about creating
over decades through neighborhood growth, community anchor Thunderbcrd R<>3d as the
center'ed on Gfntry Park front&ge primary commercial and opportunity something new for
agricultural roots, civic investment, and and civic institutions. for growth,
its own sake. It is
corridor development.
about translating
9 1 tl M , 5 .....::::: ... : --=3==­ ,IL___ what already exists
Rather than redefining downtown, this
NEIGHBORIOOD REGIONAL into a coherent
project seeks to clarify and strengthen FABRIC GATEWAY
RMidcntial neighboffloods Grand Avenue / US 60 visual and
the places, stories, and connections that that form the cultural and as the primary regional
family-cente<N:1 of downtown. backbone navigational system. ''
already shape community life. •
WHERE WE'VE BEEN Over the past several months. the project team has been developing a coordinated branding and wayfinding foundation for Downtown El Mirage
through community engagement, identity exploration, downtown analysis, and preliminary design development. The following work reflects the
Work Completed to Date emerging alignment between placemaking. branding, connec·tivity, and revitalization opportunities.
0
G 8 cm, J C, G Cl
- -
PROJECT FRAMING > COMMUNITY ENGAGEMENT > DOWNTOWN ANALYSIS > BRANDING + IDENTITY > WAYFINDING + > PRELIMINARY
+ VISIONING + OUTREACH + STRUCTURE DEVELOPMENT PLACEMAKING CONCEPTS DESIGN OPTIONS
• Project goals • Spring Fair outreach • Corridor obsel'vations • logo concepts • Sign family dil'ection • Integrated identity systems
• Downtown identity exploration • Survey engagement • Activity nodes • Color palettes • Gateway concepts • Visual direction refinement
• Brand journey framework • Stakeholder convel'sations • Connectivity opportunities • Typogl'aphy systems • 0istrict continuity • Branding and wayfinding alignment
• Community obsel'Vations • Gateway exploration • 0owntown ch.al'3cter themes • Pedestri.an experience ideas • Community review preparation
Bui/cling a cohesive downtown identity
through layered planning. engagen1ent, @ --------+ (S) ________ ...,. @ ---------► 0 -------+ ®
branding, and wayfinding. LISTEN DISCOVER DEFINE DESIGN CONNECT
- I:g· 11,, ,·




APPENDIX D:
Executive Summary of Marketing Campaign
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 17

Downtown Survey
City of El Mirage Marketing Campaigns
The marketing campaign for the Downtown Survey generally
ran from June 1 to August 31, 2026, and utilized a full
complement of City communication and marketing tools.
There were four separate messages/campaigns:
o Take the Survey by clicking the link/scanning the QR
code, and win a prize
o Attend the pop-up Workshops at Family Dollar
(citywide)
o Invitation to attend Resident Advisory Group meetings
(targeted)
o Social media poll, non-statistical, on preferred
amenities (Nextdoor only)
Strategies and Platforms
1. Social media
a. Reels (video)
b. Posts (graphic/photos)
c. Poll (Nextdoor only)
d. Events within the platform (Facebook &
Nextdoor)
2. Website (Homepage News & Announcements, Dev.
Services Dept., Calendar)
3. Digital signs
a. Outdoor Billboards at Gateway and Bill Gentry
Park
b. City Hall Lobby Screens
4. Mass Notification MyAlerts – City News and Updates
5. Print media
a. Utility bill inserts
b. Flyers (8.5 x 11)
c. Posters
6. In-person outreach
a. Spring Faire booth (April)
b. Community pop-up workshop events (2)
(Family Dollar)
c. Resident Advisory Group meetings (Riverview School and Senior Center)
City Marketing Campaigns for the Downtown Survey
1

Social Media Summary
The social media campaign consisted of 84 posts on
the City’s five channels, utilizing a combination of
static posts and reels.
Across Facebook, Instagram, Nextdoor, X, and
YouTube, the Downtown Survey campaign delivered
strong awareness for survey-type content,
reaching 14,268 unique viewers/reach and
generating 24,777 total views across platforms. The
campaign successfully informed residents, stimulated
conversation about community planning, and
achieved broad multi-platform visibility, making it a
high-performing example of municipal survey
communication.
On Facebook, survey posts reached 145% of our
follower base (7,902 followers), demonstrating
substantial visibility among non-followers and local
residents.
Instagram reached virtually 100% of its follower
base (2,785), indicating complete saturation of the
audience there. Even platforms with lower expected
engagement for civic survey content—such as X
(2,329 followers) and YouTube (151 subscribers)—
still contributed meaningful supplemental exposure.
With survey content being informational rather than
entertaining, the campaign’s 122 reactions, 29
verified shares, and active public discussion
(especially on Nextdoor’s 13,759-member
community) reflect solid and appropriate
engagement patterns.
Compared with El Mirage’s population of 36,000
residents, the campaign reached an estimated
35–40% of the community, an exceptionally
strong outcome for civic survey messaging.
This level of visibility and engagement indicates that
the outreach successfully informed residents,
stimulated meaningful conversation, and ensured
widespread awareness of the Downtown Survey
across the city. Interpreted through the lens of survey outreach—which typically yields low reactions, low
saves, modest follower growth, and limited viral spread—the metrics exceed expectations.
City Marketing Campaigns for the Downtown Survey
2

Website
Homepage News: Downtown Survey
The Downtown Survey was promoted on several pages of the
City’s website, including the homepage and Community areas,
where it appeared under “News & Announcements” from June 1
to August 31, 2026.
In addition, it was featured on the Development Services
Downtown Revitalization page.
Digital Billboards
The Downtown Survey campaign was also featured on both of
the City’s digital billboards near Gateway Park and Bill Gentry
Park from June 12 to August 31, 2026. In addition, during that
period, a promotional graphic was part of the rotation on City
Hall monitor displays in the lobby and vestibule of Council
Chambers.
Digital Signs-Billboards
Mass Notification
The City sends periodic updates to utility
customers, business license holders, and
subscribers through its MyAlerts system
(text/email/App). The Downtown Survey was
highlighted three times during the June -
August survey period.
City Marketing Campaigns for the Downtown Survey
3

Print
Print media was utilized in a variety of ways to promote the
survey, utilizing QR codes and through the shortcut link
www.ElMirageAZ.gov/Downtown. Due to the timing of deadlines
for the quarterly newsletter, this campaign was not able to be
featured in that magazine, but several other print methods were
utilized.
• Utility bill inserts (August)
• Flyers (200) were placed at city and partner facilities and
handed out in person by staff (see below).
.
• Posters (A-frame and easel) posters were placed at
special events (2026 Spring Faire), at Customer Service,
and on-site at the pop-up workshops (see below).
Utility Bill Insert (August)
City Marketing Campaigns for the Downtown Survey
4

Pop-up Workshops
The City promoted the two in-person pop-up tables, or “workshops”
conducted by Michael Baker Consulting on 6/19/2026 and 6/26/2026 from
9:30 a.m. to 11 a.m. at Family Dollar.
• Posts and “Events” were created with the social media
platforms Facebook & Nextdoor, inviting residents to these
in-person workshops
• Flyers (200) were hand-delivered to downtown businesses
by staff members of Economic Development and
Intergovernmental & Public Relations (IPR) on 6/19/2026.
Copies were also provided to the consulting firm for further
distribution.
• The consulting firm provided survey materials, staff, and
posterboards for the “pop-up workshop” event.
City Marketing Campaigns for the Downtown Survey
5

Resident Advisory Group
Two resident advisory group meetings
were held on 7/30/2026. The City
promoted the resident advisory group
meetings through targeted invitations
to neighborhoods identified by the
Development Services Department
and consultant teams.
A letter was mailed via USPS to all
residents in the downtown advisory
group areas. In addition, the City’s
mass notification system (text and
email) was utilized to notify residents
and subscribers in the specific
neighborhoods of “Old Town” and
“Arizona Brisas.”
This invitation was supported by a Nextdoor event invitation.
Nextdoor Poll
The City conducted two polls on Nextdoor, asking, “What is the biggest
improvement you would like to see in the El Mirage downtown area?” The
first one ran for one week, ending July 9, 2026. The second ran for the
month of August. The polls received 652 combined impressions and 19
responses.
1. Biking/walking infrastructure (37%)
2. Benches, planters, decorative lights (streetscaping) (21%)
3. Murals, sculptures, art wraps (public art) (21%)
4. Green Spaces (16%)
5. Welcome, directional signs
(wayfinding) (5%)
Comments included:
• Better lighting on old el mirage streets
• I didn’t know El Mirage had a downtown.
• Me either
• I am sorry. I am not trying to be dumb or
mean but can you tell me where the
downtown is? The map seems to indicate
Grand Ave? I would be happy to complete
the survey if I actually knew where it was.
City Marketing Campaigns for the Downtown Survey
6

Glossary
Each definition explains what the metric means on that specific platform and how to interpret it.
Cross-Platform Social Media Metrics for the Downtown Survey Campaign and Definitions
Facebook Metrics
Facebook Impressions = 13,613
Definition: The total number of times your Facebook content (post, photo, video, etc.) appeared on any user’s screen.
Details: Each time a post or Reel loads, it counts as one impression. If the same person sees your post multiple times,
each view is counted separately.
Facebook Interactions = 96
Definition: The total number of actions people took on your Facebook content.
Details: This includes likes, comments, shares, link clicks, video views, reactions, and any other user activity that
indicates engagement.
Facebook Net Follows = 8
Definition: The number of new followers minus the number of unfollows over the reporting period.
Details: A positive number means your Facebook audience grew.
Facebook Reactions = 79
Definition: The emotional-response buttons users click on your post.
Details: Includes Like, Love, Care, Haha, Wow, Sad, and Angry, showing how people feel about your content.
Facebook Saves = 3
Definition: The number of times users saved or bookmarked your post to return to later.
Details: Saves signal high content value because users consider the information worth revisiting.
Facebook Shares = 29
Definition: The number of times Facebook users re-shared your post to their own feed or timeline.
Details: Shares extend your content to new audiences outside your existing followers.
Facebook Viewers = 11,474
Definition: The number of unique people who viewed your video or visited your content.
Details: Each person is counted once, no matter how many times they watched.
Facebook Views = 17,463
Definition: The number of times your video or content was played.
Details: If one individual watches your video three times, that counts as one viewer and three views.
City Marketing Campaigns for the Downtown Survey
7

Instagram Metrics
Instagram Impressions / Reach = 2,794
Definition: The number of unique Instagram accounts that saw your Reel or post.
Details: Reach counts unique viewers; impressions count total load views. Reach is your best indicator of how widely
your content spread.
Instagram Views = 3,991
Definition: The number of times your Instagram Reels or videos were watched.
Details: Each watch counts as one view, including repeat plays from the same user.
Instagram Likes (Reactions) = 51
Definition: The number of users who tapped “Like” on your Instagram content.
Details: A simple way users show positive acknowledgment of your post.
Instagram Shares = 16
Definition: The number of times users shared your Reel or post via direct messages or to their Instagram Story.
Details: Shares greatly increase your visibility because they move your content into private and semi-private spaces.
Instagram Saves = 6
Definition: The number of times users stored your post in their Saved collection.
Details: Saves are a strong indicator of value and user intent to revisit the information later.
Instagram Follows = (varies by post)
Definition: The number of new followers gained from Instagram posts.
Details: Follows reflect audience growth and indicate content resonance with new users.
X / Twitter Metrics
X Views = 2,762
Definition: The number of times your posts were displayed on screens.
Details: A “view” occurs when a post becomes visible in someone’s timeline, even if they don’t interact with it.
X Likes = 3
Definition: The number of users who tapped “Like” on your Tweet.
Details: Likes signal positive reception but are often lower for government or survey-based content.
X Replies = 1
Definition: The number of public responses written directly under your Tweet.
Details: Replies reflect conversation and user willingness to engage.
X Reposts = 0
Definition: The number of times users re-shared your Tweet to their own feed.
Details: Reposts greatly extend reach but are uncommon for survey content.
City Marketing Campaigns for the Downtown Survey
8

X Bookmarks = 1
Definition: The number of users who saved your Tweet privately.
Details: Bookmarks indicate the user may revisit or share the content later.
Nextdoor Metrics – Survey (does not include the poll)
Nextdoor Impressions = 547
Definition: The total number of times your Nextdoor post appeared in residents’ feeds.
Details: Each time your post loads for a member, it counts as an impression.
Nextdoor Thanks = 0
Definition: The closest equivalent to a “Like” on Nextdoor.
Details: “Thanks” acknowledges positive sentiment but is often low for survey content.
Nextdoor Replies = 35 (across posts)
Definition: The number of public comments posted under your survey outreach.
Details: Replies reflect meaningful conversation and resident interest, often more valuable than reactions.
Nextdoor Attachments / Link Clicks
Definition: The number of attachments (photos, maps, videos) included in posts and any link interactions.
Details: These items help clarify content and increase engagement with informational posts like surveys.
Nextdoor Audience Size = 13,759 members
Definition: Total users who can potentially see your posts.
Details: Not every member receives the same post because visibility depends on neighborhood scope and algorithm
behavior.
YouTube Metrics
YouTube Views = 14
Definition: The number of times your video was watched on YouTube.
Details: Views include repeat plays and are counted after a few seconds of active watch time.
YouTube Watch Time (Seconds Viewed)
Definition: How long viewers spent watching your video.
Details: Higher watch time indicates deeper engagement with informational content.
YouTube Subscribers = 151
Definition: The number of people following your YouTube channel.
Details: A subscriber is more likely to see future videos and receive notifications.
YouTube Likes / Comments (if any)
Definition: Standard engagement indicators similar to other platforms.
Details: These reflect viewer sentiment and interaction with your video content.
City Marketing Campaigns for the Downtown Survey
9

APPENDIX E:
Survey Results
EL MIRAGE DOWNTOWN REVITALIZATION PLAN DETAILED IMPLEMENTATION STRATEGY | 18

November 2026
El Mirage Downtown Revitalization
Community Input Survey Analysis

Executive
Summary
T h e E l M i ra g e D ow n t ow n One of the most consistent findings
Revitalization Community survey was a widespread lack of awareness
received 208 responses collected of a defined downtown district,
between March 20th and August with many long-term residents
31st, representing residents from unaware the city had a downtown
across multiple neighborhoods at all. Among those who recognize
and offering a broad cross-section it, the area was most commonly
of community perspectives. This referred to as “Old El Mirage” or “Old
survey captured feedback across Town El Mirage,” with Bill Gentry
several key topic areas, including Park, the library, fire station, and
existing conditions, community former city hall serving as primary
identity, desired improvements, and anchors, underscoring the need for
long-term vision for the area. stronger district identity, improved
wayfinding, and a more cohesive
The survey results reflect a visual presence.
community that is proud of El
Mirage’s history and strong sense Residents described the downtown’s
of community but feels like its character as “hardworking,”
downtown lacks a clear identity. “evolving,” and “friendly,” balanced
Residents generally view the area against candid acknowledgments
as the civic and historic heart of of unrealized potential. Demand was
the city, centered around parks, strong for more local businesses,
public facilities, local businesses, restaurants, improved streetscaping,
and community events. Common shade, lighting, public art, and
priorities for the future include community gathering spaces.
beautification, redevelopment, Most meaningfully, respondents
additional restaurants and local expressed a clear desire for
businesses, improved walkability, revitalization that honors El Mirage’s
and stronger branding to create Hispanic heritage, working-class
a more vibrant and recognizable roots, and historic character,
destination. supporting existing residents and
businesses rather than displacing
them.
Survey Analysis:
The following summary outlines the most prominent themes and findings per question, identified
across 208 responses throughout the survey period.
2

1. When you talk about the “Downtown El
Mirage area”, what name do you usually use
to refer to it?
Responses to this question offer a glimpse into how residents relate to and understand the downtown
area. The most frequently used terms were “Old El Mirage,” and “Old Town El Mirage,” reflecting a
connection between the community and the area’s historic
roots. General references such as “Downtown El Mirage,”
and simply “Downtown” were also widely used, suggesting Key Themes Identified:
that while residents do recognize the area, there is not yet
• “Old El Mirage” and “Old Town
a universally shared name or identity for the district.
El Mirage” as the most common
identifiers
Another finding from this question was the number of
residents who expressed surprise at the existence of a • Widespread lack of awareness of a
defined downtown area. Several respondents noted they defined downtown district
had lived in El Mirage for many years without recognizing a
• Landmark and location-based
distinct downtown district, which speaks to an opportunity
orientation in lieu of a distinct
for greater awareness and visibility. In the absence of a
identity
strong district identity, many residents naturally gravitated
toward familiar landmarks and locations to describe the • A range of perceptions reflecting
area, including Gentry Park, the library, former city hall, the both frustrations and community
fire station, and Grand Avenue. pride
• Inconsistent terminology reflecting
Responses also captured a range of perceptions about
an opportunity to establish a clearer
the area’s current character. A notable portion of residents identity
shared candid and at times critical feedback reflecting
frustrations with its present conditions. At the same time,
several residents spoke warmly of the district, highlighting
the meaningful connection some community members
feel toward the area.
3

2. Please describe the boundaries of this
area in your own words. (You may also use
the following map to reference specific
street names as needed.)
While no single boundary definition emerged as universal, several consistent reference points
appeared across a meaningful share of responses.
The most commonly referenced boundaries centered
around El Mirage Road and Thunderbird Road as the Key Themes Identified:
core of the downtown area, with Grand Avenue (US 60)
• El Mirage Road and Thunderbird
frequently cited as the northern edge. Many respondents
Road as the most commonly
also referenced the Agua Fria River as an eastern boundary,
identified core
Cactus Road as a southern limit, and 127th Avenue as a
western edge. This general framework emerged as the • Grand Avenue, Cactus Road, the
most shared understanding of the district’s extents, though Agua Fria River, and 127th Avenue
definitions varied considerably across responses. As was as the most frequently referenced
the case with the previous question, civic landmarks and outer boundaries
community facilities, including Bill Gentry Park, the library,
• Civic landmarks and community
former city hall, the fire station, and El Mirage Elementary facilities as primary spatial anchors
School, played a significant role in how residents described
and oriented area. • Inconsistent boundary definitions
reflecting a lack of clearly defined
A number of responses reflected uncertainty or unfamiliarity district edges
with the area’s boundaries, with some residents describing
• Continued uncertainty and
the downtown area in broad or informal terms, referencing unfamiliarity with the downtown
nearby destinations such as Walmart, Food City, or the area among a portion of residents
post office rather than specific streets. Perceptions of the
area’s character were also woven into many descriptions, • A mix of community pride and
ranging from warm reflections on the district’s small-town candid concerns about current
feel and community facilities, to candid assessments conditions
noting concerns about infrastructure, upkeep, and safety.
4

3. If Downtown El Mirage was a person,
how would you describe their personality?
(For example: friendly, hardworking, evolving,
proud, quiet, energetic, etc…)
Responses to this question offer an insight into how residents perceive the character of Downtown
El Mirage. While a wide variety of descriptors were shared, several personality traits emerged with
notable frequency.
“Hardworking” and “evolving” were by far the most Key Themes Identified:
commonly used descriptors, appearing across a significant
• “Hardworking” and “evolving” as the
share of responses. Together, these traits suggest that
most frequently used descriptors
residents recognize both the working-class roots of the
community and a sense of forward momentum. “Friendly,” • “Friendly,” “quiet,” and “proud”
“quiet,” and “proud” were also frequently cited, reflecting reflecting a modest but community-
a district that feels modest and unassuming, but with a connected identity
genuine sense of community identity and belonging.
• A notable thread of critical
perceptions reflecting feelings of
A portion of responses leaned toward more critical
neglect and unrealized potential
characterizations. These descriptors reflect a candid
recognition that the area’s potential has not yet been fully • Optimism and hope for the area’s
realized. Balanced against this, however, were a number future
of more hopeful descriptors, suggesting an undercurrent
of optimism about the district’s future. Several responses • Strong cultural identity tied to
Hispanic heritage, working-class
also reflected the area’s strong cultural identity, with
roots, and close-knit community
references to its Hispanic heritage, immigrant roots, blue- character
collar character, and close-knit neighborhoods.
5

4. What do you think Downtown El Mirage
is “best at” or “does especially well” right
now?
Responses to this question revealed a mix of appreciation for certain aspects of the downtown area
alongside acknowledgement of its limitations. While a notable share of respondents indicated they
couldn’t identify a particular strength, several consistent
themes emerged among those who did.
Key Themes Identified:
Community events and gatherings stood out as the most
• Community events and seasonal
frequently cited strength, with many residents pointing to
festivals as the most widely
seasonal celebrations, holiday festivals, food trucks, and
recognized strength
park events, particularly at Bill Gentry Park, as meaningful
opportunities for the community to come together. The • Civic and community facilities as
concentration of civic and community facilities was also a valued and accessible resource
widely recognized, with the library, fire station, former cluster
city hall, the senior center, and nearby parks frequently
• Small-town character and Hispanic
noted as valuable assets that make the area a practical
cultural identity as appreciated
and accessible hub for everyday needs. For residents qualities
living nearby, the walkability of these resources was an
added benefit. • Local small businesses recognized
as emerging assets
The district’s small-town character and cultural identity,
• A significant portion of residents
particularly its Hispanic heritage, local small businesses,
unable to identify a current strength,
and close-knit neighborhood feel, were also cited as reflecting an opportunity for growth
qualities worth preserving.
At the same time, a meaningful portion of respondents
struggled to identify a specific strength, with some stating
outright that the area does nothing especially well at this time, reinforcing the broader opportunity
for the district to establish a clearer and more compelling identity.
6

5. If you had a magic wand and could
change one thing about Downtown El
Mirage, what would it be?
The most common desire expressed was for more local businesses, residents, and dining options.
Residents repeatedly cited the need for sit-down restaurants, coffee shops, boutiques, and locally-
owned establishments, with many referencing successful
examples in neighboring communities, such as downtown
Tolleson, old town Glendale, and downtown Peoria, as Key Themes Identified:
inspiration for the type of walkable environment they hope
• More local businesses, restaurants,
to see in El Mirage.
and dining options as the most
frequently expressed desire
Visual improvements and streetscape enhancements
were equally prominent, with residents calling for • Visual and streetscape
better landscaping, shade trees, public art, murals, improvements including
updated building facades, improved lighting, and cleaner landscaping, shade, lighting, murals,
storefronts. The condition of buildings along Thunderbird and updated facades
Road was specifically noted by multiple respondents
• A stronger and more defined sense
as an area needing attention. A stronger sense of place of place and district identity
and identity, including gateway signage, wayfinding, and
design consistency, was also a frequently expressed • Addressing homelessness and
desire. Addressing homelessness, improving safety, improving perceptions of safety
and enhancing cleanliness along both commercial and
• Improved cleanliness and property
residential corridors were additional recurring priorities,
upkeep along commercial and
with several residents identifying these as meaningful residential corridors
barriers to enjoying the downtown area.
• More community gathering spaces,
Several respondents also called for more community amenities, and family-friendly
gathering spaces, including shaded plazas, splash pads, destinations
expanded park facilities, and improved parking near event
venues, alongside a revival of larger community festivals
reminiscent of past celebrations.
7

6. When you think of Downtown El Mirage,
what places or areas come to mind?
Bill Gentry Park was by far the most frequently referenced location, reinforcing its role as the most
recognizable and meaningful public space in the downtown area. The library and fire station, El Mirage
Elementary School, the senior center, the post office, and
former city hall were also among the most commonly
cited landmarks, collectively forming the backbone of how Key Themes Identified:
residents mentally map the downtown area.
• Bill Gentry Park as the most widely
recognized landmark
On the commercial side, Walmart and Food City
were frequently mentioned alongside smaller local • Civic and community facilities as
establishments such as Pratt’s Pets, Family Dollar, Rally’s, the primary mental anchors for the
carnicerias, and food trucks. Small businesses were noted downtown area
as emerging spots, while several residents expressed
• A mix of local commercial
frustration with the concentration of liquor stores, smoke
references ranging from valued
shops, and cannabis dispensaries in the area. Vacant
small businesses to less-desired
lots, run-down storefronts, and aging buildings were also uses
prominently referenced, reflecting the area’s current
physical condition, through a number of respondents • Vacant lots and aging storefronts as
spoke warmly of the area’s cultural character, including notable physical characteristics
street vendors, local churches, and the community garden,
• Cultural assets including food
as meaningful elements of the downtown experience.
trucks, carnicerias, local vendors,
and churches
• Continued uncertainty among
some residents about what
constitutes the downtown area
8

7. Are there places in Downtown El Mirage
that are hard to find or confusing to navigate?
If so, what are they?
Responses to this question were notably mixed, with a significant portion of respondents indicating
that the downtown area is generally easy to navigate given its small size and straightforward layout.
However, a number of respondents did identify specific
challenges, and several consistent themes emerged
among those who did. Key Themes Identified:
• Lack of clear signage and
The most frequently cited challenge was the lack of clear
wayfinding as the most commonly
signage and wayfinding. Multiple respondents noted that
cited navigational challenge
public facilities such as the library, community center, City
Hall, and parking areas are not well-marked from main • Absence of gateway markers
roads, making them difficult to identify, particularly for defining the downtown district’s
first-time visitors or newer residents. The absence of clear entry points
gateway markers indicating where the downtown district
• Traffic and intersection concerns,
begins was also noted as a source of confusion. Parking
particularly at Grand Avenue and
access, particularly around former city hall and during Thunderbird Road
events at Bill Gentry Park, was similarly mentioned, with
entrances not always being obvious from the main road. • Parking access and visibility as
areas of confusion
Traffic and intersection issues were another recurring
• Individual businesses and facilities
concern, with several residents specifically highlighting the
difficult to identify from main roads
entry onto Grand Avenue and the left-turn configuration
at Grand Avenue and Thunderbird Road as a challenge • A notable share of respondents
during busy periods. A smaller number of respondents finding the area easy to navigate
noted that individual businesses along the main corridors due to its small scale
can be difficult to spot due to limited signage or placement
• Continued unfamiliarity with the
set back from the road.
downtown area among some
residents
Notably, several respondents used this question to reiterate
their unfamiliarity with the downtown area altogether,
reinforcing the broader finding that the district lacks a
clear and recognizable identity for a portion of the community.
9

8. How would you like to see Downtown El
Mirage evolve in the future?
The desire for more local businesses, restaurants, and dining options was the most common theme,
echoing sentiments expressed throughout the survey. Residents repeatedly called for sit-down
restaurants, coffee shops, boutiques, and locally-owned
establishments that would give people a reason to
spend time in the area. Many referenced neighboring Key Themes Identified:
communities as inspiration, with a strong undercurrent
• More local businesses, restaurants,
across responses being the desire for a downtown that
and dining options, as the most
feels like a true destination rather than a pass-through frequently expressed vision
corridor.
• Improved walkability, streetscaping,
Improved walkability, streetscaping, and visual appeal lighting, and visual appeal
were equally prominent, with residents calling for shaded
• Preservation of cultural identity
sidewalks, more trees, better lighting, murals, public art,
and historic character throughout
updated facades, and landscaping that reflects the city’s
revitalization
southwestern character. Several respondents emphasized
the importance of preserving the area’s cultural identity • More community events, gathering
and historic character through this process, expressing a spaces, and family-friendly
desire for revitalization that enhances rather than erases amenities
what makes El Mirage unique. More community events,
• Addressing homelessness, safety,
gathering spaces, and family-friendly amenities were also
and cleanliness as foundational
widely requested, alongside continued calls for addressing priorities
homelessness, improving safety, and cleaning up the area
as foundational priorities. • A desire for Downtown El Mirage
to become a true destination rather
A smaller group also emphasized the importance of than a pass-through corridor
supporting existing residents and small businesses
• Support for existing residents and
throughout the revitalization process, expressing concern small businesses throughout the
that growth and investment should benefit the community growth process
already there rather than displacing longtime residents.
10

9. Is there anything else you’d like the
project team to understand.
The most consistent message was a desire for the project team to honor the area’s history, heritage, and
existing community. Many residents expressed pride in El Mirage’s roots as a working-class, migrant,
and Hispanic community, emphasizing that revitalization
should reflect and celebrate that identity rather than
replace it. Several respondents expressed concern that Key Themes Identified:
improvements could be designed for newcomers or
• A strong desire to honor the area’s
outside interests rather than for the families that have
history, heritage, and existing
called El Mirage home for generations. community identity
A closely related theme was a sense that Downtown El • A longstanding sense that
Mirage has long been overlooked, with multiple residents Downtown El Mirage has been
noting that the area has been neglected while newer overlooked and underinvested
developments and neighboring communities received
• Cautious optimism that the planning
investment and attention. This sentiment was paired with
process represents a genuine
cautious optimism with many expressing hope that the commitment to change
planning process represents a commitment to change,
and that visible improvements would go a long way toward • Concern that revitalization
rebuilding community trust. Authenticity and affordability remain authentic, affordable, and
were also recurring concerns, with residents cautioning community-centered
against developments that could displace longtime
• Reiteration of practical priorities
residents or result in a downtown that feels disconnected including safety, lighting,
from El Mirage’s true character. homelessness, and more
businesses
Practical priorities, including better lighting, improved
safety, addressing homelessness, and attracting more • A call for continued and meaningful
businesses, were reiterated throughout, reinforcing community involvement throughout
themes that appeared consistently across the survey. the planning process
Many respondents also stressed the importance of • Expressions of gratitude,
ongoing and meaningful community involvement in the community pride, and hope for the
planning process. area’s future
11

10. How do you primarily interact with El
Mirage?
Responses to this question confirm that the survey reached a predominately resident audience, with
the vast majority of respondents identifying as people who live in El Mirage. Beyond residents, the
next most commonly represented groups were regular
visitors and business owners, followed by a smaller number
of respondents who identified working in El Mirage or Key Themes Identified:
representing a community organization or institution. A
small number selected “Other,” suggesting interactions
• Residents as the overwhelming
with the city that may not fit neatly into the provided
majority of survey respondents
categories.
• Regular visitors and business
The strong resident representation across the response
owners are the next most
set reinforces the relevance and authenticity of the
represented groups
community input gathered, and suggests that the findings
of this survey are based in the lived experiences of those
• Workers and community
who interact with Downtown El Mirage on a regular basis.
organization representatives
2.4% 1.9% contributing additional
perspectives
3.8/%
5.8%
7.2%
Live Visit regularly Own a business
Work Other Represent a
community
organization
78.8%
12

11. What neighborhood/subdivision do you
live in?
Responses to this question reflect a broad geographic distribution of survey participants across El
Mirage, with representation from a wide range of neighborhoods and subdivisions throughout the city.
Sundial, encompassing several units including Sundial 1, 2,
3, and 4, was the most frequently referenced neighborhood, Key Themes Identified:
appearing across a significant share of responses.
• Sundial as the most frequently
Rancho El Mirage was the second most commonly cited
represented neighborhood
subdivision, followed by Parque Verde, Arizona Brisas,
Buenavida, Cactus Park, and Thompson Ranch, each • Rancho El Mirage, Parque Verde,
appearing multiple times. A number of respondents Arizona Brisas, Buenavida, and
identified themselves as living in or near the historic core, Cactus Park as other commonly
referencing areas such as Old El Mirage, Primrose, Pueblo referenced subdivisions
El Mirage, and Dysart Ranchettes. Several respondents
• Representation from both historic
also provided street intersections or general location
core neighborhoods and newer
descriptions rather than subdivision names, suggesting outer subdivisions
either uncertainty about their subdivision’s official name
or a preference for orienting by familiar landmarks. • Some respondents identifying
by street location rather than
subdivision name
• Broad geographic distribution
suggesting community-wide
engagement with the survey
13

12. Please select your age.
The 25-64 age group represented the overwhelming majority of respondents, accounting for a
significant share of the total response set. This broad working-age bracket encompasses a wide
range of life stages and perspectives, suggesting that
the survey captured input from the core of El Mirage’s
resident population. Key Themes Identified:
• The 25-64 age group is the
The 65 and over age group represented the second most
dominant respondent demographic
common age group, appearing across a notable portion
of responses. This level of participation from younger • Meaningful participation from the
residents is an encouraging sign of engagement from 18-24 age group reflecting youth
a demographic that is sometimes underrepresented engagement
in community planning processes. Residents 65 and
• Representation from residents
over were also meaningfully represented, reflecting the
65 and over reflecting older adult
presence and engagement of El Mirage’s older population.
perspectives
A very small number of residents identified as under 18,
indicating some participation from younger community • A small but present voice from
members as well. respondents under 18
81.3%
• Broad age distribution supporting
the overall relevance of survey
findings
7.7% 10.1%
1.0%
Under 18 18-24 25-64 65 and over
14