Extracted text (via tesseract_tsv)
3245 characters
PO REQUEST INFO Date: TOTAL PO AMOUNT: 4st GL Account: Amount 1st GL: 10/12/26 $ 118,459.35 541-5-7585-656 Requested By: If extra funds needed,enter acct. # you will use below: ) Adam Ford i Vendor: Contract Entity: Good News Construction, LLC El] Mirage Activity or Special Project Number: Contract Number: Contract End Date CIP/Spcl Proj #62619 PW24-JOC01 Explanation of request: Request to use Good News Construction to restore and improve the WRF office building and bring applicable areas into compliance with the Americans with Disabilities Act. Per CIP #62619 and under terms and conditions of El Mirage contract PW24-JOC01. If Multiple accounts, list additional GLs and amounts: ADD'L GL Account: Amount 2nd GL: GL to use if shortage: ADD'L GL Account: Amount 3rd GL: GL to use if shortage: ADD'L GL Account: Amount 4th GL: GL to use if shortage: Check appropriate box and confirm required attachments are included/emailed: [| $5000.01-10,000. Attached: Three (3) informal quotes -OR- Contract and quote [| $10,000.01-30,0000. Attached: Contract & formal quote -OR- Three (3) formal quotes Over $30,000. Attached: Contract & formal quote or RFP if no contract; AND Council Approval, budget line from Budget Book [| Memo attached for Sole Source, Emergency Purchase, or other non-conforming request. [| New Vendor, new name, new ownership? W9 and Vendor Registration Form attached. Dept. Head Approval: April 2024 Good News Construction, LLC Residential & Commercial General Contractor AZ License # ROC 203755-KB-01 THIS UPDATED PROPOSAL, Prepared as of October 6th, In the Year of 2026, For: City of El Mirage Attn.: Mr. Marcus Johnson By: Good News Construction, LLC 782 N. 164th. Drive, Goodyear, AZ 85338 For the Project: WRF B2 Building Restoration & ADA Compliance Project Good News Construction, LLC proposes the following: Category Amount Supply labor, materials and necessary equipment to execute the following |$ 118,459.35 restoration and ADA compliance work in WRF building B2 Gut-out existing 2 bathrooms, and complete full finish replacement of Floor Tile, Wall Tile, Plumbing Fixtures, Accessories, Toilet, Partitions, etc. Construct 3 new walls with (2) new 3070 Hollow Metal Frames with wood doors and hardware, creating 2 new offices Per drawings. Construct 2 new walls totaling approximately 38’ L.F. By 9’ft tall in the break room area, with a 3070 Hollow Metal frame with wood door and hardware. Prep, patch and texture as needed all interior walls throughout the building (Except in the Electrical Room) and apply 2 coats of paint. Color TBD. Install new 4” in. Rubber base at new framed walls. Remove and replace the 2 countertops, 1 SS sink and faucet in the break room Polish existing flooring throughout the building. HVAC work in the 2 new office spaces, split existing supply to service the new offices. Provide 4 new 120V receptacles, 2 in each office space, and (2) 3/4” con- duit for Data drops by each electrical drop point. Provide (1) 240V- 30Amp power drop in the shop area. Subtotal $ 118,459.35 Grand Total'$ 118,459.35 Respectfully submitted by: Asbed Khosdeghian Good News Construction, LLC 782 N. 164th Drive, Goodyear, AZ 85338, T/F 623-882-3570, C 623-764-2288 goodnewsconstruction@cox.net lof 1